# I / o # Department of Toxic Substances Control Edwin F. Lowry, Director 1011 N. Grandview Avenue Glendale, California 91201 Winston H. Hickox Agency Secretary California Environmental Protection Agency Gray Davis Governor August 3, 2000 CERTIFIED MAIL: Mr. James Marzolino Environmental Manager GNB Technologies, Inc, 2700 South Indiana Avenue Vernon, California 90023 Mr. James Marzolino: On , May 23, 2000 and June 6, 8, 12, 19, 2000, the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), conducted an inspection of GNB Technologies, Inc. (GNB) located on 2700 S.outh Indiana Avenue, Vernon, California 90023. The enclosed report describes the findings of this inspection, including all violations and any actions that should be taken by the facility to correct the violations. You are required by section 25185(c)(3) of the Health and Safety Code to submit a written response to the Department within _30_ days describing the corrective actions that you have taken or propose to take to bring your facility into compliance. If you dispute any of the violations, you should explain your disagreement in this written -response. All pertinent information derived from the inspection, including documents, and photographs are included as attachments to the report. This report will become a public document; you may request that any trade secret or facility security information be withheld from public disclosure. (R) Printed on Recycled Paper # # Mr. James Marzolino August 3, 2000 Page 2 If you have any questions regarding this letter, or if you wish to meet with the Department to discuss any questions or concerns you have with the inspection, the report, the violations, or the proposed corrective action, please call Ruth Williams-Morehead at (818) 551-2916. Sincerely Mukul Agarwai Supervising Hazardous Substances Scientist I Statewide Compliance Division Southern California Branch Enclosures Certified Mail 7099 3220 0008 0830 1794 Return Receipt Requested # # State of California - California Environmental Protection Agency Department of Toxic Substances Control INSPECTION REPORT I. GENERAL INFORMATION: Company Name: GNB Technologies, Inc. Facility Address: 2700 South Indiana Avenue Vernon, Ca. 90023 Telephone Number: (323) 262-1101 ext. 259 EPA ID Number: CAD097854541 Registration Number: 2157 Facility Type: RCRA Hazardous Waste Treatment Facility Regulated Units: The facility is currently operating under an ISD for their wastewater retention pond, lead smelter, wastewater treatment unit and six spent lead-acid battery and lead waste storage areas. Waste Streams: Polypropylene waste, furnace slag, rubber and plastic casing material, wastewater, filter cake sludge, lead contaminated wipes and rags, etc. Inspected by: Ruth Williams-Morehead, HSS Date of Inspection: May 23, 2000 and June 6, 8 , 12, 19, 2000 Type of Inspection: CEI X CME o O&M o Focused Limited o Transporter Facility Rep.: James Marzolino, Environmental Manager Phil Milazzo, Plant Manager Type of Business: GNB is a secondary lead smelter which produces pure lead and lead alloy from mainly lead acid batteries and other lead bearing waste. The lead is subsequently sold as a product. l # # Inspection Report GNB Technologies, Inc Page 2 II. CONSENT: Consent to conduct inspection that involves: taking photographs, reviewing and copying records, questioning personnel and inspecting hazardous waste handling areas. Yes. Consent given by : James Marzolino, Environmental Manager III. DOCUMENTS REVIEWED: a. Manifests, Bills of Lading, LDR's, Exception Reports: All LDR notifications were attached to manifest used to transport LDR waste off-site for disposal. b. Contingency Plan: No violations found. c. Training Plan and Records : GNB could not provide personnel training records for those employees involved with the management of hazardous waste batteries. d. Incident Report: N/A e. Waste Analysis Plan and Records: No violations found. f. Operating Log: The operating log does not described the final disposition of the waste (attachment #1), after its removed from its storage location. Also the following waste scale ticket weigh numbers (attachment #2) were not entered into the operating log. The scale ticket weigh number is used to 2 # # Inspection Report GNB Technologies, Inc Page 3 record incoming batteries into the operating log. The scale ticket contains the weight of the batteries, and the name of the generator. g- Inspection Records: No violations found. (Attachment 3) h. Tiered Permitting Applications and Authorization Letters: N/A I. Annual/Biennial Reports: No violations noted. j SB 14 Plans: No violations noted. k. Closure Cost Estimates and Updates: No violations noted ( Attachment 4). I. Part A: An application was filed in 1981 by Gould , Inc. former owner of GNB. GNB revised the Part A, and is currently operating under interim status. m. Part B: Permit is pending issuance. n. POT. Compliance Data: The facility has a permit to discharge treated waste water into the Los Angeles County Sanitation District. o. Tank and/or Containment Certifications: The treatment and storage tanks used in waste water treatment do not have secondary containment. The last tank integrity test was performed in 1993. The facility was issued a Consent Agreement by DTSC ordering 3 0 0 Inspection Report GNB Technologies, Inc Page 4 that an integrity test be performed on each tank within one year of the effective date of the agreement. However, the facility was recently issued a second modification to their ISD to install secondary containment for the tanks. p. Air Board Permits: No violations found. q. Variances: Not currently operating under a variance. r. Recycling Records: N/A s. Other: N/A IV. NARRATIVE OF OBSERVATIONS/DISCUSSION WITH OPERATOR: On May 23, 2000, I began the Comprehensive Evaluation Inspection at GNB. I received permission from Jim Marzolino, Plant Manager gave permission allowing me to conduct the inspection, and began with a discussion of the facility operations. The management of the hazardous waste storage and treatment activities has not changed in the past 2 years according to Mr. Marzolino. A detailed description of the hazardous activities is described in the CEI report dated March 26, 1998. Mr. Marzolino informed that GNB was being audited by a potential customer. He asked me if we could end the inspection at this time, and continue the inspection at a later date. I told him yes, and that I would return on June 6, 2000 to reconvene the inspection. On June 6, 2000, I reconvened the CEI at GNB. Mr. Marzolino gave me permission to continue the inspection. I began the inspection by reviewing the operating record. The operating record was found inadequate because it does not track when Pb-Acid batteries are removed from storage and process in the battery smelter. I also noticed that many of the scale ticket numbers that 4 Inspection Report GNB Technologies, Inc Page 5 accompany Pb-acid batteries received from off-site for the month of February were not logged into the operating record. The scale ticket numbers are entered into the operating record in the reference column, on the date the Pb-acid batteries are received. The scale tickets provide the name of the customer sending the batteries and the weight of the batteries received. The following scale tickets were not entered into the operating log: 57949, 57986, 57989, 58006, 58030, 58033, 58034, 58035-58046, 58049, 58069, 58075-94, 5810058137, 58144-58157, 58161-58165, 58169-58197, 58203-58214, 59961-63, 59965. I asked Mr. Marzolino why the scale tickets had not been entered in the operating log. He stated that when the batteries are warehoused in another location prior to being brought to GNB, that sometimes scale tickets are not entered into the operating log. I asked what he meant by warehoused in another location. Mr. Marzolino stated that DTSC gave GNB permission to warehouse batteries in another location prior to bring them to the facility for recycling. Mr. Marzolino stated that California Code of Regulations, section 66266.81 (a)(6) allows them to store batteries off-site without a permit. I asked Mr. Marzolino if he had a letter from DTSC granting them permission for off-site battery storage, and he stated "Yes", he would probably be able to get a copy of the letter from his attorney. I asked Mr. Marzolino the locations of the warehouses that they use for off-site storage. He said that GNB's Battery Distribution Center in Industry accumulates and stores used Pb-Acid batteries in their warehouse for eventual shipment to GNB Vernon for recycling . He stated that he knows that GNB stores used PbAcid batteries in other warehouses, but that Tony Saldana in GNB's business office is responsible for making the warehousing arrangements. I ask Mr. Marzolino if I could visit the GNB battery distribution center in Industry . He gave permission for the visit, but due to the lateness of the day we delayed until June 8, 2000, when I returned to continue my inspection. On June 8, 2000, I received permission from Jim Marzolino to continue my inspection. I asked Mr. Marzolino if we could go to GNB's Battery Distribution Center to observe how used Pb-Acid batteries are managed. Phil Milazzo, the Plant Manager for GNB Vernon , accompanied us on the site visit. We met with Mr. Peter Garcia, Acting Distribution Center Manager and Mr. Dave Erickson, Special Project Manager of the Battery Distribution center. I explained # # Inspection Report GNB Technologies, Inc Page 6 to them the purpose of my visit was to obtain information on how used batteries stored at Industry are managed , prior to being shipped to the Vernon facility for recycling. Mr. Erickson told me that new batteries are distributed to various customers . The customers consist of Wal-mart, Sams club, Advance Auto,etc. At the distribution center, the customers decals are placed on the batteries and delivered. During delivery GNB will collect the customer's junk batteries. Junk batteries consist of used batteries Gunks), warranty returns, and stock lifts (over stocked products.). The junk batteries are separated. Used batteries are consolidated, and eventually sent to the Vernon facility for recycling. Warranty return batteries are checked, and resold as a secondary battery. Warranty return batteries that do not past inspection are sent to the Vernon facility for recycling. Stock lifts are restored at the distribution center. The distribution center keeps a operating log for receivables and shipment of used batteries to the Vernon recycling center. I conducted a walk-through of the warehouse (photos taken, attachment #5), and each pallet of used batteries were marked with the date they were received. No leaks or spill were noted. After the walk-through of the warehouse we concluded the inspection at the distribution center and return to the Vernon facility. Upon arrival to the Vernon facility I continued the record review. I met with Craig Bless, Environmental Coordinator who is responsible for the inspections of the hazardous waste management units, the inspection schedule and logs. The manifests, contingency plan, waste analysis plan, inspection records, inspection schedule, closure plan and closure cost estimates were found in order. After the record review, I concluded the inspection , and reconvened on June 12, 2000. On June 12, I met with Mr. Bless. Mr. Marzolino was not available to participate on the inspection. Mr. granted permission allowing me to continue the inspection. We conducted a walk-though of the Pb-acid storage areas (103108), the surface impoundments, and the RMPS building. In Pb-acid battery storage area 106, several number containing lead waste were stored open and one drum was lying on its sides, with its contents exposed. No leaks are spill were noted. I notified Mr. Bless of the drums, and he had Mr. Rafael Perez removed the 0 0 Inspection Report GNB Technologies, Inc Page 7 drums from storage 106 to the RMPS building for processing. No other violations were noted during the walk-through. We return to the office, at the conclusion of the walk-through I asked Mr. Bless for the employee training records. He stated that Ty Avedano from the Health and Safety Department managed the employee training records. I met with Mr. Avedano and he said that the personnel office was handling employee training. He was unable to find the training records for those employees managing hazardous waste. I concluded the inspection at this time. Mr. Bless asked if I could return to have the exit interview with Mr. Marzolino. He said that Mr. Marzolino would not be in the office until the following week. I told Mr. Bless that I would call Mr. Marzolino and schedule visit with him for the exit interview. V. EXIT INTERVIEW: On June 19, 2000, I met with Jim Marzolino and conducted the exit interview. We discussed my findings and I issued him a Summary of Violations (Attachment 6). Mr. Marzolino stated that he would respond to each violation, and send verification, via mail, that each violation had been corrected. I ended my inspection at this time. VI. ATTACHMENTS: 1. 2. 3. 4. 5. 6. Operating Record Scale Weigh Ticket Inspection Records Closure Cost Documents Photo Log Summary of Violations Hazardous Substances Scientist SUMMARY OF VIOLATIONS ^ ~L4~T>0 % ... ! < As &result o f that inspection, the violations o f hazardous waste laws, regulations, and requirements listed on the attached pages were discovered. .-All violations must be conected; the actions you must take to correct the violations are listed with each violation. I f you disagree with any o f the violations or proposed corrective actions listed in this Summary of Violations, you should inform DTSC. I f you disagree with any o f the violations listed in Section I, you must give the inspector who issued the Notice to Comply a written notice of disagreement. You must correct the violations listed in Section 1: Minor Violations, Within I 'y days. Within five working days o f achieving compliance, you must sign the statement certifying compliance at the bottom o f Section I and return it to DTSC at the address provided. A false statement that compliance has been achieved is a violation o f the law and punishable by a fine of not less Than $2,000 or more than $25,000 for each violation. DTSC may rtinspect this facility at any time. DTSC will provide you a complete inspection report within 65 days o f the date o f this inspection. You may request a meeting with DTSC to discuss the inspection or the findings o f the report. The issuance o f this summary o f Violations does not preclude DTSC from taking administrative, civil, or criminal action as a result o f the violations noted in the Summary o f Violations or that have not been corrected within the time provided in the Notice to comply. Company Representative Accepting Summary 5 ? i g n a m r e - - j & k 4 - X - Department Representative o Signature Tide Date Title Date Q*5) ftSS / Chilli(?' . F-6 ' Page SUMMARY OF VIOLATIONS Facility Name: 6 / ^ J i { c l o Data:'CC-//'//tX ' S E C T I O N I: M I N O R VIOLATIONS/NOTICE TO C O M P L Y Within five working days o f achieving compliance, you are required to sign the certification below, and return it to DTSC at the above address. # Failure to correct the violations and certify compliance within the time provided may result in the department taking additional enforcement action for these violations. C*rv- d o o t ? cfr 7 3 (bl().. ijut>&.Jr a,,i - 6<- I certify under penalty o f law that the above corrective actions have been taken and the violations have been corrected. I am aware that these are significant penalties for submitting false information. Signature Title 0/95) Date o : p_7 o Page of m Facility N a m e : Date: ? ; SECTION II: OTHER VIOLATIONS (SJ OR M I N O R VIOLA T/ONS CORRECTED DURING INSPECTION o (CHECK APPROPRIATE BOX) List o f violations and compliance actions not included in Section I: Minor Violations/Notice to Comply 0 ( l i Q U t f M W - t k i t 4 - ^^ 1 lie LfioJfl 0 S W - [<; C ur. ^ ^ ^/"7^ ^ | DTSC (3/95) J h " ^ U t J^. iy ^ VON LOG . . - . . . 1'-:- , : ~ . . I - sum~ rTP Area Pit IVVVV 1 r' Filter Press Sump . , f,. - o Look I of prior . . , DAILY. INSPEC. ",::~,;;ON LOG ,::,.' . TANKS AND SUMPS .... ,..., , . ~ o I DEPT. Tank No. WWT WWT WWT WWT WWT WWT WW1 WWT WWT \I\MIT WWT WWT WWT WWT WWT \1\/\1\/1' i3.H. I[;UI. 6 7 II 9 ill 11 12 13 14 I) z j " ~ , , DumpTn Sump IRMPS rouur ;Sump I North Mud Tank rMud Tank ISouth Mud Tank ,Tank IAcid ' Tank I"" II."...... !Unit 5 ' RMPS RMi'S RMPS _Ri\JIPS ,RMPS RMPS RMPS RMPS RMPS DATE: TIME: INSPECTOR: SIGNATURE: . , tr;!lft)'< , //).?L1& -, :r CAG&9S>..J 0&.0-_ Ii. 'S ,[ 2- ... , I~ :1 :i Work Order # & Person Notified J 'cu." ~i~"., _ s.-- "I.. , I I I , , ! ! : , Tank 15 1511KTank, 16 '. IWest I,Tank . 11 lEast I Tank 18 ,Tank 19 ,Tank 20 IDelta Stack r:ln,.,.. 21 Delta Stack 22 lEast r:n. Tank 23 IWest Tank 24 Tan 25 Tank ' 26 IPh Tank # 1 27 Iph tTank#2 t Tank # 3 . 211 IPh 29 Tank 30 ! Tank , 31 IN. Flue Dust 32 IS. Flue Dust I "'1' Area sum~ Pit ,"iA''" I. 35 \I\/WT 38 1I\I\I\/T 39 ' IVV.' I r' Filter Press Sump , " ' . . . I? '-:' -'c , ; , , .' , "Ir- ~ i ! , . t !,, I o Look for ,of Drior , c:C--: r ,':':\ , o , o DEPT. Tank No. RMPS RMPS Ii 6 7 8 iRMPS RMPS RMPS 9 , RMPS RMPS ,RMPS 10 11 12 ! ~ ~UII 'Dump 1 sump IRMPS rluurSump INorth Mild Tank rMud Tank ISouth Mud Tank IAcid Tank 'Tank I" 11>.. " ... I I Unit o ... .J DATE:. TIME: INSPECTOR: SIGNATURE: DAIL. Y INSPEC ,;:;~ON LOG .,., ... TANKS AND SUMPS (t~--! 7'~ fr. ~ 9~ '~ ' _\, ._'- 12--eL.CUY' e.&?o-- Ii. ~ N 0 z :; 1 I~ ~ i ~ Work Order # & Person Notified 0 t>~ , , , , ' , , I I, , RMPS WWT WWT WWT WWT WWT WW1 WWT W\I\IT WWT WWT WWT WWT WWT WWT WWT V\IWT S.H. S.H. , 'v,,,, .. 16 ' 17 18 19 20 21 22 23 24 25 26 21 26 29 30 31 32 WWT 35 38 WWT 39 I. Tank Ili0K 'ank I Tank IWes1 Tank ' lEast I Tank Tank IDelta Stack IDelta Stack Tank lEast IWest Tank Tank 1 Tank Tank #1 I IPh ITank#2 IPh Tank#3 IPh Tank I Tank ,N. Flue Dust IS. Flue Dust I Pit o oo 1 , .. Area Sump 0.0. ," Filter Press Sump I i ,. : ' - , , .' , ~ , I - I, I' I' I: I' , ~ , ~"- o _ookfor , of prior I ~ , ,,'. ( ;'" ;;'." "I ~ " o DATE: TIME: INSPECTOR: SIGNATURE: DAILY INSPEC,)ON LOG TANKS AND SUMPS ,I ;.'~,i.i" . ' :.'.;\,-. , DEPT. ItMPS ItMPS ftMPS Tank No. Ii 6 7 RMPS RMPS 8 9 .ItMPS RMPS RMPS RMPS RMPS 10 11 12 WWT WWT 15 WWT WWT WWT WWT WWT WWT WWT 17 18 19 20 21 22 23 WWT 24 WIIIIT WWT 25 26 WWT WWT I/IIWT 27 20 13 14 16 B.H. S.H. 29 30 31 32 MAINT. 35 WWT 38 39 WWT WWT o. . ..... '"~ ...'" 101 .5 Description Battery Dump Bin Sump RMPS Floor Sump North Mud Tank Center Mud Tank South Mud Tank Acid Storage Tank Overeflow Tank Paste Thickening Unit Sil)klFloat Separator Recycle Tank SOKTank West Reaction Tank East Recation Tank ' Pump Tank Sludge Tank Delta Stack Flocculation Delta Stack Clarifier . East Equalization Tank West Equalization Tank North Oxidation Tank South Oxidation Tank Ph Adjustment Tank # 1 Ph Adjustment Tank # 2 Ph Adjustment Tank # 3 Process Tank Filtrate Tank N. Flue Dust Slurry S. Flue Dust Slurry Mobile Equipment Pit WWTP Area Sump WWTP Filter Press Sump OJ 'iii .. c ~ ." 0 d! . fA N zII . it.!! ~~)6 r"M ,::l~"" ....... .~ t}A <-t~J' - Ii. ;; ..- CT W ,101 .. c c 0 il ,.; .!: C ::J -CT o~ .. 'E E . 'U ., ::I E ::Jo .."- ..CI~ ::J 0 >.l! Comments, Work Order # & Person Notified ::J :5 oz "- :J:j ~c ~d! 0<< 1; "- ~ aiL I , I I I I - I. I I I ..--- f1(~ "'~k o (r?, ,~,fI',J 1it~4_ I I 0'I I I I o Look for evidence of prior releases , , , .DAILY INSPEC;;.;:~ON LOG , DATE: TIME: INSPECTOR: SIGNATURE: TANKS AND SUMPS , In I DEPT. RMPS RMPS I'IMPS ~MPS Il.I\IiPS RMPS RMPS RMPS RMPS RMPS Ift!1l\lT WWT WWT WWT WWT Tank No. Ii 6 '1 II 9 10 11 12 13 14 15 16 " 1'1 111 WWT 19 20 WWT 21 WWT WWT 22 WWT WWT 23 24 25 WWT 26 WWT WWT \I\IWT WWT 21 28 29 30 B.H. 31 I!U!. 32 MAINT. 35 WWT WWT 39 38 '" ~? Description Battery Dump Bin Sump RMPS Floor Sump North Mud Tank Center Mud Tank South Mud Tank Acid Storage Tank Overeflow Tank Paste Thickening"Unit Sink/Float separator Recycle Tank IiOK Tank West Reaction Tank East Recation Tank Pump Tank Sludge Tank Delta Stack Flocculation Delta Stack Clarifier East Equalization Tank West Equalization Tank North Oxidation Tank South Oxidation Tank Ph Adjustment Tank # 1 Ph Adjustment Tank # 2 Ph Adjustment Tank # 3 Process Tank Filtrate Tank N. Flue Dust Slurry S. Flue Dust Slurry Mobile Equipment Pit WWTP Area sump WWTP Filter Press Sump m c S~ o .fA u l! 1'1 "" :2 2 d1 :s III 0 .!!! N I I I 1(--r1 <.'0 /~~I?.~ ltC, ,- ..~: .: ' &1S,,-;' ~ Comments, Work Order # & Person Notified J',-v~,,:; . .~ "I . , L . .. I ~ i!: ""; ... ... .. In << i.(-( o-fl' .,.. . ~) f/I-i' ,; : ~. ,-' DATE: TIME: INSPECTOR: SIGNATURE: . " ;', . I I .1 ! I I . - . .. . . rl o Look for , , of prior --c o I , t I "" o ' TANKS ANDSUMPS , 1 RMPS RMPS RMPS RMPS RMPS RMPS RMPS wwr WWT WWT WWT WWT W\/VT WWT 1MI\IT WWT WWT WWT WWT WWT WWT WWT WlfIlT B.H. B.H. MAINT. WWT WWT No. ., .5 .. ""u """" ~! 0I! Description Battery Dump Bin Sump RMPS Floor Sump 7 North Mud Tank a Center Mud Tank 9 South Mud Tank 10 Acid Storage Tank 11 Overeflow Tank 12 Paste Thickening Unit 13 Sink/Float Separator 14 Recycle Tank 60KTank, 16 16 ' West Reaction Tank 17 East Recation Tank 18 Pump Tank 19 Sludge Tank 20 Delta Stack Flocculation 21 Delta Stack Clarifier 22 East Equalization Tank 23 West Equalization Tank 24 North Oxidation Tank 25 South Oxidation Tank ' 26 Ph Adjustment Tank # 1 27 Ph Adjustment Tank # 2 28 Ph Adjustment Tank # 3 29 Process Tank Filtrate Tank , 30 N. Flue Dust Slurry 31 32 S. Flue Dust Slurry .. 35 Mobile Equipment Pit 38 WWTP Area Sump 39 WWTP Filter Press Sump .. . I :;::;:::J ::I0 :5 o z :::J Ii , .!! << III Tank DEPT. RMPS RMPS RMPS DATE: , TIME: INSPECTOR: SIGNATURE: DAILY INSPEC.',:,';ON LOG \t_. " . N N 0 z lj.!! lj ~. - C~- C al 0 ;= .2 E . . . ., :l!J 11 ..Ie 6 0i dol!' Ol- :::J Q, " 11. ...:~ e :::J ... ::;; a: 't: ~ Comments, Work Order # & Person Notified ;..f.[)e {, e (. v' I I I I , I , , I , , I I I 'I ' - ," I " I ' , I I I - 1 I I '/ ~b o Look for evidence of prior releases : .." CJ..t~J . ~ It !! o In - E "g-a c ... 'fl ":"5 't: ~ .5.,. ..J! GJ .. 0" xli GJ " -'0 :a 64 Comments, Work Order # & Person Notified r'- - I I I I /.04. ., ../AA" i' / 4'o.... . I I I . . o I. . ? ? . . ? ? o _ookfor ,of prior . C', o o DEPT. IRM' PS RMPS , RMPS RMPS RMPS . RMPS RMPS I Ii ' 6 7 8 9 10 11 12 16 . 17 WWT 18 WW WW WWT 19 20 21 22 WWT 23 WWT VVWT WWT 24 25 . 26 WWT 27 WWT WWT WVIIT . 28 _i3.H. B.H. :2 ~ IBa'tterY DumpB'lii Sump I Floor Sump I Mud Tank , 'Mud Tank I Mud Tank Tank IAcid Tank . I I Unit .,. t! j 29 30 31 32 IVI ""~ I o 35 WWT WWT 33 39 '.' N W It-., '- ~(;{;r/ C;~ Ii. :; w !!- N '~" I! ~ Work Order # & Person Notified ';'1 I , . I r' i , I I I i i . . 1~ WII\f WWT JI1MI I Tank No. , ... , t ( ._( 2? r DATE: ? TIME: INSPECTOR: SIGNATURE: .CAILY INSPECC:.jON LOG TANKS AND SUMPS I Tank ISOK Tank. IWest Tank . Tank lEast IPumpTank I Tank I Delta Stack IDelta Stack . lEast Tank West Tank Tank I Tank : Tank # 1 IPh :Tank#2 IPh :Tank#3 IPh Tank I Tank IN. Flue Dust "'.. ~. S. Flue Dust : Pit .v.w I r' Area Sump In.o I r' Filter Press Sump I I i , '. , I . . , - . I' o Look ror' I of prior , o : 1"*'-" \~J;i;-:: o : , ,i I i I DEPT. Tank No. 5 6 7 8 9 RMPS .RMPS RMPS RMPS . RMPS 10 11 12 13 14 I RMPS RMPS WWT WWT WWT WWT WWT WWT WWT WWT WWT . 18 19 20 21 22 23 WWT 24 25 WWT 26 WWT 27 20 WWT wwr (R)IT JWT I.H. S.H. .MAINT. .JIIIWT WWT 29 30 31 32 35 38 39 J ........... . , Dump Bin Sump IItMt'l:O Floor Sump I North Mud Tank . 'MudTank I Mud Tank Tank IAcid Tank I" ,Unit IPaste o Tank 150KTank . IWest Tank ,Tank lEast IPumpTank IliIh ..t, Tank IDelta Stack I Delta Stack I Tank lEast West Tank Tank Tank IPh Arih t Tank # 1 t Tank#2 IPh : Tank#3 IPh Tank Tank IN. Flue Dust IS. Flue Dust tPit I ........ Area Sump Ivvvv I t' Filter Press Sump o ?s i I 8 ~ , I .~ <-/._((;" c>-V '. DATE: TIME: INSPECTOR: SIGNATURE: CAlLY INSPEO;":::ON LOG . TANKS ANO "S'UMPS ~_ ,~ If--' .... , ;- c!3l/xY r;~ ti. 0- I] ~ ~ Work Order # & Person Notified :) oV . , . I ! . I I I i I I . I i . . ~ ! ,i i . ~ ' , ' ; , ' . I' II i I l I, o Look 'or' , of prior , ,~- .. "").. DATE: TIME.:__ INSPECTOR.:__ SIGNATURE.:__ DAILY INSPEC :/::DN LOG . TANKS AND "slJMPS i tt'- (CI" ,I-' . ---Z-P:,.. .!c;;.. ......:..:-P ,,;...""' .. :.c:. ,.'_' ----!.. C,;.!; ' {3:;,:"' :.;.: ?i?~ :SY __ = __ ----== Q..,6 ~ .f.v..-~4 i I o DEPT. RMPS RMPS RMi"S RMPS RMF'S .RMPS RMPS 5? 6 1 8 9 10 11 I RM: 12 13 14 WWT 15 16 RMPS ww _VVW ww wwr WWT WWT WWT WWT . WWT WWT WWT WW1 wm wwr I I~ Mud Tank rMud Tank I Mud Tank IAcid Tank Tank . I [Unit 31 32 IVI""" . 35 311 39 Work Order # & Person Notified oi . . . . 29 30 IB.H. oo , Dump I Sump {! ~ Floorsum~~p~~-+. +-~~'-4--+-~~-4--+ . -~-~~---~~----~ Tank 150KTank Tank IWest Tank lEast IPumpTank 1l'llllrin.. Tank I Delta Stack IDelta Stack Tank lEast West Tank Tank I Tank 26 . IPh 41i 27 IPh 23 IPh B.H. WWT o Tank 1\10. . '. . . . . . . ..... , . : Pit I V\lVlf I " Area Sump Filter Press Sump IV"". I" . Io .' o Look for I of prior . DATE: , TIME: CAlLY INSPEC:'Y:'ON LOG , TANKS AND 'SUMPS , ~ Tank _~T,+","",N::-'-"BiitlerYDump Bin Sump ftMPs 6 ~_ 7 !'IMPS 8 RIIIlPS 9 ftMPs RMPS RfilPS 10 ~~ 1~ ViiW 11 12 15 I Floor sump I Mud Tank . ' Mud Tank Mud Tank IAcid Tank IU Tank, IPaste " U n i t SIGNATURE:_----"Cd3.:::.o..;,:~~=___ IWest lEast Tank Tank WWT III/WT 24 25 26 WWT WWT WWT WWT 27 28 29 30 , 9.H. 31 IN. Flue Dust .,.uny IB.H. 32 35 38 39 IS. Flue Dust WWT WWT l~ I ~ ; l-w......~..~, Work Order # & Person Notified . . , , I ; I , ,6 , 17 18 , 19 20 21 22 23 'V,"". ,. , ~ Tank ISOK Tank, ' WW WWT WWT WWT WWT WWT WWT WWT wwr o /:;.~- C'1l p o .,..o,r- INSPECTOR:----L;C'?8~c..-::=:J.:-J:--'-- I ~ t- 7- ,,"- IP"m" Tank Tanl IDelta Stacl IDelta Stacl ' lEast IWest ~n"th Ph Ph . - ! - I I I j. , Tank Tank Tank Tank Tank # 1 Tank # 2 I , , Ph~Tank#3 Tank ' Pit I.... 'r ' Area Sump IvvVV I t' Filter Press Sump , , . I ! . o Look 'or' , of prior I , (' " ( .:. ~,~ ''''~rj 'r.., . ~ DAILY INSPEC "-"'~' HON LOG . . TANKS AND SUMPS ,,j I . o .: .. I I DEPT. RMPS RMPS RMPS RMPS ilMPS . RMPS RMPS RMPS RMPS RMPS WWT WII\/T WWT WWT WII\IT WWT WWT WWT WWT WWT WWT WWT WWT WWT WWT WWT B.H. S.H. MAINT. WII\IT WWT Tank No. Ii 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 35 38 39 , m c: .. Description Battery Dump Bin Sump RMPS Floor Sump North Mud Tank Center Mud Tank South Mud Tank Acid Storage Tank Overeflow Tank Paste Thickening Unit Sil)klFloat Separator Recycle Tank GOKTank West Reaction Tank East Recation Tank Pump Tank Sludge Tank Delta Stack Flocculation Delta Stack Clarifier . East Equalization Tank West Equalization Tank North Oxidation Tank South Oxidation Tank Ph Adjustment Tank # 1 Ph Adjustment Tank # 2 Ph Adjustment Tank # 3 Process Tank Filtrate Tank . N. Flue Dust Slurry S. Flue Dust Slurry Mobile Equipment Pit WWTP Area Sump WWTP Filter Press Sump ..... ....~ .. c ~~ I 0 , . << 8 :2 VI &! Ii. :; ~N 0 2 0" 1;11 _ N 1 :; S .5 02 .m .. c: ...! VI -0" ~ II c: .2 ...E .. - ... '2 o .. '"1; w ::I ... ..: c: ~ .-::I 't: - -1-6 00' ,) :$U {' B , .. .. f1-o . ,. -.- r ",,:CS'f U~"..-.--- E ~ :z:j j e ~&! 0< Comments, Work Order # & Person Notified ::I !1. 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 ~ 90 X~k ' O=fault Sealed CommentS '/- " (- y; v.. . ,~ 'I Y. Y- , 10#/ ABC 23 23 22 ' 22 * SizeJType o o o o 26 26 26 26 26 27 26 ~ 26 , o 26 26 26 26 26 26 26 26 26 ' 26 26 26 26 26 26 26 26 ~ IO#1ABC 10#lABC lO#/ABC 10#/ABC 20#/ABC 13#lHalon 13#lHalon J3#lHaIon 20#/ABC 2M/ABC lOfl/ABC 1M/ABC lO#/ABC 20fl/ABC , 10fl/ABC Water Water 3O#D 10#/ABC 20#/ABC 20#/ABC , " "\l ~' I/.. , f If. j( '/. .~ v: y::. )L y:. I: -i i1')!. . Y K V- <<. Ie ')( X y: f 20fl/ABC 'f. IO#/ABC B#lHalon 13#lHalon )( y:. )C 201j/ABC )( 20#/ABC ,1M/ABC 'f 10fl/ABC 20#/ABC ~ Y. ~ ~ , .. . ,. , -J' .- .\ ,} Page 3 91 92 93 94 . 95 96 Location . Description MCC ~ Platform MCC~ .Rtfmerv-CP4 ? Refmery-CP4 Refinery-Southend . Blast Fee.d Room South RR Bldg. # 26 26 26 . 26 26 27 SizeJType 2 2 2 2 2 2 10#/ABC 10#/ABC 10#/ABC lO#/ABC 10#/ABC 13#lHaJon I 10#/ABC I I I 10#/ABC 5# Haloo ? 1O#/ABC lO#/ABC 10#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC " 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC. 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC 20#/ABC Full lO#/ABC 13#lHalon 30#0 10#/ABC 20#/ABC 20#/ABC Dock 97 98 99 100 101 102 103 ,.---, 1-.-':;,0'1 104 lOS 106 107 108 ; -. En!!. Bldg. Guard Office Eog. Bldg. Guard Office En!!. Bid!!. HaDwav Eng. Bldg. HaUway . Eo!!. Bid!!. HaDwaV41Dstairs Eng. Bldg. Waster Water Lab Administration-North West HaD Administration-South Hall Administration-Phone room Administration-East HaD Administration-Basement Administration-Basement I spare 2 . spare 3 . spare 4 spare 5 .spare 6 spare 7 spare 8 spare ' 9 spare 10 spare II spare . 12 spare 13 . spare 14 spare 15 spare 16 spare 17 spare 18 spare 19 spare 20 spare . I 1 * * o o * * * * o o o o * o * o * * * o X=ok .. O=fault Comments Sealed .. Y , Y . Y . 'y 'I . Y Y V ~( r Y )( '/ 'f Y . Y 'I Y Y X )( y: Y V. Y )(: 'I , , ~; " Attachment 4 Closure Activities Contamer Storage Area Start-up of wastewater and desulfurization systems Container storage area inventory management Container storage area soil contamination testing Container storage area decontamination Container storage area certification of final closure Treatment and Storage Tank Tank/sump system inventory removal Tank/sump system soil contamination testing Tank/sump system decontamination Tank/sump system certification of closure Tank/sump survey plat - fmal closure Containment Building Containment building Containment- building Containment building Containment building Containment building inventory removal soil contamination testing decontamination certification of fmal closure survey plat - final closure Miscellaneous Units (FurDaces) Miscellaneous unit inventory removal Miscellaneous unit soil contamination testing Miscellaneous unit decontamination Miscellaneous unit certification of fmal closure $ 30,000 $ 182,949 $ 16,280 $ 30,540 $ 5,520 $ 265,289 $ 374,642 $ 810,961 $ 627,727 $ 26,583 $ 50,504 $ 288,399 $ 5,520 $ 3,638 $ 604,218 $ 29,000 $ 170,297 $ 5,520 1,926 $ $ 584,146 $ 18,153 $ 19,908 5,520 $ Miscellaneous Units (Hammer Mill, Elutriation Columns, and Filter Presses) Inventory Management $ 172,600 Decontamination $ 6,179 5,520 $ Certification of Final Closure $ 12,020 Testing for Soil Contamination -$ Storm Water Retention Pond Storm Water Retention Pond Inventory Management $ 98,445 Storm Water Retention Pond -Leachate and/or Run-off $ 13,952 Management Storm Water Retention _Pond Inspection & Repairs ? $ 67,275 Storin Water Retention Pond Testing for Soil Contamination- $ 23,960 Storm Water Retention Pond Decontamination $ 49,i54 - Storm Water Retention Pond Certification of Final Closure $ 5,520 _ Storm Water Retention Pond Survey Plat - Final Closure $ 1,698 $ 196,319 260,004 Storm Water Discharge Pipe Construction of storm water discharge pipe . Subtotal Closure Engineering Fees (15 of subtotal) Contractor?s (15% of subtotal) Contingency Factor (0.1 of subtotal) Total Closure Contingent Closure Activities Container Storage Area Container storage area foundation/pad removal Container storage area contaminated soil removal Container storage area ?nal cover Treatment and Storage Tank Tank/sump system foundation/pad removal Tank/sump tank removal Tank/sump system contaminated soil removal Tank/sump system ?nal cover Containment Buildings Containment Buildings foundation/pad removal Containment Buildings contaminated soil removal Containment Buildings certi?cation of partial closure Containment Buildings ?nal cover - Containment Buildings survey plat - partial closure Miscellaneous Units (furnaces) Miscellaneous units foundation/pad. removal Miscellaneous units contaminated soil removal Miscellaneous units unit ?nal cover Miscellaneous Units (Hammer Mill, Elutriation Columns, and Filter Presses) Foundation/Pad Removal Removal of Contaminated Soil - Final Cover 666999 9999996999 99696699 996999 GIG-E699 686999 2,600 2,600 - 2,537,542 380,631 380,631 253,754 3,552,558 15,464 178,100 22,317 8,560 86,467 85,654 11,645 28,176 348,213 1,500 44,603 1,926 8,350 140,061 13,975 2,037 3,339 1,330 . 215,881 192,326 424,418 162,386 12,256 Non-regulated Units Decontamination of non-regulated units Storm Water Retention Pond . . Storm Water Retention Pond Removal of Contaminated Soil Storm Water Retention Pond Certi?cation of Partial Closure Storm Water Retention Pond Survey Plat-Partial Closures Subtotal Contingent Closure Engineering Fees (15 of subtotal) Contractor?s (15 of subtotal) Contingency Factor (0.1 of subtotal) Total Contingent Closure Post?Closure Activities (30 year care period) Noti?cation of pr0perty deed - ?nal Maintenance of waste management area boundaries Routine maintenance and repair Facility inspection Collected storm water discharge and maintenance Roofed area inspection Certi?cation of post-closure Subtotal Post?Closure Engineering Fees (15% of subtotal) Contractor?s (15% of subtotal) Contingency Factor (0.1 of subtotal) Total Post?Closure Contingent Post-Closure Activities (30 year care period) Groundwater monitoring (lst 5 years) Groundwater monitoring (2nd 25 years) Roofed area maintenance and repairs Noti?cation on pr0perty deed - partial closure Subtotal Contingent Post-Closure Engineering Fees (15 of subtotal) Contractor?s (15% of subtotal) Contingency Factor (0.1 of subtotal) Total Contingent Post?Closure 699999 99-6669 {16996669699999 69669999 .9399? 562,829 A 562,829 257,079 1,500 1,698 260,277 8 1,830,373 274,556 274,556 - 183,037 2,562,522 11,300 760 13,110 138,600 690,000 9,150 29,820 8' 892,740. 133,911 133,911 89,274 1,249,836 283,050 453,063 29,464 69,500 - 835,077 125,262 125,262 83,508 1,169,109 Total Closure and Contingent Closure Total Post-Closure and Contingent Post-Closure $ 6,115,080 $ 2,418,945 1999 GRAND TOTAL:? $ 8,534,025 .sm. 0/ California California ?nvirofllMnJt11 Pro{~c/iOl rcy [MpartmenJ o/Toiic Subs(anca C. FINANCIAL RESPONSIBILITY REVIEW FINDINGS 1-.iJ'/~~. J1'1S- Ho.... Rut-j~ TO: FROM: .<) ai-:fs-i.. ~p,., j .f".Jz r:;" 3 REGION: (& 1& ) SSI - 2g 118 . PHONE NO.: For the purpose of the financial responsibility review. the results of the evaluation are good for sixty (60) days from the date of this review and are as follOWS: . .. <' -, .o ..' F A~ILr:WIW,.V;ffiW~IX~~ '?;';: ", ' . - ~ " /<,' nS blA.ysk.::t ~rOrJ~eys /;,"'-'-- . Address: /3/4 NorlL Le.2>1.0}1 $'h~eJ (/8 If 504 8'8/ II ?1?\~e.i ?~ .- &:,t)--oy}U~ q2 '30/ Facility Name: EPA 10 No.: CI'1J) FINANCIAL ASSURANCE.FOR CLOSURE ? Document Type: Ce..Yti?,k~ ?IL~.l?"r~. C./O~ ""1'''./ !?,f/r- CLc,~ Document Amount Closure: 4f Closure Cost Estimate: . ~) FAI L Results: Results: PASS $ 2 15 23'} Document Amount Post ..-fc,',( (' Y', "' ~'" U 9 ~ <'. L, r',,, -re.. 0... <:. ~ 1"." "r-EURLA.A....I'" 0 p..,,, 'h, ~l--J>,,_ H~ 'i'-P . v a..~ ".- r I (" O. .0. <" lA \ -<2 X ... d o oJ r~ c'__ .i i !-\...."'. 1_.? ,'0. LC a. \.' c: 1 D .r' i ~ ,0, Document 7 COMMENTS 1\, -, S,-\l a..J..,....Y FR COORDINATOR FR ?1 (8/94' < /.,; 7\ 1 :2- lOb DATE c!)..- ",.tI t1.-..o.. C'o C. . (h_ . (.-{ .0. __ ~ .1"..,. r~D . ~ --yo !? Vl" Q ,-=-=\ ('-': M o...1a....., ~ Q.. "--"-" i'Yh.. Y.e c '" ~ J-,~,.. I r~' , .'-.--:. . l,'\ ~'~""'-? L"" _. .-t, .. .1 , 1= R 'lIP" , P.,-., . .('-1~,_clA "'\~(/' "'~t..-.."''''?,-=t. ,""""---0>....... J"'~ +I~ rJr.,. I I...., VEUR \; I cl\ \ .I.,~ ;, ., .... S \A 'r~~_ ~.... _( _l:':,..f)- ~ ~~ c'...... ,'e> J C-<,w . \"- v. r;: II. ,_ . ". FAI L Amo~Non.Sudden: Deficiency ~Sudden: ,QQ., ;""" \ ~ ;:-M,t.L~.o ~ "'--~J 0~ Res ults : PASS o , . &-,. "', ~ l AIL NON-SUDDEN LlA70VERAGE Document Type: Deficiency Sudden: VIOLAnON: See_ ? / / / / 5",,,, C~,'\A. ?\VO-.l~ .. ~~ SUDDEN LIABIUTY COVERAGE Document Type: Lic.b, L.~ /~ FINANCIALASSURANCE .FORPOSTCLOSURE Document Type: a ,.....vo..' i '" ...I o ., ..L._ \ q~~~1 1~~?Jjr~!~ . Department of Toxic Substances Control Edwin F. Lowry, Director 1011 N. Grandview Avenue Glendale, California 91201 Winston H. Hickox Agency Secretary California Environmental Protection Agency Gray Davis Governor FINANCIAL RESPONSIBILITY REVIEW FINDINGS EPA 10 NUMBER: FACILITY NAME: SITE LOCATION: WORKSHEET: - Jf ; Gill ; 0I 0 0 cet: (eE 20 f l, goR - "(1 20 ii, 8.0 S- X / Oln - it 20~ sst X /,015 - - :$ 206, 85;:; 71 20"( 959 . /' , Financial Responsibility Coordinator: <::' &1(.."., \ ",'1..1 ~ (R) Printed on Recycled Paper Date: . I }I 2.... \ (! f") KINSBukSKY 8~u~ . INL. re o 10 ~~ ~ ~ r. l O ' LO V4 EXHIBIT 1 CLOSURE COST ESTIMATE 3.2.1 Inventory Rr:rn.oval Non?lead Acid Batteries Lead Acid Baru:ries C.9.talyuc Converters 840,000 Precious Metals Bulk Waste W.,tt GeneraJed On Site Liquid wastes from TmJes 27.339 Ills Ib, Ibs Ibs Ibs lb, g>J 8 2 ?2 7 2, 6 I, 2 2 Procedures (or Sampli ng and A..nalysis 3 .3 .i Pre?Sampling lrup<<:tion Pct:ionnel Profess ional Engint:er (PE) Regist e. 3 3 3 3 3.3.4 QAlQC Program Persoo.nd (Data Assessment) Senior Geologist hI> hI> Project G(:ologis( Laboratory Analyses CCR Mews pH 3 3 J eo e. eo Mercury 3 ( .311019S fQ 1: 4.2 PM Png.l FE3- 16- 199 9 16: 44 71 4 44 1 0857 E.thibltLl..IJ . ?XHJmT 1 0) 97% P.04 ," ;:; ... EXHIBIT 1 CLOSURE COST ESTIMATE 4 Decontamination and/or Disposru 3.4.2 DecontAmination Proctdures Concrete Areas Triple Rinsing (Are, 62.675 fr') DOT-.1pproved Storl.ge Container Tank>, Pipes &: Selecn:d Equipment SOO-gallon Portable Tank DOT -approvod Stonge Container Triple Rinsing of TaokslPiping Is 4 Is I, Is Is 4 3A.3 DecorrUmin.tion An.lyses Laborltory Analyses (Con.rel< RiruaLe) CCR Me",ls ea- 3 3 p.H Mercury Cyanide LaboratOry Analyses (Equipment Rimate) CCR Merals pH Mercury Cyanide 3 3 e3 3 3 ea ea ea oo 3 3 3 3 Is Is S hOlm hours 3 3 hours bours 3 3 hom, 3 I'll'" 3 3 .4 .5 StructUf'e Demolition and ReffiO'\'al Tanks, Piping, and Equipment Demolition Recycling of Tank, and Equip=nt 4.0 005urc Certification Engineer oversight: Senior En.gine~r 20 Assistam Engine.er Certified fndustrial Hygiil Sheet 112 TC:lruporution Costs Assumes 5 roll-off containers with 40,000 lb c~p.dciry each No disposal costs for precious me(JJs per dgrc~ment between KBSI and DTSC, transporution cost at SO.005tlb is includ,," )1l0198@ 1:1l2 PM Per Detail Sheet #3 Erltibitl.ili . EXHrBIT \ O} Page 2 .... FEE- 16-1999 16:44 714 441 0857 97% P.05 . , RCRA FINANCIAL ASSURANCE CHECKLIST FOR CWSURE/POST-CWSURE INSURANCE (page 1 of 3) Parent Company Name: _ _ _ __ _ __ _ __ _ _ __ _ __ __ __ __ _ ParentCompanyAdd~s: Facility Name: _ _ __ _ __ __ __ __ _ __ _ __ _ __ __ _ K / n;, b /..-f Y.s" k 7 1317Tlze Y3 > i11..-(. . Facility Address: 13 1ft Nor!l. . [e.'Y'-V'" St.'P_~'..t; 0)(u," . l~ ..County in which Facility is Located: EPA I.D . Number: Iln c, ).el;41, t'lt :7 '28"",,1 () CI'J:2 OS'g SoL, /38 / , / Facility Contact Phone Number: -\,,(~Z'-"/-.: ? {"-:1?"'")-LZ'-'."'3'""!?" '-==-8~5""'/"..C/.'? __ __ _ _ __ _ _ _ __ _ Instrument Covers: Closure Land Disposal Facility: Yes ~ Post-closure 0 No 5tee.d/adJ- Insurance Company Name: f"?1Sl HVV r j kb 7?"'~-' /'i "'I .5,~tNV J/"l:!f .59 2. o o/,&. g Source Document: Date: I Source Document: Amount of Closure .:it (Agency Approved) : ..z:$r....=2.=-=Q-'~r_'_5'-=S'""' -5''------- cc_e..-, f. St.,6?.,.,/1..:d '" / *8 p ,/., r . / Amount of Post-closure ? _ __ __ _ (Agency Approved): _ _--"-#'7'/'-'/1'-' Source Document: _ _ _+1_7___ Date: / ___ _ - ------------------------ RCRA FINANCIAL ASSURANCE CHECKLIST FOR CWSUREJPOST-CWSURE INSURANCE (page 2 of 3) YES NO [2( 0 g' 0 [L( 0 0" 0 0 0 0 0 0 0 t 0 0 , i, ~ -< 0 J- ()\ "1 "'- . :;. ,.,) '---t' !. . ) .,,) -"i <0'\ -,b ~. j L_ < > Is the insurance policy issued by an insurer who is licensed to transact the business of insurance or who is eligible to provide insurance as an excess or surplus lines insurer in one or more states? (40 CFR ?264.143(e)(1)/40 CFR ?264.145(e)(1) 40 CPR ?265.143(d)(1)/40 CFR ?265.145(d)(1>> Has the policy been issued for a face amount at least equal to the current closure and/or post-closure cost estimate(s) except as provided in 40 CFR ?264.143(g), 40 CFR ?264.145(g), 40 CFR ?265 .143(f), and 40 CPR ?265.145(f)? (40 CFR ?264 .143(e)(3)/40 CFR ?264.145(e)(3) - 40 CFR ?265 .143(d)(3)/40 CFR ?265.145(d)(3>> Does the insurance policy gua.raptee that funds will be available to perform closure and/or post-closure activities whenever such activities commence? (40 CFR ?264.143(e)(4)/40 CFR ?264.145(e)(4) and 40 CFR ?265.143(d)(4)/40 CFR ?265 .145(d)(4>> Does the insurance policy guarantee that once closure and/or post-closure activities commence, the insurer will be responsible for paying out funds, up to an amount equal to the face amount! of the policy, upon the direction of the Regional Administrator, to such party or parties as the Regional Administrator specifies? (40 CFR ?264.143(e)(4)/40 CPR ?264. 145(e)(4) and 40 CFR ?265 .143(d)(4)/ 40 CRF ?265.145(d)(4>> Does the insurance policy contain a provision allowing assignment of the policy to a successor owner or operator as specified by 40 CFR ?264.143(e)(7)/40 CFR 264. 145 (e) (7) and 40 CFR ?265 .143(d)(7)/40 CFR ?264.145(d)(7)? Does the insurance policy contain a provision that the insurer may not cancel, terminate, or fail to renew the policy, except for failure to pay the premium? (40 CPR ?264.143(e)(8)/40 CFR ?246.145(e)(8) and 40 CFR ?265.143(d)(8)/40 CFR ?265.145(d)(8>>? The term "face amount" mean s the total amount the insurer is obligated to pay under the policy. ?, RCRA FINANCIAL ASSURANCE CHECKLIST FOR CWSURE/POST-CWSURE INSURANCE (page 3 of 3) YES NO Is the facility in compliance with all c1osurelpost-closure insurance requirements as specified in 40 CFR ?264. 143(e)/40 CFR ?264.145(e) and 40 CFR ?265 . 143(d)/40 CFR ?265. 145(d)? COMMENTS: b~ ~g . ~~ ,.:~ t\" . \ '~-fflO {' ~"'--"'-- (/\ \.j ~ ,J ,L C""-=t d) L, S:\.\?):-?o' ( g, / t-N>... J..,.. . .:i, L- 'Wo...QJ:; (' .1 ,,.e , .o... c . . Reviewed by: __c-...cc-~::::M..",-~=.::.~~.~_==-_ _ _ _ _ __ _ _ _ _ __ _ __ Date: 7 1)'2-\ i CJ e., ~ otT.Dc Subot'''aI eootm CERTIF'ICATE OF INSURANCE CLOSURE/POST CLOSURE If additional space is needed, add attachment. Iosurer Name: Address Steadfast Insurance Company losured Name: Kinsbursky Bros. Supply, Inc. (Enter Clo~ure and Post Clo3ure License Number: 2852.P 1400 American Lane Schaumburg, IL 60196-1056 Issued by State 0(: DE Address: 1314 N. Lemon St., Anaheim, CA 92801-1201 Amount~ SeparatelYi i:F;:~~;:~;~mn:;~;;~ ;:~;:e Face Name Kinsbursky Bros. Supply, Inc. Address 1314 N. Lemon St., Anaheim, CA 92801-1201 PLC 36-55-537-04 Identification Number CAD 088504881 Amount Amount $215,239 Effective Date F_Am<>unt 6/30/2000 $215,239 . Insurer Certification The Insurer hereby certmes that it has iSsued to the Insured the policy of insurance identified above to provide rmanclal assurance for Closure 0 Closure and Post Closure Care 0 Post Closure Care 0 for the facilities/transportable treatment units (TI'Us) identified above. The Insurer further warrants that such policy conforms In all respects with the requirements of California Code of Regulaticns, Tltle 22, Division 4.5, Chapter 14 and 15; Article 8, Section 66264.143, 66264.145, 66265.143 and 66265.145 as applicable. The Insurer certifies that it will not cancel, terminate, or fail to renew this policy except for failure to pay the premium, and that the automatic renewal of the policy provides the insured with the option of renewal at the face amount of the expiring policy. If there is a registered or certified mail to the owner or operator and the Department of Toxic Substances Control (DTSC), cancellation, termination, or failure to renew may not occur, however, during the one hundred twenty (120) days beginning with the date of receipt of the notice by the owner or operator and the DTSC as evidence by the return receipt. Cancellation, termination or failure to renew will not occur and the pollcy will remain in full force and effect in tbe event that on or before the date expiration: (1) The DTSC deems the facility/TID abandoned; or (2) The permit Is tenninated 01? revoked or a new permit Is denied by the DTSC; or DTSC 1138 (O~/95) (Formerly DBS 81(4) (3) Closure l'!i ordered by the DTS< or " any other State or Federal agency, a court of competent jUrisdiction; (4) The owner or operator Is named as a debtor in a voluntary or involuntary proceeding under Title 11 (Bankruptcy) U. S. Code; or (5) The premium due Is paid. Whenever requested by the Department of Toxic Substances Control of the State of CalifornIa, the Insurer agrees to furnish to the DTSC a certified copy of the original policy listed above, iI!c1uding all endorsements thereon. In the event this policy Is used in combination with another mechanism, this policy shall be considered (insert "primary" or "excess") primary coverage. The parties below certify that this document is being executed in accordance with the requirements of Article 8!lf Chapters 14 and 15 of Divlslon 4.5, California Code of Regulations. Authorized Signature of Insurer .~---;7 Typed or Printed Name of Person Signing L' , Authorlzed Representative Paul J. Kinni Witness of Notary Signature L;1i-tlAiI,',( /~1Y0/G Coynty of San Francisco) State of California) s.s. Title Date 7/5/00 I PRIVACY STATEMENT This Intormatlon is requested by the Department of Toxic Substances Control under Health and Safety Code, Section 25246, in order to verify adequate linancial-...:nce olha:zardous WINe facilities/tranle 'treament units (TTU). Completion of the form i'! mandatory. r ... ~",,-.ce of;:::t =~ the rO<"ll! k denial 01 a perniit to operate a hazardous waste racility.rITU. Information may be provided to the U. S. EnvirollllJental Protection Agency, State Attorney General, Air Resol1I'CeS Board, California InUgrntel Comervation and Development Commission, Water Resol1I'CeS Control Board, and California Regional Water QuaIiIy cOOtroI Boards. For IIIOrt infonnation or aa:rso; to your records, contact the Department or Toxic SnbstaOces CODtnJl, 400 P Street, P.O. Box 806, Sacramento, California, 95812-0806, (916) 324-1826. .'. DTSC 1158 (0!5/95) (Formerly DRS 8104) PlIjIe lor 1 RCRA FlNANCIAL ASSURANCE CHECKLIST FOR LIABILITY INSURANCE (page 1 of 4) Parent Company Name: Parent Company Address: Facility Name: L<. ,. Yl :2. b '" ~ .5 1<. ~I , J ':;{ , r-e--()JC d , /'VLL ' ot().tIL L e "''-/'" .5'(>, e.eJ / ," II.; Facility Address: /? I ,::J ? County in which Facility is Located: d eC:llJ ,; (O./b Facility Contact Person!ritle: ' <; (i'JA,. Year For Which Audit Is Conducted: ',"l'3"l -2 0 Yes Land Disposal Facility: Sr'; r:J cd .l4A/- Insurance Company Name: (/ () j 0 0 0 ~ l21. E71 v , ffj-fy-M / D ;'re f ,{;,' NoGY" s: lj ~~,....,.1?1.C_~ r.m-h'l'(j fI I!t, DO Arl!;;!-:LI'~ IA~ <;'~i"e.""""""/''''''7> IL ,50/96 7 Insurance Company Address: Insurance Company Contact: 'l2.un talC. I &, Insurance Company Contact Phone Number: '2 ; bs-hq (; Effective Date (Sudden): ie/no > cA '7 2;s-o I 8 YL6. ( 71 Ii ,) 733 - Facility Contact Phone Number: 11-71(;; () " ",?i L, _,~Cn'L4 <2.. ' CD!=! CA-J,2 Ogg So LI 881 EPA I.D, Number: ? Expiration Date (Sudden): CO, i170 "" ,/)(d ~ tZ.,IJ I 71; {1 _ 3 LI2 L C7/~2 > ,..-:= Amount Per Occurrence, Sudden (Facility Submittal): f! / t1i/L,~ DaLe: /01..'1-2. ) 72.Z <;.c. ,/'3.2 " 116 ~ ' ~PL C 71-o/-73c -o5 Ex= Nonsudden: Primary Source Document: / Expiration Date (Nonsudden) : Insurance Policy Number(s): : Sudden: It/' {,4 Effective Date (Nonsudden): f) ' ,Ai / ltJ: Excess c Amount Per Occurrence, Sudden , (Agency Approved): ;11 I Hd!iw-v'-Source Document: CG,26 Ir,/L(7 (,1;-0 z..'I" LeA.. DaLe: ' " Annual Aggregate Amount, Suddetl ' (Facility Sub mittaI): IF 2 ti/ Pher" Source Document: 'i) iSc- DaLe: !:z,1.< 1i.2'i /0 , 1160 ' Annual Aggregate Amount..- Su?eiJ (Agency Approved): -11 7- H;:{!f"s-vSource Documen't: 6lU; DaLe: I!, I i, 7 1: t k 'l- 'J,- c.uL RCRA FINANCIAL ASSURANCE CHECKLIST FOR LIABILITY INSURANCE (page 2 of 4) Amount Per OCcurrence", Nonsudden (Facility Submittal): _ _ _ _ _ _ __ Source Document: _-,-_ _ _ _ _ _ __ Date: ------------- "Amount Per Occurrence, Nonsudden "~ (Agency Slate Approved): --~,..L ~ '-----Source Document: Date: ~ ~ ~~----------- Annual Aggregate, Nonsudden (Facili ty Su brrii ttal): _ _ _----::~""---- Annual Aggregate, Nonsudden (Agency Approved): _ _ _ _ _ _ _ __ Source Document..:.:-'""""'==--_ _ _ _ _ _ __ Source Document: _ _ _ _ _ _ _ _ __ Date: ~~------------ Date: ------------- The facility's insurance policies are: o Amended by a Hazardous Waste Facility Liability Endorsement. (40 CFR ?264.l47(a)(1)(i)/40 CFR ?264.147(b)(1)(i)) 1/1"' U Evidenced by a Certificate pf Liability Insurance. (40 CFR o YES ?264.l47(a)(l)(i)/40 CFR ?264 .14 7(b )(l)(i)) Not demonstrated through the use of either. NO o o Has a signed duplicate of the Hazardous Waste Facility Endorsement or the Certificate of Insurance been submitted as required by 40 CFR ?264.l47(a)(l)(i) and 40 CFR ?264.l47(b)(1)(i)? Does the the Hazardous Waste Facility Liability Endorsement or Certificate of Liability Insurance contain wording identical to the wording specified in 40 CFR ?264.l5l(i) and 40 CFR ?264.l5l(j), respectively as required by 40 CFR ?264.147(a)(1)(i) and 40 CFR ?264.l47(b)(l)(i)? o o Neither form submitted Is the insurance policy issued by an insurer licensed to transact the business of insurance, or eligible to provide insurance as an excess or surplus lines insurer, in one or more States as required by 40 CFR ?264.l47(a)(l)(J..i) and 40 CFR " ?264.l47(b)(1)(ii)? Best's Insurance Rating: _ _ RCRA FINANCIAL ASSURANCE CHECKLIST FOR LIABILITY INSURANCE (page 3 of 4) YES NO GiD o 0 Does the owner or operator have and maintain continuous liability coverage for sudden or accidental occurrences in the amount of at least $1,000,000 per occurrence with an annual aggregate of at least $2,000,000, exclusive of legal defense costs as required by 40 CFR ?264.147(a) and 40 CFR ?265.147(a)? If the facility is a land disposal facility, does the owner or operator have and maintain continuous additional liability coverage for nonsudden accidental occurrences in the amount of at least S3,OOO,OOO per occurrence with an annual aggregate of at least $6,000,000, exclusive of legal defense costs as required by 40 CFR ?264.147(b) and 40 CFR ?265.147(b)? I~l Not Required o Has the owner or operator chosen to satisfy the requirements for "Liability Self Insurance" as specified in 40 CFR ?264 . 147(f) and (g) and 40 CFR ?265.147(f) and (g)? If yes, use financial test/corporate guarantee checklist. o Are any of these five mechanisms employed in conjunction with liability insurance to demonstrate the required liability coverage? (40 CFR ?264.147(a)(6)/40 CFR ?264.147(b)(6) - 40 CFR ?265.1~7(a)(6)/40 CFR ?265.147(b)(6>>. If yes, indicate the appropriate mechanism(s). 0 0 0 0 0 o CO~: Corporate Guarantee Letter of Credit Surety Bond Trust Fund If formally requested, has a signed copy of the insurance policy been submitted as specified in 40 CFR ?264.147(a)(l)(i) and 40 CFR ?264.147(b)(1)(i)? o o Financial Test Not formally requested Is the facility in compliance with all Liability Assurance requirements as specified in 40 CFR ?264.147(a) and (b) and 40 CFR ?265.147(a) and (b)? ____________ ~ ___________________________________ RCRA FINANCIAL ASSURANCE CHECKLIST FOR LIABn..ITY INSURANCE (page 4 of 4) COMMENTS (con't): _ _ _ __ _ __ _ _ __ __ _ _ _ _ _ _ _ _ __ Reviewed by: Date: C C.v1C( 7 \ \ 2... \ C I.,' _y rI" ., 00 Department olToxi~ Sa'hsteno'l Coatrol LIABILITY CERTIFICATE OF INStTRANCE If additional space is needed, add attachment. AcId=s : Insurer Name: Steadfast Insurance Companv License Nwnber: 2852P 1400 American Lane Schaumburq? IT. fiCll96-1056 Issued by State of: Address: Insured Name: Ki.nsburskv Br others . Inc . . Toxco . Inc. 1314 No . Lemon St- ? Anaheim . CA 92801 Hazardow Waste FacllltieslITU. Covered: rEnter Information For Each Facilitv!ITUl NAME OF DE LIMITS OF LIABILITY ADDRESS OF HAZARDOUS WASTE SUDDEN- FACll..ITYrrru FAcn.rrYrrrtJ OCCURRENCES EACH OCCURRENCfJ NONSUDDENOCCURRENCES EACH OCCURRENCFJ ANNUAL AGGREGATE ANNUAL AGGREGATE AMOUNT AMOUNT FACIUfYnTIJ lDNUMBER Kinsburskv Broth, r s . 1314 No. Lemen pL. CAD 088504881 Inc o. Toxco, I nc. Anaheim . CA 92801 $1/ 000,.000/$2,000 000 . Effecuve D* Po&,. Nwnh<< PLC 79-01-750-05 8/25/99 NOr COVERRD / / / / / / Toui $1;0001 000/$2,000, / rJ5j . NOT CCVERED / o Excludmg legal costs and deducttbles INSURER CERTIFICATION: 1. This eridorsement certifies that this policy has provided liability insurance covering bodily injury and property damage in connection with the insured's obligation to demonstrate financial responsibility under California Code of Regulations, Title 22, Division 4.5, Chapter 14 and 15, Article 8, Sections 66264.147 and 66265. 147. The coverage applies to the above listed facilities/transportab le treatment units [TTUsJ in the amounts listed for sudden lind/or nonsudden occurrences or both, and are exclusive oflegal defense costs. If the endorsement is for an excess insurance policy, complet e the following sentence: each occurrence and $ annual aggregate in excess of the underlying limits of $ each occurrence and $ annual aggregate." .. $ DTSC 1l~ (OS/95)(Fonnerly DHS 8107) Page 1 or 2 2. The Insurer further [a] [b] [c] [d] [e) certifi~ . I-t~ _ollowing with respect to the insura? - ..described above: BanJauptcy or insolvency of the insured shall not relieve the Insurer of its obligations under the policy. The Insurer is liable for the payment of amounts within any deductible applicable to the policy, with a right of reimbursement by the insured for any. such payment made by in the Insurer. This provision does not apply with respect to that amount of any deductible for which coverage is demonstrated as specified in California Code of Regulations, Title 22, Division 4.5, Chapter 14 and 15, Article 8, Section 66264.147 and 66265.147. Whenever requested by the Department of Toxic Substances Control [DTSC], the Insurer agrees to furnish to DTSC a signed duplicate original of the policy and all endorsements. Cancellation of the insurance, whether by the insurer or the insured, a parent corporation providing insurance coverage for its subsidiary, or by a firm having an insurable interest in and obtaining liability insurance on behalf of the owner or operator of hazardous waste management facilityrrru, may OCGur only by sending notice of cancellation by either registered or certified mail to DTSC. Cancellation will not be effective until after th", e{CJJiration of sixty [60] days after receipt of notice of canc~!Ia!ion as) evidenced by the returned receipt. . . Any other termination of the insurance may occur only by sending notice of cancellation by either registered or certified mail to DTSC. Cancellation will"not be effective until after the expiration of thirty [30] days after receipt of cancellation as evidence by the returned receipt. The party below certifies that this document is being executed in accordance with the requirements of California Code of Regulations, Title 22, Division 4.5, Chapter 14 and 15, Article 8, Sections 66264.147 and 66265.147, and that the Insurer is licensed to transact the business of insurance, or eligible to provide insurance as an excess o"r surplus lines insurer, in one or more states. Authorized Representative Authorized S~r lruurer L/~ Title . Typed or Printed Name of Person Signing Dale 10/22/99 Paul J. Kinni Addre3S 0/ Penon Signing For lruurer 44 Montgomerv St . , San Francisco, CA 94104-4801 PRIVACY STATEMENT "This information is requested by the Department of Toxic Substances Control under the Health and Safety Code, Section 25245 in order to verify adequate financial assurance of hazardous waste facilities!transportable treatment units. Completion of the form is mandatory. The consequeoce of not completing the form is denial of a pennit to open1te a bazardous waste facilityfTIU. Information may be provided to U.S. Environmental Protection A?,ency , State Attorney General, Air ~= BoanI, California Integrnted Waste Management Board, Energy Resources Conservation and Development Commi33ion, Water Resources Control Board and California Regional Water Quality Control Boards. For more information or access to you records, contact the Department of Toxic Substances Control , P .O. Box 806, 400 P Stree~ Sacramento, California, 95812-0806, [916J 324?1826. DTSC 1160 (05195)(Fonnerly DRS 8107) Page 2 of 2 S~ate of Califomia . Cafifomis EnYironmfmtaJ Pro ' "on Agency Department of Toxic Substances Control FINANCIAL RESPONSffiILITY REVIEW REQUEST Senior Inilial .?_-"1""-"'---- Financial Responsibil ity Ana lyst Person Requesting Review ~l?f1 1,.0 i !II'O:Yns'- t-L{J/"Q...~et<'6'( Add ress: r.3I'1 IV, L'e rVlQYl ~t- C1v\.(}--li\r~i tVl I C4 0)....~ 0 ) Phone No.: DOCUMENTS !DENT/FIN G THE CLOSURE/POSTCLOSURE COST TE & TE OF THE EST/MATE MUST Closure PostC los Standardized Permit Conditional ly Authorized Series A Series B Series C Series Small Qua..nity C Conditionally Exempt SI.OOO,Ooo Per OccurnncclS2,OOO,OOO S500,000 Annual Aggregate Per OccurnncdSI ,000,000 Annual AggregaLc SJOO,OOO Per OccurnncelS600,000 Annual Aggregate S 100,000 Per OccurrancelS200,OOO Annual Agg:rcgat.e Exempt from liability requ irement until Janua.ry t, 2000 I CME FR ? I (/()I94) O&M A TTA CH ANY ADDITIONAL fNrURMA TI{)N TO TillS PIICI:: Variance Attachment 5 DATE : 06/08/2000 S ITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR : WI LLIAMS-MOREHEAD DESCRIPTION: Lead stored in pails for shipment to GNB Technologies, Inc. in Vernon Phot o 1 DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR : WILLIAMS-MOREHEAD DESCRIPTION:Used Pb-Acid batteries placed in truc ks to be shipped to GNB Technologies, Inc. Photos 2 & 3 .. DATE: SITE: GNB DISTRIBUTION CENTER INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The loading and unloadi ng warehouse. Photo 4 area located in the DATE : 06/08/2000 SITE: GNBDISTRIBUTION CENTER, INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored, prior to being shipped to GNB Technologies, Inc . For recycling . Photo 5 DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER , INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored , prior to being shipped to GNB Technologies, Inc. For recycling. Photo 6 DATE:06/0B/2000 SITE: GNE DISTRIBUTION CENTER, INDUSTRY INSPECTOR : WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored, prior to being shipped to GNB Technologies, Inc. Fo r recycling . Photo 7 ... DATE:06/0S/2000SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored, prior to being shipped to GNB Technologies, Inc. for recycling. Photo S DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR : WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb - Acid batteries are stored, prior to being shipped to GNB Technologies, Inc. f o r recycling. Photo 9 DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR : WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored, prior to being shipped to GNB Te chnologies, Inc. f or recycling. Photo 10 ----~ DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored , prior to being shipped to GNB Technologies, Inc. for recycling. Photo 11 ... DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER, INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used pb - Acid batteries are stored , prior to being shipped to GNB Technologies, Inc. for recycling. Photo 12 --------- DATE:06/08/2000 SITE: GNB DISTRIBUTION CENTER , INDUSTRY INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The area in the warehouse where used Pb-Acid batteries are stored, prior to being shipped to GNB Technologies, Inc. for recycling. Photo 13 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The surface impoundment, currently being used as a storm water collection pond. No free-standing liquid or sludge was noted in the pond. photos 14 & 15 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: The surface impoundment, currently being used as a storm water collection pond. No free-standing liquid or sludge was noted in the pond. photos 16 & 17 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Installation of the drop-out box. The three large tanks in the background, are a part of the overflow system. The area covered with gravel is where the drop-out box will be installed. photos 18 & 19 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID # : CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Battery storage area 103, no violations observed. photos 20 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Battery storage area 104, no violations observed. photos 21 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Battery storage area 105, no violations observed. photos 22 DATE: 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Battery storage area 105, no Violations observed. photos 23 DATE 06/08/2000 SITE: GNB TECHNOLOGIES EPA ID #: CAD 097 854 541 INSPECTOR: WILLIAMS-MOREHEAD DESCRIPTION: Battery storage area 106, leaking batteries were stored opened. photos 24 sev eral drums containing Attachment 6 " $..,. of c . _ - c.~omio ~ j ' ' Prof' " ...Q"-r rtc\e.-8fx.C. GiL-it..,..... 'u1J-..f!.vi.tc, aiM- t't.. l"'''lU. bL ,W..C<./-i j I{- I) \. h( <..~(J J i,, 'Ii. ~ j7.( os;;:. c.f)-& toOt! , 1 , y I certify under penalty of law that the above conutive actions have been taken and the violations have been corrected, I am aware that these are significant penalties for submitting false information. Signarure ;.... , _ _ _ _ _ _-'-_ _ _ _ _ _-'--_ _ Date -'--_ _ _ _ __ Title _ _~_ _~-~-~-------- .. !lyse - -- 131951 Pagl _ F-7 - - - - -- -- -.......,-.,----:--:. .. ,.-, -. -_._----- -- of __ SUM. ,ARY OF VJOLATILNS ?/ .' Facility Name: ~ Q~II... '4!b5 ? ~_ _ _ _ _--'-_ _ SECTION II: OTHER VIOLATIONS JKJ ' OR . . MINOR VIOLA TIONS CORRECTED DURiNG INSPECTION 0 (CHECK APPROPRIATE BOX) List of violations and complianu actions not included in Section I: Minor ViolationsINotice to Comply tt IV b'vLlC+ '(V<.\ .\-, ~ ' II-- ~ 6l ~ !. / ~ . \~~ i,'-{,i{t+, t!..L,,,u't(' no!-' ,';V()l.Jk.- ji!.t'I \WtU..J.7 ~;"Ir7/'--/j . {! :1L- ~6.)i; l L. J J ,,\*L.U\-Z ..e'11l . UPc U0tK- \c U}'( I-lk. ~ t~t 1?;(1l' S " !. . (....t.0-,) , 'r rt-Lil/ hi. d Shlt. . "+t~q.- (;IV'-L \1b -cC {;v '-'-. DTSC (-It ~-t~..z [,.. -, "'V'-(, ,"" 4 u+ '-'6- ./ ly1UL (kef..... ~.1.iJtD{ ILt~~<..L f-!-IC-/<,. , !. r y"': C. iI (,( ~ oJ yO 6 ()-r l~ L. r ,"Fio....".' I/, [/Ci J. >0., (;u:.J, lA,J,)L o"t: {1l0 '>L. ( , &?:7b'6." I -J~ (&-)I-.?J y.'C!-,/),-- I, ~/c.ii. '.. \". l.v,", 1,;0",,'2 '" ~ Z iii ll: c '">2 '" 128 128 456 7/3/2000 74 112 0 98 112 7/5/2000 0 7/6/2000 98 112 0 I) I 0 1------'717/2000 -'--- -- - - ~ - - .. j- - 0 1----0 __ !!/~il(l(\ - 5S 7/11/2000 88 43 0 0 7/12/2000 0 0 0 0 7/13/2000 51 0 0 0 7/14/2000 65 0 0 0 0 7/17/2000 87 46 0 7/18/2000 55 81 96 0 7/19/2000 87 97 105 0 7/20/2000 MAX PER BIN c-!l'i 128 53 110 68 !l ~ ~ Z ~ Z iii ll: iii ll: '" '"'" '"~ !3 304 0 0 0 '" 456 0 0 0 0 --! - () o o _O_J:_O_ ---ft u 0 0 0 0 0 0 0 0 0 0 0 0 0 .. " =.. E I c '" 0 ~c ..Jz 7/25/2000 7/26/2000 7/27/2000 7/28/2000 7/31/2000 .9 c '" :!! 1i > '3 ~ ge" '" '.." 1600 239 320 278 -0 131 0 51 65 133 232 289 '"c>2 '" ....~ ,; '" '" ; 55 TRSWITH BATTS IN 103,1(14,105,106 &107 E! : w - 540,857 724,160 629,114 - -, 124,465 296,453 115,413 147,095 300,979 525,016 654,007 I 7/21/2000 7/24/2000 :! " c ~ <" .... ":;; -.. " EST WT at 2.263 Ibs/skid '" ." l!! Z 0 , TRLS SKD 14.9 20.0 17.4 0.0 3.4 8.2 0.0 3.2 4.1 8.3 14.5 18.1 0 0 42 278 g 0 131 0 0 0 0 0 5 7 0 0 4 0 0 0 100 140 0 0 80 0 1 0 0 () o __ 0 5 6 1,' 3 4 2 T1 0 100 110 1 ! ~ 1 3 3 GNB-Vernon Approved BY~~ Number SENIOR PROJECT ENGINEER I REV:O Department: Engineering Reports to: Engineering/Technical Manager Dale: 7/ 18/00 HROI-26 Page 1 of 1 SUMMARY Supervises outside labor forces in the completion of environmental, facility, and process improvements projects. Directly manages projects from appropriatioI) request through project start up. RESPONSIDILITIES o Direct supervision of union and non union contractors. o Implementation and completion of both capital and non capital projects on time and within budget. o Various system and equipment upgrade projects from conceptualization to start up in the areas of environmental, facility, and process improvements. o Coordinating project activities involving internal maintenance. SKILLS, KNOWLEDGE AND QUALIFICATIQNS REQUIRED o o o o Strong verbal/written communication and interpersonal skills. BS in a technical area or equivalent experience. Ten years experience in the engineering or technical related field. Five years experience in a manufacturing environment GNB -Vernon Approved By: ~ Department: Engineering Reports to: Plant Manager Number ENGINEERINGITECHNICAL MANAGER IRE V: 0 Date: 7/18/00 HROI-25 Page 1 of 1 SUMMARY Acts as the liaison between all engineering and technical activities within the manufacturing facility. Coordinates all engineering activities involving corporate, outside agencies and the plant. RESPONSmILITIES o Manage overall engineering and provide techoical support to entire plant. o Manage all capital., expense, process and facility upgrades from planning through implementation. o Develops, controls, manages and evaluates the corporate capital budget projects. o Directly manages all project engineering, process engineering, design, capital and expense project activity. o Implementation and adherence to a fiscal budget that roadmaps capital expenditures. o Manages techoical aspects of plant operations that impact safety, environmental, quality and production. o Facilitate team development. o Participate in traioing and development programs. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o o o o o o o Strong verbal/written communication and interpersonal skills. Ability to administrate and follow all safety rules and regulations. Must be able to work independently on multiple projects. BS in a technical area or equivalent experience. Ten years experience in the engineering or techoical related field. Five years experience in a manufacturing environment Knowledge of the governing agencies that interact with manufacturing facilities. GNB-Vernon Approved BY:~' Number CASTER IREV; 0 Department: Refining Reports to,: Refining Department Supervisor HROI-24 Dare: 7/6/00 Page 1 of 1 RESPONSIBILITIES o Follow all Health and Safety procedures as they apply to the area of work and the facility. o Follow established standard operating procedures. o Setting up casting machines or molds prior to casting metal. o Pour and stack product appropriately. o Package or strap finished material according to instructions. o Participate in training and development programs. o Perform whatever other responsibilities and duties that are assigned by management. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o Production background, preferably in a process environment. o Ability to organize and perform casting process. o Forklift and Crane Certification. GNB -Vernon Approved By: . .~ . Number REFINER IREV, 0 Department: Refining Reports to: Refining Department Supervisor HROI -23 Date: 7/6/00 Page 1 of 1 RESPONSIBILITIES o Follow all Health and Safety procedures as they apply to the area of work and the facility. o Follow established standard operating procedures. o Ensure safe operation of refining department in meeting established operating goals and quality standards. o Follow procedures to operate equipment, skim kettles, and make necessary specification adjustments per instructions. o Participate in training and development programs. o Perform whatever other responsibilities and duties that are assigned by management. SKILLS, KNOWLEDGE AND QUALIFICATIONS REOUIRED o Production background, preferably in a process environment. o Ability to perform calculations using a calculator. o Ability to .organize and perform refining process. o Forklift and Crane Certification. GNB-Vernon Number REFINING LEAD PERSON Approved By : ~ IREV; 0 Department: Refining Reports to: Refining Department Supervisor Dale: 6117/00 HROI-22 Page 1 of1 RESPONSIBILITIES o Follow all Health and Safety procedures as they apply to the area of work and the facility. o Follow and insure all employees follow established standard operating procedures. o Ensure safe operation of refining department in meeting established operating goals and quality standards. o ConmlUnicate with smelting, shipping, maintenance, QNlab, and other departments to insure continual process continuity and improvement. o Work with the Refining associates to insure processes are properly followed . o Coordinate refining activities within the department on a shift basis. o Participate in training and development programs. o Perform whatever other responsibilities and duties that are assigned by management. SKILLS. KNOWLEDGE AND OUALlFICA TIONS REQUIRED o Production background, preferably in a process environment. o Ability to lead and motivate hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Forklift and Crane Certification. GNB -Vernon Approved By: /0;", 7""'<--' ENVIRONMENTAL COORDINATOR -~ Department: Environmental Coordinator Reports to: Environmental Manager I REV, 0 Date: -7/6/00 Number HROI-21 Page 1 of 1 SUMMARY The environmental coordinator is responsible for the daily inspection requirements to assure compliance with all federal, state and local regulations. Also responsible for the receiving of incoming spent lead acid batteries and the scale house personnel. Tracking and monitoring all spent lead acid batteries and manifesting wastes in and out of the facility. Also assures compliance with air and the management of hazardous waste. RESPONSIDILITIES o Responsible for the receiving and recording incoming spent lead acid batteries. o Recording and tracking environmental parameters to assure compliance with regulatory requirements. o Operating and maintaining Air Quality monitoring to assure compliance with federal and state regulatory requirements. o Creating and management oflog sheets to monitor all hazardous wastes in the facility. o Interaction with environmental agencies to help support the environmental manager in inspection requests. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o Associate degree in the sciences or relevant experience. o Minimum of3 years in environmental matters or relevant experience and an understanding of manufacturing processes and the maintenance of monitoring equipment. o Forklift Certification. GNB-Vernon ENVIRONMENTAL MANAGER Approved BY:;-/~-- Department: . Reports to: I REV: 0 Date: 7/6/00 N umber HROI-20 Page 1 of 1 Environmental Manager Plant Manager SUMMARY , To assure compliance with all federal, state, and local environmental regulations by monitoring all regulatory requirements of all environmental permits issued to the facility. Must be proactive in assuring the community that the health, safety and the environment, are a top priority to the Vernon Facility. RESPONSmILITIES o Assure compliance with all Federal, State and Local environmental regulations involving air, water, and Resource Conservation Recovery Act (RCRA). o Interaction with all above listed agencies to assure compliance and any process.changes or the addition of new processes to the facility. o Assurance that all fees, fines and permitting are kept current. o Track all emissions for permitting requirements to assure compliance with regulatory requirements. o Negotiate contracts for hazardous waste removal and disposal. o Oversight of Environmental Training for compliance o Involvement in community affitirs to educate surrounding neighbors to assure the health and safety and protect the environment. o Training of Managers and Supervisors as to environmental matters. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o Degree in Environmental Sciences or Management and equiValent experience. o At least 7 years experience in environmental management and a working knowledge of manufacturing processes and how they affect the environment. GNB -Vernon Approved By: Number SIDPPING FORKLIFT OPERATOR J...o--- Department: Shipping Reports to: Assistant Materials Manager IREV: 0 Date: 7/6/00 HROI-19 Page 1 of 1 SUMMARY Fill customer orders and facilitate the loading of outbound materials leaving the Shipping Department. RESPONSIDILITIES o Follow all Health and Safety procedures as they apply to the area of work and the facility. o Work with the Shipping Clerk and Lead man to effectively identifY and load finished products. o Insure that pull orders are followed and the appropriate product is loaded. o Participate in training and development programs. o Perfonn whatever other responsibilities and duties that are assigned. SKILLS, KNOWLEDGE AND OUALlFICAnONS REQUIRED o Ability to identifY product by alloy name and lot number. o Ability to follow instructions and properly mark outgoing materials (if applicable). o Forklift Certification. GNB-Vernon Approved By: f A~ , " Department: Shipping Reports to: Assistant Materials Manager Number SHIPPING CLERK I REV; 0 HROJ-18 Date: 7/6/00 Page 1 of 1 SUMMARY Coordinate the logistics involved with outbowld materials leaving the Shipping Department. RESPONSmILITIES o Follow all Health and Safety procedures as they apply to the area of work and the facility. o Work with the Shipping associates to effectively coordinate the identification and loading of finished products. o Insure that pull orders and appropriate paperwork are?properly processed. o Participate in training and development programs. o Perform whatever other responsibilities and duties that are assigned by management. o Perform weekly dock audit on finished product prior to its shipment as needed. SKJLLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o Ability to perform inventory as required. o Ability to organize and plan workflow. o Basic computer skills. o Forklift Certification. GNB-Vernon Approved By: Number SHIPPING LEAD MAN ,k i8- Department: Shipping Reports to: Assistant Materials Manager IREV: O HR01-17 Dale: 7/6/00 Page 1 of 1 SUMMARY Lead hourly employees in coordinating all outboWld materials from within the Shipping Department. RESPONSIDILITIES o Fo llow aU Health and Safety procedures as they apply to the area of work and the facility. o Work with the Shipping associates to insure paperwork is properly processed. o Coordinate shipping activities within the department on a daily basis. o Participate in training and development programs. o Perform whatever other responsibilities and duties that are assigned by management. o Perform weekly dock audit on finished product prior to its shipment. SKILLS. KNOWLEDGE AND QUALIFICATIONS REQUIRED o Ability to perform inventory as required. o Ability to organize and plan workflow. o Basic computer skills. o Forklift Certification. GNB-Vernon Approved .- kBy; Department: Plant Manager Reports to: VP Manufacturing Number PLANT MANAGER 1 REV: 0 HROI-16 Date: 7/6/00 Page 1 of 1 SUMMARY Responsible for achieving all established Safety, Environmental, Quality, Production and Financial goals on a facility-wide basis. Operate with the lowest possible manufacturing costs and provide overall support and direction to supporting staff. Communicate with Corporate Representatives and Customers as needed. RESPONSIDILITIES o Establish and modifY plant operations, policies and goals towards improving plant profitability in all areas. o Promote cost reduction opportnnities and delegate responsibility for action. o Continuously evaluate production equipment and processes to ensure competiveness in the field. . o Monitor levels of production, shipments, labor performance, scrap and rejects, and housekeeping. Take action to correct unfavorable deviations to improve favorable trends. o Insure plant and equipment is maintained to achieve production requirements and provide a safe and clean work environment. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o College degree or equivalent preferred o 5-7 years manufacturing management experience at the plant leveL o Collaborative/team based management style preferred o Strong interpersonal and communication skills o Strong customer focus o General computer literacy GNB -Vernon Approved By: C'.~- Number RMPS SUPERVISOR I REV, 0 HROI-15 Dale: 7/3100 Page 1 of 1 Department: RMPS Reports to: RMPS Department Manager RESPONSIBILITIES o Direct supervision of hourly RMPS employees. o Ensure safe operation of the RMPS department in meeting established operating goals and quality standards. o Training and scheduling of hourly employees. o Communicate with Receiving, Smelting, Maintenance, QNlab, and other departments to insure continual process consistency and improvemept. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o Production background, preferably in a process environment. o Ability to supervise and motivate hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Computer skills - familiarity with MS Office. o College degree or closely related coursework. GNB-Vernon Approved By: -/.6X RMPS DEPARTMENT MANAGER I REV, 0 Date; 611 7/00 Number HROI-14 Page 1 of 1 Department: RMPS Reports to : Plant Superintendent SUMMARY Work directly with the Materials Manager in scheduling to meet both production and quality requirements. Maintain the inventory offeedstock needed for the production process is in adequate supply. Direct Supervisors on addressing safety issues, environmental compliance, quality requirements and meeting production forecasts. RESPONSIDILITIES o Direct management of both RMPS Supervisors and hourly employees. o Ensure safe operation of the RMPS Department in meeting established operating goals and quality standards. o Training and scheduling ofRMPS employees. o Co=unicate with Receiving, Smelting, Maintenance, QAllab, and other departments to insure continual process consistency and improvement. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o Production background, preferably in a process environment. o Ability to supervise and motivate both Supervisors and hourly employees. o Ability to organize and plan workflow. o Good written and oral co=unication skills. o Computer skills - familiarity with MS Office. o College degree or closely related coursework. GNB -Vernon Approved By: ~s---.-. ~. Number SMELTING SUPERVISOR I REV: 0 Dale: 6f12100 HROJ-J3 Page 1 of 1 Department: Smelting Reports to: Plant Superintendent RESPONSIBILITIES o Direct supervision of hourly Smelting employees. o Ensure safe operation of smelting operation in meeting established operating goals and quality standards. o Training and scheduling of smelting members. o Communicate with R.M.P.S., Refining, Maintenance, QAllab, and other departments to insure continual process. SKILLS, KNOWLEDGE AND QUALIFICATIQNS REQUIRED o Production backgrowld, preferably in a process environment. o Ability to supervise and motivate hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Computer skills - fanllliarity with MS Office. o College degree or closely related coursework. GNB-Vernon ,,-. ... N umber HEALTH AND SAFETY COORDINATOR . Approved Oy: ~ I REV: 0 Date: 7/3JOO HROI-12 Page 1 of 1 Department: Health and Safety Reports to: Human Resource Manager SUMMARY: To insure that all federal and state rules and regulations pertaining to industrial hygiene ( i.e. personal protective equipment, sanitary facilities, emergency equipment, air quality, etc.) at GNB are followed. RESPONSIBILITms: o Perform air sample tests for required areas in the plant on a quarterly basis. o Perform personal air monitoring tests as required. o Take regular noise level readings in plant areas as required. o Inspect and maintain a log of all emergency shower locations and operation. o Conduct new-hire employee safety orientation. o Conduct respirator fit testing semi-annually and respirator refresher training atmually. o Maintain complete records on air testing, inspections, and respirator fit testing. o Maintain an effective respirator program that includes training, record keeping, and compliance with state and federal regulations: o Maintain an inventory of all types of respirators used by GNB personnel. o Be prepared to work overtime when the need for hygiene services are required. o Be prepared to conduct a seminar or training session on GNB hygiene programs for employee. Federal/State agencies, or visiting GNB managers. o Must be familiar with all hygiene related equipment and maintain same. o Maintain all CallOSHA record keeping requirements and act as liason. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o BS Degree in Industrial Hygiene or equivalent work experience. o Two years of on the job training as an Industrial Hygienist. GNB-Vernon Approved By: Number HUMAN RESOURCE MANAGER I REv , 0 --j~ Department: Human Resources Reports to: Plant Manager Dale: 7/3/00 HROl-ll Page 1 of 1 SUMMARY To establish, direct and administer day-to-day Human Resource fimctions so as to maintain a level of employee involvement and morale conducive to our facility realizillg its operating objectives. Ensure the facility meets all local, state and federal laws. RESPONSIBILITIES o Administer the provisions contained in the local labor contract and conduct grievance meetings. o Administration of all salaried and hourly benefit programs and record-keeping. o Supervise the Plant Employee Involvement Program. o Counsel Plant Supervisors on matters pertaining to safety, housekeeping, discipline, assignments and transfers. o Supervise the operation of the plant health and safety progratns, as well as medical, security, food, and janitorial services. o Develop and administer employee-training programs. o Administer the salaried employee performance appraisal pragranl, and approve all personnel status changes. o Develop and update the Affirmative Action Program; supervise the pragranl' s implementation; and fulfill EEO reporting requirements. o Review employment applications, conduct interviews for all salaried positions, and supervise the hiring and termination of all hourly employees. o Attend and participate in various meetings. o Write and distribute periodic reports, forms, booklets, etc. SKILLS, KNOWLEDGE AND QUALIFICATIONS REOUIRED o o o o o Good written and oral communication skills. Thorough knowledge oflabor relations, safetylhealth, security, benefits administration, employment practices as well as various governmental regulations pertaining to the above. Ability to work well with all levels of matlllgement and hourly employees. Capable of administrating and following all safety rules and regulations. Bachelor' s degree in Personnel, Business or related field or its equivalent. GNB -Vernon Approved By : o o o ,~ PLANT SUPERINTENDENT I REYO Date: 6/17/00 Number HROI-IO Page 2 of 2 Good written and oral communication skills. Capable ofleading and participating in C.W.l.P. Able to administer and follow all safety rules and regulations. OTHER QUALIFICATIONS REQUIREDillESIRED Prefer 5-10 years experience in smelting operations. Prefer undergraduate degree in Business or Production Management or Metallurgical college degree. Working knowledge of computers. Training and/or experience in manufacturing, production, maintenance and personnel. GNB-Vernon Approved By: I ~ Department: Manufacturing Reports to: Plant Manager Number PLANT SUPERINTENDENT REV: 0 Date: 6117/00 HR01-1O Page 1 of 2 SUMMARY To achieve the established production and shipping goals while ensuring quality level ofthe product; to provide prompt customer service at a competitive manufucturing cost. This position can be responsible for the work of8-12 supervisors directly and 200-250 employees indirectly. Plan, schedule, and supervise all operational functions at the Los Angeles Smelter to meet or exceed sales requirements at the minimum operating cost. RESPONSmlLITIES o Coordinate the availability of materials, flow of supplies, and manpower in all production and finishing areas to ensure the achievement of production and shipping goals. o Review individual cost areas utilizing computer printout, in-factory reports, divisional cost reports, graphs, etc. to meet cost reduction goals. o Inspect each process to reduce scrap and salvage costs, machine downtime, and to ensure finished quality production. o Prepare various reports, attend meetings, etc. to promote open communication between plant personnel. o Assist subordinates in the accomplishment of their business objectives and in their efforts to develop themselves technically and professionally. o Evaluate supervisors performance and periodically review results with them; assist them to meet objectives, performance standards, quality, housekeeping and all areas of their responsibilities. o Recommend salary merit and promotion increases for his direct reports which are within established salary ranges for each position. o Supervise the operating departments: Shipping and Receiving, RMPS, Environmenta~ Furnaces, and Refining including scheduling furnace operations and refining to meet production requirements with quality lead and coordinating the maintenance activity to minimize costs. o Maintain safe working conditions and practices and operate the plant in compliance with all OSHA and other environmental regulations. SKILLS, KNOWLEDGE AND ABILITIES REOUIRED o o 8-10 years experience in a battery recycling plant, with graduated levels of business experIence. Training and/or experience in manufacturing, production, maintenance, and personnel. GNB -Vernon Approved By: MAINTENANCE SUPERVISOR , -~ I REV: 0 Date: 6117100 Number HROI-09 Page 1 of 1 Department: Maintenance Reports To: Superintendent SUMMARY Self-starter with proven leadership and excellent communication skills to assume responsibility of the maintenance function. Will provide guidance and direction for maintenance operations by shift in a 24/7 union environment. Proven mechanical/electrical aptitude in a metals processing 1 furnace environment preferred . RESPONSIBILITIES o Day to day responsibility for maintenance operations. o Manage the maintenance and repairs of plant and auxiliary equipment. o Administrate preventive maintenance program (main saver) . o Supervision of maintenance repairs. o Participate in selection of new Employees. o Train and qualify new Employees. o Be on call 24 hours a day. o Purchase maintenance parts. SKILLS. KNOWLEDGE AND ABILITIES REQUIRED o BS Degree in Mechanical Engineering or similar. o Seven plus years of experience. o Demonstrated proficiency in hydraulic, pneumatic, mechanical and electrical operations. o PC skills required. o ISO 9000 experience a plus. GNB -Vernon Approved By: ASSISTANT MATERIALS MANAGER :/~ I REV: 0 Date: 6/ 17/00 Number HR01-08 Page 1 of 1 Department: Material Handling Reports To: Materials Manager SUMMARY To assist in achieving and retaining the required market share of available raw material feed supply for the smelter at margins adequate to optimize profit and max capacity available. Assist in planning forecasting and maintaining the required materials margin and volume for the facility while providing complete technical and logistical service to all customers. RESPONSIBILITIES o Assist in developing and maintaining a close personal relationship with not only all suppliers and all customers but also potential suppliers and potential customers in an efficient and cost effective manner. o Assist in coordinating raw material procurements for shipments with operations to achieve inventory turn goals and insure continuity of operations while eliminating loss risks. o Assist in negotiating pricing for raw material to maximize material margins and minimizing risk in order to meet regional financial goals. o Assist in preparing required plans, forecasts, records and reports to establish sales and material budgets to meet plant requirements and measure effectiveness. o Responsible for shipping and warehouse activities, which includes all outbound materials. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o Production background, preferably in a process environment. o Ability to supervise and motivate hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Computer skills - familiarity with MS Office. o College degree or closely related coursework. GNB-Vernon Number REFINING DEPARTMENT MANAGER 1 Approved By: ~~ 1 REV: 0 Dale: 6/17/00 HROI-07 Page 1 of 1 Department: Refining Reports to: Plant Superintendent SUMMARY Work directly with the sales department in scheduling to meet both production and quality requirements. Make sure the inventory of premium metals and reagents needed for the refining process is in adequate supply. Direct Supervisors on addressing safety issues, environmental compliance, quality requirements and meeting production forecasts. RESPONSmILlTIES o Direct management of both Refining Supervisors and hourly employees. o Ensure safe operation of the Refining Department in meeting established operating goals and quality standards. o Training and scheduling of Refining employees. o Communicate with Smelting, Shipping, Maintenance, QA/lab, and other departments to insure continual process consistency and improvement. SKILLS. KNOWLEDGE AND OUALIFICATIONS REOUIRED o Production background, preferably in a process environment. o Ability to supervise and motivate both Supervisors and hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Computer skills - familiarity with MS Office. o College degree or closely related coursework. GNB -Vernon , Approved By: p - Number REFINING SUPERVISOR IlllV: 0 Date: 6/ 17/00 HRO.l-06 Page 1 of 1 Department: Refining Reports to: Refining Department Manager RESPONSIBILITlES o Direct supervision of hourly refining employees. o Ensure safe operation of refining department in meeting established operating goals and quality standards. o Training and scheduling of refining crews. o C()mmunicate with smelting, shipping, maintenance, QNlab, and other departments to insure continual process. SKILLS, KNOWLEDGE AND OUALIFICATIONS REQUIRED o Production background, preferably in a process envirolUnent. o Ability to supervise and motivate hourly employees. o Ability to organize and plan workflow. o Good written and oral communication skills. o Computer skills - familiarity with MS Office. o College degree or closely related coursework. GNB-Vernon Approved By: ~ Number MATERIALS MANAGER! COMMUNITY RELATIONS I REV: 0 Dale: 611 7100 HROI-05 Page 1 of 1 Department: Material Management Reports to: Plant Manager SUMMARY Achieve and retain the required market share of available raw material feed supply for the smelter at margins adequate to optimize profit and utilize capacity available. Must also plan, forecasts and maintain the required inventory and volume for the Vernon Recycling Facility while providing complete technical and logistical service to all customers. Must be proactive in Conununity Affairs to enhance GNB's visibility in the area surrounding this facility. RESPONSIBILITIES o Develop and maintain a close personal relationship with not onJy all suppliers and all customers but also potential suppliers and potential customers in an efficient and cost effective manner. o Coordinate raw material procurements and customer requirements for maxintizing operational capacity while achieving inventory turn goals and insure continuity of operations. o Negotiate pricing for all raw materials to maximize material margins and purchasing premium metals. Maximize sales margins, while meeting facility financial goals, minimum costs while maintairring a minimum inventory of premium additives. o Prepare required plans, forecasts, records and reports to establish sales and material budgets to meet regional requirements and measure effectiveness. o Actively participate in Community Affairs to inform and educate the surrounding areas in regards to GNB' s social and ethical responsibilities. o While supporting the growth and development in the community in which we work and live. SKILLS, KNOWLEDGE AND QUALIFICATIQNS REQUIRED o Degree in Business Administration or equivalent work experience. o Minimum of 5 years experience in one or a combination of materials functions (purchasing, inventory or production control, etc.). GNB -Vernon Approved By: A9-- Number PLANT CONTROLLER I REV: 0 HR01-04 Dale: 6/ 17/00 Page 1 of 1 Department: Finance Reports to: Plant Manager SUMMARY To manage the financial reporting and control functions at the plant level consistent with company objectives and procedures. RESPONSIBILITIES o Manage payroll, accounting and accounts payable functions; monitor plant transactions to insure efficient and accurate handling of all accounting and reporting procedures. o Prepare plant related financial reports in accordance with Generally Accepted Accounting Principles and company policy. o Insure compliance with proper internal controls. o Monitor costs for labor, overhead and fixed expenses for control and forecasting. Advise Plant Manager and Staff members on financial issues. o Analyze cost performance to note trends or changes in operations; control costs to improve financial performance. o Coordinate the maintenance and improvement of management information systems at the plant level. o Prepare cost studies, reports, annual budgets and strategic plans. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o o o o o o o Good written and oral communication skills. Leadership skills. Technical skills involving office equipment and computers. Knowledge ofISO/QS 9000 and product costing B.S. degree in a business related discipline required. MBA,CPA, CMA helpful Experience in supervision, J11allufacturing process, cost, or general accounting. Extensive knowledge ofIT (information technology) for plant level applications necessary. .1 GNB -Vernon Approved By: r:~~ -, r; Number LAB TECHNICIAN I REV: 0 HRO\-03 Date: 6/ 17/0 0 Page 1 of 1 Department: Quality Assurance Reports to: Quality Assurance Manager SUMMARY Individual will maintain the quality specifications ofthe product and assist the Production Departments by communicating accurate and timely laboratory analysis. RESPONSmILlTIES o Perform instrumental analysis on product and process samples as directed for quality and environmental control. o Perform required sampling and sample preparation for analysis. o Maintain working area, equipment and reagents in functional and safe condition. o Communicate and maintain record of results and prepare required reports. SKILLS, KNOWLEDGE AND QUALIFICATIONS REQUIRED o Minimum: High school chemistry. o Preferred: Vocational school graduate. o Minimum of two years of related experience. o Two years related analytical cheruistry work. I' ! GNB -Vernon Approved By: ~ Number PROCESS ENGINEER IREV: 0 HROI-02 Date: 6117/00 Page 1 of 1 Department: Engineering Reports to: Technical Manager SUMMARY Individual will maintain the quality specifications ofthe product and assist in the supervision of the . Quality Assurance Technicians. RESPONSIBILITIES o Monitor plant quality indicators and make recommendations to improve overall quality performance. o Anticipate potential quality system problems and initiate necessary corrective actions. o Analyze defective products returned from customers. o Carry out various production, engineering, and quality assurance deviations as required and report to appropriate personnel. o Review and interpret quality testing requirements and procedures initiating changes to satisfY changing division requirements. o Evaluate overall product quality, processes, and test equipment. o Conduct, schedule, and monitor lab testing. o Investigate quality problems and take corrective action. o Maintain lab equipment and order materials as required. o Keep Quality Assurance Management and Production Management infonned of current quality trends in all areas of the plant. o Assist in training and supervising Techillcians in their areas of responsibility, and insure accountability for their areas. o Review SPC charts and make recommendations to Technicians to improve processes. o Substitute for Quality Assurance Manager as required. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o o o o o o o Strong verbal/written communication and interpersonal skills. General Quality Assurance backgrounds with statistical quality assurance. Ability to administrate and follow all safety rules and regulations. Must be able to work independently on mUltiple projects_ 2-4 years chemical and/or electrical technical experience. BS in a technical area or equivalent experience. Working knowledge of computers. GNB-Vernon Appmved By: p~::-. Number QUALITY ASSURANCE MANAGER I REV: 0 Date: 6/ 17100 HR01-OI Page 1 of 1 Department: Quality Assurance Reports to: Plant Mana&er SUMMARY Self-starter with excellent communication and interpersonal skills to lead the development, implementation and administration of QS 9000 program. Establish strategic objectives, review operating indices, administer continuous improvement programs, provide guidance and decision making in operational issues ..Establish standards, monitor and recommend process improvements to achieve superior quality and reliability. RESPONSmILlTIES o Supervise all Quality Assurance Personnel; and provide training where necessary. o Monitor the total quality system to ensure the quality of incoming materials, in-process manufacturing of subassemblies, and assemblies meet engineering and quality specifications and Customer requirements. o Worm Plant Management of Customer and division audits; assist in preparation of audits; and coordinate and participate in appropriate corrective actions to audits as necessary. o Review test results; audit reports and S.P.C. charts from all shifts; and determine and inlplement appropriate corrective actions where necessary. o Investigate Customer complaints and field problems. Ensure excellent Customer relations through adequate communication. o Strive to control costs by keeping scrap at a minimum while meeting specifications. o Keep Management (Plant and Division) informed of possible quality problems. o Ensure all equipment is calibrated periodically; and maintain all laboratory and quaJityrelated production equipment in a professional manner. SKILLS, KNOWLEDGE AND OUALIFICATIONS REOUIRED o o o o o o o o o Knowledge of Statistical Process Control (SPC). FanUliar with labor relations. Thoroughness and follow-through_ Capable of administrating and following all safety rules and regulations. Thorough working knowledge ofQS 9000 quality standards. Strong verbal/written communication and interpersonal skills. GMP, SPC and training background essential. PC skills Lead Assessor Certification preferred. HON 07 : 59 FAX 209 07 / 06 / 95 O~te f~inted G S N t kAT C ( Check heJ::'e if thh i!I J ~. ~ C hem i c o 1 21/.0'/98 ~002 KHF Site Service Sl09 ~ '~ il ll~uHfic&t1en H. r. t. "A' T E LOC~TION ~ 9 o Sen t . P k 0 P : L S OF OR!GINAL K?TT~~~ Inc. hoot lIe o ~~ 5 HEr T "XL;! PACIL:TY GIan:RAL rNP"ORMATlOn i. Gene~~t~r N~m. , GNB TECHNOLOC:IS INC 2: . GC'nerator J>4dre38 ~ .2~7~O~'~S,-,I~""""I~""""",-"S-~,_~_ _ _--'-_ _ _ _ _ 81U.ing Address: (! l Sar.\e l . o echr.ic41 Cant.act / Phone , J.:lrnqll 8 . ~r.olino 2;.31;:52-1101 , . Alternat.e Contact / Phone: torn Lewder PROPEftT!&s ~ H]t:z62-J.1tl o CO<1tact/Phonr., ron , . . . OOHPOs:rION S . P,"Qcess Gtnll:rilt ing Woo t.tn ' W I ftmN.lt..CE OPERl.TIQN, SOIL, nJR..~hCi '~ICKS , Np"IR . AUO YARD DBH~IS ETC. Ie this a US2PA hUlrdol,lt. ,."a:.e 14.0 Cf'R PU t 261)1 1'41. () No ( ~ l Identify ALL U5FE''' ii_teo and ch.r.etal"iotic Wist" ewe number. (O,P',J(,P,tJ)! 7A . e. ______________ _ _ __ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _____________ St.~e w.~te Code. : ~l~'~ ! _ _',~:~'c_ __ ~ J~'2<_ _______ D. St.rong Odor (_1 ; Qc8cribe _________ ________ _ _ _ _ _________ II C'JiE~IC.I.L C'OMPOS:T!ON , Conet:.tue:"lta Li 3't N.oI. ccn,t.Ll:ucr.t. (incl . h'l.logenlt." SI;';:C!, CA:,.:::UM OJl.lO?: l O~ "o 10 to GO t.11 ilO " PCB>> l! yet , coflccntntior, _ ppm. P::BI R.4 i oa C'~iv~ :) aC~lene.f yel , conccn:r.t1 on 1) . I~ CT :r.[ectiou8 1_1 wr; , Wlste .Ubjo:ct to the lsru:: S~:PPlNO (~ J ~lk l'a . l Eb o re~~t.d by 1C erR 7H L ) . Pyroph'.:lric I I txp}.O/l1V(; I_ I ppm . N&S~ '_ 1 Shock SenDitivl (_) Oxidltlr :_1 metee tl:c 1:ltlt.l!:nt .t.an~Clrd9 , check Liquid '_ 1 Orum I_ I oryp. / S1ze , ~'~rl! : .OI]lJ(""''--______________ Other _____ _______________ Sh ' pp i ng Frequeney, DAY I~FORMA!ION Sa~le ~~ec oat~ .caooco e ther 12000 UnH:I;: : 1'QN!. SAM?LINO -------'? H~ INTO~710~ H . PA:;u..Olt/G : eu lk Scl .i.d o , to C.:;r.rc1r,oge!"l o 10 tr:l OJ rre,er.t b ar.y coT'1l;;'lIIIntrat1C1r...nd teN'I'o ar.... lyli. Ur.i.: nelcript i cn SO t,,, 12 . OTHER' ~riiln ic . : al!.nge (drum , ~goon, po~ . t.nk , v~t, .~e . l ~ SamIl l ed: G~n~r~tor'8 ~gent Super.vi. 1ng sampl i ~; : OSNt~TOR ' i C~RTIF1CATION I her-eby certHy tl\.~t ;Ill informal:ion 8UbmLtted it'! U.i" IUld ,,11 .t:.tilched dOCWTor..r.!;, containa t-rve ..nd ilCQunte cleaerl.pt .l.on:l of thu "Iiste . Azly l!Ii'::I'.pl e subcr.i h .C':d :i.e nprut;l'ItOltivc al de!i.ned in 40 CTR 2(;1 o A("'p.:".d! X I cr by u.!.ng" ILn cqo.;iv&lent ~thod . Al l reltv~r.t i ntermIt-ion rc~~ r ~in9 ~~own or .u.pected h&a~rd3 in the po~~o oo ion ot th~ generator hAo been dt.clo.~ . r authorlae ewH to obtai .. a samp l e trom ~ny wag:. sn1~nt !O~ pUrp C 9~. of r.ctrt ~ fication . s~i~g~n~.~'~"~r~'_"o"',_"o?r~lq~1~n~.~:~ ? ~p~r~o~'~i~I~.-r~'~'~'~7~O'------------- SIGN~TUU Ol'll OfllG:m PROPILE ;20670 S1gr.&~lJre N.nw .!'Iei Tith MO~ 07 / 06 / 98 07 : 59 FAX 209 J8~ KHF SHe Senlce 6109 ProtUe ~ 2l0~7~ l S. !f this ~alt. 1~ ~ubject e~ct r~8tr~ctlon t~'t ia to any ~!~tornl. li3t reA~rict1on3 en!e~ th. l.tt~r from below leiUhe~ A. B. 1 or ! . ~I rAXt te ~ppl ~ oolble, _ HOCc; , _ cy.. n~de. Ac;id, __ "'Ictd,. _ 00., _ 20 . Jd~nl.i.fy ALL CNr.H:terlttl,o and L1l'Jtcd US!:Pi\ hUlrdo~t wa8te "'.... mbera tlklt apply 1<<1. ~e!in.d by 4 0 OR ;..:C:) . ror '.:1-, wutc rl\OW\bj!,r , idvntify the .ubC4ttl'gory (al t.pp!.iC.,llle , c}',eclc. non., Ot; write i ., t!-le cieo;;;riptlor: irem ,~ CTR .2,? , 41 , ~U . 42 , "'rod 26r . 4ll . a. I .sUBCATEGO~'t 1o. HOW MUS'!" C. APPLlCAiL!: 'l'REA'mEm' the RUbe~t8g0ry dete~iptl~ . 1______________~.~r~~~~~~~S~~~~~------- I ~ ~TE !E If not ~ppli=.b l o. I I SPEC'lFI20 1 fWOtlGC? ~imply ch.~k none I P~POIW.MfceI ttOiN::>t-%y, I I I ~E[) : ICheck . . &A'lHcable l I I NONi: : ' L?a l U I_ l ! Ii 1 :..1 1 , 1 21 If appliC'a.b:'. !!Inter ehe 4!) CPR ~H , 42 t.l:ll~ 1 trell~me:\; cee.. (_J 158 . 4:2 l&:'I.ter I fro~ I ~.tter bt:low r i 1 I 1 1 1 , 1 .' 1 ,I ,I 1 'I 1 10 ' I .ILJ~ -+________ _ _ ~+-_---L __+ _______-;--_ _ ----' 1 1 ~~~ge~ent A. un~c ~hc l&nd G1.po~.l RES':'RIC'TE:; \oiASTE RCQUIRtS rcstrict io~8 : 'rn.D.~'T fl . :;: RESlKICTE:O WAsms roR ""'H I CH THE TRi..\DlEtrr S"'IA.."mAAD IS EXPRr:SSi'i) I\S A S PECIF":t:: 'nQ{NC'LC'GY 1'RE.1.TEO BY THAT TECliNOt.OGy ) iAlro ~ WAS'I'~ fl . ) 0000 r'\lT!-l ANALYTIC1\L CfJR'rlf"ICATICN FOR It-lCINXRAT:iD Ok C)\J{ICS ~~ , C' . R?STIUC't!;p WASTE St!E;F.:C1' TO " t. !-lOT CUR.RtNTLY SU!J!C"I TO LAND n!sPOSAI. Ar.S'J'hlCTIONS h th1a wa l'te o !Joil or I1ehritli' >2 . Spe:Cif:i. c Gravi ty R.1.l"l9c , 2:i . ?~?AA IA1'lCE Nc ' ~ Ye.s, sol1 ' nl. Oel:l~~3 :- to Il"Ioic .. :e the r.::l'"'51c of oo ch : !)nit o Cy.:an1 dltll l Nol"c <0 'JYpe !tree . I:.or.... l, Cyanidea , Nor,e to l'/PO If~er., SuHid.oo , ~OO to KJ / tca Nnena!:lle. et.c , ) total, aMe:n..lIbl c . etc .) TO!,...:,.. lYP' <,?tional P~I"\OliC8: 2< . ldenti .t:y th~ ;t.n'J phys i cal to Non e. W4totfl< ?color ?vAjUES ap~c~~.nce SCLIO 00':' phy.i":l. l 1Ii:..!atc So l id iiAS gEfN 07 . 06 / P6 16004 KHF 51 te 5erv1ce MON 08 : 00 FAX 209 386 6109 Prctlh o ~ t2='5'1':' 2~. C'OI"I~LErE ONL\' FOil: WASTES X~'TEh"Dw FOR Fut1S OR INCI~~~1:0N I 26 . I i 1i.EC:l.At>~,T:.:JN . rJiLS or INCtt."EIV.TICN PMA.'G:1.SfU: lnf g~t1on IProv1d. it I l' .v~iiAb~. l I I ----------------------------pp. I I $OOlUI"I u -------------------------.~ I , l-la irorr.in o o , 8. C't.lori ne illl c1 Sl.i l tul: 4S S ----------------------------pp. i I ------------------------, I ------------------------ , I o II ------------------------ , I 8. !o;a:.r , ... . V1eeo:.ity lep.l) : ___ O___ F' _ 100 F D. ..,.,1:1: liO f' '" V, VilJ,>Or Preea..:.re "8'rP (nrn/Hal : G. Is thi. waste a pumpablc 11qui~7 Ye. NQ I I I I I J . Partie:'. 1; " ms /l OOl,j mel 1 lC . 0 ~i il l:' 010; , ,,, n ms l l DO }~ r;~trcce;'l;:t::n! X 2 ,0 r:q11 DOH Pt~t.Ch l o:~p~eno 1 X n !!fi I i DOli ilvrid;.r.c X 5 . ::0 !!!T I l DOli T~t~.chlcrop.thy:cn! X ' . ? :sil OOl~ roxap."l.fJnll:: X O. S ITQIl DOl"' X . 0 nq/l. DOl.'1 X a .' mg!l DO~ O 5.Tr~eh!oro?hen~1 X -t OO , C mg / l 00<11 2.' . ,. 'J'1' ~ c~19rOpr"~f'lQ l X ;: , 1:1 mg ! l IiO'l 2 Vinyl CI-.101'ldt X 0, " mg/l DOO Metr.cxvch:or "'.echv:' Et.~,y l 2,4 S?TP X K"':c!'".e sl::. ... ex ':':"1chloroct.hy l. r;" n ~ 2:1 1(" k,. lyt1cal i TC~P I viI! \,In~ts? I ,1 TU~ J __ 'ul.le Reai.,: lt~ pe'T'. 01' L't'I9;O I I ! TeA. 0,. TWAL un~e.II : p~ . 1'09/101," " I l!u~ OT ! 06 I n ~00 7 KHF Site Service 08 : 01 FAX 209 386 6109 Pro!!:", &!1 CI"'.D-1:c:A.:.. ~POSl'::::'Ot-.- : Ad::H tiorw l. eonn.1tu.nt. N07 i.nclu.d.ed. on pag". 1 of tho WUt. ProH l e Ccns:.i ':.:.Jtntl ::;~'JN sV'"...r;.o? M.t.G...."'iS H.Jo1 OXrDE Ran3_ 3 to 2: to SCOIJ.l:1 CXrDC' J to SOl:" ~ ~o unit Dea:rl;>ti.on o lO o 10 ---' o , " R2 0 ?iO r Oi / 06 i 98 Oat ~ Prtnted ~005 KHF Slte Se rvl ce 1I0li 08 : 00 FAX 209 386 6109 C i IC 6 /~ 8 Proof 11. " 1C'Jfr~ Ht'TAUi I TeL l' 1!"'. Iorfllillion ! jCheck only ONE for ~ach eon.t~t~."t l : Ur.oc Wilt. , FEw' ma l l I I 1 Lc ~' 1J I I I ThSY'l !C Re/fUl_t;C"d L~ve.l ! I I AUQr:.1c ao AP ! I I [Uoi U:Tl U Df.I : I X 01: : MO~ I I WUte- I +-____1-__________ 1 ~ No . ! I [ lOC' 0 r:s / l. 'I ! I ; ~N~10~"~'11~"~.~N~ 1 __ I I I . ! tcr~ l l 5 .0 115'1 X TCLp D6~~ T'Ct..P ActlUl I ~~, IThar; . DOCII poo . . 'fCA Ot TO:'AL ~~it. ; p~ , r9 / 1 . ~ /k 9 e t prr':.,,:. ::'lHomh l.i!t I uoo I fl~ Ul,) t.d Lev. ) I I '99 rrg / l 1&q\Ul l I el" I [Man I I I I t __1-____~________________+-__+ _~__~~i---~----------------- t-______________-1__-1~~~~~----~---------------____t-______________-f__ ' C"'~~~llll i "~'~'~.~'~I~l~____~~________~__~~____ I l ?c'r~'~~11~~ ' m~n~.x ~-+ ____~__________~__~~ ~~~~~~----t----------------- ......:.. ;';. ':" I 1-____-+________ '________+-__+---------~---f--------------- 1 ~~~,~~'Ul~;l!~~"~'----~----1-----______~__ I [CopDer I I~V~iD~'~dl l c~ 'm ~ +-____ __________;____ ____ ~ -+________________+-__,-________ __ _________________ -L____ ~ ~ I ! ~Z'~'n~<~-------L----~----------~--~------~------- --------+--~---------t----t----------------- o Dai Iy Inspection Log: Tanks and Sumps Date: _ _ _ _ _ _ _ __ Inspector: _ _ _ _ _ _ _ __ 5 - Battery Dump Bin Sump 6 - RMPS Floor 7 - North Mud Tank 8 - Central Mud Tank 9 - South Mud Tank 10- Acid St Tank II - Overflow Tank Unit 14 - 16 - West Reaction Tank 17 - East Reaction Tank 21 - Delta Stack Clarifier 22 - East 23 24 - North Oxidation Tank 25 - South Oxidat ion Tank 26 27 - ustment Tank #2 28 - pH Adjustment Tank #3 29 - Process Tank 30 - Fi Itrate Tank 31 - l'<. FI ue Dust 32 - S . Fl ue Du st Slurry 35 - Mobile h :/490 _97/part_b. 97linspecLcdr DAILY INSPECTION LOG Containment Building (Reverb and Blast Furnace Feed Rooms) Month ? Date Reverb Furnace Feed Room Material Stored Leak Detection Tracking Visible Emission Blast Furnace Feed Room Material Stored Free Liquids Tracking Visible Emission Comments (geDeral integrity of noor, walls. aDd rool) Inspector Initials DAILY INSPECTION LOG MONTH___________ MISCELLANEOUS UNITS Reverb Furnace -Date Structural Integrity Operating Conditions Blast Furnace Spillage Structural In!cgrity Operating Conditions Spillage Comments MONTHLY INSPECTION CHECKLIST TO BE COMPLETED ON THE FIRST OF EVERY MONTH RETURN TO OFFICE OF ENVIRONMENTAL ENGINEER Date: _ _ _ _ __ _ _ _ _ _ __ Name oflnspector:_ _ _ _ _ _ _ _ _ __ Time: _ _ _ __ _ _ _ _ __ _ __ SAFETY AND EMERGENCY EOUIPMENT Fire Extinguisbers (See attached list) Check for location, access, chemical charge level Fire Hosereels - Check for access, location, wear (See attached list) First Aid Kits - Check for location, access, inventory, instructions (See attached checklist) Emergency Showers and Eyewasb Stations Check for access, operation (See attached checklist) Facility Alarm - Check for access, operation Monitor Wells - Check for cracked or broken pipe andlor well cap; erosion around well, access (See attached checklist) Storm Water Pond - Check outlet pipe and liner integrity, pump, pond level (See attached checklist) Compressed Air Horns - Check for access, operation (See attached checklist) Yard Area - Storm Water Components blockage, structural integrity, sediment accumulation (See attached check list) Facility Wide - Structures - structural integrity, leaks (See attached checklist) Observations/ActioDli Taken MONTHLY INSPECTION LOG FIRE HOSEREELS Location Blast Furnace Feed Room (near SE comer) Smelter Building (West wall) Smelter Building (North wall) Smelter Building (center of building) Reverb Furnace Feed Room (NE comer) North of RMPS Floor Sump North of Overflow Tank Access We.r Comments MONTHLY INSPECTION LOG FIRST AID KITS Loc. # Location Description Smelting Building RMPS Administrative Building Garage Maintenance Shop Employee Facilities Bldg. Access Inventory Instructions # Comments MONTHLY SAFETY fYE ~ t.l:i.O SHOWER INSPECTION ..rformed By _ _ _ _ _ __ Supervised By _ _ _ _ _ __ Foreman Time Staned _ _ _ __ Time Completed _ _ __ Date Performed _ _ _ _ __ Job Ticket No ._ _ _ _ _ __ Time Required to Complete PM _ _ __ EYEWASH Cbeck eye wasb sprays for proper alignment. Run water until Cbeck valve for ease of operation - sbould turn freely. kkim water appears. SHOWERS Cbeck shower for proper flow. run water until kkim water appears. Cbeck valve for ease of operation -- should turn or operate freely. ACCESSIBILITY Check eye wash and shower areas for acceSSibility -- no product or equipment blocking use of safety equipment. LOCATION I . Mounted on column-center of Recon Bldg. 2. North end of mobile garage ( '. J. West end of W IT fIlter press 4. NIW corner of soda solution tank 5. Inside battery charging room (NIW corner) 6 . South side of west smelter entrance 7. South end of reftnery under stairs 8. North end of reftnery - west side of door 9. NIW corner of MCC-4-7 10. SIW corner of MCC-4-7 II . SI E corner of ballery acid slOrage tank 12. Base of scrubber stairs 13. West outside wall of MCC-I 14. Under HIM on inside of west wall IS. Inside HIM room (NIW corner) 16. North side of RMPS fIlter press 17 . West side of ballery dumper belt .~. Panfeeder basement (south wall) 19. Upstairs smelter lab. 20 . Q. A. lab. 490.4.S .5W90-97\SAFEINSP,T8L. EYEWASH OPERATION SHOWER OPERATION OK OK FAULT FAULT ACCESS . OK FAULT COMMENTS MONTHL Y INSPECTION LOG MONITORING WELLS ID# 2S/ 12W- 18QI 2S/ 12W-7C3 2S113W- 14Hl 2SI13W- 14H2 2S/ 13W- 14H3 2SI13W- 14C? 2S113W- 14AI 2SI13 W- 14A4 2S/ 13W- 14A5 2S113W-14A6 2SI13W- 13R2 2SI13W- J3RI 2S/ 13W- 13E5 2S113W-1 3AI 2S11 3W-12Q2 2S11 3W-12KI 2S/ 13W-12A I 2SI13W-IIR3 2S!13W- I I R2 2S11 3W- 1112 Lock Pad Protective Casing Weep Hole Comment MONTHLY INSPECTION LOG (and after each storm event) Monili: ____________ STORM WATER POND DATE METER READIN G POND LEVEL ('10 ) PUMP ON/OFF INSPECllON INTEG RITY Outlt t pi~ SIGNATlIRL Uarr TOTALS Comment: Date Comment: Comment: Comment: Date Date Date MONTHLY INSPECTION LOG COMPRESSED AIR HORNS Loc. 1/ Location Description Bldg. Access Operation 1/ Comments MONTHL Y INSPECTION LOG YARD AREA - STORM WATER COMPONENTS Item Storm Water Trenches Storm Water Piping and Manholes Storm Water DropOut-Box Blockage Structural Iategrity Sediment Accumulation Comments MONTHLY INSPECTION LOG FACILITY WIDE - STRUCTURES Item Floors Walls Roofs Drains Structural Integrity Fracture. Leaks Blockage Comments