From: Santiago Zuleta Sent: Monday, April 23, 2018 9:51 PM To: Jim Schneiderman ; Caleb Linn Subject: RE: Flagler Memorial Jim, Recently the bridge has experienced a series of frequent malfunctions. These malfunctions started to occur after the EOR and the system’s subcontractor (EHM) adjusted the control settings to comply with a request/preference from the Owner’s Engineer. Prior to these recent control setting adjustments we did not have a malfunction of the bridge for over two months. Currently the team is working diligently to resolve any issues caused by the setting adjustment, and we have significantly reduced the frequency of these events. We have an additional setting adjustments scheduled to take place by the end of the week, and we are optimistic that these last adjustments will completely resolve the issues. Attached is an email from Mike Sileno with a more technical and in depth explanation of the issue and the steps taken to resolve it. Let me know if you have any questions or if you need additional information. SZ