CONFIDENTIAL - DO NOT RELEASE MEMORANDUM To:__________ Brent Cossette. USAGE Johnathan Shelman. USAGE From:________Tom Siguaw. Dakota Access Steve Rowe. HDR Engineering Date:________ April 12. 2016 Subject:______ DAPL - Route Comparison and Environmental Justice Considerations The su bject o f th is m e m o ra n d u m Is th e Dakota Access crossing a t Lake Oahe w ith respect to co m m en ts raised by Standing Rock Sioux T rib e (SRST) re la tive to E n viro nm e nta l Justice (EJ). This e va lu a tio n includes a com p arison o f d o w n stre a m w a te r Intakes a t th e proposed crossing and th e N o rth Bism arck Crossing a lte rn a tiv e th a t was dism issed fro m fu rth e r analysis in th e EA. T he re fo re , th is a lte rn a tiv e was n o t discussed o u tsid e o f th e a lte rn a tiv e section in th e EA w h e re It was dism issed fro m fu rth e r analysis. H ow ever, th is m e m o ra n d u m provides a d d itio n a l In fo rm a tio n to s u p p o rt th e conclusion th a t th e EJ issues o r claim s fro m th e SRST fo r th e N o rth Bism arck Crossing are a c tu a lly m o re d ire c t and m ore d is p ro p o rtio n a te to m in o ritie s th a n th e p re fe rre d and c u rre n tly proposed rou te. A d d itio n a lly , th e d etails as Included w ith in th is m e m o ra n d u m regarding th e w a te r Intakes d o w n stre a m o f th e Lake Oahe a n d /o r th e M isso uri River crossings o f each a lte rn a tiv e o ffe r value fo r USACE review and d o c u m e n ta tio n purposes to su b sta n tia te th e conclusion th a t th e Lake Oahe crossing Is th e p re fe rre d crossing loca tion . The d etails o f th e w a te r lo ca tio n intake locations and th e e s tim a te d p lu m e tra v e l tim e s to th ese Intakes are n o t in fo rm a tio n th a t Is m ade available to th e public. T h e re fo re , th is d o c u m e n t Is n o t in te n d e d to be included w ith in th e EA b u t Instead Is su pp le m e n ta l in fo rm a tio n p ro vid e d to th e USACE fo r th e record and could be re fe ren ced as a c o n fid e n tia l add en du m o r data source In th e EA. Routing Criteria and Avoidance of Sensitive Resources and Sensitive Lands The p rim a ry focus o f p ip e lin e ro u tin g is to establish a ro u te th a t has th e least im p a ct to th e g re ate st n u m b e r o f stakeholders, regardless o f race, e con om ic status, o r any o th e r fa c to r and balanced against th e e n v iro n m e n ta l co n d itio n s along th e various a lte rn a tive s. DAPL e m p lo ye d a so ph istica te d and p ro p rie ta ry G eographic In fo rm a tio n System (GlS)-based ro u tin g p rogram , u tilizin g co nside ratio ns fro m a v a rie ty o f p ro p rie ty , pub lic and purchased datasets to establish a ro u te baseline, exceeding w id e ly accepted In d u stry best practices as discussed In th e EA. N o rth D akota, w h e n co m p ared to o th e r states in th e U.S., has a high p ro p o rtio n o f fe d e ra l and o th e r p ub lic lands as w e ll as trib a l land. As p a rt o f th e ro u tin g c rite ria , sensitive resources coupled w ith sensitive lands. Including fe d e ra l and o th e r pub lic lands, sovereign and trib a l lands, w e re screened fo r avoidance o r exclusion in th e p re lim in a ry e va lu a tio n o f th e DAPL ro u te . As w ith any n a rro w and line ar p ro je ct, th e d ire c t and in d ire c t Im pacts fro m a p ip e lin e p ro je c t are e x tre m e ly localized and are g en erally CONFIDENTIAL USACE DAPL0073033 lim ite d to th e fo o tp r in t o f th e p ro je c t (co n s tru c tio n fo o tp r in t and p e rm a n e n t rig h t-o f-w a y fo o tp r in t - in th is a 150 fo o t w id e c o rrid o r fo r th e len gth o f th e p ip eline ). As such, a conse rva tive 1 /2 m i b u ffe r was im p le m e n te d fo r ce rta in lands avoidance c rite ria in th e ro u tin g to o l and analysis, such th a t trib a l or p ub lic lands w e re avoided as a p rim a ry avoidance c rite ria w ith a hig he r w e ig h te d p rio rity th a n m ost o th e r ro u tin g crite ria . The DAPL ro u te a t Lake Oahe is g re a te r th a n 0.5 m iles fro m SRST R eservation and avoids im pacts to th e reservation. For NEPA and p ro je c t assurance purposes, w h e n d e te rm in in g th e fe a s ib ility o f a ro u te and b e fo re any open season is announced, co n tra cts o r m a te ria l fu n d in g fo r a p ro je c t are established, th e com pany enlists a te a m o f professionals to p e rfo rm fe a s ib ility and fa ta l fla w analyses o f p o te n tia l p ro je c t ro u te , scope and schedule. It is d urin g th is phase o f th e p ro je c t th a t m a jo r ro u te a lte rn a tiv e s are evalua te d fo r th e p ip e lin e ro u te as a w h o le . D uring th e DAPL p ro je c t fa ta l fla w analysis and e arly ro u tin g process, datasets u tilize d included engin ee rin g co n stra in ts (e.g., existing pipelines, railroads, karst to p o g ra p h y , p ow erline s, etc.), e n v iro n m e n ta l concerns (e.g., critica l h a b ita t, fa u lt lines, state parks, n atio na l forests, b ro w n fie ld s, n atio na l re g istry o f h isto ric places, etc.), and land issues (e.g., fe e o w n e d fe d e ra l lands, fe d e ra l easem ents, dams, a irp o rts, cem eteries, schools, m ining, trib a l lands, and m ilita ry installatio ns, etc.). A t th e conclusion o f th e ro u tin g analysis, th e re w e re m u ltip le rou tes th a t w e re considered. H ow ever o n ly a ve ry select fe w m e t th e ro u tin g c rite ria w h ile balancing th e im pacts to th e pub lic as w ell as th e e n v iro n m e n ta l co nside ratio ns along th e ro u te . For th e purposes o f th e EA, th e tw o ro u te a lte rn a tive s th a t w e re considered as viab le included th e p rim a ry ro u te and th e n o rth Bism arck ro u te . A t th e conclusion o f th e analysis and upon fu rth e r d e ta ile d re vie w o f equal w e ig h tin g c rite ria and specifically fo r EJ issues, th e Lake Oahe ro u te p ro vid e d a less im pacting, m o re fe asib le a lte rn a tiv e th a n th e N o rth Bism arck ro u te as d e ta ile d below . Environmental Justice Comparison of the proposed Lake Oahe Crossing and the North Bismarck Crossing To address co m m e n ts m ade by SRST th a t th e N o rth Bism arck Crossing re la tive to EJ, Dakota Access co nd ucte d an analysis u tilizin g th e same EJ approach as was co m p le te d fo r th e P referred Route. The tw o census tra c ts th a t th e N o rth Bism arck Crossing a lte rn a tiv e w o u ld cross (CT 111.05 and CT 2004) w e re averaged as th e "a lte rn a tiv e im p acts", th e co un ties it w o u ld cross (M o rto n and Burleigh) w e re averaged as th e "a lte rn a tiv e baseline", and th e n th e "a lte rn a tiv e im p a cts" w e re co m p ared to th e "P roposed Crossing im p acts" data (fro m Table 3-14 o f th e EA). As d e m o n stra te d in th e ta b le b e lo w th e p re fe rre d and proposed crossing o f Lake Oahe w o u ld im p a c t a p o p u la tio n o f fe w e r m in o ritie s (2% fe w e r). The data does h o w e v e r suggest th a t m ore lo w -in c o m e (7% m ore) p o p u la tio n s are located near th e p re fe rre d crossing lo ca tio n . H ow ever, th e ro u te does cross less th a n th e overall state average o f 12% im p ove rish ed p o p u la tio n s conclud ing th a t th e ro u te does n o t d is p ro p o rtio n a lly im p a ct lo w -in co m e o r im p rovised p op ulatio n s. For th e m in o rity im pacts, th e N o rth Bism arck Crossing consists o f 1% m o re A m erican Indian and Alaska N atives (2% in th e N o rth Bism arck Crossing opposed to 1% in th e proposed) th a n th e proposed ro u te . This, as w e ll as th e o verall data, suggests th a t th e p re fe rre d ro u te is less im p a ctin g o r th e im pacts are less p ro p o rtio n a te to N ative Am ericans as co m p ared to n o n -m in o rity o r o th e r m in o rity groups. T h e re fo re th e th e re is no basis o r conclusion o f an EJ claim to N ative A m ericans re la te d to th e p re fe rre d ro u te . CONFIDENTIAL USACE DAPL0073034 Table A-1. Minority and Low Income Population Statistics for the North Bismarck Alternative And Compared to the Proposed Action Area Minority and Low Income Population Statistics for the North of Bismarck Alternative Compared to the Proposed Action Area Geographic Area Total Population White Black or African Am. 704,925 89 2 Am. Indian and Alaska Native Asian 5 1 Percent Native Hawaiian Some and Other Other Race Pacific Islander Two or More Races Total Minority Population Persons Below the Poverty Level STATE N o rth Dakota 0 1 2 11 12 COUNTIES W THIN BASELINE ANALYS>15 (ALTERIMATIVE B/»lSELINE /\REA) Burleigh 86,111 93 M o rto n 28,428 93 O liver 1,832 94 57,270 93 1 4 1 0 0 2 7 8 1 3 0 0 1 2 7 9 0 4 0 0 1 1 6 8 1 4 0 0 1 2 7 8 1 4 0 0 1 2 7 8 0 2 0 0 1 2 4 0 Burleigh and M o rto n Average All 3 Counties 38,790 93 Average ALTERNATIVE CENSUS TRACTS CT111.05 4,167 96 CT204 3,143 96 0 1 0 0 1 1 4 4 0 2 0 0 1 1 4 2 -2 -4 -1 0 0 -1 -7 -10 -2 0 0 0 0 -3 -6 PROPOSED ACTION CENSUS TRACTS 3,317 1 Average 98 0 PROPOSED ACTION COMPARISON TO ALTERNATIVE 0 0 0 1 2 9 0 0 0 -1 -2 7 Average 3,655 96 STATE COMPARISON TO ALTERNATIVE A lte rn a tiv e -701,270 7 BASELINE COMPARISON TO ALTERNATIVE A lte rn a tiv e Proposed A ctio n -35,135 -338 3 2 -1 0 -1 Source: U.S. Census Bureau, American Community Survey (2010-2014 5-year estimates). Note: totals may not sum across the table due to rounding used In data collection. * A negative number Indicates th a t the value fo r the proposed action Is less than the value fo r the population th a t the proposed action Is being compared to. CONFIDENTIAL USACE DAPL0073035 Specific Concerns Related to T ribal W a te r Intakes A n o th e r issue o f sig n ifica n t concern and c o m m e n t received fro m th e SRST is th a t trib a l w a te r intakes w o u ld be d is p ro p o rtio n a te ly a ffe cte d in th e highly u n like ly e ve n t o f a p ip e lin e p ro d u c t release to Lake Oahe. Given th e e ng ineering design, p roposed in s ta lla tio n m e th o d o lo g y , q u a lity o f m a te ria l selected, o p e ra tio n s m easures and response plans, th e risk o f an in a d v e rte n t release in o r reaching Lake Oahe is e x tre m e ly low . As a m a tte r o f practice, p ip e lin e o p e ra to rs and sp ecifically DAPL designed th e p ip e lin e to n o t leak o r have a spoil and have im p le m e n te d all th e available and reasonable m easures to p re v e n t a leak o r spill (see th e atta che d ta b le as file d in th e Iowa U tilitie s Board hearings fo r DAPL u n d e r D ocket H LP-2014-0001 fo r th e m easures above and beyond th e 49 CFR Part 194 and 195 re q u ire m e n ts being im p le m e n te d by DAPL w hich w o u ld all a pp ly to th e Lake Oahe crossing and p ip e lin e design). The n o tio n , as a rtic u la te d by th e SRST, th a t a spill is going to happen, is sim p ly n o t th e case. H ow ever, th e fo llo w in g in fo rm a tio n was pre pa re d to p ro vid e evidence th a t th e re is n o t a d is p ro p o rtio n a te p ro je c t e ffe c t to low o r m in o rity p o p u la tio n s fro m th e Lake Oahe crossing in regards to a spill. Table A-2 b e lo w provides a com p arison o f surface w a te r intakes d o w n stre a m o f th e P referred A lte rn a tiv e across Lake Oahe and d o w n stre a m o f th e N o rth Bism arck Crossing a lte rn a tiv e . Table A-2. Downstream Water Intake Comparison Between Crossing at Lake Oahe and Alternative Crossing North of Bismark Water Intake Comparison at the Preferred and Alternate Crossings North Bismarck Crossin y Crossing at Lake Oahe Intake O w n er/U se M iles D o w n ­ Travel stream T im e (hrs) Intake O w n er/U se M iles D o w n ­ Travel Tim e stream (hrs) Local Ag In ta ke * 4.2 6.7 City o f M andan * * 7.3 11.3 Tribal Ag In ta ke * 7.6 11.7 City o f Bism arck * * 11.6 18.2 SCRWD D rinking 11.1 17 City o f Bism arck 12.3 19.3 W a te r* W e ll Intake * * U nspecified 23.5 36.7 Fort Yates M un icip al 26.2 40.8 NA * In fo rm a tio n supplied by Rick Harnois, USACE to Steve Rowe, HDR via em ail on 3 /2 1 /2 0 1 6 . M r. H arnois ind icate d th a t th e firs t lo ca tio n was fo r a g ric u ltu ra l use, he believed th e 2nd lo ca tio n was a SRST in ta ke fo r a g ricu ltu ra l use, and th a t th e th ird intake belongs to th e South C entral Regional W a te r D istrict (SCRWD) and th a t th is intake provides w a te r to m o st o f Em m ons C ounty, N o rth Dakota. * * Estim ated lo ca tio n and o w n e rsh ip In fo rm a tio n e stim a te d by HDR engineer, B rent Ericksen, Bismarck, ND. O w n ership and use in fo rm a tio n fo rm a lly requested o f th e USACE by DAPL. On 4 /7 /2 0 1 6 W illia m H arlon, USACE, o ffic ia lly requested a d d itio n a l intake lo ca tio n and in fo rm a tio n fro m PHMSA. NA - No in fo rm a tio n kn ow n re la tive to th e M isso uri River fa rth e r d o w n stre a m th a n th e City o f Bism arck W e ll Intake D ow n stre a m o f th e Lake Oahe crossing (p re fe rre d crossing loca tion ), th e riv e r separates p riv a te land to th e east fro m trib a l land to th e w est. There are th re e w a te r supply intakes w ith in 15 m iles d o w n stre a m o f th is crossing, w ith th e closest intake located 4.2 m iles d o w n s tre a m o f th e Lake crossing and is fo r CONFIDENTIAL USACE DAPL0073036 n o n -p o ta b le co n su m p tio n . The closest p o ta b le Intake fo r c o n s u m p tio n is located 11.1 m iles. H ow ever, fo r th e n o rth Bism arck crossing th e re are tw o w a te r intakes located w ith in th e firs t 15 m iles d o w n stre a m o f th e crossing w ith th e closest w a te r Intake fo r c o n s u m p tio n located 7.3 m iles d o w n stre a m o f th e a lte rn a tiv e crossing. Specifically, th e firs t d o w n stre a m Intake fro m th e Lake Oahe crossing is a p p ro x im a te ly 4.2 m iles d o w n stre a m , is believed to be fo r a g ricu ltu ra l use and is believed to be non-T ribal. The second intake is a p p ro x im a te ly 7.6 m iles d o w n stre a m and is u n d e rsto o d to be an SRST Intake fo r a g ric u ltu ra l use. The th ird Intake, a p p ro x im a te ly 11.1 m iles d o w n s tre a m . Is u n d e rs to o d to be th e firs t d rin k in g w a te r Intake, w h ich belongs to th e South C entral Regional W a te r D istrict (SCRWD). The firs t SRST Intake fo r public co n su m p tio n is located 26.2 m iles d o w n stre a m o f th e Lake Oahe crossing. As ind icate d In Table A-2, th e N o rth Bism arck Crossing co nta ins tw o m un icip al d rin k in g w a te r Intakes w ith in th e firs t 13 m iles d o w n stre a m o f th e M isso uri River crossing lo ca tio n . The City o f M andan m un icip al Intake Is located a p p ro x im a te ly 7.3 m iles d o w n s tre a m and a C ity o f Bism arck m un icip al Intake is located a p p ro x im a te ly 11.6 m iles d o w n s tre a m . The averaged census data fo r th ese tw o cities Is 2% m in o rity (sim ilar to th e proposed w h ich Is also 2%) and 10 % lo w -in c o m e (sim ilar to th e proposed w hich The to ta l p o p u la tio n served by th e Intake located a t th e SCRWD (11.1 m iles d o w n stre a m o f th e Lake Oahe crossing) serves 3,491 people In Emmons C ounty, N o rth Dakota. The SRST trib e Intake th a t p rovides w a te r fo r co n su m p tio n located 26.2 m iles south o f th e Lake Oahe crossing (F o rt Yates intake) services 229 people In Fort Yates and p o te n tia lly up to 4,317 in Sioux C ounty, N orth D akota. W hen co m p aring th is to th e tw o closest crossing o f th e n o rth Bism arck crossing, th e City o f M andan Intake services 19,381 people and th e City o f Bism arck intake services 65,123 people. T he re fo re , th e d is p ro p o rtio n a te Im pacts In th e e ve n t o f a spill are clearly w orse along th e n o rth Bism arck crossing. W hich, w h e n co up lin g th is fa c t w ith th e d is p ro p o rtio n a te Im pact to m in o ritie s by p o p u la tio n , relying upon th e p ip e lin e ro u te n o rth o f Bism arck as a viab le o r p re fe rre d a lte rn a tiv e w o u ld a ctu a lly lead to m o re im pacts o r in fa c t a d is p ro p o rtio n a te Im pact to m in o ritie s fro m a spill o r th e ro u tin g . Based solely on th e firs t p o ta b le w a te r Intakes to be e n co u n te re d by an unabated release, th e N orth Bism arck Crossing a lte rn a tiv e w o u ld be less p re fe rre d as it co nta ins tw o m un icip al surface w a te r Intakes co m p ared to one fo r th e P referred A lte rn a tiv e . From an EJ perspective, th e SCRWD service te rr ito ry is Em m ons C ounty, w h ich has a p o p u la tio n th a t is 98% w h ite and Is n o t low incom e. The averaged census data fo r th e C ity o f M andan and th e City o f Bism arck is 2% m in o rity (sim ilar to th e proposed w h ich Is also 2%) and 10 % lo w -in co m e (sim ilar to th e proposed w h ich Is 9%). The Fort Yates m un icip al d rin kin g w a te r Intake (the firs t kn ow n T rib a l-re la te d d rin k in g w a te r Intake d o w n stre a m o f th e Lake Oahe crossing) Is o ve r 26 m iles d o w n s tre a m co m p ared to th e a p p ro x im a te ly 11 m ile distance to th e SCRWD Intake. The e s tim a te d tra v e l tim e to reach th e SCRWD Intake o f an u nabated spill a t th e Lake Oahe crossing Is a p p ro x im a te ly 17 hours co m p ared w ith a tra v e l tim e o f a p p ro x im a te ly 40 hours to reach th e Fort Yates intake. In th e u n like ly e v e n t th a t th e response te am does n o t co n ta in th e spill w ith in th e PHMSA re q u ire d 6 hours and th e spill co ntin ue s una ba te d fo r some tim e p eriod. It is likely th a t o n ly th e SCRWD Intake (serving th e n o n -m in o rity p o p u la tio n ) w o u ld be im p acted b u t e x tre m e ly u n like ly like th e p lu m e w o u ld go u nabated fo r 40 hours to reach th e m in o rity c o m m u n ity intake a t Fort Yates. CONFIDENTIAL USACE DAPL0073037 Sim ilarly, th e p riva te a g ricu ltu ra l intake is closer to th e Lake Oahe crossing th a n trib a l a g ric u ltu ra l intake. Given th a t b o th th a t b o th th e p riva te a g ric u ltu ra l and m un icip al intakes w o u ld be reached b e fo re th e ir respective trib a l intakes, th e lo w p o te n tia l fo r an una ba te d release, and th e lim ite d risk o f an unabated release to Lake Oahe, th e re are no EJ issues e v id e n t fro m p la ce m e n t o f th e Lake Oahe crossing based solely on th e analysis o f d rin kin g w a te r intakes d o w n s tre a m o f th e Lake Oahe crossing alone. Spill Frequency Considerations The spill freq ue n cie s presented in th e analysis are n o t like ly to o ccur and are p ro vid e d o n ly as p a rt o f th e conse rva tive fra m e w o rk to ensure agency decisions are based on kn ow led ge o f th e p o te n tia l range o f effects. In cid e n t fre q u e n cie s w e re e stim a te d fro m p u b licly available h istorica l data (PHMSA 2016). In 2002, PHMSA in s titu te d a 5-gallon spill re p o rtin g lim it. Prior to th is change, o n ly spills o ve r 1,575 gallons o r 50 barrels (bbl) w e re re p o rte d . This change has resu lted in a su bsta ntia l increase in th e calculated baseline in cid e n t fre q u e n cy. The calculated in c id e n t fre q u e n c y using all available data (fro m 1993 to 2011) is 0.000883 in cid e n ts /m ile -y e a r. The calculated in c id e n t fre q u e n c y using data o b ta in e d a fte r th e u pdated re p o rtin g lim it (2002 to 2015) is 0.00211 in c id e n ts /m ile -y e a r, a su bsta ntia l increase in in c id e n t fre q u e n cy. H ow ever, it should be n o te d th a t th is increase is a ttrib u ta b le to d iffe re n t re p o rtin g re q u ire m e n ts, w h ich ca p tu re a larger n u m b e r o f spill types, and does n o t necessarily re fle c t an actual increase in spills. A spill fre q u e n c y e q u iva le n t o f 7.5 spills in 10 years was calculated using th e co nse rva tive in c id e n t fre q u e n c y o f 0.00211 incid en ts per m ile per ye ar fo r th e e n tire 358 m iles o f DAPL P roject in N orth D akota. For any 1 -m ile segm ent, th is p ro b a b ility is e q u iv a le n t to one spill every 474 years. W h ile fu tu re events c a n n o t be kn ow n w ith a bso lu te c e rta in ty , in c id e n t freq ue n cie s can be used to e stim a te th e n u m b e r o f events th a t m ig h t occur o ve r a p e rio d o f tim e . A ctual fre q u e n c y m ay d iffe r fro m th e p re d icte d values o f th is analysis; actual n u m b e r o f incid en ts w ill likely be s u b s ta n tia lly lo w e r th a n e stim a te d fo r th is re p o rt. PHMSA, in its role re g u la tin g oil and hazardous liqu id s pipelines, has decreased th e risk o f spills by a b o u t 5 p e rce n t per year since 2002 and is a ctively w o rk in g to im p ro v e on th a t tre n d (PHMSA, 2012). This decrease in spill risk has been o ccurrin g w h ile su bsta ntia l increases in m iles o f pipelines have com e in to service (35% increase in pipelines fro m 2004 to 2014). E xam ination o f th e PHMSA d a ta se t fro m 2002 to 2015 (PHMSA, 2016) indicates th a t th e m a jo rity o f actual p ip e lin e spills are re la tive ly sm all. F ifty p e rce n t o f th e spills consist o f 4 bbis o r less. In 84 p ercen t o f th e cases, th e spill vo lu m e was 100 bbIs o r less. In 95 p e rce n t o f th e incidents, spill vo lu m e s w e re less th a n 1,000 bbis. Oil spills o f 10,000 bbis o r larger occurre d in 0.5 p e rce n t o f cases. These data d e m o n s tra te th a t m o st p ip e lin e spills are sm all and th a t releases o f 10,000 bbis o r m o re are e x tre m e ly u nco m m on . Table A-3 illu stra te s th e freq ue n cie s th a t oil spills o f d iffe re n t vo lu m e s are p re d icte d to occur along th e 358-m iles o f th e DAPL P roject w ith in N o rth Dakota o ve r a 10-year in te rva l. The s h o rte r sections o f th e DAPL Project w ith in th e fe d e ra l flo w a g e easem ents and crossing b e lo w Lake Oahe w o u ld have even sm aller spill o ccurrence freq ue n cie s and like lih o o d o f h ig h -vo lu m e spills given th e ir s h o rte r p ip e lin e lengths. CONFIDENTIAL USACE DAPL0073038 Table A-3: Spill Occurrence Frequency by Volum e over 10 Years Spill Occurrenc® Frequency by Volume over 10 years Spill Volume Conservative Number of Spills in 10 Years Spill volume 4 bbl or less 3.8 Spill volume of 100 bbl 1.2 Spill volume of 1,000 bbl 0.4 Spill volume o f 10,000 bbl 0.04 The like lih o o d o f a release in to any single w a te rb o d y w o u ld be low , w ith a p re d icte d o ccurrence interval o f no m o re th a n once every 1,430 to 476,642 years (Table A-4). If any release did occur, it is likely th a t th e to ta l release vo lu m e o f a spill w o u ld be 4 bbis o r less based on h istorical spill volum es. Table A-4: Spill Frequency Spill Frequency Product Released Very Small Spill: 4 bbl Streamflow Stream Flow Rate Low Small Spill: 50 bbl Occurrence Interval (yrs) Occurrence Interval (yrs) 10 4,766 Moderate Spill: 1,000 bbl Large Spill: 10,000 bbl Occurrence Interval (yrs) Occurrence Interval (yrs) 11,916 4 7 ,664 47 6,64 2 Lower Moderate 100 3,336 8,341 33,365 333,649 Upper Moderate 1,000 2,502 6,256 2 5 ,024 250,237 10,000 1,430 3,575 14,299 142,993 High Notes: - Adapted fro m Stantec, 2015 - Historical data indicate th a t th e most probable spiii volum e w ould be 4 bbl or less. However, analysis Is based on conservative Incident frequencies and a range o f spill volumes, to provide a range o f th e m agnitude o f potential effects fo r th e NEPA analysis. - Occurrence Intervals are based on th e overall predicted incident frequency o f 0.00211 lncldent/m lle*year, projected frequencies of each spill volum e, and estim ated stream w idths. W idths o f h ig h e rflo w streams are g reate rtha n w idths o f low er flo w streams, w ith m ore distance w here an incident might occur. This results In a greater predicted frequency fo r high flo w streams and a corresponding low er occurrence interval. Conclusion The siting and c o n stru ctio n o f oil pipelines upstream o f d rin k in g w a te r intakes is n o t u nco m m on th ro u g h o u t th e U nited States and by its e lf is n o t considered an E n viro nm e nta l Justice issue. Due to th e lack o f d ire c t and in d ire c t e ffe cts fro m th e fe d e ra l a ction, no m in o rity o r lo w -in c o m e c o m m u n itie s w o u ld be d ire c tly o r d is p ro p o rtio n a te ly im p acted by th e c o n s tru c tio n and o p e ra tio n o f th is pipeline. Based on th e evidence in th is M e m o ra n d u m , th e re are no EJ issues o r concerns resu ltin g fro m th e Proposed A ctio n a t Lake Oahe. As p ro vid e d fo r in th e EA, Section 2.1 and Table 2-1, th e N o rth Bism arck Crossing a lte rn a tiv e was e lim in a te d because it was longer, w o u ld re q u ire im pacts to a d d itio n a l e n v iro n m e n ta l resources, was m o re expensive and th e fa c t th a t th e N o rth Bism arck Crossing a ctua lly w o u ld lead to o r could re su lt in a d is p ro p o rtio n a te im p a ct to m in o ritie s in th e e ve n t o f ro u tin g as w e ll as a spill all lead to th e conclusion th a t th e p re fe rre d a lte rn a tiv e and c u rre n t crossing lo c a tio n o f Lake Oahe is th e su p e rio r a lte rn a tive . CONFIDENTIAL USACE DAPL0073039 References: Pipeline and Hazardous Materials Safety Administration (PHMSA). 2016. PHMSA Pipeline Incident Statistics Internet website: http://www.phmsa.dot.qov/pipeline/librarv/data-stats/pipelineincidenttrends. 2012. Pipeline and Hazardous Materials Safety Administration. Strategic Plan (2012-2016) Stantec, 2015. BakkenLink Risk Assessm ent and E n viro nm e nta l Consequences Analysis. Prepared fo r BakkenLink Pipeline LEG. A tta ch m e n ts: Alternatives Map from EA (Figures 13) Water Intake Comparison Map CFR 194 & 195 Above and Beyond Measures Table CONFIDENTIAL USACE DAPL0073040 - .- iV " '■ ■ i ■ . "Sr^ V . v "" 1 ■ " W ^ i -1 “ >9 ■ ' - ~m % ^ -a - • t J ■ _ o i^ r r V K k North Dakota Preferred Alternative Route Alternarive USACE Garrison Flowage Easements Standing Rock Sioux Reservation USAGE Lake Oafie Fee-Owned Land Otfier Government Lands DAKOTA ACCESS, LLC Dakota Access Pipeline Project Figure 13 Route Alternative Lake Oahe Crossing Emmons & Morton Counties. North Dakota :650.000 Mies NAD 1983 UTM Zone 14N Date: April, 2016 Path: P :\G IS \C lie n t\E T C _ E n e rg yT ra n sfe r\D a ko ta A cce ss_ D A P L \M a p s\E N V \N D _ F lo w E a se m e n ts\1 3 N D _ L a ke _ O a h e _ X in g _ u p d a te 2 0 1 6 0 4 1 2 .m xd CONFIDENTIAL USACE DAPL0073041 City of Bism arck City of Mandan BIsm arck City of Bism arck W ell Intake i18061 Local Ag Intake 0 Tribal Ag Intake SCRW D Drinking W a te r—s Linton Unspecified '83 Fort Yates Municipal P referred R oute R oute A lte rn a tive <> DAKOTA ACCESS, LLC W a te r Intake North Dakota Dakota Access Pipeline Project Water intake Locations Lake Oahe Crossing 1:590,501 M iles NAD 1983 UTM Zone 14N Date: April, 2016 Path: P :\G IS \C lie n t\E T C _ E n e rg yT ran sfer\D ako taA ccess_ D A P L\M a p s\E N V \W a ter_in take s\20 1 60 41 3 \M X D \V \fete rln take .m xd CONFIDENTIAL USACE DAPL0073042 FILED WITH Executive Secretaiy Comparison of DAPL Plans Specifications and Federal Code — imnmyiiLMiM, at i f t w n ................. DAPL P tau & S^edffeatians October 26, 2015 DOT CFR 195 Requiremems H L P -2 0 1 4 -0 0 0 1 EXHIBIT CAF-5 Page 1 of 1 . DOT Part 195 Rebrence Pipdine C ovtr and S tp a n tion Dbtancc* Providtng a m nimtim clearance of 24 inches (2 fe e t between drain tile and OAPLpipeline as indicated in the AcrkulturaHm pact M itigatian Plan Minim um clearance required between pipe and drain tile is 2 inches CFR 195.250 Providlns a minimum cover (from top o f pipe to ground level) of 48 inches (4 feet) in cultivated fields Pipe must be buried so that it is below the ^evel of cultivation or to a depth of 50 inches o f cover, whichever h. deeper a R 195.248 Provtding a minimum cover (from top of pipe to ground level) o f 60 inches {5 feet] a t public road drainage ditches Minim um cover required for public road drainage ditch crossings b 36 inches (3 feet) CFR 195 248 commercial, and resideniJal areas Minim um cover required is 36 inches {3 feet] CFR 195.248 Providing at least 60 inches Mmimum cover required is 30 or 36 inches (3 feet] CFR 195.248 Minimum cover required is only 48 inches (4 feet) CFR 195.248 Providing a minimum cover (from top of pipe to ground leve^ of 48 Inches (4 feet) through industrial, feet) of cover for w aterbody crossings Hofixontaily D rectionally Drilling underneath w aterbody crossings wider than 1 00 feet In w idth to a depth of ar least 20 feet under the bottom o f the waterbody PfpeliM Strength OAPLIine pipe is specified to API 5U PL5'2 standards which m andate additional metallurgical requirements, factorv inspections and record retention. Longitudinal seam of aH Rne pipe has been IdDH examined by non-destructnre testing INDT) Uh pipe must be fit-for*purpose CFR 195.112 All pipe mi^lswere inspected for their quality assurance and quality testing programs pnor to being allowed to bid to supply pipe for DAPL No requirement N /A Inspectors for DAPL w ere placed in each pipe mill while OAPL pipe was being produced to ensure M compliance w ith all quality control measures Line pipe inspection only required a t the )ob site during Installation CFR 195.206 0.50 Design factor will be used for all public road, w aterw ay and ralroad crossings, and for aL above* ground sections of the DAPL system {mainline valve sites and pump stations). Line pipe w ith 0.625” wall thickness )WT) will be installed through these areas. ■&72 Design Factor is permitted throughout the entire pipeline system - which equates to providing Ane pipe w ith 0.429” W T CFR 195 106 Piptffne Vifves All mainline valves on DAPL will have m otorued actuators to provide for the capability to remotely close all valves to isolate pipeline segments as needed. All mainline valves qualify as Emergency Flow No requirement Aestnction Devices (Ef AD). PipeUns Constfwcttofi lOOX of a^ m a rlin e girth welds will be have an NDT inspection, either by radiographic {x*ray] or Need to perform an NDT for only 10% o f girth welds made by each w elder each day CFR 195.234 Hydrotesting entire pipeline for 6 hours a t 125% Hydrotest fo r4 hours a t 125% plus4 additional hours a t 1 1 0 % CFR 195.304 Hydrotestlng a4 valves and above-ground equipm ent for 8 hours a t 125% Manufacturing facilities only provide 1 fiour leak tests CFR 195.305 An Internal Line Inspection deformation tool will be run through the entire pipeline prior to start-up No requirement Cathodic Protection System will be activated in stages along the right of way as the pipeline is backfilled and completed. Cathodic protection must be activated w ithin 1 year after the pipeline begins operation The pipeline right of w ay will be inspected weekly, w eather permitting, by aerta: means Right of way inspections are required 26 times per year, with intervals not to exceed three weeks ultrasonic means N /A CFR 1 95 36 3 PIpetoie Opentfons CFR 109.412