Kentucky Utilities Brown Station April 26, 2017 Todd Hendricks, P.G. Kentucky Division of Waste Management Solid Waste Branch Inactive gypsum processing plant. Pond at gypsum processing plant. The predecessor pond was considered a possible source of groundwater pollution. It was clean-closed and lined as remedial measures. . a . . .. f. . 434w $1me 4,21. .. 1. A a _uo:o_ mm 962:: Ema. Zuni?. $93.1 Pond at gypsum processing plant. m. a a a Monitoring Well Monitoring Well MW-103, installed pursuant to the federal CCR Rule. West Quarry, which was filled with soil and rock and vegetated to reduce infiltration and potential groundwater flow into the Main Ash Pond / Landfill West Quarry, which was filled with soil and rock and vegetated to reduce infiltration and potential groundwater flow into the Main Ash Pond / Landfill West Quarry, which was filled with soil and rock and vegetated to reduce infiltration and potential groundwater flow into the Main Ash Pond / Landfill Waste being compacted in the landfill with a smooth roller. The landfill liner itself is intended to reduce infiltration of water into the underlying Main Ash Pond Waste and the associated leaching of .52: $830 8 __mt:o @9236 Ucom 05>th wc__wq_o_ Lou, w_occm_>_ .70 Auxiliary Pond. Looking north. _uoso_ 1-.v i . 4 a? A (1-3 (I.- 51* Auxiliary Pond spillway. Auxiliary Pond. Looking north. f-I' 3 0. Solar generating facility. Looking south from Auxiliary Pond dam. f-the federal CCR rule. Power plant, looking north. HQ Inlet and Curd’s Inlet drainages are between this point and the plant. Auxiliary Pond dam. Manhole for pipeline carrying Auxiliary Pond discharge to outfall to Curd?s Inlet. 11., . Manhole for pipeline carrying Auxiliary Pond discharge to outfallto Curd? IrIIet. View inside manhole for pipeline carrying Auxiliary Pond discharge to outfall to Curd?s Inlet. iew inside manhole for pipeline carrying Auxiliary Pond discharge to outfall to urd?s Inlet. View inside manhole for pipeline carrying Auxiliary Pond discharge to outfall to Curd?s Inlet. mc_v_oo._ .57: $830 Main Ash Pond toe drain cutoff wall wet well. Impoundment dam in background. Main Ash Pond toe drain cutoff wall wet well top slab. Main Ash Pond toe drain cutoff wall wet well. Note sheen on water. This sheen probably forms as a result of oxidation of reduced metals. Main Ash Pond toe drain cutoff wall wet well. Note sheen on water. This sheen probably forms as a result of oxidation of reduced metals. Main Ash Pond toe drain cutoff wall wet well. 3f 3? I {z I Monitoring Well installed pursuant to the federal CCR rule. Last manhole for pipeline from Auxiliary Pond before discharge to outfall to Curd?s Inlet. East Quarry. Note grayish discoloration of limestone. Turtles in East Quarry. Discharge of ef?uent from Auxiliary Pond to drainage way leading to Curd?s Inlet. _um