West Virginia State Auditor's Office Request for Special Processing Request for: *Manual Warrant (check received same day) *Walk through (check received next business day) Marked for Special Handling in WVFIMS ID: 014944215 014945366 014944222 l014945377 014944234 014945382 014944242 014945390 Reason for request: Per Justin McAllister understand a fee of $5 per transaction will be charged to the State agency making the request and wish to have the transactions identi?ed on this request processed in the manner indicated above. . 0210 State Agency Name State Org ID ?own/\NUW Representative Date REPORT ID: WVFA70U0 STATE OF WEST VIRGINIA 12/19/13 PAGE 1 FINANCIAL INFORMATION MANAGEMENT SYSTEM 13:26:48 OFFICE OF THE STATE AUDITOR STATEWIDE INVOICE COVER SHEET AUDITOR ENTRY ID: I 6 14944222 WVFIMS DOCUMENT ID: I 14944222 STATE ORGANIZATION: 0210 STATE ORGANIZATION NAME: INFORMATION SERVICES COMMUNICATIONS ORGANIZATION CONTACT: JUSTIN MCALLISTER ORGANIZATION ADDRESS: 2101 WASHINGTON STREET, EAST DEPT ADMIN ACCOUNTING BLDG 15 CHARLESTON WV 25305?0000 ORGANIZATION: 0210 ORGANIZATION NAME: INFORMATION SERVICES COMMUNICATIONS DATE PREPARED: 12/03/13 DOCUMENT AMOUNT: 33,980.63 VENDOR INVOICE NUMBER: 9041194134MN AGENCY COMMITMENT: AGENCY DOCUMENT: SPECIAL AUTHORIZATION: OPEN END CONTRACT NUMBER: MPLSO7 DUE DATE: 12/03/13 SPECIAL HANDLING: VENDOR NUMBER: 176148 VENDOR NAME: FRONTIER WEST VIRGINIA INC VENDOR ADDRESS: 1500 MACCORKLE AVE RM 302 CHARLESTON WV 25396- CONTACT CANDACE L. KIMBLE 004-558-6183 EXT: CASH ADVANCE: BEGIN TRAVEL: END TRAVEL: COMMENTS: WEIRTON HIGHTS ELEMENTARY SCHOOL 1194134 BB15A12 ELECTRONICALLY AUTHORIZED BY: KELLY WILLIAMS APPROVED BY AUDITOR: DATE: FUND FY ORG ACT OBJ GRANT AMOUNT 2223 2014 0210 099 027 33,980.63 TOTAL INVOICE AMOUNT 33,980.63 oniT REMIT PAYMENT TO THIS ADDRESS Cost Overrun Due to the Following: 1) Materials Cost is lower than estimated because the ?ber cable size was changed. 2) Engineering cost was zero because the engineering work was done by a contractor and billed under contractor costs. Labor costs for placing and splicing are not broken out separately in the Company's accounting system and are combined in actual costs under the row for placing. 4) Labor costs were higher because the Fiber cable route was revised and the new route was longer which required additional placing and splicing time. 5) Contractor cost were higher because a majority of the engineering was done by a contractor instead of a Frontier engineer as planned. 6) Loadings were not included as a separate item in the original estimate. Loadings in actual project cost are based on work done and materials used. Loadings are allocated indirect costs such as vehicles, aCCOUOting, administration, etc. 7) Loadings were not included as a separate item in the original estimate. Loadings in actual project cost are based on work done and materials used. Loadings are allocated indirect costs such as vehicles, accounting, administration, etc. b? 33330.?3 hereby certify that the items listed OCT 2 4 2013 11 use.? Communica?o??m; . BILL DATE: 11/22/2012. . - PLEASE BILL Bill 3: 90411941343431 Contracts and Agreements NUMBER ON YOUR CHECK AMOUNT: 35,373i33 1500 MacCorkle Ave Room 302 DUE DATE: 12/24/2012 Charleston, WV, 25396 (Please refer to Appendix D, Alternative Access Offerings Pricing for internet Dedicated Access) STATE OF WEST VIRGINIA OFFICE OF TECHNOLOGY ATTN: JOHN INFRASTRUCTURE DESIGN OPERATIONS PO BOX 50110 CHARLESTON, wv, 25305 OF CHARGES AMOUNT Billing Description: 23,440.43 Project Billing for BTOP Funding CAI: WEIRTON HEIGHTS ELEMENTARY SCHOOL Project it: 1194134 3315A12 Original LCR Cost Estimate Actual Project Cost Variance 1) Materials 5,346.00 1,592.03 5 (3,753.92) 2) Engineering 5 3,742.20 5 - (3,742.20) 3) Placing 4,490.64 3,973.63 5 4,436.04 4) Splicing 5 2,352.24 - (2,352.24) 5) Contractor 5 4,009.50 5 6,430.52 5 2,421.02 6) Loadings 5 2,991.09 6,441.15 5 3,450.06 TOTAL. . ..22,931.67 J. . 23,440.43 5.03.76 . Additional cost due to customer premise facility build out work: lo .540 2. a AMOUNT DUE: Location Construction Request and Approval Form Thu twat M111 is: awn-Emma: no mt an em Emma Out-a 1M gum mm WMthu ?rumin- wimva uth Wutha. CW Mam mm; mm "mm new.) um? rs an?: :Wme. 6mm; thkn?'n scum. I31 0? MW MB A13, Fa?unl?am 159M (Ciing.9w_ for WW Upmruupg an ?aunt ?film! he team?: the for 2 :Wm way, we 1?09 ?m imwzia We?! umauwgg "5136" . .. . 2:57;. ?by 25-311: :35 ff?? '52:??msz?rgzvuxj 2.83"] - 3,04" ca: 16:3 out 10 armnm ?Pour: an bumom "3 mm: mam: I hereby certify the estimates containe?d on this ?03? .1va5! form are rm and accurate. ,zi" 1 OMRO 1 1 Signature: hum-n Remnast f: if a :55; .. 99 mm mm ?1039 um mu?: 5 ?fun M3 va '345?} nary-s saga! Amgg. .dmang? [mammang . 1 sum cums NA mu! stump wm caucus-u NA GGE Cmum I Charm 3: Clam Rama? Wu can!an rm {marzimis m? m! ach_ magma mm gn mg gm: mt; a mum Comm {Sf- C). mm bu! no: (Writs! assessment$333 ?Amok. in ?suit. . ?mm? ?gun-r fr!? Mr. Deer ufk r3}. ?og-mm: 3:23:91 1 W: m: D. W. Nam (??-gamma and ?ag: ?(22901 3 mm' an l. rm. mm-vnmf?ggm awn-m 8?1 GUDENKAUF CORPORATION UTILITY CONTRACTORS 121 Garvins Lane Phone: Wheeling, WV 26003 Fax: (304) 243-6765 March 2, 20 I 2 West Virginia State Stimulus Projects 38 I SAIZFB EWO if I I94I34 GUDENKAUF JOB 3260085 C0: Weirton Heights COUNTY: Hancock LOCATION: Weinon Heights Elementary School DESCRIPTION: dienkauf to place building attachment. olace mast with weather heads. bury 40? of 4?-schedule 4O conduit to bu'ldin then build conduit throuqh ceiling to demarc ESTIMATED COMPLETION TIME: 3 Days LABOR 7 200.00 MATERIAL: $2,000.00 TOTAL: $9,200.00 Ali prices based on prints and Iota! units as weii as travel to project site Thank You, Dave Robinson Division Manager Equa! Oppodunity Employer . Frontierlnvolce Audi-tchecklist? DATE: ll l2. . I Does the addrees on invoice match the address In No I Does the invoice match the LCR backupestimate, actual project cost, and variance? if the invoice is above LCR, does the invoice include original LCR cost A I if the invoice is above LCR, does it contain the cost overrun description? If Loadln? does the loadan match agreement between Gale and Frontier? I Approval Date I invoice Number Cindi lid ?16 7 Project Location M91 Hon Height-S . ?Li -- an 777-7:- . . .- f?hjj? war? LEI?{Number I Reguest Frontier-105 West Virginia BTOP Funds Flow Form NT108IX5570031 Agency: Office of Technoiogv As assigned by the Agency POC: (Sectio John Dunlap/Justin McAllister Address: PO Box 50110 E-Mail: Justin.T.McAlIister@wv.gov Charleston, WV 25305 Phone: 304-380-9460 Fax: 304-558-1531 n8) Reimbursement: (Section C) 9 .w ., (Advance Approval - CLASSIFICATION required) tribe; Purchased?? ?IaSsifitatid .- 49sg?v. .uv?Total: "i fewer sites; router. site'shetcsIf", rgTe Be-usegd: a} . E'See Iis {attach A '2 .- a - .11his-'32 r1 .. -- (Funds Request/Reimbursement - CLASSIFICATION required) . . Classificatio'ni .- d4 ..1 . .. WQODSDALE ELEMENTARYISCHOOL 383.5315. :?z-omqwm: - ?4 a Intel 23.81.512.9- .. 9041194134MN I "'?3?3I98016f3 . - Frontier-ks- vii-IL". (In 5: Erontierggas; . 3815:1121 ram Fronti?r?; M: MINERAL OFFICE [0149114134 .. - Frontier i .. .a 1 cars?oaid?i S. 5.: ?41-n Eronner w: q. '3sz 12,3, .v . s? 9.041194135cba? 3349113; 1- a? - 3, w} Eipht.iEr-.a 9041.20.63.90MNL .. . 1. av A. ., . 33155934" - CENTER-POINT A. 1 Wk . lip/LI?witfarm i?seb? . I a -, FIMS ACCT Re red 2223-20 4490-999-861 Signature: a GIIT: . a . Approu a ., .. Date sent to GEO: 264,983.06 Date: Ufa/13 Date4.. 51199439. "n . Closed: Reviewed by:51Amount Reimbursed: Date: Reviewed by: 2) FormII: CONTACT: Michael Todorovich- PIIPD BTOP Grant 1703 Coonskin Drive, Charleston, WV 25311 Office: 304-551-6675 Fax:304-561-6400 REVISED Version 4/28/2011 verizonbustness 0 APPENDIX - ALTERNATIVE ACCESS OFFERINGS PRICING APPENDIX, TOGETHER WITH APPENDICES AND E, SHOULD BE cm SEPARATED FROM THE TECHNICAL PORTION OF VENDOR RESPONSES AND BE INCLUDED IN SEALED, COST PORTION OF THEIR RESPONSE TO THIS .. u; are.) PAGE ANDIOR RFP I Escnodon of Offering SECTION NRC Montth Unit Cost: Access Frame Reiay Indirect Access method 3.1.12 23 3.1.17 DS-O $150.00 $380.00 08?3 ?rnb $2,000.00 6min $2,400.00 08-3 22mb $2,850.00 45ml: $3,640.00 Additions} PVC $4.00 ATM Indirect Access 3.1.12 3 3.1.17 $525.00 08?3 with 10 mb CBR $3,250.00 DS-3 45 mb $3,640.00 00-3 $7,000.00 3.1.12 a Private Line Pt to Pt Direct Access method 3.1.125 $150.00 EDS-1 Access to PIP oniy $285.00 $395.00 [18-1 (max of 12 Meg support or 8 Ti's) $2.85 ea EDS-3 (Direct Access to PIP Verizon Territory only) $2,850.00 Internet Dedicated Access EDA is referenced in the technical section as an access method for VoiP. Pricing for IDA would have to be provided on an bases due to the public nature of this access instead of the Private iP access offered by PIP. IDA can not be but couid be utitized on an ICB by a buying entitiy not needing the connection to PIP. However in most cases PIP offers the mose economicei connection with the highest SLA. ICB Ethernet 355 (Standard VLAN) 3.1.12.1 10 Meg $885.00 100 Meg $1,600.00 Gig $2,550.00 interof?iice Transport per mile (oniy appiies when SE8 piatform is not in local of?ce of service) $100.00 (with Standard Access not to PIP) 10 Meg $200.00 $50.00 100 Meg $200.00 $100.00 1 Gig $200.00 $200.00 State of West Virginia March 14, 200? I