REPORT OF ANNUAL INSPECTION OF CCR SURFACE IMPOUNDMENT FACILITY NAME: Barry Steam Plant - Ash Pond OF FACILITY: Alabama Power Company INSPECTION DATE: November 14, 2017 INSPECTING ENGINEER: .Iacob A. Jordan, P.E. (Alabama P.E. License #25093) Southern Company Services, Technical Services - Senior Engineer, Fossil Dam Safety ANY CHANGES IN GEOMETRY OF THE IMPOUNDING STRUCTURE NO SINCE THE PREVIOUS ANNUAL (IF YES, DESCRIBE): LOCATION AND TYPE OF EXISTING INSTRUMENTATION (no instrumentation) MAXIMUM RECORDED READING OF EACH INSTRUMENT SINCE PREVIOUS ANNUAL INSPECTION '"Stmmentat'mI APPROXIMATE MINIMUM, MAXIMUM AND WATER SINCE PREVIOUS ANNUAL INSPECTION MIN. DEPTH: less than 1 foot MAX. DEPTH: 11 ft PRESENT DEPTH: up to 11 feet MIN. ELEVATION: EL 15 ft MAX. ELEVATION: EL 15 ft PRESENT. ELEVATION: EL 15 ft APPROXIMATE MINIMUM, MAXIMUM AND PRESENT DEPTH AND ELEVATION OF CCR SINCE PREVIOUS ANNUAL INSPECTION. MIN. DEPTH: less than 1 ft MAX. DEPTH: 33 ft PRESENT DEPTH: up to 33 feet MIN. ELEVATION: EL 3 ft (est.) MAX. ELEVATION: EL 36 ft PRESENT ELEVATION: up to EL 36 ft APPROXIMATE STORAGE CAPACITY OF IMPOUNDING STRUCTURE AT TIME OF 25,000,000 cubic yards (with stacking)* INSPECTION. APPROXIMATE VOLUME OF IMPOUNDED WATER . 3* . 3* AND CR AT TIME OF INSPECTION WATER. 240,000 yd CCR. 21,000,000 yd ANY APPEARANCE OF AN ACTUAL OR POTENTIAL STRUCTURAL WEAKNESS OF THE CCR UNIT, IN ADDITION TO ANY EXISTING CONDITIONS THAT ARE DISRUPTING OR HAVE THE POTENTIAL NO TO DISRUPT THE OPERATION AND SAFETY OF THE CCR UNIT AND APPURTENANT (IF YES, DESCRIBE): ANY OTHER WHICH MAY HAVE AFFECTED THE STABILITY OR OPERATION SINCE THE PREVIOUS ANNUAL NO (IF YES, DESCRIBE): *Volume figures are estimated derived from available information. Annual Inspection Barry Steam Plant Ash Pond Dam Page 1 of 2 Based on the results of my inspection and review of the data provided, it is my professional opinion that the report has been completed in accordance with 40 CFR M. Jord? Date [3 I A Annual Inspection Barry Steam Plant Ash Pond Dam Page 2 of 2