7? 201 EA District Wide Renewal Projects Projects by Facility Major Maintenance Facility Subsystem Detail Cost A.C. Bible Stadium (2009) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $30,295.00 Summary for A.C. Bible Stadium $30,295.00 Admin Annex (1938) 2019 Roof Roofing Repairs $11,798.00 Summary for Admin Annex $11,798.00 Bagdad EL (1999) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $40,535.00 Plumbing $45,101.00 Replace Gas Fired Water Heaters (2) Summary for Bagdad EL $85,636.00 Canyon Ridge MS (2004) 2019 Interior Finish Aux Gym Floor - Resurface Floor $11,176.00 Interior Finish Comp Gym Floor - Resurface Floor $14,715.00 Summary for Canyon Ridge MS $25,890.00 Cedar Park HS (1998) 2019 Exterior System Replace Downspouts $63,600.00 Exterior System Replace Storefront Doors + Add Canopies Building "A", East and West Side $640,187.00 Grounds Remove and Resurface Track HS $206,700.00 Grounds Restripe Band Practice Field- Asphalt Surface $15,141.00 Grounds Restripe Parking Lots and Curbs $26,370.00 Interior Finish Athletic Additions, Modernizations & Renovations Phase II $3,958,570.00 Interior Finish Multi Purpose Gym Floor- Resurface Floor $14,933.00 Interior Finish Paint 2nd Floor Building "A" and Remove Vinyl Wall Covering in the Admin Areas Plumbing Replace Gas Fired Water Heaters (2 @ Kitchen/PE) $95,563.00 Roof Roofing Repairs $18,935.00 $102,820.00 Summary for Cedar Park HS $5,142,819.00 Thursday, January 17, 2019 Page 1 of 6 Facility Subsystem Detail Cost Cedar Park MS (1995) 2019 Grounds Restripe Parking Lots and Curbs $12,720.00 Summary for Cedar Park MS $12,720.00 Cypress EL (1988) 2019 Grounds Erosion Control at Various Locations $63,600.00 Plumbing Replace Gas Fired Water Heaters $57,327.00 Roof Roofing Repairs $7,759.00 Summary for Cypress EL $128,686.00 Deer Creek EL (2004) 2019 Roof Roofing Repairs Safety Replace Fire Alarm $4,792.00 $26,500.00 Summary for Deer Creek EL $31,292.00 Don Tew PAC (1999) 2019 Exterior System Exterior Paint- Repaint Front Entry $11,378.00 Summary for Don Tew PAC $11,378.00 Faubion EL (1974) 2019 Grounds Restripe Parking Lots and Curbs $7,950.00 Summary for Faubion EL $7,950.00 Florence Stiles MS (2011) 2019 Interior Finish Aux Gym Floor - Resurface Floor $11,106.00 Interior Finish Comp Gym Floor - Resurface Floor $14,623.00 Summary for Florence Stiles MS $25,728.00 Four Points MS (2009) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $38,665.00 Grounds Restripe Parking Lots and Curbs $12,720.00 Grounds Resurface Track MS Interior Finish Aux Gym Floor - Resurface Floor $11,176.00 Interior Finish Comp Gym Floor - Resurface Floor $14,715.00 Kitchen Equip Replace Booster Heater #1 Kitchen Equip Replace Dishwasher $100,700.00 $6,481.00 $38,299.00 Summary for Four Points MS $222,755.00 Glenn HS (2016) 2019 Grounds Restripe Band Practice Field Concrete $7,155.00 Summary for Glenn HS Thursday, January 17, 2019 $7,155.00 Page 2 of 6 Facility Subsystem Detail Cost Grandview Hills EL (2008) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $12,231.00 Summary for Grandview Hills EL $12,231.00 Henry MS (2002) 2019 Grounds Resurface Track MS $100,700.00 HVAC HRU's (Heat Recovery Units) Design 2019 - Replacement 2020 Interior Finish Aux Gym Floor - Resurface Floor $11,176.00 Interior Finish Comp Gym Floor - Resurface Floor $14,715.00 $1,895,216.00 Summary for Henry MS $2,021,807.00 Knowles EL (2003) 2019 Interior Finish Kitchen Floor Epoxy - Replace Epoxy Floor Roof Roofing Repairs $68,900.00 $3,765.00 Summary for Knowles EL $72,665.00 Leander HS (1982) 2019 Grounds Restripe Band Practice Field $16,138.00 Grounds Restripe Parking Lots and Curbs $19,080.00 Grounds Softball Infield Renovation Interior Finish Multi Purpose Gym Floor- Resurface Floor $132,500.00 $14,933.00 Summary for Leander HS $182,652.00 LEO (1955) 2019 Interior Finish VCT/ Epoxy/ Carpet Flooring Renovation- Phase II Moisture Mitigation Process and Replace MPR Carpet $454,253.00 Summary for LEO $454,253.00 LISD Misc. Equipment 2019 Exterior System New Aluminum Decks and Ramps $53,000.00 HVAC Heat Recovery Wheel (3) $84,588.00 Kitchen Equip Replace Spare/Emergency Equip. $265,000.00 Summary for LISD Misc. Equipment $402,588.00 Mason EL (1994) 2019 Roof Roofing Repairs $9,328.00 Summary for Mason EL Thursday, January 17, 2019 $9,328.00 Page 3 of 6 Facility Subsystem Detail Cost Naumann EL (1998) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames Interior Finish $39,397.00 Replace Carpet $705,000.00 Summary for Naumann EL $744,397.00 Parkside EL (2008) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames Safety $5,120.00 Replace Fire Alarm $26,500.00 Summary for Parkside EL $31,620.00 Plain EL (2006) 2019 Roof Roofing Repairs Safety Replace Fire Alarm $4,050.00 $26,500.00 Summary for Plain EL $30,550.00 Pleasant Hill EL (2004) 2019 Interior Finish Paint Corridors, MPR and Cafeteria $106,000.00 Summary for Pleasant Hill EL $106,000.00 Reagan EL (2009) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $10,667.00 Exterior System Recaulk Expansion Joints $67,701.00 Grounds Restripe Parking Lots and Curbs $7,950.00 Kitchen Equip Replace Electric Water Heaters $85,049.00 Safety Replace Fire Alarm $26,500.00 Summary for Reagan EL $197,867.00 Reed EL (2011) 2019 Kitchen Equip Replace Water Softener $4,395.00 Summary for Reed EL $4,395.00 River Place EL (2007) 2019 Exterior System Recaulk Expansion Joints Roof $60,874.00 Roofing Repairs $3,172.00 Summary for River Place EL $64,045.00 River Ridge EL (2009) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $5,689.00 Exterior System Recaulk Expansion Joints Grounds $67,558.00 Restripe Parking Lots and Curbs $7,950.00 Summary for River Ridge EL Thursday, January 17, 2019 $81,197.00 Page 4 of 6 Facility Subsystem Detail Cost Rouse HS (2008) 2019 Grounds Restripe Band Practice Field -Asphalt Surface $16,138.00 Interior Finish Multi Purpose Gym Floor - Resurface Floor $12,813.00 Kitchen Equip Replace Garbage Disposal #1 $4,790.00 Kitchen Equip Replace Garbage Disposal #2 $4,790.00 Kitchen Equip Replace Water Softener Roof Roofing Repairs $6,043.00 $28,522.00 Summary for Rouse HS $73,098.00 Running Brushy MS (2000) 2019 Exterior System Clean and Seal - Exterior Walls Roof $296,355.00 Roofing Repairs $12,555.00 Summary for Running Brushy MS $308,909.00 Science Materials Center (2008) 2019 Exterior System Clean and Seal - Exterior Walls $15,900.00 Summary for Science Materials Center $15,900.00 Support Services (2000) 2019 Roof Roofing Repairs $6,427.00 Summary for Support Services $6,427.00 Transportation (2000) 2019 Roof Roofing Repairs $5,363.00 Summary for Transportation $5,363.00 Vandegrift HS (2010) 2019 Grounds Restripe Band Practice Field - Concrete Surface $7,155.00 Summary for Vandegrift HS $7,155.00 Vista Ridge HS (2003) 2019 Exterior System Tilt-Up Concrete Panel - Repair Tilt-Wall Panels $150,711.00 Grounds Restripe Band Practice Field- Asphalt Surface $16,138.00 Interior Finish Comp Gym Floor - Resurface Floor $22,137.00 Interior Finish Multi Purpose Gym Floor - Resurface Floor $14,933.00 Roof Roofing Repairs $19,870.00 Summary for Vista Ridge HS Thursday, January 17, 2019 $223,789.00 Page 5 of 6 Facility Subsystem Detail Cost Westside EL (2008) 2019 Exterior System Exterior Paint- Repaint All Hollow Metal Doors, Door & Window Frames $11,378.00 Safety $26,500.00 Replace Fire Alarm Summary for Westside EL $37,878.00 Whitestone EL (1991) 2019 Roof Roofing Repairs $8,500.00 Summary for Whitestone EL $8,500.00 Wiley MS (2006) 2019 Kitchen Equip Replace Booster Heater #1 $6,481.00 Kitchen Equip Replace Convection Oven #1 $27,100.00 Kitchen Equip Replace Convection Oven #2 $27,100.00 Kitchen Equip Replace Convection Oven #3 $27,100.00 Kitchen Equip Replace Convection Oven #4 $27,100.00 Kitchen Equip Replace Dishwasher $26,121.00 Kitchen Equip Replace Milk Box #1 $4,683.00 Kitchen Equip Replace Milk Box #2 $4,683.00 Kitchen Equip Replace Milk Box #3 $4,683.00 Kitchen Equip Replace Water Softener $6,043.00 Summary for Wiley MS $161,094.00 Winkley EL (2006) 2019 Interior Finish Repaint Corridor Walls, Door Frames, Stairs Wells $98,991.00 Summary for Winkley EL Grand Total Thursday, January 17, 2019 $98,991.00 $11,106,803 Page 6 of 6