Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 1 of 17 Page ID #:1 1 GREGORY C. LOARIE (CA Bar No. 215859) MARIE E. LOGAN (CA Bar No. 308228) 2 EARTHJUSTICE 50 California Street, Suite 500 3 San Francisco, CA 94111 T: (415) 217-2000 • F: (415) 217-2040 4 E: gloarie@earthjustice.org mlogan@earthjustice.org 5 6 Additional Counsel of Record Listed in Signature Block 7 8 UNITED STATES DISTRICT COURT FOR THE CENTRAL DISTRICT OF CALIFORNIA WESTERN DIVISION 9 10 CENTER FOR BIOLOGICAL DIVERSITY ) ) 11 and CENTER FOR FOOD SAFETY, ) Plaintiffs, ) 12 vs. ) 13 ) U.S. BUREAU OF LAND MANAGEMENT; ) 14 RYAN ZINKE, Secretary of Interior; BRIAN ) Acting Director, Bureau of Land ) 15 STEED, Mgmt.; JEROME PEREZ, California Director, ) ) 16 Bureau of Land Mgmt.; BETH RANSEL, District Manager, California Desert District ) ) 17 Office, Bureau of Land Mgmt.; KATRINA SYMONS, Manger, Barstow Field Office, ) 18 Bureau of Land Mgmt., ) ) 19 Defendants. ) ) 20 COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF INTRODUCTION 21 22 Civ. No. 1. This case challenges an illegal determination by the Trump 23 Administration that enables a for-profit corporation called Cadiz, Inc. to construct a 24 43-mile pipeline through Mojave Trails National Monument and other public land 25 while circumventing laws enacted to protect human health and the environment. A 26 key component of the so-called “Cadiz Valley Water Conservation, Recovery and 27 Storage Project” (Cadiz Project), the pipeline will allow Cadiz, Inc. to sell billions of 28 gallons of groundwater mined from ancient desert aquifers to urban water districts. 1 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 2 of 17 Page ID #:2 1 2. The impact that the Cadiz Project pipeline will have on the fragile desert 2 environment cannot be overstated. Not only will construction and maintenance of the 3 pipeline disrupt wildlife and worsen pollution in and around Mojave Trails National 4 Monument, but also the U.S. Geological Survey has warned the pipeline will make it 5 possible for Cadiz, Inc. to extract far more groundwater from the desert aquifers than 6 is replenished naturally. The resulting draw-down of the water table will cause many 7 freshwater springs of critical importance to desert plants and animals to go dry. The 8 retreating aquifer will also desiccate desert “playa” lakebeds, resulting in toxic air 9 pollution from windswept sediments akin to what has plagued the Owens Valley to 10 the north ever since Los Angeles dried Owens Lake a century ago. 11 3. Making matters worse, the desert aquifers that Cadiz, Inc. intends to 12 drain are high in hexavalent chromium, a powerful carcinogen, and other heavy metals 13 like arsenic and mercury. Health experts have concluded that the Cadiz Project will 14 produce water laced with toxins that could pose a serious risk to consumers. 15 4. On October 13, 2017, defendants U.S. Bureau of Land Management, et 16 al. (collectively, “BLM”) improperly concluded the Cadiz Project pipeline “falls 17 within the scope” of an existing right-of-way easement granted to the Arizona 18 California Railroad under the 1875 General Railroad Right-of-Way Act (1875 Act). 19 BLM therefore wrongly determined that Cadiz, Inc. may contract to build and operate 20 its pipeline within the railroad’s right-of-way without prior authorization from BLM, 21 which would be contingent legally upon environmental review, an opportunity for 22 public review and comment, and compliance with federal environmental laws. 23 5. To accommodate Cadiz, Inc., BLM also withdrew a comprehensive legal 24 analysis undertaken by the prior presidential administration, which had reached 25 precisely the opposite conclusion with respect to the Cadiz Project pipeline. In 2011, 26 the Department of Interior analyzed Supreme Court precedent and legislative history 27 and concluded correctly that activities within an 1875 Act right-of-way must “derive 28 from or further a railroad purpose.” And in 2015, the Bureau of Land Management 2 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 3 of 17 Page ID #:3 1 confirmed that the Cadiz Project pipeline “does not derive from or further a railroad 2 purpose” and thus cannot be built on public land without federal review and approval. 3 6. Plaintiffs Center for Biological Diversity and Center for Food Safety will 4 be directly harmed by BLM’s illegal reversal and new determination with regard to 5 the Cadiz Project pipeline. Plaintiffs ask this Court to find and declare that the Cadiz 6 Project pipeline falls outside the scope of the 1875 Act right-of-way at issue, vacate 7 BLM’s determination to the contrary, and enjoin BLM from allowing the pipeline to 8 proceed without authorization issued in accordance with all applicable federal laws. JURISDICTION AND VENUE 9 10 7. This Court has jurisdiction under 28 U.S.C. §§ 1331 and 1346, because 11 defendants are agents of the United States and because Plaintiffs’ claims arise under 12 federal law. The Court may issue a declaratory judgment and further relief under 28 13 U.S.C. §§ 2201-02. An actual justiciable controversy exists between the parties. 14 8. Venue is proper in this Court pursuant to 28 U.S.C. § 1391(e)(1), because 15 a substantial part of the public land that is the subject of this action lies in this District. 16 9. Assignment to the Western Division of this Court is proper under 17 General Order No. 16-05 I.B.1.a(1)(b). 18 19 PARTIES 10. Plaintiff Center for Biological Diversity (CBD) is a national non-profit 20 conservation organization with over 61,000 members dedicated to the protection of 21 biodiversity and ecosystems throughout the world. CBD works through science, law, 22 and creative media to secure a future for all species, great and small, hovering on the 23 brink of extinction, with a focus on protecting the lands, waters and climate that 24 species need to survive. CBD has offices in California and over 13,000 members 25 across the state. CBD is actively involved in species and habitat protection in the 26 California Desert, including on the federal land at issue in this case. 27 11. Plaintiff Center for Food Safety (CFS) is a public interest, non-profit 28 membership organization with offices in San Francisco, California; Portland, Oregon; 3 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 4 of 17 Page ID #:4 1 and Washington, D.C. CFS represents over 900,000 members from every state in the 2 country, including over 100,000 Californians whose economic and personal wellbeing 3 depends upon the equitable distribution of safe and uncontaminated water. CFS’s 4 fundamental mission is to protect food, farmers, and the environment from the harms 5 of industrial agriculture. To that end, CFS works to protect our freshwater resources 6 and ensure that access to and use of freshwater is fair and sustainable. CFS advocates 7 for a more equitable and democratic distribution of our shared water resources and 8 seeks to ensure that environmental stewardship is the starting point for any decision 9 affecting the distribution of water resources. 10 12. Plaintiffs have members who live, work, and recreate in the Mojave 11 Desert region in the vicinity of the Cadiz Project. Plaintiffs’ members and supporters 12 enjoy, on a continuing basis, public lands within Mojave Trails National Monument 13 and other public lands that will be affected by the Cadiz Project. In a land where 14 water is scarce and precious, Plaintiffs’ members have visited freshwater springs near 15 the Cadiz Project, including Bonanza Springs, to observe rare plants and animals and 16 find solace and renewal, and they intend to continue to do so in the future. Plaintiffs’ 17 members derive professional, aesthetic, recreational, and educational enjoyment from 18 the natural ecosystems that these desert springs and other riparian areas support. 19 13. Plaintiffs have been, are being, and will continue to be adversely affected 20 and irreparably injured by BLM’s illegal determination that the Cadiz Project pipeline 21 may proceed without environmental review or authorization by BLM. The interests of 22 Plaintiffs’ members described above will be injured not only by the noise, pollution, 23 and adverse impacts to plants and wildlife associated with construction, operation, and 24 maintenance of the Cadiz Project pipeline, but also by the draw-down of the aquifers 25 that will result from operation of the Cadiz Project. The drying of desert springs and 26 riparian areas, as well as the air pollution caused by excessive drying of desert 27 lakebeds, will cause Plaintiffs’ and their members to suffer actual injury-in-fact that is 28 both concrete and particularized. 4 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 5 of 17 Page ID #:5 1 14. Plaintiffs also have members who live in urban areas that would receive 2 water from the Cadiz Project and are justifiably concerned about the health risks 3 associated with using and consuming water that contains hexavalent chromium and 4 other heavy metals. BLM’s decision to allow the Cadiz Project pipeline to circumvent 5 federal health and safety laws harms Plaintiffs and their members, because it allows 6 Cadiz, Inc. to profit by privatizing and selling public water resources that are unsafe 7 for urban uses. 8 15. Plaintiffs are non-profit advocacy organizations whose organizational 9 missions have been, are being, and will continue to be frustrated by BLM’s illegal 10 determination regarding the Cadiz Project pipeline. Plaintiffs have been, are being, 11 and will continue to be required to divert their organizational resources to oppose 12 BLM’s illegal determination and to ensure that the Cadiz Project pipeline is not 13 allowed to proceed. 14 16. Plaintiffs’ injuries described above would be redressed by the relief 15 sought herein. Plaintiffs have no adequate remedy at law. Plaintiffs have exhausted 16 all available administrative remedies. 17 17. Defendant U.S. Bureau of Land Management is an administrative agency 18 within the Department of Interior responsible for managing the public land 19 surrounding much of the Cadiz Project and underlying much of the railroad right-of20 way through which the Cadiz Project pipeline is proposed to be built. 21 18. Defendant Ryan Zinke is the Secretary of Interior and sued in his official 22 capacity. 23 19. Defendant Brian Steed is the Bureau of Land Management’s acting 24 director and is sued in his official capacity. 25 20. Defendant Jerome Perez is the state director for the Bureau of Land 26 Management in California and is sued in his official capacity. 27 21. Defendant Beth Ransel is the district manager of the Bureau of Land 28 Management’s California Desert District Office and is sued in her official capacity. 5 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 6 of 17 Page ID #:6 1 22. Defendant Katrina Symons is the field manager of the Bureau of Land 2 Management’s Barstow Field Office and is sued in her official capacity. FACTUAL BACKGROUND 3 4 Mojave Trails National Monument 5 23. President Obama established Mojave Trails National Monument by 6 presidential proclamation on February 12, 2016. See 81 Fed. Reg. 8,371 (Feb. 18, 7 2016). Stretching from Joshua Tree National Park north to Mojave National Preserve, 8 the Monument encompasses 1.6 million acres of federal land administered by the 9 Bureau of Land Management and has been described as “the connective tissue of the 10 California desert.” A BLM map of the Monument is reproduced below: 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 6 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 7 of 17 Page ID #:7 1 24. The presidential proclamation describes Mojave Trails National 2 Monument as “a stunning mosaic of rugged mountain ranges, ancient lava flows, and 3 spectacular sand dunes.” The proclamation finds that the Monument is “an invaluable 4 treasure and will continue to serve as an irreplaceable national resource for geologists, 5 ecologists, archaeologists, and historians for generations to come.” It concludes that 6 “protection of the Mojave Trails area will preserve its cultural, prehistoric, and 7 historic legacy and maintain its diverse array of natural and scientific resources, 8 ensuring that the prehistoric, historic, and scientific values of this area remain for the 9 benefit of all Americans.” 10 25. A complex network of ancient underground aquifers supports a number 11 of ecologically significant springs, seeps and other riparian areas in and near Mojave 12 Trails National Monument. For example, the Bonanza Spring complex rises from the 13 southwest slope of the Clipper Mountains and supports a substantial riparian area with 14 cottonwoods, willows, and other water-dependent vegetation within the Monument. 15 In a region where water is scarce, springs, seeps, and riparian areas provide essential 16 habitat for a variety of desert wildlife, including many imperiled species. The 17 proclamation recognizes the importance of maintaining sufficient water resources to 18 support the plants and animals that inhabit these desert lands, and it requires the 19 Secretary of Interior to “work with appropriate State officials to ensure the availability 20 of water resources, including groundwater resources, needed for monument purposes.” 21 26. Mojave Trails National Monument surrounds both Bristol Dry Lake, 22 located southeast of Amboy, and Cadiz Dry Lake, located south of the Cadiz Dunes 23 Wilderness Area. Although these desert lakebeds, or “playas,” are dry for most of the 24 year, evaporation from underground aquifers keeps the lakebeds moist year-round and 25 prevents lakebed sediment from becoming airborne particulate pollution. 26 The Cadiz Project 27 27. Cadiz, Inc. is a for-profit corporation that has acquired over 34,000 acres 28 of private land in the Mojave Desert, most of which is located within the large 7 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 8 of 17 Page ID #:8 1 rectangular “donut hole” at the center of Mojave Trails National Monument. 2 Spanning portions of the Fenner, Cadiz, and Bristol Valley watersheds, Cadiz, Inc.’s 3 property sits above portions of the same underground aquifers that feed springs, seeps 4 and riparian areas within the Monument and other nearby public lands, as well as the 5 Bristol and Cadiz Dry Lakes. 6 28. In 2012, Cadiz, Inc. received approval from the County of San 7 Bernardino to undertake the “Cadiz Valley Water Conservation, Recovery and 8 Storage Project.” The Cadiz Project is designed to extract an average of 50,000 acre 9 feet (an amount equivalent to 16.3 billion gallons) of groundwater every year for 50 10 years from the aquifers underlying Cadiz’ property. Cadiz, Inc. intends to profit by 11 selling the extracted groundwater to municipal water districts in San Bernardino, Los 12 Angeles and Orange counties. 13 29. The Cadiz Project will extract groundwater that would otherwise support 14 springs, seeps, and riparian areas in Mojave Trails National Monument and other 15 public lands and evaporate through Bristol and Cadiz Dry Lakes. Overall, the Project 16 will lower groundwater levels by 80 feet in the aquifer system through unsustainable 17 pumping. Because the Project will extract significantly more groundwater than will 18 be recharged naturally, it could take up to 390 years after the cessation of pumping for 19 the aquifer to return to its natural equilibrium. 20 30. In 2000, the U.S. Geological Survey (USGS) reviewed hydraulic 21 modeling done by Cadiz, Inc. that purports to show the Fenner, Bristol, and Cadiz 22 watersheds receive 50,000 acre-feet of water each year through natural precipitation 23 run-off. USGS concluded that modeling done by Cadiz, Inc. was “not defensible” and 24 had overestimated the natural recharge rate by 5 to 25 times. 25 31. The desert aquifers that the Cadiz Project intends to tap contain 26 hexavalent chromium and other naturally occurring heavy metals. Experts have 27 warned that that water produced from the Cadiz Project will contain hexavalent 28 chromium at levels that far exceed state and federal safety guidelines. 8 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 9 of 17 Page ID #:9 1 The Cadiz Project Pipeline 2 32. A critical component of the Cadiz Project is a 43-mile pipeline that will 3 be used to convey groundwater extracted from the property owned by Cadiz, Inc. 4 south to the California River Aqueduct near the town of Rice, where it will be made 5 available for sale to municipal waters districts further west. 6 33. Cadiz, Inc. intends to build its pipeline within an existing right of way 7 granted to the Arizona and California Railroad (ARZC) under the General Railroad 8 Right-of-Way Act of 1875. A map depicting the ARZC right-of-way in relation to the 9 Cadiz Project and the Colorado River Aqueduct is reproduced below: 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 9 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 10 of 17 Page ID #:10 1 34. The Cadiz Project pipeline will be installed underground using open- 2 trench construction methods at a depth of 15 feet below ground. The pipeline will 3 cross several desert washes along the right-of-way. 4 35. A significant portion of the Cadiz Project pipeline will transect Mojave 5 Trails National Monument near the Cadiz Dunes Wilderness Area. The pipeline will 6 also transect federal land that is subject to the California Desert Conservation Area 7 Management Plan of 1980 (CDCA Plan), as amended by both the Northern and 8 Eastern Colorado Desert Coordinated Management Plan (NECO Plan), and the Desert 9 Renewable Energy Conservation Plan (DRECP). The Cadiz Project pipeline will be 10 constructed outside of the transmission corridors designated in CDCA Plan. 11 Accordingly, BLM would be required to amend the CDCA Plan before it could permit 12 construction and operation of the Cadiz Project pipeline. LEGAL BACKGROUND 13 14 The General Railroad Right-of-Way Act of 1875 15 36. The General Railroad Right-of-Way Act of 1875 “was designed to permit 16 the construction of railroads through the public lands, and thus enhance their value 17 and hasten their settlement.” Great Northern Railway Co. v. United States, 315 U.S. 18 262, 271 (1942). Section 1 of the 1875 Act provides: 19 20 21 22 23 24 25 26 The right of way through the public lands of the United States is granted to any railroad company duly organized under the laws of any State or Territory, except the District of Columbia, or by the Congress of the United States, which shall have filed with the Secretary of the Interior a copy of its articles of incorporation, and due proofs of its organization under the same, to the extent of one hundred feet on each side of the central line of said road; also the right to take, from the public lands adjacent to the line of said road, material, earth, stone, and timber necessary for the construction of said railroad; also ground adjacent to such right of way for station buildings, depots, machine shops, side tracks, turnouts, and water stations, not to exceed in amount twenty acres for each station, to the extent of one station for each ten miles of its road. 27 43 U.S.C. § 934. 28 10 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 11 of 17 Page ID #:11 1 37. Section 4 of the 1875 Act provides that “any railroad desiring to secure 2 the benefits of this act shall . . . file with the register of the land office . . . a profile of 3 its road; and upon approval . . . the same shall be noted upon the plats . . .; and 4 thereafter all such lands over which such right of way shall pass shall be disposed of 5 subject to such right of way.” 43 U.S.C. § 937. 6 38. Construing the plain language and legislative history of the 1875 Act, the 7 U.S. Supreme Court has held that the statute “clearly grants only an easement, not a 8 fee.” Great Northern Railway Co., 315 U.S. at 271. Thus, whereas earlier statutes 9 provided “lavish” outright grants of land to railroads, the 1875 Act provides only for 10 limited right-of-way easement. Id. at 274. 11 39. The plain language and legislative history of the 1875 Act also confirm 12 that the statute grants only those property rights necessary for the purpose of 13 constructing and running the railroad itself. Activities that do not further a railroad 14 purpose are beyond the scope of an 1875 Act right-of-way easement. 15 40. On November 4, 2011, the Department of Interior’s Solicitor’s Office 16 issued an opinion analyzing the plain language and legislative history of the 1875 Act. 17 The Solicitor’s Opinion determined: 18 19 20 21 22 Within an 1875 Act [right-of-way], a railroad’s authority to undertake or authorize activities is limited to those activities that derive from or further a railroad purpose, which allows a railroad to undertake, or authorize others to undertake, activities that have both railroad and commercial purposes, but does not permit a railroad to authorize activities that bear no relationship to the construction or operation of a railroad. 23 The Federal Land Policy & Management Act of 1976 41. The Federal Land Policy and Management Act (FLPMA) is a 24 25 comprehensive statute designed to ensure that public land administered by BLM is 26 “managed in a manner that will protect the quality of scientific, scenic, historic, 27 ecological, environmental, air and atmospheric, water resource, and archeological 28 values.” 43 U.S.C. § 1701(a)(8). 11 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 12 of 17 Page ID #:12 1 42. FLPMA recognizes that the deserts of southeastern California provide a 2 rich and unique environment teaming with “historical, scenic, archeological, 3 environmental, biological, cultural, scientific, educational, recreational, and economic 4 resources.” 43 U.S.C. § 1781(a)(2). Though vast, the statute recognizes that these 5 California deserts and their resources are “extremely fragile, easily scarred, and 6 slowly healed.” Id. Human activities can easily threaten rare and endangered species 7 of wildlife and plants in this sensitive ecosystem. 43 U.S.C. § 1781(a)(3). 8 43. To protect and conserve California’s deserts and their resources, FLPMA 9 designated 25 million acres as the California Desert Conservation Area (CDCA). 43 10 U.S.C. § 1781(c). About half of the CDCA is public land administered by the Bureau 11 of Land Management. Id. Congress mandated that the Secretary of the Interior 12 develop a “comprehensive, long-range plan for the management, use, development, 13 and protection of the public lands within the [CDCA].” 43 U.S.C. § 1781(d). 14 44. To ensure proper stewardship of federal public land, including land 15 within the CDCA, FLPMA also “replaced a tangled array of laws granting rights-of16 way across federal lands, with a single method for establishing a right-of-way over 17 public lands.” W. Watersheds Project v. Matejko, 468 F.3d 1099, 1104 (9th Cir. 18 2006). Specifically, FLPMA authorizes the Secretary of Interior “to grant, issue, or 19 renew rights-of-way over, upon, under, or through” land administered by BLM for, 20 among other things, “pipelines . . . for the . . . transportation or distribution of water.” 21 43 U.S.C. § 1761 (a)(1). 22 45. “Effective on and after October 21, 1976,” FLPMA provides that “no 23 right-of-way for the purposes listed in this subchapter shall be granted, issued, or 24 renewed over, upon, under, or through such lands except under and subject to the 25 provision, limitations, and conditions of this subchapter.” 43 U.S.C. § 1770(a). 26 Regulations promulgated by the Secretary of Interior under FLPMA and codified in 27 Title 43, Part 2800 of the Code of Federal Regulations make clear: “You must have a 28 grant under this part when you plan to use public lands for systems or facilities over, 12 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 13 of 17 Page ID #:13 1 under, on, or through public lands. These include, but are not limited to: . . . pipelines 2 . . . and other systems which impound, store, transport, or distribute water.” 43 C.F.R. 3 § 2801.9(a)(1). 4 46. Prior to granting a right-of-way for a water pipeline under FLPMA, the 5 applicant must submit substantial analysis and the Secretary of Interior, acting through 6 BLM, must make a number of findings. For example, “prior to granting or issuing a 7 right-of-way . . . for a new project which may have a significant impact on the 8 environment,” BLM “shall require the applicant to submit a plan for construction, 9 operation, and rehabilitation for such right-of-way.” 43 U.S.C. § 1764(d). 10 47. When granting rights-of-way, BLM is authorized to include terms, 11 conditions, and stipulations it determines to be in the public interest, which may 12 include modifying the proposed use or changing the route or location of the proposed 13 facilities. 43 CFR § 2805.10(a)(1). In deciding whether to grant a right-of-way, BLM 14 must also comply with the existing land and resource management plans, including 15 the CDCA Plan, as amended by the NECO Plan and the DRECP. 16 48. If the granting of a right-of-way under FLPMA may have a significant 17 impact on the environment, BLM must prepare an environmental impact statement in 18 accordance with the National Environmental Policy Act, 42 U.S.C. § 4321 et seq. 19 Prior to granting a right-of-way under FLPMA, BLM must also comply with the 20 requirements of the Endangered Species Act, 16 U.S.C. § 1531 et seq. 21 22 PROCEDURAL BACKGROUND 49. In 2015, during the previous presidential administration, the Bureau of 23 Land Management analyzed the Cadiz Project pipeline and issued a 24-page 24 document that determined correctly that the Project “does not derive from or further a 25 railroad purpose.” On October 2, 2015, the Bureau of Land Management informed 26 Cadiz, Inc. that it had therefore “reached an administrative determination that the 27 [Cadiz] Project as described cannot be authorized by ARZC because it is outside the 28 scope of ARZC’s [right-of-way] grants held under the 1875 Act.” “In order to 13 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 14 of 17 Page ID #:14 1 proceed with the proposed Project,” the Bureau stated that “Cadiz, Inc., ARZC, or 2 other parties involved will require . . . authorization for a right-of-way for the Project 3 under regulations set forth in 43 C.F.R. Part 2800.” 4 50. On September 1, 2017, under a new presidential administration, the 5 Department of Interior’s Solicitor’s Office issued a memorandum that superseded the 6 November 4, 2011 Solicitor’s Opinion regarding the scope of an 1875 Act right-of7 way easement and instead wrongly concludes: 11 [R]ights-of-way granted to railroad companies under the 1875 Act allow railroad companies to lease portions of their easements to third parties without permit or grant from the Bureau of Land Management . . . provided that such leases are limited to the surface, broadly defined, of the easement and do not interfere with the continued use of the easement as a railroad. 12 51. 8 9 10 On October 13, 2017, BLM advised Cadiz, Inc. by letter that it had 13 determined that the Cadiz Project pipeline is “within the scope of rights granted to the 14 Arizona and California Railroad (ARZC) under the General Railroad Right-of-Way 15 Act of March 3, 1875 (1875 Act), and therefore does not require authorization by 16 BLM.” The October 13, 2017 letter “concludes that the Cadiz Project would not 17 interfere with the continued use of the easement for railroad operations, nor would the 18 proposed activities extend beyond the surface of the easement, broadly defined.” The 19 letter further “concludes in the alternative that the Cadiz Project would further a 20 railroad purpose consistent with the historical understanding of the incidental use 21 doctrine.” 22 52. BLM’s October 13, 2017 letter “expressly supersedes” the agency’s 23 prior, October 2, 2015, administrative determination regarding the Cadiz Project 24 pipeline. BLM’s October 13, 2017 letter constitutes “final agency action” for 25 purposes of the Administrative Procedure Act, 5 U.S.C. § 704, because it determines 26 final rights and legal consequences flow from it. Plaintiffs have exhausted their 27 administrative remedies. 28 14 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 15 of 17 Page ID #:15 1 FIRST CLAIM FOR RELIEF 2 (Illegal Agency Action) 3 53. Plaintiffs re-allege, as if fully set forth herein, each and every allegation 4 contained in the preceding paragraphs. 5 54. FLPMA prohibits BLM from authorizing or otherwise allowing 6 construction or operation of the Cadiz Project pipeline to proceed in the absence of a 7 valid, right-of-way easement across the federal lands at issue. 8 55. Construction and operation of the Cadiz Project pipeline is beyond the 9 scope of the existing 1875 Act right-of-way easement held by ARZC, because it does 10 not derive from or further a railroad purpose and bears no relationship to the 11 construction or operation of a railroad. Construction and operation of the Cadiz 12 Project pipeline is not incidental to continued railroad operations. 13 56. BLM’s determination that construction and operation of the Cadiz 14 Project pipeline is within the scope of the existing 1875 Act right-of-way easement 15 held by ARZC and does not require a new right-of-way granted in accordance with 16 FLPMA and other applicable laws and regulations is arbitrary, capricious, an abuse of 17 discretion, and otherwise not in accordance with law. 18 SECOND CLAIM FOR RELIEF 19 (In the Alternative: Failure to Act in Accordance with Law) 20 57. Plaintiffs re-allege, as if fully set forth herein, each and every allegation 21 contained in the preceding paragraphs. 22 58. By allowing construction and operation of the Cadiz Project pipeline to 23 proceed in the absence of a valid, right-of-way easement across the federal lands at 24 issue, BLM has failed to act in accordance with the requirements of FLPMA and the 25 other applicable federal laws and regulations identified herein. 26 27 REQUEST FOR RELIEF WHEREFORE, Plaintiffs respectfully request that this Court: 28 15 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 16 of 17 Page ID #:16 1 A. Find and declare that construction and operation of the Cadiz Project 2 pipeline is beyond the scope of the 1875 Act right-of-way easement held by ARZC; 3 B. Find and declare that BLM violated FLPMA by determining that 4 construction and operation of the Cadiz Project pipeline may proceed in the absence 5 of a valid, right-of-way easement across the federal lands at issue; 6 C. Vacate BLM’s illegal determination with regard to the Cadiz Project 7 pipeline and enjoin BLM from authorizing or otherwise allowing construction and 8 operation of the Cadiz Project pipeline to proceed in the absence of a valid, right-of9 way easement across the federal lands at issue; 10 D. Award Plaintiffs their costs of litigation, including reasonable attorneys’ 11 fees and costs; and 12 E. Grant Plaintiffs such additional relief as the Court may deem proper. 13 Respectfully submitted, 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Dated: Nov. 28, 2017 /s/ Gregory C. Loarie GREGORY C. LOARIE (CA Bar No. 215859) MARIE E. LOGAN (CA Bar No. 308228) EARTHJUSTICE 50 California Street, Suite 500 San Francisco, CA 94111 T: (415) 217-2000 • F: (415) 217-2040 E: gloarie@earthjustice.org mlogan@earthjustice.org Lead Counsel for All Plaintiffs LISA T. BELENKY (CA Bar No. 203225) ARUNA M. PRABHALA (CA Bar No. 278865) CENTER FOR BIOLOGICAL DIVERSITY 1212 Broadway Street, Suite 800 Oakland, CA 94612 T: (510) 844-7100 • F: (510) 844-7150 E: lbelenky@biologicaldiversity.org aprabhala@biologicaldiversity.org Counsel for Plaintiff Center for Biological Diversity 28 16 Complaint for Declaratory and Injunctive Relief Case 2:17-cv-08587 Document 1 Filed 11/28/17 Page 17 of 17 Page ID #:17 1 2 3 4 5 6 ADAM F. KEATS (CA Bar No. 191157) CENTER FOR FOOD SAFETY 303 Sacramento Street, Floor 2 San Francisco, CA 94111 T: (415) 826-2770 • F: (415) 826-0507 E: akeats@centerforfoodsafety.org Counsel for Plaintiff Center for Food Safety 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 17 Complaint for Declaratory and Injunctive Relief