H O U S TO N D I S T R I C T I-45 GULF FREEWAY WIDENING/FM 646 CONTRUCTION BEFORE N N AFTER CLOSURE 45 96 “Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.” 646 PROJECT DESCRIPTION = CONSTRUCTION AREA As a part of the I-45 Gulf Freeway Widening Project between FM 518 and FM 517, the I-45/FM 646 intersection will be flipped so that I-45 passes over FM 646. 646 EB Detour 646 WB Detour Traveling WB at FM 646 – Utilize the I-45 NB Frontage Road, U-turn at SH 96 and continue on the I-45 SB Frontage Road to FM 646. If traveling EB at FM 646, utilize the I-45 SB Frontage Road, U-turn at FM 517 and continue on the I-45 NB Frontage Road to FM 646. The intersection will be constructed in two phases. The first phase will include the demolition of the FM 646 overpass, construction of the I-45 northbound mainlane overpass, and reconstruction of the intersection and frontage roads. Following the first phase of construction, the intersection will be reopened to east/west traffic and the access roads will be reconstructed along with the I-45 southbound mainlane overpass. FAST FACTS ACCESSIBILITY All efforts will be made to minimize the impacts of the intersection construction to the local businesses and residents. Therefore, during these actvities, the access roads will remain open and the reconstruction of the driveways into the businesses along the access roads will be reconstructed in sections or during non-business hours. 517 646 CLOSURE 45 TEXAS DEPARTMENT OF TRANSPORTATION • Houston District Office • 7600 Washington Ave. • Houston, TX 77007 BENEFITS The new FM 646/ I-45 intersection will include bi-direction access roads and U-turns. Both new amenities will improve the access to the surrounding businesses and residences, reduce congestion and queue times at the intersection. N 45 646 SCHEDULE • It is anticipated that the FM 646 overpass will be removed in early 2019. • The contractor will have 6 months with incentives and disincentives for early and late completion. • It is anticipated that the intersection will reopen to east/west traffic in Fall 2019. STAY INFORMED • TxDOT Public Information Office: (713) 802-5076 • Danny Perez TxDOT Public Information Officer (713) 802-5077 Danny.Perez@txdot.gov • Closure information: houstontranstar.org OR drivetexas.org @txdothouston @txdothouston SPRING FALL •2018 2018