Manatee County Government Proposed Half Cent Infrastructure Sales Tax Transportation ‐ Sidewalks  Project Categories  Estimated  Annual  Estimated  Amount by  Percent of  Total Annual  Category Sidewalks  15 Years Transportation  (65% of Revenue Per Committee Recommendations) Sidewalks Neighborhood sidewalks and sidewalks to schools  To improve pedestrian safety $1,219,575 5.3% $18,293,625 Preliminary Cost  Estimate by  Project Recommended Sidewalks Improvement 11th Ave E from 69th St Ct E to 72nd St Ct E 18th St E from 2nd Ave E to US 41 19th St W & E from 2nd Ave W to US 41 1st Ave E from 17th St E to North DE 1st Ave W from 63rd St NW to 59th St W Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Add sidewalks on both sides $             156,000 $             111,000 $             209,000 $             547,000 $             175,000 20th St W & E from 2nd Ave W to US 41 21st St W & E from 4th Ave W to US 41 22nd St E from 1st Ave E to US 41 22nd St W from Dead End to 2nd Ave W 25th St W & E from Bayshore Rd to 2nd Ave E 26th Avenue East from 27th Street East to 45th St E 26th St W from Cortez Rd to 21st Ave W 27th St E from 26th Ave E to 30th Ave E 27th St E from Stone Creek sub to 31st Ave E 2nd Ave E from 17th St E to 25th St E 2nd Ave W from 17th st E to Dead End 2nd Avenue West from 17th Street East to End road Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Add sidewalk on one side Road drainage and sidewalk Add sidewalks on both sides Add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalk on one side Add sidewalk on one side Road drainage and sidewalk $             198,000 $             319,000 $             123,000 $             100,000 $                95,000 $             449,000 $             528,000 $             106,000 $             113,000 $             418,000 $             259,000 $             345,000 301 Blvd from Tallevast Rd to University Parkway 30th Street East from 49th Ct. East to 8th Avenue East 31st Street East from 9th Avenue Dr. East to 33rd Street E 35th St W from 9th Ave W to 13th Ave W 36th St E (Prospect Rd) from Whitfield Ave to 70th Ave E  (just South to existing sidewalk) 36th St E (Prospect Rd) from Whitfield Ave to Cottages @  Blu Vista, North of 72nd Ave E 39th Ave W from 63rd St W to 59th St W 3rd Ave E from 17th St E to 22nd St E 3rd Ave W from 17th St E to 22nd St W Add sidewalk on west side, gaps on east side. Road drainage and sidewalk Road drainage and sidewalk Add sidewalk on one side $             643,000 $             230,000 $             173,000 $             103,000 Road drainage and add sidewalk on one side $             171,000 Road drainage and add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side $             168,000 $             103,000 $             259,000 $             235,000 42nd Ave W from 63rd St W to 59th St W 43rd Ave w from Cape Vista Dr to 51st St W Add sidewalk on one side Add sidewalk on one side $             103,000 $             103,000 1 Preliminary Cost  Estimate by  Project Recommended Sidewalks Improvement 45th St E from 4th Ave E to End of Street 4th Ave E from 45th St E to 49th St e Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side $             173,000 $             200,000 51st St W from 32nd Ave Dr W to 26th Ave W 51st St W from 47th Ave W to Cortez Rd 53rd Ave W from 25th St W to US 41 54th Ct E from 74th Pl  E to Woodlawn Cir W 55th Ave W from 26th St W to US 41 55th St E from existing sidewalk to 65th Ter E 59th St W from Manatee Ave W to 6th Ave NW 59th St W from Sun Chase Apt to Cortez 5 Ave NW from 71st St NW to 75th St NW Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalk on one side Add sidewalks on both sides Add sidewalks on both sides Add sidewalk on one side Add sidewalk on one side $             163,000 $             143,000 $             282,000 $                63,000 $             556,000 $             144,000 $             393,000 $                99,000 $             103,000 61st Ave E from 1st St E to 5th St E 61st St E from Bayshore Rd to 16th Ave E 65th Ter E from 49th Ct E to Dead end 67th St W from Manatee Ave W to 5th Ave NW 69th St Ct E from Bayshore Rd to End of Street Add sidewalk on south side Road drainage and add sidewalk on one side Add sidewalk on one side Add sidewalks on both sides Add sidewalk on one side $             120,000 $             412,000 $             113,000 $             178,000 $                40,000 71st St E from Bayshore Rd to End of Street 72nd St Ct E from Bayshore Rd to End of Street 72nd St Ct E from Bayshore Rd to US 41  72nd St E from Bayshore Rd to End of Street 75 St W from Cortez Rd to 53 Ave W 7th Ave NW from 75th St NW to 71st St NW Road drainage and add sidewalk on one side Road drainage and add sidewalk on one side Road drainage and sidewalk Road drainage and add sidewalk on one side Add sidewalks to both sides of the road. Add sidewalks on both sides $             136,000 $             316,000 $             518,000 $             295,000 $             416,000 $                85,000 80th Ave Cir E from 55th St E to 55th St E 83rd St NW from existing  s/w 1400 block to 17th Ave NW 8th Avenue East from 33rd Street East to 9th Avenue Dr E 9th Ave NW from 71st St NW to 83rd St NW Add sidewalk on one side Add sidewalk on one side Road drainage and sidewalk Add sidewalk on one side $             112,000 $                53,000 $             173,000 $             312,000 Bayshore Rd from 72nd St Ct E to US 41 Cape Vista Dr from 39th Ave W to 36th Ave Dr W Cape Vista Dr from Cortez Rd to 38th Ave W Case Ave from Cornell Rd to Tulane Rd Columbia Dr from Florida Blvd to Bayshore Gardens Pkwy Cornell Rd from Bayshore Gardens Pkwy to Case Ave Dartmouth Dr from Harvard Ave to Bayshore Gardens Pkwy Florida Blvd from 34th St W to 26th St W Georgia Ave from Bayshore Garden Pkwy to Bay Dr Golf Course Rd from Fort Hamer Rd to Twin Rivers Trail Greenbrook Blvd from Lorraine Rd to Royal Turn Circle Road drainage and add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalks on both sides Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalks on both sides Add sidewalk on north side $             932,000 $                22,000 $             149,000 $                18,000 $             249,000 $             102,000 $             158,000 $             209,000 $             590,000 $          3,421,000 $             115,000 Hamilton Way from Roosevelt Rd to Manatee Ave Harvard Ave from Columbia Dr to Roslyn Ave Idlewild Ct from 12th St E to 15th St E Old Tampa Road from 89 Ave E to Chin Rd Palma Sola from 34th Ave W to 27th Ave W Red Rooster Rd from US 301 to Major Turner Run Roslyn Ave from Dartmouth Dr to Bayshore Gardens Pkwy School Drive from Lakewood Ranch Blvd to Mustang Alley Silverleaf Ave from US 301 to Ft Hamer Rd Spencer Parrish Rd from 57th St E to Golf Course Rd Road drainage and add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalks on both sides Add sidewalks to both sides of the road. Add sidewalk on one side Road drainage and add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Road drainage and add sidewalks on both sides Road drainage and add sidewalk on one side $                94,000 $             207,000 $             371,000 $             811,000 $             522,000 $             350,000 $             153,000 $             161,000 $             265,000 $             870,000 2 Preliminary Cost  Estimate by  Project Recommended Sidewalks Improvement Stanford Ave from 26th St W to Columbia Dr Tulane Ave from Georgia Ave to 26th St W Waterline Rd from Rye Rd to Dam Rd Whitfield Ave from 15th St E to 9th Ave E Whitfield Ave from 15th St E to West to existing sidewalk Wilmerling Ave (65th Ave E) from 5th St E to End of road Woodlawn Cir S from Erie Rd to end of 79th Ave E Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalk on one side Add sidewalks on both sides Add sidewalks on both sides Add sidewalks on both sides Preliminary Cost Estimate Total $                72,000 $                88,000 $          1,028,000 $             200,000 $                47,000 $             153,000 $             361,000 $    23,858,000 NOTES:  All amounts in current year (2016) dollars.  List derived from School Board and citizen requests. Prepared by Manatee County Government, 6/7/2016. 3 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Transportation ‐ Intersection Improvements  Estimated  Annual  Amount by  Category Project Categories  Percent of  Estimated  Intersection  Total Amount    Improvements  15 Years Transportation  (65% of Revenue Per Committee Recommendations) Intersection Improvements Upgraded traffic signals and additional turn lanes To reduce congestion and improve safety $      2,276,540 9.9% $34,148,100 Recommended Intersections Improvement Prelimiary Cost  Estimate  Breakdown 15 St E @ US 301 26 Ave E @ 27 St E 26 St W @ 30 Ave W 26 St W @ 57 Ave W 26 ST W @ Bayshore Gardens Parkway 43 St W @ 9 Ave W 53 Ave W @ 26 St W 53 Ave W @ 34 St W 60 Ave E @ K‐MART 63 Ave E @ 9 St E 66 St Ct E / 64 St Ct E @ SR 64 9 St E @ 30 Ave E 9 St W @ 30 Ave W Add southbound right turn lane Upgrade to mast‐arm supports, add separate northbound and southbound lefts Upgrade to mast‐arm supports, and add westbound left and right turn lanes Upgrade to mast‐arm supports and add turn lane(s) Add turn lane(s) Upgrade to mast‐arm supports and add right turn lanes Upgrade to mast‐arm supports and add turn lane(s) Add turn lane(s) Upgrade to mast‐arm supports, add turn lane(s) Add turn lane(s) Add northbound left and right turn lanes Upgrade to mast‐arm supports and add turn lane(s) Add right turn lanes on all approaches $             327,000 $             449,000 $             449,000 $             449,000 $             654,000 $             449,000 $             449,000 $          1,645,000 $             449,000 $             980,000 $             750,000 $             449,000 $             654,000 Ellenton‐Gillette Rd @ Mendoza Rd Erie Road @ US 301 Parrish Honore Ave @ Cooper Creek Blvd Lockwood Ridge Rd @ Whitfield Ext Lorraine Rd @ 44th Ave E Lorraine Rd @ Rangeland Parkway Tallevast Rd @ Tuttle St White Eagle Blvd @ 44th Ave E White Eagle Blvd @ Malachite Rd Whitfield Ave @ Prospect Rd Install signal and add turn lanes (partial funding in CIP) Align east and west approaches Install traffic signal Add turn lane(s) Install traffic signal and add turn lanes Install traffic signal and add turn lanes Add separate northbound, southbound right turn lanes Install traffic signal Install traffic signal Upgrade to mast‐arm supports, add separate right turn lanes on all approaches $             484,000 $          1,357,000 $             576,000 $          1,307,000 $          1,697,000 $          1,697,000 $          1,307,000 $             576,000 $             576,000 $             449,000 Preliminary Cost Estimate Total $    18,179,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  Prepared by Manatee County Government, 6/7/2016. 4 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Transportation ‐ Major Road Projects  Estimated  Annual  Amount by  Category Project Categories  Estimated  Percent of  Major Road  Total Amount    15 Years Projects  Transportation  (65% of Revenue Per Committee Recommendations) Major Road Improvements Standard and sufficient travel lanes, bridges, sidewalks, bike lanes (or  path),  and lighting To improve safety for motorists, bicyclists and pedestrians $       12,764,885 55.5% $191,473,275 Prelimiary Cost  Estimate Recommended Major Roads Improvement 27 St E from 38th Ave E to 26th Ave E Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         8,509,000 30 Ave E from 9th St E to 15th St E Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         5,189,000 37 St E from 38 Ave E to SR 70 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       12,971,000 43 St W from Cortez Rd to 53 Ave W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       11,207,000 43rd St W from 36th Ave W to 9th Ave W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       15,876,000 45 St E from 44 Ave E to 26 Ave E Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       10,377,000 51 AV E from US 301 to 33 ST E Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         5,500,000 51 St W from 21 Ave W to Cortez Rd Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       13,386,000 51 St W from Cortez Rd to 53rd Ave W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       10,481,000 53 Ave W from 26 St W to 30 St W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         3,743,000 53 Ave W from US 41 to 26 St W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       10,797,000 59 St W from 33 Ave Dr W to Cortez Rd Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         7,783,000 59 St W from Riverview Blvd to Manatee Ave W Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       10,169,000 5 Prelimiary Cost  Estimate Recommended Major Roads Improvement 60 Ave E from Factor Shop Blvd to Mendoza Rd Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         3,840,000 60 Ave E from US 301 to Factory Shop Blvd Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         3,024,000 69 St E from Ellenton‐Gillette to I‐75 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         8,405,000 69 St E from US 41 to Ellenton‐Gillette Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         9,754,000 Canal Road from US 301 to US 41 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       19,320,000 Honore Ave from 83 Ave E to Cooper Creek Blvd Add two lanes to existing two lane roadway $         2,666,000 Mendoza Rd from Ellenton‐Gillette to I‐75 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $       10,999,000 Moccasin Wallow Rd from Ellenton‐Gillette to  Gateway/49 Ave E  Widen to include four standard travel lanes, sidewalks, bike  lanes (or trail), and lighting $         7,390,000 Moccasin Wallow Rd from US 41 to Ellenton‐ Gillette Widen to include four standard travel lanes, sidewalks, bike  lanes (or trail), and lighting $         6,371,000 Upper Manatee River Rd from Ft Hamer Bridge  to Rye Rd Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         8,050,000 Victory Rd from Mendoza Rd to US 301 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         8,094,000 Whitfield Ave E from 301 Blvd to US 301 Upgrade to current standards for travel lanes, sidewalks,  bike lanes (or trail), and lighting $         8,820,000 Preliminary Cost Estimate Total $    222,721,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  Prepared by Manatee County Government, 6/7/2016 6 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Public Safety & Law Enforcement  ‐ Law Enforcement Facilities & Equipment Project Categories  Estimated  Annual  Amount by  Category Percent of Law  Enforcement  Estimated     Facilities &  Total Amount    Equipment 15 Years Public Safety & Law Enforcement (14% of Revenue Per Committee Recommendations) Law Enforcement Facilities & Equipment $          1,678,080 Replacement and expansion of aging facilities and equipment To increase safety and provide necessary service locations and capacity 7.3% $25,171,200 Prelimiary Cost  Estimate  Breakdown Recommended Projects & Improvements MSO District Office 4 New ‐ 20,000 s.f. (without land acquisition cost) MSO District Office I Desoto Center Existing Complex 20,000 sf Addition  MSO District Office II 57th Avenue East Raze and Rebuild 20,000 sf building Fleet Facility for Vehicle Maintennace (without land aquisition cost), 15ksf building, $1m site work, $900k  parking, plus design. Helicopter Replacement (not ordered until after November) New Property Evidence Building Parking Lot District I or behind CPS Facility (does not include land) $          3,793,500 $          3,296,250 $          3,296,250 Desoto Center UPS Replacement ‐ MSO Data Center Desoto Data Center Liebert AC Units Desoto Parking Lot Resurface ‐ Rear of the Building New CPS Facility Generator Renovate Old Purchasing Building SWAT Training ‐ Driveway Stockade Roofs Replacement $             225,000 $               65,000 $               30,000 $             350,000 $             100,000 $             250,000 $             772,000 $          6,892,250 $          4,000,000 $          6,780,000 Preliminary Cost Estimate Total $       29,850,250 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  List derived from Property Management Dept., Public Safety Dept. and Manatee County Sheriff's Office Prepared by Manatee County Government, 6/7/2016. 7 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Public Safety & Law Enforcement  ‐ Criminal Justice & Public Safety Facilities Upgrades Project Categories  Percent of  Criminal  Estimated  Justice &  Estimated  Annual  Public Safety  Total  Amount by  Facility  Amount  15  Category Upgrades Years Public Safety & Law Enforcement (14% of Revenue Per Committee Recommendations) Criminal Justice & Public Safety Facility Improvements Replacement and expansion of aging facilities and equipment To increase safety and provide necessary service locations and capacity $    1,083,760 4.7% $16,256,400 Recommended Projects & Improvements Prelimiary  Cost Estimate  Breakdown Jail Renovations and Improvements  Bariatric Ambulance with Paramedic Training Equipment Beach Lifeguard Tower Replacements (7) Additional Beach Lifeguard Towers $   12,660,200 $         532,000 $         750,000 $         350,000 Preliminary Cost Estimate Total $   14,292,200 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  Prepared by Manatee County Government, 6/7/2016. 8 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Public Safety & Law Enforcement  ‐ 911 & Public Safety Technology Upgrades Project Categories  Estimated  Percent of  Estimated  Annual  911 & Public  Total  Amount by  Safety Tech  Amount      Category Upgrades 15 Years Public Safety & Law Enforcement (14% of Revenue Per Committee Recommendations) 911 & Public Safety Technology Upgrades Replacement and expansion of aging critical facilities and equipment To increase safety and provide necessary modernization and capabilities $        664,240 2.9% $9,963,600 Recommended Projects & Improvements Prelimiary  Cost Estimate  Breakdown Next Gen 911 ‐ Text to 911 911 Disaster Recovery System 911 Hardware Replacement & Software Updates Public Safety Communication System Upgrades Emergency Operations Communication System $     3,895,000 $         584,250 $     1,500,000 $     1,250,000 $         580,000 Preliminary Cost Estimate Total $     7,809,250 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  Prepared by Manatee County Government, 6/7/2016. 9 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Public Safety & Law Enforcement  ‐ Animal Services & Sheltering Project Categories  Estimated  Annual  Amount by  Category Percent of  Animal  Services &  Sheltering Estimated  Total  Amount     15 Years $          69,920 0.3% $1,048,800 Public Safety & Law Enforcement (14% of Revenue Per Committee Recommendations) Animal Services & Sheltering Replacement, renovations and expansion of aging facilities and equipment To increase animal safety and provide necessary services and capacity Recommended Projects & Improvements Prelimiary  Cost Estimate  Breakdown Renovate Existing Animal Shelter $     1,000,000 Preliminary Cost Estimate Total $     1,000,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  10 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Parks & Community Facilities ‐ District Parks & Aquatic Facilities  Estimated  Annual  Amount by  Category Project Categories  Percent of  District  Estimated  Parks &  Total  Aquatic  Amount   15  Facilities  Years Parks & Community Facilities (13% of Revenue Per Committee Recommendations) District Parks  & Aquatic Facilities Replacement and enhancement of aging facilities and equipment To provide necessary service locations and maintain existing recreation facilities $        888,258 3.9% $13,323,866 Prelimiary  Cost Estimate Location Project Braden River District Park Construct fenced dog park, includes large and small dog areas, pavillions,  picnic tables, benches, water fountains, signage, sidewalks, seating, and trees. Remove and replace and upgrade existing skate park equipment Relocate basketball court to open space areas resurfacing to pickleball Remove and replace tennis courts  Enlarge existing fenced dog park, includes large and small dog areas,  pavillions, picnic tables, benches, water fountains, signage, sidewalks, seating,  and trees. Remove and replace tennis courts  Remove handball courts and replace with pickle ball.  Upgrade tennis court lighting to LED (glare reduction for residences and electr Splash pad equipment replacement, expansion add shade structures G.T. Bray District Park G.T. Bray District Park G.T. Bray District Park G.T. Bray District Park Lakewood Ranch District Park Lakewood Ranch District Park Lakewood Ranch District Park Lincoln Park            300,000            273,000            100,000            225,000            300,000            225,000            300,000            250,000            300,000 Preliminary Cost Estimate Total $     2,273,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  11 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Parks & Community Facilities ‐ Athletic Fields  Project Categories  Estimated  Annual  Amount by  Category Percent of  Athletic  Fields  Estimated  Total  Amount     15 Years $        750,430 3.3% $11,256,453 Parks & Community Facilities (13% of Revenue Per Committee Recommendations) Athletic  Fields Replacement and enhancement of aging facilities and equipment To provide necessary service locations and maintain existing recreation facilities Location Project Prelimiary  Cost Estimate Blackstone Park  Blackstone soccer concession stand and restrooms $         400,000 Blackstone Park Six dugout replacements $         100,000 Blackstone Park Replacement softball consession stand and restrooms $         309,500 Braden River District Park Complete ballfield #6 renovation of outfield to include soil, grading, rolling  and sodding to combat settlement $         250,000 G.T. Bray District Park Replacement backstops for softball fields (4) and baseball fields (4) $         360,000 G.T. Bray District Park Reconstruct Bronco football building  $         400,000 G.T. Bray District Park Lighting (LED) for one football field, two north soccer fields,  two softball  fields and skatepark area lighting. $     1,770,000 G.T. Bray District Park Bray soccer building replacement $         400,000 G.T. Bray District Park Demolish and remove existing baseball/big concession building and construct  $         400,000 ADA and fire code compliant building G.T. Bray District Park G.T. Bray District Park Demolish and remove existing softball concession building and construct ADA  $         400,000 and fire code compliant concession building Dugout replacements for softball fields (8) and baseball complex (8) $        320,000 Preliminary Cost Estimate Total $     5,109,500 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  12 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Parks & Community Facilities ‐ Recreation Buildings & Playgrounds  Estimated  Annual  Amount by  Category Project Categories  Percent of  Recreation  Buildings &  Parks  Estimated  Total Amount   15 Years Parks & Community Facilities (13% of Revenue Per Committee Recommendations) Recreation Buildings  & Playgrounds $           971,603 Replacement and enhancement of aging facilities and equipment To provide necessary service locations and maintain existing recreation facilities 4.2% $14,574,042 Location Project Prelimiary Cost  Estimate Bennett Regional Park Blackstone Park Coquina Beach Regional Park East Bradenton Park John H. Marble John H. Marble John H. Marble John H. Marble Lakewood Ranch District Park Myakka Park Install shade structure for existing playground Remove, replace and upgrade existing skatepark equipment Replace bathrooms at Coquina Beach (6) Replace park restroom facility to include community indoor activity area   Replace pavilion with a new pavilion with restroom Repave parking lot  Facility retrofit Phase II ‐ picnic shelters, deck expansion Gymnasium replacement, community center Destination shaded playground structure Replace restroom and drinking water supply well $              30,000 $            273,000 $            250,000 $            300,000 $            250,000 $            150,000 $            500,000 $        2,580,000 $            937,500 $            200,000 Preliminary Cost Estimate Total $        5,470,500 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  13 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Parks & Community Facilities ‐ Environmental Preserves & Boat Ramps Percent of  Estimated  Environmental  Estimated Total  Annual Amount  Preserves &  Amount          by Category Boat Ramps 15 Years Project Categories  Parks & Community Facilities (13% of Revenue Per Committee Recommendations) Environmental Preserves & Boat Ramps $              438,129 Replacement and enhancement of aging facilities and equipment To provide necessary service locations and maintain existing recreation facilities 1.9% $6,571,940 Prelimiary Cost  Estimate Location Project Boat Ramp ‐ Kingfish Boat Ramp ‐ SR 64 @ Braden River Emerson Point Preserve Regional Park Leffis Key Robinson Preserve Construct new restrooms and upgrades Construct new restrooms and upgrades Reconstruct boardwalk decking  Reconstruct boardwalk decking and associated superstructure   Reconstruct boardwalk decking $              200,000 $              125,000 $              500,000 $              500,000 $              500,000 Preliminary Cost Estimate Total $           1,825,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  14 Manatee County Government Proposed Half Cent Infrastructure Sales Tax Parks & Community Facilities ‐ Libraries & Community Facilities Estimated  Annual Amount  by Category Project Categories  Percent of  Libraries &  Community  Facilities Estimated Total  Amount          15 Years Parks & Community Facilities (13% of Revenue Per Committee Recommendations) Libraries & Community Facilities $              194,580 Replacement and enhancement of aging facilities and construction of new  facilities To provide necessary service locations and capacity. 0.8% $2,918,700 Prelimiary Cost  Estimate Location Project Braden River Library Expansion Construct addition to Braden River Library, includes study/tutor rooms, business  center/lab, additional shelving and fencing. Replace HVAC. $              500,000 East County Library New East County Library ‐ Community Center $           1,200,000 Rocky Bluff Library Expand library to include children's storyroom and Friends bookstore with  outside entrance and replace HVAC. $              500,000 Preliminary Cost Estimate Total $           2,200,000 NOTES:  Impact fees or other revenues are not included. All amounts in current year (2016) dollars.  Prepared by Manatee County Government, 6/7/2016 15