AGNS High Level Estimate July 2022 Continue project with 100%D0 Construction Estimate Construction Costs (Includes Insurance, Means & Methods) $ 115,660,285 Contingency (Includes Design Stage, Construction, Escalation) $ 15,131,389 CM Fee $ 4,744,870 Construction Subtotal $ 135,536,544 Consulting Fees $ 14,168,234 Owner (Testing, PM, Engineering Review) $ 4,200,000 Furniture, Fixtures & Equipment $ 8,690,000 SUBTOTAL $ 162,594,778 Control Budget (2020) $ 136,738,928 Variance -$ 25,855,851 Notes: Assume tendering in July 2022 with August mobilization Additional funding necessary Escalation costs included in Construction Contingency