CITY COMMISSION 9 AGENDA STUDY JUNE 14, 2019 La ke lc?T??d Magnolia Montessori Academy Key Considerations 7/ La ke [$13 Item VI.A.1. CUP19-002 Magnolia Montessori Expansion, 1540 New Jersey Road Major modification of an existing conditional use to allow for the construction of a new 4,500 square foot school building and increase the maximum number of students allowed from 120 to 185, on property located at 1540 New Jersey Road. 5T 250 Foot Notificatinn_ Bo unda r5! 3% r-k - LIEIEHTDH Suhject/ Prnpe rty 33?! EBED 5?51 [3333;513:311 . E?l 5:15:11 a. s. :?!f4l FQL (?1h3? - hI-uh? I 2 IRA-1 ?u Subject . Ti. Property i I 3?51 1! . tar-H 'I?i NOR SITE DATA TABLE In rm; .3 .15: IA: . :3 LCII an I 3 HOURS OE OPERATTON 3 .: CROP Orr' 3: T: 3:30 AM 2:45 7-3 3: 05 EEFSR: CAR: 3:33 AII - 3:3 0 CARE 3:33 I3 4. .3 MLJTII IKCJ. If; IRIS if?) ACRE LE (3?1 I "ix-3 ?Aft". .tm. HULLTR. AIME?Eff?r? I I. I A- F.- cam-?r .548 II: -I. LAN: AIILI. 333-33 l_.4 Ex . A LA, LIMA-3 jams-BED TR 1? Irll A l2?! ZEY RD. - 30' I ur5.33 I I L'k?lbl 50,3630 Irma . .3I3r I EXIT: INC. 34*1 33- .I ARE, 3.. .3. -33 . MumFARR. Lf. 3/ SCALE S. McKeel Academy STUDENT GRADES NO. 1,160 K–7 1,760 ft. Lawton Chiles 655 6–8 770 ft. Lakeland Christian School Geneva Classical 1,067 K4 – 12 1,100 ft. 250 K4 – 12 950 ft. – 1,450 Magnolia Montessori 185 Pre K – 8 650 – 1,100 SCHOOL QUEUE LENGTH New Jersey Road • Approximately 8,100 Average Annual Daily Trips • 729 PM Peak Hours Trips o 372 NB o 357 SB • Level-of-Service “B” • Project Adds 47 AM and 11 PM Peak Hour Trips; no additional mitigation required New Jersey Road Resident Concerns 7/ La ke lama Geneva Academy Turn Lane • Southbound left-turn lane is under design • Original design would have shifted trail approximately four feet to the west, generating concerns • On-site meeting on June 5th • Modified cross-section under consideration, 10.5 foot wide travel lanes and 10 foot wide turn lane • Turn lane would abut trail, trail would not shift to west • Engineer evaluating utility impacts • Implementation delay with financial guarantee • Estimate - $150,000 • Warrants not currently met • Traffic Operations evaluating ability to install based on other considerations • Separation of southbound and northbound movements (SB left turns) • Question regarding availability of right-of-way for infrastructure • Benefits overall traffic flow Sylvester Road Signalization 1,2- Sidewalk on East Side of Road • Estimate - $262,500 • Limited Usage • Most school students will be from outside area • Part of determination to proceed with current trail • Utility impacts and constraints Options - Enhanced lighting - Sidewalk along portion of corridor