05/07/2018 --------------NSR IMS - PROJECT RECORD PROJECT#: 285049 -----:-;:-----i::,:.--------------------------------- STATUS: PENDING \r('v 0 / PROJECT ADMIN NAME: CONCRETE BATCH PLANT PROJECT TECH NAME: CONCRETE BATCH PLANT PROJECT ACTIONS Permit Action Type Permit Type Received Date Permit Status 151715 INITIAL STDPMT 05/02/2018 PENDING Renewal Date Action Status Complete Date PENDING ·----------~------------- Assigned Team: MECHANICAL TEAM STAFF ASSIGNED TO PROJECT: GLASPIE-FELIX , SHELIA AP INITIAL REVIEW - REVIEWR1_2- REVIEW ENG - TEAM LEADER , MECHANICAL COMPANY INFORMATION Issued To SOTO READY MIX, INC. MECHANICAL TEAM Company Name Soto Ready Mix, Inc. Customer Reference Number CN605378967 - CONTACT INFORMATION Contact Type Name Title Organization Name RESPONSIBLE OFFICIAL MR ARMANDO SOTO PRESIDENT SOTO READY MIX INC Phone Address FAX (832) 768-3537 3411 DE SOTO ST, HOUSTON, TX, 77091-3717 EMAIL: SOTOREADYMIX@GMAILCOM ---------•--··--···------·-·---------- Contact Type Name Title Organization Name TECHNICAL CONTACT MR VENKATA GODASI GRADUATE ENGINEER AARC ENVIRONMENTAL INC Phone FAX Address (713) 974-2272 (713) 339-2272 2 RIVERWAY STE 1780, HOUSTON, TX, 77056-2039 Pf\J CohY0 I - (oo 3 1~ I ·J f,C-{tJJ]071 ~ l EMAIL: VGODASl@AARCENV.COM Co h-\"' ~ ) PERMIT INFORMATION rr-TC- REGULATED ENTITY NUMBER: RN110070547 Permit Account 151715 County Region SOTO READY MIX CBP 1 HARRIS REGION 12HOUSTON c 3 pe,v- Permittee Name f{ Sent: Monday, November 5, 2018 12:11 PM To: Don Nelon Subject: RE: Soto Ready Mix Thanks Don. Erich (512) 349-9300 - office From: Don Nelon Sent: Friday, November 2, 2018 11:39 AM To: Erich Birch Subject: RE: Soto Ready Mix 1 The TCEQ Staff responsible for coordinating the copying of applications made a scan of the Soto File, attached. Don Nelon 512-239-0894 From: ·Erich Birch Sent: Wednesday, October 31, 2018 9:10 AM To: Don Nelon Subject: RE: Soto Ready Mix Okay, will do. Erich (512) 349-9300 - office From: Don Nelon Sent: Wednesday, October 31, 2018 9:08 AM To: Erich Birch Subject: RE: Soto Ready Mix The paralegal will have to go the file room for a copy. Don Nelon 512-239-0894 From: Erich Birch Sent: Wednesday, October 31, 2018 9:06 AM To: Don Nelon Subject: RE: Soto Ready Mix I assume you have the most complete copy of the application - could I send my paralegal by your office to pick up a copy? Erich (512) 349-9300 - office From: Don Nelon Sent: Wednesday, October 31, 2018 8:58 AM To: Erich Birch Subject: RE: Soto Ready Mix No Sir, I do not have an electronic copy of the application. Don Nelon 512-239-0894 From: Erich Birch Sent: Wednesday, October 31, 2018 8:48 AM 2 To: Don Nelon Subject: Soto Ready Mix Hi Don, By chance do you have an electronic copy of the Soto Ready Mix permit application that you could forward to me? Erich Birch, Becker & Moorman, LLP 4705 Spicewood Springs Rd., Suite 200 Austin, Texas 78759-7814 ebirch@birchbecker.com (512) 349-9300 (512) 349-9303 - fax www.birchbecker.com ************************************************** E-MAIL CONFIDENTIALITY NOTICE: This transmission may be: (1) subject to the Attorney-Client Privilege, (2) an attorney work product, or (3) strictly confidential. If you are not the intended recipient of this message, you may not disclose, print, copy or disseminate this information. If you have received this in error, please reply and notify the sender (only) and delete the message. Unauthorized interception of this e-mail is a violation of a federal criminal law. ************************************************** 3 Don Nelon From: Sent: To: Cc: Subject: Don Nelon Friday, November 2, 2018 10:58 AM 'Erich Birch' 'Soto Ready Mix' RE: Soto Ready Mix Mr. Birch, In addition to the updated plot plan and all other documents that would change based on the purchase of the additional land that were requested at the public meeting held on October 22, 2018 and again on October 31, 2018. The TCEQ will also need a current public notice verification form. Please ensure these documents are received no later than start of business on November 12, 2018. If these items have not been resolved by this date the application will be recommended for voidance. Additionally, I understand your office did not get a copy of the application yesterday as discussed. Not sure what happened, TCEQ Staff was ready to take the file to the central file room when needed. The staff who handles this are both out today. Maybe we can make it happen Monday. Don Nelon 512-239-0894 From: Don Nelon Sent: Wednesday, October 31, 2018 9:11 AM To: 'Erich Birch' Subject: RE: Soto Ready Mix We still need the updated plot plan and any other documents that would change. Don Nelon 512-239-0894 From: Erich Birch Sent: Wednesday, October 31, 2018 9:10 AM To: Don Nelon Subject: RE: Soto Ready Mix Okay, will do. Erich (512) 349-9300 - office From: Don Nelon Sent: Wednesday, October 31, 2018 9:08 AM To: Erich Birch Subject: RE: Soto Ready Mix 1 The paralegal will have to go the file room for a copy. Don Nelon 512-239-0894 .. From:.ErichBirch• Sent: Wednesday, October 31, 2018 9:06 AM To: Don Nelon Subject: RE: Soto Ready Mix I assume you have the most complete copy of the application - could I send my paralegal by your office to pick up a copy? Erich (512) 349-9300 - office From: Don Nelon Sent: Wednesday, October 31, 2018 8:58 AM To: Erich Birch Subject: RE: Soto Ready Mix No Sir, I do not have an electronic copy of the application. Don Nelon 512-239-0894 From: Erich Birch Sent: Wednesday, October 31, 2018 8:48 AM To: Don Nelon Subject: Soto Ready Mix Hi Don, By chance do you have an electronic copy of the Soto Ready Mix permit application that you could forward to me? Erich Birch, Becker & Moorman, LLP 4705 Spicewood Springs Rd., Suite 200 Austin, Texas 78759-7814 ebirch@birchbecker.com (512) 349-9300 ········-·{Sl2}349-9303- fax-·•·· www.birchbecker.com ************************************************** E-MAIL CONFIDENTIALITY NOTICE: 2 This transmission may be: (1) subject lO the Attorney-Client Privilege, (2) an accorney work product, or (3) strictly confidential. If you are not the intended recipient of this message, you may not disclose, print, copy or disseminate this information. If you have received this in error, please reply and notify the sender (only) and delete the message. Unauthorized interception of this e-mail is a violation of a federal criminal law. ************************************************** 3 EXAMPLE A TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Notice of Public Meeting Air Quality Standard Permit for Concrete Batch Plants Proposed Registration No. 151715 Application. Soto Ready Mix, Inc., has applied to the Texas Commission on Environmental Quality (TCEQ) for an Air Quality Standard Permit, Registration No. 151715, which would authorize construction of a permanent concrete batch plant located at 3411 De Soto Street, Houston, Harris County, Texas 77091. This link to an electronic map of the site or facility's general location is provided as a public courtesy and not part of the application or notice. For exact location, refer to application. http://www. tceq. texas.gov/assets/public/hb610/index. html?lat=29.853611 &lng=95.458055&zoom= 13&type=r. The proposed facility will emit the following air contaminants: particulate matter including (but not limited to) aggregate, cement, road dust, and particulate matter with diameters of 10 microns or less and 2.5 microns or less. The executive director has completed the administrative and technical reviews of the application and determined that the application meets all of the requirements of a standard permit authorized by 30 TAC§ 116.611, which would establish the conditions under which the plant must operate. The executive director has made a preliminary decision to issue the registration because it meets all applicable rules. Public Comment/Public Meeting. You may submit public comments to the Office of the Chief Clerk at the address below. The TCEQ will consider all public comments in developing a final decision on the application. A public meeting will be held and will consist of two parts, an Informal Discussion Period and a Formal Comment Period. A public meeting is not a contested case hearing under the Administrative Procedure Act. During the Informal Discussion Period, the public will be encouraged to ask questions of the applicant and TCEQ staff concerning the permit application. The comments and questions submitted orally during the Informal Discussion Period will not be considered before a decision is reached on the permit application and no formal response will be made. Responses will be provided orally during the Informal Discussion Period. During the Formal Comment Period on the permit application, members of the public may state their formal comments orally into the official record. At the conclusion of the comment period, all formal comments will be considered before a decision is reached on the permit application. A written response to all formal comments will be prepared by the Executive Director and will be sent to each person who submits a formal comment or who requested to be on the mailing list for this permit application and provides a mailing address. Only relevant and material issues raised during the Formal Comment Period can be considered if a contested case hearing is granted on this permit application. The Public Meeting is to be held: Monday, October 22, 2018 at 7:00 PM Ivy Court 6684 Antoine Houston, Texas 77091 INFORMATION. Citizens are encouraged to submit written comments anytime during the public meeting or by mail before the close of the public comment period to the Office of the Chief Clerk, TCEQ, Mail Code MC-105, P.O. Box 13087, Austin, Texas 78711-3087 or electronically at http://www14.tceq.texas.gov/epic/eComment/. If you need more information about the permit application or the permitting process, please call the TCEQ Public Education Program, toll free, at 1-800-687-4040. General information can be found at our Web site at www.tceq.texas.gov. Si desea informaci6n en Espanol, puede 1/amar al 1-800-687-4040. The application, executive director's preliminary decision, and standard permit will be available for viewing and copying at the TCEQ central office, the TCEQ Houston regional office, and the Collier Regional Library, 6200 Pinemont, Houston, Harris County, Texas. The facility's compliance file, if any exists, is available for public review at the TCEQ Houston Regional Office, 5425 Polk St Ste H, Houston, Texas. Visit www.tceq.texas.gov/goto/cbp to review the standard permit. Further information may also be obtained from Soto Ready Mix, Inc., 3411 De Soto Street, Houston, Texas 77091-3717 or by calling Mr. Venkata Godasi, Graduate Engineer, AARC Environmental, Inc. at (713) 974-2272. Persons with disabilities who need special accommodations at the meeting should call the Office of the Chief Clerk at 512-239-3300 or 1-800-RELAY-TX (TDD) at least one week prior to the meeting. Notice Issuance Date: WC I Air Quality Standard Permit for Concrete Batch Plants Registration Checklist li TCEQ The following checklist has been developed so the Texas Commission on Environmental Quality (TCEQ), Air Permits Division (APD) can confirm that the concrete batch plant meets the standard permit requirements. Please read all questions and select YES, NO, N/ A, or give specific information for the facility. If the concrete batch plant does not meet all conditions of this standard permit, it will not be allowed to operate under the standard permit and must apply for a case-by-case preconstruction permit as required under Title 30 Texas Administrative Code (TAC) §116.110. Sections 3 through 7 are requirements for all concrete batch plant standard permit applications. Sections 8, 9, and 10 are specific requirements required for either temporary, permanent, or specialty plants. Facility Type Check the facility type authorized D Temporary Concrete Batch Plant (Complete Sections 3-7 and 8) [8] Permanent Concrete Batch Plant (Complete Sections 3-7 and 9) D Specialty Concrete Batch Plant (Comp Sections 3-7 and 10) Condition Number and Description (3) Administrative Requirements (3)(A) Are the form PI-1S, Registrations for Air Standard Permit, Table 11, Fabric Filters, Table 20, Concrete Batch Plants attached? [8]YES0NO If applicable, is Table 29 Reciprocating Engines attached? □ YES [8]NO Will copies of all information be mailed to the Air Permits Division, the TCEQ regional office, and all applicable local programs? [8]YES0NO Was the $900 fee sent to the TCEQ Revenue Section? [8]YES0NO (3)(B) (The fee is not required if the facility meets the requirements of being in or adjacent to the right of way of a public works project.) (3)(C) Has construction and/ or operation begun on the facility? 0YES[8]NO (3)(G) Will this facility qualify for relocation under section (8)(F)? 0YES[8]NO (If yes, the facility will be exempt from public notice requirements in section (4) of this standard permit.) (3)(H) Will construction commence within 18 months of written approval from the Executive Director in accordance with 30 TAC § 116.12o(a)(1), Voiding of Permits? [8]YES □ NO (3)(J) Will records be maintained and kept for a rolling 24 months? [8]YES0NO (3)(K) Will abatement equipment failure or emissions deviations in excess of [8]YES0NO paragraph (s)(B)(iii) be reported in accordance with 30 TAC Chapter 101, General Air Quality Rules as appropriate? TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Page1of6 •• i l! Air Quality Standard Permit for Concrete Batch Plants Registration Checklist (4) Public Notice (4) Will the public notice requirements be followed in accordance in 30 TAC Chapter 39, Public Notice? ~YESON0 Is this a temporary facility that is exempt from public notice under OYES~N0 30 TAC§ 116.178(b), Relocations and Changes of Location of Portable Facilities? If Yes, please provide a map indicating where the public works right of way is located and the location of the proposed plant. Also provide the name of the project or Texas Department of Transportation project number. (5) General Requirement (5)(A) Will all cement/flyash storage silos, weigh hoppers, and auxiliary storage tanks be vented to a fabric/ cartridge filter or a central fabric/cartridge filter system? ~YESON0 (5)(B)(i) Will fabric/ cartridge filters and collection systems be operated properly with no tears or leaks? ~YESON0 (5)(B)(ii) Will filter systems (including any central filter system) be designed to ~YESON0 meet a minimum control efficiency of at least 99.5 percent at particle sizes of 2.5 microns and smaller? (5)(B)(iii) Will all filter systems meet visible emissions performance standards? ~YESON0 (5)(B)(iv) Will cement and/ or flyash silo filter exhausts be equipped with sufficient illumination to observe visible emissions performance if filled during non-daylight hours? ~YESON0 (5)(C)(i) Will conveying systems to and from the storage silos be properly operated, remain totally enclosed, and maintained with no tears or leaks? ~YESON0 (5)(C)(ii) During cement/flyash storage silo filling, except for connecting or ~YESON0 disconnecting, will you keep a standard of having no visible emissions for more than 30 seconds in any six-minute period from the conveying system? (5)(D) Is there an automatic shut-off or warning device installed on each bulk storage silo? ~YESON0 (5)(D)(i) If an automatic shut-off device is installed, will it shut down the loading operations on each bulk storage silo or auxiliary storage tank prior to reaching capacity? OYESON0~N/A TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Page2of6 •• if Air Quality Standard Permit for Concrete Batch Plants Registration Checklist 'ii (5) General Requirement ( continued) (5)(D)(ii) If a warning device is used, will it alert operators in sufficient time to prevent an adverse impact on the pollution abatement equipment or other parts of the loading operation? ~ YES ONO ON/A Do you regularly prevent particle build-up on visible warning devices? ~ YES ONO ON/A (5)(D )(iii) Will warning devices or shut-off systems be tested at least monthly during operations and records kept indicating test and repair results in accordance with Section (3)(J) of this standard permit? (5)(E) The following methods will be used to control emissions from in-plant ~YES0NO roads and traffic areas: (5)(E)(i) Watering. ~YES0NO (5)(E)(ii) Treated with dust-suppressant chemicals (as described in the application of aqueous detergents, surfactants, and other cleaning solutions in the de minimis list). 0YES~NO (5)(E)(iii) Covered with a material such as, (but not limited to), roofing shingles 0YES~NO or tire chips and used in combination with (i) or (ii) above. (5)(E)(iv) Paved with a cohesive hard surface that is maintained intact and cleaned. ~YES0NO (5)(F) Will dust emissions from all stockpiles be minimized at all times by sprinkling with water, dust-suppressant chemicals, or covered? ~ YES ONO ON/A (5)(G) Will all material spills be immediately cleaned up and contained or dampened so dust emissions are minimized? ~ YES ONO ON/A (5)(H) Will visible emissions leave the property for more than 30 seconds in duration in any six-minute period during normal plant operations as determined using EPA Test Method 22? 0YES~NO Will quarterly visible emission observations be performed and recorded in accordance with Section (3)(J) of this standard permit? ~YES0NO If visible emissions exceed Test Method 22 criteria, will immediate corrective action be taken and documented? ~YES0NO Will the concrete batch plant be located at least 550 feet from any crushing plant or hot mix asphalt plant? ~YES0NO If no, will the concrete batch plant operate at the same time as the crushing plant or hot mix asphalt plant? 0YES0NO~N/A (5)(1) ~YES0NO TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Page3 of6 Air Quality Standard Permit for Concrete Batch Plants Registration Checklist TCEQ (5) General Requirement ( continued) Cs)CJ) Are multiple concrete batch plants being operated on the same site? □ YESIZJNO Will site production limits be maintained per Sections (8), (9), or (10)? IZJYES □ NO (5)(K) Will any concrete additives emit volatile organic compounds (VOC)? □ YESIZJNO (6) Engines (6)(A) Will the horsepower (or combined horsepower) of the stationary compression ignition internal combustion engine(s) exceed 1,000 horsepower? □ YES □ NO IZJN/A (6)(C) Will the engine exhaust stack be a minimum of eight feet tall? □ YES □ NO IZJN/A (6)(D) Will fuel for the engine be liquid fuel with a maximum sulfur content of no more than 0.0015 percent by weight and not consist of a blend containing waste oils or solvents? □ YES □ NO IZJN/A (7) Planned Maintenance, Startup, and Shutdown (MSS) Activities Will planned maintenance activities receive separate authorization or [8:IYES □ NO meet the conditions of 30 TAC§ 116.119, De Minimis Facilities or Sources? (8) Additional Requirements for Temporary Concrete Batch Plants (8)(A) Will the site production rate be limited to 300 cubic yards in any one hour (cy/hr) not to exceed 6,000 cubic yards per day? (8)(B) Will the suction shroud be vented to a fabric or cartridge filter system 0YES0NO with a minimum of 5,000 actual cubic feet per minute (acfm)? (8)(C) Will the truck drop point be sheltered by an intact three-sided curtain 0YES0NO or equivalent dust control technology that extends below the mixer truck-receiving funnel? (8)(D)(i) Will the suction shroud baghouse exhaust be located at least 100 feet from any property line? 0YES0NO 0YES0NO Note: For concrete batch plants that supply concrete for a single public works project, the property line measurements for purposes of compliance with this standard permit shall be made to the outer boundaries of the designated public property, roadway project and associated rights-of-way. (8)(D)(ii) Will all stationary equipment, stockpiles, or vehicles used for the □ YES □ NO ON/A operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site) be located or operated at least 50 feet from any property line? TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Page 4 of6 Air Quality Standard Permit for Concrete Batch Plants Registration Checklist (8) Additional Requirements for Temporary Concrete Batch Plants ( continued) (8)(E)(i) In lieu of meeting the distance requirements in (8)(D) (ii), will the 0 YES ONO ON/A roads and other traffic areas within the buffer distance be bordered by dust suppressing fencing or other barriers along all traffic routes or work areas? (8)(E)(ii) Will these borders be constructed to a height of at least 12 feet? OYESON0ON/A (8)(E)(iii) Will stockpiles be contained within a three-walled bunker that extends at least two feet above the top of the stockpile? OYESON0ON/A (8)(F)(i) Is a registered portable facility moving to a site for support of a public OYESONO works project in which the proposed site is located in or contiguous to the right-of-way of the public works project? (8)(F)(ii) Is a registered portable facility moving to a site in which a portable facility was located at the site at any time during the previous two years and was the site subject to public notice? (8)(G) If (8)(F) conditions are met, forward the required information to the appropriate regional office for final decision. (9) Additional Requirements for Permanent Concrete Batch Plants (9)(A) Will the site production rate be limited to no more than 300 cubic yards in any one hour, not to exceed 6,000 cubic yards per day? [8]YES □ NO (9)(B) Will the suction shroud or other pickup device be installed at the batch drop point (drum feed for central mix plants)? [8JYESONO OYESONO Will the suction shroud or other pickup device be vented to a fabric or [8]YES □ NO cartridge filter system with a minimum of 5,000 acfm? (9)(C) Will the truck drop point be sheltered by an intact three-sided curtain [8]YES □ NO or equivalent dust control technology that extends below the mixer truck-receiving funnel? (9)(D)(i) Will the suction shroud baghouse exhaust be located at least 100 feet from any property line? (9)(D)(ii) Will all stationary equipment, stockpiles, or vehicles used for the □ YES IZI NO ON/A operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site) be located or operated at least 50 feet from any property line? (9)(E)(i) In lieu of meeting the distance requirements in (9)(D)(ii), will the [8] YES □ NO ON/A roads and other traffic areas within the buffer distance be bordered by dust suppressing fencing or other barriers along all traffic routes or work areas? [8] YES □ NO ON/A TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Pages of6 •• ii 'ii .... Air Quality Standard Permit for Concrete Batch Plants Registration Checklist (9) Additional Requirements for Permanent Concrete Batch Plants ( continued) (9)(E)(ii) Will these borders be constructed to a height of at least 12 feet? C8J YES ONO ON/A (9)(E)(iii) Will stockpiles be contained within a three-walled bunker that extends at least two feet above the top of the stockpile? l:8JYES ONO ON/A (9)(F) Will all entry and exit roads and main traffic routes associated with the operation of the concrete batch plant (including batch truck and material delivery truck roads) be paved with a cohesive hard surface that can be maintained intact and cleaned? l:8JYES0NO Will all batch trucks and material delivery trucks remain on the paved l:8JYES0NO surface when entering, conducting primary function, and leaving the property? Will all other traffic areas, except entry and exit roads and main traffic l:8JYES □ NO routes, be maintained using the control requirements of subsection (5)(E) of this standard permit. (10) Additional Requirements for Specialty Concrete Batch Plants (10)(A) Will the site production rate be limited to no more than 30 cubic yards per hour? 0YES0NO (10)(B) As an alternative to the requirement in subsection (s)(A) of this 0YES0NO standard permit, will the cement/fly ash weigh hopper be vented inside the batch mixer? (10)(C)(i) Will the dust emissions at the batch mixer be controlled using a suction shroud or other pickup device delivering air to a fabric or cartridge filter? 0 YES ONO ON/A (10)(C)(ii) Will the dust emissions at the batch mixer be controlled using an enclosed batch mixer feed? 0 YES ONO ON/A (10)(C)(iii) Will the dust emissions at the batch mixer be controlled by conducting the entire mixing operation inside an enclosed process building? 0 YES ONO ON/A (10)(D) Will all vehicles used for the operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site) be located or operated at least 25 feet from any property line? □ YES ONO ON/A (10)(E)(i) In lieu of meeting the distance requirements in (10 )(D ), will the roads 0YES0N00N/A and other traffic areas within the buffer distance be bordered by dust suppressing fencing or other barriers along all traffic routes or work areas? (10 )(E)(ii) Will these borders be constructed to a height of at least 12 feet? 0YES0N00N/A TCEQ - 10377 (Revised 12/12) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG5045v4) Page 6 of6 Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 1) I. Registrant Information A. Company or Other Legal Customer Name: Soto Ready Mix, Inc. B. Company Official Contact Information ([2J Mr. D Mrs. D Ms. D Other:)_ Name: Armando Soto Title: President Mailing Address: 3411 De Soto Street, City: Houston IZIP Code: 77091 IState: TX Phone: (832) 768-3537 jFax: E-mail Address: sotoreadymix@gmail.com All permit correspondence will be sent via e-mail. C. Technical Contact Information ([2J Mr. D Mrs. D Ms. D Other:)_ Name: Venkata Godasi 17itl~: ,Graduate Engjneer Company Na.me: AARC Environmental, Inc. Mailing Address: 2 Riverway, Suite# 1780 City: Ho.us~on IZIP Code: 77056 j State: TX Phone: (713) 974-2272 IFax: (713} 339 -2272 E-:-mail Address: vgodasi@aarcenv.com II. A. Facility and Site Information Name and Type of Facility Facility Name: Soto Ready Mix- CBP1 j [2J Permanent D Temporary Type of Facility: Concrete Batch Plant For portable units, please provide the serial number of the equipment being authorized below. Serial No: Unknown at this time !serial No: ., d85o1q 151116 TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page_of_ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 2) II. 8. Facility and Site Information (continued) Facility Location Information Street Address: 3411 De Soto Street, If there is no street address, provide written driving directions to the site and provide the closest city or town, county, and ZIP code for the site (attach description if additional space is needed). City: Houston ICounty: Harris ZIP Code: 77091 ILongitude (nearest second): 95° 27' 29.11" Latitude (nearest second): 29° 51' 12.63" C. Core Data Form (required for Standard Permits 6004, 6006, 6007, 6008, and 6013). I[;] YES □ NO Is the Core Data Form (TCEQ Form 10400) attached? If ''NO," provide customer reference number (CN) and regulated entity number (RN) below. Customer Reference Number (CN): CN605378967 . . RegulatedEntity Number (RN): RN110070547 D. E. . •( TCEQ Account Identification Number (if known): , Type of Action: ~ Initial Application D Change to Registration D Renewal D Renewal Certification For Change to Registration, Renewal, or Renewal Certification actions provide the following: Registration Number: IExpiration Date: F. Standard Permit Claimed: 6004 G. Previous Standard Exemption or PBR Registration Number Is this authorization for a change to an existing facility previously authorized under a standard exemption or PBR? 0 YES[;] NO If "YES," enter previous standard exemption number(s) and PBR registration number(s), and associated effective date in the spaces provided below. Standard Exemption and PBR Registration Number(s) TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Effective Date Page_of_ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 3) II. H. Facility and Site Information (continued) Other Facilities at this Site Authorized by Standard Exemption, PBR, or Standard Permit Are there any other facilities at this site that are authorized by an Air Standard Exemption, PBR, or Standard Permit? OYESC8JNO If "YES," enter standard exemption number(s), PBR registration number(s), and Standard Permit registration number(s), and associated effective date in the spaces provided below. Standard Exemption, PBR Registration, and Standard Permit Registration Number(s) I. Effective Date Other Air Preconstruction Permits □ YES C8J NO Are there any other air preconstruction permits at this site? If "YES," enter permit number(s) in the spaces provided below. J. Affected Air Preconstruction Permits □ YES C8J NO Does the standard permit directly affect any permitted facility? If "YES," enter permit number(s) in the spaces provided below. K. Concrete Batch Plant D Central Mix C8l Ready Mix D Specialty Mix D Enhanced Controls for Concrete Batch Plants 1. State Legislators State Senator: Senator John Whitmire; Senate District 15 State Representative: Representative Jarvis Johnson; House District 139 2. County Judge Name: Judge Edward M. Emmett Mailing Address: 1001 Preston, Suite# 911 City: Houston IState: TX TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. jz1P Code: 11002 Page_of_ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 4) II. K. Facility and Site Information (continued) 3. Presiding Officer I Is the facility located in a municipality or extraterritorial jurisdiction of a municipality? C8] YES D NO If "YES," list the name of the Presiding Officer for the municipality and/or extraterritorial jurisdiction: Presiding Officer Name: Mayor Sylvester Turner Title: City of Houston - Mayor Mailing Address: P. o. Box 1562 IState: TX City: Houston L. IZIP Code: 77251 Federal Operating Permit (FOP) Requirements Is this facility located at a site that is required to obtain an FOP pursuant to 30 TAC Chapter 122? □ YES C8J NO □ To Be Determined If the site currently has an existing FOP, enter the permit number: Check the requirements of 30 TAC Chapter 122 that will be triggered if this standard permit is approved (check all that apply). D Initial Application for an FOP D Significant Revision for an SOP D Operational Flexibility/Off Permit Notification for an SOP D To be Determined D D Minor Revision for an SOP Revision for a GOP C8] None Identify the type(s) of FOP issued and/or FOP application(s) submitted/pending for the site. (check all that apply) □ SOP □ GOP C8J N/A D Ill. D GOP application/revision (submitted or under APO review) SOP application/revision (submitted or under APO review) Fee Information (see Section IX for address to send fee or go to www.tceq.texas.gov/epay to pay online) A. Fee Amount: $ 900.00 8. Payment Information Check/money order/transaction or voucher number: Receipt Number# M809549 Individual or company name on check: Soto Ready Mix, Inc. Was fee paid online? TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. ID YES C8J NO Page _ _ of _ _ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 5) Public Notice (if applicable) IV. A. Responsible Person(~ Mr. D Mrs. D Ms. D Other:) Name: Armando Soto Title: President Company: Soto Ready Mix, Inc. Mailing Address: 3411 De Soto Street, IZIP Code: 77091 IState: TX City: Houston IFax No.: Phone: (832) 768 - 3537 E-mail Address: sotoreadymix@gmail.com 8. Technical Contact (~ Mr. D Mrs. D Ms. D Other):_ Name: Venkata Godasi Title: Graduate Engineer Company: AARC Environmental, Inc. Mailing Address: 2 Riverway, Suite City: Houston IState: TX Phone No.: (713) 974-2272 !ZIP Code: 77056 IFax No.: (713) 339 -2272 E-mail Address: vgodasi@aarcenv.com C. Bilingual Notice Is a bilingual program required by the Texas Education Code in the School District? ~YES □ NO Are the children who attend either the elementary school or the middle school closest to your facility eligible to be enrolled in a bilingual program provided by the district? ~YES ONO If "YES," list which language(s) are required by the bilingual program? Spanish I TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. I Page _ _ of _ _ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 6) IV. Public Notice (if applicable) (continued) D. Small Business Classification and Alternate Public Notice Does this company (including parent companies and subsidiary companies) have fewer than 100 employees or less than $6 million in annual gross receipts? cg]YES □ NO Is the site a major source under 30 TAC Chapter 122, Federal Operating Permit Program? □ YES cg] NO Are the site emissions of any individual regulated air contaminant equal to or greater than □ YES cg] NO 50 tpy? Are the site emissions of all regulated air contaminant combined equal to or greater than 75 tpy? E. For Concrete Batch Plants 1. Public Works Project: Will the plant provide concrete to a public works project, and be located in or contiguous to the right of-way of the public works project? (If "YES," public notice is not required.) 2. Application in Public Place □ YES cg] NO □ YES cg] NO {:1;[, 12:'.:lYES □ NO v Name of Public Place: Collier Regional Library Physical Address: 6200 Pinemont, City: Houston ICounty: Harris V. Renewal Certification Option A. Does the permitted facility emit an air contaminant on the Air Pollutant Watch List, and is the permitted facility located in an area on the watch list? OYESONO 8. For facilities participating in the Houston/Galveston/Brazoria area (HGB) cap and trade program for highly reactive VOCs (HRVOCs), do the HRVOCs need to be speciated on the maximum allowable emission rates table (MAERT)? OYESONO C. Does the company and/or site have an unsatisfactory compliance history? □ YES □ NO D. Are there any applications currently under review for this standard permit registration? □ YES □ NO E. Are scheduled maintenance, startup, or shutdown emissions required to be included □ YES □ NO in the standard permit registration at this time? TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page _ _ of _ _ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 7) V. Renewal Certification Option (continued) F. Are any of the following actions being requested at the time of renewal: 0YES0NO 1. Are there any facilities that have been permanently shutdown that are proposed to be removed from the standard permit registration? 0YES0NO 2. Do changes need to be made to the standard permit registration in order to remain in compliance? 0YES0NO 3. Are sources or facilities that have always been present and represented, but never identified in the standard permit registration, proposed to be included with this renewal? □ YES □ NO 4. Are there any changes to the current emission rates table being proposed? 0YES0NO Note: If answers to all of the questions in Section V. Renewal Certification Option are "NO," use the certification option and skip to Section VII. of this form. If the answers to any of the questions in Section V. Renewal Certification Option are "YES," the certification option cannot be used. *If notice is applicable and comments are received in response to the public notice, the application does not qualify for the renewal certification option. VI. Technical Information Including State and Federal Regulatory Requirements Place a check next to the appropriate box to indicate what you have included in your submittal. NOTE: Any technical or essential information needed to confirm that facilities are meeting the requirements of the standard permit must be provided. Not providing key information could result in an automatic deficiency and voiding of the project. A. Standard Permit requirements (Checklists are optional; however, your review will go faster if you provide applicable checklists.) Did you demonstrate that the general requirements in 30 TAC Sections 116.610 and 116.615 are met? ~YES □ NO Did you demonstrate that emission limitations in 30 TAC Sections 106.261 and 106.262 are met? ~YES □ NO Did you demonstrate that the individual requirements of the specific standard permit are met? ~YES □ NO B. Confidential Information (All pages properly marked "CONFIDENTIAL") □ YES~NO C. Process Flow Diagram ~YES □ NO D. Process Description ~YES □ NO E. Maximum Emissions Data and Calculations ~YES □ NO F. Plot Plan ~YES □ NO TCEQ-10370 (APDG 5235v27, Revised 03/18) Pl-1S This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page _ _ of _ _ Texas Commission on Environmental Quality Form Pl-1S Registrations for Air Standard Permit (Page 8) VI. Technical Information Including State and Federal Regulatory Requirements (continued) Place a check next to the appropriate box to indicate what you have included in your submittal. NOTE: Any technical or essential information needed to confirm that facilities are meeting the requirements of the standard permit must be provided. Not providing key information could result in an automatic deficiency and voiding of the project. G. Projected Start Of Construction Date, Start Of Operation Date, and Length of Time at Site: ~YES □ NO Projected Start of Construction (provide date): upon issue of the permit Projected Start of Operation (provide date): upon issue of the permit Length of Time at the Site: 10 Years VII. Delinquent Fees and Penalties This form will not be processed until all delinquent fees and/or penalties owed to the TCEQ or the Office of the Attorney General on behalf of the TCEQ are paid in accordance with the Delinquent Fee and Penalty Protocol. For more information regarding Delinquent Fees and Penalties, go to the TCEQ Web site at: www.tceq.texas.gov/agency/delin/index. html. VIII. Signature Requirements The signature below confirms that I have knowledge of the facts included in this application and that these facts are true and correct to the best of my knowledge and belief. I further state that to the best of my knowledge and belief, the project for which application is made will not in any way violate any provision of the Texas Water Code (TWC), Chapter 7; the Texas Health and Safety Code, Chapter 382, the Texas Clean Air Act (TCAA) the air quality rules of the Texas Commission on Environmental Quality; or any local governmental ordinance or resolution enacted pursuant to the TCAA. I further state that I understand my signature indicates that this application meets all applicable nonattainment, prevention of significant deterioration, or major source of hazardous air pollutant permitting requirements. The signature further signifies awareness that intentionally or knowingly making or causing to be made false material statements or representations in the application is a criminal offense subject to criminal penalties. Name (printed): Mr. ARMANDO SOTO; President Signature (original signature required): Date: t-1~70-✓ } ' Page _ _ of _ _ Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Pagel) cl For the Standard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ 20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 All applicants must complete all applicable portions of this form. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. For more information, refer to the instructions in the public notice package. Alternative Language Checklist ltEJ Yes O No I have contacted the appropriate school district. School District: Aldine ISO Phone Number: (281) 449-1011 Person Contacted: Aldine ISD Date of Contract: December 2017 Is a bilingual education program (BEP) required by the Texas Education Code in the district? t8] Yes O No If answer is "NO," skip to first question in verification box on next page. (Note: A BEP is different from "English as a Second Language" (ESL) program; and Elementary/Middle schools that only offer ESL will not trigger notice in an alternative language.) Notice in an alternative language is required if a BEP is required in the District, and one of the following conditions is met: 1. students in the elementary or middle school nearest the facility are enrolled in a program at that school; t8] Yes O No 2. students from the elementary or middle school nearest the facility attend a BEP at another location; or 0 Yes tEJ No 3. the school district that otherwise would be required to provide a BEP has been granted an exception from the requirements to provide the program, as provided for in 19 Texas Administrative Code 89.1207(a). 0 Yes t8] No If the answer is "NO" to 1, 2, and 3 above, then alternative language notice is not required. The name of the elementary school nearest to the proposed or existing facility is: Smith Academy The name of the middle school nearest to the proposed or existing facility is: Hoffman Middle School The following language(s) is/are utilized in the bilingual program: Spanish I I If notice in an alternative language is required, then applicants must publish alternative language notice(s) and post alterative langauge signs, as outlined in the Instruction for Public Notice and certify compliance with those requirements on this form. TCEQ-20778 (APDG 639lvl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page_/ or_Z_ Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Page 2) EortheStandard Permit for Concrete Batch Plants with Enhanced Controls, useformTCEQ20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 For more information regarding public notice, refer to the instructions in the public notice package. Alternative Language Verification ~ Yes ONo 1. A BEP is required by the Texas Education Code in the area addressed by this permit application and the application is subject to alternative language public notice requirements. If "NO," skip 2 through 6 and complete signature, title, date, and name of applicant. 2. The applicant has conducted a diligent search for a newspaper or publication ~ Yes ONo of general circulation in both the municipality and county in which the facility is located (or proposed to be located). 3. A newspaper or publication could not be found in any of the alternative language(s) in which notice is required. 4. The publishers of the newspaper listed below refused to publish the notice 0 Yes O No~ N/A as requested, and another newspaper or publication in the same language and of general circulation could not be found in the municipality or county in which the facility is located (or proposed to be located). Newspaper: OYes~No . Language: 5. Proof of publication of the newspaper alternative language notice(s) and the requested affidavits have been sent to the TCEQ. ~YesONo 6. Alternative language signs were posted as required by the TCEQ ~ Yes ONo This form must be signed and dated by a designated representative acting on behalf of the applicant after the end of the comment period. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. The TCEQ will not accept this form if submitted prior to tha~e__.. , / Verified by (signature): ~ - Applicant: Soto Ready Mix, Inc. Title: ?re. 1,~( ~ -1 - !Date: g-o/~/[{ TCEQ-20778 (APDG 639lvl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page1of ~ ,55 TCEQ-OFice of the Chief Clerk Applicant Name: Soto Ready Mix, Inc. Permit No.:_1~5~1~7~15,....__ _ _ _ _ _ _ _ _ _ _ _ __ MC-105 Attn: Notice Team P.O. Box 13087 Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Austin, Texas 78711-3087 AL TERN~TIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS§ COUNTY OF 1 1_ K?\, r- V rs § Before me. the undersigned authority, on this day personally appeared __\)...,._"""t-~--'-'--'-'---a..___f3 __o_n_d____ ,who being by me duly sworn, deposes and says that (s)he is (Na.11e of Person Representing Newspaper) A: {R_ the C-(-e-r(< ofthe (Title of Person Representing Newspaper) tl-e0-'!>~ U.,ontd:e ct,bA....- fut:1.mCr\:e.r (Name of the Newspaper) Ho ~:fp,...... that said newspaper or publication is generally circulated in tA... (the municipality or the same county as the location of the facility or the proposed facility) ,Texas; (Newspaper Representative's Signature} u ___~-- Subscribed and sworn to before me this the __ day of ~~ .20_!J__ to certify which witness my hand and seal of office. Notary Public in and for the State of Texas (Seal) C/y;r'f~ It tJa Ii hows { Sent: Tuesday, August 7, 2018 2:40 PM To: Don Nelon Subject: Soto Ready Mix Public Notice Verification and Affidavits Importance: High Hello! Mr. Nelon, Thank you so much for your time yesterday, please find attached the complete package for the "Public Notice Verification and Affidavits" The original files is on the way, you will receive it tomorrow, and I also send copies to: - U.S. Environmental Protection Agency - Air Section Manager Houston - Texas Commission on Environmental Quality - Houston Department of Health and Human Services - Harris County Solution Control If you have any questions, please call me direct at: 832-466-4294 Thanks Armando Soto President Soto Ready Mix 1 Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Pagel) For the Standard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ 20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 All applicants must complete all applicable portions of this form. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. For more information, refer to the instructions in the public notice package. Alternative Language Checklist I have contacted the appropriate school district. l~YesONo School District: Aldine ISO Phone Number: (281) 449-1011 Person Contacted: Aldine ISO Date of Contract: December 2017 Is a bilingual education program (BEP) required by the Texas Education Code in the district? ~ Yes 0No If answer is "NO," skip to first question in verification box on next page. (Note: A BEP is different from "English as a Second Language" (ESL) program; and Elementary/Middle schools that only offer ESL will not trigger notice in an alternative language.) Notice in an alternative language is required if a BEP is required in the District, and one of the following conditions is met: 1. students in the elementary or middle school nearest the facility are enrolled in a program at that school; ~Yes 0No 2. students from the elementary or middle school nearest the facility attend a BEP at another location; or 0Yes~No 3. the school district that otherwise would be required to provide a BEP has been granted 0Yes~No an exception from the requirements to provide the program, as provided for in 19 Texas Administrative Code 89.1207(a). If the answer is "NO" to 1, 2, and 3 above, then alternative language notice is not required. The name of the elementary school nearest to the proposed or existing facility is: Smith Academy The name of the middle school nearest to the proposed or existing facility is: Hoffman Middle School The following language(s) is/are utilized in the bilingual program: Spanish I I If notice in an alternative language is required, then applicants must publish alternative language notice(s) and post alterative langauge signs, as outlined in the Instruction for Public Notice and certify compliance with those requirements on this form. TCEQ-20778 (APDG 639lvl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page_l_of k Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Page 2) fQrJlle Sta11dard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ2054i' General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 For more information regarding public notice, ref er to the instructions in the public notice package. Alternative Language Verification 1. A BEP is required by the Texas Education Code in the area addressed by this permit application and the application is subject to alternative language public notice requirements. If "NO," skip 2 through 6 and complete signature, title, date, and name of applicant. [21 Yes D No 2. The applicant has conducted a diligent search for a newspaper or publication [21 Yes of general circulation in both the municipality and county in which the facility is located (or proposed to be located). D No 3. A newspaper or publication could not be found in any of the alternative language(s) in which notice is required. D Yes [21 No 4. The publishers of the newspaper listed below refused to publish the notice as requested, and another newspaper or publication in the same language and of general circulation could not be found in the municipality or county in which the facility is located (or proposed to be located). 0 Newspaper: Yes O No [21 N/A Language: 5. Proof of publication of the newspaper alternative language notice(s) and the requested affidavits have been sent to the TCEQ. [21 Yes D No 6. Alternative language signs were posted as required by the TCEQ [21 Yes D No This form must be signed ijnd dated by a designated representative acting on behalf of the applicant after the end of the comment period. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 busin~- ~ after the end of the comment period. The TCEQ will not accept this form if submitted prior to tha!)'}~ Verified by (signature): ~__;> Applicant: Soto Ready Mi , Inc. Title: PJ"eS', rle\t\ + !Date: fJ- D /- }"{ TCEQ-20778 (APDG 6391 vl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page 'J- of_]_ T<;EO-Otr.;ce of the Chief Clerk Applicant Name: Soto Ready Mix. Inc. MC-105 Attn: Notice Team PermitNo.:.~1~5~17_1~5~------------- P.O. Box 13087 Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Austin, Texas 78711-3087 ALTERN~TIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS§ COUNTY OF I. t'r.i::t .,- r 1 fS § Before me. the undersigned authority, on this day personally appeared 5____o_"°'_d ____, __\)_,._\:""'"'""'c.:::l-o___..a;...r__;1_a.--'-__ who being by me duly sworn, deposes and says that (sJhe is (Na:ne of Person Representing Newspaper) the A: fR.. C-f-e.ri(. ofthe (Title of Person Representing Newspaper) tl-~ Uv--ontd-e ®A:-: fu_ei1;1,trl'\-e.r (Name of the Newspaper) iio ~"i!Pn that said newspaper or publication is generally circulated in c...c.. (the municipality or the same county as the location of the facility or the proposed facility) , Texas; (Newspaper Representative's Signature) Subscribed and sworn to before me this the U dayof~~ .20!1_ to certify which witness my hand and seal of office. Notary Public in and for the State of Texas (Seal) Print or Type Name of Notary Public My Commis!ion Expires TCEQ - 20534 (APDG 6012v5, Revised 09/16)) I000017~455 SOTO READY MIX _ EXAMPLE A . TEXA-:o COMMISSION ON ENVIRONMENTAL QUALITY Consolidafed Notice of R of Applieation and Intent to Obtain Permit and Notice of on and Preliminary Decision Air Qualify Standard Pe for Concrete Batch Plants ProPOSed tlonNo. 1S1ns Appllcatlon. Soto Ready Mix, Inc., has applied to the Texas Commission on Environmental Qualify CTCEQ) for an Air Qualify Standard Permit, Registration No. 151715, wtilch would authorize construction of a permanent concrete batch plant located at 3411 De Soto Street, Houston, Harris County, Texas n091. This link to an electronic map of the site or facility's general location is provided as a public courtesy and not part of the application or notice. For exact location, refer to application. http://www.tceg.1exas.90v/assets/PUblic/hb6lO/index. html?lat=29.8536ll&l119=·95.458055&zoom=l3&type:r. The proPOSed facility will emit the following air contaminants: particulate matter including (but not limited toJ aggregate, cement, road dust, and particulate matter with diameters of ]p microns or less and 2.5 microns or less. This app!icafion was submitted to the TCEQ on May 2, 2018. The executive director has completed the administrative and technical reviews of the application and determined that the application meets all of the requirements of a standard permit authorized by 30 TAC § 116.611, which would establish the conditions under which the Plant must operate. The executive director has made a preliminary decision to issue the registration because i1 meets all applicable rules. The application, executive director's preliminary decision, and standard permit will be available for viewing and copying at the TCEQ central office, the TCEQ Houston regional office, and the Collier Regional Library, 6200 Pinemont, Houston, ris County, Texas, beginning the first day of publication Of this nor he facililY's compliance file, if any exists, is available for PUblic at the TCEQ Houston Regional Office, 5425 Polk St Ste H, Houston, Texas. Visit www.tceq.texas.gov/goto/cbp to review the standard permi1. Public Comment/Publie Meetln9. You may submit PUblic comments or request a PUblic meettns. See Contacts section. The TCEQ will consider all public comments in developing a final decision on the application. The deadline to submit PUbllc comments or meetln9 requests is 30 daYS after newspaper notice IS published. Issues such as property values, noise, traffic safety, and zoning are outside of the TCEQ's iurisdiction to consider in the permit Process. The purpase of a public meeting is to Provide the OPPOrtunity to submit comments or ask questions about the application. A public meeting about the application will be held if the executive director determines that there is a significant degree of PUblic interest in the application or if requested by a local legislator. A public meeting is not a contested case hearing. If a public meeting Is held, the deadline to submit public comments is extended to the end of the PVblic meeting, Contested Case Hearlns. You may request a contested case hearing, A contested case hearing ls a legal proceeding similar to a civil trial in state district court. Unless a written request tor a confested case hearing is filed within 30 daYS from ttlls notice, tile executive director may approve the aPPllcatlon. A person who may be affected by emissions of alr contamlnan!S from the facility is entltled to request a hearing. To request a hearing, a person must acluallY reside in a permanent residence within 440 yards of the Pl'OPOSed plant. If requesting a contested case hearing, you must submit ttte foHowlnu: (1) your name (or for a groui:, or association, an offidal representative), inafflng address, daytime Phone number; (2) appllcan1's name and registration number; (3) the statement "II/we] request a contested case heari1191." (4) a "'8CifiC description of how you would be adVerselY affected by the appllcatlon and air emissions from the tacmtv In a way not common to the general PUbllc; (5) tile locatlon and dlsfanee of your property re!a1!Ve to the tacilltY; (6) a descriPtlon of hoW you use the property whldl may be imP&Cted bY the faclfl1Y; and m a 11st of all diswted Jssues of tact 1hat you submit during the comment period. If the request 15 made by a group or assodaflon, one or more membel'S who have standinS to request a hearing must be identified bY name and pnysical address. The Interests which the group or association seekS to protect must be Identified. You may submit your Pl'OPOSed adlustments to the application which would satisfy your concerns. See Contacts section. TCEQ Action. After the deadline tor PVbllc comments, the executive director wiU consider the comments and prepare a response to all relevant and material, or significant i,ubllc comments. The executive director's decision on the appllc y resPOnse to comments, will be mailed to au persons on If no timely contested case hearing requests are received, or if ing requests are wi1hdrawn, the executive director may issue final approval of the application. If all timely hearing requests are not wtthdrawn, the executive director wlll not issue final approval of the permit and will forward the application and requests to the Commissioners for their consideration at a scheduled commission meeting. The Commission may only grant a request for a contested case hearing on issues the requestor submitted in their timely comments that were not subseQuentlY withdrawn. If a hearing lS granted, the sub!ect of a hearing will be limited to diswted Issues of fact or mixed questions of fact and law relating to relevant and maferlal air quality concerns submitted during the comment period. Issues such as property values, noise, traffic safety, and zoning are outside of the Commission's jurisdiction to address in this proceeding. Maillns Ust. You may ask to be placed on a mailing list to receive additional information on this specific application. see Contacts section. Information Avanable Onllne. For details about the status of the application, visit the Commissioners' Integrated Database (CID) at www.tceq.texas.gov/goto/cid. Once you have access to the CID using the link. enter the registraflon number at the toP of this notice. Contacts. Public comments and requests must be submitted etther electronically at www.tceci.texas.gov/agency/comments.html, or in writing to the Texas Commission on Environmental Quality, Office of the Chief Clerk. MC-105, P.O. Box 13087, Austin, Texas 78711-3087. Please be aware that any contact information you Provide, Including your name, Phone number, email address and PhYsical address will become part of the agency's public record. For more information about this application or the permitting process, please call the TCEQ Public Education Program toll free at l ·800·687 -4040 or visit their website at www.tcec1.texas.gov/90fo/pep, Si desea informacion en Espanol, puede Hamar al 1-800-687 -.4040. Further information may also be obtained from Soto Ready Mix, Inc., 3411 De Soto Street, Houston, Texas 77091-3717 or by calling Mr. Venkata Godasi, Graduate Engineer, AARC Environmental, Inc. at (713) 974-2272. Notice Issuance Date: June 8, 2018 ge 2 of 2 Houston Chronicle CLA$S1FIEOS .T CEO-Office of the Chief Clerk MC-105 Attn Notice Team Permit No .. --'-=--.~;::___ 151715 _ _ _ _ _ _ _ _ __ P 0. Box 13087 Consolidated_ Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Dec1s1on Austin, Texas 78711-3087 ALTERNATIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING ST ATE OF TEXAS § COUNTY OF --~H..:..::a=r.;.;.ri~s_ _ _ _ _ _ _ _ _ _ _ _ § .Before me, the undersigned authority, on this day personally appeared _V7a-=n:---e~ss~a~C::::::-a~st=-ro------::-:--~---------• who being by me duly sworn, deposes and says that (s)he is {Name of Person Representing Newspaper) the Public Notice Representative (Title of Person Representing Newspaper) of the ---=La=--=-P..:..:re::.:n.:.;;s:-=ac..:d::.::e'""'H'--'-o=u=s"""to::.:n-'-------------~ (Name of the Newspaper) that said newspaper or publication is generally circulated in Harris County , Texas; (the municipality or the same county as the location of the fac11ity or the proposed facility) that the enclosed notice was published in said newspaper or publication on the following date(s): June 24. 2018 - June 30. 2018 1 ., (Newspaper ve-'s Signature) to certify which witness my hand and seal of office. (Seal) Evelyn Castro Becerra Print or Type Name of Notary Public April 24.2021 My Commission Expires TCEQ - 20534 (APDG 6012v5, Revised 09/16)) 240130 deJuniode 2018 I Edicion Numero 854 www.prensodehouston.com 11 a @iJ SHAKIRA Los delincuentes habrian tenido meses de planeacion y utilizado una puerta trasera para cometer el delito, segun las autoridadcs que lievan el caso. La casa de Shakira y Pique hab!a sido robada, la violacion a su intimidad era noticia de todos los peri6dicos alrededor de! mundo, pues el delito ocurrio mientras la cantante colombiana se encontraba fuera ultiman- do los detalles de su tema 'Clandestino' y su esposo estaba concentrado con la Sclecci6n espafiola para el Mundial de Rusia 2018. Diferentes medios de comunicac1on manejaron que la perdida se limitaba a algunos relojes de el y joyas de Shakira, las cualcs se cncontraban en una caja fuerte aparentemente impenetrable. Las autoridades espaiiolas a cargo de Ia investigaci6n han revelado a cuentagotas algunos detalles de! robo, como que la pareja fue vigilada por bastante tiempo para conocer su rutina diaria las 24 horas de! dia. Tambien entre las pistas se sabe que la planeaci6n de! atraco fue de varios meses y que el dia de! golpe entraron por una de las puertas traseras que ese dia no estaban vigiladas, llegando de manera casi directa a la caja fuerte. COMISI6N DE CALIDAD AMBIENTAL DEL ESTADO DE TEXAS Notificacion Consolidada de Recepcion de la Solicitude Intencion de Obtener Permiso y Aviso de Aplicacion y Decision Preliminar Permiso Estandar de Calidad del Aire para Plantas de Lote de Concreto Registro PropuestoNo. 151715 SoUdtud. Soto Ready Mix, Inc., ha solicitado e la Comisi6n de Calidad Ambiental de Texas (fCEQ) un Penniso Estlindar de Calidad dcl Aire, Rcgistro No. 151715, queautorizaria la construcciOfldeunaplantapamanente de lotcdcconcn:loubicada 01. 3411 De Soto Stred, Hoostro, CmdadodcHarris. Texas 77091. Estc enlacc a un mapa electrooico de la ubicaci6o general dcl siuo o instalad6n se proporciona como cortcsia publicay noc0010 parte de la solicilud o notificaciCll. Para la ubicaci6n exacta, refierasc a la aplit-aciOO. bttp:/lwww.tceq.laas.gov/asscts/publicJhb610/iodex..htm1?lllF29.853611&1ng=95.458055&zoan=13&typc=r. La inslalaciOO propucsta emitini los si.guicntes contaminant.cs atmosfaicos: mat.eria particularque incluyc (entre olros) aridos., cemmto, polvo de la clHI'Ctt!:l'a y material particular con diametros de 10 micrones o menos y 2,5 mi crones o mcnos. Esta solicitudfueprescntada a laTCEQ cl 2 de.P.-tayo de 201&. El director ejttUtivo ha oompktado las rcvisiwcs amlioistralivas y lccnicas de la solicitudy ha dd:erminado quc la aplicacion cumplc con todos los rcquisitos de un pcnniso estlindar autorizadopor 30TAC § 116.611, quc eslableccrfa las condicimes bajo Jas cualcs la plant\ debe q:,cnn: Et dircdmo ~ wria afedJl.do sdven.umente por la 11pliatd6n y In embiones al alre de la instahad6n de 1111a manua no commt para d publfco en general; (5) la ublcad(m y la d1standa de s:n propiedad en rdadim con la hu111.l:ad6n; (6) una dcscrtpdon de c6mo usa la propledad que puede Vff'se afectada por la inslsladim; y (7) una lists de lodas las mestlones de hecho c:ontrO\wildas que presmle durantr d pffiodo- de comml.arlos. SI Ill soUdtnd es hN:ha por un grupo o :H.odadOP, uno o mas mtffllbnm que fimm legitlmad6n para M>lidtar una audimda debm ser ldmtUlcados por nombn-y direcdbn ff ska. Los lntereus que el grupo o Ja asodadim busca proteger debm ldcntula.r1t~ ~ m'\'lar los ajustes propuertos a b: aplkad6n que satisfatian sus inqulttudes. Ver la 51.'cdbn de Cool.ados. TCEQ Acd6n. Despufs de la fedta limite para Im cowmt.a:rlos publlcos, el dlredor rjecutivo cmslderarti: los commta.rlm y preparari una respuesta a todos los c:ommtarlm pitbllcns rele'\"latdt'S, m.aterlales: o !iigni.ficatlvos. La dtdst6n del diredor ejeartJvo wbre I.a solidtud y cualquhr raputsla a lot commtarios se en\.farin por c:orreo a todas lu pus0ru1s m la list.a de cw-reo. Si no sc recibcn solicitudes de audimcia de caso impugnadas o si se rctiran todas las solidlude:s de audienci.a. el dircd.Clf' tjcculivo pucdc anitir la aprobaci6n final de la solicitud. Si nose retiran todas las solicitudes de audkncia oportma,. d dirc:ctlT cjecutivo nocmitira 1a aprobacion final del pennisoy enviara la solicitudy las solicitudes a Ioli Canisiooados para su consideraci6n m unarwni6n programada de la canisi6n La Ccmisi6n solo puedc otorgar um solicitud para una audicncia de caso impugn.ado i;obre cucstiones que cl solicitantc prcscntO en sus comcntarios oportunos que no fuernn posterionnente rctirados. SI se concede ma imdit1Kb, d ttmS de la andiench. se llmltari a rutfl.lonts de hedla c:mtrnvertidm o cuestlmes de bcc:ho y leyu mixtas rtladonadu c:on ,nqu:ldudes rdevanlts y matt'dales sobre Is cddad dd aiTe presenbldu duranle d periodo de comenlarios. Cuestiones: c:omo cl vul«de las propiedades, el ruido, la seguridad dcl traficoy la zonificaci6n est.an fuera de lajurisdicci6n de la Canisi6n para abon:Jar cste procedimiento. llita de etneo. Puede solicitar que lo induyan c::n nna lista de com:o para rtcibir infmmaciOO adicianal sobrc esta apticacion especifica Mire la secciOfl Cootactos. InfonnadOO. disponible en linea. Para obtener mas infamaci6n sobre cl estado de la aplicad6n, visite la Base de Datos Intcgn:ida (CID) de las Comisionados en www.tccq.le<:im.gov/goe.o/cid. Una vcz que tenga acceso al CID usando cl cnlace, ingrcsc el m.'rmcro de registro en la partc superior de cste aviso. CONTACIOS DE LA AG ENCi A E INt'ORMA06N Comcntarios publicoo y pctkiones se deben entrcgar poc el Internet a www.ltcq.tcxas.gov/al>out/ commmts.hl.ml oi;e dcben cnviarscporescrito a laOfkina dcl Secmario Ofidal, MC-105, TCEQ. P.O. Box 13087, Austin, Texas 78711 3087. Si sc comunica coo la TCEQ porvia electr6nica, pcr favor t.enga en tucnta que stl dirtttiOO de careo, ccmo su diret-ciOf'I actuaL pa sari a formar partc del rcgistro publico de la agenda. Para mi.-. inforrnaci6n sobre est.a solicitud de penniso o sobre d proceso de pcnnisos, pcr favor Uame sin cobro al Programa de Educaci6n de1 Publico al J-80().687-4040 o visitc la pagina \VWW.lteq.to:as.gov/golofpep. Si desca infmnaciOll en Espanol,. puede Hamar al t--800--687-1040. Tambifu sc puede obtmer informaci6n adicional de Soto Ready Mix, Inc., 3411 De Soto Stred, Houston, Tocas 77091-3717 o Jlamando al Sr. Venkata Godasi, JngCfliero Graduado AARC Enviroomcntal, Int., al (;13) 974-2272. F«ha de cmisiOn: 8 de Junio de 2018 Don Nelon From: Sent: Subject: Attachments: Soto Ready Mix < president@sotoreadymix.com > Tuesday, August 7, 2018 2:40 PM Don Nelon Soto Ready Mix Public Notice Verification and Affidavits Soto Ready Mix Affidavit package.pdf Importance: High To: Hello! Mr. Nelon, Tharik you so much for your time yesterday, please find attached the complete package for the "Public Notice Verification and Affidavits" The original files is on the way, you will receive it tomorrow, and I also send copies to: - U.S. Environmental Protection Agency - Air Section Manager Houston - Texas Commission on Environmental Quality - Houston Department of Health and Human Services - Harris County Solution Control If you have any questions, please call me direct at: 832-466-4294 Thanks Armando Soto President Soto Ready Mix 1 Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Pagel) For the Standard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ 2054 7 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 All applicants must complete all applicable portions of this form. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. For more information, refer to the instructions in the public notice package. Alternative Language Checklist lrzl Yes D No I have contacted the appropriate school district. School District: Aldine ISO Phone Number: (281) 449-1011 Person Contacted: Aldine ISO Date of Contract: December 2017 Is a bilingual education program (BEP) required by the Texas Education Code in the district? fZI Yes D No If answer is "NO," skip to first question in verification box on next page. (Note: A BEP is different from "English as a Second Language" (ESL) program; and Elementary/Middle schools that only offer ESL will not trigger notice in an alternative language.) Notice in an alternative language is required if a BEP is required in the District, and one of the following conditions is met: 1. students in the elementary or middle school nearest the facility are emolled in a program at that school; fZI Yes D No 2. students from the elementary or middle school nearest the facility attend a BEP at another location; or D Yes fZI No 3. the school district that otherwise would be required to provide a BEP has been granted an exception from the requirements to provide the program, as provided for in 19 Texas Administrative Code 89.1207(a). D Yes fZI No If the answer is "NO" to 1, 2, and 3 above, then alternative language notice is not required. The name of the elementary school nearest to the proposed or existing facility is: Smith Academy The name of the middle school nearest to the proposed or existing facility is: Hoffman Middle School The following language(s) is/are utilized in the bilingual program: Spanish I I If notice in an alternative language is required, then applicants must publish alternative language notice(s) and post alterative langauge signs, as outlined in the Instruction for Public Notice and certify compliance with those requirements on this form. TCEQ-20778 (APDG 639lvl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form Is for use by facilities subject to air quality permit requirements and may be revised periodically. Page _ _ of _ _ Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Page 2) -Fol't:he Standard.J>ermitf<>r Concrete Batch-Plants with Enhanced Controls, use form TCEQ 20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Nrune: Concrete Batch Plant TCEQ Account Number (if applicable): Registration ~umber: 151715 Regulated Entity Number: RN110070547 Customer Number: CN605378967 For more information regarding public notice, ref er to the instructions in the public notice package. Alternative Language Verification 1. A BEP is required by the Texas Education Code in the area addressed by this permit application and the application is subject to alternative language public notice requirements. If "NO," skip 2 through 6 and complete signature, title, date, and name of applicant. IZI Yes D No 2. The applicant has conducted a diligent search for a newspaper or publication of general circulation in both the municipality and county in which the facility is located (or proposed to he located). IZI Yes D No 3. A newspaper or publication could not be found in any of the alternative language(s) in which notice is required. D Yes IZI No 4. The publishers of the newspaper listed below refused to publish the notice as requested, and another newspaper or publication in the smne language and of general circulation could not be found in the municipality or county in which the facility is located (or proposed to be located). D Yes D No IZI N/A Newspaper: Language: 5. Proof of publication of the newspaper alternative language notice(s) and the requested affidavits have been sent to the TCEQ. f2l Yes □ No 6. Alternative language signs were posted as required by the TCEQ f2l Yes D No This form must be signed and dated by a designated representative acting on behalf of the applicant after the end of the comment period. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. The TCEQ will not accept this form if submitted prior to tha~~ _,/ Verified by (signature): ~ - Applicant: Soto Ready Mix, Inc. Title: ?, e. 1,~, ~ / !Date: g-o /- Jg" TCEQ-20778 (APDG 6391 vl, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page _ _ of _ _ Soto Ready Mix TyEQ-Off;ce of the Chief Clerk Applicant Name: MC-105 Altn: Notice Team Permit No.:_1~5~1~71~5~------------- P.O. Box 13087 Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Inc Austin, Texas 78711-3087 AL TERN~ TIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS § COUNTY OF 1 I. rf"?\. r I"'" f,5 § Before me, the undersigned authority, on this day personally appeared __\)..,,_-"(c.o~::;_i.::...c.'-1:ca...,,:.=_ _ r)"-o"-l'""\-c{--'----• who being by me duly sworn, deposes and says that (s)he is (Name of Person Representing Newspaper) fJr: (R_ the C-(e-rK ofthe (Title of Person Representing Newspaper) that said newspaper t\--~ aV"Qf'.l.l:¢ CP6A..,., fuet.1:1,ltrl.-e.r" (Name of the Newspaper) or publication is generally circulated in t±o C-A... e.--tPn (the municlpa/lty or the same county as the location of the facility or the proposed facility) ,Texas; (Newspaper Representative's Signature) -.· u-=-->L--- day of 'J ~ 20_!J__ Subscribed and sworn to before me this the __ to certify which witness my hand and seal of office. Notary Public in and for the State of Texas (Seal} C/v;.,.- h It Wo Ire.. Crow.s {Ci Print or Type Name of Notary Public My Cornmis!ion Expires TCEQ - 20534 (APDG 6012v5, Revised 09/16)) I000017~455 I I ' SOTO READY MIX ' EXAMPLE A · TEXk> COMMISSION ON ENVIRONMENTAL QUALITY Notice of R ~ I of Appfice1ion and Intent to Obteln Consol Pe and Notice of cation and Pretlmlnarv Decision I Air Standard Perm for Cone atch Plan'ls ProPOsed ' Registration 5 Appllc:aflon. Soto Ready Mix, o 1he Texas Commission on Environmental QualilY for an Air QualilY Standard Permit, Registration No. 151 , lch would authorize construction of a pem,anent concre1e batch plant located at 3411 De Soto Street, Houston;·Harr1s·coumy, Texas 77091. This fink to an erectronlc map of the site or facility's general location Is provided aa i, public courtesy and not pa rt of the application or notice. For exact location, refer to application. http://www.tceo.fexas.gov/assets/PUblic/hb610/lndex. html?lat:29.853611&1n11=•95.458055&z001'11=13&'1Yi>e=r. The proPOSed tacilltY will emit the foll0wln9 air contaminants: particulate matter lncludl119 (but not limited to) eggregate, cement, road dust, and r:,articulate matter wl1h dlameters of 1J) microns or less and 2.5 microns or less. This application was submitted to the TCEQ on May 2, 2018. The executive director has completed the administrative and technical reviews of the application and determined that the application meen all of the requlremems of a standard permit au1horlzed by 30 TAC § 116,611; which would establish the conditions under which the Plent must OPerate. The executive director has made a P!'eliminary decision to Issue the ration because tt meets all applicable rules. The appllc , ex director's prellmlnary decision, and standa~ be Hou on r~ci~I ~~firJnc'ofife~~cri,~11Tt,V::.,, 6itf6 ~ Houston, Harris , Texas, beginning the first day of publication of this notice. The fa 's compliance file, lf any exists, Is available for public review at the TCEQ Houston Regional Office, 5425 Polk St Ste H, Houston, Texas. Visit www.tceq.texas.gov/gato/cbp to review the standard permit. · Public Comment/Pubflc Meetfn9. You mav submit PVl>llc comments or request a PllbliC meettng•.See Contacts section. The TCEQ will consider all public comments· 1rr-developing a final decision on the appJication. The deadf"mei.fo submit PUbllc comments or meeting requests Is 30 davs after newspaper notice ls publiShed, Issues such as property. values, noise, traffic safety, and zoning are outside of the TCEQ's iurlsdlction to consider In the i:iermlt process. The purpose of a public meeting Is to provide the OPPOrtunlty to submit comments or ask questions about the application. A public meeting about me application wm be held If the execunve director determines that there ls II s19nlflcent degree of public Interest in1he application or if requested by a local le9islator. A Public meeting Is not a contested case hearing. If a public meeting ls held, the deadline to submit PUbllc comments is extended to the end of the public meeting. contested Case Hearin!!. You mey request II contested case heorlng, A c; ed case hearing rs a legal proceeding similar to a civil trial In state c:ourt. Unless a wrltfen request tor a contested case hearln9 Is In 30 davs from 1hls notice, the executtve director may approve tne appJlcaffon. A per.;on who ~v be affeded bY emissions of air contaminants from 1he fll:dlltV Is enfltled to request a hearing. To request a hearing, a person must actuallY reside in a permanent mldenee Within 440 Yards of the proPOSed plant. If requesflng a contested case hearing, you must submit !tie fODowlmr. Cl l your name (or for a !lrGuP or association, an official representative), mamns addl'I!$$, daYlime Phone number; (2) appllcant'1 name and registration number; (3) 111e sfatement "[1/wel request a contested case hearlmJi."_ (4) a specific description of how you would be adversely affected by me IIPPllcatlon and air' emissions from the fadllty In a way not common to the senerat the location and distance of your property relative to the faclll1Y; •on of how Y® use the property which may be lmP&ded by I and (7) a list of an dlspUfed Issues of fact 1hat you submit durlns , comment per!Od. If tile request Is made bY a group or association, one or more members who have standlns to recruest a hearlllll must be Identified and physical address. The Interests which the group or seeks to protect must be ldenfflied. You may submit your pro ents to the appJlcatlon whldl would satlsfY your concerns. Contacts section. TCEQ Action. After the deadline tor PVbllc comments, the executive director wlD consider the comments and prepare a response to all relevant and material, or sl9111ffcant public comments. Tile execvHve director's decision on the apPllcatlon, and any respense to comments, will be malled to an per,ons on 1he manln9 nst. If no timely contested c;ase heoring requests are received, or If all hearing reQuests are withdrawn! the executive direcfor may Issue final approval of the application. If al timely hearing requestsarenotwtthdrawn, the executive director wlll not issue final apProval of the i,ermlt end will forward the application and requests to the Commissioners for their consideration at a scheduled commission meeting. The Commission may only grant a reques1 for a contested case hearing on Issues the requester submitted in their timely commen1s that were not subsequently withdrawn. If a hearlns iS granted, tile sublect of a hearing will be limited to disputed Issues of fact or mixed questtons of fact and law relating to relevant and material air quality concerns submitted during the comment period. Issues such as property values, noise, traffic safety, and zoning are ou1slde of the Commission's iurlsdlctlon to address In this 1>roceedln9. Malling List. You mav osk to be pla ailing list to receive additional Information on this specific a Contacls section. lnf1>rmatlon AvaUable . OnflnS!. For the status of fhe aPPlication, visit the Commissioners' Integrated Database (CIOJ at www.tceq.texas.goy/goto/cld. Once you have access to the CID using the link, enter the registration number at the top of this notice. Contacts. Public comments and requests must be submitted either electronicallY at wwwtceq.texas.gov/agency/comments.html, or in writing to the Texas Commlsslon on Environmental QualllY, Office of the Chief Clerk, MC· 105, P.O. Box 13087, Austin, Texas 78711-3087. .e1easeJJ1Law:11.re_lhat"amL.conta.ctJnformation_}'.OU.P!.'.QY:llde, Jm;!vdil'\SI your name, !lhone number, email address and Phvs1ca address will become part of the ageney's_public record. For more Information about this aplll!cation or the permitting process, l>lease call the TCEQ Public Education Program toll freti at 1·800·687·4040 or visit their website at www.tc1<1.texas.gov/soto/pep. Si desea informac:ion en Espanol, puede llamar al l-800-687-.4040. Further information may also be obtained from Solo Ready Mix, Inc., 3411 De Soto Street, Houston, Texas 77091•3717 or by calling Mr. Venkata Godasl, Graduate Engineer, AARC Environmental, inc:. at {713) 974-2272. Notice Issuance Date: June 8, 2018 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - · --····~-- Page 2 of 2 Houston Chronicle CLASSIFIEOS TCEQ-Office of tt,e Chief Clerk Applicant Name: Soto Ready Mix, Inc. MC-105 Attn: Notice Team Permit No.:-'1=5.,;..17.:.-1.;.,;5:..__ _ _ _ _ _ _ _ _ _ _ __ P.O. Box 13087 Cons_olidate~ Notice of Receipt of Application and Intent to Obt~1~ Permit and Notice of Application and Preliminary Dec1s1on Austin, Texas 78711·3087 ALTERNATIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS § COUNTY OF Harris § Before me, the undersigned authority, on this day personally appeared ..:.V~a!,!;ne:::.::s:::::s:::::a~C~a::.:s~tr~o_ _ _ _ _ _ _ _ _ _ _ _ , who being by me duly sworn, deposes and says.~hffl(s)he is (Name of Person Representing Newspaper) the Public ·Notice Representative (Title of Person Representing Newspaper) of the _ ___,!L~awP~r~e~nsi:!,!:a;wd:::!.5e'""'Hu:o~ud.ss~to;:.!.n!...-_ _ _ _ _ _ _ _ _ ___,, (Name of the Newspaper) that said newspaper or publication is generally circulated in Harris County , Texas; · (the municipality o.r the same county as the location of the facility or the proposed facility) 's Signature) Subscribed ancfswomto befo,r~ me this the 25 to certify which. Witf'l~§fl'flY hand and seal of office;· Evelyn Castro Becerra · . Print or Type Name of Notary Public My commission Expires 24 al 30 deJunio de 2018 I Edid6n Nurrero 854 www.prensodehouston.com 11 C a r@ SHRKIRR Los delincuentes habrian tenido meses de plancaci6n y utilizado una puerta trasera para comete1· el delito, segun las auloridades que lievan el caso. La casa de Shakira y Pique habfa sido robada, la viola• ci6n a su intimidad era noticia de todos los peri6dicos alrededor del mundo, pucs cl dclito ocuni6 mienlnls In cantante colombiana se encontraba fuera nltiman- do Jos detalles de su tema 'Clandeslinu' y su esposo estaba concentrado con la Seleccion cspaiiola para el :Mwidial de Rusia 2018. Diferentes· mcdios de comunicaci6n manrjaron que la p6rdida se limitaba a algunos relojes de el y joyas de Shakira, I.as cua• Jes se encontraban en una caja fuette aparenteni.ente impenetrable. Las autoridades espafiolas a cargo de la investigaci6n ban revelado a cuentagotas algunos delalles del mbo, como que la pan:ja fuc vigilada por bastante tiempo para cono• cer su rutina diaria las 24 hotas de! dia Tambien entre las pistas se sabe que la planeaci6n del atraco fue de varios meses y que el dia del golpe entraron por una de las puertas traseras que ese dla no estaban vigilada.s, lle• gando de manera casi directa a la caja fuerle. COMISI6N DE CALIDAD AMBIENTAL DEL ESTADO DE TEXAS Notificacion Consolidada de Recepcion de la Solicitude Intencion de Obtener Permiso y Aviso de Aplicacion y Decision Preliminar Permiso Estandar de Calidad dcl Aire para Plantas de Lote de Concrcto Registro Propuesto No. 151715 Solldtnd.. Seto Ready Mix, Inc.,b:a soHc~ado a la ComJl!i6n de CalidadAmbiental de Texas (TCBQ) lll Pcmliso &lmldar dcCalldad dd.A!re:, ~ fu 15111.S.quemtorizarb ht cortlU\lt"Cilri demaplllfda p-t:rn1Wtente de lote deconcretoubicada en 3,411 De Soto Street, Hom;tm, Condado de H.mis, Tcx:at 77091. Este c:nlacc a un map a elcctratico de la ubicadCll gcrunl dd sitio o instala:i6o se propon:iona camo cortcs/a publica y no cmto pa rte de la solkitud o notiflcaciOO. Para la ubicaci6n exacta, rc~nR a la 2J)liaci6n. http://v;ww.t.ceq.tctas.g,O'llassclS/pWliclltb610f'ndcx.hunJ71at=29.853611&.l:ng=9.S.◄.580.5.5&.z:oan=13&t)'pc=r: La ll1S1alaci6n propucstacuiitiri los si!J,!k:utc$ toull!r1Uhaotcs abnoflcric0'5: mmerla p1uticulu-quc induye (mtn: dros)aridos, canento. polvo de la cam:tern y rmttrial pmti:cular con dimnctro5 de 10 micrmcs o ma'JOS y 2..5 micrones o mcnot. E.sbl solitillld i\ic prcsartBda a la TCEQ ct 2 de Mayo de 2018.. l:U dirutor ejtt\llivo tm coq,.letado las revisioors. ldminis'tratlva:s. y t«nicaa de la sclititud y ha d«emiinadoqta la aplir:acion CUllple coo todCG loarequisitos de tr1 pcnni&o cstandar autorizadop« 30TAC § 116.611, que ~le«ri1 lu condMcms bajo ht1 cualew la planta dcbe- qKr.r. El: direct« ejc,cutivo tom6 una deciriOIJ preliminar pan cmitir cl registro porque cun:iple ton todts In rcghw ap~cablcs. La 101icilud, la dedsicln prelimin81' dd dirtdor ejecutivoyel pcnniso effllndartstartn disponiblesparn su vw.&JizaciOQy copia en la oficir.ia ceotral deTCEQ. lt ofidna lqiooal dcTCEQ HoUSlaly l•Bfbliottt1Regiomil Collier, 6200 Pinanoot. Howtoo,. Cond.dodeHanis, T ~ cm,cnzando dprimer dla de: publica:iOO dc ette aviso. El 2tthiwi ck nanplimierrto de It inm-Ja.ci6n, si exist to, m:.6 dl,ponihlc pan N!Vi1lM p{lblic-a tn h Ofkina Regioual de TCEQ Houston. 542.5 Pok St Ste H. Houston, Texas. Vitite www.tceq.ttxat.gov/goto/cbp pan m'isa- cl penni,o esta:ndar. CanmtaioPfd:>Uco/ Rnin161tP6bHa..Puedeemtar comentu1otS p6bllca osoUdlar ana reun16n puhllca.Min la suciOO de Calb!ictos. LaTCEQ ruuidem lodes las CGnCJt.mios publka; al desarroUar um decisia'I final sobrt la aplicacWIL La tech a }butte p...-a tt1\1ar comentarlos p!TulJcos o so!ldtu~1 d~ nun:16n ts 30 dlu delpn& de la pubtltad6n dd.11\>'lso del pcrlMko. Cueslione1 emt0 eJ val« de las propicdadcs,. cl ruido. fa scguidad dd tri6to y la zcnificaci.OntsUDJ\u:ra de lajurisditdon dt la TCEQ Pffll cmdderar m el proceso deprnnisos. El objetlvo de umt ram:idn pilbHca cs brimar Ja opcrnnidad de cnviar ccmc:ntaioo o haca- pregootas soorc la l!lplinci6n. Sc renlizara una rem ion p(iblici1 rob re la solidtud si d direttcr cjmitivo determina que hay ungrado 1igni:ficativo de int.er& J)Ublico en la solicitud osi lo solicita tm kgi;bdor local. Una rwni6n Ucw • cdl'O tlllttfcutUl.ln publka, la[o.:ba llmle para aiviAt comall.ariot publicos se aticudc bast.a cl fiun.l p(lblie11 no t:t uun 1u.11!it:m:i• dt:cltft> irupugmrdo. Si" de ta rcmi6n p1'i)hca. Audlenda de cuo lmpognadL Pnecte Hllc:brUbl .andtmdt dr cmo bnpngn.lda.. Una audiencia de cuo impugnado tS lit proccdimimto legal sirnilar a un jukio civil en tra tribunal de di:sbito estatal. A mffl0.'1 que .e- p~teun• rolldtud por e,crlto plU'a nn• .udlend• de (UO lmpugna1'.~ dmtro ff Ju 30 dfnt dt ate lfflso, d dlred.- eJeailh-o pttedt: 1111roh1:r la soldtud. Um pmona quepaede wrie sfectadaptff' las tm!slcnts de cantamlnantes dd atre del• ln.StaJtdOnUene dtttd\02 solld1u' una ndlmda. Psr• sdldtar tma audlenda, un• ptnOQ1l debe nd.dlr en um rtddffld• pa'llu1nm~ s 440 de la phnhi propuub. SI Wllldt• un• audlmdt de cuo bnpugn:sdo, ~unur lo slgt:dmle: (1) su nombre(opan.un grupo oaodad6n, tm repnsUJtmteofldaJ), cUretdOflposbl, o6mtro detdtranodonn:te el dl:t; (2) rumbre dd IOlldbtntey nmnero dettglstro; (J) It dedarad6n "(Yo I nOSW'MJ soHcttamos una andlendt de caso tmpngnsdo;» (4) rma demrtpdbn esptdfkt de C'OIUD st Tt:tb. afectado adttnammt.e p« 1• •pllad6n y las embionn al :sire deb lnstaladim ~ ma muua no con:nbl par• d pl'Jbllco ea &mend: (S) Ja uble:adan yl• dlstsnda de su propledad en rdlldOn con la tnstaladltn: (6) una deurfpdon 6e cbmo ma t. proph:dad qoe putde- nne afcdtda por 1• lmbudl;m; 1 ('i) m11 lllta de todas lti mestlmes de hecho cootrO\'ertldu que 1)tesente dltnmte- el perfodo de t1Fl1lmlarios. SI la solldtud es hfdta par rm grupo o uodadOl'I, UM o mh n:dm:lko, que uenen lqilttmadon para solldtar una audtenda dtbm ffl' ldtntlfiadOI por nmnbre y dlrecdlm flslc:a. Los .lnt.ensts quc d gnrpo o Ja tUedad6n basai pr«epr deben ldmtlftellne. Puede mvlu- IOI •Jw:tev propuest.Oll 1111 1111 apllctd6n qne ntlmrftn ms lnqutetmtes. Vtr la secdbn de Contad.os. 1.-m• TCEQ A«ton. Despuft de ta rema llmfte para Jos commtarto, pllbUc.os, el 4trtctor eJecutlTo cmSIOOa:rt lo, commtmos y prrptrarl1 um respunta a todo1 IM commtu1m p-lrblh:os relnmrtes, tmtmal• o dtplllk.tlvo1. La dedsl6n df!l tlndot f'jtruthro IOI.tr• la nlldtwl y cnalqulrr rnpun1a 11 IM a:ounlm'klr se embrin por corno a todas tu person.all en Ja lhta de Carrfll. Si nose rttibm solicitudes de audicnc-ia. decaso impugnadas o si se rctiran todu las aolicitudesdeaudieoci11, el di:n:ctor e,ja:utm, puttlt cmitir la apn:ib-.:u:ifu faul dcla solicitul Si no rcrdinm. toda1 lu 501.icituda de audicncia oportlna, cl dirrct«cjccutivonocmitinllaapn:t,ad6nftnaJ ddpC'fm!!'Oy emim\lt,olkitudJ bu.rotieitudea a Jo.,Ca'niriauidot pan.sueoiuid~ion m man:ucion programada de la canisi6n. UI Canisido solo pucdc ctcrgaruna solicitud pan una audicnciu dccaBO impugn.ado '®ff: cuestlooes que el solkit!nte pmcnt6 en commtarios oportunoa que no fueroo poitaiormente retiradot. SI se cm cede mta 1Wdlencb, ti tffllA delt audltmdl re Omit.art a atesil:ones dt- ha:ho IU8 cmtrovertldu o CUt1ttooa: de bttho y le}'tl mtxte ntadomclas CGD lnqUlffl!des rdevWay matmdessobre lt: C1ltd.1.d dd lireprne:ntada ctarert.t d: perlodo d& conmdM'loc. Cuectione,; come el vtloc de Ju propiedade,, t1 ruido. 1• tt9uri&iid de:I trifko y la zoniflnd6n fflm'I roffll de fajurisdkritt'I de I• O:misi6nperatbordarotcproeedimimto. U.C..decocreu. Puctlcsu.ticiur- que lo im:luyim m 1.1111 li3la decmcu pun m:ibil i11foou1u.·ilXI 111fo.iumJ aol,rc Cl.ill epfo:11CiO!li c:qJet:iOca. Mire 1a ~ci&t Cmhtctnit. ,-Jnfomm:iil!rdt,ponlb!emittt,r:l'On! ilt>!!!!""11fs-!Obrt! cl .,..,io de ta·1ptittt!61l;'Oi!fu'!l!Bmdella!t>lllft,ar,d1r(CID) lli:'10!1 C"'1!sf«l!ldor "1 .... www.tccq.tci.11S.gov/goto/eid. Un.a va quc tcnga 11ccao .ti CID usando cl cnlacc, ingrex el n6mcro de rcginro c:n la pstc auptritl' de etb: i:r,,j10, CONrACTOS DE LAAGENCIA E INFORMACION CommtariOJ pilblicO!I y pd.icioott sc deben entrcg,r par cl Internet a www.tccq.lc:tas,gm•/about/ c001mmts.html oscdcbcn i:n\llarscporcmitoa laOficinadcl Semt.ariootitinl,MC.105, TCEQ, P.O.Bttt= 13087,Austin, Tc,cm 7'iI7H 3087. Si secantmlct cm l:aTCEQporv&i dtct:r6nic-a, porfaVCf tmgam rutnbil qucau diro:cim de caTe(\ comowdiruci6n actua~ puai a ronn.. parte det regiatropfib!icode ta agenda. Pan mis infcrma:ciln sotn tstas-olicirud de pcn:nisoo sobrc el proceso dcpcnnisos, pcr fm,r !lame sin tobroal Progrunade Edutaci6ndc1 P6bHc:o al 1·800--6S'7-4040 o '7isite la paginfl m\W.lLcq.tcxas.gov/gotolpcp. Si dcsea ilf«mec:il!a en Espatk>~ puede ilffl!ar al 1-800-687-4040. Tmnbibt se pucdc obt.ener infameci6n adicional de Soto Ready Moc, lnc., 3411 DeSoto Street. Houston. T=<11;s 77091-3717 o Uamandoal Sr. Vcnbta Godasi. Ingcnicro Oraduado MRC Envirmmcntal. Inc, ,1 (713) 974-227l. Pecha dcernisiOn: 8 de lunio de 2018 Don Nelon From: Sent: To: Subject: Don Nelon Monday, August 6, 2018 12:16 PM Venkata Godasi (VGodasi@aarcenv.com); Jaime Armendariz (JArmendariz@aarcenv.com); 'sotoreadymix@gmail.com' CBP application for registration number 151715 The public notice package was provided on June 8, 2018 for publishing public notice within 30 days from that date. We have not received any documentation that public notice has been published. The application will be recommended for voidance on August 10, 2018 if newspaper clippings and affidavits are not received by August 10, 2018 proving public notice was published no later than July 8, 2018. Don Nelon 512-239-0894 1 Bryan W. Shaw, Ph.D., P.E., Chairman Toby Baker, Commissioner Jon Niermann, Commissioner Stephanie Bergeron Perdue, Interim Executive Director TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Protecting Texas by Reducing and Preventing Pollution June 8, 2018 MR ARMANDO SOTO PRESIDENT SOTO READY MIX INC 3411 DE SOTO ST HOUSTON TX 77091-3717 Re: Consolidated Notice of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Registration under an Air Quality Standard Permit for Concrete Batch Plants Air Quality Registration Number: 151715 Concrete Batch Plant Houston, Harris County Customer Reference Number: CN605378967 Regulated Entity Number: RN110070547 Dear Mr. Soto: The executive director has completed the administrative and technical reviews of your application and has prepared a preliminary decision. We understand you have represented that this application is for a small business stationary source. You are now required to publish notice of your proposed activity. To help you meet the regulatory requirements associated with this notice, we have included the following items: • • • • • • • • • Notices for Newspaper Publication (Example A) Sign Posting Example (Example C) Public Notice Checklist Instructions for Public Notice Affidavit of Publication for Air Permitting (Form TCEQ-20533) and Alternative Language Affidavit of Publication for Air Permitting (Form TCEQ-20534) Web link to download Public Notice Verification Form (refer to Public Notice Instructions) Notification List Standard Permit General Conditions Air Quality Standard Permit for Concrete Batch Plants Please note that it is very important that you follow all directions in the enclosed instructions. If you do not, you may be required to republish the notice. A common mistake is the unauthorized changing of notice wording or font. If you have any questions, please contact us before you proceed with publication. A "Public Notice Checklist" is enclosed which notes the time limitations for each step of the public notice process. The processing of your application may be delayed if these time limitations are not met (i.e.; submitting proof of publication of the notice within 10 business days after publication, affidavits of publication within 30 calendar days after the date of publication, and public notice P.O. Box 13087 • Austin, Texas 78711-3087 How is our customer service? • 512-239-1000 • tceq.texas.gov tceq.texas.gov/customersurvey printed on recycled paper Mr. Armando Soto Page 2 June 8, 2018 Re: Registration: 151715 verification form within 10 business days after the end of the designated comment period). This checklist should be used as a tool in conjunction with the enclosed, detailed instructions. If you do not comply with all requirements described in the instructions, further processing of your application may be suspended or the agency may take other actions. If you have any questions regarding publication requirements, please contact the Office of the Chief Clerk at (512) 239-3300. If you have any other questions, please contact Mr. Donald D. Nelon at (512) 2390894. Sincerely, 8~~ C.&k,_, Bridget C. Bohac Chief Clerk Office of the Chief Clerk Texas Commission on Environmental Quality Enclosure cc: Mr.Venkata Godasi, Graduate Engineer, AARC Environmental Inc., Houston Senior Project Manager, Houston Department of Health and Human Services, Bureau of Pollution Control & Prevention, Houston Director, Harris County, Pollution Control Services, Pasadena Air Section Manager, Region 12 - Houston Air Permits Section Chief, New Source Review Section (6MM-AP), U.S. Environmental Protection Agency, Region 6, Dallas Project Number: 285049 EXAMPLE A TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Air Quality Standard Permit for Concrete Batch Plants Proposed Registration No. 151715 Application. Soto Ready Mix, Inc., has applied to the Texas Commission on Environmental Quality (TCEQ) for an Air Quality Standard Permit, Registration No. 151715, which would authorize construction of a permanent concrete batch plant located at 3411 De Soto Street, Houston, Harris County, Texas 77091. This link to an electronic map of the site or facility's general location is provided as a public courtesy and not part of the application or notice. For exact location, refer to application. http://www.tceq.texas.gov/assets/public/hb61 0/index.html?lat=29.853611 &lng=95.458055&zoom=13&type=r. The proposed facility will emit the following air contaminants: particulate matter including (but not limited to) aggregate, cement, road dust, and particulate matter with diameters of 10 microns or less and 2.5 microns or less. This application was submitted to the TCEQ on May 2, 2018. The executive director has completed the administrative and technical reviews of the application and determined that the application meets all of the requirements of a standard permit authorized by 30 TAC§ 116.611, which would establish the conditions under which the plant must operate. The executive director has made a preliminary decision to issue the registration because it meets all applicable rules. The application, executive director's preliminary decision, and standard permit will be available for viewing and copying at the TCEQ central office, the TCEQ Houston regional office, and the Collier Regional Library, 6200 Pinemont, Houston, Harris County, Texas, beginning the first day of publication of this notice. The facility's compliance file, if any exists, is available for public review at the TCEQ Houston Regional Office, 5425 Polk St Ste H, Houston, Texas. Visit www.tceq.texas.gov/goto/cbp to review the standard permit. Public Comment/Public Meeting. You may submit public comments or request a public meeting. See Contacts section. The TCEQ will consider all public comments in developing a final decision on the application. The deadline to submit public comments or meeting requests is 30 days after newspaper notice is published. Issues such as property values, noise, traffic safety, and zoning are ou_tside of the TCEQ's jurisdiction to consider in the permit process. The purpose of a public meeting is to provide the opportunity to submit comments or ask questions about the application. A public meeting about the application will be held if the executive director determines that there is a significant degree of public interest in the application or if requested by a local legislator. A public meeting is not a contested case hearing. If a public meeting is held, the deadline to submit public comments is extended to the end of the public meeting. Contested Case Hearing. You may request a contested case hearing. A contested case hearing is a legal proceeding similar to a civil trial in state district court. Unless a written request for a contested case hearing is filed within 30 days from this notice, the executive director may approve the application. A person who may be affected by emissions of air contaminants from the facility is entitled to request a hearing. To request a hearing, a person must actually reside in a permanent residence within 440 yards of the proposed plant. If requesting a contested case hearing, you must submit the following: (1) your name (or for a group or association, an official representative), mailing address, daytime phone number; (2) applicant's name and registration number; (3) the statement "[I/we] request a contested case hearing;" (4) a specific description of how you would be adversely affected by the application and air emissions from the facility in a way not common to the general public; (5) the location and distance of your property relative to the facility; (6) a description of how you use the property which may be impacted by the facility; and (7) a list of all disputed issues of fact that you submit during the comment period. If the request is made by a group or association, one or more members who have standing to request a hearing must be identified by name and physical address. The interests which the group or association seeks to protect must be identified. You may submit your proposed adjustments to the application which would satisfy your concerns. See Contacts section. TCEQ Action. After the deadline for public comments, the executive director will consider the comments and prepare a response to all relevant and material, or significant public comments. The executive director's decision on the application, and any response to comments, will be mailed to all persons on the mailing list. If no timely contested case hearing requests are received, or if all hearing requests are withdrawn, the executive director may issue final approval of the application. If all timely hearing requests are not withdrawn, the executive director will not issue final approval of the permit and will forward the application and requests to the Commissioners for their consideration at a scheduled commission meeting. The Commission may only grant a request for a contested case hearing on issues the requester submitted in their timely comments that were not subsequently withdrawn. If a hearing is granted, the subject of a hearing will be limited to disputed issues of fact or mixed questions of fact and law relating to relevant and ... material air quality concerns submitted during the comment period. Issues such as property values, noise, traffic safety, and zoning are outside of the Commission's jurisdiction to address in this proceeding. Mailing List. You may ask to be placed on a mailing list to receive additional information on this specific application. See Contacts section. Information Available Online. For details about the status of the application, visit the Commissioners' Integrated Database (CID) at www.tceq.texas.gov/goto/cid. Once you have access to the CID using the link, enter the registration number at the top of this notice. Contacts. Public comments and requests must be submitted either electronically at www.tceq.texas.gov/agency/comments.html, or in writing to the Texas Commission on Environmental Quality, Office of the Chief Clerk, MC-105, P.O. Box 13087, Austin, Texas 78711-3087. Please be aware that any contact information you provide, including your name, phone number, email address and physical address will become part of the agency's public record. For more information about this application or the permitting process, please call the TCEQ Public Education Program toll free at 1-800-687-4040 or visit their website at www.tceq.texas.gov/goto/pep. Si desea informaci6n en Espanol, puede llamar al 1-800-687-4040. Further information may also be obtained from Soto Ready Mix, Inc., 3411 De Soto Street, Houston, Texas 77091-3717 or by calling Mr. Venkata Godasi, Graduate Engineer, AARC Environmental, Inc. at (713) 974-2272. Notice Issuance Date: June 8, 2018 Example C Sign Posting Sign(s) must be in place on day of publication of first newspaper notice and must remain in place and the lettering must be legible during that designated comment period (30 days). Note - The information shown is an example only. It is your responsibility to verify that the appropriate information pertaining to your application is accurate. Each sign placed at the site must be located within 10 feet of each (every) property line paralleling a public highway, street or road. Signs must be visible from the street and spaced at not more than 1,500-foot intervals. A minimum of one sign, but not more than three signs shall be required along any property line paralleling a public highway, street, or road. ◄ 18" Minimum ► PROPOSED AIR QUALITY PERMIT APPLICATION NO.: 151715 FOR FURTHER INFORMATION CONTACT: 28' Minimum TEXAS COMMISSION ON ENVIRONMENTAL QUALITY HOUSTON REGIONAL OFFICE 5425 POLK ST STE H HOUSTON, TEXAS 77023-1452 (713) 767-3500 Sign(s) must be placed at whatever height above the ground is necessary for sign(s) to be 100% visible from the street. WHITE BACKGROUND WITH BLACK LETTERS All lettering must be no less than 1-1/2 inch block printed capitals. Public Notice Checklist Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision (1st Notice and 2nd Notice) The following tasks must be completed for public notice. If publication in an alternative language is required, please . complete the tasks for .both the English and alternative language publications. Detailed instructions are included in the "Instructions for Public Notice" section of this package. Within 30 calendar days after date of technical completeness letter Publish Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision - Example A must be published in "public notice" section of newspaper. Review for accuracy prior to publishing. Provide copy of application at a public place for review and copying. Keep it there until end of the designated comment period. Prepare signs. First day of newspaper publication Review published newspaper notice for accuracy. If errors, contact Air Permits Division. Post signs and keep them up for duration of the designated comment period (see Example C). Ensure copy of application is at the public place. Within 10 business days after date of publication Mail proof of publication showing publication date and newspaper name to: Texas Commission on Environmental Quality Office of the Chief Clerk, MC-105 Attn: Notice Team P.O. Box 13087 Austin, Texas 78711-3087 Mail photocopies of newspaper clippings showing publication date and newspaper name to persons listed on Notification List Within 30 calendar days after date of publication Mail original affidavit of publication for air permitting and alternative language affidavit of publication for air permitting (if applicable) to: Texas Commission on Environmental Quality Office of the Chief Clerk, MC-105 Attn: Notice Team P.O. Box 13087 Austin, Texas 78711-3087 Mail photocopies of affidavits to persons listed on Notification List Within 10 business days after end of the designated comment period Mail Public Notice Verification Form to: Texas Commission on Environmental Quality Office of the Chief Clerk, MC-105 Attn: Notice Team P.O. Box 13087 Austin, Texas 78711-3087 Mail photocopies of Public Notice Verification Form to persons listed on Notification List TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Instructions for Public Notice For New Source Review Air Quality Standard Permit For Small Business Stationary Sources Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Your application has been declared administratively and technically complete and now you must comply with the following instructions: Review Notice Included in the notice is all of the information which the commission believes is necessary to effectuate compliance with applicable public notice requirements. Please read it carefully and notify the Texas Commission on Environmental Quality (TCEQ) immediately if it contains any errors or omissions. You are responsible for ensuring the accuracy of all information published. You may not change the text of the notice without prior approval from the TCEQ. Newspaper Notice • You must publish the enclosed Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision within 30 calendar days after the date of administrative completeness. Refer to the cover letter for the date of completeness. • You must publish the enclosed notice at your expense, in a newspaper that is of general circulation in the municipality where the facility is or will be located. If the facility is not located within a municipality, the newspaper should be of general circulation in the municipality nearest to the location or proposed location. • You must publish this notice in one issue of any applicable newspaper. • The bold text of the enclosed notice must be printed in the newspaper in a font style or size that distinguishes it from the rest of the notice (i.e., bold, italics). Failure to do so may require renotice. Alternative Language Notice In certain circumstances, applicants for air permits must complete notice in alternative languages. • Public notice rules require the applicant to determine whether a bilingual program is required at either the elementary or middle school nearest to the facility or proposed facility location. Bilingual education programs are determined on a district-wide basis. When students who are required to attend either school are eligible to be enrolled in a bilingual education program, some alternative language notice is required (signs, or signs and newspaper notice). • Since the school district, and not the schools, must provide the bilingual education program, these programs do not have to be located at the elementary or middle school nearest to the facility or proposed facility to trigger the alternative language notice requirement. If there are students who would normally attend the nearest schools eligible to be taught in a bilingual education program at a different location, alternative language notice is required. • If triggered, publication of alternative language notices must be made in a newspaper or publication primarily printed in each language taught in the bilingual education program. This notice is required if such a newspaper or publication exists in the municipality or the county where the facility is or will be located. • The applicant must demonstrate a good faith effort to identify a newspaper or publication in the required language. If a newspaper or publication of general circulation published at least once a month in such language cannot be found, publishing in that language is not required, but signs must still be posted adjacent to each English language sign. • Publication in an alternative language section or insertion within an English language newspaper does not satisfy these requirements. • The applicant has the burden to demonstrate compliance with these requirements. You must fill out the Public Notice Verification Form for Air Quality Standard Permits for Concrete Batch Plants (Form TCEQ-20778) indicating your compliance with the requirements regarding publication in an alternative language. This form is available at www.tceq.texas.gov/permitting/air/nav/air_publicnotice.html. • It is suggested the applicant work with the local school district to do the following: (a) (b) (c) (d) determine if a bilingual program is required in the district; determine which language is required by the bilingual program; locate the nearest elementary and middle schools; and determine if any students attending either school are eligible to be enrolled in a bilingual educational program. • If you determine that you must meet the alternative language notice requirements, you are responsible for ensuring that the publication in the alternative language is complete and accurate in that language. Spanish notice templates are available through the Air Permits Division Web site at www.tceq.texas.gov/permitting/air/nav/air_publicnotice.html. All italic notes should be replaced with the corresponding Spanish translations for the specific application and published in the alternative language publication. • If you are required to publish notice in a language other than Spanish, you must translate the entire public notice at your own expense. Public Comment Period • The public comment period should last at least 30 calendar days. • The comment period will be longer if the last day of the public comment period ends on a weekend or a holiday. In this case, the comment period will end on the next business day. • The comment period for the permit may lengthen depending on whether a public meeting is held. If a public meeting is held, the comment period will be extended to the later of either the date of the public meeting or the end of the second notice period, if applicable. Proof of Publication • Check each publication to ensure that the articles were accurately published. If a notice was not published correctly you may be required to republish. • For each newspaper in which you published, you must submit proof of publication that shows the notice, the date of publication, and the name of the newspaper to the Office of the Chief Clerk within 10 business days after the date of publication. Acceptable proofs of publication are 1) copies of the published notice or 2) the original newspaper clippings of the published notice. If you choose to submit copies of the published notice to the Office of the Chief Clerk, copies must be on standard-size 8½" x 11" paper and must show the actual size of the published notice (do not reduce the image when making copies). Published notices longer than 11" must be copied onto multiple 8½" x 11" pages. Please note, submitting a copy of your published notice could result in faster processing of your application. It is recommended that you maintain original newspaper clippings or tear sheets of the notice for your records. • You must submit an original affidavit of publication for air permitting and alternate language affidavit of publication for air permitting (if applicable) to the Office of the Chief Clerk within 30 calendar days after the date of publication. You must use the enclosed affidavit forms. The affidavits must clearly identify the applicant's name and permit number. You are encouraged to submit the affidavit with the proof of publication described above. • You must submit the Public Notice Verification Form for Air Quality Standard Permit for Concrete Batch Plants to the Office of the Chief Clerk within 10 business days of the end of this public comment period. You must use this form to certify that you have met bilingual notice requirements. • The original affidavits of publication for air permitting, Public Notice Verification Form for Air Quality Standard Permit for Concrete Batch Plants, and acceptable proof of publication of the published notices must be mailed to: Texas Commission on Environmental Quality Office of the Chief Clerk, MC-105 Attn: Notice Team P.O. Box 13087 Austin, Texas 78711-3087 • Please ensure that the affidavit(s) you send to the Chief Clerk is/are originals and that all blanks on the affidavit are filled in correctly. Photocopies of affidavits will not be accepted. • Photocopies of newspaper clippings, affidavits, and verifications must also be sent to those listed on the enclosed Notification List within the deadlines specified above. Failure to Publish and Submit Proof of Publication You must meet all publication requirements. If you fail to publish the notice or submit proof of publication on time, then the TCEQ may suspend further processing on your application or take other actions. Sign Posting Applicants for air quality permits must also post signs. • You must post at least one sign in English and as applicable, in each alternative language. • Signs must be in place on the first day of publication in a newspaper and must remain in place and be legible and be visible from the street for the entire duration of the publications' designated comment period (see Example C). • The sign template enclosed (Example C) is an example only. Read the sign template carefully and notify the TCEQ if it has an error or omissions. It is your responsibility to verify that the appropriate information pertaining to your application is accurate. Any changes to the text prepared by the TCEQ must be approved by the agency . .• Signs placed at the site must be located within 10 feet of each (every) property line paralleling a public highway, street, or road. Signs must be visible from the street and spaced at not more than 1,500-foot intervals. A minimum of one sign, but not more than three signs are required along any property line paralleling a public highway, street, or road. Sign(s) must be placed at a sufficient height above the ground that is necessary for sign(s) to be 100 percent visible from the street. • All lettering on the sign must be at least 1½" in height with block printed capital lettering. The sign must be at least 18" wide and 28" tall, and consist of black lettering on a white background. • Alternative language signs are required if alternative notice is required, even if no newspaper can be found. • Inspect each posted sign daily to ensure it is present and visible throughout the entire comment period. • You must submit verification of sign posting using the Public Notice Verification Form for Air Quality Standard Permit for Concrete Batch Plants (Form TCEQ-20778) within 10 business days after end of the publications' designated comment period. Do not submit the Public Notice Verification Form verifying sign posting until after the comment period is over. You cannot certify that the sign posting is in compliance until after the comment period is over. This form is available at www.tceq.texas.gov1permitting/air/nav/air_publicnotice.html. Application in a Public Place • You must provide a copy of the technically complete application at a public place for review and copying by the public. This place must be in the county in which the facility is located or proposed to be located. • A public place is one that is publicly owned or operated. For example, public libraries, county courthouses, or city halls could be public viewing places. • The technically complete application must be available beginning on the first day of newspaper publication and remain available during the entire public comment period. • If the application is submitted to the TCEQ with information marked as confidential, you are required to indicate which specific portions of the application are not being made available to the public. These portions of the application must be accompanied with the following statement: "Any request for portions of this application that are marked as confidential must be submitted in writing, pursuant to the Public Information Act, to the Texas Commission on Environmental Quality, Public Information Coordinator, MC-197, P.O. Box 13087, Austin, Texas 78711-3087." • You must submit verification of file availability using the Public Notice Verification Form for Air Quality Standard Permit for Concrete Batch Plants (Form TCEQ-20778) within 10 business days after end of the publications' designated comment period. Do not submit the form verifying that the application was in a public place until after the comment period is complete. If a public meeting is held or second notice is required causing the public comment period to be extended, ... ata.fater-dateyouwill be required to Nerifythattheapplication-was in a public place-during-the entire public comment period. This form is available at www.tceq.texas.gov/permitting/air/nav/air_publicnotice.html. General Information When contacting the Commission regarding this application, please refer to the permit number at the top of the notice. If you wish to obtain an electronic copy, please contact the initial reviewer who assisted in the preparation of this public notice package. The electronic version is available in Microsoft Word format only and can be requested once your application has been declared administratively complete. Please ensure that the electronic version is correct and consistent with the hard copies that were provided. Any revisions made may not be accepted. You may download copies of the Public Notice Verification Form and Affidavit of Publication by visiting our agency Web site at www.tceq.texas.gov/permitting/air/nav/air_publicnotice.html. If you have questions or need assistance regarding publication requirements, please contact the Office of the Chief Clerk at (512) 239-3300 or the reviewer listed in the cover letter. TCEQ-Office of the Chief Clerk Applicant Name: Soto Ready Mix, Inc. MC-105 Attn: Notice Team Permit No.:~1~5~17~1~5~-------------- P.O. Box 13087 Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision · · ·······Austin, Texas 78711-3087 AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS § COUNTY OF _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ § Before me, the undersigned authority, on this day personally appeared _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , who being by me duly sworn, deposes and says that (s)he is (name of person representing newspaper) the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _of the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ (Name of Newspaper) (Title of Person Representing Newspaper) that said newspaper is generally circulated in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , Texas; (The municipality or nearest municipality (not county) to the location of the facility or the proposed facility) that the enclosed notice was published in said newspaper on the following date(s): (newspaper representative's signature) Subscribed and sworn to before me this the _ _ _ _ _ _ day of _ _ _ _ _ _ _ _ _ _ _ _ , 20 _ _ __ to certify which witness my hand and seal of office. Notary Public in and for the State of Texas (Seal) Print or Type Name of Notary Public My Commission Expires TCEQ - 20533 (APDG 6011v5, Revised 09/16) TCEQ-Office of the Chief Clerk Applicant Name: Soto Ready Mix, Inc. MC-105 Attn: Notice Team Permit No.:-'1~5""'"1"--71""""5=---------------- P.O. Box 13087 Consolidated Notice of Receipt of Application and Intent to Obtain Permit and Notice of Application and Preliminary Decision Austin, Texas 78711-3087 ALTERNATIVE LANGUAGE AFFIDAVIT OF PUBLICATION FOR AIR PERMITTING STATE OF TEXAS§ COUNTY OF _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ § Before me, the undersigned authority, on this day personally appeared _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , who being by me duly sworn, deposes and says that (s)he is (Name of Person Representing Newspaper) the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ of the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____. (Title of Person Representing Newspaper) (Name of the Newspaper) that said newspaper or publication is generally circulated in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , Texas; (the municipality or the same county as the location of the facility or the proposed facility) that the enclosed notice was published in said newspaper or publication on the following date(s): (Newspaper Representative's Signature) Subscribed and sworn to before me this the _ _ _ _ _ day of _ _ _ _ _ _ _ _ _ _ _ _ _ , 20 _ __ to certify which witness my hand and seal of office. Notary Public in and for the State of Texas (Seal) Print or Type Name of Notary Public My Commission Expires TCEQ - 20534 (APDG 6012v5, Revised 09/16)) Notification List It is the responsibility of the applicant to furnish the following offices with copies of the notices published, the Affidavit of Publication for Air Permitting, the Alternative Language Affidavit of Publication for Air Permitting (if applicable), and a completed copy ofthePublic Notice Verification Form forAir Quality Standard Permits(Form TCEQ-20778). Acceptable proof of publication and originals of any affidavits and Form TCEQ-20778 should be sent to the Texas Commission on Environmental Quality, Office of the Chief Clerk, MC-105, P.O. Box 13087, Austin, Texas 78711-3087. Copies should be sent to the following: U.S. Environmental Protection Agency Region 6 Attn: Air Permits Section (6MM-AP) 1445 Ross Avenue, Suite 1200 Dallas, Texas 75202-2733 Texas Commission on Environmental Quality Office of Air Air Permits Division, MC-163 Ms. Bonnie Evridge P.O. Box 13087 Austin, Texas 78711-3087 Air Section Manager Houston Regional Office 5425 Polk St Ste H Houston, Texas 77023-1452 Senior Project Manager Houston Department of Health and Human Services Bureau of Pollution Control & Prevention 7411 Park Place Blvd Houston, Texas 77087-4441 Director Harris County Pollution Control Services 101 South Richey Ste H Pasadena, Texas 77506- Standard Permit General Conditions The following general conditions are applicable to holders of standard permits, but will not necessarily be specifically stated within the standard permit document. ( 1) Protection of public health and welfare. The emissions from the facility must comply with all applicable rules and regulations of the commission adopted under the Texas Health and Safety Code, Chapter 382, and with intent of the TCAA, including protection of health and property of the public. (2) Standard permit representations. All representations with regard to construction plans, operating procedures, and maximum emission rates in any registration for a standard permit become conditions upon which the facility or changes thereto, must be constructed and operated. It is unlawful for any person to vary from such representations if the change will affect that person's right to claim a standard permit under this section. Any change in condition such that a person is no longer eligible to claim a standard permit under this section requires proper authorization under Title 30 Texas Administrative Code § 116.110 (30 TAC § 116.110) of this title (relating to Applicability). If the facility remains eligible for a standard permit, the owner or operator of the facility shall notify the executive director of any change in conditions which will result in a change in the method of control of emissions, a change in the character of the emissions, or an increase in the discharge of the various emissions as compared to the representations in the original registration or any previous notification of a change in representations. Notice of changes in representations must be received by the executive director no later than 30 days after the change. (3) Standard permit in lieu of permit amendment. All changes authorized by standard permit to a facility previously permitted under 30 TAC § 116.110 of this title (relating to Applicability) shall be administratively incorporated into that facility's permit at such time as the permit is amended or renewed. (4) Construction progress. Start of construction, construction interruptions exceeding 45 days, and completion of construction shall be reported to the appropriate regional office not later than 15 working days after occurrence of the event, except where a different time period is specified for a particular standard permit. (5) Start-up notification. The appropriate air program regional office of the commission and any other air pollution control program having jurisdiction shall be notified prior to the commencement of operations of the facilities authorized by the standard permit in such a manner that a representative of the executive director may be present. For phased construction, which may involve a series of units commencing operations at different times, the owner or operator of the facility shall provide separate notification for the commencement of operations for each unit. A particular standard permit may modify start-up notification requirements. (6) Sampling requirements. If sampling of stacks or process vents is required, the standard permit holder shall contact the Office of Air and any other air pollution control program having jurisdiction prior to sampling to obtain the proper data forms and procedures. All sampling and testing procedures must be approved by the executive director and coordinated with the regional representatives of the commission. The standard permit holder is also responsible for providing sampling facilities and conducting the sampling operations or contracting with an independent sampling consultant. (7) Equivalency of methods. The standard permit holder shall demonstrate or otherwise justify the equivalency of emission control methods, sampling or other emission testing methods, and monitoring methods proposed as alternatives to methods indicated in the conditions of the standard permit. Alternative methods must be applied for in writing and must be reviewed and approved by the executive director prior to their use in fulfilling any requirements of the standard permit. (8) Recordkeeping. Acopy of the standard permitalong with information and data sufficient to demonstrate applicability of and compliance with the standard permit shall be maintained in a file at the plant site and made available at the request of representatives of the executive director, the U.S. Environmental Protection Agency, or any air pollution control program having jurisdiction. For facilities that normally operate unattended, this information shall be maintained at the nearest staffed location within Texas specified by the standard permit holder in the standard permit registration. This information must include (but is not limited to) production records and operating hours. Additional recordkeeping requirements may be specified in the conditions of the standard permit. Information and data sufficient to demonstrate applicability of and compliance with the standard permit must be retained for at least two years following the date that the information or data is obtained. The copy of the standard permit must be maintained as a permanent record. (9) Maintenance of emission control. The facilities covered by the standard permit may not be operated unless all air pollution emission capture and abatement equipment is maintained in good working order and operating properly during normal facility operations. Notification for upsets and maintenance shall be made in accordance with 30 TAC§§ 101.201 and 101.211 of this title (relating to Emissions Event Reporting and Recordkeeping Requirements, Scheduled Maintenance, Startup, and Shutdown Reporting and Recordkeeping Requirements, Recordkeeping; and Operational Requirements). (10) Compliance with rules. Registration of a standard permit by a standard permit applicant constitutes an acknowledgment and agreement that the holder will comply with all rules, regulations, and orders of the commission issued in conformity with the TCAA and the conditions precedent to the claiming of the standard permit. If more than one state or federal rule or regulation or permit condition is applicable, the most stringent limit or condition shall govern. Acceptance includes consent to the entrance of commission employees and designated representatives of any air pollution control program having jurisdiction into the permitted premises at reasonable times to investigate conditions relating to the emission or concentration of air contaminants, including compliance with the standard permit. (11) Distance Limitations. Distance limitations, setbacks, and buffer zones. Notwithstanding any requirement in any standard permit, if a standard permit for a facility requires a distance, setback, or buffer from other property or structures as a condition of the permit, the determination of whether the distance, setback, or buffer is satisfied shall be made on the basis of conditions existing at the earlier of: 1. The date new construction, expansion, or modification of a facility begins; or 2. The date any application or notice of intent is first filed with the commission to obtain approval for the construction or operation of the facility. Amendments to the Air Quality Standard Permit for Concrete Batch Plants Effective Date December 21, 2012 (1) (2) Applicability (A) This air quality standard permit authorizes concrete batch plant facilities that meet all of the conditions listed in sections (1) through (7) and one of sections (8), (9), or (10). If a concrete batch plant operates using sections (8), (9), or (10) of this standard permit and operational changes are proposed that would change the applicable section, the owner or operator shall reregister for the concrete batch plant standard permit prior to operating the change. (B) This standard permit does not authorize emission increases of any air contaminant that is specifically prohibited by a condition or conditions in any permit issued under Title 30 Texas Administrative Code (30 TAC) Chapter 116, Control of Air Pollution by Permits for New Construction or Modification, at the site. (C) This standard permit does not relieve the owner or operator from complying with any other applicable provision of the Texas Health and Safety Code (THSC), Texas Water Code, rules of the Texas Commission on Environmental Quality (TCEQ), or any additional state or federal regulations. Definitions (A) Auxiliary tank - storage containers used to hold raw materials for use in the batching process not including petroleum products and fuel storage tanks. (B) Cohesive hard surface - An in-plant road surface preparation including, but not limited to: paving with concrete, asphalt, or other similar surface preparation where the road surface remains intact during vehicle and equipment use and is capable of being cleaned. Cleaning mechanisms may include water washing, sweeping, or vacuuming. (C) Concrete batch plant - For the concrete batch plant standard permit, it is a plant that consists of a concrete batch facility and associated abatement equipment, including, but not limited to: material storage silos, aggregate storage bins, auxiliary storage tanks, conveyors, weigh hoppers, and a mixer. Concrete batch plants can add water, Portland cement, and aggregates into a delivery truck, or the concrete may be prepared in a central mix drum and transferred to a delivery truck for transport. This definition does not include operations that meet the requirements of 30 TAC § 106.141, Batch Mixer or 30 TAC § 106.146, Soil Stabilization Plants. (D) Dust suppressing fencing or other barrier - A manmade obstruction that is at least 12 feet high that is used to prevent fugitive dust from stationary equipment stockpiles, in-plant roads, and traffic areas from leaving the plant property. (E) Permanent concrete batch plant - For the concrete batch plant standard permit, it is a concrete batch plant that is not a temporary or specialty concrete batch plant. (F) Related project segments - For plants on a Texas Department of Transportation right-ofway, related project segments are one contract with multiple project locations or one contractor with multiple contracts in which separate project limits are in close proximity to each other. A plant that is sited on the right-of-way is usually within project limits. However, a plant located at an intersection or wider right-of-way outside project limits is acceptable if it can be easily associated with. the project. (3) (G) Right-of-way of a public works project - Any public works project that is associated with a right-of-way. Examples of right-of-way public works projects are public highways and roads, water and sewer pipelines, electrical transmission lines, and other similar works. A facility must be in or contiguous to the right-of-way of the public works project to be exempt from the public notice requirements listed in Texas Health and Safety Code,§ 382.056, Notice of Intent to Obtain Permit or Permit Review; Hearing. (H) Site - The total of all stationary sources located on one or more contiguous or adjacent properties, which are under common control of the same person (or persons under common control). (I) Specialty concrete batch plant - For the concrete batch plant standard permit, it is a concrete batch plant with a low production concrete mixing plant that manufactures concrete less than or equal to 30 cubic yards per hour (cu yd/hr). These plants are typically dedicated to manufacturing precast concrete products, including but not limited to burial vaults, septic tanks, yard ornaments, concrete block and pipe, etc. This does not include small repair projects using mortar, grout, gunite, or other concrete repair materials. (J) Stationary internal combustion engine - For the concrete batch plant standard permit, it is any internal combustion engine that remains at a location for more than 12 consecutive months and is not defined as a nonroad engine according to 40 Code of Federal Regulations (CFR) 89.2, Definitions. (K) Temporary concrete batch plant - For the concrete batch plant standard permit, it is a concrete batch plant that occupies a designated site for not more than 180 consecutive days or that supplies concrete for a single project (single contract or same contractor for related project segments), but not for other unrelated projects. (L) Traffic areas - For the concrete batch plant standard permit, it is an area within the concrete batch plant that includes stockpiles and the area where mobile equipment moves or supplies aggregate to the batch plant and trucks supply aggregate and cement. Administrative Requirements (A) The owner or operator of any concrete batch plant seeking authorization under this standard permit shall register in accordance with 30 TAC§ 116.611, Registration to Use a Standard Permit. Owners or operators shall submit a completed, current form Pl-1 S Registrations for Air Standard Permit, Table 11, Fabric Filters, Table 20, Concrete Batch Plants, and a Concrete Batch Plant Standard Permit checklist. (8) Owners or operators shall also comply with 30 TAC§ 116.614, Standard Permit Fees, when they are required to complete public notice under section four of this standard permit. ...... (C) ······-·N·oowneLoLo.per.ato.Lota..co.nciete-batch . pJantsbalLbegin..c.onstcuction .oLop.eration. without obtaining written approval from the TCEQ executive director. (D) The time period in 30 TAC§ 116.611(b) (45 days) does not apply to owners or operators registering plants under this standard permit. (E) Beginning December 21, 2012, all new and modified sources must comply with this standard permit. (F) Renewals shall comply with this standard permit on the later of: (i) December 21, 2014; or (ii) the date the facility's registration is renewed. (G) Owners or operators of temporary concrete plants seeking registration and those already registered for this standard permit that qualify for relocation under subsection (8)(F) are exempt from public notice requirements in section (4) of this standard permit. (H) During start of construction, the owner or operator of a plant shall comply with 30 TAC§ 116.120(a)(1 ), Voiding of Permits, and commence construction within 18 months of written approval from the Executive Director. (I) Owners or operators are not required to submit air dispersion modeling as a part of this concrete batch plant standard permit registration. (J) Owners or operators shall keep written records on site for a rolling 24-month period. Owners or operators shall make these records available at the request of TCEQ personnel or any air pollution control program having jurisdiction. Records shall be maintained on-site for the following including, but not limited to: (K) (i) 30 TAC § 101.201, Emissions Event Reporting and Record keeping Requirements; (ii) 30 TAC § 101.211, Scheduled Maintenance, Startup, and Shutdown Reporting and Recordkeeping Requirements; (iii) production rate for each hour and day of operation that demonstrates compliance with subsection (8)(A),(9)(A), or (1 0)(A) of this standard permit, as applicable; (iv) all repairs and maintenance of abatement systems; (v) Material Safety Data Sheets for all additives and other chemicals used at the site; (vi) road cleaning, application of road dust control, or road maintenance for dust control; (vii) stockpile dust suppression; (viii) silo warning device or shut-off system tests; (ix) quarterly visible emissions observations and any corrective actions required to control excess visible emissions; (x) demonstration of compliance with subsection (6)(8) of this standard permit; and (xi) type of fue·I used to power engines authorized by this standard permit. Owners or operators will document and report abatement equipment failure or visible emissions deviations in excess of paragraph (S)(B)(iii) in accordance with 30 TAC Chapter 101, General Air Quality Rules as appropriate. (4) Public Notice · The owner or operator shall follow the notice requirements in 30 TAC Chapter 39, Public Notice, unless a temporary concrete batch plant is exempted from public notice under 30 TAC§ 116.178(b), Relocations and Changes of Location of Portable Facilities. (5) General Requirements (A) Owners or operators shall vent all cement/flyash storage silos, weigh hoppers, and auxiliary storage tanks to a fabric/cartridge filter or to a central fabric/cartridge filter system except as allowed by subsection (10)(8). (B) Owners or operators shall maintain fabric or cartridge filters and collection systems by meeting all the following: (C) (D) (i) operating them properly with no tears or leaks; (ii) using filter systems (including any central filter system) designed to meet a minimum control efficiency of at least 99.5 percent at particle sizes of 2.5 microns and smaller; (iii) meeting a performance standard of no visible emissions exceeding 30 seconds in any six-minute period as determined using United States Environmental Protection Agency (EPA) Test Method (TM) 22; and (iv) sufficiently illuminating silo filter exhaust systems when cement or fly ash silos are filled during non-daylight hours to enable a determination of compliance with the visible emissions requirement in paragraph (5)(B)(iii) of this standard permit. When transferring cement/flyash, owners or operators shall: (i) totally enclose conveying systems to and from storage silos and auxiliary storage tanks, operate them properly, and maintain them with no tears or leaks; and (ii) maintain the conveying system using a performance standard of no visible emissions exceeding 30 seconds in any six-minute period as determined using EPA TM 22, except during cement and flyash tanker connect and disconnect. The owner or operator shall install an automatic shut-off or warning device on storage silos. (i) An automatic shut-off device on the silo shall shut down the loading of the silo or auxiliary storage tank prior to reaching its capacity during loading operations, in order to avoid adversely impacting the pollution abatement equipment or other parts of the loading operation. (ii) If a warning device is used, it shall alert operators in sufficient time to prevent an adverse impact on the pollution abatement equipment or other parts of the loading operation. Visible warning devices shall be kept free of particulate buildup at all times. (iii) Silo and auxiliary tank warning devices or shut-off systems shall be tested at . . least.once monthly. .during.. aperatiansand . recards.shalLbe..kept indicating. test. and repair results according to subsection (3)(J) of this standard permit. Silo and auxiliary tank loading and unloading shall not be conducted with inoperative or faulty warning or shut-off devices. (E) Owners or operators shall control emissions from in-plant roads and traffic areas at all times by: (i) watering them; or (ii) treating them with dust-suppressant chemicals as described in the application of aqueous detergents, surfactants, and other cleaning solutions in the de minimis list; or (iii) covering them with a material such as, (but not limited to), roofing shingles or tire chips and used in combination with (i) or (ii) of this subsection; or (iv) paving them with a cohesive hard surface that is maintained intact and cleaned. (F) Owners or operators shall use water, dust-suppressant chemicals, or cover stockpiles, as necessary to minimize dust emissions. (G) Owners or operators shall immediately clean up spilled materials. To minimize dust emissions, owners or operators shall contain, or dampen spilled materials. (H) There shall be no visible fugitive emissions leaving the property. Observations for visible emissions shall be performed and recorded quarterly. The visible emissions determination shall be made during normal plant operations. Observations shall be made on the downwind property line for a minimum of six minutes. If visible emissions are observed, an evaluation must be accomplished in accordance with U.S. Environmental Protection Agency (EPA) Title 40 Code of Federal Regulations Part 60 (40 CFR Part 60), Appendix A, TM 22, using the criteria that visible emissions shall not exceed a cumulative 30 seconds in duration in any six-minute period. If visible emissions exceed the Test Method 22 criteria, immediate action shall be taken to eliminate the excessive visible emissions. The corrective action shall be documented within 24 business hours of completion. (I) The owner or operator shall locate the concrete batch plant operating under this standard permit at least 550 feet from any crushing plant or hot mix asphalt plant. The owner or operator shall measure from the closest point on the concrete batch plant to the closest point on any other facility. If the owner or operator cannot meet this distance, then the owner or operator shall not operate the concrete batch plant at the same time as the rock crusher, concrete crusher, or hot mix asphalt plant. (J) When operating multiple concrete batch plants on the same site, the owner or operator shall comply with the appropriate site production limits specified in sections (8), (9), or (10) of this standard permit. If engines are being used for electrical power or equipment operations, then the site is limited to a total of 1,000 hp in simultaneous operation. There are no restrictions to engine operations if the engines will be on site for less than 12 consecutive months. (K) Concrete additives shall not emit volatile organic compounds (VOCs). (L) Any claim under this standard permit shall comply with: (i) 30 TAC§ 116.604, Duration and Renewal of Registrations to Use Standard Permits; (ii) 30 TAC§ 116.605(d)(I), Standard Permit Amendment and Revocation; (6) (7) (iii) 30 TAC§ 116.614; (iv) the public notice processes established in THSC, § 382.055, Review and Renewal of Preconstruction Permit; (v) the public notice processes established in THSC, § 382.056; (vi) the contested case hearing and public notice requirements established in 30 TAC § 55.152(a)(2), Public Comment Period; and (vii) the contested case hearing and public notice requirements established in 30 TAC § 55.201 (h)(i)(C), Requests for Reconsideration or Contested Case Hearing. Engines (A) This standard permit authorizes emissions from a stationary compression ignition internal combustion engine (or combination of engines) of no more than 1000 total horsepower. (B) Owners or operators of concrete batch plants that include a stationary compression ignition internal combustion engines shall comply with additional applicable engine requirements in 40 CFR 60 Subpart 1111, Standards of Performance for Stationary Compression Ignition Internal Combustion Engines, 40 CFR 63, Subpart ZZZZ, National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines, 30 TAC Chapter 117, Control of Air Pollution from Nitrogen Compounds, and any other applicable state or federal regulation. (C) Engine exhaust stacks shall be a minimum of eight feet tall. (D) Fuel for the engine shall be liquid fuel with a maximum sulfur content of no more than 0.0015 percent by weight and shall not consist of a blend containing waste oils or solvents. Planned Maintenance, Startup, and Shutdown (MSS) Activities This standard permit authorizes operations including planned startup and shutdown emissions. Maintenance activities are not authorized by this standard permit and will need separate authorization, unless the activity can meet the conditions of 30 TAC § 116.119, De Minimis Facilities or Sources. (8) Additional Requirements for Temporary Concrete Plants (A) The owner or operator shall limit site production to no more than 300 cubic yards in any one hour and no more than 6,000 cubic yards per day. (B) The owner or operator shall use a suction shroud or other pickup device at the batch drop point (drum feed for central mix plants) and vent it to a fabric or cartridge filter system operating with a minimum of 5,000 actual cubic feet per minute (acfm) of air. (C) For truck mix plants, the owner or operator shall shelter the drop point by an intact threesided curtain, or equivalent dust control technology that extends below the mixer truckreceiving funnel. (D) The owner or operator shall maintain the following minimum plant buffer distances from ·····any propertyffne;·excepr·ror te'frfporaf'{cor\c:retet>Iants··approved ft>operaie in·me right or··· · way of a public works project: (E) (F) (G) (i) The suction shroud baghouse exhaust shall be at least 100 feet from any property line. (ii) The owner or operator shall not locate or operate stationary equipment, stockpiles, or vehicles used for the operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site) within 50 feet from any property line. In lieu of meeting the buffer distance requirement for roads and stockpiles in subsection (8)(0) of this standard permit owners or operators shall: (i) construct dust suppressing fencing or other barriers as a border around roads, other traffic areas and work areas; (ii) construct these borders to a height of at least 12 feet; and (iii) contain stockpiles within a three-walled bunker that extends at least two feet above the top of the stockpile. The appropriate TCEQ regional office may approve, without the need of public notice referenced in section (4) of this standard permit, the relocations of a temporary concrete batch plant that has previously been determined by the commission to be in compliance with the technical requirements of the concrete batch plant standard permit version adopted at registration that provides the information listed under subsection (8)(G) and meets one of the following conditions: (i) A registered portable facility and associated equipment are moving to a site for support of a public works project in which the proposed site is located in or contiguous to the right-of-way of the public works project; or (ii) A registered portable facility is moving to a site in which a portable facility has been located at the site at any time during the previous two years and the site was subject to public notice. For relocations meeting subsection (8)(F) of this standard permit, the owner or operator must submit to the regional office and any local air pollution control agency having jurisdiction at least 12 business days prior to locating at the site: (i) The company name, address, company contact, and telephone number; (ii) The regulated entity number (RN), customer reference number (CN), applicable permit or registration numbers, and if available, the TCEQ account number; (iii) The location from which the facility is moving (current location); (iv) A location description of the proposed site (city, county, and exact physical location description); (v) A scaled plot plan that identifies the location of all equipment and stockpiles, and also indicates that the required distances to the property lines can be met; (vi) A scaled area map that clearly indicates how the proposed site is contiguous or adjacent to the right-of-way of a public works project (if required); (vii) The proposed date for start of construction and expected date for start of operation; (viii) The expected time period at the proposed site; (9) (ix) The permit or registration number of the portable facility that was located at the proposed site any. time during the last two years, and the date the facility was last located there. This information is not necessary if the relocation request is for a public works project that is contiguous or adjacent to the right-of-way of a public works project; and (x) Proof that the proposed site had accomplished public notice, as required by 30 TAC Chapter 39. This proof is not necessary if the relocation request is for a public works project that is contiguous or adjacent to the right-of-way of a public works project. Additional Requirements for Permanent Concrete Plants (A) The owner or operator shall limit site production to no more than 300 cubic yards in any one hour and no more than 6,000 cubic yards per day. (B) The owner or operator shall install a suction shroud or other pickup device at the batch drop point (drum feed for central mix plants) and vent it to a fabric/cartridge filter system with a minimum of 5,000 acfm. (C) For truck mix plants, the owner or operator shall shelter the drop point by an intact threesided curtain, or equivalent dust control technology that extends below the mixer truckreceiving funnel. (D) The owner or operator shall maintain the following minimum plant buffer distances from any property line: (E) (i) The suction shroud bag house exhaust shall be at least 100 feet from any property line; (ii) The owner or operator shall not locate or operate stationary equipment, stockpiles, or vehicles used for the operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site), within 50 feet from any property line. In lieu of meeting the buffer distance requirements for roads and stockpiles of paragraph (9)(D)(ii) of this standard permit, the owner or operator shall: (i) construct dust suppressing fencing or other barriers as a border around roads, other traffic areas, and work areas; (ii) construct these borders to a height of at least 12 feet; and (iii) contain stockpiles within a three-walled bunker that extends at least two feet above the top of the stockpile. (F) The owner or operator shall pave all entry and exit roads and main traffic routes associated with the operation of the concrete batch plant (including batch truck and material delivery truck roads) with a cohesive hard surface that can be maintained intact and shall be cleaned. All batch trucks and material delivery trucks shall remain on the paved surface when entering, conducting primary function, and leaving the property. The · · · ····· · ··owner or operator shan·maintaiffother traffic areasasingthe controtrequirements·of subsection(S)(E) of this standard permit. (10) Additional Requirements for Specialty Concrete Batch Plants (A) The owner or operator shall limit site production to no more than 30 cubic yards per hour. (B) As an alternative to the requirement in subsection (5)(A) of this standard permit, the owner or operator may vent the cement/fly ash weigh hopper inside the batch mixer. (C) The owner or operator shall control dust emissions at the batch mixer feed so that no outdoor visible emissions occur by one of the following: (i) using a suction shroud or other pickup device delivering air to a fabric or cartridge filter; (ii) using an enclosed batch mixer feed; or (iii) conducting the entire mixing operation inside an enclosed process building. (D) The owner or operator shall not operate vehicles used for the operation of the concrete batch plant (except for incidental traffic and the entrance and exit to the site) within a minimum buffer distance of 25 feet from any property line. (E) In lieu of meeting the buffer distance requirement for roads and other traffic areas in subsection (1 O)(D) of this standard permit, owners or operators shall: (i) construct dust suppressing fencing or other barriers as a border around roads, other traffic areas, and work areas; and (ii) construct these barriers borders to a height of at least 12 feet. For TCEQ Use Only Permit Application Routing and Summary Sheet Air Permits This sheet should accompany all notices to be processed by the office of the chief clerk on the left side of the file folder. Name of applicant: ....................................................................................................... Soto Ready Mix, Inc. Facility/ Site name: ..................................................................................................... Concrete Batch Plant TCEQ permit number: ....................................................................................................................... 151715 Application received date: ........................................................................................................ May 2, 2018 Customer reference number: ............................................................................................... CN605378967 Regulated entity number: ..................................................................................................... RN110070547 County: ........................................................ Harris Region: ................ ,,,,, ........................................... 12 Local program 1: Houston Local program 2: Harris Permit type: Internal program routing Tech. team leader: Bonnie Evridqe APIRT team leader: Johnny Bowers I Phone no. I Date: I Phone no. Technically reviewed by: Donald D. Nelon Administratively complete date: 05/07/2018 I Public viewing location must have internet access: Is 2nd public notice required: *709 does not apply (512) 239-5222 ~ Consolidated □ Yes □ No ~ No (512) 239-0894 For TCEQ Use Only Applicant and Contact Information This sheet should accompany all notices to be processed by the office of the chief clerk on the right side of the file folder. Applicant's main contact and address to be shown on permit: Name/Title: Armando Soto, President Company: Soto Ready Mix Inc. Street/Road: 3411 De Soto St City/State/Zip: Houston, TX 77091-3717 Telephone: (832) 768-3537 I Fax: Applicant's technical representative/ consultant: Name/Title: Venkata Godasi, Graduate Engineer Company: AARC Environmental Inc. Street/Road: 2 Riverway Suite 1780 City/State/Zip: Houston, TX 77056-2039 Phone: (713) 974-2272 I Fax: Person responsible for publishin~ notice: Name/Title: Armando Soto, President Company: Soto Ready Mix Inc. Street/Road: 3411 De Soto St City/State/Zip: Houston, TX 77091-3717 Telephone: (832) 768-3537 I Fax: (713) 339-2272 Don Nelon From: Sent: To: Subject: Venkata Godasi Thursday, June 07, 2018 11:37 AM Don Nelon; Jaime Armendariz; sotoreadymix@gmail.com RE: Soto Draft PN 151715.docx Don, Draft notice is good. Sincerely, Venkata Godasi (Ragu) AARC Environmental, Inc. Ph: (713) 974 - 2272 From: Don Nelon [mailto:don.nelon@tceq.texas.gov] Sent: Thursday, June 07, 2018 10:19 AM To: Venkata Godasi; Jaime Armendariz; sotoreadymix@gmail.com Subject: Soto Draft PN 151715.docx The draft public notice is attached for your review. Please let me know if it is okay or if you have any recommended changes. Please remember the applicant is required to publish the notice no later than July 9, 2018 based on a notice date of June 8, 2018. If the deadline is not met the application will be recommended for voidance. 1 Don Nelon From: Sent: To: Subject: Attachments: Don Nelon Thursday, June 07, 2018 10:19 AM Venkata Godasi (VGodasi@aarcenv.com); Jaime Armendariz (JArmendariz@aarcenv.com); sotoreadymix@gmail.com Soto Draft PN 151715.docx Soto Draft PN 151715.docx The draft public notice is attached for your review. Please let me know if it is okay or if you have any recommended changes. Please remember the applicant is required to publish the notice no later than July 9, 2018 based on a notice date of June 8, 2018. If the deadline is not met the application will be recommended for voidance. 1 Don Nelon From: Sent: To: Subject: Attachments: Venkata Godasi Wednesday, June 06, 2018 7:20 PM Don Nelon RE: Soto Ready Mix Soto-Ready-Mix_Corrected-Pages.pdf Don, Yes, the stockpiles will be located in area of 120-ft X 110-ft (13,200 sq.ft= 0.30 acres). Table 20 and emission calculations "Table-CBP6 & Table-CBP7" are corrected and are attached. Item 116.610(a)(l) on TCEQ Checklist 20335: No other contaminants are on site which does not have NAAQS limits; neither option ("Yes" or "No") provided in checklist is appropriate. Let me know how to answer the checklist in this scenario? The process description is corrected -1) only one conveyor is used to load the elevated storage bins 2) conveyor is loaded from loading hopper which is loaded using front end loaders. The process description, Process Flow Diagram and emission calculations "Table-CBP2 & Table-CBP7" are corrected and attached. Sincerely, Venkata Godasi (Ragu) AARC Environmental, Inc. Ph: (713) 974 - 2272 From: Don Nelon [mailto:don.nelon@tceq.texas.gov] Sent: Tuesday, June 05, 2018 9:58 AM To: Venkata Godasi Subject: Soto Ready Mix Ragu, Either the plot plan scale is off or the amount of stockpiles on the Table 20 is off. The plot plan scale indicates 7/8 of inch is equal to 100 feet so best guess the stockpiles identified on the plot plan are 120 feet by 110 feet or so. The Table 20 indicates there will be 0.5 acres of stockpiles which equates to approximately 148 feet by 148 feet. Either the plot plan is incorrect or the Table 20 is incorrect, please resolve. Please provide details for the response to the second question for Item 116.610(a)(1) on the TCEQ Checklist 20335. What contaminants on site do not already have a NAAQS limit? The process description indicates there are three conveyors moving material from the stockpiles to the elevated storage bins. The process flow diagram only reflects one conveyor, additionally the process description does not provide details on how the conveyors are loaded. Don Nelon Mechanical Team 512-239-0894 tel 1 512-239~1300 fax Soto Ready Mix, Inc. - Houston, TX Process Flow Diagram - Concrete Batch Plant Operations EPN #7 t EPN#4 ..r: ),... ! EPN#3 ;::rl "'> ---r-0 "' 0 =u::~ I.I'> ---- rl ~c~ 0. CJ 0 Sand Storage Bin Aggregate Storage Bin (SCC: 3-05-011-05) (SCC: 3-05-011-04) v, E cu m u Uu !:0- LEGEND ~~ O rl ---------)- ~9 ..., Ln f C:, 0 CJ ' E <:'! CJ u u~ Material Process line Air Emissions (Stack) A / ' =""' Air Emissions (fugitive) ➔ Water e Control Device Front-End Loader Sand & Aggregate Weigh Hopper EPN#9 (SCC:3-05-011-08) ,+. i Sand & Aggregate EPN#.8tt···•. ~ 0 SP2 L •..'•• . •·.•·•.· .•·.·.·.·.·: •· . . .'. . .•.· .·.·.·.···. . •.·. •.•· • ...... @·····~~; ,. .·; .w· .c-;z Front-End loader SPl 'f"~er Transit Mix Truck Loading (SCC: 3-05-011-10) 0 AARC Environmental, Inc. EPN #10 ) Wind Erosion from Stockpiles (SPl, SP2) Environmental Inc Soto Ready Mix, Inc. - Houston, TX TCEQ Air Quality Standard Permit Registration June, 2018 26 ATTACHMENT VI.D: PROCESS DESCRIPTION Soto Ready Mix, Inc., is proposing to construct and operate a permanent concrete batch plant located at 3411 De Soto Street, Houston, Texas. The facility intends to register this concrete batch plant as standard permit under 30 TAC 116, Subchapter F. CONCRETE BATCH PLANT (EPN #1- EPN #10) The facility will be a permanent concrete batch plant and the maximum production rated capacity of the plant is 180 cubic yards per hour. The maximum operating schedule of the plant will be 24 hours per day, 7 days per week and 52 weeks per year. The concrete will be composed of water, sand, aggregate, flyash, and cement. Sand and aggregate will be brought into the facility via trucks and unloaded onto the aggregate & sand stockpiles (SPl & SP2) (EPN #1 & #2). The sand and aggregate will be loaded to loading hopper which loads to conveyor (EPN #3) to be transported to the elevated storage bins (EPN #4). Sand and aggregate from storage bins will be dropped onto the weigh hopper (EPN #5) and transferred to the truck mixer (EPN #8). Sand and aggregate materials are prewashed, sprinkled, and handled wet. All sand and aggregate handling at the facility will be considered as material handling operations (EPN #1 thru EPN #5). Emissions from material handling will be fugitives. Cement and flyash will be brought into the facility via trucks and loaded pneumatically into split silo or Cement Silo-2. Particulate emissions from the cement and flyash loading into silos will be vented to the respective baghouses (EPN #6 & EPN #7).Cement and flyash will be transferred from the split silo/cement silo-2 to the cement batcher and transferred to the truck mixer (EPN #8). Particulate emissions from the cement batcher will be vented to the Central Dust Collector (EPN #9). Raw materials: cement & flyash from the cement batcher and sand & aggregate from weigh hopper are loaded to the truck mixer (EPN #8). Water will be added to the raw material in the truck mixer along with sand, aggregate, cement, and flyash. Emissions from the truck mixer are captured using atleast 5,000 cfm central dust collector (EPN #9). Un-captured emissions from truck mixer will be fugitives. The concrete from truck mixer is delivered to customers off-site. Additional emissions from stockpiles at the facility (SPl, SP2) operations due to wind are addressed as one source of fugitives under stockpile wind erosions from the facility (EPN #10). Water will be sprinkled to suppress the dust emissions from the stockpiles and roads as necessary. The facility will have a diesel fuel tank; emissions from this diesel fuel tank are authorized under PBR 106.472; which does not require registration. Soto Ready Mix, Inc. - Houston, TX June 2018 27 AARC Environmental, Inc. © 1994 - 2018 Table -CBP2 Soto Ready Mix, Inc. - Houston, TX Emissions from Aggregate & Sand Transfer Points - (Material Handling) : EPN #1 thru EPN #4 Parameters: CBP-1 Aggregate Sand Information Source Hourly Flow Rate (tons/hr) 168 129 Soto Ready Mix, Inc. - Houston, TX Annual Flow Rate (tons/yr) 1,470,366 1,125,835 Soto Ready Mix, Inc. - Houston, TX Number of Transfer points 4 4 Emission Control Factor (%) 95% 95% (1) - Trucks to Stockpiles; (2) - Stockpiles to Loading Hopper; (3) Loading Hopper to Conveyor; (4) - Conveyor to Storage Bins Washed Materials Aggregate - Delivery to Stockpiles, Transfer to Conveyor & Transfer to Storage Bins (SCC: 3-0S-011-21, -23 & -04) Hourly Unloading Emissions Factor Pollutant 3 3 Number Of Transfer Points (1- Control Factor) Hourly Emissions Annual Unloading Annual Emission % (lbs/hr) (yd /yr) 3 (tpy) (yd /hr) (lb/yd ) PM 168 0.0069 4 5% 0.23 1,470,366 1.01 PM-10 168 0.0033 4 5% 0.11 1,470,366 0.49 PM-2.5 168 0.0005 4 5% 0.02 1,470,366 0.07 Hourly Emissions Annual Unloading Annual Emission % (lbs/hr) 3 {yd /yr) (tpy) Sand - Delivery to Stockpiles, Transfer to Conveyor & Transfer to Storage Bins (SCC: 3-05-011-22, -24 & -05) {1- Control Factor) Hourly Unloading Emissions Factor 3 (yd /hr) 3 (lb/yd ) Points PM 129 0.0021 4 5% 0.05 1,125,835 0.24 PM-10 129 0.00099 4 5% 0.03 1,125,835 0.11 PM-2.5 129 0.00015 4 5% 0.004 1,125,835 0.02 Pollutant Number Of Transfer Notes: Emission factors are from EPA AP-42 Table 11.12-2 PM-2.5 Emission Factors are derived based EPA AP-42 Table 11.12-2 Footnote "b" & EPA AP-42 Chapter 13.2.4 AARC Environmental, Inc. Soto Ready Mix, Inc. - Houston, TX June 2018 30 © 1994-2018 Table- CBP6 Soto Ready Mix, Inc. - Houston, TX Emissions from Stockpiles : EPN #10 (SPl - SP2) Parameters: CBP-1 Data Units Information Source Stockpiles Acerage 0.30 acres Soto Ready Mix, Inc. - Houston, TX Number of Active Days 365 days/yr Soto Ready Mix, Inc. - Houston, TX Control Factor 95% % Washed Materials Emissions from Stockpiles I Inactive Days Inactive Days Active Days Active Days Annual Total Annual Emissions Factor Annual Emission Emissions Factor Emission Emission % (lb/acre/day) (tpy) (lb/acre/day) (tpy) 0.30 95% 3.50 0 13.20 0.04 0.04 0.30 95% 1.75 0 6.60 0.02 0.02 0.30 95% 0.26 0 0.99 0.003 0.003 Stockpile Area Control Factor (acres) Pollutant[ I t I PM PM-10 I I PM-2.5 l (tpy) Notes: Emission factors for PM (:active & inactive days) are from EPA Document Number EPA-450/3-74-037 Table 27 PM-10 Emission Factors are derived based on 50% of respective PM Emission Factors (derived based EPA AP-42 Chapter 13.2.4) PM-2.5 Emission Factdrs are derived based on 15% of respective PM-10 Emission Factors (derived based EPA AP-42 Chapter 13.2.4) Soto Ready Mix, lrJC. - Houston, TX June 2018 AARC Environmental, Inc. 34 © 1994- 2018 Table - CBP7 Soto Ready Mix, Inc. - Houston, TX Summary of Concrete Batching Operations Emissions - (EPN #1 - EPN #10) Hourly Emissions (lbs/hr) EPN# Plant/ Site Annual Emissions (tpy) FIN PM PM-10 PM-2.S PM PM-10 PM-2.S Material Handling (Fugitives) 0.36 0.18 0.03 1.56 0.78 0.12 Split Silo (Cement+ Flyash) 0.19 0.08 0.01 0.77 0.32 0.05 Cement Silo -2 0.04 0.02 0.004 0.16 0.10 0.02 8 Truck Mixer Loading (Fugitives) 1.42 0.39 0.07 6.21 1.72 0.29 9 Mixer Central Dust Collector 0.06 0.02 0.003 0.25 0.07 0.01 - - - 0.04 0.02 0.003 2.06 0.69 0.11 8.99 3.01 0.50 1 thru 5 6 7 10 CBP-1 All Stockpiles Stockpiles (Wind Erosion) Total Emissions AARC Environmental, Inc. Soto Ready Mix, Inc. - Houston, TX June 2018 35 © 1994- 2018 Texas Commission on Environmental Quality Table 20 Concrete Batch Plants The following table is designed to help you confirm that you meet the requirements of Title 30 Texas Administrative Code Chapter 116. Tables, checklists, and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmental Quality Air Permits Division website at http://www.tceq.texas.gov/permitting/air/air_permits.html. Please Complete the Following ( continued) Will the sand and aggregate be washed prior to delivery at your facility? [gjYES □ NO What is the number of acres or square feet which will be covered by aggregate stockpiles? 0.30 acres or 13,200 square feet Water sprays will be used at the following locations: [gJ Stockpiles D Aggregate Bin Outlets D Convey or Transfer Points D Screens [gJ Water Sprinkled D Gravel How will plant roads be treated to prevent dust emissions? [gjPaved and Cleaned (asphalt or concrete) D Chemical Sprayed D Paved and Vacuumed Is there a generator or engine on site? □ YES [gJ NO [Note: If"YES," complete generator information below and submit a completed Table 29 entitled, "Reciprocating Engines. '1 Generator Information Make and model: Maximum rated horsepower : Fuel type: Percentage of sulfur content: Annual hours of operation: Distance to nearest property line (feet): NOx rating (specify in units): Fabric Filter Fabric filter name or EPN: EPN #9 (Central Dust Collector) Manufacturer's represented efficiency(%): 99.9% Micron level(s) evaluated: at 1 micron TCEQ-10188 (Revised 05/13) Table 20 This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG 5995v3) Page 2 of2 Don Nelon From: Sent: To: Subject: Don Nelon Tuesday, June 05, 2018 9:58 AM Venkata Godasi (VGodasi@aarcenv.com) Soto Ready Mix Ragu, Either the plot plan scale is off or the amount of stockpiles on the Table 20 is off. The plot plan scale indicates 7/8 of inch js equal to 100 feet so best guess the stockpiles identified on the plot plan are 120 feet by 110 feet or so. The Table 20 Vindicates there will be 0.5 acres of stockpiles which equates to approximately 148 feet by 148 feet. Either the plot plan is incorrect or the Table 20 is incorrect, please resolve. ✓ lease provide details for the response to the second question for Item 116.610(a)(l) on the TCEQ Checklist 20335. What contaminants on site do not already have a NAAQS limit? o/ process description indicates there are three conveyors moving material from the stockpiles to the elevated storage L..--'Dins. The process flow diagram only reflects one conveyor, additionally the process description does not provide details on how the conveyors are loaded. Don Nelon Mechanical Team 512-239-0894 tel 512-239-1300 fax 1 Don Nelon From: Sent: To: Cc: Subject: Attachments: Priscilla Hudson Monday, June 04, 2018 11:26 AM Don Nelon Letasha Miller; Hasanain Alameen RFC Project 285049 Soto Ready Mix Inc. Permit 151715 RFC-285049.pdf Don, The Houston Region office has completed the review of project No. 285049. Comments are included in the attached Request for Comments form. If you have any questions or concerns, please feel free to contact me. Thank you. n ~ iliill TCEQ Priscilla Hudson Environmental Investigator Air Section • Office of Compliance and Enforcement Region 12 • Houston Regional Office 5425 Polk Ave • Suite H • Houston TX 77023 Phone: 713-767-3733 • Fax: 713-767-3761 1 Request for Comments -- Site Review TCEQ -- Air Permits Division Phone: (512) 239-1250 Fax: (512) 239-1300 Submitted by: Air Permits Initial Review Team TO: Region: 12 ICounty: City: Houston Harris I Date Response Requested: Date Request Submitted: May 14, 2018 June 4, 2018 Comments: Deadline is 45 days for MSS-type reviews, 21 calendar days for all others, from the Date Request Submitted. Section Manager approval is required for responses requested sooner than those deadlines. MSS an NSR application for Planned Maintenance, Start-up, or Shutdown emissions in accordance with 30 TAC Chapter 101. Date Application Received by Air Permit Initial Review Team: May 2, 2018 REGIONAL OFFICES: Please return comments to the appropriate Permitting Team Leader indicated on the following page ASAP, but no later than deadline established above. Permit disposition will proceed after comments are received or after the comments deadline has passed. REQUESTED PERMIT ACTION: MSS Construction MSS Amendment Construction Amendment Renewal Renewal Abbreviated Review Revision X Other Standard Permit Project No.: 285049 PERMIT No.: 151715 Regulated Entity No.: RN110070547 Customer No.: CN605378967 Company Name: Soto Ready Mix Inc Plant Name: Soto Ready Mix Cbp 1 City: Houston County: Harris Location: 3411 De Soto St Applicant appears to have rights to all three parcels of land now per HCAD. Please ensure all setback requirements can be met. Unit Name: Concrete Batch Plant Phone: (713) 974-2272 Technical Contact: Venkata Godasi Local Program Applicable?: X Yes No Local Programs: Houston I Harris Note: For sites in a region that has a local program with jurisdiction, MSS projects for those sites will be reviewed by regional offices only. = Request for Comments -- Site Review RESPONSE PLEASE SEND COMMENTS TO THE PERSON IDENTIFIED BELOW. (To avoid delays, please do not send this back to the Air Permits Initial Review Team.): . To: Bonnie Evridge - Air Permits Division - Austin (MAC) (M/A) E-Mail: Bonnie Evridge Phone: (512) 239-5222 To: Ann Mosher - Air Permits Division - Austin (Coatings) (M/C) E-Mail: Ann Mosher Phone: (512) 239-3753 To: Marc Sturdivant - Air Permits Division - Austin (Comb) (Comb) E-Mail : Marc Sturdivant Phone: (512) 239-1313 To: Tom Lawshae - Air Permits Division - Austin (Chem) (Coat) E-Mail: Tom Lawshae Phone: (512) 239-2048 To: Colleen Krenek - Air Permits Division - Austin (Energy) E-Mail : Colleen Krenek Phone: (512) 239-1309 To: Rule Registration Section E-Mail: AirRR Phone: (512) 239-1250 Fax: (512) 239-2101 X To: Don Nelon E-Mail: don.nelon@tceq.texas.go V FROM: Region: 12 Phone: 512-239-0894 Fax:(512) 239-1300 City: Houston County: Harris Compliance: Legal: Copy of Application Received by your Office: .1L_ YES _ NO Date Received: May 04, 2018 PERMIT No. 151715 PROJECT No. 285049 Company Name: Soto Ready Mix Inc Investigator's/Compliance Officer's Name (Please Print): Ms. Priscilla Hudson Organization: Texas Commission on Environmental Quality Phone: (713) 767-3733 Comments Deadline: May 04, 2018 Date of Last Site Visit: NIA SITE INFORMATION: Nuisance/Odor Potential: _ Low _2S_ Moderate _ Existing Odor Problem:_ Yes Hazard Potential: _2S_ Low _ . . Surroundi~g_Land ..Use: .lL_ No (If yes, provide details) Moderate _ .. School within 3,000 feet? .lL_ Yes High .. .... ... - No High ... ..... .... ... ...... .. Distance (feet): Approximately 2,337 ft School Name: Our Savior Lutheran School (Elementary and Middle School) Distance to Nearest Off-Property Receptor: Approximately 260 ft Receptor Type: Residence .......... ,.,, ..... Distance from unit to nearest property line: Approximately 108 ft Describe area surrounding the site (agriculture, industrial, residential): Residential Additional measurements requested by APO on May 25, 2018: Proposed Loading Area to Sidewalk/Proposed Driveway: Approximately 125 ft Proposed Loading Area to the West Property Line: 103 ft NOV/NOE INFORMATION (concerning affected process unit): _x_ Type of Site: NOV Issued? -- No New _ Existing Yes - Date: N/A Type of Violation: N/A Was there an NOE for this site?: --No _ _Yes Date: N/A Please provide any information the permit engineer needs concerning the current NOV, violation, or NOE status N/A Summarize any recent complaints related to this facility including complaint type and CCEDS number: Please see below. CCEDS 281282: The Complainant is concerned about dust, particulate and odor from a business in the area. This complaint was referred to City of Houston Bureau of Pollution Control and Prevention on March 29, 2018. Investigation Findings from City of Houston Bureau of Pollution Control and Prevention provided on May 30, 2018: Based on this investigation there was no dust or odor observed emanating from the site to neighboring properties at the time of this dust survey investigation. No nuisance dust/odor pollution violations were observed during this investigation. The complaint is unconfirmed. Recommendation based on Compliance History: (*For Compliance Use Only) Proceed with Permit Review SITE REVIEW: 0 Additional Provisions D Deny Permit D Update Application D NIA In light of the proximity of sensitive receptors and the surrounding land use, please discuss any concerns you have concerning a facility of this type locating at the proposed site. MSS Specific Notes: N/A The following MSS activities in the application are insufficient or inconsistent with our knowledge of MSS at the facility, and why: The following activities are typically considered planned MSS and are not found in the application. These activities should be added or addressed: BIRCH, BECKER a: MOORMAN, LLP 4705 SPECEWOOD SPRINGS RD, SUETE 200, AUSTIN, TEXAS 78759 (512) 349-9300 FAX (512) 349-9303 i AW iiERMl?i?E? Email: ebirch@birchbecker.com JUN 231% June 11, 2019 WHANQ VIA HAND DELIVERY Don Nelon Mechanical/Coatings New Source Review Permits Section Air Permits Division Texas Commission on Environmental Quality 12100 Park 35 Circle, Building Austin, TX 78753 Re: Soto Ready Mix, Inc, Air Quality Standard Permit, Registration No. 151715. Dear Mr. Nelon: Attached is the updated public notice veri?cation form for the Soto Concrete Batch Plant application. Please let me know if you have any questions. Smceg?lya at? ?ff El: . i @554 Mm '0 I 4?43 MM gig a Erich Birch Attorney for Soto Ready Mix, Inc. Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Pagel) For the Standard Permit. for Concrete Batch Plants with Enhanced Controls, use form TCEQ 20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number (if applicable): Registration Number: 151715 Regulated Entity Number: RN 110070547 Customer Number: CN 605378967 All applicants must complete all applicable portions of this form. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. For more information, refer to the instructions in the public notice package. Altermtive Language Checklist [have contacted the appropriate school district. Yes N0 School District: Aldine ISD Phone Number: (281)449~1011 Person Contacted: Aldine ?30 Date of Contract: December 2017 he a hiligigual education program, (REP) required by the Texas Education Code in the Yes No istrict. If answer is skip to first question in veri?cation box on next page. . . (Note: A BEP is different from "English as a Second Language? (ESL) programs and Elainentunis??-?ddle schools that only offer 1391. will not trigger notice in an rilltemotive language.) Notice in an alternative language is required if a REP is required in the District, and one of the following conditions is met: 1.. students in the elementary or middle school nearest the facility are enrolled in a El Yes No program at that school; 2. students from the elementary or middle school nearest the facility attend. 21 at Yes No another location; or 3. the school district that otherwise would be required to provide a has been granted Yes No an exception from the requirements to provide the program, as provided for in 19 Texas Administrative Code 89.1 207(a). If the answer is to 1, 2, and 3 above, then alternative language notice is not required. The name of the elementary school nearest to the proposed or existing facility is: Smith Academy The name of the middle school nearest to the proposed or existing facility is: i Hoffman Middle School The following lauguage(s) its/are utilized in the bilingual program: Spanish If notice in an alternative language is required, then applicants must publish alternative language notice(s) and post alterative langauge signsas outlined in the for Public Notice and certify compliance with those requirements on this form. TCEQ-ZOYYS (APDG 6391v't. Revised 01/1 7) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page 1 of 3 Texas Commission on Environmental Quality Public Notice Verification Form Air Quality Standard Permit for Concrete Batch Plants (Page 2) For the Standard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ 20547 General Information Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant TCEQ Account Number {if applicable): Registration Number: 151715 Regulated Entity Number: RN 11007054? Customer Number: (IN 605378987 For more information regarding public notice, refer to the instructions in the public notice package. Alternative Language Verification l. A is required by the Texas Education Code in the area addressed by this Yes No permit application and the application is subject to alternative language public notice requirements. If skip 2 through 6 and complete signature, title, date. and name of applicant. 2. The applicant has conducted a diligent search for a newspaper or publication El Yes No of general circulation in both the municipality and county in which the facility is located (or proposed to be located). 3. A newspaper or publication could not he found in any of the alternative Cl Yes El No languagels) in which notice is required. Al. The publishers of the newspaper listed below refused to publish the notice Yes No as requ ested, and another newspaper or publication in the same language and. of general circulation could not be found in the municipality or county in which the facility is located (or proposed to be located). Newspaper: Language: 5. Proof of publication of the net-vs paper alternative language notice(s) and .I Yes No the requested. affidavits have been sent to the TCEQ. 6. Alternative language signs were posted as required by the TCEQ ies No This form must be signed and dated by a designated representative acting on behalf of the applicant after the end of the comment period. Send. this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. he TCEQ will not accept this form if submitted prior to that date. ?verified by (signature): Title: President Applicant: Soto Ready Mix, lac. Date: (APDG 6391v1, Revised 01/17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page 2 of 3 "I?exas Commission on Environmental Quality Public Notice Verification. Form Air Quality Standard Permit for Concrete Batch Plants (Page 3) For the Standard Permit for Concrete Batch Plants with Enhanced Controls, use form TCEQ 20547 General Applicant Name: Soto Ready Mix, Inc. Site or Facility Name: Concrete Batch Plant Account Number (if applicable): Registration Number: 1517i5 Regulated Entity Number: RN 110070547 Customer Number: CN 605378967 For more information regarding public notice. refer to the instructions in the public notice package. Air Quality Standard Permit for Concrete Batch Plants Proof of publication. of the newspaper notices and the requested affidax-its have Yes No been fnrnished in accordance with the regulations and instructions of the TCEQ. Required signs were posted in accordance with the regulations and instruction of Yes No the TCEQ. A copy of the complete registration application (including any revisions to the IE Yes Cl No application) and the executive director's preliminary decision (which includes the standard permit), are available for review and copying at the public place indicated below from the first day after newspaper publication, and will remain available until either; the TCEQ acts on the application; or (2) the application is referred to the State Office of Administrative Hearings (SOAH) for hearing Name of Public Place: Cotlier Regional Library Address of Public Place: 6200 Pinemont Drive City: Houston State: Texas Code: 77092 This form must be signed and dated by a designated representative acting" on behalf of the applicant after the end of the comment period. Send this completed form to the TCEQ to the attention of the Office of the Chief Clerk within 10 business days after the end of the comment period. The TCEQ will not accept this form if submitted prior to that date. 1 Verified by (signature): Applicant: Soto Ready Mix. Inc. Title: President Date: If; PRINT FORM RESET FORM TCEQ-20778 (APDG 6391v1. Revised Oil/.17) Public Notice Verification Form for Concrete Batch Plants This form is for use by facilities subject to air quality permit requirements and my be revised periodically. Page 0f _3 our wide L. E: 13 Bench Mark Locations Siios Dust Collector Property Line Fence halt Grass Gravei 0' 50" 200' 1 00' Lat: 29? 51' 12.63" Long: 95? 27' 29.11" Approx. 2.68 Acres image Source: Googie Earth Imagery Date: 08/30/2017 oto Ready Mix, Inc. Prepared 411 De Soto Street, ouston, TX 77091 ?1994 - 2017 Environmental, Inc. Environmental. Occupaiionai Health 54 Safety Solutions Date: 12/01/2017 Revised By: VG Revision: 1 Drawn By: VG Dwg. Type: Air Plot Plan Don Neion I I From: Don Nelon Sent: Monday, May 14, 2018 10:13 AM To: Subject: Site Review/Request for Comments for Project Number 285049 Attachments: RFC?285049.docx PLEASE DO NOT RESPOND TO THE PERSON SENDING THIS EMAIL. This is a request for comments. Please submit comments to the individual and within the specified time frame as identified in the attached file. Don Nelon I From: Venkata Godasi Sent: Wednesday, May 09, 2018 5:15 PM To: Don Nelon Cc: Jaime Armendariz; sotoreadymix@gmail.com Subject: RE: CBP application for Soto Ready Mix, Inc. Proposed registration number 151715 Attachments: 2_LT14?BLK23wHighland?Heights- Don, Please find the ownership documents from HCAD (Harris County Appraisal District) website for three parcels of land. All three parcels of land are owned by appiicant. Let us know if need any additional information. Sincerely, Venkata Godasi (Ragu) AARC Environmental, inc. Ph: (713) 974 2272 From: Don Nelon Sent: Wednesday, May 09, 2018 3:41 AM To: Venkata Godasi Cc: Jaime Armendariz; sotoreadvrnix?qmail.com Subject: CBP application for Soto Ready Mix, Inc. Proposed registration number 151715 Mr. Godasi, As requested for the previous application, please provide documentation (lease agreement/ownership deed) the applicant owns or has a legal authority to use ail three parcels of iand. The request for this documentation is not typical but it is required before the application begins the technical review. The TCEQ is asking for this documentation to ensure the applicant will be able to meet the requirements of the standard permit if approved. This is a rare case where the distance setback requirements are limited by location of the proposed site and if the applicant does have legal authority to use all three parcels of land would barely meet the setback requirements ifthe measurements are correct in the appiication. The application will be recommended for voidance on May 16, 2018 if the requested documentation isjiaatsirac?ivea aerate may 16,2018 (emphasis added). Additionally, if the documentation is provided indicating the applicant has legal authority to use all three parcels of land a second site review will be performed by TCEQ Regional Staff to ensure distance setback requirements will be met. This site review will use information provided by the applicant during the site visit, Harris County appraisal district, the application, and any other documentation/tools the investigator will have availabie. if measurements are ta ken that indicate the setback requirements cannot be met the application wili be recommended for voidance. Don Nelon Mechanical Team 512-239-0894 tel 512-239-1300 fax 5f9l2018 Print Detaiis HARRIS COUNTY APPRAISAL DISTRICT Tax Yea? 2018 REAL PROPERTY ACCOUNT INFORMATION 0600730230013 team -.Owner and Property Information Owner Name SOTO ARMANDO Legal Description: LT 13 BLK 23? Mailing Address: CASTRO MARICELA HIGHLAND HEIGHTS ANNEX SEC 4 4802 HOLLOW HOOK RD Property Address: 0 DE SOTO ST HOUSTON TX 77?41'8931 HOUSTON TX 77091 State Ciass Code Land Use Code Land Total Living Neighborhood Neighborhood Map Key - - - Area Area . Group Facet Map? C1 Real, Vacant 1000 Residential 42,930 0 SF 944 9001 5161B 4510 Lots/Tracts (In City) Vacant SF Value Status Information Value Status I I 3 I Shared CAD Ail Values Pending No Exemptions and Jurisdictions Exemption Type Districts Jurisdictions Exemption Vaiue ARB Status 2017 Rate 2018 Rate None 009 ALDINE 150 Pending Pending 1.373388 040 HARRIS COUNTY Pending Pending 0.418010 041 HARRIS CO FLOOD Pending Pending 0.028310 O42 PORT OF HOUSTON AUTHY Pending Pending 0.012560 O43 HARRIS CO HOSP DIST Pending Pending 0.171100 044 HARRIS CO EDUC DEPT Pending Pending 0.005195 045 LONE STAR COLLEGE SYS Pending Pending 0.107800 061 CITY OF HOUSTON Pending Pending 0.584210 Texas law prohibits us from displaying residential photographs, sketches, floor pians, or information indicating the age of a property owner on our website. You can inspect this information or get a copy at HCAD's information center at 13-013 NW Freeway. Valuations Value as of January 1, 2017' I as of Janoary 1, 2018' Market Appraised Market Appraised Land 72,981 Land Improvement 0 Improvement Total 72,981 72,981 Total Pending Pending Land Market Value Land . . . Appr Appr 1: - .. . . . Site Unit . Size Site . Total Unit Ad] Unit Line Description 3 Code Type Unit? Factor Factor OR OR Adj Price Price Value Factor Reason . - - 1 1000 -- Res Vacant Table SFS SF 20,000 1.00 1.00 1.00 -- 1.00 Pending Pending Pending Vaiue 2 1000 -- Res Vacant Table SF3 SF 22,930 1.00 1.00 1.00 1.00 Pending Pending Pending Value Building Vacant (No Building Data) :l/publ ic.hcad.org 20188acct= 06007302300138card= 1&bl d=1 5/9/2018 Print Details HARRIS COUNTY APPRAISAL DISTRICT REAL PROPERTY ACCOUNT INFORMATION 0600730230014 Tax Year: 2018 ?Print Owner and Property Information Owner Name 8: Mailing Address: SOTO ARMANDO 4802 HOLLOW HOOK RD HOUSTON TX 77041?8931 Legal Description: Property Address: LT 14 BLK 23 HIGHLAND HEIGHTS ANNEX SEC 4 3411 DE SOTO ST HOUSTON TX 77091 State Class Code Land Use Code Land Total Living Neighborhood Neighborhood Map Key Area . Area - - Group Facet Map? A1 Reai, Residential, 1001 Residential 42,930 0 SF 944 9001 51610 4510 Auxiliary Buildings Improved SF Value Status Information Value Status Shared CAD All Vaiues Pending No Exemptions and Jurisdictions Exemption Type Districts Jurisdictions Exemption Value ARB Status 2017 Rate 2018 Rate None 009 ALDINE ISD Pending Pending 1.373388 O40 HARRIS COUNTY Pending Pending 0.418010 041 HARRIS CO FLOOD Pending Pending 0.028310 042 PORT OF HOUSTON AUTHY Pending Pending 0.012560 043 HARRIS CO HOSP DIST Pending Pending 0.171100 044 HARRIS CO EDUC DEPT Pending Pending 0.005195 045 LONE STAR COLLEGE SYS Pending Pending 0.107800 061 CITY OF HOUSTON Pending Pending 0.584210 Texas law prohibits us from displaying residentiai photographs, sketches, floor pians, or information indicating the age of a property owner on our website. You can inspect this information or get a copy at information center at 13013 NW Freeway. Value as of January 1, 2017 Valuations Appraised Value as of 3anuary 1, 2018 Market Market Appraised Land 72,981 Land Improvement 30,240 Improvement Total 103,221 103,221 Totai Pending Pending Land Market Value Land - . . - . Appr Appr - -- . . . at; .3312. ?553, Rgagn/ .31: Arts? vame 1 1001 Res Improved SFI SF 20,000 1.00 1.00 1.00 -- 1.00 Pending Pending Pending Table Value 2 1001 Res Improved SF3 SF 22,930 1.00 1.00 1.00 1.00 Pending Pending Pending Table Value Building Vacant (No Buiiding Data) Extra Features Line Description Quality Condition Units Year Buiit 1 Canopy - Residential Average Average 1,365.00 2015 i c. 1i2 Print Details 51'91?2018 Canopy Residential Average Average 1,189.00 2015 3 1 Side Open Wood Pole Barn Average Average 1,760.00 2015 Canopy Residential Average Average 920.00 2017 [records/Fri 201881610001 060073023001 4&card= 1&bid=1 2/2 5/9/2013 Print Details HARRIS COUNTY APPRAISAL DISTRICT REAL PROPERTY ACCOUNT INFORMATION 0600730230015 Tax Year: 2018 ?E?Print "Owner and Property Information Owner Name Mailing Address: SOTO ARMANDO 4802 HOLLOW HOOK HOUSTON TX 77041 Legal Description: Property Address: TR 15A BLK 23 HIGHLAND HEIGHTS ANNEX SEC 4 OTCJ HOUSTON TX 77091 ESTER BLVD State Class Code Land Use Code Building Totai Land Building Net Neighborhood Map .Key Class Units Area. Area Rentabie Facet Map? Area C2 -- Real, 8001 -- Land 0 31,298 0 0 9302.51 5161i) 451D Vacant Neighborhood SF Commercial Section 1 Value Status Information Value Status Notice Date Shared CAD Noticed 04/27/2018 No Exemptions and Jurisdictions Exemption Type Districts Jurisdictions Exemption-Vaiue ARB Status 2017 Rate 2018 Rate None 009 ALDINE 150 Not Certified 1.373388 040 HARRIS COUNTY Not Certified 0.418010 041 HARRIS CO FLOOD Not Certified 0.028310 042 PORT OF HOUSTON AUTHY Not Certified 0.012560 043 HARRIS CO HOSP DEST Not Certified 0.171100 044 HARRIS CO EDUC DEPT Not Certified 0.005195 045 LONE STAR COLLEGE SYS Not Certified 0.107800 061 CITY OF HOUSTON Not Certified 0.584210 center at 13013 NW Freeway. Texas law prohibits us from displaying residential photographs, sketches, floor plans, or information indicating the age of a property owner on our website. You can inspect this information or get a copy at information Value as of January 1, 2017 Valuations Vaiue as of January 1, 2018 Market Appraised Market Appraised Land 32,754 Land 62,596 Improvement 0 Improvement 0 Totai 32,754 32,754 Total 62,596 62,596 Land Market Value Land 3 . . Appr Appr .3-3 Adj - . . . Site Unit . Slze Site Total Unit - . - Lane Description Units -. . Unit Code Type Factor Factor Factor Reason Ad} Price Price . 1 8001 -- Land Neighborhood 4300 SF 31,298 1.00 1.00 1.00 1.00 2.00 2.00 62,596.00 Section 1 Building Vacant (No Building Data) 1l?l Don Nelon From: Don Nelon Sent: Wednesday, May 09, 2018 3:41 AM To: Venkata Godasi (VGodasi@aarcenv.com) Cc: Jaime Armendariz sotoreadymix?grnailcom Subject: CBP application for Soto Ready Mix, Inc. Proposed registration number 151715 Mr. Godasi, As requested for the previous application, please provide documentation (lease agreement/ownership deed) the applicant owns or has a legal authority to use all three parcels of land. The request for this documentation is not typical but it is required before the application begins the technical review. The TCEQ is asking for this documentation to ensure the applicant will be able to meet the requirements of the standard permit if approved. This is a rare case where the distance setback requirements are limited by location of the proposed site and if the applicant does have legal authority to use all three parcels of land would barely meet the setback requirements if the measurements are correct in the application. The application will: be recommended for voidance on May 16, 2018 if the requested documentation isnotreceived (emphasis added)- Additionally, if the documentation is provided indicating the applicant has legal authority to use all three parcels of land a second site review will be performed by TCEQ Regional Staff to ensure distance setback requirements will be met. This site review will use information provided by the applicant during the site visit, Harris County appraisal district, the application, and any other documentation/tools the investigator will have available. if measurements are taken that indicate the setback requirements cannot be met the application will be recommended for voidance. Don Nelon Mechanical Team 512-239?0894 tel 512-239?1300 fax Shelia Glaspie-Felix From: em EQ Sent: Monday May 07, 2018 3:26 PM To: texas.gov': '15? Subject: Attachments: This email is being sent to electronically transmit an of?cial document issued by the Of?ce of Air of the Texas Commission on Environmental Quality. This email is being sent to you because either you ?led a document with the Of?ce of the Chief Clerk that made you part of the of?cial mailing list for the above referenced matter, or notice to you is legally required. As authorized by Texas Water Code 5.128, this electronic transmittal is replacing the previous practice of hard copy distribution. Amendments to Texas Government Code 552.137 prompted a change to the agency's privacy policy regarding con?dentiality of certain email addresses. The revised privacy policy can be viewed at info Questions regarding this email may be submitted either by replying directly to this email or by calling Ms. Betsy Peticolas with the Air Permits Division at 512-239-6033. The attached document is provided in an Adobe Acrobat .pdf format. If you cannot display the attachment, you may need to visit the Adobe web site to download the free Adobe Acrobat Reader software. Collier Regional Library HoustO?? llDublic Library Page halan.sdt-'-I5'02 002f . . 5n. Ii t2?" HOOJ earc '-002fac-.n ??Locat'o 0 id?? fi -libra ation Houston Public Library LinkingYOU to The World Search Our Catalog Search Our Website find books. ebooks, videos 8: more Search MENU Home?) LOCATIONS Collier Regional Library Add This gaonaoirar Collier Regional Library ?g Region 4- Education a: 1 a Service Center l. .u w' - . . 53}; (anemark l'mseltown ??46} 99 - . 0,3, 0? . mom 0! PmemG?f Q, Pinemonl Br ,4 r- . . E: Acorn waard s: . W43rds: Gomglem 9 Address . 6200 Pinemont 9? Va? Houston, Texas 77092 Fully Accessible 832 ?393 40 Hours 12-8 IT 10-6 1 10?6 [Th 10-8 10-5 iSa 10-5 I Su Closed Parking Free parking. Parking lot entrance is on Arbor Vitae Dr. 5/3 /20 1 8 Mayor's Of?ce RESIDENTS BUSINESS Mayor?s Office Home Page 5; OFFICE Sylvester Turner, Mayor GOVERNMENT Mayor Sylvester Turner serves as the Executive Of?cer of the City. As the City's chief administrator and official representative, the Mayor is responsible for the general management of the City and for seeing that all laws and ordinances are enforced. Administrative duties include the appointments, with Councii approval, of department heads and persons serving on advisory boards. -- Letter to Houstonians About Pension Reform -- Mayor's 2017 State of the City Speech Mayor's 2016 State of Mobitity Speech -- Mayor's 2016 State of the City Speech Mayor's Transition Team Reports -- Biography of Mayor Turner As Executive Officer, the Mayor administers oaths and signs alt motions, resolutions and ordinances passed by City Council. The Mayor also serves a legislative function, presiding over City Council with voting privileges. Mayor urner?s Speech at State of Mobility Mayor's State ofthe Mobility Speech (.pdf, June 8. 2017) Page 1 of 2 Seiect Language - SERVICES CONTACT SEARCH CONTACT THE MAYOR Phone: 311 or 713.837.031? Email: or to request an appearance: scheduling@houstontx.gov OFFICE LINK: i - Divisions and Directors Photo gallery and links to Divisions of the Mayor's Office - Press Releases - To access the City of Houston Newsroom, go to - Press Conference Audio Archive Audio iinks from mayoral press conferences 5/3/2018 Harris County Judge Ed Emmett - - - Page 1 of 1 Harris County at} En Espa?oi Home StaffDirectory Helpfui Links Contact Maps About Ed Emmett About Harris County News Photos Ceremonial Documents OHSEM Jail Diversion Program lnternationai Economic Development BIOGRAPHY Edward M. Emmett became Harris County Judge on March 6, 2007. A member of the Texas House of Representatives from 19?9 to 1987?, Judge Emmett was chairman of the Committee on Energy, a member of the Transportation Committee, and represented the state on numerous nationai committees relating to energy and transportation policy. in 1989, President George H. W. Bush nominated Emmett as a Commissioner at the interstate Commerce Commission After being con?rmed unanimously by the United States Senate. Judge Emmett served on the commission for three years. Judge Emmett has received international recognition for his work in transportation and logistics policy. He was named Transportation Person of the Year by Transportation Clubs international and one of the Top 20 Logistics Professionals by Logistics Forum. County Judge Emmett. working with the. county commissioners, manages the nation's third largest county. He also is director of Harris County?s Of?ce of Homeiand Security and Emergency Management, chairman of the Harris County Juvenile Board and chairman of the Conference of Urban Counties Policy Committee. Judge Emmett attended Bellaire High Schoot. He graduated from Rice University in 1971 with a Bacheior of Arts degree in Economics and from the University of Texas at Austin in 1974 with a Master of Public Affairs degree. Judge Emmett has received numerous awards and honors, including Distinguished Alumnus of Rice University, the Distinguished Public Service Award from the Lyndon B. Johnson Schoot of Public Affairs, and the Presidentiai Call to Service Award. Judge Emmett and his wife, Gwen, have been married for 43 years and have four children and 13 grandchildren. home :1 faq's newsletters newsroom sitemap udgeemmett.org/ biographyasp 5/3 /20 1 8 Who Represents Me--Districts ddress Page 1 of 2 Who Represents Me? Districts By Address U.S. SenatorslUS. RepresentativesIState RepresentativesISBOE 3411 De Soto St Houston, TX 77091?3717 Harris Texas U.S. Senators S. Senators represent the entire state. Texas' current U. S. Senators are Senator John Cornyn and Senator Ted Cruz. See their websites for current contact information. Texas US. Representative Congressional District 18??Congresswoman ?Sheiia Jackson Lee Texas Congressional Member Websites Texas State Senator .. rleSotoSE Capitol Office: CAP 1E.13 Capitol Phene: (512) 463? 0115 COUNTY Capitol Address: P.O. Box 12068, Capitol Station Austin, TX 78711 District Address: 803 Yale Street Houston TX 77007 . Phone: (713) 864~8701 State District Offices Texas State Representative Type: {No District Shading CapItol Office: EXT E1. 424 Capitol Phone: (512) 463- 0554 Capitol Address: P.O. Box 2910 Austin, TX 78768 District Address: 6112 Wheatley Street Houston TX 77091 Texas State Board of Education Member Texas State SBOE District 4--Mr. Lawrence A. Allen, Jr. State Board of Education Member Websites 5/3/2018 ihelia Glaspie-Fell?izr I I From: Sheiia Glaspie~Felix Sent: Monday, May 07, 2018 2:35 PM o: ?Venkata Godasi' Subject: RE: Application (Small Business) Soto Ready Mix, inc. Permit #151715 From: Venkata Godasi Sent: Friday, May 04, 2018 3:36 PM To: Shelia Glaspie-Felix Subject: RE: PI-IS Application (Small Business) - Soto Ready Mix, Inc. - Permit #151715 Sheiia, Please find the filied Pl-lS Form (updated version form) and Page 1 of Core Data form with corrected RNii for Soto Ready Mix. Please do not hesitate to contact us, if you have any questions. Sincerely, Venkata Godasi (Ragu) AARC Environmental, Inc. Ph: (713) 974 - 2272 From: Shelia Giaspie-Felix Sent: Thursday, May 03, 2018 3:22 PM To: Venkata Godasi Subject: PI-IS Application (Small Business) Soto Ready Mix, Inc. Permit #151715 Our office is in receipt of the above listed application. Please address the following issue immediately: 0 Please provide an updated Pl~15 form. Our forms have been updated to include options for receiving the final action from the Agency, all Standard Permit Registration responses will be sent via e?mail. - The correct RN that is assigned to this Concrete Batch Plant is RN110070547. please updage this on all forms, including your Core Data Form. Please respond and correct all issues by 5/6/18 or your project will be voided and place on hold. She/fa ?laspIE-Fe/Ibr Air Perm/'7? Im'fia/ Review Team Air Permits Division Texas Commission on En w'ronmen fa/ Qualify Phone {512) 239-1210 Fax (512) 2394500 she/fa. q/as'pie? fe lfx?) fceq. faxes. 570 Texas Commission on Environmental Quality Form Registration for Air Standard Permit (Page 9) IX. Copies of the Registration Copies must be sent as listed below. Processing delays will occur if copies are not sent as noted. Air Permits Initial Review Team (APIRT) Regular, Certified, Priority Mail Mail Code 161, PO. Box 13087, Austin, Texas 78711-3087 OR Hand Delivery, Overnight Mail Mail Code 161, 12100 Park 35 Circle, Building C, Third Floor, Room 300 W, Austin, Texas 78753 Originals of Form Core Data Form, all attachments. Not required if using ePermits1. Regional Office or call (512) 239-1250 Revenue Section TCEQ Regular, Certified, Priority Mail Original Money Order or Mail Code 214, PO. Box 13088, Check, Copy of Form Austin, Texas 78711-3088 18, Core Date Form. Not required if fee was paid OR using ePayz. Hand Delivery, Overnight Mail Mail Code 214, 12100 Park 35 Circle, Building A, Third Floor, Austin, Texas 78753 Appropriate TCEQ To find your regional of?ce address go to Copy of Form Pl-lS, Core Data Form, and all attachments. Not required if using ei-"ermits2 Appropriate Local Air Pollution Control Program(s) To find your local air pollution control programs go to or call (512) 239-1250 Copy of Form Core Data Form, and all attachments 1 ePermits located at 2 ePay located at (APDG 5235v27, Revised O3I18) This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page of Texas Commission on Environmental Quality Form Registrations for Air Standard Permit (Page 1) I A. Company or Other Legal Customer Name: Soto Ready Mix, tnc. B. Company Of?cial Contact Information Mr. Mrs. Ms. Name: Armando Soto Title: President Mailing Address: 3411 De Soto Street, City: Houston State: TX ZIP Code: 77091 Phone: (832) 768-3537 Fax: E-mail Address: sotoreadymix@gmail.com All permit correspondence will be sent via regular mail unless electronic copies are specifically requested. The company of?cial must initial here if electronic correspondence is requested. C. Technical Contact Information (E Mr. Mrs. El Ms. Name: Venkata Godasi Title: Graduate Engineer Company Name: AARC Environmental, inc. Mailing Address: 2 Riverway, Suite it 1780 City: Houston State: TX Code: 77056 Phone: (713) 974-2272 Fax: (713) 339 ~2272 Email Address: vgodasi@aarcenv.com Sitelnfermaim-HV I I I I A. Name and Type of Facility Facility Name: Soto Ready Mix - CBP1 Type of Facility: Concrete Batch Plant Permanent Temporary For portable units, please provide the serial number of the equipment being authorized below. Serial No: Unknown at this time Serial No: 3 new; 6? TCEQ-10370 (APDG 5235v25, Revised 03? 7) PMS . {5/7 l3 This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page of Texas Commission on Environmental Quality Form Registrations for Air Standard Permit (Page 2) B. Facility Location Information Street Address: 3411 De Soto Street, If there is no street address, provide written driving directions to the site and provide the closest city or town, county, and ZIP code for the site (attach description if additional space is needed). City:-Houston County: Harris ZIP Code: 77091 Latitude (nearest second): 29? 51? 12.63? Longitude (nearest second): 95? 27? 291:" C. Core Data Form (required for Standard Permits 6004, 6006, 6007, 6008, and 6013). ls the Core Data Form (TCEQ Form 10400) attached? YES NO lf provide customer reference number (CN) and regulated entity number (RN) below. Customer Reference Number (CN): CN605378967 Regulated Entity Number (RN): RN109813790 i D. TCEQ Account Identi?cation Number (if known): E. Type of Action: Initial Application Change to Registration Renewal Renewal Certification For Change to Registration, Renewal, or Renewal Certification actions provide the following: Registration Number: Expiration Date: F. Standard Permit Claimed: 6004 G. Previous Standard Exemption or PER Registration Number is this authorization for a change to an existing facility previousiy authorized under a YES NO standard exemption or if enter previous standard exemption number(s) and PBR registration number(s), and associated effective date in the spaces provided below. Standard Exemption and PBR Registration Number(s) Effective Date TCEQ-10370 (APDG 5235v25, Revised 08/1 7) PMS This form is for use by facilities subiect to air quality permit requirements and may be revised periodically. Page of Texas Commission on Environmental Quality Form Registrations for Air Standard Permit (Page 3) lL Facility and Site Information (continuedOther Facilities at this Site Authorized by Standard Exemption, PBR or Standard Permit Are there any other facilities at this site that are authorized by an Air Standard YES NO Exemption, PBR, or Standard Permit? number(s), and associated effective date in the spaces provided below. if enter standard exemption number(s), PBR registration number(s), and Standard Permit registration Standard Exemption, PBR Registration, and Standard Permit Registration Number(5) Effective Date l. Other Air Preconstruction Permits Are there any other air preconstruction permits at this site? YES NO if enter permit number(s) in the spaces provided below. J. Affected Air Preconstruction Permits Does the standard permit directly affect any permitted facility? Cl YES NO lf enter permit number(s) in the spaces provided below. K. Concrete Batch Plant Central Mix Ready Mix El Specialty Mix Enhanced Controls for Concrete Batch Plants 1 . State Legislators State Senator: Senator John Whitmire; Senate District 15 ?1 State Representative: Representative Jarvis Johnson; House District 139 2. County Judge Name: iudge Edward M. ?mmett Matting Address: 1001 Preston, Suite it 911 City: Houston v? State: TX ZIP Code: 77002 9/ 1:;th 0370 (APDG 5235v25, Revised can 7) PMS This form is for use by facilities subject to air quaiity permit requirements and may be revised periodically. Page of Texas Commission on Environmentai Quality Form Registrations for Air Standard Permit (Page 4) II.- 'fij-Fae'il'i'ty was lama-ugh (continued). K. 3. Presiding Of?cer is the facility located in a municipaiity or extraterritorial jurisdiction of a municipality? YES NO If list the name of the Presiding Officer for the municipality and/or extraterritorial jurisdiction: Presiding Officer Name: Mayor Sylvester Turner Title: City of Houston Mayor Mailing Address: P. 0. Box 1562 City: Houston State: TX ZIP Code: 77251 rig, L. Federal Operating Permit (FOP) Requirements is this facility located at a site that is required to obtain an FOP YES NO To Be Determined pursuant to 30 TAC Chapter 122? if the site currently has an existing FOP, enter the permit number: Check the requirements of 30 TAC Chapter 122 that wiil be triggered if this standard permit' Is approved (check all that apply). [3 Initial Application for an FOP Signi?cant Revision for an SOP Minor Revision for an SOP Operational Permit Notification for an SOP Revision for a GOP To be Determined None Identify the type(s) of FOP issued and/or FOP application(s) submitted/pending for the site. (check all that apply) SOP El GOP GOP application/revision (submitted or under APD review) MA I: SOP application/revision (submitted or under APD review) information (see Section IX for address to send fee or go to tceq texas gov/spay to pay onlineFee Amount: 900.00 B. Payment Information Check/money order/transaction or voucher number: Receipt Number it M809549 individual or company name on check: Soto Ready Mix, inc. Was fee paid online? YES NO 0370 (APDG 5235v25, Revised 0811'!) PMS This form is for use by subject to air quaiity permit requirements and may be revised periodicaiiy. Page of Texas Commission on Environmental Quality Form Registrations for Air Standard Permit (Page 5) Public Notice (if applicable) A. Responsible Person (E Mr. Mrs. Ms. Other:) Name: Armando Soto Title: President Company: Soto Ready Mix, Inc. Mailing Address: 3411 De Soto Street, City: Houston State: TX Code: 77091 Phone: (832) 768 3537 Fax No.: E-mail Address: sotoreadymix?gmaiLcom B. Technical Contact (E Mr. El Mrs. Ms. Name: Venkata Godasi Title: Graduate Engineer Company: AARC Environmental, lnc. Mailing Address: 2 Riverway, Suite City: Houston State: TX ZIP Code: 77056 Phone No.: (713) 974-2272 Fax No: (713) 339 -2272 E?mail Address: vgodasi@aarcenv.com C. Bilingual Notice is a bilingual program required by the Texas Education Code in the School District? YES NO if Are the children who attend either the elementary school or the middle school closest to YES CI NO your facility eligible to be enrolled in a bilingual program provided by the district? if list which language(s) are required by the bilingual program? Spanish TCEQ-10370 (APDG 5235v25, Revised 08117) This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page of Texas Commission on Environmental Quality Form PMS Registrations for Air Standard Permit (Page 6) Iv. Notice (ifapplic'atile) (commuted) D. Small Business Classi?cation and Alternate Public Notice Does this company (including parent companies and subsidiary companies) have fewer than 100 employees or less than $6 million in annual gross receipts? .YESD NO is the site a major source under 30 TAC Chapter 122, Federal Operating Permit Program? YES NO Are the site emissions of any individual regulated air contaminant equal to or greater than NO 50 tpy? Are the site emissions of all regulated air contaminant combined equal to or greater than YES NO 75 tpy? E. For Concrete Batch Plants 1. Public Works Project: Will the plant provide concrete to a public works project, and YES NO be located in or contiguous to the right otaway of the public works project? (If public notice is not required.) 2.. Application in Public Place YES NO Name of Public Place: Collier Regional Library Vi Physical Address: 6200 Pinemont, Ci.ty Houston Vt County: Harris Renewal Certification Option . . . .. . I I A. Does the permitted facility emit an air contaminant on the Air Pollutant Watch List YES NO and is the permitted facility located in an area on the watch list? 8. For facilities participating in the Houstoanalveston/Brazoria area (HGBtrade program for highly reactive VOCs (HRVOCs), do the HRVOCs need to be speciated on the maximum allowable emission rates table C. Does the company and/or site have an unsatisfactory compiiance history? YES NO D. Are there any applications currently under review for this standard permit YES NC registration? E. Are scheduled maintenance, startup, or shutdown emissions required to be included YES El NO in the standard permit registration at this time? TCEQ-1037D (APDG 5235v25, Revised 0811?) PMS This form is for use by facilities subject to air quality permit requirements andrnaybere?sedpe?odma?v Page of Texas Commission on Environmental Quality Form Registrations for Air Standard Permit (Page 7) Renewal Certi?cation Option (continuedthe following actions being requested at the time of renewal: YES NO 1. Are there any facilities that have been permanently shutdown that are proposed to be YES NO removed from the standard permit registration? 2. Do changes need to be made to the standard permit registration in order to remain in I: YESEI NO compliance? 3. Are sources or facilities that have always been present and represented, but never [3 YES NO identi?ed in the standard permit registration, proposed to be included with this renewal? 4. Are there any changes to the current emission rates table being proposed? YES NO Note: If answers to all of the questions in Section V. Renewal Certification Option are use the certi?cation option and skip to Section VII. of this form. If the answers to any of the questions in Section V. Renewal Certification Option are the certi?cation option cannot be used. *lf notice is applicable and comments are received in response to the public notice, the application does not qualify for the renewal certification option Technical information lncludmg State and Federal Regulatory Requrrements Place a check next to the appropnate box" to indicate what you have Included 111 your submittal NOTE An technical or?- seasonal information needed to con?rm that facrlities are meeting the requrrements of the standard penmt must be prowded Net provrding key mfonnation could result in an automatic deficiency "and veidrng of the project . . . . . . . . . . . . . . - A. Standard Permit requirements (Checklists are optional; however your review will go ?faster if you provide applicable checklists Did you demonstrate that the general requirements in 30 TAC Sections 116.610 and YES NO 116.615 are met? Did you demonstrate that emission limitations in 30 TAC Sections 106.261 and 106.262 YES NO are met? Did you demonstrate that the individual requirements of the speci?c standard permit are YES NO met? B. Con?dential information (All pages properly marked [3 YES ND C. Process Flow Diagram YES NO D. Process Description YES NO E. Maximum Emissions Data and Calculations YES NO F. Plot Plan YES NO EEO-10370 (APDG 5235v25, Revised 0811?) This form is for use by facilities subject to air quality permit requirements and may be revised periodicaiiy. Page of Texas Commission on Environmental Quality Form Pl-?lS Registrations for Air Standard Permit (Page 8) VI. Technical Information Including State and Federal Regulatory Requirements (continued) Place a check next to the appropriate box to indicate what you have included in your submittal. NOTE: Any technical or essential information needed to con?nn that facilities are meeting the requirements of the Standard permit must be provided. Not providing key information cauld resylt in an automatic de?ciency and voiding of the project. G. Projected Start Of Construction Date, Start Of Operation Date, and Length of Time El YES NO at Site: Projected Start of Construction (provide date): upon issue of the permit Projected Start of Operation (provide date): upon issue of the permit Length of Time at the Site: 10 Years VII. Delinquent Fees and Penalties This form will not be processed until all delinquent fees and/or penalties owed to the TCEQ or the Off ce of the Attorney General on behalf of the TCEQ are paid' In accordance with the Delinquent Fee and Penalty Protocol. For more information regarding Delinquent Fees and Penalties, go to the TCEQ Web site at: tceq texas. gov/agency/delin/index.html. Signature Requirements The signature below confirms that have knowledge of the facts included in this application and that these facts are true and correct to the best of my knowledge and belief I further state that to the best of my knowledge and belief, the project for which application is made will not in any way violate any provision of the Texas Water Code (TWO), Chapter 7; the Texas Health and Safety Code, Chapter 382, the Texas Clean Air Act (TCAA) the air quality rules of the Texas Commission on Environmental Quality; or any local governmental ordinance or resolution enacted pursuant to the TCAA I further state that I understand my signature indicates that this application meets all applicable nonattainment, prevention of significant deterioration, or major source of hazardous air pollutant permitting requirements The signature further signifies awareness that intentionally or knowingly making or causing to be made false material statements or representations in the application is a criminal offense subject to criminal penalties. Name (printed): Mr. ARMANDO President Signature (original signature required): Date: TCEQ-1037G (APDG 5235v27, Revised 031?: 8) PMS This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page of Texas Commission on Environmental Quality Form PMS Registration for Air Standard Permit (Page 9) lX- -- -- Copies must be sent as listed below. Processing delays wili occur if copies are not sent as noted. Air Permits lnitiai Review Team Regular, Certi?ed, Priority Mail Mail Code 161, PC. Box 13087, Austin, Texas 78711-3087 OR Hand Delivery, Overnight Mail Mail Code 161, 12100 Park 35 Circle, Building C, Third Floor, Room 300 W, Austin, Texas 78753 Originais of Form Core Data Form, ali attachments. Not required if using ePermits1. Regional Office or call (512) 239-1250 Revenue Section TCEQ Regular, Certi?ed, Priority Mail Original Money Order or Mail Code 214, PO. Box 13088, Check, Copy of Form Pl? Austin, Texas 78711?3088 18, Core Date Form. Not required if fee was paid OR using ePayz. Hand Deiivery, Overnight Mail Mail Code 214, 12100 Park 35 Circle, Building A, Third Floor, Austin, Texas 78753 Appropriate TCEQ To ?nd your regional office address go to Copy of Form PI-1S, Core Data Form, and all attachments Appropriate Local Air Pollution Control Program(s) To ?nd your local air pollution control programs go to or call (512) 239?1250 Copy of Form PMS, Core Data Form, and all attachments 1 ePermits located at 2 ePay iocated at 0370 (APDG 5235v25, Revised 0811 7) PMS This form is for use by facilities subject to air quality permit requirements and may be revised periodically. Page of ?wu? as TCEQ TCEQ Core Data Form For detailed instructions regarding completion of this form, piease read the Core Data Form instructions or soil 512-239-5175. SECTION I: General Information fifhb?i?ti?sf/ 1. Reason for Submission (if other is checked please describe in space provided.) 5? New Permit, Registration or Authorization (Core Data Form should be submitted with the program application.) [3 Renewal (Core Data Form should be submitted with the renewal form) Other 2. Customer Reference Number (it issued) Follow this link to search 3. Reguiated Entity Reference Number (it issued) for ON or RN numbers in ON 605378967 Central Registry? RN 110070547 SECTION II: Customer Information 4. Genera! Customer information 1 5. Effective Date for Customer information Updates New Customer Update to Customer information Change in Regulated Entity Ownership [:JCiiange in Legal Name (Verifiabie with the Texas Secretary of State or Texas Comptroller of Public Accounts) The Customer Name submitted here may be updated automatically based on what is current and active with the Texas Secretary of State (808) or Texas Comptroller of Public Accounts (CPA). 6. Customer Legal Name (If an individual, print last name first: eg: Doe, John) if new Customer, enter previous Customer below: litiilt i ii Soto Ready Mix, Inc. 7. TX SOSICPA Filing Number 8. TX State Tax lD (11 digits) 9. Federal Tax to (9 digits) 10. DUNS Number (iiapplicable) 0802422976 32060018234 11. Type of Customer: Corporation individual Partnership: General Ci Limited Government: City County [3 Federal State Other El Sole Proprietorship [3 Other: 12. Number of Emptoyees 13. independently Owned and Operated? 0-20 21-100 Cl 101?250 251-500 501 and higher Yes No 14. Customer Role (Proposed or Actual) as it relates to the Regulated Entity listed on this form. Please check one of the following: EOwner El Operator Owner Operator [:iOccupationai Licensee Responsibie Party Voiuntary Cleanup Applicant DOther: 3411 De Soto Street 15. Mailing Address: City Houston State TX ZIP 77091 ZIP 4 16. Country Mailing information (ifoutside USA) 17. E-Maii Address (ifappiicabie) sotoreadymix@gmail.com 18. Teiephone Number 19. Extension or Code 20. Fax Number (if applicable) (832)7683537 SECTION Regulated Entity Information 21. General Regulated Entity information (it ?New Regulated Entity" is selected below this form should be accompanied by a permit application) New Reguiated Entity El Update to Regulated Entity Name Update to Regulated Entity information The Regulated Entity Name submitted may be updated in order to meet TCEQ Agency Data Standards (removal of organizational endings such as inc, LP, or LLC.) 22. Reguiated Entity Name (Enter name of the site where the regulated action is taking place.) Soto Ready Mix - CBPI TCEQ-10400 (04115) Page 1 of 2 i i - TCEQ Use Only TC EQ Core DcitaiForm For detailed instructions regarding completion of this form, piease read the Core Data Form instructions or call 512?239-5175. SECTION I: General Information TCEQ 1. Reason for Submission (if other is checked please describe in space provided.) New Permit. Registration or Authorization (Core Data Form should be submitted with the program application.) Renewal (Core Data Form should be submitted with the renewal form) Other 2. Customer Reference Number (if issued) Follow this link to search 3. Regulated Entity Reference Number {it issued) for ON or RN numbers in CN 605378967 Central Registry? 0 RN 109813790 SECTION II: Customer Information 4. General Customer information I 5. Effective Date for Customer Information Updates (mm/dd/wyy) New Customer Update to Customer Information Change in Reguiated Entity Ownership DChange in Legai Name (Verifiabie with the Texas Secretary of State or Texas Comptroller of Public Accounts) The Customer Name submitted here may be updated automatically based on what is current and active with the Texas Secretary of State (SOS) or Texas Comptroller of Public Accounts (CPA). 6. Customer Legai Name (if an individual, print last name first: eg: Doe, John) if new Customer: enter previous Customer below: Soto Ready Mix, Inc. 7. TX SOSICPA Filing Number 8. TX State Tax 10 (ii digits) 9. Federal Tax ID (9 digits) 10. DUNS Number {ifapplicable} 0802422976 32060018234 11. Type of Customer: Corporation Individuai Partnership: {3 General Limited Government: City County Fedora! [3 State Other Sole Proprietorship Other: 12. Number of Empioyees 13. independently Owned and Operated? 0?20 21-100 101?250 251-500 501 and higher Yes No 14. Customer Role (Proposed or Actuai) as it relates to the Regulated Entity listed on this form. Please check one of the following: [:10wner El Operator Owner Operator DOccupationai Licensee l] Responsible Party CI Voluntary Cleanup Applicant DOtherz 3411 De Soto Street 15. Mailing Address: City Houston State TX ZIP 77091 ZIP 4 16. Country Mailing Information (itoutside USA) 17. Euiil?lail Address (ifapplicable) sotoreadymix@gmail.com t8. Telephone Number 19. Extension or Code 20. Fax Number (if applicable) 832 )768-3537 - SECTION Regulated Entity Information 21. General Regulated Entity information (it ?New Regulated Entity? is selected below this form should be accompanied by a permit application) New Regulated Entity Update to Regulated Entity Name El Update to Regulated Entity information The Regulated Entity Name submitted may be updated in order to meet TCEQ Agency Data Standards (removal of organizational endings such as Inc, LP, or LLC.) 22. Regulated Entity Name (Enter name of the site where the regulated action is taking piece.) Soto Ready Mix - TCEQ.-1D4OO (04115) Page 1 of 2 4 23. Street Address of 3 11 5" 0 Street the Regulated Entity: {No P0 Boxesl City Houston State TX ZIP 77091 ZIP 4 24. County Harris Enter Physical Location Description if no street address is provided. 25. Description to Physicat Location: 3411 De Soto Street 26. Nearest City State Nearest ZIP Code Houston I TX 77091 27. Latitude (N) In Decimal: 28. Longitude (W) In Decimal: Degrees Minutes Seconds Degrees Minutes Seconds 29 51 12.63 95 27 29.11 . . . . . 31. Primary Code 32. Secondary Code 29. Primary SIC Code (4 digits) 30. Secondary SIC Code (4 digits) (5 or 6 (m5) (5 orS digits) 3273 33. What is the Primary Business of this entity? (Do not repeat the SIG or NAICS description.) Ready Mix Plant 3411 De Soto Street 34. Address: City Houston State TX ZIP 77091 ZIP 4 35. E-?Mail Address: i sotoreadymix@gmaii.com 36. Teiephone Number 37. Extension or Code 38. Fax Number (if applicable) (332 768-3537 I I 39. TCEQ Programs and ED Numbers Check all Programs and write in the permitslregistration numbers that will be affected by the updates submitted on this form. See the Core Data Form instructions for additional guidance. Dam Safety Districts Cl Edwards Aquifer Emissions Inventory Air Industrial Hazardous Waste Municipat Solid Waste New Source Review Air OSSF Petroleum Storage Tank PWS Sludge Storm Water [3 Title Air Tires Used Oil El Voluntary Cleanup Waste Water Wastewater Agriculture Water Rights Other: SECTION IV: Preparer Information 40. Name: Venkata Godasi 41. Title: Graduate Engineer 42. Telephone Number 43. ExtJCode 44. Fax Number 45. E-Mail Address 713 974?22 72 713 3 39-2272 vgodasi@aarcenv.com SECTION V: Authorized Signature 46. By my signature below, i certify, to the best of my knowledge, that the information provided in this form is true and complete, and that I have signature authority to submit this form on behalf of the entity specified in Section 11, Field 6 and/or as required for the updates to the ID numbers identi?ed in ?eid 39. Company: Soto Ready Mix, Inc. Job Titie: President Name(ln Pn'nt) Mr. Armando Soto Phone: 832 7683537 Signature: {?rmg? (55} 35$ Date: (2777, (e411 5) Page 2 of 2 AARC ENVIRONMENTAL, INC. m? Environmental, Occupational Health Safety Solutions Etwir'antaentai In: AIR QUALITY STANDARD PERMIT APPLICATION SOTO READY MIX, INC. HOUSTON, TX APRIL 2018 Prepared for: Soto Ready Mix, Inc. 3411 De Soto Street, Houston, TX 77091 Submitted to: Texas Commission on Environmental Quality Office of Air Quaiity 12124 Park 35 Circle Austin, Texas 78753 AARC Project No: 1-E-7063-91 Soto Ready Mix, Inc. Houston, TX AARC Environmental, Inc. Apr?l 2018 1994 2018 TABLE OF CONTENTS SECTION PAGE INTRODUCTION 1 CORE DATA FORM 2 FORM 5 ATTACHMENT VLA: GENERAL REQUIREMENTS AND APPLICABILITY 1166104116615 15 ATTACHMENT VLA: SPECIFIC REQUIREMENTS REGISTRATION CHECKLIST 18 ATTACHMENT VLC: PROCESS FLOW DIAGRAM 25 ATTACHMENT VI.D: PROCESS DESCRIPTION 27 ATTACHMENT VLE: MAXIMUM EMISSIONS DATA 8: CALCULATIONS 28 ATTACHMENT VLF: PLOT PLAN 36 APPENDIX A: TABLE 20 38 APPENDIX 8: TABLE 11 41 APPENDIX C: 44 Soto Ready Mix, Inc. . Houston, TX ii AARC Environmental, Inc. April 2018 1994 - 2018 INTRODUCTION Soto Ready Mix, inc., is proposing to construct and operate a permanent concrete batch plant located at 3411 De Soto Street, Houston, Texas. The facility intends to register this concrete batch plant as standard permit under 30 TAC 116, Subchapter F. This application format corresponds to the TCEQ Form (Registrations for Air Standard Permit). Soto Ready Mix, Inc. - Houston, TX 1 April 2018 MRS Environmental, inc. 1994 2018 Soto Ready Mix, Inc. - Houston, TX April 2018 CORE DATA FORM AARC Environmentai, Inc. 1994 - 2018 Soto Ready Mix, Inc. - Houston, TX April 2018 FORM AARC ?nvironmental, Inc. 1994 2018 ATTACHMENT VLA: GENERAL REQUIREMENTS AND APPLICABILITY 116.610- ?116.615 Soto Ready Mix, Inc. - Houston, TX 15 AARC Envirunmental, Inc. Aprii 2013 1994 2018 Texas Commission on Environmental Quality Air Quality Standard Permits General Requirements Checklist Title 30 Texas Administrative Code Check the most appropriate answer and include any additional information in the spaces provided. If additional space is needed, please include an extra page and reference the rule number. The SP forms, tables, checklists, and guidance documents are available from the TCEQ, Air Permits Division web site at: Most Standard Permits require registration with the commission?s Of?ce of Permitting, Remediation, and Registration in Austin. The facilities and/or changes to facilities can be registered by completing a Form Pl?lS, ?Registration for Air Standard Permit.? This checklist should accompany the registration form to expedite any registration review. CHECK THE MOST APPROPRIATE ANSWERS AND FILL IN THE REQUESTED INFORMATION established, meet the emission limits of 106.26] or 39 106.262? than those for which a National Ambient Air Quality Standard QS) has been Rule Questions/Description Response 1 16 610(a)(1) Are there net emissions increases associated with this registration? NO If will net emission inc; eases of air contaminants? om the project, if does the speci?c standard permit exempt emissions from this limit? YES [3 NO Attach emissions summary and calculations: 1 Do any of the Title 40 Code of Federal Regulations Part (CF R) 60, New Source Performance Standards apply to this registration? YES N0 If list subpartS: 116.610 [Do any Hazardous Air Pollutant requirements apply to this registration? YES NO If list subparts i 16.610 (20(5) Do any maximum achievable control technology (MACT) standards as listed under 40 CFR Part 63 or Chapter 113, Subchapterj; (National Emissions Standard for Hazardous Air for Source Categories) apply to this registration? YES NO If list subparts: Will additional emission allowances under Chapter 101, Subchapter Division 3 Emissions Banking and Trading, need to be obtained following this iegistration? YES NO 116.61 Is the following documentation included with this registration: YES NO Emissions calculations including the basis of the calculations? YES NO Quanti?cation of all emission increases and/or decreases associated with this project? YES N0 Sufficient information demonstrating that this project does not trigger PSD or NSR review? YES No Description of efforts to minimize collateral emissions increases associated with this project? YES EINO Process descriptions including related processes? YES NO Description of any equipment being installed? YES NO TCEQ 20335 (APDG 5803v1, Revised 05/14) Standard Permit General Requirements Checklist 116610-1166? This form is used by sources subject to air quality permit requirements and maybe revised periodically. Page 1 of2 Texas Commission on Environmental Quality Air Quality Standard Permits General Requirements Checklist Title 30 Texas Administrative Code TCEQ, the Texas Health and Safety Code, Chapter 382, and the Texas Clean Air Act? Rule QeeStion/De?criptien .. . . . . .. . . . - 116.614 Are the required fee and a copy of the check or money order provided with YES El NO the application? 116.6150) Will emissions from the facility comply with all applicable rules and YES NO regulations of the commission adopted under Texas Health and Safety Code, Chapter 382, and with the intent of the Texas Clean Air Act? 116.615(2) Do you understand that all representations with regard to construction plans, YES NO operating procedures, and maximum emission rates in this registration become conditions upon which the facility will be constructed and operated? 116.6150) Do you understand that all changes authorized by this registration need to be YES El NO incorporated into the facility?s permit if the facility is currently permitted under ?l 16.110 (relating to Applicability)? List all related permit numbers: Will all air pollution emission capture and abatement equipment be YES [3 NO maintained in good working order? 11661500) Will the facility comply with all applicable rules and regulations of the YES El NO TCEQ 20335 (APDG 5803v1, Revised 05/14) Standard Permit General Requirements Checklist 116610?1166? This form is used by sources subject to air quality permit requirements and may be revised periodically. Page 2 of2 ATTACHMENT VLA: SPECIFIC REQUIREMENTS REGISTRATION CHECKLIST Soto Ready Mix, Inc. Houston, TX 18 AARC Environmental, Inc. ApriI 2018 1994 - 2018 Soto Ready Mix, Inc. - Houston, TX April 2018 ATTACHMENT VLC: PROCESS FLOW DIAGRAM 25 AARC Environmentai, Inc. 1994 - 2018 Soto Ready Mix, inc. - Houston, TX Process Flow Diagram - Concrete Batch Plant Operations Sand Stockpiles Aggregate Stockpiies (SCC: 3-05-011?22) (SCCMaterial Process tine Sand Aggregate Storage Bin Storage Bin (SCC: (SCC: 3-05?011-04) qseAH/ mama: ous fl Air ?missions (Stack) I: 321-! me: En U8 Air Emissions (Fugitive) Wind Erosion from Stockpiles SP2) 5? Water EPN a Control Device Cement Batcher Sand 81 Aggregate - Weigh Hopper Cement: Ftyash Sand Aggregate Transit Mix Truck Loading (scc:3-os-011-10) AARC Environmental, inc. Soto Ready Mix, Inc. Houston, TX TCEQ Air Quality Standard Permit Registration April, 2018 26 ATTACHMENT VLD: PROCESS DESCRIPTION Soto Ready Mix, too, is proposing to construct and operate a permanent concrete batch plant located at 3411 De Soto Street, Houston, Texas. The facility intends to register this concrete batch piant as standard permit under 30 TAC 116, Subchapter F. CONCRETE BATCH PLANT (EPN #1 - EPN #10) The facility will be a permanent concrete batch piant and the maximum production rated capacity of the plant is 180 cubic yards per hour. The maximum operating schedule of the piant will be 24 hours per day, 7 days per week and 52 weeks per year. The concrete will be composed of water, sand, aggregate, flyash, and cement. Sand and aggregate will be brought into the facility via truck and unloaded onto the aggregate sand stockpiles (SP1 SP2) (EPN #1 The sand and aggregate wiil be loaded to three conveyors-(EPN to be transported to the elevated storage bins (EPN Sand and aggregate from storage bins will be dropped onto the weigh hopper (EPN and transferred to the truck mixer (EPN Sand and aggregate materials are prewashed, sprinkled, and handled wet. All sand and aggregate handiing at the facility will be considered as materiai handling operations (EPN #1 thru EPN Emissions from material handling will be fugitives. Cement and flyash wiil be brought into the facility via trucks and loaded pneumatically into split silo or Cement Silo-2. Particulate emissions from the cement and fiyash ioading into silos wiil be vented to the respective baghouses (EPN #6 EPN #7).Cement and flyash wiil be transferred from the split siio/cement silo?2 to the cement batcher and transferred to the truck mixer (EPN Particulate emissions from the cement batcher wili be vented to the Central Dust Collector (EPN Raw materiais: cement 8L flyash from the cement batcher and sand 8: aggregate from weigh hopper are loaded to the truck mixer (EPN Water wili be added to the raw material in the truck mixer along with sand, aggregate, cement, and flyash. Emissions from the truck mixer are captured using atleast 5,000 central dust collector (EPN Un?captured emissions from truck mixer wili be fugitives. The concrete from truck mixer is delivered to customers off?site. Additional emissions from stockpiles at the facility (SP1, SP2) operations due to wind are addressed as one source of fugitives under stockpile wind erosions from the facility (EPN Water will be sprinkied to suppress the dust emissions from the stockpiles and roads as necessary. The wiil have a diesei fuel tank; emissions from this diesel fuel tank are authorized under PBR 106.472; which does not require registration. Soto Ready Mix, Inc. - Houston, TX 27' AARC Environmental, inc. April 2018 1994 2018 ATTACHMENT VLE: MAXIMUM DATA St CALCULATIONS Emissions of from the concrete batch operations are quantified in this section. The emission sources covered by this permit application are as follows: Concrete Batch Plant (Proposed) EPN #1 EPN #9 PM, Wind Erosions from Stockpiles EPN #10 PM, PMZIS A detailed discussion of the quantification of emission rates is presented below, and a summary of the criteria poilutant emission rates by source is provided in Table CBP7. Concrete Batch Plant Operations: All emissions from concrete batch plant operations are calculated based on AP-42 Chapter: 11.12 Concrete Batching?. Emission factors are obtained from EPA AP-42 Table 11.12~2. Stockpiies: All stockpiles at the facility are considered as one emission point (EPN Emissions due to wind erosion from stockpiles are caiculated using EPA AP - 42 Chapters 13.2.4. Soto Ready Mix, Inc. - Houston, TX 28 AARC Environmental, inc. April 2018 1994 - 2018 Weight of Concrete (tbs/1 from EPA AP - 42 Table 1.1.12.2 Table - CBP1 Soto Ready Mix, inc. - Houston, TX Summary of Raw Materials 8: Throughputs 4,924 Maximum Hourly Concrete Production Maximum Annual Operating Hours (hrs/yr Maximum Annual Concrete Production (yd Maximum Hourly Concrete Production (yd3/hr) 180 tons/hr) 362 8,760 m) 1,576,300 Maximum Annual Concrete Production (tons/yr) 3,172,522 HMS yda/ tons/hr hrs/yr ydB/vr tons/yr Aggregate Sand Cement Flyash Soto Ready Mix, Inc. - Houston, TX April 2018 29 1,470,366 1,125,835 387,104 57,553 131,663 AARC Environmental, Inc. 1994 - 2018 Table - CBPZ Soto Ready Mix, lnc. - Houston, TX Emissions from Aggregate 8: Sand Transfer Points - (Material Handiing) EPN #1 thru EPN #4 Aggregate information Source 129 Soto Ready Mix, lnc. - Houston, TX Hourly Flow Rate (tons/hr) 168 1,125,835 Soto Ready Mix, Inc. Houston, TX Annual Flow Rate (tons/yr) 1,470,366 3 (1) Trucks to Stockpiles; - Stockpiles to Conveyor; (3) - Conveyor to Storage Bins Number of Transfer points 3 Emission Control Factor (96) 95% Washed Materials PM 1,470,366 158 1,470,366 0.36 1,470,366 0.06 FAA-2.5 168 ,5 granola": PM 1,125,835 1,125,835 129 0.00099 1,125,835 PM-2.5 129 0.00015 Notes: Emission factors are from EPA AP-42 Table 11.12-2 PM-2.5 Emission Factors are derived based EPA AP-42 Table 11.12-2 Footnote EPA AP-42 Chapter 13.2.4 AARC Environmental, lnc. Soto Ready Mix, inc. - Houston, TX 30 1994 2018 April 2018 Table - CBP3 Soto Ready Mix, inc. - Houston, TX Emissions from Weigh Hopper Loading - (Material Handling) EPN #5 Paran?i?r?i??- ii. . information Source Hourly Flow Rate (tons/hr) 129 Soto Ready Mix, inc. - Houston, ix Annual Flow Rate (tons/yr) 1,470,366 1,125,835 2,596,201 Soto Ready Mix, lnc. - Houston, TX Emission Control Factor 95% 95% 95% Washed Materials 2,596,201 PM ?10 296 0.0028 5% 0.04 2,596,201 0.18 PM-2.5 296 0.00042 5% 0.006 2,596,201 0.03 Notes: Emission factors are from EPA AP-42 Table 11.12-2 Footnote PM-2.5 Emission Factors are derived based EPA AP?liz Table 11.12?2 Footnote 8: EPA AP-42 Chapter 13.2.4 Soto Ready Mix, Inc. - Houston, TX AARC Environmental, Inc. April 2018 31 1994 - 2013 Yable - CBP4 Soto Ready Mix, Inc. - Houston, TX Emissions from Split Siio Cement Silo-2 EPN #6 EPN #7 Parameters 39*1 Cement information Source Houriy Flow Rate (tons/hr) 50 Soto Ready Mix, inc. Houston, TX Annual Fiow Rate (tons/yr) 387,104 Soto Ready Mix, inc. - Houston, TX Emission Controi Factor (96) 99.90% 99.90% Silo Baghouse Control Efficiency Number of Siios FAG-2.5 50 Cement Unloading to Split Silo 81 Cement Silo?2 (EPN (SCC: 444,658 444,658 444,658 50 PM-2.5 50 387,104 387,104 387,104 Notes: Emission factors are from EPA Tabte 11.12?2 8: Footnote PM-2.5 Emission Factors are derived based on 17.1% of respective Emission Factors. Soto Ready Mix, Inc. - Houston, TX Apri12018 32 AARC Environmentai, Inc. 1994 - 2018 Table - CBPS Soto Ready Mix, Inc. - Houston, TX Emissions from Truck Mixer Loading Centre! Dust Collector EPN #8 8: EPN #9 I-i'fii Cemet+Fyah Information Source Hourly Flow Rate (tons/hr) 51 Soto Ready Mix, Inc. Houston, TX Annual Fiow Rate (tons/yr) 444,658 Soto Ready Mix, Inc. Houston, TX Emission Capture Efficiency (96) 97.50% Capture Efficiency: Three Sided Suction Shroud and atleast 5,000 Centre! Dust Collector at the Truck Drop Point Emission Control Factor 99.90% Central Dust Coiiector Efficiency Emissions from Truck Mixer Loading (EPN (SCC: 3-05-011-10) PM 444,658 51 0.310 2.50% 0.39 444,658 PM-2.5 51 0.053 2.50% 0.07 444,658 PM 51 99.90% PM-2.5 51 99.90% AnnualEmissmn 444,658 444,658 0.07 444,658 0.01 Notes: Emission factors are from EPA AP-42 Table 11.124 Footnote PM-2.S Emission Factors are derived based on 17.1% of respective Emission Factors. Soto Ready Mix, lac. - Houston, TX April 2018 33 AARC Envimnmentai, inc. 1994 2018 Table - CBP6 Soto Ready Mix, Inc. - Houston, TX Emissions from Stockpiies EPN #10 (SP1 - SP2) mom u: information sauce Stockpiies Acerage acres Soto Ready Mix, Inc. Houston, TX Number of Active Days 365 days/yr Soto Ready Mix, Inc. Houston, TX Control Factor 95% Washed Materials Emissions from Stockpiies Pollutant PM 2.5 Notes: Emission factors for PM (active 8L inactive days) are from EPA Document Number Tabie 27 Emission Factors are derived based on 50% of respective PM Emission Factors (derived based EPA AP-42 Chapter 13.2.4) PM-2.5 Emission Factors are derived based on 15% of respective Emission Factors (derived based EPA AP-42 Chapter 13.2.4) Soto Ready Mix, inc. - Houston, TX AARC Environmental, Inc. April 2013 34 1994- 2018 Summary of Concrete Batching Operations Emissions - (EPN #1 EPN #10) Table - CBP7 Soto Ready Mix, inc. - Houston, TX EPN Plant Site FIN Hourly Emissions) (lbs/hr) Annual Emissions (tpv) PM pM-m PM-2.5 PM PM-2.5 1 thru 5 Material Handling (Fugitives) 0.29 0.14 0.02 1.25 0.63 0.10 6 Split Silo (Cement Fiyash) 0.19 0.08 0.01 0.77 0.32 0.05 7 CBP-I Cement Silo ?2 0.04 0.02 0.004 0.16 0.10 0.02 8 Truck Mixer Loading (Fugitives) 1.42 0.39 0.07 6.21 1.72 0.29 9 Mixer Central Dust Collector 0.06 0.02 0.003 0.25 0.07 0.01 10 Sto??iies Stockpiles (Wind Erosion) 0.06 0.03 0.005 Totai Emissions 1.99 0.55 0.11 8.?0 2.87 0.48 Soto Ready Mix, inc. - Houston, TX April 2018 35 AARC Environmental. inc. 3.994 - 2018 Soto Ready Mix, Inc. - Houston, TX April 2018 ATTACHMENT VLF: PLOT PLAN 36 AARC Environmentai, inc. 1994 - 2018 Soto Ready Mix, Inc. - Houston, TX April 2018 APPENDIX A: TABLE 20 38 AARC Environmental, Inc. 1994 2018 Texas Commission on Environmental Quality Table 20 Concrete Batch Plants The following table is designed to help you con?rm that you meet the requirements of Title 30 Texas Administrative Code Chapter 116, Tables, checklists, and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmental Quality Air Permits Division website at http: gov/ pe rmitting/ air ipieasec?mpia? ae'a?uowine; i _ij 7 i 5 Company Name: Soto Ready Mix, Inc. Plant identi?cation or name: Soto Ready Mix CBP1 Type of plant: Permanent Temporary Specialty Mix Type of batching that will be Wet (Rotary Mix Truck) Ci Dry [3 Central Mix accomplished Maximum production rates: 180 cubic yards/ hour 1,576,800 cubic yards year Maximum operations: 24 hours/ day 7 days/week 52 weeks/year 3,760 hour/year Does the facility operate at night? YES NO Is a completed table 11 ?Fabric Filters,? submitted with this application for each fabric ?ler? YES El NO Silolnformatlon .How many silos will this plant have? 1 Split Silo; 1 Cement Silo What is the volume of each silo (cubic feet)? 3,600 ft3; 1,400 ft3 Explain the method of loading silo(s): Pneumatic Is each silo equipped with overload warning device? YES NO What type of abatement device will be used on silo vent(s)? Silo Baghouses: Vince Hagan How will the batch drop to truck or central mixer be controlled to prevent dust emissions? Suction shroud with exhaust air to central fabric ?lter (If checked, attach a completed Table 11, ?T?abric ilters.?) Flexible discharge spouts with water fog ring (If checked, attach design drawing.) Other type of abatement device (If checked, explain in detail and attach desigmdrawing.) What is the distance from the water fog ring or central bag house stack to the nearest property line 103-ft How will the cement weigh hopper be vented? Cement Fly Ash Silo Fabric Filter (If checked, attach a completed Table 11, ?Fabric Filters?) Central Fabric Fiiter (If checked, attach a completed Table 11, ?Fabric Filters. Other (Please indicate) TCEQ - 10188 (Revised 85/13) Table 20 This form is for use by facilities subject to air quality permit requirements and maybe revised periodically. (APDG 5995v3) Page 1 of 2 Texas Commission on Environmental Quality Table 20 Concrete Batch Plants TCEQ The following table is designed to help you con?rm that you meet the requirements of Title 30 Texas Administrative Code Chapter 116. Tables, checklists, and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmental Quality Air Permits Division website at Please Complete the Followang (continued) Will the sand and aggregate be washed prior to delivery at your facility? BNO What is the number of acres or square feet which will be covered by aggregate stockpiles? 5,:acres or 21,7230 square feet Water sprays will be used at the following locations: Stockpiles Aggregate Bin Outlets Convey or Transfer Points Screens How will plant roads be treated to prevent dust emissions? EPaved and Cleaned Chemical Sprayed Water Sprinkled El Gravel (asphalt or concrete) Paved and Vacuumed Is there a generator or engine on site? EYES .NO ?Reciprocating Engines. [Note: If complete generator information below and submit a completed Table 29 entitled, Generator Information Make and model: Maximum rated horsepower Fuel type: Percentage of sulfur content: Annual hours of operation: Distance to nearest property line (feet): rating (specify in units): Fabric Filter Fabric ?lter name or EPN: EPN #9 (Central Dust Collector) Manufacturer?s represented ef?ciency 99.9% Micron level(s) evaluated: at 1 micron TCEQ - 10188 (Revised 05/13) Table 20 This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG 5995v3) Page 2 of2 Soto Ready Mix, Inc. - Houston, TX April 2018 APPENDIX 3: TABLE 11 41 AARC Environmental, inc. 1994 - 2018 Texas Commission on Environmental Quality Table 11 Fabric Filters Tables, checklists, and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmental Quality (TCEQ) Air Permits Division (APD) Web site at 1. Emission Point No: EPN #9 Name (from process flow diagram): Central Dust Collector 2. Manufacturer No.: Vince Hagan Model No.2 3. Name of Source(s) or Equipment being Controlled: Cement Batcher 81 Truck Drop Point 4. Type of Particulate Controlled: PM 5. Gas Stream Characteristics Below: AVBrageExpected Flow__ Gas Stream Temperature Particulate GramLoadmg(gram/scf) 6, 500 6,500 Ambient Inlet: Outlet: Pressure Drop Water Vapor Content of Ef?uent Stream f; FanRequlrements I I (inches of. H20) watertli) dry air) 0.5" hp: 15 ft3/min; 6,500 6. Particulate Distribution (By We1ght) Below: 0.0-0.5 0.5?1.0 1.0-5.0 5-10 10?20 over 20 7. Filter Characteristics Below: Filtering Velocity BagDiameter?nches) Bag Length?ee?fi TotalNumberof Bags (aefm/ft? ofClothBag Rows Will Be: Staggered Straight 9. Will Waikways Be Provided Between Banks Of Bags? YES NO 10. Filtering Material: Polyester 0.065 (Nam) '11. Describe Bag Cleaning Method and Cycle: Replace filters as per manufacturing specifications 12. Capital Installed Cost: Annual Operating Cost: Note: Attach the details regarding the principle of operation and an assembly drawing (front and top view) of the abatement device drawn to scale clearly showing the design, size and shape. If the device has bypasses. safety valves. etc, include in the drawing and specij?? when such bypasses are to be used and under what conditions. TCEQ 10179 (Revised 07/03) Table 11 This form is for uSe by facilities subject to air quality permit requirements and may be revised periodically. (APDG 5981v1) Page 1 of Texas Commission on Environmental Quality Table 11 Fabric Filters Tables, checklists, and guidance documents pertaining to air quaiity permits are available from the Texas Commission on Environmental Quality (TCEQ) Air Permits Division (APD) Web site at 1. Emission Point No.: EPN #6 EPN #7 Name (from process flow diagram): Split Silo Cement Silo-2 2. Manufacturer No.: Vince Hagan Model No.: VH-24SJP 3. Name of Source(s) or Equipment being Controlled: Split Silo Cement Silo?2 4. Type of Particulate Controlled: PM 5. Gas Stream Characteristics Below: I Demgn Maxnnum Average Expected Flow- :Gas Stream Temperature i?a?ieulat?iG?in? Loadmg(gram/sci) .f . . . . Rate (acfm) . .32.. 2:1: .3 . .. 500 600 Ambient Inlet: Outlet: Pressure Drop I Water Vapor Content of Ef?uent Stream II: '5 i: FanRequlrements (inches 011110) hp: ?3/min.: 6. Particulate Distribution (By Weight) Below. nw% w: mw%e v? 0.0?0.5 0.5?l.0 1.0-5.0 5?10 10?20 over 20 7. Filter Characteristics Below: Filtermg Velouty BagLengthUe?t) I 33:: fi' (germ/n2 'efCloth) . I 3 2.45 1 8" 3? 7 8. Bag Rows Will Be: Staggered Straight 9. W111 Walkways Be Provided Between Banks or Bags? YES NO 10. Filtering Material: Spun-Bound Polyester ll. Describe Bag Cleaning Method and Cycle: Replace filters as per manufacturing specifications 12. Capital installed Cost: Annual Operating Cost: Note: Attach the detaiis regarding the principle of operation and an assembly drawing (front and top view) of the abatement device drawn to scale clearly showing the design, size and shape. If the device has bypasses, safety valves, eta, include in the drawing and specijj} when such bypasses are to be used and under what conditions. TCEQ - 10179 (Revised (37/03) Table 11 This form is for use by facilities subject to air quality permit requirements and may be revised periodically. (APDG 5981vl) Page 1 of! Soto Ready Mix, lnc. - Houston, April 2018 APPENDIX C: SPECIFICATION 44 AARC Environmental, Inc. 1994 2018 SPECIFICATIONS Jet?Pulse Dust Collector Model Cloth Area No. of Bags ACFM Blower H.P. AIC Ratio (Sq. Ft.) VH-700JP 700 64 4,900 7.5 7:1 730 64 5,100 10 7:1 VH-1083JP 1083 99 6,500 15 6:1 1094 100 6,500 15 6:1 1203 110 7,200 15 6:1 VH-1432JP 1423 130 8,500 25 6:1 Hagan Jet-Pulse Filter Bag Ef?ciency 99.9% At 1 Microns Cloth Type Polyester Felt Cloth Weave Polyester .065 (Nom) Permeability 25 to 45 Ft. w.g. Bag Weight 15.5 1 Ft. Construction Needle punched self supported Bag Length 84? Bag Diameter 6? Specifications Model VH-245JP Cloth Filtering Area 245 Sq. Ft. Number of Cartridges 7 Cartridge Diameter 8.00? OD. Cartridge Length 36? Cloth Type Spun-Bound Polyester Cloth Weight 7.7 Oz./Sq. Yd. Permeability 20 Ft. 0.5" Water Temperature Limit 200 Deg. F. Air Volume Intake 600 0.5" Water Exhaust Opening Size 0.24 Sq. Ft. Ef?ciency 99.9% At 1 Microns MADE IN THE U.S.A PO. Box 655141 Dallas, Texas 75265-5141 Sales@VinceHagan.com 1.800.354.3238 Bryan W. Shaw, Phil, P.E., Chairman Toby Baker, Commissioner ion Niermann, Commissioner Stephanie Bergeron Perdue, Interim Executive Director TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Protecting Texas by Reducing and Preventing Pollution April 11, 2018 MR ARMAN DO SOTO PRESIDENT SOTO READY MIX WC 3411 DE SOTO ST HOUSTON TX 77091?3717 Re: Permit Application Voiciance Permit Number: 149713 Soto Ready Mix inc. Concrete Batch Plant Houston, Harris County Regulated Entity Number: RN110070547 Customer Reference Number: CN605378967 Dear Mr. Soto: We received the aboveureferenced appiication for permit to construct, Form PMS (Registration for Air Standard Permit) dated December 18, 2017. During the application review process it was determined that the 100 foot setback requirement from the centrai baghouse stack exhaust to the nearest property line could not be met, therefore the application has been voided. Title 30 Texas Administrative Code 116.614 prohibits permit fee refunds. However, the fee used for this project can be applied to a future submittal received within six months of the date of this ietter by referencing the receipt number M809549. To reapply, please submit a new Form PMS and an entirely new appiication. The new application will be subject to the state and fedora! rules and regulations in piece at the time of submittal. Public notice may be required as directed by the standard permit. if notice was pubiished for the voided application and the new application also requires public notice, then notice must be republished. When a new application is submitted, the appropriate fee for the project must be submitted with the application. if you need further information or have any questions, piease contact Mr. Donaid D. Nelon at (512) 239 0894 or write to the Texas Commission on Environmentai Quality, Office of Air. Air Permits Division, 163, PO. Box 13087, Austin, Texas 78711-3087. P.O. Box 13087 . Austin. Texas 78711-3087 - 5122-2394000 - tceq.texas.gov How is our customer service? tceq.texas.gov/customersurvey printed on recycled paper Mr. Armando Soto 20.18 .3, .. . Re: Permit Number: 149713 This action is taken under authority deiegated by the Executive Director of the Texas Commission on Environmental Quality. Sincerely, Michael Wilson, P.E., Director Air Permits Division Of?ce of Air Texas Commission on Environmental Quaiity Enclosure cc: Mr. Venkata Godasi, Graduate Engineer, AARC Environmental inc., Houston Senior Project Manager, Houston Department of Health and Human Services, Bureau of Pollution Control Prevention, Houston Director, Harris County, Poiiution Controi Services, Pasadena Air Section Manager, Region 12 - Houston Project Number: 279255 5/1/2018 FedEx Ship Manager - Print Your Labei(s" #133143 (E 1% ?91.81 X1. 8001:] GHIHJ981$ were 331. mu MEMO (may) 0331 9991:}. XL WVSJ. 81.lele HIV or as ?w sosz luz lzu Ezra-m (an) 8V 9433 3 0 Any 3338 ild?? 9%th dii-ES 831N513 HERMES Til$31an 31011!me After printing this label: 1. Use the 'Print' button on this page to print your label to your laser or inkjet printer. 2. Fold the printed page along the horizontal line. 3. Piece labei in shipping pouch and affix it to your shipment so that the barcode portion of the iabei can be read and scanned. Warning: Use only the printed original label for shipping. Using a photocopy of this label for shipping purposes is frauduient and could result in additional billing charges, along ith the canceliation of your FedEx account number. Use of this system constitutes your agreement to the service conditions in the current FedEx Service Guide, avaiiable on fedexcomFedEx will not be responsible for any claim in excess of $100 per package, hether the resuit of loss. damage, delay. non-deiiverymisdeiivery,or nisinformation. unless you declare a higher vaiue. pay an additional charge. document your actual loss and file a timely claimLin?itations found in the current FedEx Service Guide appiy. Your right to recover from FedEx for any loss. inoiuding intrinsic value of the package, loss of sales, income interest. profit, attorney's fees, costs. and other forms of damage hether direct, incidental,consequentiai, or special is lirrited to the greater of $100 or the authorized declared value. Recovery cannot exceed actual documented lossMaximum for items of extraordinary value is $1,000. e.g. jewelry. precious metals. negotiable instruments and other items iisted in our ServiceGuide. Written claims must be filed within strict time iimits. see current FedEx Service Guide. ontinue