20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION APPLICATION FOR PRELIMINARY PERMIT FREESTONE PUMPED STORAGE HYDRO PROJECT FERC PROJECT NO. Applicant: Renewable Energy Aggregators Agent: Adam Rousselle l 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM VERIFICATION This Application for preliminary permit is executed in the State of County of Bucks BY: Adam Robert Rousselle 5710 Oak Crest dr. Doylestown, PA 18902 Being duly sworn, depos an says that the contents of this application are true and to the best of his We or be f. undersigned applicant has signed the application this I 3 day of a 20 Adam R. Rousselle ll Sub cribed and sworn before me, a notary public of the commonwealth of this k??l da of February 2019. . NotaryPublic NOTARIAL SEAL Victoria L. Child. Notary Public Buckingham Twp.. Bucks County Myconwms?onexpkes November24.2019 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM TABLE OF CONTENTS Initial Statement Additional Information (18 CFR 4.32) Exhibit 1-Project Description 1.1 General Project Description 1.2 Reservoirs 1.3 Existing or Proposed Interconnection to Transmission Lines 1.4 Generating Equipment 1.5 Lands of the United States 1.6 Public Interest Exhibit 2? Description of Studies 2.1 Studies Process 2.2 Studies to be Completed 2.3 Roads 2.4 New Dam Construction 2.5 Schedule for Studies Exhibit 3- Cost and Financing 3.1 Estimated Costs 3.2 Financial Sources 3.3 Proposed market Exhibit 4-Project Maps 4.1 Freestone Project General Map 4.1.1 Freestone Project General Overview Map 4.1.2 Freestone Project Overview Substation 4.2 Freestone Project Upper Reservoir and Penstock with Interconnection 4.3 Freestone Project Lower Reservoir and Powerhouse 4.3.1 Freestone Project Lower Reservoir with Tap Pipe and Water Source 4.4 Freestone Project General Map with Topography 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Initial statement 1) 2) 3) 4) BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Appiicatiori for Preliminary Permit Renewable Energy Aggregators applies to the Federal Energy Regulatory Commission for a preliminary permit for the proposed Freestone Pumped Storage Hydro Project, as described in the attached exhibits. This application is made in order that the applicant may secure and maintain priority of application for a license for the project under Part of the Federal Power Act while obtaining the data and performing the acts required to determine the feasibility of the project and to support an application for a license. The location of the proposed project is: State or territory: GA County: Dade Township or nearby town: Trenton Stream or other body of water: Nickajack Lake State or territory: GA County: Dade Township or nearby town: Trenton Stream or other body of water: Nickajack Lake Applicant's Contact Information The exact name, business address, and telephone number of the applicant are: Renewable Energy Aggregators Adam Rousselle II 5710 Oak Crest Drive Doylestown? Pa 18902 Email: arousselleii@reaggregators.com Phone: 215485-1708 The exact name and business address of each person authorized to act as agent for the applicant is: Adam Rousselle 5710 Oak Crest Drive Doylestown, Pa 18902 Email: arousselleii@reaggregators.com Phone: 215-485-1708 Statement of Authority: Renewable Energy Aggregators is a Corporation located in Doylestown, Pa. It is organized under the laws of the State of and as such, the Applicant is qualified under of the Federal Power Act (FPA) to hold hydroelectric licenses issued under Part 1 of the The Applicant is not claiming preference under of the FPA at this time. 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM 5) The proposed term of the requested permit is 36 Months. 6) Existing Dams or Other Project Facilities There are no existing dams or project facilities. The lower reservoir may include an existing abandoned mining area(s). A: Additional Information (18 CFR 4.32) 1) The Applicant intends to obtain and will maintain and proprietary rights necessary to construct operate or maintain the project. 2) The names and mailing addresses of entities affected or used by the proposed project are provided below. a) County in which the project would be located: i. Dade County 71 Case Avenue Trenton, GA 30752 3) City, Town or similar local political subdivision a)Every City, town or similar political subdivision in which the project would be located: Trenton, GA 12282 N. Main Street Trenton, GA 30752 b)Every City, town or similar political subdivision that has a population of 5,000 or more people and is located within 15 miles of the project: 1. None 4) Every irrigation district, drainage district, or similar purpose political subdivision: a) in which any part of the project, and any Federal facilities that would be used by the project, would be located, or b) that owns, operates, maintains, or uses any project facilities or any Federal facilities that would be used by the project: There are no known irrigation or drainage districts we are aware ofand no federal facilities that would be used the project. 5) Every other political subdivision in the general area of the project that there is reason to believe would likely be interested in, or affected by, the application: There are no political subdivisions in the general area that this applicant is aware of. 6) All Indian tribes that may be affected by the project. The Applicant is not aware that the Project affects any Native American tribe. 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Exhibit 1- Project Description 1.1 General Project Description Based on current conceptual design, the Freestone Pumped Storage Hydro Project involves the construction of a closed loop Pumped-storage hydroelectric generating facility capable of producing approximately 80 MW. The basic configuration would include: As many as two pumping/generating units contained in a powerhouse A newly constructed lower reservoir of approximately 31.4 acres An Upper Reservoir - One approximately 84 -acre upper reservoir created through construction of a semi-circular darn containing 410,544,540 gallons of water One 48 Penstock approximately The project will have an approximate net head of approximately 839 feet. 0 Emergency Spillway locations shown are approximate and require additional survey information to properly determine their location. The Applicant proposes to create one upper reservoir with approximately 84 acres. The Applicant anticipates that the lower reservoir will be filled from local inflow including groundwater inputs and operated at a surface elevation of 879 (ASL). The upper reservoir would potentially be constructed using dam roller compacted concrete or earth and rock excavated from mine site reclamation. Preliminary designs estimate the upper reservoir to have a total surface area of approximately 84 acres and hold approximately 410,544,540 gallons of water at a pool discharge elevation of 1,518 feet ASL. The average annual generation from this project would be approximately 351,482.98 and the cost of the studies vary from $150,000 to $400,000. 1.2 RESERVOIRS The estimated number, surface area, storage capacity, and normal maximum surface elevation (mean sea level) of any reservoirs, whether existing or proposed, that would be part ofthe project: Upper Reservoirs One with a surface Area 84 acres containing, 1,259.92 acre feet of water Storage Volume approximately 410,544,540 gallons Drain Elevation approximately 1,518 feet above mean sea level Composition of Dam Roller-compacted Concrete or Rock-Fill Lower Reservoir Surface Area 31.4 acres Storage Volume 1,883.87 acre-feet Surface Elevation 679 feet above sea level 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM 1.3 EXISTING OR PROPOSED TRANSMISSION LINES The estimated number, length, voltage, interconnections, and, where applicable, age and condition, of any primary transmission lines whether existing or proposed, that would be part of the project [see 16 U.S.C. (I) There are two contemplated interconnection areas one is a 69 kV circuit adjacent to the Lower Reservoir and a substation adjacent to the upper reservoir. (2) The Applicant will conduct studies to determine the location, number ot?circuits, voltage, and con?guration of the project?s interconnection with the regional utility network. (3) This project will also evaluate the use of any Transmission Circuits developed and related to the Wind Farm which is adjacent to the project. (4) A PJM Generation Interconnection Study is being planned as part ot?this study. 1.4 GENERATING EQUIPMENT Hydroelectric Plant (1) Nominal Capacity 80 MW (2) Number of Units 1 units (3) Composition Francis or Pelton (4) Diameter 48? Penstocks (5) From Upper Reservoir 48? approximately 3,158 feet Powerhouse (6) Height approximately 25 feet (7) Length approximately 150 Feet (8) Width approximately 50 feet Average Annual Energy Production Assuming a twelve?hour generation time and based on preliminary design of 80 MW, the Applicant anticipates an energy output ot?about 351,482.98 annually. 1.5 LANDS OF THE UNITED STATES . There are no lands of the United States included within the proposed project boundary. There are no known areas within or in the vicinity of the proposed project boundary that are included in or have been designated for study for inclusion in the National Wild and Scenic Rivers System. There are no areas within the proposed project boundary that are known to be under the provisions of the Wilderness Act or that have been designated as wilderness area, recommended for designation as wilderness area, or designated as wilderness study area. 1.6 PUBLIC INTEREST 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM The proposed Freestone Pumped Storage Hydro Project will be achieved by installing a new hydroelectric generator which will utilize modern, state-of?the-art technology to optimize the clean, renewable electricity generating potential of site in a manner that best develops conserves and utilizes this resource for beneficial public use. The proposed project will fulfill the public interest for a less expensive, more reliable and environmentally sound source of renewable energy while creating energyjobs in an economically depressed area who has lost energy related jobs in the transition away from coal. The hydraulic capacity of the Freestone Pumped Storage Hydro Project will develop, conserve, protect and utilize in the public interest the public water resources ofthe region without damage to the environment. Development of the proposed project will reduce the acid rain and greenhouse effects associated with coal and oil fueled power plants that currently supply a significant portion of the energy needs of Georgia. Providing reliable peak energy on demand Creating Emergency and Pre-Emergency Load Response for PJM Creating Quick Start Reserves and grid storage for the PJM Grid Providing a means to store excess energy especially from intermittent renewable sources such as the Wind Farm at times when demand is low and large thermal plants cannot shed load. Enhancing local economics through creation of jobs during construction and for operations. EXHIBIT 2 DESCRIPTION OF STUDIES 2.1 STUDIES PROCESS The Applicant has reviewed substantial topographical, parcel ownership, municipal, economic as well as the mechanical and environmental aspects of the project and conducted a field visit. 2.2. STUDIES TO BE COMPLETED The studies and related work to be completed will provide the applicant with the necessary information to prepare the application for license and to progress the concept deveiopment plan to final design. All work will be conducted in a manner so as not to affect cultural resources or endangered species, if any, and to cause minimal disturbance to the land and water. Any land altered or disturbed will be adequately restored to the satisfaction of the owner. The applicant proposes to carry out the studies below to determine the feasibility of the proposed project and support an application for license. As the studies are being conducted the applicant will consult with appropriate federal, state, municipal and local agencies. The exact scope and scheduling of studies will be coordinated in accordance with consultation related to the integrated licensing process. 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM 2.2.1 GENERAL PLAN AND SURVEY A general plan and survey of the proposed project will be prepared to delineate the site topographic characteristics and approximate size. location and elevations of existing and proposed facilities. 2.2.2 GEOTECHNICAL STUDIES The applicant will have a geotechnical engineer review existing geotechnical information and perform a current review and analysis of the project site. The geotechnical engineer will also analyze the geotechnical suitability of the foundation material for construction of any potential location for powerhouse and other structures. 2.2.3 WATER QUALITY STUDIES Data collection for water quality will consist of reviewing existing water quality of the lower reservoir as well as performing new field sampling. Water quality characteristics of interest will primarily be related to acidity which may affect the Generation equipment. 2.2.4 RECREATION STUDIES Analysis will be performed to assess potential use of the project area for to ensure that do not interfere with current recreational activities. 2.2.5 HISTORIC AND ARCHAEOLOGICAL STUDIES There are no records of archaeological studies as the land has been primarily used for coal mining. Should any such studies exist, the applicant will have a qualified cultural resources firm review any previous studies and other existing documents, as required, to determine if any additional studies are warranted at this time. 2.2.6 FISHERIES STUDIES As this project is a closed-loop Pumped Storage Hydro Project, field investigation will not include a review of fisheries unless the project feasibility study determines that access to an existing stream or river is necessary to perform the initial charge. 2.2.7 PRELIMINARY DESIGN STUDIES Preliminary engineering design of the proposed powerhouse and electrical faults will be prepared to delineate the scope, cost and schedule for construction. A projection of energy generation will also be made. The preliminary design data will be utilized in the economic analysis to be preformed for the proposed project. 2.2.8 ECONOMIC ANALYSES Economic analyses of the proposed project will be performed. The analysis will include estimates of power production and power sales rates. A transmission interconnection study will be performed to determine best location for interconnection and feasibility. The Economic criteria such as net revenue, net present value and bene?ticost ratio will be determined. 2. 3 ROADS No new roads will be built for the purpose of conducting the studies referenced herein. 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM 2.4 NEW DAM CONSTRUCTION The proposed project contemplates the construction of as many as two new reservoirs. Accordingly, The Applicant will be working with approved State of Dam consultants to properly determine the location, size and characteristics of the required reservoirs. 2.5 SCHEDULE FOR STUDIES The following schedule has been developed for conducting the studies and consultations speci?ed herein and leading up to the submission of a license application to the Commission at the conclusion of the requested 36-month term of the permit. This schedule assumes that a permit will be issued to the Applicant by January 15th, 2019. Based on the work to be performed under the requested permit, the Applicant will make a determination as to whether it is appropriate to follow the integrated Licensing Process or request a waiver for either the Alternative or Traditional Licensing Process. Permit Issued Feb 2019 Perform Studies Feb 2019-Nov 2019 Complete Initial Environmental Analysis April 2019 Initiate License Process December 2019 File License Application at FERC Feb 2021 EXHIBIT 3 COST AND FINANCING 3.1. ESTIMATED COSTS The estimated costs of carrying out and preparing the studies, investigations, tests, surveys, maps, plans and speci?cations identified in Exhibit 2 is $170,000.00 allocated as follows. General Plan and Geotechnical Studies $100,000.00 Water Quality Studies $1000.00 Recreational Studies $7,500.00 Historic and Archaeological Studies $0.0 Fisheries Studies $0.0 Preliminary Design Studies $35,000.00 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Economic and Market Analysis $35,000.00 Total $178,500.00 3.2. FINANCIAL SOURCES The applicant will provide the necessary ?nancing to conduct the activities identi?ed in Exhibit 2. 3.3. PROPOSED MARKET Through the development of the proposed Freestone Pumped Storage Hydro Project, the applicant will provide an additional source of clean, renewable energy that will provide added stability and capacity to the local energy markets. it is proposed that the electricity generated at the Freestone Pumped Storage Hydro Project will be offered to the State or sold at market rates to either an electric utility marketer or for transmission to the electric grid. Based upon available feasibility and marketing studies conducted for the electric power market in the vicinity of the proposed project, project revenues are expected to be adequate to construct and operate the Freestone Pumped Storage Hydro Project and to yield a reasonable rate of return on investment. EXHIBIT 4 MAPS 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Ruud wen; 7 l' 5/ ain?? a 5 1" i 5 lower l?vnr-?tm It If I Pipe ?(105!qu Pmiwl [muudnry ?nurre 1 4.1: Freestone Project Genera! Map 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Substation 3 (we. Ruml imwurlmuan Interculmm lion L: I luwvr Risvnm?rr Souru' Pipo 1 I lIm-rqmq! Upper 305?:er 4.1.1: Freestone Project Genera! Overview 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:u,tma*: gr?? int ??31::th ., bi"! l?J ur? ne: E511, Edi-119155 j'f'lil, :Jl 4.1.2: Freestone Project Overview Substation Pen stock 20190225?5191 FERC PDF In tercon nection (Unofficial) reeston mjed Bou nd a my 2/25/2019 2 49 36 PM per Reservoir .45- '59 :3 rt: Ln (-echerhI-s. Eula/rut} LB 9 3. U3 J?rvs?mlu 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM may}; ()dll I warvnir .J .3 .: Pl-n-itm I up 9in Water Esuurt 4.3: Freestone Project Lower Reservoir and Powerhouse 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM l'owurhuua'u luwvr Rraytirvuir I Wdlur 4.3.1: Freestone Project Lower Reservoir with Top Pipe and Water Source 4.4: Freestone Project Map with Topography Scam Em. HERE. Gum-n. Imam-c. . GEBCO.USGS. FAC NPS. Guano. Kan-Ill: NL. Oucnanca Suva, Eu: Jun. METI. 9 Oplnsum: mrbulau are the GIS 20190225?5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM 20190225-5191 FERC PDF (Unofficial) 2/25/2019 2:49:36 PM Document Content(s) Freestone.PDF.........................................................1-18