Tank Operalions C(mlracl' Section Contract No. DEModi?calion N0. 4 04 SECTION J, ATTACHMENT .4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN 11232215 ()pemn'mz? (Tm-231201 Seesaw: Clk'mlracz? NU. Mmigjfimfi?wz N0. 404 Emmi Year NW mwmmem Mam W?mhimgm? Riva? E?wmg?an .?Pa?brmi?m Pm?ia?: Gambia? 13.5 28:15 30, @me by: Emit: 1W. Smith Bate Mai Z?a?iwmim?im Offi?i?? ta} Tank Operations Contract Section .1 Contract No. C2 7-08R V14800 Modi?cation No. 40-4 FBI-25.0 CLIN 2 Farm Retrievals Performance Fee value is established at $3,900,000 of Fiscal Year 2017 fee pool. Fee Structure: Straight?Line and Terminal Method Milestone Method Fee Value Due Date 1 Straight~Line $1,050,000 September 30, 2017 2 Terminal $1,000,000 September30, 2017 3 Terminal 1 ,5 00,000 September 30, 2017 4 Terminal $250,000 September 30, 20l7 5 Terminal $100,000 September 30, 2017 Total $3,900,000 Desired Endpoint/Outcome: Hose?in?hose transfer lines (HIHTL) that are used in the tank farms for the temporary movement of waste for retrieval are required to be removed from the Hanford Tank Farms once retrieval activities in a Farm are complete in accordance with the schedule in the temporary Hll?lTL Management Plan. Prepare and retrieve the residual waste in using an approved third Technology retrieval method will assist in completion of tank waste retrieval activities to meet or exceed performance requirements oi?the Consent Decree Appendix 13 and C. In addition, completion ofthis proposed scope of work will bene?t the sites by developing a common, demonstrated methodology for the transition from active storage to closure of the tank. Fee Bearing Milestones: 1. Complete removal of eighteen (18) interim stabilization HIHTLs by September 30, 2017. The Contractor shall earn $58,333 of fee for each HIHTL removal for a total available fee of $1,050,000. Work scope/completion criteria for removal: The line has been removed from the ?eld and packaged for shipment to the treatment vendor. The line removal and packaging will be documented by Operations acceptance of the work package. At the completion of the HIHTL removal, the field work supervisor will verify all housekeeping activities related to the work having been completed. Completion of housekeeping will be signed off in the work record of the work package. Completion document: Letter transmitting the performance expectation completion notice and work package coversheet documenting completion and acceptance by Operations. 2. Complete construction and installation ofa third technology retrieval system for Tank 241 05 by September 30, 2017. The Contractor shall earn $1,000,000 ofincrementai fee.