Kosmer, William, P.G. From: Englq David Tuesday, November 19, 2013 Means, Jennifer Sent: To: L2t2lPM Kosmet William, P.G.; Paneftieri, Michael; Pennings, Jonathan; Erich, John RE: Andrew Drilling Incident RE: Plugging info Cc: Subject: Attachments; V. 1. 1 len, I spoke with John Erich this morning about this. He does know the well driller, Joe Hastines, and spoke with him at the incident (he also is acquainted with him through the Ambulance squad and Fire Department) in addition to Duane Cizek-well-known local well driller and subcontracted by Shell. I second waterwellwas drilled on the prope.ty to a depth of_90', with good quality/volume and no methane. John explained to Joe that the original well would need to be properly plu8ged and notification provided to Topo Geo, although lohn wasn't certainJoe knewthe proper protocol.lohn expects to seeJoe tonight and offered to deliverthe plugginB procedure and notification information (attached €mail). With that, I believe we can close out our involvement with the case. OP EN _S OU RC E Thanks to everyone who was involved with this-greatly appreciated, Dave David Engle I Environmental Group I\4anager Department of Environmental Protection I Eastern Oil and Gas District Bureau of District Oil and Gas Operations 208 West Third Street Suite 101 Williamsport PA 17701 Phone: 570.327.0519 Faxt 57O.32J.3420 www.depw€b.state.pa.us PRAGRA?AAI'G NAi'I i i{tt KPC','I . i !". Ci.,i ,// FILE TYFF /"Jl. From: i.4eans, Jennifer Sentr lvlonday, November 18, 2013 3:43 To: Kosmer, William, P.G,; Engle, David Subjecti RE: Andrew Drilling Incident C