BRECKENRIDGE for STORMBREW Collection By on 2009?10?28 1035 7 October 2009 STORMBREW has completed SCIF construction and also received security certification for BRECKENRIDGE, its latest collection site on 11 September 2009. The 10,000 square foot facility is equipped with the necessary power, communications and equipment racks to support the planned near?term deployment of 15 TURMOIL stems rovidin 1506 of processing against the newly acquiredH The results of a recent signal survey, conducted by 550, indicates a potentially rich target environment of both DNI and DNR. Initial collection system de lo ments are scheduled for 2nd quarter 2010. The ffort commenced in February 2007 and is the first ?cable?head" collection effort conducted under STORMBREW. POC: Deputy PD STORMBREW,