SLIDE 23 Re-Planning 110 According to New Instructions Following new instructions by the honorable Minister of Defense, intensive meetings of Project 110 technical committee were held in order to accommodate the activities to the instructions. In the new outline, the work would be divided in two: covert {secret structure and goals} and overt (regular structure). The covert operations are directed towards the completion of the existing timetable. in order to do so, the operations were divided into two types of work: contaminating work and non-contaminating work. In the contaminating work, that is planned to take place after the non-contaminating work, the members' attention will be focused on the portability, in order for us to stay clear both of espionage and to leave no identifiable traces. The overt operation's goal is to prepare and develop the foundation; therefore it was planned and proposed to establish two university centers under the names "Institute for Applied Physics" and "Center for Shock and Explosion Technology Research". Moreover, it is necessary to use the Chemical Engineering and Material Center in the Malek Ashtar University. Both centetrs mentioned above will not be linked with 110 and will belong administratevly to the institute or the university. However, because of the depth of the coordination, their supervisor needs to be appointed in accordance to 110's executor. 1. The main plans: 1.1.Sareb-1: A system for a static test of the product as a basic plan with an existing specification. This specification will be re?examined and authorized by the project?s technical committee. 1.2. Sareb-Z: A system suitable for integrating on the warhead. Its specifications will also be designed to address flight requirements of 111. 1.3. Sareb-3: A Shehab-3 warhead equipped with Sareb-Z. inA?t?ruv . I Vlf.? . :5 -4. in . ITILIHE. .iumbw. lurkalpirJ ll. . i a 1-4.. I r? .a .1. . 0.- Jill: rlli. I w; .r . . I'll-I'll. L) . n. trt=l 4? i: I