Alternate Runs to Inform Council on Pending and Upcoming Decisions Case No. 1 Case No. 2 Case No. 3 Case No. 4 Informs Council Decision on CT Informs Council on Energy Smart Target Informs Council Decision on AMI Load Forecast Consistent with Business Plan 16 Update (BP16-U) and consistent with NOPS Application (include Algiers) BP16-U Forecast Natural Gas Price Forecast or BP16-U Forecast (All Stakeholders to Confirm if Appropriate ) Use Synapse Energy Economics 2016 CO2 Mid Case Price Forecast ($20/ton in 2022, $41/ton in 2035) Load Forecast Consistent with Business Plan 16 Update (BP16-U) and consistent with NOPS Application (include Algiers) BP16-U Forecast Natural Gas Price Forecast or BP16-U Forecast (All Stakeholders to Confirm if Appropriate ) Use Synapse Energy Economics 2016 CO2 Mid Case Price Forecast ($20/ton in 2022, $41/ton in 2035) Proposed NOPS CT Proposed NOPS CT Include 100 MW of Renewable Capacity (Solar) No NOPS CT but necessary transmission Proposed NOPS CT solutions ensure compliance with NERC Standard TPL-001-4 Include 100 MW of Renewable Capacity (Solar) Include 100 MW of Renewable Capacity (Solar) Incorporation of Stakeholder Input Case Energy Smart Savings and Programs Incorporation of Stakeholder Input Case Energy Smart Savings and Programs Incorporation in run of implementing programs to increase Energy Smart Program Savings by 0.2 % per year until such time as program generates savings at a rate equal to 2% of annual kWh sales (R-15-599) Include Direct Load Control and Non-Enabled Include Direct Load Control and Non-Enabled Include Direct Load Control and Non-Enabled Dynamic Pricing Measures from Stakeholder Input Dynamic Pricing Measures from Stakeholder Input Dynamic Pricing Measures from Stakeholder Input Case Case Case Incorporation of Stakeholder Input Case Energy Smart Savings and Programs Include Planned and Recent Completed Transmission Upgrades Include Effects of Planned new Generating Resources including the proposed St Charles Power Station Incorporate Termination of the Entergy System Agreement Unless otherwise Identified, Use IRP Stakeholder Input Case Parameters Perform runs through 2035, Provide Load and Capability tables by year, Provide annual results as well as NPV comparison, Provide Ratepayer Impact Identify any likely PPA or CHP resources and include as appropriate and agreed by the stakeholders Include Planned and Recent Completed Transmission Upgrades Include Effects of Planned new Generating Resources including the proposed St Charles Power Station Incorporate Termination of the Entergy System Agreement Unless otherwise Identified, Use IRP Stakeholder Input Case Parameters Perform runs through 2035, Provide Load and Capability tables by year, Provide annual results as well as NPV comparison, Provide Ratepayer Impact Identify any likely PPA or CHP resources and include as appropriate and agreed by the stakeholders Include Planned and Recent Completed Transmission Upgrades Include Effects of Planned new Generating Resources including the proposed St Charles Power Station Incorporate Termination of the Entergy System Agreement Unless otherwise Identified, Use IRP Stakeholder Input Case Parameters Perform runs through 2035, Provide Load and Capability tables by year, Provide annual results as well as NPV comparison, Provide Ratepayer Impact Identify any likely PPA or CHP resources and include as appropriate and agreed by the stakeholders Load Forecast Consistent with Business Plan 16 Update (BP16-U) and consistent with NOPS Application (include Algiers) BP16-U Forecast Natural Gas Price Forecast or BP16-U Forecast (All Stakeholders to Confirm if Appropriate ) Use Synapse Energy Economics 2016 CO2 Mid Case Price Forecast ($20/ton in 2022, $41/ton in 2035) Include 100 MW of Renewable Capacity (Solar) Include planned rollout of AMI and Expand/implement associated Load Control measures now capable with AMI. Include, as appropriate, battery storage alternatives as the technology matures and its implementation is facilitated by AMI Revision 01 Exhibit SEC-8 CNO Docket No. UD-16-02 Page 1 of 1 Include Planned and Recent Completed Transmission Upgrades Include Effects of Planned new Generating Resources including the proposed St Charles Power Station Incorporate Termination of the Entergy System Agreement Unless otherwise Identified, Use IRP Stakeholder Input Case Parameters Perform runs through 2035, Provide Load and Capability tables by year, Provide annual results as well as NPV comparison, Provide Ratepayer Impact Identify any likely PPA or CHP resources and include as appropriate and agreed by the stakeholders Load Forecast Consistent with Business Plan 16 Update (BP16-U) and consistent with NOPS Application (include Algiers) BP16-U Forecast Natural Gas Price Forecast or BP16-U Forecast (All Stakeholders to Confirm if Appropriate ) Use Synapse Energy Economics 2016 CO2 Mid Case Price Forecast ($20/ton in 2022, $41/ton in 2035)