Rosenwald Scope of Work Plumbing repair water line for tilt skillet repair/replace leaking faucet 1st girls restroom repair/replace leaking faucet 1st boys restroom repair toilet in faculty restroom repair leaking toilet in 2nd girls restroom repair broken urinals in 2nd boys restroom repair broken toilet in 2nd boys restroom repair broken toilet in 2nd faculty restroom Electrical investigate and repair lights not working in cafeteria replace light in electrical closet in cafeteria replace blown lights in 100 replace missing outlet covers in 802 replace missing outlet covers in 702 replace missing junction box cover in 702 replace missing junction box cover in 200 replace blown lights in ATA Wing replace blown lights in front office Contraction cafeteria - (6) tiles replaced/encapsulated replace missing floor tiles in 100 (underneath file cabinet only) replace missing floor tiles in 600 (10% loose tile replaced) remove and replace missing floor tiles in 202 (entire room replaced) replace missing floor tiles ATA Wing (5% tiles replaced) replace door in 200 replace stained ceiling tile throughout campus remove and replace loose floor tile in room 200 (20% ) remove and replace loose floor tile in cyber café (hallway only) remove and replace loose floor tile in hall by 203(hallway only) remove and replace loose floor tile in hall between 200 & 300 (hallway only)