FFG(X) Update National Symposium – Surface Navy Association Dr. Regan Campbell January 15, 2019 DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. FFG(X) System Description Mission:  Anti‐Submarine Warfare, Surface Warfare,  Electromagnetic Maneuver Warfare, and  Air Warfare Description:  FFG(X) is an agile, multi‐mission platform  designed for operation in blue water and  littoral environments. Employment: Operate independently or integrated with  a Strike/Task Group to conduct offensive  and defensive Surface, Anti‐Submarine,  and Air Warfare FFG(X) supports the Navy the Nation Needs and the validated requirement for 355 Battle Force ships in line with the 2018 National Defense Authorization Act (NDAA). DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 2 Guided Missile Frigate (FFG(X)) Capabilities EW / IO AW • • • • • • • 3x3x3 fixed-face EASR Mk41 VLS (32 cell) SM-2 Blk IIIC ESSM Blk 2 21 cell RAM launcher UPX-29 IFF CEC • • • • • SLQ-32(V)6 (SEWIP Blk II) w/ HGHS and Specific Emitter Identification (SEI) Spectral (Follow on to SSEE Inc F) AOEW (on airborne asset) SWAP-C reservation for SLQ-32C(V)7 (SEWIP Blk III Lite) SWAP-C reservation for 150kw laser WATERCRAFT • 7m RHIB (x2) AVIATION SUW • • • • • • • • 57mm gun (with ALaMO) Mk160 GFCS Mk20 Mod 1EOSS OTH fire control system OTH 2x4 (T)/ 2x8 (Obj) 50 caliber machine guns iStalker w/3600 coverage NGSSR Current Capability Growth Potential • • • • • Organic MH-60R (x1) Organic MQ-8C (x1) Secure & Traverse Aircraft Handling System Horizon Reference System Night Vision Device Compatibility C4I/ CMS • • • • ASW • • • • • • • • AN/SQS-62 Variable Depth Sonar or Low Band Hull Array TB-37 MFTA w/ TACI AN/SQQ-89(V)15 USW-DSS AN/SLQ-61 Lightweight Tow or SLQ-25 NIXIE ADC (Torp CM) Mk41 VLS supports VLA for allwx stand-off ASW weapon (future) SVTT – Shipboard Torpedo Launch (Obj) • • • • • • DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. CANES ICOP Link-11/22 Link-16 LOS/STJ/JRE HF/VHF/UHF LOS UHF/SHF/EHF SATCOM NTCDL Frigate Weapon System (FWS) Advanced Cyber Design GPNTS & ECDIS FFG(X) Requirements Development  Process  Conceptual Design Phase 1. Draft CDD - Informed by FF CDD, DDG CDD, FFG RET, RFI, process, analysis, staffing process 1 FFG(X) Draft CCD 4. Cost /Capability Trades - Frigate Affordability Board - Technical and Leadership adjudication - Informed Cost / Capability decisions 4 Cost/Capability Trades Draft Spec Industry Feedback 3 2 2. Draft System Specifications - Basis for industry efforts - “Derived” requirements based on CDD - Updated based on Cost Reduction Initiatives 3. Industry Feedback - Cost Reduction Initiatives - Monthly Technical Exchange Meetings - Design Reviews Supported Industry‐informed cost‐capability trades DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 4 Guided Missile Frigate  (FFG(X))Acquisition Strategy/Profile • • Full and Open Competition Conceptual Design Contracts awarded in FY18 ‐ Mature Designs, Reduce Technical Risk,  Identify Cost Reduction Opportunities • • Detail Design and Construction (DD&C) Contract award to a single vendor in FY20  • • Request for Proposals in 4QFY19 Contract award in 4QFY20 FY QTY Hull Number • Awarded to five vendors 16 month period of performance • Initial Conceptual Design Review with Industry: Q1FY19 • Final Conceptual Design Review with Industry: Q3FY19 20 1 21 1 22 2 23 2 24 2 25 2 26 2 27 2 28 2 29 2 30 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 5 FFG(X) Conceptual Design Contracts FMM Austal BIW DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. LM 6 6 FFG(X) Program Status • FFG(X) Requirements are mature – informed by detailed  analysis, early engagement with industry, and a collaborative  Conceptual Design phase • Ongoing Conceptual Design phase ends in June 2019 – Matures Designs via Navy‐Industry engagements and CDRL comments – Reduces Technical Risk – Identifies Cost Reduction Opportunities • FFG(X) Program is on track for a Detail Design & Construction  Award to a single vendor – Request for Proposals – Q4FY19 – DD&C Award – Q4FY20 DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 7 Questions? DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 8