Westbrook Westbrook Weymouth C/S (Proposed) Taurus 60 (7,700 HP) + Cooling Eliot Chaplin C/S Add Centaur 50 (6,300 HP) + Cooling Replace two existing Taurus 60’s with two new 9ppm NOx Taurus 60’s (1500 HP) Needham Oxford C/S Add Taurus 60 (7,700 HP) + Cooling Plymouth Pine Hills Stony Point C/S Utilize reserve capacity in unit C7 (additional 3,300 HP) Legend of Facilities Salem Pike Proposed Compressor Station Existing Compressor Station Danbury Yorktown Stony Point Discharge 4.0 mi L&R 26”w/42” (Regs at End) Meter & Regulator Station Southeast Discharge 2.3 mi L&R 26” w/42” (Regs at End) Pipeline Lift & Relay Atlantic Bridge Project 132 Case (132,700 Dth/d) Facilities Diagram Rev: October-8-2015