Non?Compliance History 2012 3&7 Hilcorp Alaska, LLC 1 8/20 13 Information compiled for a meeting with Hilcorp Alaska, LLC (Hilcorp) on January 14, 2013. Date Non-Compliance Location AOGCC Comments Action April 2012 Missing SVS tests; Failure Westside CI No action taken Numerous efforts by AOGCC to obtain SVS test to notify AOGCC for test since some of results for IRU, PCU, LRU, Stump Lake; some witness testing was missing SVS between 5/2011 and 2/2012; some Chevron failure to notify AOGCC for Opportunity to witness re5ponsibility tests 5/8/2012 Missing Kill Line Valve Swanson River NOV BOPE test; in3pector observed missing kill line valve Aurora Rig #1 at kill line inlet to stack (2 required); AOGCC closed out 5/25/12 9/17/2012 Choke Manifold Valves Swanson River 21-25 Correct actions; Rig crew performing choke manifold test greased and cheated closed during (Aurora Rig con?rm had to cheat choke manifold valves closed to pass BOPE test manufacturer pressure test recommendation 10/2/2012 Notice of Meter Happy Valley Send schedule; AOGCC has not received notice of meter calibration Calibrations provided for Happy Valley custody transfer meter for at least as 10/9/12 long as Hilcorp has been responsible 10/18/2012 Incorrect BOPE Test Soldotna Ck 44-33 See 10/23/ 12 When ?nally tested BOPE after use (10/1 8/ 12), tested Pressure (Doyon Rig enforcement to wrong pressure (4000psi instead of 5000psi) Failure to notify of changes Notice of Hilcorp failed to follow well drilling procedures to approved permit Preposed approved in PTD by failed to notify Enforcement AOGCC of changes to well plan; failed to maintain Soldotna Ck 44-33 . - . . . 10/23/2012 (Doyon Rig Penalty) well in overbalanced condition, lack gt of change Well control; Failure to test Hilcorp failed to test BOPE used in well control BOPE after use operations prior to ?rst wellbore entry following use; AOGCC preparing ?nal decision 10/26/2012 Failure to Test BOPE Granite Pt 32-13RD i Denied request within 7 days (Crane for delaying BOPE test Test due 10/26/12, started running completion 1500hrs on 10/26 without making any attempt to get test extension (working daylight hours only); landed pipe high, had to trip pipe; request extension 10/27/ 12 Page 1 of 2 10/31/2012 Improper gauge on IA TBU I none Hilcorp self reported that gauge was pegged out; 2000psi alarm set. 1000psi gauge; well SI by Hilcorp 11/29/2012 Missing well control Happy Valley NOV Missing top drive valve(s) on 10/10/12 and again equipment (Aurora Rig 11/18/12; reviewing Hilcorp response rec?d 12/1 1/ 12 11/29/2012 Incorrect BOPE test Granite Point #50 NOV Sundry 312-439 required BOPE rams, valves to test to pressure (Schlumberger 4500psi; Hilcorp tested to 3500psi 12/6/2012 Conduct of operations TBU G-32 NOV Violation found 11/7/12 as part of rig inspection! and (Williams 404) BOPE test witness; hazardous conditions; wellbore ?uids on deck; equipment placement; lack of winterization; reviewing Hilcorp response rec?d 12/21/12 12/16/2012 Winterization; Conduct of TBU (3-32 Ordered rig ops Inspector arrived 12/ 15/12 for BOPE test; unable to Operations (Williams 404) shut down test due to ?uids covering stack well cellar (similar to pending issued noted in 12/6/ 12 returned 12/ 16/ 12 to resolution of test BOPE unable to test BOPE (frozen choke winterization manifold, top drive valves, ?oor safety valves, choke issues AOGCC and kill lines along with everything else not in heated inSpection and enclosure passing BOPE test; rig ops allowed to restart 12/31/12 12/ 16/2012 Commence production w/o Nikolaevsk Unit (Red Reviewing; 12/1 8/ 12 Hilcorp contacts AOGCC with notice of approved LACT meter pad) action TBD SVS testing; AOGCC determined by questioning . status that well commenced production 12/ 6/ 12; application for LACT meter rec?d 1/9/ 12 Page 2 of 2