May 24, 2019 Patrick Cheney 5101 Minute Maid Road Ft. Pierce, FL 34945 Subject: Notice of Proposed Agency Action to Deny Environmental Resource Permit Application No.: 180613-16 Project Name: Sunbreak Farms St. Lucie County Dear Mr. Cheney: On September 14, 2018 and January 11, 2019, the South Florida Water Management District (“District”) sent you Requests for Additional Information (RAIs) requiring either the submittal of a monitoring plan or an alternative to demonstrate that the proposed pollution abatement practices function properly and meet the objectives of Section 4.9.3, Vol. II of the Applicant’s Handbook. The District received a letter from your counsel on April 4, 2019, advising that no monitoring plan or other alternative will be provided and requesting that the District determine the application complete. Attached is the District’s Proposed Agency Action to deny the application, without prejudice to your right to reapply later. Absent further action by you, this denial will be final June 3, 2019. Alternatively, you may withdraw your application prior to final agency action. If you choose to withdraw your application, the District will apply the submitted processing fee for this application to a new application filed within 365 days, as specified in Rule 5.5.3.7, Environmental Resource Applicant’s Handbook Vol. I. If you wish to refer the application and Proposed Agency Action to the Governing Board for final agency action, a written request must be received on or before May 31, 2019. The application and Proposed Agency Action will then be considered at the June Governing Board meeting. Sincerely, Jill S. Creech, P.E. Division Director, Regulation Enclosures: Proposed Agency Action/Staff Report Notice of Rights C: David Baggett, P.E., Engineering Design & Construction, Inc. (via Email) Kim Graham, P.E., St. Lucie County Public Works (via Email) David Dee, Esq., Gardner, Bist, Bowden, Bush, Dee, Lavia & Wright, P.A. (via Email) Dylan Reingold, Esq., Indian River County (via Email) State Rep. Larry Lee, Jr. (via Email) Cammie Dewey, P.E., St. John's River Water Management District (via Email) Virginia P. Sherlock on behalf of PGA Village Property Owners Association, Inc. (via Email) Dennis Corrick, Esq. (via Email) NOTICE OF RIGHTS As required by Sections 120.569 and 120.60(3), Fla. Stat., the following is notice of the opportunities which may be available for administrative hearing or judicial review when the substantial interests of a party are determined by an agency. Please note that this Notice of Rights is not intended to provide legal advice. Not all of the legal proceedings detailed below may be an applicable or appropriate remedy. You may wish to consult an attorney regarding your legal rights. RIGHT TO REQUEST ADMINISTRATIVE HEARING A person whose substantial interests are or may be affected by the South Florida Water Management District’s (SFWMD or District) action has the right to request an administrative hearing on that action pursuant to Sections 120.569 and 120.57, Fla. Stat. Persons seeking a hearing on a SFWMD decision which affects or may affect their substantial interests shall file a petition for hearing with the Office of the District Clerk of the SFWMD, in accordance with the filing instructions set forth herein, within 21 days of receipt of written notice of the decision, unless one of the following shorter time periods apply: (1) within 14 days of the notice of consolidated intent to grant or deny concurrently reviewed applications for environmental resource permits and use of sovereign submerged lands pursuant to Section 373.427, Fla. Stat.; or (2) within 14 days of service of an Administrative Order pursuant to Section 373.119(1), Fla. Stat. "Receipt of written notice of agency decision" means receipt of written notice through mail, electronic mail, or posting that the SFWMD has or intends to take final agency action, or publication of notice that the SFWMD has or intends to take final agency action. Any person who receives written notice of a SFWMD decision and fails to file a written request for hearing within the timeframe described above waives the right to request a hearing on that decision. If the District takes final agency action which materially differs from the noticed intended agency decision, persons who may be substantially affected shall, unless otherwise provided by law, have an additional Rule 28-106.111, Fla. Admin. Code, point of entry. Any person to whom an emergency order is directed pursuant to Section 373.119(2), Fla. Stat., shall comply therewith immediately, but on petition to the board shall be afforded a hearing as soon as possible. A person may file a request for an extension of time for filing a petition. The SFWMD may, for good cause, grant the request. Requests for extension of time must be filed with the SFWMD prior to the deadline for filing a petition for hearing. Such requests for extension shall contain a certificate that the moving party has consulted with all other parties concerning the extension and that the SFWMD and any other parties agree to or oppose the extension. A timely request for an extension of time shall toll the running of the time period for filing a petition until the request is acted upon. FILING INSTRUCTIONS A petition for administrative hearing must be filed with the Office of the District Clerk of the SFWMD. Filings with the Office of the District Clerk may be made by mail, hand-delivery, or e-mail. Filings by facsimile will not be accepted. A petition for administrative hearing or other document is deemed filed upon receipt during normal business hours by the Office of the District Clerk at SFWMD headquarters in West Palm Beach, Florida. The District’s normal business hours are 8:00 a.m. – 5:00 p.m., excluding weekends and District holidays. Any document received by the Office of the District Clerk after 5:00 p.m. shall be deemed filed as of 8:00 a.m. on the next regular business day. Additional filing instructions are as follows: • Filings by mail must be addressed to the Office of the District Clerk, 3301 Gun Club Road, West Palm Beach, Florida 33406. Rev. 11/08/16 1 • • Filings by hand-delivery must be delivered to the Office of the District Clerk. Delivery of a petition to the SFWMD's security desk does not constitute filing. It will be necessary to request that the SFWMD's security officer contact the Office of the District Clerk. An employee of the SFWMD's Clerk's office will receive and file the petition. Filings by e-mail must be transmitted to the Office of the District Clerk at clerk@sfwmd.gov. The filing date for a document transmitted by electronic mail shall be the date the Office of the District Clerk receives the complete document. A party who files a document by e-mail shall (1) represent that the original physically signed document will be retained by that party for the duration of the proceeding and of any subsequent appeal or subsequent proceeding in that cause and that the party shall produce it upon the request of other parties; and (2) be responsible for any delay, disruption, or interruption of the electronic signals and accepts the full risk that the document may not be properly filed. INITIATION OF AN ADMINISTRATIVE HEARING Pursuant to Sections 120.54(5)(b)4. and 120.569(2)(c), Fla. Stat., and Rules 28-106.201 and 28-106.301, Fla. Admin. Code, initiation of an administrative hearing shall be made by written petition to the SFWMD in legible form and on 8 1/2 by 11 inch white paper. All petitions shall contain: 1. Identification of the action being contested, including the permit number, application number, SFWMD file number or any other SFWMD identification number, if known. 2. The name, address, any email address, any facsimile number, and telephone number of the petitioner and petitioner’s representative, if any. 3. An explanation of how the petitioner’s substantial interests will be affected by the agency determination. 4. A statement of when and how the petitioner received notice of the SFWMD’s decision. 5. A statement of all disputed issues of material fact. If there are none, the petition must so indicate. 6. A concise statement of the ultimate facts alleged, including the specific facts the petitioner contends warrant reversal or modification of the SFWMD’s proposed action. 7. A statement of the specific rules or statutes the petitioner contends require reversal or modification of the SFWMD’s proposed action. 8. If disputed issues of material fact exist, the statement must also include an explanation of how the alleged facts relate to the specific rules or statutes. 9. A statement of the relief sought by the petitioner, stating precisely the action the petitioner wishes the SFWMD to take with respect to the SFWMD’s proposed action. MEDIATION The procedures for pursuing mediation are set forth in Section 120.573, Fla. Stat., and Rules 28-106.111 and 28-106.401–.405, Fla. Admin. Code. The SFWMD is not proposing mediation for this agency action under Section 120.573, Fla. Stat., at this time. RIGHT TO SEEK JUDICIAL REVIEW Pursuant to Section 120.68, Fla. Stat., and in accordance with Florida Rule of Appellate Procedure 9.110, a party who is adversely affected by final SFWMD action may seek judicial review of the SFWMD's final decision by filing a notice of appeal with the Office of the District Clerk of the SFWMD in accordance with the filing instructions set forth herein within 30 days of rendition of the order to be reviewed, and by filing a copy of the notice with the clerk of the appropriate district court of appeal. Rev. 11/08/16 2 erp_staff_report.rdf Last Date For Agency Action: June 3, 2019 INDIVIDUAL ENVIRONMENTAL RESOURCE DENIAL STAFF REPORT Project Name: Sunbreak Farms Permit No.: 56-00111-S Application No.: 180613-16 Application Type: Environmental Resource (Construction/Operation Modification) Location: St Lucie County, S28, 33, 34/T33S/R38E S3,4,5,8,9,10,15,16,17,20,21,29/T34S/R38E Applicant : Sunbreak Farms L L C Project Area: 80.75 acres Project Land Use: Agricultural Drainage Basin: C-25 Receiving Body: C-25 Class: CLASS III Special Drainage District: NA Conservation Easement To District : Sovereign Submerged Lands: No App.no. : 180613-16 No Page 1 of 6 erp_staff_report.rdf PROJECT SUMMARY: This Environmental Resource Permit application requests Construction and Operation of a stormwater management (SWM) system to serve an 80.75 acre composting operation for a project known as Sunbreak Farms. The proposed SWM system includes the construction of containment cells that will be used for on-site composting of aerobically digested and dewatered residuals with yard debris to produce Class AA compost pursuant to Florida Department of Environmental Protection Permit No. FLA979830. The Class AA compost material will be used onsite as a soil amendment and fertilizer for the existing agricultural production of row crops pursuant to Chapter 62-640 F.A.C. Please refer to the composting cell construction plans Exhibit 2.0 for details. The applicant has not provided reasonable assurances that the project will not result in adverse impacts to water resources. The applicant did not provide the requested water quality monitoring plan and reporting schedule designed to provide data to determine if the pollution abatement practices incorporated into the design of the stormwater management system will function properly as required by Section 4.9.3, Volume II of the Applicant's Handbook. Staff is recommending denial of the application pursuant to the conditions of issuance Chapter 62330.301 F.A.C. Specifically, the applicant has not demonstrated that construction, operation and maintenance of the project: (e) Will not adversely affect the quality of receiving waters such that the state water quality standards set forth in chapters 62-4, 62-302, 62-520, and 62-550, F.A.C., including the antidegradation provisions of paragraphs 62-4.242(1)(a) and (b), F.A.C., subsections 62-4.242(2) and (3), F.A.C., and rule 62302.300, F.A.C., and any special standards for Outstanding Florida Waters and Outstanding National Resource Waters set forth in subsections 62-4.242(2) and (3), F.A.C., will be violated. App.no. : 180613-16 Page 2 of 6 erp_staff_report.rdf PROJECT EVALUATION: PROJECT SITE DESCRIPTION: Refer to Exhibit 1.0 for a Location Map. The project is approximately 2.25 miles west of Interstate 95, north of the Florida Turnpike in St. Lucie County. The site consists of existing row crops located within an agricultural project previously known as Cloud Grove. The majority of the property is located in St. Lucie County with the northern portion in Indian River County. The property includes a 640 acre above ground impoundment (AGI) used for storage of storm water for irrigation and flood protection. The AGI outfalls into an adjacent ditch that discharges to the C-25 Canal pursuant to Permit No. 56-00111-S. The SWM system also has the ability to discharge stormwater to the Minute Maid Canal, which discharges to the C-25 Canal. BACKGROUND: On October 19, 1978, the District authorized the operation (Application Nos. 21917, 21918, 21921) of an above ground impoundment for irrigation and flood protection of a 6,560 acre agricultural project known as Cloud Grove. On June 29, 2006, the District authorized a permit transfer (Application No. 060127-19) to Florida Conservancy and Development Group LLC. WATER QUANTITY : The proposed operation of the SWM system associated with the composting containment cells includes a protocol to maintain the water table 1 foot below the lowest grade of the containment cells during composting. Discharge Rate : The project is located within the C-25 Basin which has a 10 year, 3 day design storm. The previously permitted design storm discharge rate remains unchanged. The composting containment cells will retain 11.0 inches of rainfall within the cells associated with the 100 year, 3 day design storm event. Thus, the existing SWM system and 640-acre above ground impoundment will not receive storm water runoff from the composting area associated with 10 year, 3 day C-25 Basin design storm event. The applicant provided an annual storm water runoff analysis which indicates the annual volume of storm water runoff will be reduced. The proposed project is intended to result in less annual storm water runoff volume and a reduction in the peak rate of storm water runoff from design storm event resulting in less discharge from the SWM system. App.no. : 180613-16 Page 3 of 6 erp_staff_report.rdf WATER QUALITY : The applicant has provided the following: 1) The proposed project area will retain 11.0 inches (74 ac-ft) of storm water runoff from the 80.75 acre composting containment cells associated with the 100 year, 3 day design storm event. 2) The applicant provided a water quality analysis based on the proposed agronomic practices. The applicant has not provided the requested water quality monitoring plan and reporting schedule designed to provide data to determine if the pollution abatement practices incorporated into the design of the SWM system will function properly. Section 4.9.3, Volume II of the Applicant's Handbook provides for requiring water quality monitoring for two reasons: 1) such data can be used to determine if the pollution abatement practices incorporated into the design for SWM system are functioning properly, 2) In some cases there may be a real and immediate concern regarding degradation of quality in the receiving waters, regardless of the apparent pollutant removal efficiency of the SWM system. The intent of the water quality monitoring plan and reporting schedule is to develop sets of data that can be analyzed to determine if pollution abatement practices are functioning properly after the implementation of the biosolids composting activity at Sunbreak Farms. The water quality monitoring plan and reporting schedule should include, at a minimum: an explanation of how the proposed program will achieve valid measurements of flow, bacteria, nitrogen, phosphorus, and dissolved oxygen concentration; description of monitoring sites which should include on-site and off-site locations; sample collection methods, technique, preservation, identification and schedules; description of laboratory facilities, analyses, reporting delivery and data review; and other items as necessary to determine if the pollution abatement practices incorporated into the design are functioning properly and will prevent water quality degradation. The plan and schedule should be implemented at least six (6) months prior to the deliveries of biosolids to the site. The proposed plan should also include the recordation of pumped discharges (times, rates, and durations) from all stormwater discharge facilities located on the farm site. A time period for the monitoring and reporting should be defined within the plan, to be no less than five years. The plan and schedule must be submitted to the District for review and approval, prior to implementation. WETLANDS: Wetlands And Other Surface Waters: There are no wetlands or other surface waters located within the project area or affected by this project. App.no. : 180613-16 Page 4 of 6 erp_staff_report.rdf RELATED CONCERNS: Third Party Interest: The following third parties have contacted the District with concerns about this application: St. Lucie County Indian River County St. Johns River Water Management District State Representative Larry Lee, Jr. David Dee, Esq. PGA Village Property Owners Association, Virginia Sherlock Esq. District staff have coordinated several meetings with the applicant and the third parties to address questions and concerns. Enforcement: There has been no enforcement activity associated with this application. App.no. : 180613-16 Page 5 of 6 erp_staff_report.rdf STAFF RECOMMENDATION TO EXECUTIVE DIRECTOR: The Staff recommends the following: Denial of the application for Construction and Operation of a stormwater management system serving an 80.75 acre composting operation for a project known as Sunbreak Farms. STAFF REVIEW: NATURAL RESOURCE MANAGEMENT APPROVAL ENVIRONMENTAL EVALUATION SUPERVISOR _____________________________________ Jessica Huffman __________________________________ Barbara J. Conmy SURFACE WATER MANAGEMENT APPROVAL ENGINEERING EVALUATION SUPERVISOR _____________________________________ Glen J. Gareau, P.E. __________________________________ Gary Priest, P.E. ENVIRONMENTAL RESOURCE COMPLIANCE BUREAU CHIEF : _____________________________________ Ricardo A. Valera, P.E. DATE:_____________________________ REGULATION DIVISION ASSISTANT DIRECTOR : _____________________________________ Anthony M. Waterhouse, P.E. App.no. : 180613-16 Page 6 of 6 DATE:_____________________________ P K S KINGS HWY E D WA R D O T U C S E D CH W M I D WAY R D RD G Exhibit No: 1 Exhibit Created On: 2018-07-17 Project Name: SUNBREAK FARMS 2.5 5 Miles SFWMD GeoSpatial Services Application ST. LUCIE COUNTY, FL REGULATION DIVISION 0 S RD A EE E L OK E OB F F R D 129 SHINN RD SNEED RD -1 5 O R A N G E AV E US I-9 FLORIDA'S TPKE -1 8 INDRIO RD US 13 E US-1 T 95 'S N 13TH ST A I- ID N 25TH ST R SR-615 O N KINGS HWY L JOHNSTON RD F Permit No: 56-00111-S ¯ Application Number: 180613-16 Created by South Florida Water Management District Application 180613-16 Exhibit 2.0 CULVERT 391 PUMP TP (390) SUNBREAK FARMS BOUNDARY 1 2 3 4 5 6 7 8 9 10 11 12 13 PUMP 1 (387) 24 PUMP 5 (#5A) SUNSHINE FARMS PROJECT CULVERT NO. 3 TURNPIKE STRAZULLA RESERVOIR 160 Ac. MINUTE MAID RESERVOIR 640 Ac. 16-243 1 OF 2 PORT ST. LUCIE FLORIDA OVERALL COMPOST EXHIBIT SUNBREAK FARMS SUNBREAK FARMS BOUNDARY 14 CULVERT 383 26 16 PUMP 3 (#3) 27 17 CULVERT 389 PUMP 2B PUMP 2A 28 18 PUMP 4 (#4) 29 19 25 30 20 15 31 32 33 21 22 23 SUNBREAK FARMS OFFICE PUMP 7 STATION 34 35 36 37 38 39 40 41 42 BIOSOLIDS COMPOST AREA (TYP.) (SEE DETAIL SHEET#2) DATE TO SFWMD C-25 CANAL VIA PROJECT CULVERT NO. 8 MINUTE MAID CANAL REVISION COMMENTS SUNBREAK FARMS BOUNDARY RESERVOIR OUTFALL STRUCTURE TO MINUTE MAID CANAL PUMP 6 (385) 43 44 45 46 47 48 49 50 51 DCB DRAWN BY JLW DESIGNED BY DATE 19DEC18 SCALE AS SHOWN LAYOUT OVERALL FILENAME 16-243 compost exhibit r1.dwg SUNBREAK FARMS BOUNDARY PUMP LOCATION FARM BLOCK FARM DITCH FLOW DIRECTION FARM DITCH (TYPICAL) DRAINAGE FLOW DIRECTION(SHEET FLOW) PROPOSED BIOSOLIDS COMPOST AREA 5 PUMPS 41 LEGEND THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY EDC, INC. SHALL BE WITHOUT LIABILITY TO EDC, INC. Z:\EDC-Fort-Pierce\16-projects\16-243(SunbreakFarms)\Drawings\16-243 Compost exhibit R1.dwg, 12/19/2018 4:05:50 PM ENGINEERS SURVEYORS 10250 SW VILLAGE PARKWAY - SUITE 201 PORT SAINT LUCIE, FL 34987 ' 772-462-2455 PORT SAINT LUCIE OFFICE 8 www.edc-inc.com F.B.P.E. CERTIFICATE OF AUTHORIZATION 9935 L.B. CERTIFICATE OF AUTHORIZATION 8098 DAVID C. BAGGETT (DATE) #81375 10250 SW VILLAGE PARKWAY - SUITE 201 PORT SAINT LUCIE, FL 34987 ' 772-462-2455 1 of 2 2 of 2 ALL BERMS SHALL BE FULLY STABILIZED (SEE NOTE 3 BELOW) 66' TOP OF STABILIZED BERM 23.75 NAVD(AVG) (SEE NOTE 3 BELOW) 23.75 NAVD(AVG) (SEE NOTE 3 BELOW) FARM BLOCK ACCESS ROAD 12' MIN. COMPOST AREA 22.75 NAVD(AVG) 1 4 2% ENGINEERS 24" MIN. 2% 24" SURVEYORS 1 21.75 NAVD(AVG) 4 1 4 PORT SAINT LUCIE OFFICE 10250 SW VILLAGE PARKWAY - SUITE 201 PORT SAINT LUCIE, FL 34987 ' 772-462-2455 EXISTING FARM BLOCKS 1 8 www.edc-inc.com 4 F.B.P.E. CERTIFICATE OF AUTHORIZATION 9935 L.B. CERTIFICATE OF AUTHORIZATION 8098 A A 12' MIN. 3. SUNBREAK FARMS SHALL BE RESPONSIBLE FOR ENSURING THE CELLS ARE CONSTRUCTED TO THE TYPICAL CROSS-SECTION A-A FOR THE ENTIRE LENGTH OF THE COMPOST AREA. THE FINAL LENGTH OF CELLS MAY VARY SLIGHTLY BASED ON FARM BLOCK WIDTH. AS SUCH, SUNBREAK FARMS SHALL CONSTRUCT BASED ON SECTION A-A AT 1:1 RATIO PER LINEAR FOOT OF COMPOST TO ENSURE TOTAL RETENTION. ALL ENDS OF COMPOST CELLS SHALL BE ENCLOSED WITH BERMS OF THE MINIMUM REQUIRED HEIGHT. ALL BERMS SHALL BE FULLY STABILIZED (SEEDED OR SODDED) WITH NATIVE FLORIDA GRASS TO ENSURE ADEQUATE SEDIMENT AND EROSION CONTROL. EXISTING FARM BLOCK 21.75 NAVD(AVG) 4. 5. PRIOR TO COMMENCEMENT OF COMPOSTING ACTIVITIES, THE ENGINEER OF RECORD SHALL INSPECT AND PROVIDE AS-BUILT CERTIFICATION FOR EACH CONSTRUCTED CELL TO THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD) AND FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP). COMPOSTING ACTIVITIES SHALL NOT OCCUR IN ANY CELL WHICH HAS NOT BEEN CERTIFIED AND APPROVED BY THE RESPECTIVE AGENCIES. 6. ALL CERTIFIED BERMS, PADS, AND V-DITCHES ASSOCIATED WITH THE COMPOST CELLS SHALL REMAIN ENCLOSED AND STABILIZED FOR THE DURATION OF THEIR USE. AUTHORIZATION FROM THE SFWMD AND FDEP SHALL BE OBTAINED PRIOR TO THE ABANDONMENT OR MODIFICATION OF ANY COMPOST CELLS. 7. CONTAINMENT AREA ELEVATIONS ARE AVERAGES, ACTUAL CONFIGURATION SHALL MEET THE DEPTH AND WIDTH FOR EACH FARM BLOCK. 16' TYP COMPOST MANAGEMENT AREA TO BE GRADED AT 2% TOWARDS V-DITCH RETENTION AREA. DRAINAGE SHALL NOT BE DIRECTED TOWARDS DITCHES OR OTHER SURFACE WATERS. HEIGHT: 8 FT. MIXED BULKING AGENTS AND FEEDSTOCKS. MINIMUM RATIO: 3:1 (v:v) 8' MIN 8' MIN GRADE TO MATCH EXISTING 12" BASE LAYER GROUND YARD WASTE AND/OR OVER'S TYPICAL BIOSOLIDS COMPOSTING AREA DETAIL WIDTH: 16 FT. SCALE : NTS TYPICAL COMPOST WINDROW SECTION B-B SCALE : 1"=2' TYPICAL BIOSOLIDS COMPOSTING AREA NOTES: TYPICAL COMPOST WINDROW SECTION NOTES: 1. 1. PRIOR TO THE ACCEPTANCE OF BULKING AGENTS OR BIOSOLIDS, THE COMPOSTING AREA SHALL BE STRIPPED/GRUBBED OF VEGETATION, PERIMETER BERMS SHALL BE FORMED, A STABILIZED ROCK ENTRANCE INSTALLED, AND THE INTERIOR AREA GRADED AS SHOWN ON THIS EXHIBIT. 2. NO POLLUTION OR EROSION CAUSED BY THIS PROJECT WILL BE ALLOWED IN THE STORMWATER DRAINAGE SYSTEM. THE CONTRACTOR SHALL INSTALL ANY DEVICES NECESSARY TO PREVENT POLLUTION OR EROSION. 3. ALL AREAS SHALL BE CLEARED AND GRUBBED PRIOR TO CONSTRUCTION. THIS SHALL CONSIST OF THE COMPLETE REMOVAL AND DISPOSAL OF ALL TREES, BRUSH, STUMPS, GRASS, WEEDS, RUBBISH AND ALL OTHER OBSTRUCTIONS RESTING ON, OR PROTRUDING THROUGH THE SURFACE OF THE EXISTING GROUND TO A DEPTH OF ONE (1) FOOT. 4. BERMS SHALL BE CONSTRUCTED OF FILL CONSISTING OF A UNIFORM FREE DRAINING GRANULAR SOIL (CLEAN SAND) AND BE PLACED IN LAYERS NOT TO EXCEED 12INCHES LOOSE MEASURE AND SUFFICIENT COMPACTIVE EFFORT SHOULD BE APPLIED TO OBTAIN A MINIMUM OF 98% OF THE MODIFIED PROCTOR (ASTM D-1557) MAXIMUM VALUE. 6. 7. 8. A) WHERE POSSIBLE, THE MOST FRESHLY GROUND YARD TRASH SHALL BE SET ASIDE SEPARATELY. B) WINDROWS COMPOSTING SHALL BE CONSTRUCTED DIRECTLY ON A COMPOST PAD. PRIOR TO PLACING BIOSOLIDS IN THE MANAGEMENT AREA A 50:50 BLEND OF GROUND YARD TRASH AND SCREEN-OVERS SHALL BE USED TO CREATE A 12” BASE LAYER UPON WHICH ACTIVE COMPOSTING WILL BE PLACED. SCREEN-OVERS SHALL CONSIST OF SCREENED RAW COMPOST FROM SCREENING DURING POST-PROCESSING. THE BASE LAYER SHOULD BE REASONABLY MIXED AND UNIFORMLY PLACED TO ACHIEVE PROPER INSULATION FROM THE GROUND SURFACE. THE FRESHLY GROUND YARD TRASH (A ABOVE) SHALL BE SPREAD ON TOP OF THIS BASE LAYER IN AN AMOUNT EQUIVALENT TO TWICE THE VOLUME OF BIOSOLIDS TO BE RECEIVED. YARD TRASH MATERIALS SHOULD ALSO BE USED TO FORM A PERIMETER CONTAINMENT BERM AROUND THE BASE LAYER PRIOR TO PLACEMENT OF BIOSOLIDS. C) TRUCKS SHALL UNLOAD THE BIOSOLIDS TO A PRE-CONSTRUCTED BASE LAYER ONCE THE ASSOCIATED BERMS HAVE BEEN FORMED. EXCESS BIOSOLIDS LIQUIDS SHALL NOT BE APPLIED TO THE WINDROW. D) ALL TRUCKS AND EQUIPMENT ASSOCIATED WITH THE BIOSOLIDS COMPOSTING OPERATION SHALL ENTER THROUGH THE STABILIZED ROCK ENTRANCE. THE ENTRANCE SHALL BE CLEARLY VISIBLE AND ACCESIBLE FROM THE FARM BLOCK ACCESS ROADS. AFTER PLACEMENT OF THE BIOSOLIDS ON THE DESIGNATED WINDROW BASE LAYER, STAFF SHALL PLACE FRESHLY GROUND YARD TRASH ON TOP OF THE BIOSOLIDS. THE VOLUMETRIC RATIO OF YARD TRASH TO BIOSOLIDS SHALL BE 3-TO-1, RESPECTIVELY. E) UNSCREENED BIOSOLIDS COMPOST SHALL BE USED TO CONSTRUCT A CAPPING LAYER TO INSULATE THE ACTIVE COMPOST MIX AND ACT AS A BIOFILTER TO MINIMIZE ODORS. IF UNSCREENED BIOSOLIDS ARE NOT AVAILABLE, THE CAP LAYER SHALL CONSIST OF GROUND YARD TRASH. F) STAFF SHALL PROMPTLY UTILIZE MECHANICAL MEANS TO THOROUGHLY MIX THE BIOSOLIDS AND BULKING AGENT TOGETHER. G) THE WINDROW SHALL BE CONSTRUCTED TO DIMENSIONS THAT ARE APPROXIMATELY 8 FEET WIDE AND 16 FEET TALL. LENGTHS WILL VARY BASED ON AVAILABLE SPACE IN THE COMPOSTING AREAS BUT WILL NOT EXCEED THE LENGTH OF THE FARM BLOCK. ALL WINDROWS SHALL BE COMPLETELY CONSTRUCTED AND MIXED TO PREVENT OPEN EXPOSURE OF BIOSOLIDS. ALL PILE SLOPES SHALL BE REASONABLY STABLE TO PREVENT SLOUGHING OF MATERIALS. ALL BULKING AGENT AND BIOSOLIDS MATERIALS MUST BE BROUGHT DIRECTLY TO THE APPROPRIATE COMPOST AREA AS DESIGNATED BY THE FACILITIES MANAGER. THE FACILITIES MANAGER SHALL ENSURE THAT QUANTITIES OF MATERIALS BROUGHT TO EACH COMPOSTING AREAS CAN BE INCORPORATED INTO THE COMPOSTING PROCESS AS DESCRIBED IN THE OPERATIONS MANUAL AND THIS SHEET. THERE SHALL BE NO EXCESS STORAGE OF BIOSOLIDS OR BULKING AGENTS THAT ARE NOT APART OF THE ACTIVE COMPOSTING PROCESS. DATE 19DEC18 SCALE AS SHOWN LAYOUT TYPICAL AREA FILENAME THE WINDROWS SHALL BE CONSTRUCTED AS SHOWN ABOVE. CONSTRUCTION SHALL BE PERFORMED AS FOLLOWS: THE INTERIOR OF THE COMPOSTING AREAS SHALL BE GRADED WITH A 2% SLOPE TOWARD THE V-DITCH RETENTION AREA SUCH THAT DRAINAGE DOES NOT REACH THE ADJACENT DITCHES. UPON ARRIVAL AT THE FARM ALL BULKING AGENT AND BIOSOLIDS MATERIALS MUST BE FIRST BROUGHT TO THE FRONT OFFICE TO DOCUMENT THE DATE, TIME, QUANTITY, TYPE, AND OPERATOR'S NAME. THESE RECORDS SHALL BE KEPT AT THE FRONT OFFICE AND MADE AVAILABLE UPON REQUEST. SUNBREAK FARMS 12" CAPPING LAYER GROUND YARD WASTE OR UNSCREENED COMPOST TOP OF BERM TO MATCH ACCESS ROAD 5. JLW ALL BERMS SHALL BE FULLY STABILIZED (SEEDED OR SODDED) WITH NATIVE FLORIDA GRASS TO ENSURE ADEQUATE SEDIMENT AND EROSION CONTROL 2% 16' TYP DRAWN BY UPON COMPLETION OF EACH INDIVIDUAL COMPOST CELL, SUNBREAK FARMS SHALL BE RESPONSIBLE FOR FURNISHING A CERTIFIED AS-BUILT RECORD DRAWING FROM A PROFESSIONAL LAND SURVEYOR TO THE ENGINEER OF RECORD. DEFICIENCIES IN CONSTRUCTION OR OPERATION SHALL BE CORRECTED IMMEDIATELY UPON DIRECTION FROM THE ENGINEER OF RECORD OR ANY GOVERNING AGENCY WITH APPLICABLE JURISDICTION. 19DEC18 2% T.O.B.=23.75 NAVD(AVG) 2' MIN. INSTALL PVC PIEZOMETRIC OR EQUIVALENT GROUNDWATER MEASURING DEVICE OUTSIDE OF COMPOST CELL BERM IN THE IMMEDIATE VICINITY OF THE V-DITCH(TYP.) REVISION COMMENTS PRIOR TO CONSTRUCTION OF THE COMPOST CELLS, SUNBREAK FARMS SHALL PUMP DOWN WATER LEVELS IN THE INTERNAL FARM DITCHES A MINIMUM OF 12" BELOW THE PROPOSED V-DITCH INVERT(S). THE PUMPED WATER SHALL BER ROUTED AND STORED IN THE EXISTING 640 ACRE ABOVE GROUND IMPOUNDMENT. WATER LEVELS SHALL BE CONTROLLED AT THIS ELEVATION FOR THE DURATION OF COMPOSTING ACTIVITIES TO ENSURE THE CELLS REMAIN SUFFICIENTLY DRY. DATE 2. GROUNDWATER MEASURING DEVICE ADDED SUNBREAK FARMS SHALL CLEAR , GRUB, AND LEVEL ALL AREAS WITHIN THE FOOTPRINT OF THE PROPOSED COMPOST CELLS PRIOR TO CONSTRUCTION OF THE BERMS, PADS, OR V-DITCH. COMPOST CELL AREA SHALL BE FREE OF ANY VEGETATION AND DELETERIOUS MATERIALS. FLORIDA 8' MIN. 21.75 NAVD(AVG) BOTTOM OF V-DITCH=19.75 NAVD(AVG) 8' MIN. COMPOST WINDROW 22.75 NAVD(AVG) 1. B CURING & FINISHED PRODUCT ALL BERMS SHALL BE FULLY STABILIZED (SEEDED OR SODDED) WITH NATIVE FLORIDA GRASS TO ENSURE ADEQUATE SEDIMENT AND EROSION CONTROL T.O.B.=23.75 NAVD(AVG) B NOTES: PORT ST. LUCIE 2% N.T.S. INSTALL MEASURING DEVICE WITH SUFFICIENT DEPTH TO VERIFY THE REQUIRED GROUNDWATER LEVELS TYPICAL COMPOST AREA EXHIBIT 2% TYPICAL CONTAINMENT SECTION A-A DCB FOOTPRINT OF COMPOST CELL SHALL BE CLEARED, GRUBBED, AND LEVELED PRIOR TO CONSTRUCTION OF THE BERMS, PADS, OR V-DITCH DESIGNED BY C.E.: 18.75 NAVD(AVG) (SEE NOTE 2 BELOW) 16-243 compost exhibit r1.dwg BOTTOM OF V-DITCH RETENTION 19.75 NAVD(AVG) CONSTRUCT 12" STABILIZED ROCK ENTRANCE EXISTING FARM BLOCK ACCESS ROAD THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY EDC, INC. SHALL BE WITHOUT LIABILITY TO EDC, INC. Exhibit 2.0 8' MIN Application 180613-16 COMPOST AREA 50' GRADE TO MATCH EXISTING 8' MIN Z:\EDC-Fort-Pierce\16-projects\16-243(SunbreakFarms)\Drawings\16-243 Compost exhibit R1.dwg, 12/19/2018 4:05:59 PM INSTALL PVC PIEZOMETRIC OR EQUIVALENT GROUNDWATER MEASURING DEVICE OUTSIDE OF COMPOST CELL BERM IN THE IMMEDIATE VICINITY OF THE V-DITCH(TYP.). CARE SHALL BE GIVEN TO PROTECT DEVICE AT ALL TIMES DURING CONSTRUCTION, COMPOSTING, AND FARMING OPERATIONS. DAVID C. BAGGETT (DATE) #81375 10250 SW VILLAGE PARKWAY - SUITE 201 PORT SAINT LUCIE, FL 34987 ' 772-462-2455 16-243 2 OF 2 STAFF REPORT DISTRIBUTION LIST SUNBREAK FARMS Application No: 180613-16 Permit No: 56-00111-S INTERNAL DISTRIBUTION X X X X X X X X X Glen J. Gareau, P.E. Jessica Huffman Gary Priest, P.E. Barbara J. Conmy Tony Waterhouse, P.E. Randy Smith Susan Martin Ansley Marr Jill Creech, P.E. EXTERNAL DISTRIBUTION X Permittee - Sunbreak Farms L L C X Engr Consultant - Engineering Design & Construction Inc X Other Interested Party - Gardner, Bist, Bowden, Bush, Dee, Lavia & Wright, P.A. X Other Interested Party - Indian River County X Other Interested Party - Pga Village Poa Inc. X Other Interested Party - State Rep. GOVERNMENT AGENCIES X X X X X City of Port St Lucie - Planning Div City of Port St Lucie - Public Works St. Lucie County Engineer St. Lucie County Planning and Development Services US Army Corps of Engineers Permit Section