City of Seattle Department of Construction and Inspections Engineering Services ROY MCGARRAH 4137 24th Pl S Seattle, WA 98108 Re: Project# 6506398 Correction Notice #2 Review Type Project Address Contact Email SDCI Reviewer ORD STRUCT 6006 12th Ave S roy.stark.design@gmail.co m Robert W Kennedy Reviewer Phone (206) 684-0834 Reviewer Fax (206) 386-4039 Reviewer Email Owner kennedr@seattle.gov Date March 21, 2016 Contact Phone (734) 646-4816 Contact Fax Address Seattle Department of Construction and Inspections 700 5th Ave Suite 2000 PO Box 34019 Seattle, WA 98124-4019 JOHN BENNETT Applicant Instructions Please see the attached flyer to learn "How to Respond to a SDCI Correction Notice". If the 3-step process outlined in the aforementioned document is not followed, it is likely that there will be a delay in permit issuance and there is a potential for penalty fees. Codes Reviewed This project has been reviewed for conformance with one or more of the following codes: 2012 Seattle Building Code (SBC); 2012 Seattle Existing Building Code (SEBC); 2012 Seattle Mechanical Code (SMC). Corrections 1 SEBC 302.4 - Parapet walls that are in deteriorated condition or are otherwise unable to sustain the design loads specified in the code, are hereby designated as unsafe building appendages. All such unsafe building appendages a public nuisances and shall be abated in accordance with Section 101.14. Please provide documentation that shows the parapets above all three building entrances into the tenant space have been braced by a previous permit or include those details, by a licensed structural engineer in the building plans. See shts A1.0, 2.1A & 2.1B. Project# 6506398, Correction Notice# 2 Page 1 of 1 City of Seattle How to Respond to a Seattle DCI Correction Notice Step 1: Wait for all reviews to be completed • • • • You may check the status of any review at the following link: http://web6.seattle.gov/dpd/permitstatus All reviews must be completed before the applicant can respond, upload, or submit any correction responses. Electronic Plans: We will send correction letters to the Seattle DCI Project Portal. We will notify the primary contact for the project when all reviews in the review cycle are complete. Paper Plans: We will notify the primary contact for the project by email or phone when all reviews in the review cycle are complete and plans are ready to be picked up. Once you have been notified, pick up the plans at Plans Routing in the Applicant Service Center. Step 2: Make Corrections Provide a written response for each item on all correction notices. We will not accept corrected plans without written responses. Include the following information for each item: • Describe the change • Say where the change can be found in the plan set • If you have not made a requested change, give a code citation or provide calculations to explain why not • Coordinate responses to correction items among all designers, architects, engineers, and owners • If you make voluntary changes to your plans, describe the changes you have made in your response letter Correct your Plans: • Cloud or circle all changes • You may add new sheets to the plan set if you have new information to show For Electronic Plans: • Always upload a complete plan set For Paper Plans: If you replace sheets in the paper plan sets: • Remove the old sheets, mark them as “VOID,” and include them loose at the back of each plan set • All original sheets and plan pages must be returned to Plans Routing in the Applicant Service Center • Insert the new sheets and staple the plan sets If you make changes to the original paper plan sheets: • Make all changes with ink (preferably red, waterproof ink). Do not use pencil to make changes • Do not tape or staple anything to the plan sets Platting Actions: Provide new copies of the survey when responding to a correction notice for a shortplat, lot boundary adjustment, or other platting action. Provide the same number of copies that were required when you submitted the project. Step 3: Submit Corrected Plans Electronic Plans: Upload your corrected plan set and correction response letter through your Seattle DCI Project Portal. Paper Plans: Return your corrected plans and your correction response letter to Plans Routing in the Applicant Services Center. If you don't follow these instructions: • Plans Routing may not accept your corrected plans • We may be delayed in starting corrected plan review, which can delay permit issuance • We may charge a penalty fee Plans Routing / Applicant Services Center - 700 5th Avenue, 20th Floor Hours: Monday, Wednesday, Friday: 8:00 a.m. - 4:00 p.m., Tuesday, Thursday: 10:30 a.m. - 4:00 p.m.