John J. Morris, Town Comptroller ,?i??cku?eif?gg?io Office of the Comptroller Town Council Tel: (631) 360-7530 Fax: (631) 360-7625 Thomas J. McCarthy Edward R. Wehrheim Robert J. Creighton Kevin J. Malloy - December 14, 2011 Mr. Jacinto. Dealmeida Jadeco Construction Corp. P. O. Box 16 St. James, NY 11780 Re: Invoices 214, 215, 236, 238, 239, 240, 242, 243, 244 and 246 Dear Mr. Dealmeida; We are in receipt of your invoices, which are enclosed, that requests payment of $441,936.42. Purchase order #29841 was issued on June 29'11 in the amount of $988,667.87. According to our records, this was the ?nal purchase order issued under Town of Smithtown bid #084050. The inVcices charged against this purchase order were paid. This additional 'wi'th?th'e Town of Sm'itht'own had expired,'theref6ie they cannot be paid. Invoices 242, 243, 244, and 246 should be eliminated, since they were either paid on October 25, 2011 or included with invoices 206A and 207 which are included in the returned submission but not referenced above. Sincerely, wn troller . Cc: lenn orgensen, Highway Superintendent Yvonne Lieffrig, Town Attorney - 4 C13. ain- F11 c3 TOWN HALL ANNEX - 40 MAPLE AVENUE - SMITHTOWN, NEW YORK 11787 Smithtown Highway Department 758 Smithto wn By-Pass Smithtown, New York 11 78 7-5082 Glenn Jorgensen, Superintendent of Highways 63I-360- 7500, 63} -360-2251 (1hr), Highway@tosgov.com . - June 25. 2013 Jadeco PO. Box 16 St. James, New York 11780 RE: Bid 12-104 Concrete Curbs. Sidewalks and Aprons Work Order 2013-03-CW- Concrete Work-Various Roads~Phase 3 1. Proiect Location: As per attached list, work is to be performed in the order listed. 2. Schedule - Start Date: July 1, 2013 Completion Date: July 19, 2013 3. General Proiect Description: The work under this Work Order includes the installation of concrete curbs. aprons. placing dense graded aggregate base, pavement repair where directed. all required restoration (Le. aSphalt aprons, topsoil and seed, etc). and traf?c control. 4. items of Work: It is anticipated that the following major items of work will be used, but not limited to include: Item 526 Concrete Curb Item 527 Concrete Sidewalk Item 528 Concrete Driveways and Aprons ltem 536 Asphalt Concrete Driveways, Aprons and Walkways item 542 Grading, Furnish and Spread Topsoil and Seed Item 740 Pavement Repair Final quantities and items of work shall be as directed by the Superintendent. Page 2 5. Special Notes: 1 Location and Grades will be provided by the Highway Department on site. 2. The Contractor is responsible to notify the homeowners on notices provided by the Town a minimum of twenty-four (24) hours prior to any work being performed. . The Contractor is responsible for clean-up and restoration (Le. removal of forms, back?lling to ?nal grade etc.) within 3 days of work being performed. (at) . The Contractor is responsible for repairing all sprinklers within ?ve (5) days. 5. The Contractor shall complete all site restoration within seven (7) days after placing dense graded aggregate base or pavement repair. Glenn Jorge?n Superintendent of Highways Attachments John Zollo. Town Attorney Joe Kostecki, Purchasing Director Lou Necroto. Town Comptroller 2013 Concrete Work- Various Roads-Phase 3 List of Roads Smithtown New York Avenue Whisper Lane P.D. 6913313334123 JRDECD CORP. BOX 16 ST. JQMES, NY 11733 I TOWN OF SMITHLOWN - Pairlck n. V?cchin Supervisor ELQNKET FDR CURB REPLRCEMENT Emu; THIS ORDER Elves.vou QUTHDRITY To; as INETRUETEQ BY LISTED HBDUE. THE INSTRUCTIONS HILL. DETQI-L THE SPECIFIC SHIPPING INFURMQTIDN. no NOT axcsap THE-QMDUNT BF MDNEY AUTHORIZED 0N THIS ORDER. SHIP To: OF HIEHHQV DEPT. 753 NY 11737 66/29/11 DATE OFHCE Us: ONLY 0335? ur 2?39? certi?ed . 989,667.87? y?ro?s Required 43 935,557.57 we REQUIRED TERMS FOB BLDEUQLK REPRIR aosmrxomcxl QUESTIONS REGARDING ORDER SHOULD BE RE DEPTH-55 MAPLE AVENUE, N.Y. 11737. 631-360-7 ALL PURCHASES ARE Exam 11-113 ORDER :3 PROOF OF TAX EXEMPTION AND SHALL SERVE wame magma 10 THE T?wu PURCHASING 531. PM PT FROM FEDERAL. STATE AND LOCAL TAXES. YOUR COPY OF IN LIEU OF A CERTIFICATE. ?sauna COPY Eih- uni-511354. 1 03:33?) FPOflt?l?a UFfice 1-631.350-2251 P. 2 Smithtown Highway Department 75 8 smithtown By-Pass 'Smithrown, New York 11 787-5082 Glenn Jorgensen, Superintendent (If-High ways June 30, 2011 Jedeco Construction Corp. PO. Box 16 Saint James, NY 11780 Work Order for 201 1 Concrete Curb, Apron, and Sidewalk Repairs Installations n?thtown Highway Department Road Program are to still have The following areas on the 201 1 per the order of the Superintendent of Concrete Curb, Apron, and Sidewalk Repairs done as Highways: N.E.Cemmaek NW. Commack The folloudng road on the 2011 Smithtown Highway Department Road Progtam is to have Concrete Curbs installed on or about a date to be set by the Superintendent oinghWays: Dillmont Drive. Glenn Jorgensg en Superintendent of Highways Cc: Joseph Kosteeki, Purchasing Director 611-360-225! . WW Smithtown Highway Department 75 8 Smithtown By-Pass Smithtown, New York 11 78 7-5082 Robert J. Murphy, Deputy Superintendent oingh ways (SM-3604500, 631460-225! (fax), highway??tosgovmam TO: Jadeco Construction Corporation FROM: Robert J. Murphy, Highway Department DATE: August 06, 2013 REF: Notice of Non Compliance with Contract Dear Sir. The Smilhtown Highway Department has collectively decided to write to you regarding the poor service that has been provided to the department for various work orders for concrete work. This has occurred on a repetitive basis and hence we have felt the need to give you a formal warning. In the paragraphs below, you will see the details of the reasons for this letter. Work Order 2013-03-cw- Concrete Work-Various Roads-Phase 3 Was issued on June 25, 2013 with a starting date of July 2013 and a completion date of July 19th. 2013 and was for concrete work to be done on the following roads; New York Avenue Whisper Lane On July 24th, an amendment was made to Work Order 2013-03-CW to add additional concrete work on the following roads in the vicinity of the original roads. Ma Bell Lane Elm Avenue Willow Lane The Amended Work Order has a completion date of August 6th. 2013. As of 07:00 August 6th. 2013, not one single road on the work order has been completed. Jadeco Construction Corporation has been asked to supply additional crews to get the work order completed. but has failed to act upon that request. Contract No. 12-104 under Special Provisions on page 69. item 5 1] 3 states: ?if the Contractor fails to start work and/or complete work within the time limits specified with the Work Order, Contractor shall and will pay liquidated damages of $2,500.00 per day for each and every day beyond the speci?ed time limits?. As you can see, it is not a one time incident that has provoked the department to write to you. It is the constant lethargic approach to work and unacceptable performance of these obligations to date that has led the department to take this step. In addition, the department is requesting a detailed scheduie to complete these outstanding work orders in an effort to bring the Road Program back into a workable timetable. Failure to meet these obligations will result in assessment to liquidated damages in accordance to the contract. Thank you for your time on this matter. gag/7 Robert J. Murphy Deputy Superintendent of Highways RJM/rjm 00: Glenn Jorgeneen. Superintendent of Highways John B. Zollo, Town Attorney Louis Necroto. Town Comptroller Joseph KosteckiI Purchasing Director Robert Medwig, Highway General Supervisor Town of Smithtown 2016 Tentative Budget Fund Summary Tiile Fund Budget GENERAL FUND A 43,703,425 OUTSIDE VILLAGE GENERAL FUND 3 7,965,289 COMMUNITY DEVELOPMENT FUND CD 205,000 SECTION EIGHT VOUCHERS CD2 3 1,225,000 COMMACK AMBULANCE DISTRICT 698,596 AMBULANCE DISTRICT CMZ 382,645 HIGHWAY FUND II - BRIDGES DB 3 - HIGHWAY FUND - MACHINERY DM 53 4,290,721 HIGHWAY FUND I - REPAIRS AND DR 20,356,605 HIGI IWAY FUND 1V - SNOW AND MISC. DS 1,450,000 SL1 983,290 ARTERIAL HIGHWAYS DISTRICT SL2 638,484 RES IMP 14,491.98! PAUL . FITZPATRICK COUNTRY CLUB SP 5 WATER DISTRICT SW1 2,476,289 ST. JAMES WATER SW2 2,598,533 1987 WATER SUPPLY DISTRICT 14,500 1989 WATER SUPPLY DISTRICT SW9 3 6,000 3 101,046,359 Page 139 Regular Night Meeting Minutes March 20, 2014 CarihrizCsu I 2. THE TOWN BOARD TO AWARD THE FOLLOWING BIDS AND TO AUTHORIZE THE PURCHASE OF ASSOCIATED GOODSISERVICES: (RES-2014-256) Bid 14-007 for Concrete Curbs. Sidewalks and Aprons to Jadeeo Construction Corp. and to further Authorize the Supervisor to Sign an agreement on a form approved by the Town Attorney, as per bid opening February 20, 2014. Bid 14-011 for Crack and Joint Sealing on Various Town Roads to Bimaseo, Inc. and to further authorize the Supervisor to sign an agreement on a form approved by the Town Attorney, as per bid opening February 20, 2014. (RES-2014458) Bid ii 14-003 for Steel Stock to Erlin of Long Island and Sims Steel Corp. as per bids opened On February 20, 20 i4. . (RES-2014-259) Bid ii 14-022 for a Sailboat for Recreation Department Sailing Lessons to Sailaetion, Inc as per bid opened March 13, 2014. v- 3. THE TOWN BOARD TO APPROVE THE FOLLOWING: MINUTES APPRO VAL 1. Thursday, February 27, 2014 anu'mu BID: 14?007 TITLE: CONCRETE CURBS SIDEWALKS OPENING DATE: 02/20/14 TOTAL BID PRICES 1,849,000.00 Jadeco Construction Corp. 2,100,500.00 Tri~State Paving 2,223,500.00 - Laser Industries, Inc. 2,246,000.00 - Roadwork Ahead Inc. 2,364,600.00 J. Anthony Enterprises Inc. 2,386,250.00 Saracino Construction Corp. 2,570,000.00 The Landtek Group, Inc. 3,825,000.00 Olsons Creative Landscaping Corp. Recommend Award To: Reason Le e/ 2224 3m Bid 15-010 for Sidewalk Repair Program to Town of Smithtown Smithtown NY Resolution RES-2015-537 Bid 15-010 for Sidewalk Repair Program to Jadeco Construction Corp. and to further authorize the Supervisor to sign an agreement on a form approved by the Town Attorney, as per bid opening June 11, 2015. Information Department: Purchasing Sponsors: Councilman Robert J. Creighton Category: Bid Award w/Ag reement Body The following resolution was offered by the Town Board en masse: BE IT RESOLVED, that Bid #15-010 for Sidewalk Repair Program for which bids were received and opened on June 11, 2015, is hereby awarded to Jadeco Construction Corp. The lowest responsible, responsive bidder pursuant to the recommendation of the Purchasing Director; and BE IT FURTHER RESOLVED, that the Supervisor is hereby authorized to execute an agreement effectuating said award, on a form to be approved by the Town Attorney. Dated: June 18, 2015 Meeting History . Town . . Jun 18, 2015 7:00 PM Video Board Regular Night Meeting RESULT: ADOPTED MOVER: Thomas J. McCarthy, Councilman SECONDER: Edward R. Wehrheim, Councilman AYES: Thomas J. McCarthy, Edward R. Wehrheim, Robert J. Creighton, Lynne C. Nowick ABSENT: Patrick R. Vecchio Public Discussion Add Comment 1 of2 12/9/2015 10:50 AM um.\ ?x Special Meeting Minutes August 23, 2011 RESULT: ADOPTED [UNANiMousr MOVER: Patrick Veoohlo, Supervisor SECONDER: Edward Wehrhelm, Councilman AYES: Patriots Vecchio, Edward Wehrheim, Robert Creighton. Kevin Mailoy ABSENT: Themed McCarthy (RES-281 1-706) Change of title for Josephin Neglia to the position of Principal Assessment Clerk in the Assessor?s Of?ce, at a rate of pay of $28.05 per hour, subject to a 12 week probationary period, effective August 24. 2011. RESULT: ADOPTED MOVE-3R: Patrick Veoohio. Robert Creighton SECONDER: Edward Wehrheir'n. Councilman - AYES: Patrick Veochio, Edward Wehrheim, Robert Creighton. Kevin Mailoy ABSENT: Thomas McCarthy 7. The Town Board to approve the following: (RES-201 1-709) Town Board to direct the Town Clerk to amend the Town?s copy of the Smithtown Historic Sites inventory (1981) on ?le at the Of?ce of the Town Clerk, so as to remove from the list the House, 110 Sunken Meadow Road, Fort Salonga (#FSl2a). RESULT: ADOPTED MOVER: Patrick Vecchio. Supervisor SECONDER: Edward Wehrheirn, Councilman Patrick Veoohio, Edward Wehrheim, Robert Creighton. Kevin Malioy ABSENT: Thomas McCarthy 8. The Town Board to award a bid: (RES-201 1-710) Bid 1 1-040 for Concrete Curbs and Sidewalks to Laser Industries as per bid opening June 9, 2011 and to further authorize the Supervisor to Sign an agreement on a Form approved by the Town Attorney. RESULT: ADOPTED MOVER: Patrick Veoohio. Supervisor SECONDER: Edward Wehrhoim, Councilman AYES: Patrick Vecohio. Edward Wehrheim, Robert Creighton, Kevin Mailoy ABSENT: Thomas McCarthy To REM ADJOURNED TOWN OF SMITHTOWN DEPARTMENTOF nulu "c may 104.1100 nouz 005,000 55 Maple Avenue uv 111-7 (331)390-7551 1 u" INVESTIGATIVE REPORT DATE: 01/23/12 Confidential Ianiadcca won my; mi: I03 Ptncioroccuxincl: DPS mm N0 mi :1 can-mum: psNy we: sin MALE Annalss: PNONI: 0! ME in". on. Er roux: muunin: NO rim-no YES mum 01/25/12 0800 hours: This Investigator directed to conduct a preliminary investigation intothe relationship between Jadaoo Construction Corp. and the Town of Smithtown as it relates to the matter 01 claim #071-11 tiled 12/14/11. (See attached rt 10) The Following is a chronological tlmetirie of events regarding this matter, (allowed by the written investigation. June 6, 2008 Town Board approves bid it 08050 to Jadeco tor concrete curbing tor the period at one year commencing July1, 2008. April 30, 2009 1 yearextension letter issued renewtng 08--050 until June 30, 2010, May 15. 2010 1 year extension letter Issued renewing 08-050 until June 30. 2011, May 10. 2011 Town Board approves the advertising for bid 1: 11-040 to replace the existing concrete curbing contract returnable June 9, 2011. June 9, 2011 5 bids opened with Jadeco lowest at 311738.184 Laserindustries 2nd at $2,135.735 Condo Brothers 3rd at 2,250,785. Jr Anthony 4th at $2,705,854. and Manna construction was the high bidder at $3,924.920. June 23, 2011 Purchasing sends letter to Jadeoo advtsing they are the low bidder, and advising they have 10 business days to return attidavit regarding the required apprentice program,(Sea Attachment June 29. 2011 Joe Kostecki 01 Purchasing advises Glen Jorgansen that they will be gap due to the tact that a new contract is not yet ready to be executed Glen Jorgensen issues PO #29841 to encumber $908,667.87 tor Jadeco Construction Corp. to continue working through the gap.(See Attachment June 30. 2011 Jorgensen sends work order to Jadeco Construction Corp. tor Concrete and sidewalk repair. (See Attachment July 27, 2011 Kostecki issues second letter to Jadeoo Construction Corp. giving Jadeco untIl August 11, 2011 to me required affidavits. (See Attachment August 3 2011 Kostecki initiates Town Board resolution to award contract. August 23. 2011 Town Board awards contract to Laser Industries Kosteoki sands letter to Laser advising a contract will be lorth coming, and other requirements, August 25. 2011 Kostecki sends memo to Assistant Town Attorney Matt Jakubowski asking that the contract be drawn up,(See IEPOIVINE 0mm tun NVEsnaA-non urn-cu: sums: CRIMINAL oNLv) [Em P'me SUPERVISOR: 5min: jun: 01/23/12 rut-tutu: No . use no: 12411129 1 OWN 0F SMITH s" .0, DEPARYMENT or PUBUC mmo mm mum, as more Avenue NV 11157 menu (631.) Ian-7553 REPORT DATE: 01min Confidentiei lnv/Jadcco 1093 rust: so: me: or occuRENcEi ups WM: N0 fl convuurimr: PSNV on: son MALE PHDME: am or or n: or nu: EM: "firearm inrouNnEn. no YES August 30, 2011 iakubowski sends letter and contract to Laser for signatures (See Attachment it 6) September is, 2011 Jakubowski sends memo to Town Clerk advising signed contract now in iorce (See Attachment At some point between September 15 and October 3. 2011 Jorgensan directs Jadeco Construction Corp back to Sheryl Crescent in Kings Park to do additional work based on a compiaint Work totaled $45,751.95 The (allowing is a detailed account of the investigation requested by the Town Attorney. (see attached) 01/25/2012 0830 hours This Investigator interviewed Purchasing Director Joseph Kostecki the summary of which is as iollows' Director Kostecki explained the process by which the Town of Smitntawn pays its bills tracing a bill (rain rEqulSitiOn to purchase order to work order to voucher and iinaliy to checklpayment. A purchase order guarantees payment to a contractor regardless ot contract In the case or Jadeco Construction Corp, as a resuit of a "purchase order" dated 6/29/11 Highway Superintendent Jorgensen issued a "work order" (see attached 3) to Jadaco Construction Corp on June 30th. 2011 one day prior to the expiration of a contract between the Town at Smithtown and Jadeco Construction Corp, That work order called for specified and unspecified concrete work at various locations within the Town or Smithtown. The purchase order was adiusted by Director Kostecki at which time he initiated a change to the time 0t validation (see purchase order it 29841 attachedtf 2) Director Kostecki added that the iunds tarthe purchase and work order came from a Building Department Roads and Curbing account under the supervision or Superintendent Jargensen and at a balance of $984,146,66 Further, Director Kostecki states that it is his estimation, as a result of a review 01 the documentation, that Jadeco Construction Corp had not been paid tor work pertormed as indicated In the matter at claimr 01/27/12 1000 hours: This investigator conducted an extensNe Interview with Highway Superintendent Jorgensen the summary or which is as follows: Superintendent Jorgensen states that in anticipation of high work volume and the authorized purchase arderfi 29841 he issued a "work order" to Jaoeco Construction Corp, on 6/3011 1 prior to the expiration ot a contract between the Town at Smithtown and Jadaco Construction Corp. Superintendent Jorgensen explained that inherent in all "work orders" is the discretionary decisions to authorize "add on" work not described In a "work order" which typically calls for additional repairs at the site. These "add on" repairs are usually based on an existing complaint orat the request ofa town cflicialv Superintendent Jorgensen states that in the case at Jadeoo Construction Corp, and the pending "matter of claim" most of the attached invoices were "add on" work he authorized. Superintendent Jorgensen indicates that it Is his understanding, based on prior discussions Vincent Galdiera a paid consultant trom Laser Industries "work orders" can be viewed as binding contracts between a municipality and contractor. Superintendent Jorgensen indicates that his records would roilect that the invoices involving mums -- Emma rams! REFERRED: 5mm: CRIMINAL ONLY) HE: smut); inns: 51/23/12 livinlucs: No no: Iz-Bms' TOWN 01' SMITHTOWN SE: or minus mm" 0001 Msmu 65 Maple Avenue NV 11781 Pisa 3 of4 (531) 360-7553 INVESTIGATIVE REPORT DATE: 01/13/11 memoir: Confidential Invitadcco ans: rim P051: to; puceoraccuaENcE: DPS N0 sax: MALE . Vi OF DAY OF 07 FMONE. A roux: rounmi No mm In YES "in: us! no: some: - rm contracted and "add on" work completed both before and alterthe contract expired are valid and should he paid Superintendent Jorgenseh indicated that a request to trans/er tunds trom a "pavement account to a "cement accoun which was approved by the TOS executive board on 10/25/11 may have added to the can/uston as to whether or not work that was performed. completed inspected and paid tar. Superintendent Jorgensen added that a long standing relationship with Jadeco Construction Corp.. anticipated heavy Work load' weather (Hurricane) and delay In Implementing the new contract with Laser Industries influenced declsron to continue work before during and atter the expired contact Superintendent Jorgensen acknowledged the fact that work related to invoice 235 in the amount 01345.78135 (Sheryl Crescent Kings Park) was authorized after the contract award to Laser lndustries and solely matter or "add on" because Jadeco Construction Corp. was performing work in the area. No new monies were allocated to cover this work. 01/30/121000 hours, This Investigator received a return call from Town Attorney John Zallo who requested that meet with him 0930 hours Wednesday February, 1st 2012 to discuss the Jadeco Canst. Corp, matter. 1430 hours: This investigator received a return Call tram town Comptroller Louis Necroto who agreed to be interviewed via telephone. Comptroller Necrnto states that the Jadeco Construction Corp, matter preceded his term Dt cities not that train the limited Knowledge he possessed regarding the inquiry it was his opinion that current municipal law would dictate that the work conducted by Jadeco Construction Corp regardless it conducted tie/ore or alter the expiration or any contract, it complete and satisfactory would require payment. 1/31/0930 hours: This Investigator conducted a tollow-up interview with Purchasing Director Joseph Kostecki who contributed the necessary information in order to formulate the above listed tlme line. 1430 hours This investigator conducted a (allow--up intenliew with Highway Superintendent Jorgenseh who provided the payroll receipts concerning invoice [See Attachment and additionally a payment receipt indicating partial payment in the amount at $55,544 99 dated 10/25/11,Check# 295217 (See Attachment it 8) 2/1/12 0945 hours. This Investigator met with Town Attorney Zoilo to discuss the status 0/ this investigation and address any questions or concerns in the matter Summary: This investigator, through a series on interviews and review at the involved documentation, has determined that a contract with Jadeco Construction Corp has existed with the Town or Smithtown rrcni June 2008 through June or 2011 According to Highway Superintendent Jorgerisen there had been no signiticant issue It Division INV mom . sumo: lam: sinus CRIMINAL ONLV) Ht: swimsuit: mas/t2 EVIDENCE No NO: 12411129 TOWN OF SMITHTOWN I DEPARTMENY OF PUBLIC SAFETV fi 65 mm: Am". 104.000 0002 Nv 11137 i (631) sen-7553 33? INVESTIGATIVE REPORT DATE: 01/13/12 "mom: Confidential Inv (indeed Cont: um P051: so; Iuos or occuamcsi DPS mm: M) nan six: MALE mom on: or one; minor rm: ME ucc in>> mun: mum: No "warm YES rouse No; some: comm unn- oi complainlwith regard to the quality of work or payment schedule. In May or 201i the Town Board approved advertising (or bidtt 114740 5 bids were received with Jadeco Construction Corp. being the lowest bidder, As a result oi the iailure oi Jadeoo Construction Corp, to comply with (and provide documentation tor) a town request to participate In a apprenticeship training program the contract expired July ist'2011 and the new contract award was delayed Priorto the expiration of the current Jadeco Consti Corp. contract on June 29th.2011 a purchase order Was Issued by Purchasing Director Joe Kostack in the amount of $988.667 B7i immediately followed by a work order. on June 30th. from Superintendent Jorgenseri authorizing Jadeco Const. Corp to continue working on assigned projects On July 27th, 2011 a second request was sent to Jadeco Const. Corp. to tile the necessary paperwork with a deadline oi August 'l1th,201 iv On August 23rd, 2011 bid i 1-040 was awarded to Laser industries with the town Attorneys office mailing contracts tor signatures on August 30th Jadeco Construction Corp continued work on projects assigned priorto the expiration of the contract perthe purchase agreement and work order and subsequently submitted invoices tor payment. in one instanoe (invoice if Superintendent Jorgensen authorized "add on" work on Sheryl Crescent in Kings Park which was the result of a complaint. That authorization took place sometime between September 15th,201'l and October 3rd,2011. was post contract with Laser industries, and completed on or about October 1 'lih. No new monies beyond the purchase agreement and work order were requested or authorized regarding invoice 238. A review of the involved invoices and payroll receipts has determined that the invoices submitted by Jadeco Construction Corp. totaled $497,212.25. A partial payment made to Jadeco Construction Corp on 10/25/11 in the amount of 355544.99 which would leave a baianoe owed of $441,667.26 That approximate iigure is reflected In the notice oi claim #171-11 ($441.936 42) Results at this investigation iorwarded to the requesting authority W-- - hereunto. 51?: supenvxsun: mm: min: omyizjlvinmcer No CREW ER REPORT CAR 2 CREW LEADER: WQRK DETAIL LOCATION WORK DETAIL 12m 2 3. qua-?? W4 -z Pm: I, ?mw .Date: Weatherf'f'empI LOCATIOE Cr r?s .. 99?29 Materials Used: 2 JOE El YES No EQUIPMENT IN NEED OF REPAIR: SHOP El YES El NO AQCIDQETIDICIDENTEJURY INVOLVED: TYPE OF INCIDENN INJURY: TIME INCIDENT REPORT FILED: El YES No AMBULANCE NEEDED: El YES No COMPENSATION FORMS FILED: El YES [3 NO PUBLIC SAFETY E3 YES NO Tow TRUCK NEEDED