SR1849 XT60 Performance Test Results - Coach 7210 Table of Contents The following tests were performed to verify that SR1849 XT60 can successfully operate at GVWR under San Francisco's terrain and environmental conditions. Curb weight of Coach 7210 46,932 Equipped and loaded with sandbags 66,042 Final weight with test personnel on board, roughly GVWR 67,970 See the following pages for detailed results and field notes. The test plan is included at the end of this document. DAY 1 GRADEABILITY TEST ON 60' 10%) E55 PERFORMANCE TEST DAY 2 DUTY CYCLE TEST 49 VAN DAY 3 DUTY CYCLE TEST 5 FULTON DUTY CYCLE TEST - 14 MISSION DAY 4 DUTY CYCLE TEST - 3O VAN NESS DAY 1 - 11/30/15 Start End Time Mileage unk unk Personnei on Board Steve New Flyer Raimund VKD Tom IEC Deborah Operations John Quality Assurance Bhavin Jacobs Carlos Engineering Road Grade 0% Speed Required 40 Acceleration Run 1 0-20 In 7 sec 10.5 sec 9.78 sec 9.69 sec 0-40 in 25 sec 0-18 in 7 sec 11.5 sec 13.47 sec 0-14 in 7 sec 14.61 sec 15.21 sec DAY 1 ESS TEST ESS Mode Road Requirement Result Grade 0% Reach 30 28 5% 0-15 in 20 seconds 0?15 in 25.08 seconds 10% 0-10 in 25 seconds Climbed the grade but with a max speed of 5 555 range of 2.5 miles on flat ground Passed Maintain 30 f0:r 0.5 miles Max speed of 28 for 0.5 miles Five complete stops performance Passed Enhanced Performance Mode Start at 100% charge Finish at 23% charge Drives; for 2.5 miles vie)?? DAY 1 DAY 2 - 12/1/15 Start End Time Miieage 119 140 Personnel on Board Steve New Flyer Raimund VKD John Lim Operations Rick Jacobs Nelly Engineering DUTY CYCLE TEST - 49 VAN Outside temperature 14.3 Started at Fort Mason at outbound towards Phelan/CCSF VKD paramaters recorded by DPU throughout entire roudtrip Cycled through the front door-and activated kneeler at every stop U-turns at both terminals completed successfully Reached Phelan/CCSF at Started from Phelan/CCSF at inbound towards Fort Mason Cycled through the front door and activated kneeler at every other stop At Van Ness Avenue between Broadway Pacific Avenue grade), speed attained 16mph At Van Ness Avenue Union Street a power surge and reset occurred Returned to Potrero Yard at DAY 2 Inbound (Return trip) Chestnut 8; Scott Chestnut Pierce Chestnut Fillmore Chestnut Webster Chestnut St Buchanan Chestnut 8: Laguna Chestnut 8: Octavia Chestnut 8: Gough Chestnut Franklin Chestnut Van Ness Van Ness 8: Bay North Point Polk North fioint 8t Larkin North Point Hyde Columbus Francisco Coiumbus Lombard Columbus Filbert Columbus 81 Union Stockton Paci?c Stockton Ciay Stockton 8: Sacramento Stockton Eh California Sutter Grant Townsend 13th End of Test (30 Line) FIELD NOTES 10:40 am (delayed. Steven was programming) Opened front door and knee! Opened front door and kneel Opened front door and kneel Opened front door and kneet Opened front door and kneei Opened front door and kneel Opened front door only Opened front door and kneel Opened front door only Opened front doc: and kneel Opened front door and kneel Opened front door onEy Opened front door only Opened front door only Opened ftont door and kneel End of 30 time 11:36 am Mileage 190 Intermittent rain during inbound tesi Water leak near the rear (curbside) of the arctic joint Automatic incline feature active Heating system on highest setting Returned to Potrero Yard at Unloaded sand bags from 7210 DAY 4 DAY 4 - 12/3/15 Start End Time Mileage 177 190 Personnel on Board Farah Ralmund om Nathan Rick Nelson DUTY CYCLE TEST - 30 STOCKTON Townsend 8. 4th st 3rd 81 Townsend 3rd Stillman 3rd Folsom 3rd 8: Howard 3rd 84 Mission Kearny Geary Sutter St Grant Stockton California Stockton 8; Sacramento Stockton Clay Stockton 8r Paci?c Columbus 8: Union Columbus 8: Filbert North polnt Van Ness Bay 8: Van Ness Van Ness Francisco Van Ness Chestnut Chestnut Franklin Chestnut 8: Gough Chestnut 81 Laguna Chestnut Si Webster Chestnut Fillmore Chestnut Avila Chestnut Scott Chestnut Oivisadero Chestnut 8: Broderick Broderick 8. Francisco Broderick 81 Bay Broderick 8i North Faint Broderick Jefferson Divisadero Beach Divisadero Francisco Divisadero Chestnut Start of 30 Line 9 3:53 am Mileage 179 Opened front door only Opened front door only Opened front door and kneel Opened front door and knee! Opened front door and knee! Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door and knee! Opened front door and knee! Opened front door and knee! Opened front door and kneel Opened front door only Opened front door and knee! Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door only Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door only Opened front door and kneel Opened front door only Opened front door and kneel Opened front door only Opened front door and kneel Opened front door and kneel Opened front door and kneel Opened front door and kneel 9:56 am Mileage 133 Noticed Water leak at front curbside ceiling of the trailer DAY 4 DAY 3 - 12/2/15 jg! Start End Time Mileage 140 174 Personnel on Board Steve New Flyer Raimund VKD Raul Operations Rick Jacobs Carlos Engineering DUTY CYCLE TEST - 5 FULTON Started at outbound, mileage 140 Completed roundtrip route at mileage 159 DUTY CYCLE TEST - 14 MISSION Started at towards outbound, mileage 159 Completed roundtrip route at mileage 174 Total of stops (opening doors and kneeling) 74 DAY 3