New Sidewalk Projects January 2016 to Present New Sidewalks Construction Complete # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 LOCATION Crossings Boulevard 27th Avenue North Bell Road Granny White Pike 18th Avenue South Kirkwood Avenue Lealand Lane Greenfield Avenue Sevier Street Lebanon Pike Bell Road Edge o Lake Drive Hobson Pike Antioch High J. E. Moss Elementary J. F. Kennedy Middle Cole Elementary McGavock High Madison Middle Stratton Elementary Joelton Elementary Cockrill Elementary Goodlettsville Elementary Harpeth Valley Elementary Lakeview Elem. Design Center Paragon Mills Elementary Eakin Elementary Bell Road DB Todd Jr Blvd/Albion Street Wallace Road Athens Way FROM Mt  View Road West End Avenue Existing Sidewalk Shackleford Road Blair Boulevard 10th Avenue South Gale Lane Katerine Street S 13th Street Graylynn Drive Mt. View Road Murfressboro Pike JFK Middle School Campus Parking Lot Bowfield Drive Hobson Pike Campus Parking Lot Campus Entrance Old Hickory Boulevard Whites Creek Pike Indiana Ave/49th Ave Donald Avenue Collinswood Drive Edge O Lake Drive/Rural Hill Road Donna Kay Drive School Campus Mt. View Road 300' North of Albion Recovery Road Ponder Place TO CSX RR Overpass Poston Avenue Rural Hill Road Existing Sidewalk South of Duncanwood Portland Avenue 12th Avenue South Kirkwood Avenue Golf Street S 14th Street Bluefield Avenue End of Existing Sidewalk Highmeadows Drive Existing Sidewalk S Campus Track School Entrance/Play Ground School Entrance School Entrance McGavock Pike Existing School Sidewalks School Entrance School Entrance School Campus School Entrance Playground/School Entrance School Entrance Fannie Mae Park 380' southwest of Mt. View Rd DB Todd/Jackson St. 80' West of Recovery Road 820 South of Ponder Place SIDE LENGTH (LF) West Both Both West East South West North South South North North East On Campus On Campus On Campus On Campus On Campus On Campus On Campus On Campus On Campus North On Campus On Campus On Campus North West North West 631 920 156 981 1045 999 1062 1476 330 833 425 872 960 670 550 600 100 450 720 500 550 350 415 420 260 60 435 905 70 820 PROJECT  EXPENDITURES $40,958.05 $117,863.22 $129,975.21 $605,587.70 $251,186.95 $286,159.26 $304,212.27 $1,029,083.92 $261,931.89 $317,349.48 $157,124.71 $57,123.54 $331,541.98 $66,077.24 $80,537.74 $61,643.69 $21,511.43 $74,390.71 $90,936.63 $58,812.01 $52,324.14 $73,944.10 $47,537.34 $20,008.54 $49,935.27 $14,000.00 $87,000.00 $181,000.00 $14,000.00 $82,779.89 18,564 Feet 3.5 Miles $4,966,536.91 TOTAL LENGTH COMPLETE TOTAL EXPENDITURES (COMPLETE) New Sidewalks Under Construction 31 Bellevue Road Hicks Road Old Hickory Blvd South 2085 PROJECT  EXPENDITURES $1,040,365.69 32 33 34 35 Belmont Blvd N 16th Street Jones Avenue Lawerence Av Livingston Street / 12th Street / 9th  Street Allen Pass Bowling Avenue Existing Sidewalk West of Granny White Pike Manchester Avenue Jones Avenue Dead End Street Merritt Street / Existing Sidewalk / Fowler  Street 315' North of Marlin Pass School Sidewalk North North East West 1696 1556 1331 727 $551,034.14 $798,507.08 $788,051.24 $390,995.75 Multiple West On Campus 1703 3200 325 $1,247,040.60 $640,000.00 $60,839.95 # LOCATION Gale Lane Franklin Avenue Jones Circle 11th Avenue S 36 9th Street / Bryan Street / Livingston Street 37 Neelys Bend Road 38 West End Middle FROM TO SIDE LENGTH (LF) TOTAL LENGTH UNDER CONSTRUCTION TOTAL EXPENDITURES (UNDER CONSTRUCTION) 12,623 Feet 2.4 Miles $5,516,834.45 New Sidewalks Construction Scheduled Existing Sidewalk Rock City St Existing Sidewalk to Richards Rd Thunderbird Drive Cahal Avenue Cumberland Avenue Townview Place Elizabeth Road Overhill Drive SW North of RR Tracks Brenton Park Court Old Lebanon Pike White Bridge Pike Hillwood Middle School Entrance Humber Drive Existing Sidewalk Branch St Antioch Pk to existing sidewalk  Mall Entrance Moore Street Dupont Avenue Edge O Lake Drive YMCA Entrance Warfield Drive Old Lebanon Dirt Road Fredricksburg Way W Lebanon Pike New Apartments Hillwood High School Entrance Tanglewood Court West South North East West West South North East East East Both North North North 200 783 1835 1015 628 330 1809 400 1290 390 450 640 193 1650 443 PROJECT  EXPENDITURES $235,949.61 $868,652.09 $665,157.04 $1,067,130.42 $416,853.54 $368,510.37 $738,147.05 $249,139.08 $758,777.49 $124,059.35 $348,582.84 $726,046.90 $87,385.64 $799,458.24 $171,025.61 54 Dodson Chapel Road 55 Brick Church Pike Hoggett Ford Road School Entrance on Masonwood Drive Existing Sidewalk 530' S of James Kay Lane Village Trail West East 2200 2323 $601,770.88 $1,076,218.73 56 57 58 59 60 61 62 63 64 65 66 67 Harding Place 870' NW of Gallatin Pike Rural Hill Road Haynes Park Drive Sarver Avenue Hogan Road/Trousdale Drive Plantation Drive Lone Oak Road/Granny White Pike Kings Lane Otter Creek Road Dickerson Pike McGavock Pike/Greenway Existing Sidewalk 485' N of W Longdale Drive Gallatin Pike Curtis Hollow Road Harold Prewett Drive Pierce Road Existing School Sidewalks Existing School Sidewalks School Entrance Existing School Sidewalks Existing School Sidewalks School Entrance School Entrance North East North North South On Campus On Campus On Campus On Campus On Campus On Campus On Campus 1450 870 758 1500 950 870 310 950 300 245 600 680 $624,277.26 $122,670.28 $487,581.38 $779,329.30 $51,945.70 $67,885.03 $38,510.66 $99,937.11 $39,189.29 $21,104.58 $39,511.17 $43,444.64 # 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 LOCATION Chesterfield Avenue Litton Avenue  Antioch Pk & Richards Rd Annex Avenue Branch Street Delaware Avenue Willow Branch Drive John Mallette Drive Lone Oak Road Andrew Jackson Parkway Cloverland Drive JB Estille Drive Burgess Avenue Davidson Road Harding Place Wauford Drive Conference Drive Mt View Road W. Hamilton Avenue (Phase 2) Amqui Elementary Crieve Hall Elementary Hermitage Elementary J.T. Moore Middle Robert E. Lillard Elementary Percy Priest Elementary Shwab Elementary (E.O.) Two Rivers Middle FROM TO SIDE LENGTH (LF) TOTAL LENGTH CONSTRUCTION SCHEDULED TOTAL EXPENDITURES (CONSTRUCTION SCHEDULED) 26,062 Feet 4.9 Miles $11,718,251.28