REPORT OF ANNUAL INSPECTION OF CCR SURFACE IMPOUNDMENT FACILITY NAME: Barry Steam Plant - Ash Pond OF FACILITY: Alabama Power Company INSPECTION DATE: June 25, 2015 INSPECTING ENGINEER: Richard Mickwee, P.E. (Alabama P.E. License 25107) Southern Company Generation Hydro Services - Dam Safety Surveillance Supervisor ANY CHANGES IN GEOM ETRY OF THE IMPOUNDING STRUCTURE A SINCE THE PREVIOUS ANNUAL INSPECTION (YES OR (IF YES, DESCRIBE): LOCATION AND TYPE OF EXISTING INSTRUMENTATION (no instrumentation) MAXIMUM RECORDED READING OF EACH INSTRUMENT SINCE PREVIOUS ANNUAL INSPECTION Instrumentatlonl APPROXIMATE MINIMUM, MAXIMUM AND PRESENT DEPTH AND ELEVATION OF THE IMPOUNDED WATER SINCE PREVIOUS ANNUAL INSPECTION MIN. DEPTH: MAX. DEPTH: PRESENT DEPTH: Up to 10 feet MIN. ELEVATION: MAX. ELEVATION: PRESENT ELEVATION: EL 15 ft APPROXIMATE MINIMUM, MAXIMUM AND PRESENT DEPTH AND ELEVATION OF CCR SINCE PREVIOUS ANNUAL INSPECTION. MIN. DEPTH: MAX. DEPTH: PRESENT DEPTH: Up to 18 feet MIN. ELEVATION: MAX. ELEVATION: PRESENT ELEVATION: Up to EL 30 feet APPROXIMATE STORAGE CAPACITY OF IMPOUNDING STRUCTURE AT TIME OF 25,000,000 cubic yards (with stacking) INSPECTION. APPROXIMATE VOLUME OF IMPOUNDED WATER WATER: 1,500,000 CCR: 15,760,000 cubic AND CCR AT TIME OF INSPECTION cubic yards yards ANY APPEARANCE OF AN ACTUAL OR POTENTIAL STRUCTURAL WEAKNESS OF THE CCR UNIT, IN ADDITION TO ANY EXISTING CONDITIONS THAT ARE DISRUPTING OR HAVE THE POTENTIAL NO TO DISRUPT THE OPERATION AND SAFETY OF THE CCR UNIT AND APPURTENANT STRUCTURES (YES OR (IF YES, DESCRIBE): ANY OTHER WHICH MAY HAVE AFFECTED THE STABILITY OR OPERATION SINCE THE PREVIOUS ANNUAL INSPECTION (YES OR (IF YES, DESCRIBE): This is the first 'Annual inspection by a qualified professional engineer? performed in accordance with 40 CFR Part 257.83. This information will be included in subsequent annual inspection reports. Cubic ya rd figures are estimates derived from available information. Annual Inspection Barry Steam Plant Ash Pond Page 1 of 2 Based on the results of my inspection and review ofthe data provided, it is my professional opinion that the report has been completed in accordance with 40 CFR WW 2% Richard L. Mickwee II, P.E. Date I ~:55c? [33 lz??0153"? 2 . o. "?/Irri Annual Inspection Barry Steam Plant Ash Pond Page 2 of 2