State of Illinois Illinois Department of Transportation FY 2020-2025 Proposed Highway Improvement Program Illinois Departm of Transportahon District 1 Bridge replacement on ILL 171 (Archer Avenue) at Long Run Creek in Cook and Will Counties. District 2 Bridge replacement on US 52 over the Mississippi River and BNSF Railroad at Savanna. District 3 Bridge replacement on ILL 89 over the Illinois River at Spring Valley. District 5 Resurfacing on I-74 from University Avenue in Urbana to 2 miles east of the St. Joseph interchange, including a new culvert. District 6 Roundabout at Iles Avenue and Archer Elevator Road in Springfield. District 9 Bridge replacement on I-57 at ILL 146 interchange in Union County. Printed by authority of the State of Illinois, 0014-19, 04/19, 20 FY 2020-2025 Proposed Highway Improvement Program Fall 2019 Published by the Illinois Department of Transportation Springfield, Illinois 62764 Printed by authority of State of Illinois, October 2019. This document is printed on recycled paper. This document is available online at http://www.idot.illinois.gov/MYP2020-2025 1 Rebuild Illinois Rebuild Illinois is making a historic, bipartisan $45 billion investment in creating good jobs, fixing Illinois’ crumbling roads and bridges and building major projects that are essential to Illinois’ future, like robust mass transit, a modern state crime lab, high quality veterans’ homes and world class universities. Every part of Illinois will see investment from Rebuild Illinois, which will put $33.2 billion into our aging transportation system alone and support an estimated 540,000 jobs throughout the state. Rebuild Illinois addresses the unique assets and needs of each region of the state, ensuring Northern, Central, and Southern Illinois receive funding to begin to make significant infrastructure improvements and upgrades. As part of this plan, local governments will receive $4 billion in transportation funds to meet their specific needs – their first increase in 20 years. The need for a sweeping capital plan has rarely been greater, with much of Illinois’ infrastructure in dire shape. Overall, Illinois’ infrastructure has a C-rating, and businesses and residents alike face untold costs for the congestion delays, damage to vehicles, and concern about the integrity of bridges and failure to maintain facilities for public use. In short, significant investments have long been needed to ensure Illinois’ infrastructure is repaired, maintained, and consistently prioritized year after year. Rebuild Illinois represents wide, bipartisan agreement that the time is now to make critical investments. Across the state, the Rebuild Illinois plan has also been welcomed as a muchneeded opportunity to reinvest in infrastructure in desperate need of repair. Support has come from organizations representing business and labor, local governments and regional organizations, the transportation industry and advocates for the driving public. Much of this need has resulted from Illinois’ failure to make important investments in maintaining infrastructure on a consistent basis. For roadways alone, the state consistently underfunds its maintenance needs by several hundred million dollars a year. Additionally, the federal government has failed to enact a meaningful infrastructure bill since 2009, exacerbating Illinois’ failures to invest in basic infrastructure. Instead of accepting this federal failure as Illinois’ fate, this plan leverages as much federal money as possible to bring significant investments to our surface, rail, water, broadband and community infrastructure. The Governor and bipartisan coalitions of lawmakers in the General Assembly came together to enact the Rebuild Illinois plan in a spirit of making the state stronger for every resident. The plan puts Illinois on a path toward repair and recovery after years of neglect, to ensure this state continues to be an economic leader in the nation. Rebuild Illinois finally invests in critical infrastructure that will help Illinois thrive for generations to come. While as a whole, the Rebuild Illinois invests in universities, broadband, mass transit, affordable housing and numerous other critical projects, the Multi-Year plan presented in this report is the blueprint for the State’s $23.5 billion in plans to begin to repair our crumbling roads and bridges. 1 MYP Program Overview Each year, the Illinois Department of Transportation (IDOT) develops a fiscally constrained six-year program that details how it will invest transportation dollars in the state and local highway system. As a result of the passage of the comprehensive Rebuild Illinois capital program generating new revenues and increased appropriations, the Fiscal Year 2020-2025 Proposed Highway Improvement Program (sometimes referred to as the Multi-Year Plan, or MYP) totals $23.49 billion and includes a FY 2020 annual highway program of $3.76 billion. This MYP also represents an important shift in the way that Illinois prioritizes project selection, to ensure the state is aligned with federal standards and maximizes potential federal matching dollars. For the first time, the state is moving aggressively toward meeting the goals of the state’s Transportation Asset Management Plan (TAMP). To put it simply, the TAMP prioritizes the maintenance of roads and bridges to save the state — and taxpayers — money in the long run, just as we spend money on things like oil changes and fresh paint to maintain our vehicles and homes to avoid more costly repairs later. This maintenance is known as preservation in the transportation industry. The genesis of the TAMP approach is from the Federal Highway Administration, through the Moving Ahead for Progress in the 21st Century Act (MAP-21), which requires states to develop and implement a risk-based Transportation Asset Management Plan, or TAMP, for the NHS to improve or preserve the condition of the assets and the performance of the system. Having an asset management plan means that states are required to consider the life cycle cost of roads and bridges. The projects in the FY 2020-2025 MYP that improve the condition of pavements and bridges have been selected within the parameters of the initial asset management plan. The department’s fully compliant plan was due June 30, 2019 and was approved on August 29, 2019. The program priorities are to maintain and preserve our existing roads and bridges, with a special emphasis on the National Highway System (NHS) and structurally deficient bridges on that system. There are 6,975 miles of statemaintained roads and 4,067 bridges (totaling 59,395,435 square feet of deck area) on the NHS. The department’s focus on the NHS is due in Asset management is a strategic and process of operating, large part to new federal performance rules that systematic maintaining, and improving physical require state departments of transportation to prioritize its condition. New federal performance assets, with a focus on engineering and measures were developed as a way to “increase economic analysis based upon quality the accountability and transparency of the federal- information, to identify a structured aid highway program and provides for a sequence of maintenance, preservation, framework to support improved investment repair, rehabilitation, and replacement decision making through a focus on performance actions that will achieve and sustain a desired state of good repair over the life outcomes for key national transportation goals.”1 cycle of the assets at minimum practicable cost. (23 U.S.C. 101(a)(2), MAP-21 § 1103) Focusing on asset management has allowed IDOT to change from a “worst-first” philosophy to a proactive approach to preserving our assets that are in a state of acceptable condition. The traditional “worst-first” strategy meant that IDOT prioritized assets that had deteriorated past the point of preservation, needing more costly repairs 1 https://www.fhwa.dot.gov/tpm/rule.cfm 2 or total replacement. Under asset management, the strategy is to develop and implement a datadriven decision process that supports the use of analysis tools and life cycle strategies to reduce the rate of system deterioration as cost effectively as possible. The department will continue to address road and bridge needs to ensure our system is safe, but will also invest in low-cost treatments to preserve those roads and bridges and keep them in acceptable condition. The implementation of asset management has meant many changes to the department’s programming process. The TAMP provides a realistic outlook for keeping our system in a state of acceptable condition. In addition to the minimum requirements for the TAMP, there are several other requirements outlined in the federal legislation and/or final rules that impact the way pavements and bridges are managed now and in the future. A few of these are summarized below: • Minimum standards are established for developing and operating bridge and pavement management systems (23 CFR 515.17) • No more than 5 percent of the interstate system lane miles may be in poor condition, using performance measures established by FHWA, without penalty. • No more than 10 percent of the bridge surface area on the NHS may be considered Structurally Deficient, using performance measures established by the FHWA, without penalty. More details on the TAMP can be found at http://www.idot.illinois.gov/tamp. IDOT is also updating its Long Range Transportation Plan, which establishes a set of policies to guide the future development of the transportation system rather than specific improvements, which are programmed separately and released in this document. The goals of the long-range plan – economy, livability, mobility, resiliency and stewardship – also provide the broad framework for decision-making and analysis tools, like the asset management plan. Tools such as this support data-driven decision-making and will serve to implement the goals, objectives and strategies of this plan. The department is working toward performing treatments in all stages of the transportation system’s life cycle. The goal is to work toward 80 percent reconstruction and rehabilitation, with 20 percent preservation work based on the number of miles of roads and square feet of bridges programmed in each district. The preservation work will focus on keeping the good pavements and bridges in a state of acceptable condition before they fall to a lower rating and warrant a higher cost improvement. Small, planned investments in maintenance of our roads and bridges will save the state and taxpayers money in the long run. Due to the enactment of the Rebuild Illinois capital program in June, IDOT’s highway program is double its originally estimated size. This much-needed additional funding will allow the department to make significant progress in achieving our goals for roads and bridges in acceptable condition in all categories. However, the state’s roads in need of repair are so significant that even with the additional funding, not all roads and bridges will be able to be addressed in the next six to 10 years and are being prioritized by objective criteria. The size of the program is much more significant than previous investments, and the additional funding is being provided by a combination of both bond funds and an increase in gas taxes of $.19 per gallon, diesel differential increasing $.05 per gallon, and motor vehicle registrations increased $50 or $100 depending on class. Also, beginning July 2021, a 5-year phase-in of the state portion of the sales tax on motor fuels will be deposited to the Road Fund instead of the General Funds. The additional funding, along with the implementation of Transportation Asset Management philosophy, will help to make significant progress in addressing our road and bridge needs in Illinois. 3 Because of this additional Rebuild Illinois funding, the State of Illinois was able to maximize federal dollars; said another way, without this effort, the state would have left federal funds on the table. With the additional funding, IDOT has been able to address some of our congestion issues by including a small percentage of funds for needed capacity improvements. The projects were identified and evaluated on their impact to the department’s goals of providing a safe and effective transportation system that create economic development opportunities. Some of these projects include: • I-80 from Ridge Road to U.S. 30 in District 1 - $1.2 billion to rebuild a critical freight corridor and improve safety in a high-growth area by constructing auxiliary lanes, shoulders, and multiple bridge replacements, including aging, obsolete structures over the Des Plaines River. • I-55 from Illinois 54/Sangamon Avenue to Illinois 123 in District 6 - $137.4 million for additional lanes and reconstruction along 7.8 miles, a bridge replacement, bridge widening and other improvements. • I-57 from the Middle Fork of Big Muddy River in Franklin County to the I-64 south Tri-Level interchange in District 9 - $174.6 million for additional lanes for 25 miles and bridge replacements along this critical freight corridor. Finally, as noted above, the MYP is an annual effort to publish projects that will be addressed in the coming six-year timeframe. This MYP represents the baseline year with the new Rebuild Illinois funding. The MYP will be published annually and included projects will be updated to reflect available funding streams. The Rebuild Illinois funding also created stable revenue streams that will also allow the state to better fund ongoing capital needs, instead of waiting for a decade or longer for major capital plans such as Rebuild Illinois to be enacted. Programmed Improvements The MYP includes funding for the state-maintained system of roads and bridges as well as funding for roads and bridges maintained by local agencies. While this program includes funding amounts and proposed improvements for both the state and local program, through this planning effort, the department is primarily focused on the decisions made on the state system. This section details how the program is developed, presents the federal and state funds that are available for this program and provides an overview of the funding allocations for the local program. Asset management, along with Federal Transportation Performance Measure requirements, reflect an important change to the overall philosophy of how IDOT programs and prioritizes projects and the manner in which we report accomplishments. This MYP shows the continuation of the effort to focus on preserving assets to ensure they remain in a state of acceptable condition, and thereby save taxpayers money by preventing more costly repairs down the road. 4 It is anticipated that the FY 2020-2025 Proposed Highway Improvement Program will: • Provide funding to reconstruct or rehabilitate 4,063 miles of state-maintained roads and replace or rehabilitate bridges totaling 8,815,695 square feet of bridge deck area, as well as modernizing or expanding an additional 149 miles and 387,703 square feet of bridge deck. • Allocate $1.74 billion to lower-cost treatments to preserve state-maintained roads and bridges and keep them in a state of acceptable condition. • Provide funding to maintain 755 miles and 744,029 square feet of bridge deck area on the locally-maintained system. • Provide funding for railroad crossing safety improvements throughout the state. • Provide funding for traffic and safety improvements that further enhance highway safety as part of IDOT’s regular highway improvement program by targeting specific fatal and severe crash locations. • Enhance public right-of-way accessibility as part of IDOT’s regular highway improvement program by removing barriers to accessibility as identified in the agency’s Americans with Disabilities Act (ADA) Transition Plan. 5 Fund Sources The most recent federal transportation bill – Fixing America’s Surface Transportation (FAST) Act – delivers an average of $1.5 billion per year in federal funding for highways and bridges. Illinois ranks sixth in the nation in aggregate federal funding for highways and bridges under the FAST Act. The FAST Act continues to distribute nearly 93 percent of all federal-aid highway program funds to state transportation departments through core formula programs. State funds totaling $13.7 billion are anticipated to be available for the FY 2020-2025 MYP and are primarily generated from state motor fuel taxes and motor vehicle registration fees. As can be seen in the below graph, due to the Rebuild Illinois capital program, the percent of state funding has significantly increased from 12% in the FY 2019-2024 MYP to the current 58%. FY 2020-2025 Program Fund Sources $ Billions Series A Bond $5.00 21% Local Funds $0.69 3% Federal Aid $9.09 39% State Funds $8.71 37% Asset Management’s Impact on the Program With the change to focusing on preserving assets to keep them in acceptable condition before they worsen, IDOT will no longer use the performance targets of 90/93 for percent of roads/bridges in a state of acceptable condition. These targets were based on a measure of “backlog,” defined as being in a state of deterioration. Addressing roads and bridges when they reach backlog is the most expensive way to maintain a system. Implementing asset management means IDOT will no longer wait until a road or bridge falls into backlog before considering treatment options. Instead, the department will strive to maintain its assets in a state of acceptable condition – ultimately, over time, this strategy will help save money as a far more cost-effective approach. 6 The department is working to more accurately correlate cost with preservation and maintenance activities. Through this effort IDOT has the ability to evaluate potential investment strategies and determine how best we can reach our goals. Even with the additional funding, not all roads and bridges will be able to be addressed in the next six to ten years, therefore, it is anticipated that the condition of some roads will continue to worsen. IDOT will strive to maintain its assets at a safe and serviceable level. The number of roads and bridges that fall into poor condition is projected to decrease over the long term as the percentage of preservation work increases. New performance measures that are driving these changes are discussed in greater detail in the Performance Metrics and System Condition section. Core Work Categories Federal asset management rules require that IDOT show a commitment to preserving and maintaining the existing system. This demonstration takes into account the alignment between the actual and planned levels of investment for various work types which are defined as: initial construction, maintenance, preservation, rehabilitation and reconstruction. The department must be able to identify these items for both roads and bridges, therefore the below five core areas were developed to categorize projects: road maintenance, bridges, safety/system modernization, system expansion and a system support category that includes assets and activities supporting the transportation network. Much of the funding in this program will be used to maintain and preserve the state’s existing system of roads and bridges. • Roadway Maintenance includes reconstruction, resurfacing, widening and pavement preservation projects. • Bridges consists of bridge replacement and rehabilitation, minor structure repairs and preservation projects. Bridge information will be discussed in terms of square feet of deck area instead of number of bridges. The change to quantifying bridges in square feet of deck area was done to be more consistent with FHWA reporting requirements. The tracking of bridges by number is very misleading as a bridge can range from several hundred square feet of deck area to several hundred thousand square feet of deck area. 7 • Safety/System Modernization consists of projects such as interchange reconstruction, interstate safety projects, and traffic and safety improvements. • System Expansion includes major projects, such as new bridges on new alignment, additional lanes, new interchanges, and strategic regional arterials. • System Support consists of rest area and weigh station maintenance, miscellaneous districtwide projects, contract maintenance, statewide engineering or other statewide items, such as pavement markings, guardrail delineation, sign truss work, and median barriers. Throughout the course of the MYP, IDOT’s regional districts have programmed $1.74 billion towards the preservation of our existing roads and bridges. This does not include the dollar value from projects in which preservation was done as part of a larger improvement, as IDOT is not able to capture those amounts through current tracking mechanisms. Under the Bridges category, the only projects considered “new” are less than or equal to 20 feet structures being replaced with greater than 20 feet structures. For the MYP, all bridges less than or equal to 20 feet, as well as culverts, are counted as bridges, which is different than the Transportation Asset Management Plan that defines bridges as those structures greater than 20 feet. The Safety/System Modernization category includes work being done to the state system to improve safety and the flow of traffic; work being performed for the safety of the motoring public or to modernize the system for better flow of traffic. System Expansion has also been revised. Any work not directly associated with the expansion of a roadway or bridge has been moved to a category that better describes it. An example would be the reconstruction of an interstate that includes adding new lanes. The costs and miles associated with the additional capacity portion of the project will count as “expansion” and the costs and miles associated with the reconstruction work will count under Roadway Maintenance. The System Support category includes non-project specific engineering, work to maintain rest area roads, weigh stations, training, ADA standalone projects, work performed for jurisdictional transfers, etc. Work being performed is further defined within these core categories in the department’s programming system. 8 State Program The $23.49 billion available for the FY 2020-2025 program includes $19.35 billion for improving and maintaining the state highway system. Notable items: FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 511 1,355 1,777 420 3,959,692 2,497,577 942,466 1,415,960 (184 bridges) (217 bridges) (125 bridges) (147 bridges) 0 6 9 3 341 38 76 12 5 387,703 (25 bridges) 1,744.494 The FY 2020-2025 state program includes: • Roadway Maintenance – $7.58 billion is scheduled for reconstruction, resurfacing, widening and preservation. This includes $1.13 billion for interstate resurfacing projects. • Bridges – $4.99 billion is planned to address bridge needs across the state, with $884 million of this programmed for culvert replacements and repairs. • Safety/System Modernization – $1.59 billion is scheduled for projects such as interchange reconstructions, and traffic and safety improvements, of which $961 million is specifically for safety improvements. • Expansion – $3.08 billion is planned for expansion of the system. This includes $52 million for 8.1 miles of additional lanes on US 24/Illinois 9 from Banner to Kingston Mines in Fulton and Peoria counties and $23 million for 2 miles of additional lanes on Illinois 47 (Seminary St) from north of Illinois 120 (McHenry Ave) to US 14 in Woodstock. 9 • System Support– $2.11 billion for statewide or districtwide engineering, land acquisition, training, standalone ADA projects and various other miscellaneous types of work required to maintain our roads and bridges. Approximately 65 percent of the state program is dedicated to maintaining Illinois roads and bridges, 8 percent is allocated for safety and modernization of our system, and 11 percent for other work required to deliver the highway program. The remaining 16 percent is for projects that strategically expand the system in places where the return on investment is high. The distribution of these major priorities can be seen in Figure 1. Figure 1 10 Local Program The MYP provides $4.14 billion for improvements to an estimated 755 miles and more than 744 thousand square feet of deck area. Of these, 8 miles and 116 thousand square feet of deck area are on the NHS. Funding for local projects comes from federal, state and local funds for highway improvements selected by local units of government. The funding described in this document is in addition to the funds allocated directly to the local agencies through the state motor fuel tax allotments. Additional funding totaling $1.5 billion in Series A bonds for grants to local agencies was included in the Rebuild Illinois capital program. In addition, another $400 million annually will be distributed through the Motor Fuel Tax distribution formula from a portion of the $.19 gas tax increase. The department also provides local governments funding for the following special programs, which total $620.7 million. • $219.7 million for the county consolidated program • $40.3 million for high-growth cities • $100.9 million for needy townships • $90 million for the township bridge program • $42 million for upgrading local truck routes • $39.8 million for state matching assistance • $90 million to foster economic development Performance Metrics and System Condition The below chart shows the acceptable condition levels for all road system types. The acceptable condition levels for all non-interstate, state-maintained roads will be measured against the same standard. The department has determined that the standard for non-interstates will be a Condition Rating Survey (CRS) of 5.0 or higher on a scale of 1.0 to 9.0. Interstates will be held to a higher standard of a 5.5 or higher CRS. Pavements in this condition are considered to be in fair condition, which means that they can be preserved using low-cost preservation treatments. 11 To align more closely with the FHWA, bridges will be discussed in terms of square feet of bridge deck area instead of number of bridges. The department will also use element ratings for determining the condition of a bridge. An element rating of 5 or higher on a scale of 0 to 9 will be used to classify a bridge as being in a desired state of acceptable condition. The TAMP outlines IDOT’s strategies to shift towards a more data-driven decision process that supports the use of analysis tools and life cycle strategies to reduce the rate of system deterioration as cost-effectively as possible. Through the most recent federal transportation bill, the FAST Act, a greater emphasis has been placed on the condition and performance of the NHS through performance metrics established for the states. These requirements mean that no more than 5 percent of the interstate system lane miles can be in poor condition and no more than 10 percent of the bridge deck area on the NHS can be considered structurally deficient. Additionally, the department looks at road condition data, bridge inspection data, safety data, traffic data, and ADA needs to evaluate priorities in each program. All of this data is used by the department to establish program goals, measure accomplishments and describe the overall state highway condition to the general public. Another important consideration in the programming process is making improvements to meet the Americans with Disabilities Act requirements. The department conducted an evaluation to identify access barriers in IDOT’s programs and services. The results of this evaluation were incorporated into the department’s ADA Transition Plan and set a benchmark to determine annual barrier-removal goals and accomplishments. The evaluation also identified and analyzed IDOT’s policies, practices and procedures that impact accessibility in the public right-of-way. Road Conditions and Pavement Needs Every year, the department conducts a Condition Rating Survey (CRS) to assess pavement condition on the approximately 16,000-mile state highway system. This information is an important tool to assist the department with its pavement management activities. The CRS assigns a value to each segment of roadway to indicate the current condition of the pavement. A lower CRS value indicates the pavement is in worse condition. A higher CRS value means the pavement is in better condition. The department began collecting CRS in 1974 and has collected the data annually on alternating halves of the state, with data collected on the interstates every year. 12 Bridge Needs The department manages the state bridge system using a wide-ranging process that incorporates inspection and inventory data, needs analysis and funding allocation methods in order to maximize the use of available funds to address the assigned condition goal. Each bridge is examined by using the structure inspection rating and appraisal data and other criteria, such as accident data, load limits, and traffic volume. The timely and accurate assessment of bridge condition is critical to the identification, selection and prioritization of bridge needs in the programming process. For each program development cycle, the bridge inventory is re-evaluated for additional bridge candidates for potential inclusion in the multi-year and annual programs as well as to verify changes in the condition and status of the bridges that were included in the previous MYP. 13 Other Programs Statewide Line Items Funds are set aside in the six-year program for specified projects and programs. The department also sets aside funding for various anticipated needs, but exact locations or other details are not known during the program’s development. These are categorized into four main funding groups: engineering and environmental services, construction, maintenance and repairs, and federal programs and non-highway items. For FY 2020, $291 million has been reserved for the state program and $138 million has been reserved for local projects. In addition to these funds, the department manages other specially funded programs. These programs include: Highway Safety Improvement Program This multi-year program includes $616 million for safety construction activities, including roadside safety improvements and rail-highway crossings. Projects are identified on an annual basis to correct severe accident locations and protect rail grade crossings. These funds are from the federal Highway Safety Improvement Program and can be used on state and local roads. These funds can be used in standalone projects or for safety features incorporated into projects. Illinois Transportation Enhancement Program The Illinois Transportation Enhancement Program recently received additional state funds as part of the Capital funding package. It will now use federal dollars from a set-aside of the Surface Transportation Block Grant program to fund transportation alternatives authorized under Section 1109 of the FAST Act as well as state funds as stipulated in 20 ILCS (2705/615). Project sponsors are required to keep projects on track toward implementation or risk losing the funds. Due to the additional funding having some additional requirements, the call for projects has been postponed to late summer or early fall of 2020. ITEP awards will continue on a two year cycle. Congestion Mitigation/Air Quality (CMAQ) Program The Congestion Mitigation/Air Quality Improvement Program provides federal funds exclusively for specific traffic congestion and mitigation and air quality projects in the northeastern Illinois and Metro East areas, in accordance with federal legislation. Eligible projects are developed to meet air-quality standards and can include traffic flow improvements, public transportation projects and non-motorized transportation projects. A substantial amount of these funds will be used for public transportation projects. Local metropolitan planning organizations select the projects. The program has a total of $647 million available for CMAQ projects. Illinois Special Bridge Program (ISBP) IDOT’s ISBP targets deficient highway bridge projects that exceed replacement or rehabilitation costs of $7.5 million for state bridges and $1 million for local bridges. The ISBP provides federal National Highway Performance Program funds and/or Surface Transportation Program funds for up to 90 percent of eligible project costs; a non-federal match is required. The FY 2020-2025 program identifies $995 million for 42 local projects and 36 state projects. National Highway Freight Program Illinois has developed a freight investment plan using a competitive process for selecting projects from IDOT and other eligible applicants. The investment plan will decrease delays caused by congestion, crashes, and accessibility to intermodal facilities. The specific program goals are Bottleneck Reduction, Freight Related Safety, Intermodal Accessibility, and Technology Deployment and were chosen to implement the goals of the State Freight Plan. In total, IDOT received 46 applications requesting $581 million in federal funding. Of that, 23 projects have been selected for a total award of $241 million through federal fiscal year 2022. Of this amount, 14 $152 million is included in FY 2020-2022. The 23 projects receiving grants will improve safety, leverage private investment and improve intermodal connections and commerce at the local level. The grants were awarded using a competitive, objective, and transparent ranking process. Public Involvement Public involvement is an important component of all transportation system plans and programs. In Illinois, public input on transportation issues is fundamental to the success of all transportation programs. Every year, IDOT solicits feedback on the Multi-Year Plan and considers these comments during development of the next six-year program cycle. The public is encouraged to participate in the planning and development of transportation planning across the state. For more information on this and past programs, please visit This document also includes a public comment form on the following page. The completed form can be sent to the appropriate district office at the address listed on the Illinois Department of Transportation region and district boundaries map found on page 19 or you may send the completed form to IDOT’s Central Office at: Illinois Department of Transportation Office of Planning and Programming Bureau of Programming 2300 South Dirksen Parkway, Room 307 Springfield, Illinois 62764 Individuals can also contact IDOT by phone concerning planning, programming and public involvement issues at 1-800-493-3434. Hearing-impaired persons can comment by phone through the Ameritech Illinois relay number 1-800-526-0844. 15 Public Review and Comment Transportation Issues Issue / Comment Questions / Comments Please Print Submitted By Street Address City Telephone ( ) State E-mail Address For Office Use Only Detailed Location Description Return To: Illinois Department of Transportation Bureau of Programming Room 307 2300 South Dirksen Parkway Springfield, Illinois 62764 Printed 10/19/2019 OPP 2241 (Rev. 04/01/16) Date Received: Reviewed By: 16 Zip Code GLOSSARY AADT ADA AVE/AV Annual Average Daily Traffic Americans with Disabilities Act Avenue BI-DIRECT BLDG BLVD BUS/BUSN BYP CAA CC CD CDOT CH CMAQ Bi-Directional Building Boulevard Business Route Bypass Clean Air Act Community College Collector-Distributor Chicago Department of Transportation County Highway Congestion Mitigation Air Quality CO CRS CT CTA DEMO DIST DR E County Condition Rating Survey Court Chicago Transit Authority Demonstration District Drive East E-W EB ECL EIS EXPWY EXT FAP FAS FAU FR FT East-West Eastbound East Corporate Limit Environmental Impact Statement Expressway Extension Federal-aid Primary Federal-aid Secondary Federal-aid Urban Frontage Road Feet FY Fiscal Year(s) HGTS HPP HS HWY I ICC IDNR Heights High Priority Projects Program High School Highway Interstate Route Illinois Commerce Commission Illinois Department of Natural Resources Illinois Department of Transportation 17 IDOT JCT LN MAP-21 Junction Lane Moving Ahead for Progress in the 21st Century METRA MI MO MRB MT MYP N NB Rail Transit System Mile(s) Missouri Mississippi River Bridge Mount Multi-Year Program North Northbound NCL NCIIP North Corporate Limit National Corridor Infrastructure Improvement Program Northeast Northwest National Highway System Other Road Preliminary Engineering Location Studies Plan Preparation NE NW NHS OR P.E. PE (PHASE I) PE (PHASE II) PK PKWY PL PNRS RD REHAB ROW RR S SAFETEA-LU SB SBI SCL SE ST STA STR SW Park Parkway Place Projects of National and Regional Significance Road Rehabilitation Right of Way Railroad South Safe Accountable Flexible and Efficient Transportation Equity Act – Legacy for Users Southbound State Bond Issue South Corporate Limit Southeast Street Station Structure Southwest IHPA Illinois Historic Preservation Agency TAMP TEA-21 Transportation Asset Management Plan Transportation Equity Act for the 21st Century ILL I&M Illinois Route Illinois & Michigan TI INCL INT INTCHG IRI Including Intersection Interchange International Roughness Index TR TRAF TRIB TSL ITEP Illinois Transportation Enhancement Program Intermodal Surface Transportation Efficiency Act of 1991 Illinois State Toll Highway Authority US Transportation Improvements Township Road Traffic Tributary Type, Size and Location Plans US Route W WB WCL West Westbound West Corporate Limit ISTEA ISTHA 18 PROJECT LISTING INDEX Page District 1 Program Summary .........................................................................................1-i State Project List ............................................................................ 1-1 to 1-215 Local Project List ........................................................................ 1-216 to 1-287 District 2 Program Summary .........................................................................................2-i State Project List .............................................................................. 2-1 to 2-58 Local Project List ............................................................................ 2-59 to 2-67 District 3 Program Summary .........................................................................................3-i State Project List .............................................................................. 3-1 to 3-74 Local Project List ............................................................................ 3-75 to 3-95 District 4 Program Summary .........................................................................................4-i State Project List .............................................................................. 4-1 to 4-54 Local Project List ............................................................................ 4-55 to 4-69 District 5 Program Summary .........................................................................................5-i State Project List .............................................................................. 5-1 to 5-43 Local Project List ............................................................................ 5-44 to 5-50 District 6 Program Summary .........................................................................................6-i State Project List .............................................................................. 6-1 to 6-69 Local Project List ............................................................................ 6-70 to 6-91 District 7 Program Summary .........................................................................................7-i State Project List .............................................................................. 7-1 to 7-55 Local Project List ............................................................................ 7-56 to 7-75 District 8 Program Summary .........................................................................................8-i State Project List .............................................................................. 8-1 to 8-82 Local Project List .......................................................................... 8-83 to 8-100 District 9 Program Summary .........................................................................................9-i State Project List .............................................................................. 9-1 to 9-63 Local Project List ............................................................................ 9-64 to 9-87 Statewide Items Program Summary .........................................................................................0-i State Project List .............................................................................. 0-1 to 0-22 19 ILLINOIS DEPARTMENT OF TRANSPORTATION REGION and DISTRICT BOUNDARIES Region 1 DISTRICT 1 201 WEST CENTER COURT SCHAUMBURG, ILLINOIS 60196?1096 PHONE: 34717054000 Region 2 DISTRICT 2 819 DEPOT AVENUE DIXON, ILLINOIS 61021-3546 PHONE: B15I2B4-2271 DISTRICT 3 700 EAST NORRIS DRIVE OTTAWAI ILLINOIS 61350?1628 Region 3 DISTRICT 4 401 MAIN STREET PEORIA, ILLINOIS 51602-1111 PHONE: 309I671-3333 DISTRICT 5 13473 IL Hwy. 133 P. O. BOX 510 PARIS. ILLINOIS 61944-0610 PHONE: 217i465-4181 Region 4 DISTRICT 6 126 EAST ASH STREET SPRINGFIELD, ILLINOIS 62704-4792 PHONE: 21 71782-7301 DISTRICT 7 400 WEST WABASH EFFINGHAM. ILLINOIS 62401-2699 PHONE: 21 YI342-3951 Region 5 DISTRICT 3 1102 EASTPORT PLAZA DRIVE COLLINSVILLE, ILLINOIS 62234-6198 PHONE: 618846-3100 DISTRICT 9 STATE TRANSPORTATION BUILDING P. 0. BOX 100 CARBONDALE, ILLINOIS 62903-0100 PHONE: 6181?549-2171 1. Office of Planning 8: Programming WMapping Information Systems .Io DAYIESS STEPHENSON WINNEBAGO MCHENRY LAKE CARROLL OGLE COOK D2 .Schaumbury DUPAGE WHITESIDE LEE Dixon KENDALL WILL HENRY LASALLE ROCK ISLAND GRUNDY MERCER Ottawa KANKAKEE KNOX MARSHALL WARREN STARK LIVINGSTON PEDRJA D3 IROQUOIS 4 WOODFORD I Pa '0 aria FULTON HANCOCK VERMILION CHAMPAIGN SCHUYLER ADAMS D5 MENARD CASS BROWN SA AMON PIKE PIATT DOUGLAS EDGAR Springfield 5 3 SCOTT SHELBY 2 GREENE MACOUPIN CLARK CHRISTIAN 2 MONTGOMERY CUMBERLAND a' FAYETTE JERSEY JASPER 0 ?an ham MADISON BOND 5' CLAY CRAWFORD RICHLAND LAWRENCE Cofiinsvifie MARION CLINTON ST. CLAIR D8 WAYNE I JEFFERSON 3 3 I: 3 MONROE WASHINGTON - RANDOLPH PERRY WHITE FRANKLIN I JACKSON 3 WILLIAMSON Carbondaie D9 5 UNION JOHNSON POPE HARDIN pumsm MAssnc 2 4 April 2014 20 GUIDE TO HIGHWAY PROJECT LISTINGS Projects on the state highway system identified for the FY 2020-2025 Proposed Highway Improvement Program are listed on the following pages. The lists are identified within IDOT’s nine geographic highway districts. The map on the previous page shows individual highway district boundaries. The following sequence is used within the district project listing: • Interstate-marked routes in ascending numerical order • U.S.-marked routes in ascending numerical order • Illinois-marked routes in ascending numerical order • Unmarked routes in alphabetical order by street name starting with numbered streets The estimated cost of each project is shown. The actual cost of a project listed for FY 2020-2025 can vary depending on when it is implemented in the multi-year period. The listing of projects is arranged in seven columns: Route / Street Location Improvements TAMP Category Est. Cost City Route/Street – Identifies the marked route(s) and street name Location – Identifies project limits, and length Improvements – identifies type of improvement TAMP Category – identifies the Transportation Asset Management Plan (TAMP) category that the project falls within. Est. Cost – identifies the estimated project cost City/ County – identifies city or county MYP Years Past – identifies the number of years a project has appeared in the multi-year program. FY 2020-2025 is year one. 21 MYP Years Past Current MYP Years Current – identifies projects scheduled for FY 2020 and those scheduled for FY 2021-2025. Project footnotes denote special fund sources, participation requirements, and other important, project-specific information. Roadway Information Miles AADT Truck Pct NHS 1.27 29,579 6.3 Y 0.36 25,267 8.4 N Miles – Identifies project length. AADT – Identifies the average volume of traffic for one day (24-hour period). Truck Pct – Identifies the percentage of the average volume of total trucks compared to the average volume of total vehicles for an average day. NHS – Shows if this route is designated as part of the National Highway System. Structure Information Str Number AADT Truck Pct NHS 0161013 29,100 3 Y Str Number – Unique identification number assigned to each structure. AADT – Annual Average Daily Traffic Truck Pct – Identifies the percentage of the average volume of total trucks compared to the average volume of total vehicles for an average day. NHS – Shows if this route is designated as part of the National Highway System. 22 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 1 District 1 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 1, DISTRICT 1, SCHAUMBURG Overview Highway District 1 encompasses six counties in northeastern Illinois and includes the city of Chicago, suburban Cook County, and the five collar counties of DuPage, Kane, Lake, McHenry and Will. The state highway system in District 1 consists of 2,720 miles of highways and 1,448 bridges, supporting more than 76 million miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $6.63 billion will be provided during FY 2020-2025 for improvements to state highways in District 1. The following table summarizes anticipated accomplishments on the state highway system in District 1 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 60 234 40 135 521,329 1,130,460 22,829 722,547 0 3 0 3 188 0 27 4 1 226,565 852.930 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 55 from Illinois 129 to Lorenzo Road; at Illinois 129; at Lorenzo Road; and East and West Frontage Roads from Kavanaugh Road to Lorenzo Road in Will County. Interchange reconstruction at Lorenzo Road; interchange reconstruction, bridge replacement and utility adjustments at Illinois 129; construction of auxiliary lanes, widening and resurfacing on 2.5 miles, engineering for design, location and environmental studies, engineering for contract plans, land acquisition, construction 1-i engineering, and utility adjustments from Illinois 129 to Lorenzo Road; and reconstruction of the east and west frontage roads from Kavanaugh Road to Lorenzo Road are programmed during FY 2020-2025 at an estimated total cost of $148.7 million. Of this total, $600,000 is included in FY 2020 for engineering for design, location and environmental studies. • Interstate 55 at Airport Road/Lockport Road and at Illinois 126 in Romeoville. Interchange construction at Airport Road/Lockport Road and at Illinois 126, engineering for contract plans, land acquisition, construction engineering, and utility adjustments are programmed during FY 2021-2025 at an estimated total cost of $181.4 million. • Interstate 190 (Kennedy Expressway) from Bessie Coleman Drive to Interstate 90 (Kennedy Expressway) in Chicago and Rosemont. Reconstruction of 2.1 miles, construction of auxiliary lanes, engineering for contract plans, construction engineering, and utility adjustments are programmed during FY 2020-2025 at an estimated cost of $561 million. • Interstate 80 from Ridge Road to US 30 (Lincoln Highway) in Joliet, New Lenox and Minooka. Reconstruction for 16 miles, construction of two new bridges over the Des Plaines River, construction of auxiliary lanes at the interchanges within the project limits, as well as various bridge work along the entire corridor, including multiple bridge replacements. In addition, bridge superstructures, bridge replacements, bridge widening, reconstruction, bridge repair, bridge fabrication, utility adjustments, construction engineering and a railroad flagger are programmed for eastbound and westbound structures from Illinois 53 (Chicago Street) to Rowell Avenue. Also included along the entire corridor is engineering for design, location and environmental studies, engineering for contract plans, land acquisition, construction engineering, utility adjustments and railroad flaggers. The estimated total cost of the programmed work within this corridor during FY 2020-2025 is $1.2 billion. Of this total, $104.3 million is included in FY 2020 for bridge superstructure, bridge replacements, bridge widening, reconstruction, bridge fabrication, construction engineering and a railroad flagger at eastbound structures from Illinois 53 (Chicago Street) to Rowell Avenue, as well as engineering for design, location and environmental studies, engineering for contract plans and land acquisition for the entire corridor. • Interstate 90/94 at Interstate 290/Congress Parkway (Jane Byrne Interchange) in Chicago. Bridge replacement, ramp modifications, reconstruction of 4.2 miles, retaining walls, noise barriers, lighting, landscaping, drainage improvements, bridge removal and demolition, bridge painting, miscellaneous work, ADA improvements, construction engineering, and engineering for contract plans are programmed during FY 2020-2025 at an estimated cost of $210 million. Of this total, $173 million is included in FY 2020 for bridge replacement, reconstruction of 4.2 miles, ramp modifications, retaining walls, bridge removal and demolition, drainage improvements, lighting, miscellaneous work, landscaping, construction engineering, and engineering for contract plans. The FY 2021-2025 portion of the program includes $37 million for bridge painting, landscaping, miscellaneous work, engineering for contract plans, and construction engineering. The I-90/94 (Kennedy Expressway) and I-290 Jane Byrne Interchange in downtown Chicago has been identified as one of the nation’s worst freight bottleneck locations. The Jane Byrne Interchange links the Dan Ryan Expressway (I-90/94) to the south, the Eisenhower Expressway (I-290) to the west, Congress Parkway to the east and the Kennedy Expressway (I-90/94) to the north. The interchange is congested for many hours of the day causing substantial backups in every direction. Provides for efficient freight movement. • US 12/20/45 (95th Street) at Stony Island Avenue in Chicago. Bridge replacements, railroad separation replacement, intersection reconstruction, lower roadway, pump station, lighting, land acquisition, engineering for contract plans, construction engineering, utility adjustments, railroad engineering, and a railroad flagger are programmed during FY 2020-2025 at an estimated cost of $92 million. Of this total, $10.2 million is included in FY 2020 for engineering for contract plans and land acquisition. 1-ii • US 20 from west of Randall Road to east of Shales Parkway in Elgin. bridge replacements, ramp modifications, bridge repairs, new bridge decks, bridge superstructures, bridge widening, noise walls, channelization, safety improvements, construction of auxiliary lanes, engineering for contract plans, land acquisition, construction engineering, utility adjustments, and a railroad flagger are programmed during FY 2020-2025 at an estimated cost of $109.4 million. Of this total, $15 million is included in FY 2020 for engineering for contract plans and land acquisition. This project has been approved for Illinois Special Bridge Program funding. • US 41 at Illinois 176 in Lake Bluff. Reconstruction and construction of an additional lane for one mile, interchange construction, construction of auxiliary lanes, engineering for contract plans, land acquisition, construction engineering, and utility adjustments are programmed during FY 2020-2025 at an estimated cost of $53.2 million. Of this total, $10 million is included in FY 2020 for land acquisition and engineering for contract plans. • US 52 (Jefferson Street) from River Road to Houbolt Road in Shorewood and Joliet. Reconstruction on 2.5 miles, bridge widening, turning lanes, culvert extension, bridge repair, engineering for contract plans, land acquisition, construction engineering, and utility adjustments are programmed during FY 2021-2025 at an estimated cost of $97.5 million. • Illinois 31 (Front Street) from south of Illinois 120 (Belvidere Road) to north of Illinois 176 (Terra Cotta Avenue) and at a drainage ditch 4 miles south of US 12 in McHenry. Reconstruction and construction of additional lanes for 6.3 miles, culvert replacement, engineering for contract plans, land acquisition, preliminary engineering for right-of-way, preliminary engineering surveys, construction engineering, and utility adjustments are programmed during FY 2020-2025 at an estimate cost of $113.2 million. Of this total, $2.4 million is included in FY 2020 for engineering for contract plans, preliminary engineering for right-of-way, and preliminary engineering for surveys. • Illinois 43 (Harlem Avenue) at BRC Railroad (65 th Street) in Bedford Park. A railroad grade separation, land acquisition, engineering for contract plans, construction engineering, utility adjustments, and a railroad flagger are programmed during FY 2021-2025 at an estimated cost of $118.8 million. • Illinois 47 Corridor Improvements: 1. North of Illinois 120 (McHenry Avenue) to US 14 in Woodstock. Reconstruction and construction of additional lanes for 2 miles, intersection improvement, culvert replacement, land acquisition, engineering for contract plans, construction engineering, utility adjustments and a railroad flagger are programmed during FY 2020-2025 at an estimated cost of $58.6 million. Of this total, $9.6 million is included in FY 2020 for land acquisition. 2. Illinois 47/Illinois 176 (Pleasant Valley Road) at Illinois 176 (north and south junctions) and at Pleasant Valley Road in McHenry County. Intersection reconstruction, land acquisition, engineering for contract plans, and construction engineering are programmed during FY 2020-2025 at an estimated cost of $44.5 million. Of this total, $3.6 million is included in FY 2020 for engineering for contract plans and land acquisition. 3. At Kishwaukee River in McHenry County. Bridge replacement and construction engineering are programmed during FY 2020-2025 at an estimated cost of $8.0 million. Of this total, $7.6 million is included in FY 2020 for bridge replacement and construction engineering. 4. Illinois 47/US 30 from Cross Street to south of Galena Boulevard in Sugar Grove and Yorkville. Reconstruction and construction of additional lanes for 4.3 miles, bridge replacement, culvert replacement, engineering for contract plans, and construction engineering are programmed during FY 2021-2025 at an estimated cost of $70 million. This is a SAFTEA-LU National Corridor Infrastructure Project. 1-iii • Illinois 53 (Chicago Street) from US 52 to Arsenal Road in Joliet, Elwood and Wilmington. Intersection improvement, channelization, engineering for contract plans, construction engineering, land acquisition, and utility adjustments are programmed during FY 2021-2025 at an estimated cost of $50 million. • Illinois 56 (Butterfield Road) at Illinois 53 and from west of Illinois 53 to west of Interstate 355 in Downers Grove. Reconstruction and construction of additional lanes for 2 miles, intersection reconstruction, ADA improvements, bridge repair, bridge deck overlay, bridge beam replacement, culvert rehabilitation, noise barriers, retaining wall, construction engineering, and utility adjustments are programmed during FY 2021-2025 at an estimated cost of $25.6 million. • Illinois 60/Illinois 83 from Illinois 176 (Maple Avenue) to CN Railroad in Mundelein. Reconstruction and construction of additional lanes for 3 miles, construction of a railroad grade separation, engineering for contract plans, construction engineering, land acquisition, utility adjustments, and a railroad flagger are programmed during FY 2020-2025 at an estimated cost of $129.4 million. Of this total, $9 million is included in FY 2020 for engineering for contract plans and land acquisition. • Illinois 120 from Ashford Lane to US 45 in Grayslake. Reconstruction and construction of additional lanes for nearly one mile, engineering for design, location and environmental studies, engineering for contract plans, land acquisition, and construction engineering are programmed during FY 2020-2025 at an estimated cost of $29.6 million. Of this total, $1.4 million is included in FY 2020 for engineering for design, location and environmental studies. • Illinois 131 (Green Bay Road) from Wadsworth Road to Sunset Avenue in Beach Park. Reconstruction and construction of additional lanes for 2.5 miles, engineering for contract plans, land acquisition, utility adjustments, and construction engineering are programmed during FY 2020-2025 at an estimated cost of $80 million. Of this total, $16.4 million is included in FY 2020 for engineering for contract plans and land acquisition. • Barrington Road from south of Illinois 62 (Algonquin Road) to Central Road in South Barrington. Reconstruction and construction of additional lanes for 1.5 miles, culvert rehabilitation, engineering for contract plans, construction engineering, and utility adjustments are programmed during FY 2020-2025 at an estimated cost of $19.4 million. Of this total, $700,000 is included in FY 2020 for engineering for contract plans. • Willow Road from east of the Des Plaines River to Waterview Drive/Protection Parkway in Prospect Heights. Reconstruction and construction of additional lanes for one mile, intersection improvement, lighting, noise barriers, a new bridge deck, bridge repairs, land acquisition, construction engineering, and utility adjustments are programmed during FY 2020-2025 at an estimated cost of $25.4 million. Of this total, $3.4 million is included in FY 2020 for land acquisition. 1-iv COOK COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 57 Location WILL CO LINE TO 0.1 MI N OF 175TH ST Miles = 7.24 Roadway Information Miles AADT Truck Pct 7.24 73,032 11.4 I 57 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $8,000,000 MATTESON RICHTON PARK COUNTRY CLUB HILLS 1 2021-2025 $1,000,000 MATTESON RICHTON PARK COUNTRY CLUB HILLS 1 2021-2025 4 2021-2025 PRESERVATION - PAVEMENTS NHS Y WILL CO LINE TO 0.1 MI N OF 175TH ST CONSTRUCTION ENGINEERING PRESERVATION - PAVEMENTS I 57 AT STEGER RD BRIDGE NEW DECK $1,753,000 REHABILITATION - BRIDGES I 57 AT SAUK TRAIL BRIDGE NEW DECK Structure Information Str Number AADT 2,350 0161108 $5,129,000 REHABILITATION - BRIDGES I 57 AT SAUK TRAIL BRIDGE PAINTING PRESERVATION - BRIDGES 1-1 RICHTON PARK Structure Information Str Number AADT 10,800 0160575 $1,000,000 RICHTON PARK Truck Pct NHS 5 N 4 2020 Truck Pct NHS 8 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 57 Location AT 175TH ST Improvements TAMP Category BRIDGE NEW DECK Est. Cost 57 AT US 6 (159TH ST) BRIDGE NEW DECK BRIDGE REPAIR SUBSTRUCTURE WIDENING ADA IMPROVEMENTS $3,000,000 57 AT US 6 (159TH ST) P.E. (PHASE II) 3 Structure Information Str Number AADT 4,450 0161095 $4,315,000 REHABILITATION - BRIDGES I MYP Years Past Current REHABILITATION - BRIDGES I City MARKHAM Structure Information Str Number AADT 29,100 0161013 2021-2025 Truck Pct NHS 7 N 4 2021-2025 Truck Pct NHS 3 Y $1,000,000 MARKHAM 3 2020 $500,000 MARKHAM 1 2021-2025 MARKHAM POSEN DIXMOOR RIVERDALE BLUE ISLAND CALUMET PARK CHICAGO 3 2021-2025 REHABILITATION - BRIDGES I 57 AT US 6 (159TH ST) P.E. (PHASE II) REHABILITATION - BRIDGES I 57 S OF I-294 (TRI-STATE TOLLWAY) TO ILL 1 (HALSTED ST) Miles = 8.06 Roadway Information Miles AADT Truck Pct 8.06 123,606 5.1 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 1-2 $13,460,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 57 Location S OF I-294 (TRI-STATE TOLLWAY) TO ILL 1 (HALSTED ST) Improvements TAMP Category BRIDGE DECK SEALING Est. Cost City MYP Years Past Current $480,000 POSEN 2 2021-2025 $1,000,000 MARKHAM POSEN DIXMOOR RIVERDALE BLUE ISLAND CALUMET PARK CHICAGO 2 2021-2025 $1,000,000 CALUMET PARK 3 2021-2025 $2,100,000 CHICAGO 3 2021-2025 PRESERVATION - BRIDGES I 57 S OF I-294 (TRI-STATE TOLLWAY) TO ILL 1 (HALSTED ST) P.E. (PHASE II) PRESERVATION - PAVEMENTS I 57 AT 127TH ST BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES I 57 AT PARNELL AVE BRIDGE NEW DECK DAN RYAN EXPWY REHABILITATION - BRIDGES I 80 AT OAK PARK AVE BRIDGE NEW DECK BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 1-3 Structure Information Str Number AADT 750 0162029 $2,674,000 TINLEY PARK Structure Information Str Number AADT 3,050 0160927 Truck Pct NHS 12 N 4 2021-2025 Truck Pct NHS 3 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 80 Location I-57 TO KEDZIE AVE Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $6,200,000 COUNTRY CLUB HILLS 2 2021-2025 $5,800,000 HAZEL CREST 3 2021-2025 PRESERVATION - BRIDGES I 80 AT I-294 (TRI-STATE TOLLWAY)(NB) BRIDGE REPLACEMENT (EASTBOUND) RECONSTRUCTION - BRIDGES I 80 AT I-294 (TRI-STATE TOLLWAY) (NB) P.E. (PHASE II) Structure Information Str Number AADT 1,500 0162132 Truck Pct NHS N/A Y $600,000 HAZEL CREST 2 2021-2025 $900,000 HAZEL CREST 1 2021-2025 CHICAGO PARK RIDGE 2 2020 (EASTBOUND) RECONSTRUCTION - BRIDGES I 80 AT I-294 (TRI-STATE TOLLWAY) (NB) CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES I 90 KENNEDY EXPWY (WESTBOUND) I-90: I-190 TO ILL 43 (HARLEM AVE) (WB) & ILL 72 / BRYN MAWR AVE: W OF ILL 171 (CUMBERLAND AVE) TO ILL 43 (HARLEM AVE) CONSTRUCTION ENGINEERING ILL 72 RECONSTRUCTION - PAVEMENTS 1-4 $2,750,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 Location I-190 TO ILL 43 (HARLEM AVE) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $725,000 CHICAGO 3 2020 $16,000,000 CHICAGO 4 2020 $1,000,000 CHICAGO 4 2020 $1,000,000 CHICAGO 1 2021-2025 $116,000 CHICAGO 1 2020 KENNEDY EXPWY MISCELLANEOUS IMPROVEMENTS I 90 KENNEDY EXPWY ILL 43 (HARLEM AVE) TO I-94 (EDENS JCT) Miles = 3.51 Roadway Information Miles AADT Truck Pct 3.51 164,557 3.2 I 90 DESIGNED OVERLAY DRAINAGE BRIDGE DECK SEALING BRIDGE REPAIR BRIDGE CLEANING REHABILITATION - PAVEMENTS NHS Y ILL 43 (HARLEM AVE) TO I-94 (EDENS JCT) CONSTRUCTION ENGINEERING KENNEDY EXPWY REHABILITATION - PAVEMENTS I 90 ILL 43 (HARLEM AVE) TO I-94 (EDENS JCT) CONSTRUCTION ENGINEERING KENNEDY EXPWY REHABILITATION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (MONROE ST OVER I-90/94) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) HIGH MAST LIGHTING & INTELLIGENT TRANSPORTATION SYSTEMS Improvements TAMP Category LIGHTING MISCELLANEOUS Est. Cost City MYP Years Past Current $4,000,000 CHICAGO 1 2020 $225,000 CHICAGO 1 2020 $800,000 CHICAGO 2 2021-2025 $5,000,000 CHICAGO 2 2020 $5,600,000 CHICAGO 2 2021-2025 MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (NEAR UIC) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) HIGH MAST LIGHTING & INTELLIGENT TRANSPORTATION SYSTEMS CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) P.E. (PHASE II) P.E. (CONSULTANT PLANS) RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) P.E. (PHASE II) P.E. (CONSULTANT PLANS) RECONSTRUCTION - PAVEMENTS 1-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) MISCELLANEOUS INTCHG RAMPS AT VARIOUS LOCATIONS Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $5,500,000 CHICAGO 2 2020 $2,500,000 CHICAGO 2 2021-2025 $200,000 CHICAGO 2 2021-2025 $200,000 CHICAGO 6 2020 $3,000,000 CHICAGO 4 2021-2025 RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) MISCELLANEOUS INTCHG RAMPS AT VARIOUS LOCATIONS CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) HIGH MAST LIGHTING & INTELLIGENT TRANSPORTATION SYSTEMS CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) LANDSCAPING MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) GREEN SPACE CONTRACT AT VARIOUS LOCATIONS LANDSCAPING MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 1-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) ADAMS ST & JACKSON BLVD OVER I-90/94 (DAN RYAN EXPWY) Improvements TAMP Category BRIDGE REPLACEMENT RETAINING WALL LIGHTING NOISE BARRIERS ADA IMPROVEMENTS Est. Cost 90 I 94 I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) ADAMS ST OVER I-90/94 (DAN RYAN EXPWY) CONSTRUCTION ENGINEERING MYP Years Past Current $47,000,000 RECONSTRUCTION - BRIDGES I City CHICAGO Structure Information Str Number AADT 13,800 0160589 10,700 0160588 1 2020 Truck Pct NHS 10 N 17 N $5,575,000 CHICAGO 2 2021-2025 $1,400,000 CHICAGO 1 2021-2025 $11,241,000 CHICAGO 1 2020 $500,000 CHICAGO 1 2020 RECONSTRUCTION - BRIDGES I 90 I 94 I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) ADAMS ST & JACKSON BLVD OVER I-90/94 (DAN RYAN EXPWY) CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (JACKSON BLVD ADVANCE WORK) RETAINING WALL DRAINAGE BRIDGE REMOVAL/DEMOLITION MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (JACKSON BLVD ADVANCE WORK) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (JACKSON BLVD ADVANCE WORK) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $900,000 CHICAGO 1 2021-2025 $2,000,000 CHICAGO 2 2020 $2,000,000 CHICAGO 2 2021-2025 $47,910,000 CHICAGO 1 2020 $1,532,000 CHICAGO 1 2020 MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (EB) RAMP TO I-90/94 (NB) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) (EB) RAMP TO I-90/94 (NB) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (NB): ROOSEVELT RD TO LAKE ST / MADISON ST Miles = 1.96 RECONSTRUCTION RETAINING WALL RAMP MODIFICATIONS RECONSTRUCTION - PAVEMENTS I 90 I 94 ROOSEVELT RD TO US 12/20 (95TH ST) PAVEMENT MARKING DAN RYAN EXPWY (SOUTHBOUND) MAINTENANCE - PAVEMENTS 1-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location ROOSEVELT RD TO US 12/20 (95TH ST) Improvements TAMP Category PAVEMENT MARKING Est. Cost City MYP Years Past Current $1,443,000 CHICAGO 1 2020 $700,000 CHICAGO 2 2020 $5,900,000 CHICAGO 2 2021-2025 $47,950,000 CHICAGO 1 2020 $600,000 CHICAGO 2 2020 DAN RYAN EXPWY (NORTHBOUND) MAINTENANCE - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (NB): ROOSEVELT RD TO LAKE ST / MADISON ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (NB): ROOSEVELT RD TO LAKE ST / MADISON ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (SB): ROOSEVELT RD TO LAKE ST / MADISON ST Miles = 2.28 RECONSTRUCTION RAMP MODIFICATIONS RETAINING WALL RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (SB): ROOSEVELT RD TO LAKE ST / MADISON ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 10 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) I-90/94 (SB): ROOSEVELT RD TO LAKE ST / MADISON ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $6,200,000 CHICAGO 2 2021-2025 $2,500,000 CHICAGO 1 2021-2025 $300,000 CHICAGO 2 2021-2025 $14,638,000 CHICAGO 3 2021-2025 RECONSTRUCTION - PAVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) BRIDGE (EB & WB) E OF DES PLAINES ST & I-290 (WB) BRIDGE OVER I-90/94 BRIDGE PAINTING MISCELLANEOUS IMPROVEMENTS I 90 I 94 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) BRIDGE (EB & WB) E OF DES PLAINES ST & I-290 (WB) BRIDGE OVER I-90/94 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS I 90 AT FOSTER AVE KENNEDY EXPWY BRIDGE REPLACEMENT DRAINAGE ADA IMPROVEMENTS RECONSTRUCTION - BRIDGES I 90 AT FOSTER AVE RR FLAGGER KENNEDY EXPWY RECONSTRUCTION - BRIDGES 1 - 11 Structure Information Str Number AADT 30,300 0161100 $1,300,000 CHICAGO Truck Pct NHS 1 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 Location AT FOSTER AVE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,400,000 CHICAGO 3 2020 $1,600,000 CHICAGO 3 2021-2025 $27,000,000 CHICAGO 4 2021-2025 $220,000 CHICAGO 4 2021-2025 $500,000 CHICAGO 4 2021-2025 KENNEDY EXPWY RECONSTRUCTION - BRIDGES I 90 AT FOSTER AVE CONSTRUCTION ENGINEERING KENNEDY EXPWY RECONSTRUCTION - BRIDGES I 90 I 94 KENNEDY EXPWY AT FOSTER AVE & LAWRENCE AVE TO OHIO ST (REHAB OF EXISTING KENNEDY EXPWY REVERSIBLE LANE ACCESS CONTROL SYSTEM) MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS I 90 I 94 KENNEDY EXPWY AT FOSTER AVE & LAWRENCE AVE TO OHIO ST (REHAB OF EXISTING KENNEDY EXPWY REVERSIBLE LANE) UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS I 90 I 94 KENNEDY EXPWY AT FOSTER AVE & LAWRENCE AVE TO OHIO ST (REHAB OF EXISTING KENNEDY EXPWY REVERSIBLE LANE) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location I-94 (EDENS EXPWY) TO HUBBARD ST Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost City MYP Years Past Current $60,000,000 CHICAGO 4 2021-2025 $600,000 CHICAGO 3 2020 $6,000,000 CHICAGO 4 2021-2025 $6,000,000 CHICAGO 3 2021-2025 $1,250,000 CHICAGO 3 2021-2025 KENNEDY EXPWY PRESERVATION - BRIDGES I 90 I 94 I-94 (EDENS EXPWY) TO HUBBARD ST P.E. (PHASE I) KENNEDY EXPWY PRESERVATION - BRIDGES I 90 I 94 I-94 (EDENS EXPWY) TO HUBBARD ST P.E. (PHASE II) KENNEDY EXPWY PRESERVATION - BRIDGES I 90 I 94 I-94 (EDENS EXPWY) TO HUBBARD ST CONSTRUCTION ENGINEERING KENNEDY EXPWY PRESERVATION - BRIDGES I 90 KENNEDY EXPWY AT METRA & AT UP RR BRIDGE PAINTING RR FLAGGER PRESERVATION - BRIDGES 1 - 13 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 90 I 94 Location HUBBARDS CAVE TO N OF I-290 (EISENHOWER EXPWY) Miles = 1.17 Roadway Information Miles AADT Truck Pct 1.17 231,087 5.9 I 94 Improvements TAMP Category DESIGNED OVERLAY RAMP REPAIR Est. Cost City MYP Years Past Current $6,100,000 CHICAGO 3 2021-2025 CHICAGO WILMETTE LINCOLNWOOD NORTHBROOK MORTON GROVE SKOKIE 3 2021-2025 DEERFIELD 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y VARIOUS LOCATIONS BRIDGE REPAIR $670,000 US 41 VARIOUS MAINTENANCE - BRIDGES I 94 AT PFINGSTEN RD BRIDGE REPLACEMENT $2,200,000 EDENS EXPWY / TRI-ST CONNECTOR RECONSTRUCTION - BRIDGES I 94 AT ILL 43 (WAUKEGAN RD) EDENS EXPWY / BRIDGE DECK SEALING BRIDGE JOINT REPLACE/REPAIR Structure Information Str Number AADT 12,400 0160547 $188,000 Truck Pct NHS 2 N DEERFIELD 1 2021-2025 NORTHFIELD 22 2021-2025 TRI-ST CONNECTOR PRESERVATION - BRIDGES I 94 US 41 AT WINNETKA RD BRIDGE REPLACEMENT RETAINING WALL $3,200,000 EDENS EXPWY RECONSTRUCTION - BRIDGES 1 - 14 Structure Information Str Number AADT 7,400 0160923 Truck Pct NHS 2 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 Location AT SKOKIE RIVER US 41 Improvements TAMP Category BRIDGE REPAIR BRIDGE SUPERSTRUCTURE Est. Cost City MYP Years Past Current $6,000,000 WILMETTE 2 2021-2025 $7,482,000 SKOKIE 10 2021-2025 MAINTENANCE - BRIDGES I 94 AT OLD ORCHARD RD EDENS EXPWY BRIDGE SUPERSTRUCTURE DRAINAGE BRIDGE DECK OVERLAY BRIDGE REPAIR BRIDGE DECK REPAIRS BRIDGE REMOVAL/DEMOLITION ADA IMPROVEMENTS RETAINING WALL IDOT PARTICIPATION IN PROJECT. REHABILITATION - BRIDGES I 94 AT OAKTON ST BRIDGE REPLACEMENT Structure Information Str Number AADT 27,900 0160823 $10,000,000 SKOKIE Truck Pct NHS 4 N 4 2021-2025 EDENS EXPWY RECONSTRUCTION - BRIDGES I 94 AT OAKTON ST CONSTRUCTION ENGINEERING EDENS EXPWY RECONSTRUCTION - BRIDGES 1 - 15 Structure Information Str Number AADT 25,600 0160827 $1,300,000 SKOKIE Truck Pct NHS 3 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 Location AT OAKTON ST Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,000,000 SKOKIE 1 2020 $6,400,000 CHICAGO 3 2021-2025 EDENS EXPWY RECONSTRUCTION - BRIDGES I 94 AT DEVON AVE BRIDGE NEW DECK EDENS EXPWY REHABILITATION - BRIDGES I 94 AT DEVON AVE P.E. (PHASE II) Structure Information Str Number AADT 17,800 0160834 Truck Pct NHS 3 N $640,000 CHICAGO 1 2020 $12,442,000 CHICAGO 12 2020 EDENS EXPWY REHABILITATION - BRIDGES I 94 AT MONTROSE AVE KENNEDY EXPWY BRIDGE SUPERSTRUCTURE LIGHTING ADA IMPROVEMENTS RR FLAGGER REHABILITATION - BRIDGES I 94 AT MONTROSE AVE UTILITY ADJUSTMENT KENNEDY EXPWY REHABILITATION - BRIDGES 1 - 16 Structure Information Str Number AADT 15,800 0160852 $100,000 CHICAGO Truck Pct NHS 6 N 8 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 Location AT MONTROSE AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $2,000,000 CHICAGO 4 2020 $500,000 CHICAGO 2 2021-2025 $7,000,000 CHICAGO 2 2021-2025 $500,000 CHICAGO 2 2021-2025 $500,000 CHICAGO 2 2021-2025 KENNEDY EXPWY REHABILITATION - BRIDGES I 94 I 90 AT HUBBARD ST BRIDGE PAINTING KENNEDY EXPWY PRESERVATION - BRIDGES I 94 I 90 KINZIE ST TO WAYMAN ST (HUBBARDS CAVE) BRIDGE PAINTING KENNEDY EXPWY PRESERVATION - BRIDGES I 94 I 90 AT GREEN ST BRIDGE PAINTING KENNEDY EXPWY PRESERVATION - BRIDGES I 94 I 90 AT FULTON ST BRIDGE PAINTING KENNEDY EXPWY PRESERVATION - BRIDGES 1 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 I 90 Location AT STEWART AVE Improvements TAMP Category BRIDGE REPAIR Est. Cost City MYP Years Past Current $200,000 CHICAGO 2 2021-2025 $1,000,000 CHICAGO 3 2021-2025 $16,600,000 CHICAGO CALUMET CITY DOLTON SOUTH HOLLAND 3 2021-2025 $1,000,000 CHICAGO CALUMET CITY DOLTON SOUTH HOLLAND 2 2021-2025 $5,000,000 CHICAGO CALUMET CITY DOLTON SOUTH HOLLAND 2 2021-2025 DAN RYAN EXPWY MAINTENANCE - BRIDGES I 94 I 90 AT CTA STRUCTURES OVER I-90/94 S OF 55TH ST BRIDGE PAINTING RR FLAGGER DAN RYAN EXPWY MAINTENANCE - BRIDGES I 94 BISHOP FORD EXPWY W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) Miles = 9.14 Roadway Information Miles AADT Truck Pct 9.14 143,434 7.6 I 94 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) P.E. (PHASE II) BISHOP FORD EXPWY REHABILITATION - PAVEMENTS I 94 W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) CONSTRUCTION ENGINEERING BISHOP FORD EXPWY REHABILITATION - PAVEMENTS 1 - 18 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 Location W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) BISHOP FORD EXPWY Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR RR FLAGGER CULVERT REPAIR Est. Cost City MYP Years Past Current $18,100,000 CHICAGO CALUMET CITY 3 2021-2025 $500,000 CHICAGO CALUMET CITY 1 2020 $1,000,000 CHICAGO CALUMET CITY 2 2021-2025 CHICAGO 5 2021-2025 PRESERVATION - BRIDGES I 94 W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) P.E. (PHASE I) BISHOP FORD EXPWY PRESERVATION - BRIDGES I 94 W OF MARTIN LUTHER KING DR TO US 6 (159TH ST) P.E. (PHASE II) BISHOP FORD EXPWY PRESERVATION - BRIDGES I 94 AT 111TH ST BISHOP FORD EXPWY BRIDGE REPLACEMENT INTERCHANGE RECONSTRUCTION $15,000,000 RECONSTRUCTION - BRIDGES I 94 AT MICHIGAN CITY RD BRIDGE REPLACEMENT Structure Information Str Number AADT 15,200 0160992 $5,200,000 DOLTON Truck Pct NHS 6 N 3 2021-2025 BISHOP FORD EXPWY RECONSTRUCTION - BRIDGES 1 - 19 Structure Information Str Number AADT 7,000 0161068 Truck Pct NHS 5 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 94 Location AT MICHIGAN CITY RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $520,000 DOLTON 2 2021-2025 $2,600,000 DOLTON 4 2021-2025 BISHOP FORD EXPWY REHABILITATION - BRIDGES I 94 AT GREENWOOD AVE BISHOP FORD EXPWY BRIDGE SUBSTRUCTURE BRIDGE DECK OVERLAY REHABILITATION - BRIDGES I 94 AT LITTLE CALUMET RIVER BISHOP FORD EXPWY BRIDGE DECK OVERLAY BRIDGE REPAIR Structure Information Str Number AADT 134,000 0160162 Truck Pct NHS 10 Y $1,800,000 SOUTH HOLLAND 4 2021-2025 $4,200,000 SOUTH HOLLAND DOLTON 5 2021-2025 PRESERVATION - BRIDGES I 94 AT US 6 (159TH ST) & AT 154TH ST BISHOP FORD EXPWY BRIDGE REPLACEMENT BRIDGE REPAIR BRIDGE DECK OVERLAY RECONSTRUCTION - BRIDGES I 190 BESSIE COLEMAN DR TO I-90 (KENNEDY EXPWY) ADD AUXILIARY LANES INITIAL CONSTRUCTION - PAVEMENTS 1 - 20 Structure Information Str Number AADT 17,400 0160388 $180,000,000 CHICAGO ROSEMONT Truck Pct NHS 2 Y 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 190 Location BESSIE COLEMAN DR TO I-90 (KENNEDY EXPWY) Miles = 2.08 Roadway Information Miles AADT Truck Pct 2.08 97,709 2.5 I 190 Improvements TAMP Category RECONSTRUCTION Est. Cost City MYP Years Past Current $270,000,000 CHICAGO ROSEMONT 4 2021-2025 $45,000,000 CHICAGO ROSEMONT 1 2020 $6,000,000 CHICAGO ROSEMONT 1 2021-2025 $60,000,000 CHICAGO ROSEMONT 1 2021-2025 $4,000,000 BERKELEY 2 2020 RECONSTRUCTION - PAVEMENTS NHS Y BESSIE COLEMAN DR TO I-90 (KENNEDY EXPWY) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS I 190 BESSIE COLEMAN DR TO I-90 (KENNEDY EXPWY) UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS I 190 BESSIE COLEMAN DR TO I-90 (KENNEDY EXPWY) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 290 AT ST CHARLES RD BRIDGE NEW DECK EISENHOWER EXPWY REHABILITATION - BRIDGES 1 - 21 Structure Information Str Number AADT 17,000 0161136 Truck Pct NHS 7 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 290 Location US 12/20/45 (MANNHEIM RD) TO RACINE AVE Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $425,000 HILLSIDE WESTCHESTER BELLWOOD BROADVIEW MAYWOOD FOREST PARK OAK PARK CHICAGO 1 2020 $46,000,000 FOREST PARK 22 2020 $2,000,000 FOREST PARK 1 2021-2025 $10,500,000 FOREST PARK 8 2021-2025 CHICAGO 3 2021-2025 EISENHOWER EXPWY RECONSTRUCTION - PAVEMENTS I 290 AT DES PLAINES RIVER EISENHOWER EXPWY PUMP STATION WATER MAIN MAINTENANCE - PAVEMENTS I 290 AT DES PLAINES RIVER UTILITY ADJUSTMENT EISENHOWER EXPWY MISCELLANEOUS IMPROVEMENTS I 290 AT DES PLAINES RIVER CONSTRUCTION ENGINEERING EISENHOWER EXPWY MISCELLANEOUS IMPROVEMENTS I 290 AT INDEPENDENCE BLVD BRIDGE SUPERSTRUCTURE $9,000,000 EISENHOWER EXPWY REHABILITATION - BRIDGES 1 - 22 Structure Information Str Number AADT 18,600 0162070 18,600 0162071 Truck Pct NHS 8 N 8 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 290 Location AT INDEPENDENCE BLVD Improvements TAMP Category RR FLAGGER Est. Cost City MYP Years Past Current $200,000 CHICAGO 1 2021-2025 $1,000,000 CHICAGO 3 2020 $900,000 CHICAGO 1 2021-2025 $1,170,000 CHICAGO 3 2021-2025 $5,000,000 CHICAGO 3 2021-2025 EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT INDEPENDENCE BLVD P.E. (PHASE II) EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT INDEPENDENCE BLVD P.E. (PHASE II) EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT INDEPENDENCE BLVD CONSTRUCTION ENGINEERING EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT CENTRAL PARK AVE BRIDGE SUPERSTRUCTURE EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT CENTRAL PARK AVE RR FLAGGER EISENHOWER EXPWY REHABILITATION - BRIDGES 1 - 23 Structure Information Str Number AADT 6,000 0162072 $200,000 CHICAGO Truck Pct NHS 12 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 290 Location AT CENTRAL PARK AVE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,000,000 CHICAGO 3 2020 $500,000 CHICAGO 1 2021-2025 $650,000 CHICAGO 3 2021-2025 $4,500,000 CHICAGO 3 2021-2025 EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT CENTRAL PARK AVE P.E. (PHASE II) EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT CENTRAL PARK AVE CONSTRUCTION ENGINEERING EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT SACRAMENTO AVE BRIDGE SUPERSTRUCTURE EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT SACRAMENTO AVE RR FLAGGER Structure Information Str Number AADT 15,600 0160754 Truck Pct NHS 7 N $200,000 CHICAGO 1 2021-2025 $1,000,000 CHICAGO 3 2020 EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT SACRAMENTO AVE P.E. (PHASE II) EISENHOWER EXPWY REHABILITATION - BRIDGES 1 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street I 290 Location AT SACRAMENTO AVE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $500,000 CHICAGO 1 2021-2025 $585,000 CHICAGO 3 2021-2025 $9,200,000 CHICAGO 3 2021-2025 EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT SACRAMENTO AVE CONSTRUCTION ENGINEERING EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT PAULINA AVE BRIDGE SUPERSTRUCTURE EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT PAULINA AVE P.E. (PHASE II) Structure Information Str Number AADT 4,300 0160098 Truck Pct NHS 7 N $1,000,000 CHICAGO 3 2020 $920,000 CHICAGO 1 2021-2025 $1,196,000 CHICAGO 3 2021-2025 EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT PAULINA AVE P.E. (PHASE II) EISENHOWER EXPWY REHABILITATION - BRIDGES I 290 AT PAULINA AVE CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES 1 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 6 Location AT 167TH/170TH ST ILL 83 TORRENCE AVE Improvements TAMP Category LEFT TURN LANES TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $946,000 LANSING 2 2021-2025 $8,000 LANSING 2 2020 $2,800,000 CHICAGO 1 2021-2025 WILLOW SPRINGS 3 2021-2025 MISCELLANEOUS IMPROVEMENTS US 6 AT 167TH/170TH ST LAND ACQUISITION ILL 83 TORRENCE AVE MISCELLANEOUS IMPROVEMENTS US 12 US 20 I-94 (DAN RYAN EXPY) TO I-90 (CHICAGO SKYWAY) Miles = 5.29 STANDARD OVERLAY US 41 EWING AVE Roadway Information Miles AADT Truck Pct 5.29 12,249 7.6 US 12 US 20 PRESERVATION - PAVEMENTS NHS Y OVER SANTA FE DR, S & S CANAL, IM CANAL & ICG RR US 45 BRIDGE NEW DECK BRIDGE REPAIR LIGHTING $22,100,000 LA GRANGE RD ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 1 - 26 Structure Information Str Number AADT 40,250 0162467 40,250 0162468 Truck Pct NHS 13 Y 13 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 12 Location OVER SANTA FE DR, S & S CANAL, IM CANAL & ICG RR US 20 Improvements TAMP Category RR FLAGGER Est. Cost City MYP Years Past Current $800,000 WILLOW SPRINGS 1 2021-2025 $1,000,000 WILLOW SPRINGS HODGKINS 3 2020 $3,000,000 WILLOW SPRINGS HODGKINS 3 2021-2025 $3,213,000 CHICAGO 11 2021-2025 US 45 LA GRANGE RD ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 12 OVER SANTA FE DR, S & S CANAL, IM CANAL & ICG RR US 20 P.E. (PHASE II) US 45 LA GRANGE RD ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 12 OVER SANTA FE DR, S & S CANAL, IM CANAL & ICG RR US 20 CONSTRUCTION ENGINEERING US 45 LA GRANGE RD ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 12 WESTERN AVE TO ASHLAND AVE & LAFAYETTE AVE TO STONY ISLAND AVE Miles = 3.06 US 20 95TH ST Roadway Information Miles AADT Truck Pct 1.00 31,000 12.3 2.06 13,221 11.5 STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y Y 1 - 27 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 12 Location AT STONY ISLAND AVE US 20 95TH ST STONY ISLAND AVE Improvements TAMP Category BRIDGE REPLACEMENT RR SEPARATION REPLACEMENT INTERSECTION RECONSTN LOWER ROADWAY PUMP STATION LIGHTING Est. Cost City MYP Years Past Current $58,700,000 CHICAGO 1 2021-2025 $12,000,000 CHICAGO 1 2021-2025 $1,000,000 CHICAGO 1 2021-2025 $7,200,000 CHICAGO 1 2020 RECONSTRUCTION - BRIDGES US 12 AT STONY ISLAND AVE RR FLAGGER US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES US 12 AT STONY ISLAND AVE RR ENGINEERING US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES US 12 AT STONY ISLAND AVE P.E. (PHASE II) US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES 1 - 28 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 12 Location AT STONY ISLAND AVE Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $3,000,000 CHICAGO 1 2020 $1,000,000 CHICAGO 1 2021-2025 $9,000,000 CHICAGO 1 2021-2025 $1,124,000 PALATINE 4 2020 US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES US 12 AT STONY ISLAND AVE UTILITY ADJUSTMENT US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES US 12 AT STONY ISLAND AVE CONSTRUCTION ENGINEERING US 20 95TH ST STONY ISLAND AVE RECONSTRUCTION - BRIDGES US 14 NORTHWEST HWY E OF SMITH RD TO HICKS RD Miles = 1.63 Roadway Information Miles AADT Truck Pct 1.27 29,579 6.3 0.36 25,267 8.4 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 1 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 14 NORTHWEST HWY Location E OF NICHOLAS DR TO WESTERN AVE Miles = 0.56 Roadway Information Miles AADT Truck Pct 0.56 15,100 4.3 US 14 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS STORM SEWER (NEW) RETAINING WALL Est. Cost City MYP Years Past Current $2,825,000 DES PLAINES 1 2021-2025 $3,100,000 DES PLAINES 6 2021-2025 $200,000 DES PLAINES 4 2021-2025 $475,000 DES PLAINES 3 2021-2025 MORTON GROVE 4 2021-2025 REHABILITATION - PAVEMENTS NHS N AT MT. PROSPECT RD NORTHWEST HWY TRAF SIGNAL MODERNIZATION LEFT TURN LANES RR INTERCONNECT PEDESTRIAN SIGNALS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 14 AT MT. PROSPECT RD UTILITY ADJUSTMENT NORTHWEST HWY MISCELLANEOUS IMPROVEMENTS US 14 AT ILL 58 (GOLF RD) NORTHWEST HWY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES US 14 OZARK ST TO ILL 43 (WAUKEGAN RD) DRAINAGE DEMPSTER ST MAINTENANCE - PAVEMENTS 1 - 30 $5,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 14 Location OZARK ST TO ILL 43 (WAUKEGAN RD) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $500,000 MORTON GROVE 1 2020 $250,000 MORTON GROVE 4 2021-2025 $2,634,000 MORTON GROVE NILES 4 2020 ELGIN 1 2021-2025 DEMPSTER ST MAINTENANCE - PAVEMENTS US 14 OZARK ST TO ILL 43 (WAUKEGAN RD) LAND ACQUISITION DEMPSTER ST MISCELLANEOUS IMPROVEMENTS US 14 CALDWELL AVE ILL 43 (WAUKEGAN RD) TO TOUHY AVE Miles = 1.87 Roadway Information Miles AADT Truck Pct 1.87 17,706 7.7 US 20 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y AT SHALES PKWY LAKE ST INTERCHANGE RECONSTRUCTION BRIDGE REPLACEMENT RETAINING WALL $45,000,000 MISCELLANEOUS IMPROVEMENTS US 20 AT SHALES PKWY P.E. (PHASE I) LAKE ST MISCELLANEOUS IMPROVEMENTS 1 - 31 Structure Information Str Number AADT 43,600 0160219 $2,700,000 ELGIN Truck Pct NHS 6 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 20 Location AT SHALES PKWY Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $4,500,000 ELGIN 1 2021-2025 $4,000,000 ELGIN 1 2021-2025 $5,850,000 ELGIN 1 2021-2025 $2,212,000 MELROSE PARK MAYWOOD NORTHLAKE 4 2021-2025 $6,000,000 MATTESON 4 2021-2025 LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 AT SHALES PKWY LAND ACQUISITION LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 AT SHALES PKWY CONSTRUCTION ENGINEERING LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 RAILROAD AVE TO ILL 171 (FIRST AVE) Miles = 4.29 LAKE ST Roadway Information Miles AADT Truck Pct 1.65 22,600 16.3 2.64 16,870 US 30 LINCOLN HWY 7.4 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N AT ILL 50 (CICERO AVE) TRAF SIGNAL MODERNIZATION CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 1 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 30 Location AT ILL 50 (CICERO AVE) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $90,000 MATTESON 1 2020 $300,000 MATTESON 3 2021-2025 $310,000 MATTESON 4 2021-2025 $3,880,000 CHICAGO HEIGHTS FORD HEIGHTS 4 2021-2025 $4,225,000 SAUK VILLAGE LYNWOOD 4 2021-2025 LINCOLN HWY MISCELLANEOUS IMPROVEMENTS US 30 AT ILL 50 (CICERO AVE) P.E. (PHASE II) LINCOLN HWY MISCELLANEOUS IMPROVEMENTS US 30 AT ILL 50 (CICERO AVE) LAND ACQUISITION LINCOLN HWY MISCELLANEOUS IMPROVEMENTS US 30 LINCOLN HWY LOWE AVE TO ILL 394 Miles = 2.81 Roadway Information Miles AADT Truck Pct 2.81 17,731 13.0 US 30 LINCOLN HWY REHABILITATION - PAVEMENTS NHS Y COTTAGE GROVE AVE TO INDIANA STATE LINE Miles = 3.32 Roadway Information Miles AADT Truck Pct 3.32 19,432 10.8 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y 1 - 33 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 30 Location ILL 394 TO INDIANA STATE LINE Improvements TAMP Category CRACK & JOINT SEALING Est. Cost City MYP Years Past Current $250,000 SAUK VILLAGE LYNWOOD 1 2020 $595,000 HINSDALE 1 2020 $1,185,000 WESTERN SPRINGS LA GRANGE PARK LA GRANGE 4 2021-2025 $1,911,000 WILMETTE 4 2020 CHICAGO 1 2020 LINCOLN HWY PRESERVATION - PAVEMENTS US 34 AT I-294 (TRI-STATE TOLLWAY) OGDEN AVE BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES US 34 OGDEN AVE E OF I-294 (TRI-STATE TOLLWAY) TO W OF EDGEWOOD AVE Miles = 1.46 Roadway Information Miles AADT Truck Pct 1.46 28,500 7.4 US 41 SKOKIE RD US 41 LINCOLN AVE REHABILITATION - PAVEMENTS NHS Y I-94 (EDENS EXPWY) TO S OF OLD GLENVIEW RD Miles = 2.26 Roadway Information Miles AADT Truck Pct 1.52 15,910 7.0 STANDARD OVERLAY ADA IMPROVEMENTS RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y PETERSON AVE TO FOSTER AVE Miles = 1.37 Roadway Information Miles AADT Truck Pct 1.37 24,860 2.3 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 34 $843,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street US 45 Location LAKE COOK RD TO US 12 (RAND RD) Miles = 7.70 ILL 21 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $5,260,000 DES PLAINES RIVER DES PLAINES PROSPECT HEIGHTS MOUNT PROSPECT WHEELING 4 2020 HODGKINS COUNTRYSIDE WILLOW SPRINGS PALOS PARK 2 2020 3 2021-2025 EAST HAZEL CREST HOMEWOOD HARVEY 1 2021-2025 HARVEY 2 2021-2025 RD Roadway Information Miles AADT Truck Pct 7.70 23,731 5.5 US 45 REHABILITATION - PAVEMENTS NHS Y 63RD ST TO CREEK RD US 20 US 12 TRAF SIGNAL MODERNIZATION GUARDRAIL END-SECT REPL SIGN MAINTENANCE $473,000 LA GRANGE RD MISCELLANEOUS IMPROVEMENTS US 45 AT CAL SAG CHANNEL BRIDGE PAINTING $3,000,000 96TH AVE PRESERVATION - BRIDGES ILL 1 VINCENNES RD 149TH ST TO RIDGE RD Miles = 3.93 Roadway Information Miles AADT Truck Pct 2.62 27,927 8.7 1.31 13,600 ILL 1 HALSTED ST 7.2 STANDARD OVERLAY $3,250,000 PRESERVATION - PAVEMENTS NHS Y N AT ILL 83 (147TH ST) TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 35 $550,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 1 Location AT ILL 83 (147TH ST) Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $250,000 HARVEY 2 2021-2025 $555,000 HOMEWOOD 4 2020 HARVEY EAST HAZEL CREST 1 2021-2025 PALOS PARK 4 2021-2025 HALSTED ST MISCELLANEOUS IMPROVEMENTS ILL 1 HALSTED ST 175TH ST TO RIDGE RD Miles = 0.63 Roadway Information Miles AADT Truck Pct 0.63 39,200 7.0 ILL 1 HALSTED ST 1.52 13,600 ILL 7 SOUTHWEST HWY REHABILITATION - PAVEMENTS NHS Y 149TH ST TO I-80 Miles = 3.12 Roadway Information Miles AADT Truck Pct 1.60 20,740 10.7 7.2 STANDARD OVERLAY TRAF SIGNAL MODERNIZATION PAVEMENT MARKING ADA IMPROVEMENTS $4,060,000 REHABILITATION - PAVEMENTS NHS Y N 131ST ST TO 135TH ST Miles = 0.51 Roadway Information Miles AADT Truck Pct 0.51 14,300 1.5 STANDARD OVERLAY ADA IMPROVEMENTS RECONSTRUCTION DRAINAGE DITCH CLEANING TRAF SIGNAL MODERNIZATION CULVERT REMOVAL CULVERT REPLACEMENT CULVERT (NEW) RECONSTRUCTION - PAVEMENTS NHS N 1 - 36 $12,842,000 Structure Information Str Number AADT 10,500 0160898 Truck Pct NHS 4 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 7 Location 131ST ST TO 135TH ST Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,000,000 PALOS PARK 1 2020 $1,360,000 PALOS PARK 1 2021-2025 $1,700,000 PALOS PARK 1 2021-2025 WORTH 2 2021-2025 ELGIN STREAMWOOD 4 2021-2025 SOUTHWEST HWY RECONSTRUCTION - PAVEMENTS ILL 7 131ST ST TO 135TH ST LAND ACQUISITION SOUTHWEST HWY RECONSTRUCTION - PAVEMENTS ILL 7 131ST ST TO 135TH ST CONSTRUCTION ENGINEERING SOUTHWEST HWY RECONSTRUCTION - PAVEMENTS ILL 7 AT ILL 43 (HARLEM AVE) SOUTHWEST HWY TRAF SIGNAL MODERNIZATION LEFT TURN LANES ADA IMPROVEMENTS $950,000 MISCELLANEOUS IMPROVEMENTS ILL 19 IRVING PARK RD ILL 25 (LIBERTY ST) TO BARTLETT RD Miles = 4.74 Roadway Information Miles AADT Truck Pct 4.52 13,795 8.8 0.22 9,650 6.1 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 1 - 37 $1,662,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 19 Location AT BARRINGTON RD IRVING PARK RD Improvements TAMP Category INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION Est. Cost City MYP Years Past Current $2,070,000 HANOVER PARK 2 2021-2025 $1,410,000 SCHAUMBURG 2 2021-2025 $2,500,000 SCHILLER PARK 7 2021-2025 $5,875,000 GLENVIEW 22 2021-2025 $1,375,000 GLENVIEW 2 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 19 AT WISE RD IRVING PARK RD INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS ILL 19 AT SCOTT ST & AT JUDD AVE INTERSECTION RECONSTN IRVING PARK RD MISCELLANEOUS IMPROVEMENTS ILL 21 MILWAUKEE AVE N OF SANDERS RD TO S OF EUCLID AVE / LAKE AVE Miles = 0.42 Roadway Information Miles AADT Truck Pct 0.42 33,157 6.5 ILL 21 MILWAUKEE AVE RECONSTRUCTION INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION SIGNAL TIMING/PROGRESSION MISCELLANEOUS IMPROVEMENTS NHS Y N OF SANDERS RD TO S OF EUCLID AVE / LAKE AVE Miles = 0.01 ADDITIONAL LANES (NORTHBOUND) INITIAL CONSTRUCTION - PAVEMENTS 1 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 21 Location N OF SANDERS RD TO S OF EUCLID AVE / LAKE AVE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $150,000 GLENVIEW 1 2021-2025 $750,000 GLENVIEW 9 2021-2025 $4,000,000 GLENVIEW 17 2021-2025 $610,000 GLENVIEW 4 2021-2025 MILWAUKEE AVE MISCELLANEOUS IMPROVEMENTS ILL 21 N OF SANDERS RD TO S OF EUCLID AVE / LAKE AVE CONSTRUCTION ENGINEERING MILWAUKEE AVE MISCELLANEOUS IMPROVEMENTS ILL 21 N OF SANDERS RD TO S OF EUCLID AVE LAND ACQUISITION MILWAUKEE AVE MISCELLANEOUS IMPROVEMENTS ILL 43 W FORK N BRANCH CHICAGO RIVER BRIDGE NEW DECK WAUKEGAN RD REHABILITATION - BRIDGES ILL 43 IL 19 (IRVING PARK RD) TO IL 64 (NORTH AVE) LONGITUDINAL JOINT REPAIR HARLEM AVE PRESERVATION - PAVEMENTS 1 - 39 Structure Information Str Number AADT 23,300 0160307 $750,000 CHICAGO NORRIDGE Truck Pct NHS 2 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 43 Location AT CERMAK RD / 22ND ST HARLEM AVE Improvements TAMP Category TRAF SIGNAL MODERNIZATION LEFT TURN LANES ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $2,350,000 BERWYN 6 2021-2025 $2,400,000 LYONS FOREST VIEW 4 2021-2025 $200,000 LYONS FOREST VIEW 4 2021-2025 $4,865,000 FOREST VIEW 12 2020 MISCELLANEOUS IMPROVEMENTS ILL 43 HARLEM AVE 47TH ST TO SANITARY & SHIP CANAL Miles = 0.50 Roadway Information Miles AADT Truck Pct 0.50 35,400 5.5 ILL 43 DESIGNED OVERLAY STORM SEWER (NEW) REHABILITATION - PAVEMENTS NHS Y 47TH ST TO SANITARY & SHIP CANAL LAND ACQUISITION HARLEM AVE MISCELLANEOUS IMPROVEMENTS ILL 43 HARLEM AVE AT MWRDGC RR 0.2 MI N OF I-55 (STEVENSON EXPWY) (NORTHBOUND) BRIDGE REPLACEMENT ADA IMPROVEMENTS RR FLAGGER RECONSTRUCTION - BRIDGES ILL 43 AT SANITARY & SHIP CANAL P.E. (PHASE II) HARLEM AVE REHABILITATION - BRIDGES 1 - 40 Structure Information Str Number AADT 17,700 0160314 17,700 0160314 $1,300,000 FOREST VIEW Truck Pct NHS 5 Y 5 Y 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 43 Location AT SANITARY & SHIP CANAL HARLEM AVE Improvements TAMP Category BRIDGE NEW DECK BRIDGE REPAIR Est. Cost AT SANITARY & SHIP CANAL CONSTRUCTION ENGINEERING MYP Years Past Current $12,909,000 REHABILITATION - BRIDGES ILL 43 City FOREST VIEW Structure Information Str Number AADT 17,700 0160315 17,700 0160991 4 2021-2025 Truck Pct NHS 5 Y 5 Y $1,000,000 FOREST VIEW 4 2021-2025 $1,350,000 CHICAGO 6 2021-2025 $75,000,000 BEDFORD PARK 1 2021-2025 $1,000,000 BEDFORD PARK 1 2021-2025 HARLEM AVE REHABILITATION - BRIDGES ILL 43 HARLEM AVE AT ARCHER AVE Miles = 0.01 TRAF SIGNAL MODERNIZATION LEFT TURN LANES STANDARD OVERLAY MISCELLANEOUS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 43 AT BRC RR (65TH ST) RR GRADE SEPARATION HARLEM AVE INITIAL CONSTRUCTION - BRIDGES ILL 43 AT BRC RR (65TH ST) RR FLAGGER HARLEM AVE INITIAL CONSTRUCTION - BRIDGES 1 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 43 Location AT BRC RR (65TH ST) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $7,500,000 BEDFORD PARK 1 2021-2025 $20,000,000 BEDFORD PARK 1 2021-2025 $4,000,000 BEDFORD PARK 1 2021-2025 $11,250,000 BEDFORD PARK 1 2021-2025 $3,000,000 BRIDGEVIEW 2 2021-2025 $650,000 BRIDGEVIEW 2 2021-2025 HARLEM AVE INITIAL CONSTRUCTION - BRIDGES ILL 43 AT BRC RR (65TH ST) LAND ACQUISITION HARLEM AVE INITIAL CONSTRUCTION - BRIDGES ILL 43 AT BRC RR (65TH ST) UTILITY ADJUSTMENT HARLEM AVE INITIAL CONSTRUCTION - BRIDGES ILL 43 AT BRC RR (65TH ST) CONSTRUCTION ENGINEERING HARLEM AVE INITIAL CONSTRUCTION - BRIDGES ILL 43 HARLEM AVE 78TH ST TO 90TH ST Miles = 1.52 TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS CORRIDOR IMPROVEMENT MISCELLANEOUS IMPROVEMENTS ILL 43 78TH ST TO 90TH ST LAND ACQUISITION HARLEM AVE MISCELLANEOUS IMPROVEMENTS 1 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 43 HARLEM AVE Location AT US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Improvements TAMP Category BRIDGE SUPERSTRUCTURE BRIDGE WIDENING BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY BRIDGE NEW DECK BRIDGE PAINTING INTERCHANGE RECONSTRUCTION PUMP STATION LIGHTING Est. Cost HARLEM AVE AT US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) RR FLAGGER RR ENGINEERING MYP Years Past Current $32,660,000 REHABILITATION - BRIDGES ILL 43 City BRIDGEVIEW Structure Information Str Number AADT 43,800 0160320 41,800 0160321 21 2021-2025 Truck Pct NHS 14 Y 10 Y $500,000 BRIDGEVIEW 8 2021-2025 $10,000 BRIDGEVIEW 5 2020 $500,000 BRIDGEVIEW 8 2021-2025 REHABILITATION - BRIDGES ILL 43 HARLEM AVE AT US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) LAND ACQUISITION REHABILITATION - BRIDGES ILL 43 HARLEM AVE AT US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) UTILITY ADJUSTMENT REHABILITATION - BRIDGES 1 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 43 HARLEM AVE Location AT US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $4,250,000 BRIDGEVIEW 7 2021-2025 $1,500,000 WORTH 2 2021-2025 $3,530,000 CHICAGO 3 2021-2025 ALSIP 1 2020 CRESTWOOD 7 2021-2025 REHABILITATION - BRIDGES ILL 43 AT CAL SAG CHANNEL BRIDGE PAINTING PRESERVATION - BRIDGES ILL 50 AT BRC RR CICERO AVE BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR RR FLAGGER PRESERVATION - BRIDGES ILL 50 AT 115TH ST & 122ND ST CICERO AVE TRAF SIGNAL MODERNIZATION CHANNELIZATION MEDIAN REPAIR $625,000 MISCELLANEOUS IMPROVEMENTS ILL 50 ILL 83 CICERO AVE AT MIDLOTHIAN TURNPIKE, AT 135TH ST & AT CAL SAG RD INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION RIGHT TURN LANE ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 44 $2,500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 50 ILL 83 Location AT MIDLOTHIAN TURNPIKE, AT 135TH ST & AT CAL SAG RD Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $400,000 CRESTWOOD 5 2021-2025 RICHTON PARK 6 2021-2025 ARLINGTON HEIGHTS PALATINE ROLLING MEADOWS 4 2021-2025 CICERO AVE MISCELLANEOUS IMPROVEMENTS ILL 50 AT STEGER RD CICERO AVE TURNING LANES TRAF SIGNAL INSTALLATION LIGHTING $1,148,000 MISCELLANEOUS IMPROVEMENTS ILL 53 S OF US 12 (RAND RD) TO ILL 62 (ALGONQUIN RD) BRIDGE NEW DECK $45,420,000 REHABILITATION - BRIDGES ILL 53 S OF US 12 (RAND RD) TO ILL 62 (ALGONQUIN RD) P.E. (PHASE I) Structure Information Str Number AADT 49,500 0160371 62,750 0160970 114,500 0160372 71,400 0160375 71,400 0161120 Truck Pct NHS 5 Y 4 Y 4 Y 3 Y 3 Y $1,100,000 ARLINGTON HEIGHTS ROLLING MEADOWS PALATINE 2 2020 $3,572,000 ARLINGTON HEIGHTS PALATINE ROLLING MEADOWS 4 2021-2025 REHABILITATION - BRIDGES ILL 53 S OF US 12 (RAND RD) TO ILL 62 (ALGONQUIN RD) P.E. (PHASE II) REHABILITATION - BRIDGES 1 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 53 Location S OF US 12 (RAND RD) TO ILL 62 (ALGONQUIN RD) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $4,650,000 ARLINGTON HEIGHTS 4 2021-2025 $5,200,000 ARLINGTON HEIGHTS 3 2021-2025 $1,154,000 PALATINE 11 2020 $3,966,000 PALATINE 2 2020 $2,500,000 ELGIN HOFFMAN ESTATES 3 2021-2025 REHABILITATION - BRIDGES ILL 53 LAKE-COOK RD TO ILL 68 (DUNDEE RD) NOISE BARRIERS MISCELLANEOUS IMPROVEMENTS ILL 53 US 12 (RAND RD) TO KENNEDY DR INTERSECTION IMPROVEMENT ILL 68 DUNDEE RD MISCELLANEOUS IMPROVEMENTS ILL 53 ILL 68 US 12 (RAND RD) TO KENNEDY DR Miles = 0.60 DUNDEE RD Roadway Information Miles AADT Truck Pct 0.60 24,400 2.8 ILL 58 SUMMIT ST REHABILITATION - PAVEMENTS NHS Y KANE CO LINE TO ILL 59 (SUTTON RD) Miles = 3.43 Roadway Information Miles AADT Truck Pct 3.43 12,866 3.3 STANDARD OVERLAY NEW MEDIAN SIDEWALKS DRAINAGE ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 58 Location AT SHADY OAKS DR Improvements TAMP Category TRAF SIGNAL INSTALLATION Est. Cost City MYP Years Past Current $2,000,000 ELGIN 3 2021-2025 3 2021-2025 SUMMIT ST MISCELLANEOUS IMPROVEMENTS ILL 58 POPLAR CREEK TRIB CULVERT REPAIR $200,000 GOLF RD MAINTENANCE - BRIDGES ILL 58 AT BARRINGTON RD GOLF RD INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS $3,500,000 HOFFMAN ESTATES 1 2021-2025 $1,000,000 HOFFMAN ESTATES 1 2021-2025 $2,300,000 HOFFMAN ESTATES SCHAUMBURG 3 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 58 AT BARRINGTON RD LAND ACQUISITION GOLF RD MISCELLANEOUS IMPROVEMENTS ILL 58 GOLF RD ILL 59 (SUTTON RD) TO WINDSONG DR Miles = 3.21 Roadway Information Miles AADT Truck Pct 3.21 18,877 1.6 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 1 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 58 GOLF RD Location BASSWOOD ST TO I-290 / ILL 53 Miles = 1.92 Roadway Information Miles AADT Truck Pct 1.92 32,057 5.1 ILL 58 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $3,196,000 SCHAUMBURG ROLLING MEADOWS 3 2020 $1,400,000 DES PLAINES 11 2020 MORTON GROVE 3 2020 SKOKIE 20 2021-2025 PRESERVATION - PAVEMENTS NHS Y COLLEGE DR TO E RIVER RD GOLF RD DRAINAGE RETAINING WALL MISCELLANEOUS IMPROVEMENTS ILL 58 GOLF RD LINCOLN ST TO ILL 43 (WAUKEGAN RD) Miles = 0.46 Roadway Information Miles AADT Truck Pct 0.46 41,700 2.4 ILL 58 DEMPSTER ST STANDARD OVERLAY ADA IMPROVEMENTS $700,000 REHABILITATION - PAVEMENTS NHS Y AT NILES CENTER RD & US 41 (SKOKIE BLVD) INTERSECTION IMPROVEMENT CURB AND GUTTER DRAINAGE LIGHTING RIGHT TURN LANE LEFT TURN LANES TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 48 $4,204,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 59 Location AT I-90 (JANE ADAMS TOLLWAY) SUTTON RD Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $2,100,000 HOFFMAN ESTATES 3 2021-2025 $2,600,000 BARTLETT 3 2021-2025 $1,800,000 BARRINGTON HILLS 4 2021-2025 $985,000 BARRINGTON HILLS 3 2020 $805,000 BARRINGTON HILLS 4 2021-2025 PRESERVATION - BRIDGES ILL 59 AT W BARTLETT RD SUTTON RD CHANNELIZATION TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 62 ALGONQUIN RD ILL 25 (KENNEDY DR) TO ILL 68 (DUNDEE RD) Miles = 4.77 Roadway Information Miles AADT Truck Pct 3.32 26,037 7.9 1.45 23,700 ILL 62 6.5 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y Y ILL 25 (KENNEDY DR) TO ILL 68 (DUNDEE RD) P.E. (PHASE I) ALGONQUIN RD INITIAL CONSTRUCTION - PAVEMENTS ILL 62 ILL 25 (KENNEDY DR) TO ILL 68 (DUNDEE RD) P.E. (PHASE I) ALGONQUIN RD INITIAL CONSTRUCTION - PAVEMENTS 1 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 62 Location AT SPRING CREEK 1.4 MI W OF ILL 59 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $5,630,000 BARRINGTON HILLS 3 2021-2025 ALGONQUIN RD RECONSTRUCTION - BRIDGES ILL 62 AT SPRING CREEK 1.4 MI W OF ILL 59 BRIDGE REPAIR Structure Information Str Number AADT 27,000 0160580 Truck Pct NHS 7 Y $1,000,000 BARRINGTON HILLS 1 2021-2025 $1,800,000 CHICAGO OAK PARK ELMWOOD PARK RIVER FOREST 1 2021-2025 CHICAGO 1 2021-2025 NORTHLAKE MELROSE PARK RIVER GROVE ELMWOOD PARK RIVER FOREST 3 2021-2025 ALGONQUIN RD MAINTENANCE - BRIDGES ILL 64 IL 43 (HARLEM AVE) TO IL 50 (CICERO AVE) Miles = 3.14 Roadway Information Miles AADT Truck Pct 3.14 31,134 9.2 ILL 64 ILL 64 NORTH AVE 0.0 STANDARD OVERLAY $220,000 PRESERVATION - PAVEMENTS NHS Y I-294 (TRI-STATE TOLLWAY) TO ILL 43 (HARLEM AVE) & N FR RD: 7TH AVE (HOSPITAL ENTRANCE) TO 5TH AVE Miles = 5.99 Roadway Information Miles AADT Truck Pct 5.88 45,887 9.6 0.11 PRESERVATION - PAVEMENTS NHS Y SHEFFIELD AVE TO HALSTED ST Miles = 0.26 Roadway Information Miles AADT Truck Pct 0.26 40,123 13.8 STANDARD OVERLAY STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 1 - 50 $4,646,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 64 Location AT IHB RR W OF 25TH AVE NORTH AVE Improvements TAMP Category STORM SEWER (NEW) PARKING (NEW) MISCELLANEOUS Est. Cost City MYP Years Past Current $1,117,000 MELROSE PARK 8 2020 $7,000,000 MELROSE PARK 1 2021-2025 $100,000 MELROSE PARK 2 2021-2025 $20,000 MELROSE PARK 8 2021-2025 $2,000,000 MELROSE PARK 4 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 64 AT IHB RR W OF 25TH AVE PUMP STATION NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 64 AT IHB RR W OF 25TH AVE LAND ACQUISITION NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 64 AT IHB RR W OF 25TH AVE UTILITY ADJUSTMENT NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 64 AT IHB RR W OF 25TH AVE STORM SEWER (NEW) NORTH AVE IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS 1 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 64 Location AT IHB RR W OF 25TH AVE Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $500,000 MELROSE PARK 4 2021-2025 $280,000 CHICAGO 11 2021-2025 $1,200,000 PALATINE 4 2021-2025 $4,000,000 ARLINGTON HEIGHTS BUFFALO GROVE WHEELING 4 2021-2025 $8,986,000 HOFFMAN ESTATES SOUTH BARRINGTON 4 2020 NORTH AVE IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 64 AT CLARK ST EUGENIE ST INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS ILL 68 E BRANCH SALT CREEK 0.6 MI E OF QUENTIN RD DUNDEE RD CULVERT REPLACEMENT DRAINAGE LEFT TURN LANES MISCELLANEOUS IMPROVEMENTS ILL 68 DUNDEE RD E OF KENNICOTT AVE TO FIRST ST Miles = 4.26 Roadway Information Miles AADT Truck Pct 4.26 24,131 4.1 ILL 72 HIGGINS RD REHABILITATION - PAVEMENTS NHS Y KANE CO LINE TO GLEN LAKE RD Miles = 6.94 Roadway Information Miles AADT Truck Pct 6.94 26,302 3.1 STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER STANDARD OVERLAY ADA IMPROVEMENTS PATCHING PRESERVATION - PAVEMENTS NHS Y 1 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 72 Location AT EJ & E RR (E OF PRAIRIE STONE PKWY) HIGGINS RD Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR RR FLAGGER Est. Cost City MYP Years Past Current $441,000 HOFFMAN ESTATES 1 2020 $5,142,000 ELK GROVE VILLAGE 8 2021-2025 $500,000 ELK GROVE VILLAGE 4 2021-2025 3 2021-2025 3 2021-2025 PRESERVATION - BRIDGES ILL 72 ILL 72 (W JCT) TO ILL 72 (E JCT) & AT ILL 83 INTERSECTION IMPROVEMENT ILL 83 OAKTON ST MISCELLANEOUS IMPROVEMENTS ILL 72 ILL 72 (W JCT) TO ILL 72 (E JCT) & AT ILL 83 UTILITY ADJUSTMENT ILL 83 OAKTON ST MISCELLANEOUS IMPROVEMENTS ILL 83 AT SANITARY & SHIP CANAL (INCL I & M CANAL) KINGERY HWY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR $1,495,000 PRESERVATION - BRIDGES ILL 83 AT NAVAJO CREEK W OF S NAGLE AVE CULVERT REPLACEMENT $1,000,000 PALOS HEIGHTS COLLEGE DR RECONSTRUCTION - BRIDGES 1 - 53 Structure Information Str Number AADT 17,300 0161027 Truck Pct NHS 6 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 83 Location AT NAVAJO CREEK W OF S NAGLE AVE Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $20,000 PALOS HEIGHTS 2 2021-2025 ALSIP 4 2020 COLLEGE DR RECONSTRUCTION - BRIDGES ILL 83 127TH ST AT TINLEY CREEK INT ILL 83 (CAL SAG RD) & 127TH ST BRIDGE REPLACEMENT INTERSECTION IMPROVEMENT ADA IMPROVEMENTS $6,493,000 RECONSTRUCTION - BRIDGES ILL 83 127TH ST AT TINLEY CREEK INT ILL 83 (CAL SAG RD) & 127TH ST CONSTRUCTION ENGINEERING Structure Information Str Number AADT 18,100 0160569 Truck Pct NHS 12 Y $400,000 ALSIP 1 2020 $450,000 ALSIP 1 2021-2025 $10,000,000 ALSIP 4 2021-2025 RECONSTRUCTION - BRIDGES ILL 83 127TH ST AT TINLEY CREEK INT ILL 83 (CAL SAG RD) & 127TH ST CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES ILL 83 127TH ST AT CAL SAG CHANNEL BRIDGE NEW DECK BRIDGE SUBSTRUCTURE BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 1 - 54 Structure Information Str Number AADT 18,100 0160570 Truck Pct NHS 12 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 83 Location AT CAL SAG CHANNEL Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $750,000 ALSIP 1 2020 $100,000 DOLTON 2 2021-2025 $1,750,000 DOLTON 2 2021-2025 LYNWOOD 1 2021-2025 JUSTICE 1 2020 127TH ST REHABILITATION - BRIDGES ILL 83 AT LITTLE CALUMET RIVER BRIDGE REPAIR SIBLEY BLVD MAINTENANCE - BRIDGES ILL 83 AT UP RR SIBLEY BLVD BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES ILL 83 TORRENCE AVE S OF GLENWOOD LANSING RD TO N OF GLENWOOD DYER RD GUARDRAIL SLOPE STABILIZATION $500,000 MISCELLANEOUS IMPROVEMENTS ILL 171 AT 79TH ST BRIDGE REPLACEMENT $3,000,000 ARCHER AVE RECONSTRUCTION - BRIDGES 1 - 55 Structure Information Str Number AADT 10,400 0160212 Truck Pct NHS 17 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 171 Location AT US 45 (LAGRANGE RD) (SB) RAMP TO I-294 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $3,500,000 JUSTICE 1 2020 ARCHER AVE RECONSTRUCTION - BRIDGES ILL 171 AT US 12/20/45 (MANNHEIM RD) BRIDGE REPLACEMENT Structure Information Str Number AADT 3,700 0160209 $5,000,000 WILLOW SPRINGS Truck Pct NHS 11 N 2 2021-2025 ARCHER AVE / 79TH ST (EASTBOUND) RECONSTRUCTION - BRIDGES ILL 171 AT 95TH ST ARCHER AVE INTERSECTION RECONSTN CULVERT REHABILITATION Structure Information Str Number AADT 22,900 0160518 Truck Pct NHS 18 Y $8,510,000 16 2021-2025 $800,000 8 2021-2025 8 2020 MISCELLANEOUS IMPROVEMENTS ILL 171 AT 95TH ST LANDSCAPING ARCHER AVE MISCELLANEOUS IMPROVEMENTS ILL 171 FIRST AVE AT ROOSEVELT RD TRAF SIGNAL MODERNIZATION CHANNELIZATION ADA IMPROVEMENTS DRAINAGE MISCELLANEOUS IMPROVEMENTS 1 - 56 $1,440,000 MAYWOOD FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ILL 171 Location ROOSEVELT RD TO 22ND ST (CERMAK RD) Improvements TAMP Category DRAINAGE Est. Cost City MYP Years Past Current $2,500,000 MAYWOOD NORTH RIVERSIDE 4 2021-2025 $400,000 MAYWOOD NORTH RIVERSIDE 4 2021-2025 $100,000 MC COOK 2 2021-2025 $750,000 LYNWOOD 3 2021-2025 $2,000,000 LYNWOOD 3 2021-2025 FIRST AVE IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 171 ROOSEVELT RD TO 22ND ST (CERMAK RD) LAND ACQUISITION FIRST AVE IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 171 AT JOLIET RD & BN RR BRIDGE REPAIR MAINTENANCE - BRIDGES ILL 394 AT GLENWOOD-DYER RD BISHOP FORD EXPWY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES ILL 394 RAMPS AT GLENWOOD-DYER RD TRAF SIGNAL REPLACEMENT BISHOP FORD EXPWY MISCELLANEOUS IMPROVEMENTS 1 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street 25TH AVE Location I-290 (EISENHOWER EXPWY) TO 26TH ST Miles = 2.04 Roadway Information Miles AADT Truck Pct 2.04 15,374 8.0 31ST ST Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,870,000 BROADVIEW 4 2021-2025 1 2020 REHABILITATION - PAVEMENTS NHS N AT I-294 (TRI-STATE TOLLWAY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR $460,000 PRESERVATION - BRIDGES 31ST ST AT SALT CREEK BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR $650,000 WESTCHESTER 2 2021-2025 $850,000 NORTH RIVERSIDE 3 2021-2025 $495,000 WESTERN SPRINGS 1 2020 PRESERVATION - BRIDGES 31ST ST AT DES PLAINES RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 47TH ST AT I-294 (TRI-STATE TOLLWAY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES 1 - 58 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street 47TH ST Location AT FLAGG CREEK Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS Est. Cost City MYP Years Past Current $390,000 WESTERN SPRINGS 1 2020 LYONS BROOKFIELD 4 2021-2025 $450,000 HINSDALE 1 2020 $350,000 WESTERN SPRINGS 1 2020 $7,035,000 WESTERN SPRINGS COUNTRYSIDE HINSDALE 3 2021-2025 PRESERVATION - BRIDGES 47TH ST PLAINFIELD RD TO ILL 43 (HARLEM AVE) Miles = 2.43 Roadway Information Miles AADT Truck Pct 2.43 10,056 6.7 55TH ST STANDARD OVERLAY ADA IMPROVEMENTS $1,871,000 REHABILITATION - PAVEMENTS NHS N AT I-294 (TRI-STATE TOLLWAY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES 55TH ST AT FLAGG CREEK BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES 55TH ST E OF I-294 (TRI-STATE TOLLWAY) TO W OF PLAINFIELD RD Miles = 1.76 Roadway Information Miles AADT Truck Pct 1.76 19,500 7.2 INTERSECTION IMPROVEMENT STANDARD OVERLAY NEW MEDIAN MISCELLANEOUS IMPROVEMENTS NHS N 1 - 59 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street 55TH ST Location US 12/20/45 (LA GRANGE RD) TO EAST AVE & AT US 12/20/45 Miles = 0.49 Roadway Information Miles AADT Truck Pct 0.49 19,200 9.0 55TH ST Improvements TAMP Category STANDARD OVERLAY WIDENING EXISTING PAVEMENT INTERSECTION IMPROVEMENT ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $9,015,000 COUNTRYSIDE 3 2021-2025 $1,500,000 COUNTRYSIDE 3 2021-2025 1 2020 CHICAGO 4 2020 PALOS PARK 3 2021-2025 REHABILITATION - PAVEMENTS NHS N US 12/20/45 (LA GRANGE RD) TO EAST AVE & AT US 12/20/45 LAND ACQUISITION REHABILITATION - PAVEMENTS 104TH AVE S OF US 12 (95TH ST) TO 107TH ST Miles = 1.33 Roadway Information Miles AADT Truck Pct 1.33 8,300 0.9 106TH ST 123RD ST $915,000 REHABILITATION - PAVEMENTS NHS N TORRENCE AVE TO US 12/41 (INDIANAPOLIS AVE) Miles = 1.83 Roadway Information Miles AADT Truck Pct 1.83 9,789 11.8 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS RR FLAGGER $2,415,000 REHABILITATION - PAVEMENTS NHS Y AT CREEK 0.3 MI E OF US 45 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 1 - 60 $250,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street 123RD ST Location AT CREEK 0.3 MI E OF US 45 Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $10,000 PALOS PARK 2 2021-2025 $250,000 PALOS PARK 3 2021-2025 $1,805,000 CHICAGO 4 2021-2025 $1,050,000 ORLAND PARK 12 2021-2025 OAK FOREST 4 2021-2025 MISCELLANEOUS IMPROVEMENTS 123RD ST W OF 90TH AVE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 130TH ST INDIANA AVE TO E OF I-94 (BISHOP FORD EXPWY) Miles = 1.72 Roadway Information Miles AADT Truck Pct 1.72 18,200 5.0 143RD ST STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y AT CREEK CROSSING DR INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION SIGNAL TIMING/PROGRESSION MISCELLANEOUS IMPROVEMENTS 147TH ST CAL SAG CHANNEL TRIB C 1.2 MI W OF ILL 50 AT MENARD AVE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 1 - 61 $350,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street 147TH ST Location CAL SAG CHANNEL TRIB C 1.2 MI W OF ILL 50 AT MENARD AVE Improvements TAMP Category TREE REMOVAL Est. Cost City MYP Years Past Current $20,000 OAK FOREST 1 2021-2025 HOMEWOOD EAST HAZEL CREST 4 2021-2025 12 2020 MISCELLANEOUS IMPROVEMENTS 175TH ST GOVERNORS HWY TO DIXIE HWY Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 13,600 2.7 183RD ST STANDARD OVERLAY ADA IMPROVEMENTS $689,000 REHABILITATION - PAVEMENTS NHS N AT CENTRAL AVE CHANNELIZATION TRAF SIGNAL INSTALLATION $2,600,000 MISCELLANEOUS IMPROVEMENTS ADDISON ST ILL 171 (CUMBERLAND AVE) TO FOREST PRESERVE DR Miles = 0.56 Roadway Information Miles AADT Truck Pct 0.56 11,900 5.9 ADDISON ST $715,000 CHICAGO 13 2021-2025 $982,000 CHICAGO 4 2021-2025 REHABILITATION - PAVEMENTS NHS N AVONDALE AVE TO SACRAMENTO AVE Miles = 0.86 Roadway Information Miles AADT Truck Pct 0.86 19,606 4.3 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 62 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ADDISON ST Location HASTED ST TO US 41 (LAKE SHORE DR) Miles = 0.34 Roadway Information Miles AADT Truck Pct 0.34 9,050 7.4 ALGONQUIN RD 0.63 8,501 ARLINGTON HEIGHTS RD 3.2 3.84 28,950 ASHLAND AVE 3.5 ASHLAND AVE MYP Years Past Current $284,000 CHICAGO 4 2021-2025 STANDARD OVERLAY NEW SHOULDERS ADA IMPROVEMENTS $1,745,000 DES PLAINES PARK RIDGE 4 2021-2025 $5,540,000 ARLINGTON HEIGHTS ELK GROVE VILLAGE 4 2021-2025 $934,000 CHICAGO 4 2021-2025 $400,000 BLUE ISLAND 3 2021-2025 REHABILITATION - PAVEMENTS NHS N N STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y N CERMAK RD TO MARKETPLACE ACCESS RD Miles = 0.72 Roadway Information Miles AADT Truck Pct 0.72 26,200 9.2 City REHABILITATION - PAVEMENTS PALATINE RD TO ILL 72 (HIGGINS RD) Miles = 5.71 Roadway Information Miles AADT Truck Pct 1.87 21,745 2.9 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS N ILL 83 (ELMHURST RD) TO WOLF RD & I-294 (TRI-STATE TOLLWAY) TO SIBLEY ST Miles = 2.26 Roadway Information Miles AADT Truck Pct 1.63 9,850 4.3 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y AT CAL SAG CHANNEL BRIDGE REPAIR MAINTENANCE - BRIDGES 1 - 63 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street ASHLAND AVE Location AT CAL SAG CHANNEL Improvements TAMP Category BRIDGE PAINTING Est. Cost City MYP Years Past Current $1,500,000 BLUE ISLAND 3 2021-2025 $790,000 CHICAGO 4 2021-2025 $420,000 CHICAGO 1 2020 $660,000 DES PLAINES NILES PARK RIDGE 4 2021-2025 $500,000 DES PLAINES 4 2021-2025 PRESERVATION - BRIDGES AVENUE L US 12/20 (95TH ST) TO 100TH ST Miles = 0.62 Roadway Information Miles AADT Truck Pct 0.62 3,350 0.0 0.06 3,350 AVONDALE AVE 2.0 BALLARD RD Y DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N RAND RD TO GREENWOOD AVE Miles = 1.89 Roadway Information Miles AADT Truck Pct 1.89 12,056 2.9 BALLARD RD REHABILITATION - PAVEMENTS NHS N PULASKI RD TO ADDISON ST Miles = 0.50 Roadway Information Miles AADT Truck Pct 0.50 0.0 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N CREEK 0.5 MI E OF RAND RD CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 64 Structure Information Str Number AADT 7,450 0161034 Truck Pct NHS 2 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street BALLARD RD Location DITCH W OF GREENWOOD AVE Improvements TAMP Category CULVERT REPLACEMENT DRAINAGE Est. Cost City MYP Years Past Current $1,000,000 NILES 4 2021-2025 $7,688,000 SOUTH BARRINGTON 4 2021-2025 $7,687,000 SOUTH BARRINGTON 2 2021-2025 $700,000 SOUTH BARRINGTON 3 2020 $800,000 SOUTH BARRINGTON 3 2021-2025 MISCELLANEOUS IMPROVEMENTS BARRINGTON RD S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS BARRINGTON RD S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD Miles = 1.53 Roadway Information Miles AADT Truck Pct 1.53 20,544 5.3 BARRINGTON RD RECONSTRUCTION CULVERT REHABILITATION RECONSTRUCTION - PAVEMENTS NHS Y S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS BARRINGTON RD S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 1 - 65 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street BARRINGTON RD Location S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost City MYP Years Past Current $500,000 SOUTH BARRINGTON 4 2021-2025 $2,000,000 SOUTH BARRINGTON 4 2021-2025 FRANKLIN PARK 4 2021-2025 $1,701,000 BURNHAM CHICAGO 3 2021-2025 $2,420,000 CHICAGO 9 2020 INITIAL CONSTRUCTION - PAVEMENTS BARRINGTON RD S OF ILL 62 (ALGONQUIN RD) TO CENTRAL RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS BELMONT AVE 25TH AVE TO W OF ELM ST Miles = 0.68 Roadway Information Miles AADT Truck Pct 0.68 14,412 6.4 BRAINARD AVE 1.06 11,600 BRYN MAWR AVE 6.0 $735,000 REHABILITATION - PAVEMENTS NHS N MUSKEGON AVE TO STATE LINE AVE Miles = 2.15 Roadway Information Miles AADT Truck Pct 1.09 12,483 11.7 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY NEW SHOULDERS MILLED RUMBLE STRIP ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS P N ILL 43 (HARLEM AVE) TO ELSTON AVE Miles = 2.19 DESIGNED OVERLAY ADA IMPROVEMENTS RR FLAGGER REHABILITATION - PAVEMENTS 1 - 66 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street BURNHAM AVE Location BRAINARD AVE TO RIVER OAKS DR Miles = 3.08 Roadway Information Miles AADT Truck Pct 1.46 8,450 2.3 1.62 9,398 BUSSE HWY 2.6 BUSSE RD BUTTERFIELD RD CALIFORNIA AVE $2,095,000 BURNHAM CALUMET CITY 4 2021-2025 STANDARD OVERLAY ADA IMPROVEMENTS $2,600,000 DES PLAINES PARK RIDGE 4 2021-2025 $2,500,000 MOUNT PROSPECT ELK GROVE VILLAGE 1 2021-2025 $383,000 BELLWOOD 1 2020 $307,000 CHICAGO 6 2021-2025 REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 59TH ST TO 63RD ST Miles = 0.50 Roadway Information Miles AADT Truck Pct 0.50 8,050 6.8 MYP Years Past Current N WASHINGTON BLVD TO ST CHARLES RD Miles = 0.87 Roadway Information Miles AADT Truck Pct 0.87 4,444 0.0 City REHABILITATION - PAVEMENTS ILL 58 (GOLF RD) TO ILL 72 (HIGGINS RD) Miles = 1.78 Roadway Information Miles AADT Truck Pct 1.78 22,884 9.2 STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost NHS Y US 14 (MINER ST) TO DEE RD Miles = 1.71 Roadway Information Miles AADT Truck Pct 1.71 4,852 5.6 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 67 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street CENTRAL AVE Location 53RD ST TO 63RD ST Miles = 1.28 Roadway Information Miles AADT Truck Pct 1.28 24,601 3.9 CENTRAL AVE CENTRAL AVE CENTRAL RD City MYP Years Past Current $1,012,000 CHICAGO 1 2021-2025 $577,000 FOREST VIEW CHICAGO 3 2020 $980,000 CHICAGO 4 2021-2025 $600,000 DES PLAINES 4 2021-2025 $575,000 WESTCHESTER 1 2020 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y DEVON AVE TO ELSTON AVE Miles = 0.93 Roadway Information Miles AADT Truck Pct 0.93 20,925 5.6 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS P 47TH ST TO 53RD ST Miles = 0.76 Roadway Information Miles AADT Truck Pct 0.76 32,000 3.9 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N AT DES PLAINES RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES CERMAK RD AT I-294 (TRI-STATE TOLLWAY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES 1 - 68 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street CERMAK RD Location OVER IHB RR & GARDNER RD, 25TH AVE, & ADDISON CREEK Improvements TAMP Category BRIDGE NEW DECK BRIDGE SUPERSTRUCTURE ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $10,550,000 BROADVIEW 4 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES CERMAK RD OVER IHB RR & GARDNER RD, 25TH AVE, & ADDISON CREEK RR FLAGGER Structure Information Str Number AADT 31,000 0160631 32,100 0160632 32,100 0160633 Truck Pct NHS 6 N 3 N 3 N $500,000 BROADVIEW 4 2021-2025 $500,000 BROADVIEW 4 2020 $1,200,000 BROADVIEW 4 2021-2025 CHICAGO 2 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES CERMAK RD OVER IHB RR & GARDNER RD, 25TH AVE, & ADDISON CREEK P.E. (PHASE II) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES CERMAK RD AT IHB RR & GARDNER RD, 25TH AVE, & ADDISON CREEK CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES CERMAK RD BRC RR E OF 47TH AVE IMPACT ATTENUATORS MISCELLANEOUS IMPROVEMENTS 1 - 69 $300,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street CERMAK RD Location KEDZIE AVE TO DAMEN AVE & BLUE ISLAND AVE TO HALSTED ST Miles = 2.53 Roadway Information Miles AADT Truck Pct 1.52 14,438 3.7 1.01 13,377 CHICAGO AVE 4.6 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,990,000 CHICAGO 4 2021-2025 RIVER FOREST 4 2021-2025 CHICAGO HEIGHTS 4 2020 $600,000 CHICAGO 1 2020 $2,000,000 CHICAGO 3 2021-2025 REHABILITATION - PAVEMENTS NHS N N AT DES PLAINES RIVER E OF 1ST AVE BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR $650,000 PRESERVATION - BRIDGES CHICAGO RD THORN CREEK TRIB 0.3 MI N OF ILL 1 CUTOFF CULVERT REPLACEMENT ADA IMPROVEMENTS $1,900,000 MISCELLANEOUS IMPROVEMENTS CONGRESS PKWY AT OLD POST OFFICE P.E. (PHASE I) REHABILITATION - BRIDGES CONGRESS PKWY AT OLD POST OFFICE P.E. (PHASE II) REHABILITATION - BRIDGES 1 - 70 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street CONGRESS PKWY Location AT OLD POST OFFICE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $2,800,000 CHICAGO 3 2021-2025 $246,000 EVANSTON 2 2021-2025 $403,000 NORTH RIVERSIDE RIVERSIDE 2 2021-2025 $782,000 DES PLAINES 1 2021-2025 SCHILLER PARK FRANKLIN PARK RIVER GROVE 2 2020 REHABILITATION - BRIDGES DEMPSTER ST RIDGE AVE TO CHICAGO AVE Miles = 0.41 Roadway Information Miles AADT Truck Pct 0.41 525 0.0 DES PLAINES AVE DES PLAINES RIVER RD RD REHABILITATION - PAVEMENTS RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N FOSTER AVE TO ILL 171 (FIRST AVE) Miles = 4.36 Roadway Information Miles AADT Truck Pct 4.36 25,508 5.4 STANDARD OVERLAY ADA IMPROVEMENTS NHS N US 12 (RAND RD) TO 0.4 MI N OF TOUHY AVE Miles = 2.66 Roadway Information Miles AADT Truck Pct 2.66 20,650 4.0 DES PLAINES RIVER REHABILITATION - PAVEMENTS NHS N 26TH ST TO 31ST ST Miles = 0.51 Roadway Information Miles AADT Truck Pct 0.51 12,400 0.0 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY CULVERT REPAIR NEW SHOULDERS ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 71 $3,018,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street DES PLAINES RIVER Location N OF WINONA AVE RD Improvements TAMP Category DRAINAGE EROSION CONTROL Est. Cost City MYP Years Past Current $550,000 SCHILLER PARK 3 2021-2025 $15,000 SCHILLER PARK 1 2021-2025 $2,000,000 FRANKLIN PARK 12 2021-2025 $3,000,000 PARK RIDGE 3 2021-2025 MISCELLANEOUS IMPROVEMENTS DES PLAINES RIVER N OF WINONA AVE TREE REMOVAL RD MISCELLANEOUS IMPROVEMENTS DES PLAINES RIVER AT ROBINSON RD INTERSECTION RECONSTN RD MISCELLANEOUS IMPROVEMENTS DEVON AVE AT DES PLAINES RIVER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES DEVON AVE N SPRINGFIELD AVE TO MCCORMICK BLVD Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 25,485 5.3 STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N 1 - 72 Structure Information Str Number AADT 11,200 0160832 $570,000 LINCOLNWOOD Truck Pct NHS 2 N 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street DIXIE HWY Location AT DITCH 1 MI N OF US 6 Improvements TAMP Category BRIDGE REPLACEMENT ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,200,000 HARVEY 4 2021-2025 $850,000 HOMEWOOD 4 2021-2025 $10,000 HOMEWOOD 2 2020 $3,080,000 HOMEWOOD FLOSSMOOR CHICAGO HEIGHTS 4 2021-2025 $1,000,000 CHICAGO HEIGHTS 3 2021-2025 MISCELLANEOUS IMPROVEMENTS DIXIE HWY AT IC RR DRAINAGE MISCELLANEOUS IMPROVEMENTS DIXIE HWY AT IC RR LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS DIXIE HWY 183RD ST TO ILL 1 (CHICAGO RD) Miles = 3.62 Roadway Information Miles AADT Truck Pct 3.62 9,965 4.9 DIXIE HWY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N THORN CREEK TRIB 0.4 MI N OF ILL 1 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 1 - 73 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street DIXIE HWY Location THORN CREEK TRIB 0.4 MI N OF ILL 1 Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $75,000 CHICAGO HEIGHTS 2 2021-2025 $1,000,000 CHICAGO 4 2021-2025 $8,000,000 MC COOK COUNTRYSIDE 4 2021-2025 $700,000 MC COOK COUNTRYSIDE 1 2021-2025 $1,638,000 MC COOK COUNTRYSIDE 4 2021-2025 MISCELLANEOUS IMPROVEMENTS DOTY AVE 110TH ST TO S OF KENSINGTON AVE (PS #27) DREDGING MISCELLANEOUS IMPROVEMENTS EAST AVE AT 47TH ST TRAF SIGNAL INSTALLATION ADA IMPROVEMENTS LIGHTING DRAINAGE MISCELLANEOUS IMPROVEMENTS EAST AVE AT 47TH ST RR INTERCONNECT RR FLAGGER MISCELLANEOUS IMPROVEMENTS EAST AVE 47TH ST TO JOLIET RD Miles = 1.56 Roadway Information Miles AADT Truck Pct 1.56 19,867 10.3 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 74 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street EAST AVE Location EAST AVE: 55TH ST TO JOLIET RD & 55TH ST: EAST AVE TO JOLIET RD Miles = 1.44 55TH ST Roadway Information Miles AADT Truck Pct 0.54 23,200 11.2 0.90 19,200 EAST AVE 9.0 Improvements TAMP Category INTERSECTION RECONSTN RETAINING WALL DRAINAGE SLOPE STABILIZATION ADA IMPROVEMENTS STANDARD OVERLAY Est. Cost City MYP Years Past Current $11,444,000 MC COOK COUNTRYSIDE 3 2021-2025 $1,200,000 MC COOK COUNTRYSIDE 3 2021-2025 DES PLAINES 4 2021-2025 CHICAGO 6 2020 MISCELLANEOUS IMPROVEMENTS NHS N N 55TH ST TO JOLIET RD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS ELK BLVD US 12/45 (LEE ST / MANNHEIM RD) TO US 12 (RAND RD) Miles = 0.20 Roadway Information Miles AADT Truck Pct 0.20 0.0 ELSTON AVE $170,000 REHABILITATION - PAVEMENTS NHS N I-94 (EDENS EXPWY) TO CENTRAL PARK AVE Miles = 2.06 Roadway Information Miles AADT Truck Pct 2.06 15,960 4.1 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N 1 - 75 $2,188,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street FOREST AVE Location AT DES PLAINES RIVER Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $400,000 RIVERSIDE 3 2021-2025 $1,180,000 GLENCOE WINNETKA 4 2021-2025 2 2021-2025 PRESERVATION - BRIDGES FOREST WAY DR ILL 68 (DUNDEE RD) TO WILLOW RD Miles = 2.98 Roadway Information Miles AADT Truck Pct 2.98 2,250 0.0 FOREST WAY DR STANDARD OVERLAY NEW SHOULDERS ADA IMPROVEMENTS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N AT DITCH N OF WILLOW RD CULVERT REPLACEMENT $1,000,000 RECONSTRUCTION - BRIDGES FOSTER AVE AT N BRANCH CHICAGO RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Structure Information Str Number AADT 2,250 0162309 Truck Pct NHS 3 N $800,000 CHICAGO 3 2021-2025 $1,710,000 CHICAGO 4 2021-2025 PRESERVATION - BRIDGES FRANKLIN ST CONNECTOR CERMAK RD TO I-90 Miles = 0.72 Roadway Information Miles AADT Truck Pct 0.72 58,106 4.8 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 1 - 76 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street FULLERTON AVE Location SARAH ST TO SILVER CREEK DR Improvements TAMP Category DRAINAGE RETAINING WALL ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $673,000 FRANKLIN PARK 4 2020 $4,326,000 LYNWOOD GLENWOOD 6 2021-2025 $5,300,000 SKOKIE MORTON GROVE EVANSTON 4 2020 $1,004,000 MORTON GROVE 4 2020 RIVER GROVE 4 2020 MISCELLANEOUS IMPROVEMENTS GLENWOOD DYER RD GLENWOOD LANSING RD TO ILL 83 (TORRENCE AVE) Miles = 2.86 Roadway Information Miles AADT Truck Pct 2.86 9,994 9.0 GOLF RD GOLF RD REHABILITATION - PAVEMENTS NHS N ILL 43 (WAUKEGAN RD) TO MCCORMICK BLVD Miles = 4.73 Roadway Information Miles AADT Truck Pct 4.73 29,283 3.5 WIDENING EXISTING PAVEMENT BI-DIRECT LEFT TURN LANE STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N OVERLOOK DR TO HARMS RD TURNING LANES ADA IMPROVEMENTS GUARDRAIL MISCELLANEOUS IMPROVEMENTS GRAND AVE AT DES PLAINES RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR WING WALL REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES 1 - 77 $979,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street GREEN BAY RD Location S OF SCOTT AVE TO S OF KENILWORTH AVE Miles = 2.80 Roadway Information Miles AADT Truck Pct 2.80 10,560 3.9 HARLEM AVE HICKS RD IDA B WELLS DR WILKE RD $2,030,000 GLENCOE WINNETKA KENILWORTH 4 2021-2025 STANDARD OVERLAY ADA IMPROVEMENTS $770,000 NILES 4 2021-2025 PALATINE ROLLING MEADOWS 3 2021-2025 CHICAGO 3 2021-2025 REHABILITATION - PAVEMENTS NHS N DESIGNED OVERLAY ADA IMPROVEMENTS $1,100,000 REHABILITATION - PAVEMENTS NHS N AT OLD POST OFFICE US 12 (RAND RD) TO ANDERSON DR Miles = 0.98 Roadway Information Miles AADT Truck Pct 0.98 0.0 MYP Years Past Current BRIDGE SUPERSTRUCTURE BRIDGE NEW DECK $20,000,000 REHABILITATION - BRIDGES ILL 53 W FR RD City REHABILITATION - PAVEMENTS US 14 (NORTHWEST HWY) TO KIRCHOFF RD Miles = 1.61 Roadway Information Miles AADT Truck Pct 1.61 9,310 6.4 STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost NHS N DEMPSTER ST TO OAKTON ST Miles = 1.00 Roadway Information Miles AADT Truck Pct 1.00 12,700 3.1 Improvements TAMP Category STANDARD OVERLAY NEW SHOULDERS REHABILITATION - PAVEMENTS NHS N 1 - 78 Structure Information Str Number AADT 73,200 0160460 73,200 0160461 73,200 0160462 $395,000 PALATINE Truck Pct NHS 1 Y 1 Y 1 Y 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street JOLIET RD Location AT FLAG CREEK Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost AT BRAINARD RD INTERSECTION IMPROVEMENT MYP Years Past Current $2,800,000 REHABILITATION - BRIDGES JOLIET RD City INDIAN HEAD PARK Structure Information Str Number AADT 12,500 0160393 $1,130,000 12 2020 Truck Pct NHS 8 N COUNTRYSIDE 3 2021-2025 MC COOK 2 2021-2025 MISCELLANEOUS IMPROVEMENTS JOLIET RD AT CSXT & IHB RR BRIDGE SUBSTRUCTURE BRIDGE JOINT REPLACE/REPAIR $250,000 REHABILITATION - BRIDGES JOLIET RD (CLOSED) 55TH ST INTERSECTION RECONSTN Structure Information Str Number AADT 12,500 0160394 $1,600,000 Truck Pct NHS 9 N MC COOK 3 2020 PALOS PARK 3 2021-2025 MISCELLANEOUS IMPROVEMENTS KEAN RD ILL 83 (CAL SAG RD) TO 119TH ST Miles = 0.64 Roadway Information Miles AADT Truck Pct 0.64 200 0.0 STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N 1 - 79 $282,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street KEDZIE AVE Location N OF 87TH ST TO 103RD ST & 115TH ST TO N OF 131ST ST & AT 87TH ST Miles = 4.00 Roadway Information Miles AADT Truck Pct 2.13 20,093 2.5 1.87 13,127 KEDZIE AVE 5.6 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS CHANNELIZATION Est. Cost City MYP Years Past Current $5,235,000 EVERGREEN PARK CHICAGO MERRIONETTE PARK ALSIP BLUE ISLAND 4 2021-2025 $819,000 MERRIONETTE PARK 6 2020 ROBBINS 2 2021-2025 REHABILITATION - PAVEMENTS NHS N N AT 119TH ST INTERSECTION RECONSTN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS KEDZIE AVE AT CAL SAG CHANNEL BRIDGE REPLACEMENT $10,560,000 RECONSTRUCTION - BRIDGES KEDZIE AVE AT CAL SAG CHANNEL BRIDGE PAINTING Structure Information Str Number AADT 13,100 0160762 Truck Pct NHS 5 N $1,500,000 ROBBINS 3 2021-2025 $1,100,000 ROBBINS 2 2021-2025 PRESERVATION - BRIDGES KEDZIE AVE AT CAL SAG CHANNEL P.E. (PHASE II) RECONSTRUCTION - BRIDGES 1 - 80 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street KIMBALL AVE Location WELLINGTON AVE TO DIVERSEY PKWY Miles = 0.25 Roadway Information Miles AADT Truck Pct 0.25 17,300 8.0 LAKE COOK RD Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $250,000 CHICAGO 10 2021-2025 $2,015,000 NORTHBROOK 3 2021-2025 $1,483,000 SCHILLER PARK NORRIDGE 4 2020 NILES 3 2021-2025 REHABILITATION - PAVEMENTS NHS N AT US 41 (EDENS EXPWY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR TRAF SIGNAL REPLACEMENT PRESERVATION - BRIDGES LAWRENCE AVE E OF US 12/45 (MANNHEIM RD) TO ROSE ST & E OF CANFIELD AVE Miles = 0.59 Roadway Information Miles AADT Truck Pct 0.54 22,607 7.9 0.05 21,200 LEHIGH AVE 2.6 REHABILITATION - PAVEMENTS NHS N N OAKTON ST TO TOUHY AVE Miles = 1.07 Roadway Information Miles AADT Truck Pct 1.07 6,572 6.8 STANDARD OVERLAY ADA IMPROVEMENTS STORM SEWER REPAIR DRAINAGE STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 1 - 81 $550,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street LEHIGH AVE Location TOUHY AVE TO CENTRAL AVE Miles = 1.24 Roadway Information Miles AADT Truck Pct 1.24 4,300 1.7 LINCOLN AVE LINCOLN AVE MAIN ST $1,030,000 CHICAGO 4 2021-2025 DESIGNED OVERLAY ADA IMPROVEMENTS SKOKIE 4 2020 $1,170,000 DOLTON CHICAGO 4 2021-2025 $1,500,000 BARRINGTON HILLS BARRINGTON DEER PARK 4 2021-2025 $4,350,000 LEMONT 3 2021-2025 $297,000 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER REHABILITATION - PAVEMENTS NHS N 0.21 11,000 7.6 Y 1.36 15,200 7.1 N MAIN ST MYP Years Past Current NHS N W OF HART RD TO ELA RD Miles = 2.59 Roadway Information Miles AADT Truck Pct 1.02 9,973 8.5 City REHABILITATION - PAVEMENTS INDIANA AVE TO ILL 83 (SIBLEY BLVD) Miles = 2.50 Roadway Information Miles AADT Truck Pct 2.50 3,600 13.3 STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS Est. Cost NHS N S OF MAIN ST TO NILES CENTER RD Miles = 0.43 Roadway Information Miles AADT Truck Pct 0.43 6,600 7.3 Improvements TAMP Category WHEELER DR TO ILL 83/171 (ARCHER AVE) CULVERT (NEW) DRAINAGE INITIAL CONSTRUCTION - BRIDGES 1 - 82 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street MAIN ST Location WHEELER DR TO ILL 83/171 (ARCHER AVE) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $435,000 LEMONT 1 2020 $200,000 LEMONT 2 2021-2025 SKOKIE LINCOLNWOOD 4 2020 ROLLING MEADOWS SCHAUMBURG 4 2021-2025 CHICAGO 4 2021-2025 INITIAL CONSTRUCTION - BRIDGES MAIN ST WHEELER DR TO ILL 83/171 (ARCHER AVE) LAND ACQUISITION MAINTENANCE - PAVEMENTS MCCORMICK BLVD DEMPSTER ST TO DEVON AVE Miles = 3.00 Roadway Information Miles AADT Truck Pct 3.00 29,438 4.6 MEACHAM RD MICHIGAN AVE REHABILITATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS $665,000 REHABILITATION - PAVEMENTS NHS N ROOSEVELT RD TO GARFIELD BLVD Miles = 5.06 Roadway Information Miles AADT Truck Pct 5.06 8,116 5.2 $3,500,000 NHS Y S OF EMERSON AVE TO ILL 62 (ALGONQUIN RD) Miles = 1.08 Roadway Information Miles AADT Truck Pct 1.08 15,700 3.8 DESIGNED OVERLAY ADA IMPROVEMENTS DRAINAGE DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 83 $5,315,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street MONTROSE AVE Location CENTRAL AVE TO PULASKI RD Miles = 2.04 Roadway Information Miles AADT Truck Pct 2.04 17,565 6.5 MORGAN ST NILES CENTER RD NORTHWEST HWY OAKTON ST $1,200,000 CHICAGO 1 2021-2025 STANDARD OVERLAY ADA IMPROVEMENTS $720,000 CHICAGO 4 2021-2025 $2,329,000 SKOKIE 4 2020 $3,500,000 PARK RIDGE DES PLAINES 4 2020 $2,120,000 DES PLAINES 4 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER PRESERVATION - PAVEMENTS NHS N STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N ILL 83 (ELMHURST RD) TO US 12/45 (LEE ST / MANNHEIM RD) Miles = 2.38 Roadway Information Miles AADT Truck Pct 2.38 22,967 6.6 MYP Years Past Current NHS N US 14 (MINER ST) TO S MERRILL ST Miles = 3.39 Roadway Information Miles AADT Truck Pct 3.39 13,104 2.6 City PRESERVATION - PAVEMENTS CHURCH ST TO TOUHY AVE Miles = 2.70 Roadway Information Miles AADT Truck Pct 2.70 10,363 2.7 STANDARD OVERLAY Est. Cost NHS N 79TH ST TO 87TH ST Miles = 1.00 Roadway Information Miles AADT Truck Pct 1.00 2,400 0.0 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 84 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street OAKTON ST Location US 14 (CALDWELL AVE) TO LONG AVE Miles = 1.64 Roadway Information Miles AADT Truck Pct 1.64 25,302 3.9 OGDEN AVE Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,263,000 MORTON GROVE 2 2021-2025 CICERO 1 2020 $2,260,000 CHICAGO 4 2021-2025 $10,700,000 CHICAGO 3 2021-2025 $1,070,000 CHICAGO 2 2021-2025 REHABILITATION - PAVEMENTS NHS N AT AUSTIN BLVD TRAF SIGNAL MODERNIZATION $889,000 MISCELLANEOUS IMPROVEMENTS OHIO ST I-90/94 (KENNEDY EXPWY) TO MICHIGAN AVE Miles = 1.46 Roadway Information Miles AADT Truck Pct 1.46 57,212 2.0 OHIO ST STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y AT N BRANCH CHICAGO RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES OHIO ST AT N BRANCH CHICAGO RIVER P.E. (PHASE II) PRESERVATION - BRIDGES 1 - 85 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street OHIO ST Location AT N BRANCH CHICAGO RIVER Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $1,391,000 CHICAGO 2 2021-2025 $345,000 ARLINGTON HEIGHTS 4 2021-2025 $245,000 BLUE ISLAND 4 2020 $2,272,000 BARRINGTON HILLS SOUTH BARRINGTON HOFFMAN ESTATES INVERNESS PALATINE 4 2021-2025 $1,000,000 PALATINE 2 2021-2025 PRESERVATION - BRIDGES OLD ARLINGTON HTS RD ILL 68 (DUNDEE RD) TO ARLINGTON HEIGHTS RD Miles = 0.45 Roadway Information Miles AADT Truck Pct 0.45 5,350 0.0 OLD WESTERN AVE PALATINE RD DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N ILL 62 (ALGONQUIN RD) TO E OF ROSELLE RD Miles = 4.83 Roadway Information Miles AADT Truck Pct 4.83 9,146 3.2 PALATINE RD REHABILITATION - PAVEMENTS NHS N BROADWAY ST TO WESTERN AVE Miles = 0.21 Roadway Information Miles AADT Truck Pct 0.21 2,000 0.0 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP RR FLAGGER REHABILITATION - PAVEMENTS NHS N AT SALT CREEK W OF WINSTON DR (W OF ILL 53) CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 86 Structure Information Str Number AADT 22,000 0162653 Truck Pct NHS 2 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street PALATINE RD Location AT SALT CREEK W OF WINSTON DR (W OF ILL 53) Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $100,000 PALATINE 1 2021-2025 11 2020 RECONSTRUCTION - BRIDGES PALATINE RD FR RD EB & WB AT DES PLAINES RIVER Miles = 0.73 BRIDGE NEW DECK BRIDGE APPROACH ROADWAY RECONSTRUCTION BRIDGE REPAIR ADA IMPROVEMENTS $4,393,000 REHABILITATION - BRIDGES PALATINE RD FR RD AT DES PLAINES RIVER CONSTRUCTION ENGINEERING Structure Information Str Number AADT 5,400 0160273 6,900 0160272 Truck Pct NHS 8 Y 6 Y $250,000 1 2020 $350,000 1 2021-2025 4 2021-2025 EB & WB REHABILITATION - BRIDGES PALATINE RD FR RD AT DES PLAINES RIVER CONSTRUCTION ENGINEERING EB & WB REHABILITATION - BRIDGES PALATINE RD N FR RD WILLIAMS DR TO ALISON DR Miles = 0.79 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS 1 - 87 $800,000 PALATINE FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street PALATINE RD S FR RD Location NORTH VERDE AVE TO PALATINE RD Miles = 0.75 Roadway Information Miles AADT Truck Pct 0.75 3,800 0.0 PALATINE RD S FR RD $370,000 ARLINGTON HEIGHTS 2 2020 STANDARD OVERLAY ADA IMPROVEMENTS $1,283,000 ARLINGTON HEIGHTS PROSPECT HEIGHTS WHEELING 3 2021-2025 $1,860,000 CHICAGO 4 2021-2025 $38,400,000 CHICAGO 10 2021-2025 REHABILITATION - PAVEMENTS N 0.49 0.0 N 0.49 0.0 N 0.59 0.0 N 0.34 0.0 N 0.39 0.0 N PERSHING RD MYP Years Past Current NHS N 0.0 E OF ASHLAND AVE TO W OF WELLS ST Miles = 1.53 Roadway Information Miles AADT Truck Pct 1.53 15,729 17.5 City REHABILITATION - PAVEMENTS 0.99 PERSHING RD DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS N E OF US 12 (RAND RD) TO E OF PINECREST DR Miles = 3.61 Roadway Information Miles AADT Truck Pct 0.32 0.0 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y RACINE AVE & CN RR 1.3 MI W OF I-94 BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 1 - 88 Structure Information Str Number AADT 16,500 0160396 Truck Pct NHS 17 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street PERSHING RD Location RACINE AVE & CN RR 1.3 MI W OF I-94 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $5,750,000 CHICAGO 3 2021-2025 $3,200,000 DEERFIELD NORTHBROOK GLENVIEW 4 2021-2025 $1,500,000 CHICAGO 1 2021-2025 $2,870,000 CHICAGO 4 2021-2025 $2,675,000 CHICAGO 10 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES PFINGSTEN RD LAKE COOK RD TO E LAKE AVE Miles = 4.58 Roadway Information Miles AADT Truck Pct 4.58 12,068 2.9 PULASKI RD PULASKI RD 20,090 PULASKI RD 7.1 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N DEVON AVE TO BARRY AVE & DIVERSEY AVE TO ILL 64 (NORTH AVE) Miles = 5.69 Roadway Information Miles AADT Truck Pct 4.14 18,308 5.3 1.55 REHABILITATION - PAVEMENTS NHS N I-290 (EISENHOWER EXPY) TO CERMAK RD (22ND ST) Miles = 1.60 Roadway Information Miles AADT Truck Pct 1.60 16,294 8.3 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N N AT FORD CITY DR INTERSECTION CONSTRUCTION BRIDGE REMOVAL/DEMOLITION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 89 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street RAND RD Location AT DES PLAINES RIVER Improvements TAMP Category BRIDGE REPLACEMENT RETAINING WALL ADA IMPROVEMENTS Est. Cost HOWARD ST TO PRATT BLVD (PEDESTRIAN IMPROVEMENTS) MISCELLANEOUS MYP Years Past Current $10,530,000 RECONSTRUCTION - BRIDGES RIDGE BLVD City DES PLAINES Structure Information Str Number AADT 26,400 0160362 13 2021-2025 Truck Pct NHS 4 N $2,000,000 CHICAGO 1 2021-2025 $1,100,000 CHICAGO 4 2021-2025 $2,030,000 GLENCOE 3 2021-2025 $100,000 GLENCOE 3 2021-2025 MAINTENANCE - PAVEMENTS SACRAMENTO BLVD N OF CARROLL AVE TO ROOSEVELT RD Miles = 1.52 Roadway Information Miles AADT Truck Pct 1.52 16,245 4.7 SHERIDAN RD STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N LAKE COOK RD TO MARY ST DRAINAGE ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS SHERIDAN RD LAKE COOK RD TO MARY ST LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 1 - 90 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street SHERIDAN RD Location AT RAVINES 1, 2, 3 & LAKE-COOK RD RAVINE Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $1,800,000 GLENCOE 4 2020 GLENVIEW 4 2021-2025 $3,450,000 CHICAGO 4 2021-2025 $1,190,000 BURNHAM CALUMET CITY 4 2021-2025 BURNHAM 4 2021-2025 PRESERVATION - BRIDGES SHERMER RD WILLOW RD TO OLD WILLOW RD Miles = 0.50 Roadway Information Miles AADT Truck Pct 0.50 9,200 0.0 TORRENCE AVE TORRENCE AVE TORRENCE AVE REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y GRAND CALUMET RIVER TO HARDING AVE Miles = 1.40 Roadway Information Miles AADT Truck Pct 1.40 17,500 7.9 $485,000 NHS N CALUMET RIVER TO GRAND CALUMET RIVER Miles = 1.74 Roadway Information Miles AADT Truck Pct 1.74 17,240 17.9 STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y AT CSXT RR & IHB RR BRIDGE REPAIR MAINTENANCE - BRIDGES 1 - 91 $750,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street TOUHY AVE Location ILL 72 (HIGGINS RD) TO US 14 (CALDWELL AVE) Miles = 5.45 Roadway Information Miles AADT Truck Pct 5.45 27,916 5.3 TOUHY AVE Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost MYP Years Past Current $3,060,000 DES PLAINES PARK RIDGE ROSEMONT CHICAGO NILES 4 2020 $2,900,000 NILES 11 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT N BRANCH CHICAGO RIVER 0.6 MI E OF ILL 43 BRIDGE REPLACEMENT TRAF SIGNAL MODERNIZATION RECONSTRUCTION - BRIDGES TOUHY AVE City AT KOSTNER AVE TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS Structure Information Str Number AADT 25,800 0160363 Truck Pct NHS 11 Y $540,000 LINCOLNWOOD 1 2021-2025 $75,000 LINCOLNWOOD 1 2021-2025 $1,375,000 LINCOLNWOOD SKOKIE 4 2020 MISCELLANEOUS IMPROVEMENTS TOUHY AVE AT KOSTNER AVE LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS TOUHY AVE US 41 (LINCOLN AVE) TO RIDGEWAY AVE Miles = 0.84 Roadway Information Miles AADT Truck Pct 0.84 30,633 6.5 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 92 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street TOUHY AVE Location AT HAMLIN AVE Improvements TAMP Category CHANNELIZATION TRAF SIGNAL INSTALLATION Est. Cost City MYP Years Past Current $750,000 LINCOLNWOOD 12 2021-2025 $85,000 LINCOLNWOOD 6 2021-2025 $540,000 1 2020 $770,000 1 2020 $5,000,000 8 2021-2025 1 2020 MISCELLANEOUS IMPROVEMENTS TOUHY AVE AT HAMLIN AVE LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS DISTRICTWIDE LOCATIONS (SOUTH) GUARDRAIL END-SECT REPL MISCELLANEOUS IMPROVEMENTS VARIOUS GUARDRAIL END TERMINAL REPLACEMENT – ROUND 4 – SOUTH REGION GUARDRAIL END-SECT REPL GUARDRAIL MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ADA RAMPS - S COOK) ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS BRIDGES IN DISTRICT ONE BRIDGE DECK SEALING PRESERVATION - BRIDGES 1 - 93 $495,000 JUSTICE LYONS ELGIN GLENVIEW FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street VARIOUS Location VARIOUS EXPRESSWAY LOCATIONS Improvements TAMP Category LIGHTING Est. Cost City MYP Years Past Current $2,140,000 MATTESON ROLLING MEADOWS SCHAUMBURG 1 2020 2 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS CENTRAL TRAFFIC MANAGEMENT SYSTEM MISCELLANEOUS $7,982,000 MISCELLANEOUS IMPROVEMENTS VERMONT ST WESTERN AVE TO ASHLAND AVE STORM SEWER LINING $500,000 BLUE ISLAND CALUMET PARK 3 2020 $678,000 OAK PARK 1 2021-2025 $900,000 CHICAGO 1 2021-2025 MISCELLANEOUS IMPROVEMENTS WASHINGTON BLVD ILL 43 TO AUSTIN BLVD Miles = 1.54 Roadway Information Miles AADT Truck Pct 1.54 7,917 5.4 WASHINGTON BLVD REHABILITATION - PAVEMENTS NHS N ILL 50 (CICERO AVE) TO HAMLIN AVE Miles = 1.26 Roadway Information Miles AADT Truck Pct 1.26 11,677 1.9 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N 1 - 94 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WASHINGTON BLVD Location AT DES PLAINES RIVER Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost AT DES PLAINES RIVER P.E. (PHASE II) MYP Years Past Current $3,500,000 RECONSTRUCTION - BRIDGES WASHINGTON BLVD City RIVER FOREST Structure Information Str Number AADT 6,400 0160950 3 2021-2025 Truck Pct NHS 5 N $1,000,000 RIVER FOREST 2 2021-2025 $100,000 RIVER FOREST 2 2021-2025 $700,000 NILES 3 2021-2025 $500,000 BLUE ISLAND 4 2021-2025 RECONSTRUCTION - BRIDGES WASHINGTON BLVD AT DES PLAINES RIVER LAND ACQUISITION RECONSTRUCTION - BRIDGES WAUKEGAN RD ILL 43 (OAKTON ST) TO ILL 21 (MILWAUKEE AVE) Miles = 0.92 Roadway Information Miles AADT Truck Pct 0.92 8,350 4.0 WESTERN AVE REHABILITATION - PAVEMENTS NHS N 127TH ST TO 135TH PL Miles = 1.00 Roadway Information Miles AADT Truck Pct 1.00 7,217 9.0 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 1 - 95 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WESTERN AVE Location AT CAL SAG CHANNEL Improvements TAMP Category BRIDGE SUBSTRUCTURE BRIDGE APPROACH ROADWAY ADA IMPROVEMENTS RR FLAGGER LIGHTING Est. Cost AT CAL SAG CHANNEL BRIDGE PAINTING MYP Years Past Current $11,740,000 REHABILITATION - BRIDGES WESTERN AVE City BLUE ISLAND Structure Information Str Number AADT 6,950 0160777 13 2020 Truck Pct NHS 9 Y $1,750,000 BLUE ISLAND 2 2021-2025 $36,000 BLUE ISLAND 1 2020 $600,000 DIXMOOR BLUE ISLAND 1 2021-2025 PRESERVATION - BRIDGES WESTERN AVE CAL-SAG CHANNEL P.E. (PHASE II) REHABILITATION - BRIDGES WESTERN AVE AT 139TH ST TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 96 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WILLOW RD Location E OF DES PLAINES RIVER TO WATERVIEW DR / PROTECTION PKWY Miles = 0.94 Roadway Information Miles AADT Truck Pct 0.94 43,146 7.0 WILLOW RD Improvements TAMP Category RECONSTRUCTION INTERSECTION IMPROVEMENT LIGHTING NOISE BARRIERS BRIDGE NEW DECK BRIDGE REPAIR Est. Cost City MYP Years Past Current $9,011,000 PROSPECT HEIGHTS GLENVIEW 21 2021-2025 $9,989,000 PROSPECT HEIGHTS GLENVIEW 2 2021-2025 $3,400,000 PROSPECT HEIGHTS GLENVIEW 4 2020 $500,000 PROSPECT HEIGHTS GLENVIEW 5 2021-2025 $2,500,000 PROSPECT HEIGHTS GLENVIEW 16 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y E OF DES PLAINES RIVER TO WATERVIEW DR / PROTECTION PKWY Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS WILLOW RD E OF DES PLAINES RIVER TO WATERVIEW DR / PROTECTION PKWY LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS WILLOW RD E OF DES PLAINES RIVER TO WATERVIEW DR / PROTECTION PKWY UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS WILLOW RD E OF DES PLAINES RIVER TO WATERVIEW DR / PROTECTION PKWY CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 1 - 97 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WILLOW RD Location AT W FORK N BRANCH CHICAGO RIVER Improvements TAMP Category BRIDGE REPLACEMENT SIDEWALKS Est. Cost AT W FORK N BRANCH CHICAGO RIVER P.E. (PHASE II) MYP Years Past Current $5,400,000 RECONSTRUCTION - BRIDGES WILLOW RD City NORTHBROOK GLENVIEW Structure Information Str Number AADT 42,500 0160534 3 2021-2025 Truck Pct NHS 4 Y $1,000,000 NORTHBROOK GLENVIEW 2 2021-2025 $1,100,000 GLENVIEW 4 2020 $950,000 GLENVIEW 1 2020 WILLOW SPRINGS COUNTRYSIDE 4 2021-2025 RECONSTRUCTION - BRIDGES WILLOW RD AT PFINGSTEN RD RIGHT TURN LANE ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS WILLOW RD AT LEHIGH AVE / PATRIOT BLVD & SOO RR CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES WILLOW SPRINGS RD 55TH ST TO ILL 171 (ARCHER AVE) Miles = 4.44 Roadway Information Miles AADT Truck Pct 4.44 12,723 5.1 DESIGNED OVERLAY NEW SHOULDERS ADA IMPROVEMENTS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N 1 - 98 $1,165,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WILLOW SPRINGS RD Location AT I-294 (TRI-STATE TOLLWAY) Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $515,000 COUNTRYSIDE 1 2021-2025 $13,500,000 WHEELING 21 2020 $68,000 WHEELING 1 2020 $250,000 WHEELING 7 2021-2025 $850,000 WHEELING 8 2020 PRESERVATION - BRIDGES WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD Miles = 2.04 RECONSTRUCTION ADA IMPROVEMENTS CONTINGENT UPON A JURISDICTIONAL TRANSFER. Roadway Information Miles AADT Truck Pct 0.50 9,500 4.6 1.54 WOLF RD 12,535 3.4 RECONSTRUCTION - PAVEMENTS NHS N N ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD UTILITY ADJUSTMENT CONTINGENT UPON A JURISDICTIONAL TRANSFER. RECONSTRUCTION - PAVEMENTS WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD CONSTRUCTION ENGINEERING CONTINGENT UPON A JURISDICTIONAL TRANSFER. RECONSTRUCTION - PAVEMENTS 1 - 99 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WOLF RD Location ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $850,000 WHEELING 1 2021-2025 $330,000 FRANKLIN PARK 1 2020 $705,000 ORLAND PARK 3 2021-2025 $250,000 ORLAND PARK 3 2021-2025 $503,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 1 2020 RECONSTRUCTION - PAVEMENTS WOLF RD AT I-294 (TRI-STATE TOLLWAY) BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS PRESERVATION - BRIDGES WOLF RD US 6 (SOUTHWEST HWY) TO 187TH ST Miles = 1.62 Roadway Information Miles AADT Truck Pct 1.12 13,128 3.9 0.50 WOLF RD 16,800 5.8 STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N N AT MARLEY CREEK S OF JCT US 6 (SOUTHWEST HWY) CULVERT REPAIR MAINTENANCE - BRIDGES WOOD ST N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) TREE REMOVAL MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 1 - 100 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways COOK COUNTY Route / Street WOOD ST Location N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $3,375,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 10 2020 $3,000,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 2 2021-2025 ILLINOIS JOBS NOW! PROJECT INITIAL CONSTRUCTION - PAVEMENTS WOOD ST N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) CONSTRUCTION ENGINEERING ILLINOIS JOBS NOW! PROJECT INITIAL CONSTRUCTION - PAVEMENTS 1 - 101 DUPAGE COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street I 55 Location AT LEMONT RD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $11,000,000 WOODRIDGE 13 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 AT LEMONT RD P.E. (PHASE II) Structure Information Str Number AADT 150,400 0220001 Truck Pct NHS 11 Y $600,000 WOODRIDGE 4 2020 $100,000 WOODRIDGE 5 2021-2025 $1,620,000 WOODRIDGE 5 2021-2025 4 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 AT LEMONT RD UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 AT LEMONT RD CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 STREAM 0.9 MI E OF CASS AVE CULVERT REPAIR MISCELLANEOUS IMPROVEMENTS 1 - 102 $465,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street I 55 Location AT CLARENDON HILLS RD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 55 AT MADISON ST BRIDGE SUBSTRUCTURE BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR $2,000,000 AT GARY AVE LAKE ST TRAF SIGNAL MODERNIZATION CHANNELIZATION SIGNING (NEW) 3 Structure Information Str Number AADT 2,850 0220089 $1,250,000 REHABILITATION - BRIDGES US 20 MYP Years Past Current RECONSTRUCTION - BRIDGES I City WILLOWBROOK BURR RIDGE Structure Information Str Number AADT 168,700 0220003 2021-2025 Truck Pct NHS 4 N 5 2021-2025 Truck Pct NHS 10 Y $2,930,000 HANOVER PARK 4 2021-2025 $1,100,000 HANOVER PARK 5 2021-2025 $1,500,000 NAPERVILLE 2 2021-2025 MISCELLANEOUS IMPROVEMENTS US 20 AT GARY AVE LAND ACQUISITION LAKE ST MISCELLANEOUS IMPROVEMENTS US 34 AT RICKERT DR INTERSECTION IMPROVEMENT OGDEN AVE MISCELLANEOUS IMPROVEMENTS 1 - 103 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 19 IRVING PARK RD Location 0.3 MI W OF MITCHELL BLVD TO BAKER DR Miles = 3.39 Roadway Information Miles AADT Truck Pct 0.95 24,400 6.8 6.7 Y 1.76 15,551 5.0 N E OF TECHNOLOGY BLVD TO WINFIELD RD Miles = 4.97 Roadway Information Miles AADT Truck Pct 4.97 23,076 14.5 ILL 38 City MYP Years Past Current $2,890,000 SCHAUMBURG ROSELLE ITASCA 4 2021-2025 $4,266,000 WEST CHICAGO WINFIELD 4 2021-2025 $6,000,000 WINFIELD 19 2021-2025 $1,340,000 WINFIELD 10 2021-2025 $2,500,000 WINFIELD WHEATON 3 2021-2025 REHABILITATION - PAVEMENTS 16,000 ROOSEVELT RD STANDARD OVERLAY NEW SHOULDERS ADA IMPROVEMENTS Est. Cost NHS N 0.68 ILL 38 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER REHABILITATION - PAVEMENTS NHS Y AT WINFIELD RD INTERSECTION RECONSTN ROOSEVELT RD MISCELLANEOUS IMPROVEMENTS ILL 38 AT WINFIELD RD LAND ACQUISITION ROOSEVELT RD MISCELLANEOUS IMPROVEMENTS ILL 38 ROOSEVELT RD WINFIELD RD TO COUNTY FARM RD Miles = 0.94 Roadway Information Miles AADT Truck Pct 0.94 28,900 8.7 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS NHS Y 1 - 104 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 38 ROOSEVELT RD Location COUNTY FARM RD TO PIERCE AVE Miles = 0.73 Roadway Information Miles AADT Truck Pct 0.73 32,300 6.7 ILL 38 Improvements TAMP Category STANDARD OVERLAY Est. Cost MYP Years Past Current $577,000 WHEATON 2 2021-2025 $6,950,000 WHEATON 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT COUNTY FARM RD ROOSEVELT RD INTERSECTION IMPROVEMENT BRIDGE REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 38 City AT COUNTY FARM RD P.E. (PHASE II) Structure Information Str Number AADT 28,900 0220145 Truck Pct NHS 8 Y $100,000 WHEATON WINFIELD 1 2020 $2,600,000 WHEATON WINFIELD 4 2021-2025 $1,350,000 WHEATON WINFIELD 3 2021-2025 ROOSEVELT RD MISCELLANEOUS IMPROVEMENTS ILL 38 AT COUNTY FARM RD LAND ACQUISITION ROOSEVELT RD MISCELLANEOUS IMPROVEMENTS ILL 38 ROOSEVELT RD AT COUNTY FARM RD & WINFIELD RD TO COUNTY FARM RD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 105 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 53 ROHLWING RD Location SIDNEY AVE TO ST. CHARLES RD Miles = 1.39 Roadway Information Miles AADT Truck Pct 1.39 20,365 4.6 ILL 53 COLUMBINE AVE Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost MYP Years Past Current $850,000 ADDISON LOMBARD 4 2020 $4,805,000 LOMBARD 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT GREAT WESTERN TRAIL 0.8 MI S OF ILL 64 (NORTH AVE) BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 53 City AT PARKVIEW BLVD / SURREY LN COLUMBINE AVE CHANNELIZATION TRAF SIGNAL INSTALLATION Structure Information Str Number AADT 19,000 0220076 $315,000 Truck Pct NHS 2 Y GLEN ELLYN 12 2021-2025 DOWNERS GROVE 18 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 56 BUTTERFIELD RD AT ILL 53 & W OF ILL 53 TO W OF I-355 Miles = 2.11 Roadway Information Miles AADT Truck Pct 1.61 38,411 1.5 0.50 19,280 2.6 RECONSTRUCTION INTERSECTION RECONSTN ADA IMPROVEMENTS BRIDGE REPAIR BRIDGE DECK OVERLAY BRIDGE BEAM REPLACEMENT CULVERT REHABILITATION NOISE BARRIERS RETAINING WALL RECONSTRUCTION - PAVEMENTS NHS Y Y 1 - 106 $18,973,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 56 BUTTERFIELD RD Location AT ILL 53 & W OF ILL 53 TO W OF I-355 Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES Est. Cost City MYP Years Past Current $6,172,000 DOWNERS GROVE 2 2021-2025 $500,000 DOWNERS GROVE 7 2021-2025 $3,000,000 DOWNERS GROVE 4 2021-2025 OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO AURORA DOWNERS GROVE WHEATON WARRENVILLE LOMBARD OAKBROOK TERRACE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 56 AT ILL 53 & W OF ILL 53 TO W OF I-355 UTILITY ADJUSTMENT BUTTERFIELD RD RECONSTRUCTION - PAVEMENTS ILL 56 AT ILL 53 & W OF ILL 53 TO W OF I-355 CONSTRUCTION ENGINEERING BUTTERFIELD RD RECONSTRUCTION - PAVEMENTS ILL 56 22ND ST CERMAK RD BUTTERFIELD RD ILL 59 TO ILL 50 (CICERO AVE) TRAF SIGNAL MODERNIZATION SIGNAL TIMING/PROGRESSION CHANGEABLE MESSAGE SIGNS SIGNING (NEW) SURVEILLANCE MISCELLANEOUS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 107 $13,505,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 56 Location ILL 59 TO ILL 50 (CICERO AVE) Improvements TAMP Category RR FLAGGER Est. Cost City MYP Years Past Current $10,000 OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO OAKBROOK TERRACE AURORA DOWNERS GROVE WHEATON WARRENVILLE LOMBARD 1 2021-2025 $1,350,000 ELMHURST NORTHLAKE MELROSE PARK RIVER GROVE ELMWOOD PARK RIVER FOREST CHICAGO OAK PARK OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO WEST CHICAGO VILLA PARK CAROL STREAM LOMBARD GLENDALE HEIGHTS ST. CHARLES OAKBROOK TERRACE AURORA DOWNERS GROVE WHEATON WARRENVILLE 1 2020 22ND ST CERMAK RD BUTTERFIELD RD MISCELLANEOUS IMPROVEMENTS ILL 56 ILL 59 TO ILL 50 (CICERO AVE) P.E. (PHASE II) 22ND ST CERMAK RD BUTTERFIELD RD MISCELLANEOUS IMPROVEMENTS 1 - 108 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 56 Location ILL 59 TO ILL 50 (CICERO AVE) Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $1,000,000 OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO OAKBROOK TERRACE AURORA DOWNERS GROVE WHEATON WARRENVILLE LOMBARD 1 2020 $100,000 OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO LOMBARD OAKBROOK TERRACE AURORA DOWNERS GROVE WHEATON WARRENVILLE 1 2021-2025 22ND ST CERMAK RD BUTTERFIELD RD MISCELLANEOUS IMPROVEMENTS ILL 56 ILL 59 TO ILL 50 (CICERO AVE) UTILITY ADJUSTMENT 22ND ST CERMAK RD BUTTERFIELD RD MISCELLANEOUS IMPROVEMENTS 1 - 109 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 56 Location ILL 59 TO ILL 50 (CICERO AVE) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $1,800,000 ELMHURST NORTHLAKE MELROSE PARK RIVER GROVE ELMWOOD PARK RIVER FOREST CHICAGO OAK PARK OAK BROOK WESTCHESTER BROADVIEW NORTH RIVERSIDE BERWYN CICERO WEST CHICAGO VILLA PARK CAROL STREAM LOMBARD GLENDALE HEIGHTS ST. CHARLES OAKBROOK TERRACE AURORA DOWNERS GROVE WHEATON WARRENVILLE 1 2021-2025 $3,426,000 BARTLETT 3 2020 22ND ST CERMAK RD BUTTERFIELD RD MISCELLANEOUS IMPROVEMENTS ILL 59 SUTTON RD AT ARMY TRAIL RD TRAF SIGNAL MODERNIZATION CHANNELIZATION RETAINING WALL NOISE BARRIERS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 110 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 59 Location AT JAMES AVE & AT JOLIET ST NELTNOR BLVD Improvements TAMP Category TRAF SIGNAL MODERNIZATION INTERSECTION IMPROVEMENT Est. Cost City MYP Years Past Current $1,713,000 WEST CHICAGO 2 2021-2025 $200,000 WEST CHICAGO 3 2021-2025 $750,000 WEST CHICAGO 2 2021-2025 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 59 FOREST AVE TO GLEN AVE RETAINING WALL NELTNOR BLVD MISCELLANEOUS IMPROVEMENTS ILL 59 AT GARY'S MILL RD TRAF SIGNAL INSTALLATION CHANNELIZATION MISCELLANEOUS IMPROVEMENTS ILL 64 NORTH AVE SMITH / KAUTZ RD TO ILL 50 (CICERO AVE) CHANGEABLE MESSAGE SIGNS SIGNAL TIMING/PROGRESSION SIGNING (NEW) SURVEILLANCE TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 111 $14,001,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 64 Location SMITH / KAUTZ RD TO ILL 50 (CICERO AVE) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,400,000 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2020 $1,000,000 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2020 NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 64 SMITH/KAUTZ ROAD TO IL 50 (CICERO AVE) LAND ACQUISITION NORTH AVE MISCELLANEOUS IMPROVEMENTS 1 - 112 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 64 Location SMITH / KAUTZ RD TO ILL 50 (CICERO AVE) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $1,800,000 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2021-2025 $100,000 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2021-2025 NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 64 SMITH / KAUTZ RD TO ILL 50 (CICERO AVE) UTILITY ADJUSTMENT NORTH AVE MISCELLANEOUS IMPROVEMENTS 1 - 113 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 64 Location SMITH / KAUTZ RD TO ILL 50 (CICERO AVE) Improvements TAMP Category RR FLAGGER Est. Cost City MYP Years Past Current $10,000 ST. CHARLES WEST CHICAGO CAROL STREAM GLENDALE HEIGHTS LOMBARD VILLA PARK ELMHURST CHICAGO OAK PARK MELROSE PARK ELMWOOD PARK NORTHLAKE RIVER FOREST RIVER GROVE 1 2021-2025 $881,000 ELMHURST VILLA PARK OAKBROOK TERRACE OAK BROOK WESTMONT HINSDALE CLARENDON HILLS WILLOWBROOK BURR RIDGE ADDISON 2 2020 $800,000 OAKBROOK TERRACE 4 2021-2025 NORTH AVE MISCELLANEOUS IMPROVEMENTS ILL 83 KINGERY HWY THIRD AVE 1.3 MI N OF I-290 (EISENHOWER EXPWY) TO ILL 171 (ARCHER AVE / 107TH ST) GUARDRAIL END-SECT REPL MILLED RUMBLE STRIP PAVEMENT MARKING RAMP REPAIR SAFETY IMPROVEMENTS SKIDPROOFING TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS ILL 83 KINGERY HWY DITCH AT ILL 38 (WB) RAMP CULVERT REPLACEMENT DRAINAGE MISCELLANEOUS IMPROVEMENTS 1 - 114 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DUPAGE COUNTY Route / Street ILL 83 Location AT I-88 KINGERY HWY Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost City MYP Years Past Current $1,800,000 OAK BROOK 3 2021-2025 $250,000 4 2021-2025 $600,000 2 2021-2025 WILLOWBROOK BURR RIDGE 10 2021-2025 WOODRIDGE DARIEN 4 2020 PRESERVATION - BRIDGES ILL 83 DITCH 0.6 MI S OF 91ST ST CULVERT REPLACEMENT KINGERY HWY MISCELLANEOUS IMPROVEMENTS ILL 83 AT BLUFF RD KINGERY HWY TRAF SIGNAL MODERNIZATION MEDIAN BARRIER MISCELLANEOUS IMPROVEMENTS I 55 N FR RD ILL 83 (KINGERY HWY) TO S ELM ST Miles = 1.80 STANDARD OVERLAY ADA IMPROVEMENTS $775,000 REHABILITATION - PAVEMENTS I 55 S FR RD LEMONT RD TO CASS AVE Miles = 2.59 Roadway Information Miles AADT Truck Pct 2.59 2,200 0.0 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 115 $1,400,000 KANE COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street US 20 Location AT BIG TIMBER RD Improvements TAMP Category INTERSECTION RECONSTN TRAF SIGNAL REPLACEMENT Est. Cost City MYP Years Past Current $3,000,000 3 2021-2025 $200,000 3 2021-2025 PINGREE GROVE ELGIN BARTLETT STREAMWOOD HANOVER PARK 2 2021-2025 ELGIN 11 2021-2025 MISCELLANEOUS IMPROVEMENTS US 20 AT BIG TIMBER RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 20 ILL 47 TO ONTARIOVILLE RD LAKE ST TRAF SIGNAL INSTALLATION GUARDRAIL END-SECT REPL $265,000 MISCELLANEOUS IMPROVEMENTS US 20 AT ILL 31 BRIDGE REPLACEMENT CHANNELIZATION $10,020,000 RECONSTRUCTION - BRIDGES US 20 AT ILL 31 P.E. (PHASE II) RECONSTRUCTION - BRIDGES 1 - 116 Structure Information Str Number AADT 16,600 0450017 $550,000 ELGIN Truck Pct NHS 8 N 5 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street US 20 Location AT ILL 31 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $1,200,000 ELGIN 3 2021-2025 $35,200,000 ELGIN 1 2021-2025 $43,900,000 ELGIN 1 2021-2025 RECONSTRUCTION - BRIDGES US 20 W OF RANDALL RD TO E OF SHALES PKWY LAKE ST CHANNELIZATION SAFETY IMPROVEMENTS ADD AUXILIARY LANES MISCELLANEOUS IMPROVEMENTS US 20 W OF RANDALL RD TO E OF SHALES PKWY BRIDGE REPLACEMENT BRIDGE NEW DECK BRIDGE REPAIR BRIDGE SUPERSTRUCTURE BRIDGE WIDENING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 20 W OF RANDALL RD TO E OF SHALES PKWY RR FLAGGER LAKE ST MISCELLANEOUS IMPROVEMENTS 1 - 117 Structure Information Str Number AADT 50,000 0160217 42,800 0450004 42,800 0450005 42,800 0450006 42,800 0450007 $1,000,000 ELGIN Truck Pct NHS 5 Y 9 Y 9 Y 9 Y 9 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street US 20 Location W OF RANDALL RD TO E OF SHALES PKWY Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $9,000,000 ELGIN 1 2020 $6,000,000 ELGIN 1 2020 $2,000,000 ELGIN 1 2021-2025 $5,000,000 ELGIN 1 2021-2025 $7,275,000 ELGIN 1 2021-2025 LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 W OF RANDALL RD TO E OF SHALES PKWY LAND ACQUISITION LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 W OF RANDALL RD TO E OF SHALES PKWY UTILITY ADJUSTMENT LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 W OF RANDALL RD TO E OF SHALES PKWY CONSTRUCTION ENGINEERING LAKE ST MISCELLANEOUS IMPROVEMENTS US 20 W OF RANDALL RD TO E OF SHALES PKWY CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 1 - 118 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street US 30 Location W OF DUGAN RD TO W OF ILL 47 Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost City MYP Years Past Current $2,295,000 BIG ROCK SUGAR GROVE 5 2021-2025 $300,000 MONTGOMERY YORKVILLE 4 2021-2025 $1,275,000 YORKVILLE MONTGOMERY 4 2021-2025 $100,000 MONTGOMERY 2 2021-2025 $3,855,000 ELGIN EAST DUNDEE 10 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 30 ILL 47 TO ALBRIGHT RD P.E. (ROW) INITIAL CONSTRUCTION - PAVEMENTS US 30 ILL 47 TO GALENA RD Miles = 3.75 Roadway Information Miles AADT Truck Pct 3.75 12,188 10.0 US 30 STANDARD OVERLAY MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y AT RIVER ST BRIDGE REPAIR MAINTENANCE - BRIDGES ILL 25 ILL 25 A ST CHARLES ST ILL 72 (HIGGINS RD) TO PAGE AVE & BLUFF CITY BLVD TO 0.4 MI N OF STEARNS RD Miles = 5.49 Roadway Information Miles AADT Truck Pct 2.87 17,857 7.0 2.62 14,275 13.6 STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP RR FLAGGER REHABILITATION - PAVEMENTS NHS Y Y 1 - 119 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 25 LIBERTY ST Location PAGE AVE TO DUNDEE AVE Miles = 0.19 Roadway Information Miles AADT Truck Pct 0.19 5,800 12.9 ILL 25 LIBERTY ST ILL 25 STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $100,000 ELGIN 4 2021-2025 $1,500,000 ELGIN 1 2020 $1,800,000 3 2021-2025 $300,000 5 2021-2025 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y PAGE AVE TO DWIGHT ST Miles = 2.35 Roadway Information Miles AADT Truck Pct 2.35 11,745 12.5 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y AT MAY LN, CURRIER AVE & SEMINARY RD CHANNELIZATION CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 25 AT MAY LN, CURRIER AVE & SEMINARY RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 25 BROADWAY ST HAZEL AVE TO KENDALL CO LINE Miles = 1.70 Roadway Information Miles AADT Truck Pct 1.70 10,173 6.1 STANDARD OVERLAY MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N 1 - 120 $1,550,000 AURORA MONTGOMERY FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 31 S EIGHTH ST Location STROM DR TO WEST RD (MENTAL HOSPITAL ENT) Miles = 5.64 Roadway Information Miles AADT Truck Pct 5.64 21,655 8.2 ILL 31 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $4,200,000 WEST DUNDEE ELGIN 4 2021-2025 SOUTH ELGIN 4 2021-2025 $1,500,000 GENEVA 2 2021-2025 $100,000 GENEVA 2 2021-2025 NORTH AURORA 1 2021-2025 REHABILITATION - PAVEMENTS NHS N DITCH 2.3 MI S OF US 20 CULVERT REPLACEMENT $480,000 LA FOX ST MISCELLANEOUS IMPROVEMENTS ILL 31 S OF FARGO BLVD CULVERT REPLACEMENT BATAVIA AVE RECONSTRUCTION - BRIDGES ILL 31 S OF FARGO BLVD LAND ACQUISITION BATAVIA AVE MAINTENANCE - BRIDGES ILL 31 LAKE ST AT I-88 RAMPS CHANNELIZATION TRAF SIGNAL MODERNIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 121 $1,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 31 Location RATHBONE AVE TO WEBSTER ST / AUCUTT RD Miles = 1.22 LAKE ST Roadway Information Miles AADT Truck Pct 1.22 16,200 14.5 ILL 47 DESIGNED OVERLAY ADA IMPROVEMENTS RR FLAGGER Est. Cost City MYP Years Past Current $850,000 AURORA MONTGOMERY 3 2020 $21,490,000 SUGAR GROVE YORKVILLE 2 2021-2025 $31,910,000 SUGAR GROVE YORKVILLE 2 2021-2025 REHABILITATION - PAVEMENTS NHS N CROSS ST TO S OF GALENA RD Miles = 0.01 US 30 Improvements TAMP Category ADDITIONAL LANES SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. INITIAL CONSTRUCTION - PAVEMENTS ILL 47 CROSS ST TO S OF GALENA RD Miles = 4.27 US 30 RECONSTRUCTION CULVERT REPLACEMENT BRIDGE REPLACEMENT SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. Roadway Information Miles AADT Truck Pct 2.77 21,379 14.8 1.50 ILL 47 16,420 9.5 RECONSTRUCTION - PAVEMENTS Structure Information Str Number AADT 18,000 0452011 2,100 0453044 NHS Y Y CROSS ST TO S OF GALENA RD P.E. (PHASE II) US 30 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. INITIAL CONSTRUCTION - PAVEMENTS 1 - 122 $5,400,000 SUGAR GROVE YORKVILLE Truck Pct NHS 10 Y 3 N 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 47 Location CROSS ST TO S OF GALENA RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $8,450,000 SUGAR GROVE YORKVILLE 2 2021-2025 $2,600,000 HUNTLEY 2 2021-2025 $4,300,000 PINGREE GROVE LILY LAKE 10 2021-2025 $65,000 1 2020 $500,000 5 2021-2025 US 30 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. INITIAL CONSTRUCTION - PAVEMENTS ILL 47 N OF PRINCETON DR TO N OF JIM DHAMER DR Miles = 1.38 Roadway Information Miles AADT Truck Pct 1.38 25,200 11.5 ILL 47 US 20 REHABILITATION - PAVEMENTS NHS Y N OF BIG TIMBER RD TO ILLINOIS PRAIRIE PATH Miles = 12.62 ILL 72 Roadway Information Miles AADT Truck Pct 12.62 9,518 11.2 ILL 47 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY MILLED RUMBLE STRIP NEW SHOULDERS RR FLAGGER REHABILITATION - PAVEMENTS NHS Y AT MAIN ST S OF ELBURN P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS ILL 47 AT MAIN ST S OF ELBURN CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 123 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 47 Location SEAVEY RD TO BASELINE RD / KENDALL CO LINE Miles = 7.50 Roadway Information Miles AADT Truck Pct 7.50 17,694 17.2 ILL 47 Improvements TAMP Category STANDARD OVERLAY MILLED RUMBLE STRIP Est. Cost City MYP Years Past Current $2,550,000 SUGAR GROVE 4 2020 7 2020 REHABILITATION - PAVEMENTS NHS Y AT I-88 (RONALD REAGAN MEMORIAL TOLLWAY) INTERCHANGE RECONSTRUCTION $3,045,000 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. INITIAL CONSTRUCTION - PAVEMENTS ILL 56 I-88 TO RIVER ST & E OF DOWNEN DR / WAGNER RD TO INDIAN CREEK Miles = 1.46 ILL 31 STATE ST Roadway Information Miles AADT Truck Pct 1.07 19,285 3.2 0.39 18,215 ILL 64 9.4 STANDARD OVERLAY ADA IMPROVEMENTS $500,000 NORTH AURORA AURORA 3 2021-2025 $4,000,000 CAMPTON HILLS 1 2021-2025 $2,500,000 HAMPSHIRE PINGREE GROVE 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y RENAUX BLVD TO BONNIE DR & AT BROWN RD NORTH AVE CHANNELIZATION WIDENING EXISTING PAVEMENT MISCELLANEOUS IMPROVEMENTS ILL 72 DEKALB CO LINE TO AURORA DR Miles = 6.77 Roadway Information Miles AADT Truck Pct 6.77 7,426 7.5 STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP NEW SHOULDERS REHABILITATION - PAVEMENTS NHS Y 1 - 124 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street ILL 72 Location AT STATE ST / GETZELMAN RD OAK KNOLL DR Improvements TAMP Category INTERSECTION RECONSTN DRAINAGE ADA IMPROVEMENTS CULVERT REPLACEMENT CULVERT (NEW) Est. Cost City MYP Years Past Current $3,105,000 HAMPSHIRE 8 2021-2025 $200,000 HAMPSHIRE 2 2020 $1,670,000 SUGAR GROVE AURORA 4 2021-2025 $8,500,000 SOUTH ELGIN 1 2021-2025 $1,200,000 SOUTH ELGIN 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 72 AT STATE ST / GETZELMAN RD P.E. (PHASE II) OAK KNOLL DR MISCELLANEOUS IMPROVEMENTS GALENA BLVD ILL 47 TO W OF CANTERBURY AVE Miles = 3.31 Roadway Information Miles AADT Truck Pct 3.31 11,372 5.0 MCLEAN BLVD CH 18 STANDARD OVERLAY MILLED RUMBLE STRIP NEW SHOULDERS REHABILITATION - PAVEMENTS NHS N SPRING ST TO N OF STEARNS RD Miles = 1.19 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS MCLEAN BLVD CH SPRING ST TO N OF STEARNS RD CONSTRUCTION ENGINEERING 18 INITIAL CONSTRUCTION - PAVEMENTS 1 - 125 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways KANE COUNTY Route / Street MCLEAN BLVD CH Location SPRING ST TO N OF STEARNS RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $850,000 SOUTH ELGIN 1 2020 $1,000,000 SOUTH ELGIN 1 2020 $500,000 SOUTH ELGIN 1 2021-2025 18 INITIAL CONSTRUCTION - PAVEMENTS MCLEAN BLVD CH SPRING ST TO N OF STEARNS RD LAND ACQUISITION 18 INITIAL CONSTRUCTION - PAVEMENTS MCLEAN BLVD CH SPRING ST TO N OF STEARNS RD UTILITY ADJUSTMENT 18 INITIAL CONSTRUCTION - PAVEMENTS 1 - 126 LAKE COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 12 Location AT FISH CREEK 0.7 MI N OF ILL 120 (NB) Improvements TAMP Category BRIDGE REPAIR Est. Cost City MYP Years Past Current $300,000 VOLO 3 2021-2025 $1,000,000 WADSWORTH GURNEE LAKE FOREST 4 2021-2025 $2,800,000 GURNEE 1 2021-2025 $856,000 GURNEE 1 2020 $950,000 GURNEE PARK CITY HIGHLAND PARK 1 2020 RAND RD MAINTENANCE - BRIDGES US 41 N OF ILL 173 TO S OF W WESTLEIGH RD SKOKIE HWY CULVERT REHABILITATION CULVERT REMOVAL DRAINAGE MISCELLANEOUS IMPROVEMENTS US 41 AT STEARNS SCHOOL RD TURNING LANES SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT ILL 132 (UNDER UP RR) CONSTRUCTION ENGINEERING SKOKIE HWY INITIAL CONSTRUCTION - PAVEMENTS US 41 SKOKIE HWY DORCHESTER AVE TO N OF ILL 120 (BELVIDERE RD); WEST PARK AVE TO LAKE-COOK RD; & RAMPS AT CLAVEY RD & SKOKIE VALLEY RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 127 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 41 Location AT WASHINGTON ST Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost City MYP Years Past Current $850,000 PARK CITY 2 2021-2025 $1,400,000 NORTH CHICAGO LAKE BLUFF WAUKEGAN PARK CITY LAKE FOREST HIGHLAND PARK 1 2020 $1,500,000 NORTH CHICAGO 4 2021-2025 $14,880,000 LAKE BLUFF NORTH CHICAGO 1 2021-2025 $400,000 NORTH CHICAGO 4 2021-2025 SKOKIE HWY PRESERVATION - BRIDGES US 41 ILL 120 (BELVIDERE RD) TO PARK AVE WEST CONSTRUCTION ENGINEERING SKOKIE HWY REHABILITATION - PAVEMENTS US 41 0.5 MI N OF ILL 176 (ROCKLAND RD) SKOKIE HWY DRAINAGE STORM SEWER (NEW) GRADING MISCELLANEOUS IMPROVEMENTS US 41 SKOKIE HWY AT ILL 176 (ROCKLAND RD) Miles = 0.95 Roadway Information Miles AADT Truck Pct 0.38 40,116 15.3 0.57 16,432 US 41 5.5 RECONSTRUCTION INTERCHANGE RECONSTRUCTION ADD AUXILIARY LANES RECONSTRUCTION - PAVEMENTS NHS Y N 0.5 MI N OF ILL 176 (ROCKLAND RD) LAND ACQUISITION SKOKIE HWY MISCELLANEOUS IMPROVEMENTS 1 - 128 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 41 SKOKIE HWY Location AT ILL 176 (ROCKLAND RD) Miles = 0.95 Improvements TAMP Category ADDITIONAL LANES INTERCHANGE CONSTRUCTION Est. Cost City MYP Years Past Current $22,320,000 LAKE BLUFF NORTH CHICAGO 1 2021-2025 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. INITIAL CONSTRUCTION - PAVEMENTS US 41 AT ILL 176 (ROCKLAND RD) P.E. (PHASE II) $4,000,000 LAKE BLUFF NORTH CHICAGO 1 2020 $6,000,000 LAKE BLUFF NORTH CHICAGO 1 2020 $1,000,000 LAKE BLUFF NORTH CHICAGO 1 2021-2025 $5,000,000 LAKE BLUFF NORTH CHICAGO 1 2021-2025 SKOKIE HWY INITIAL CONSTRUCTION - PAVEMENTS US 41 AT ILL 176 (ROCKLAND RD) LAND ACQUISITION SKOKIE HWY INITIAL CONSTRUCTION - PAVEMENTS US 41 AT ILL 176 (ROCKLAND RD) UTILITY ADJUSTMENT SKOKIE HWY INITIAL CONSTRUCTION - PAVEMENTS US 41 AT ILL 176 (ROCKLAND RD) CONSTRUCTION ENGINEERING SKOKIE HWY INITIAL CONSTRUCTION - PAVEMENTS 1 - 129 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 41 Location AT ILL 176 (ROCKLAND RD) (PS #37) SKOKIE HWY Improvements TAMP Category PUMP STATION STORM SEWER (NEW) UTILITY ADJUSTMENT ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $6,800,000 LAKE BLUFF 11 2021-2025 $50,000 LAKE BLUFF 4 2021-2025 $900,000 LAKE BLUFF 1 2021-2025 $11,239,000 LAKE FOREST 22 2021-2025 $700,000 LAKE FOREST 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 41 AT ILL 176 (ROCKLAND RD) RR FLAGGER SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT ILL 176 (ROCKLAND RD) (PS #37) CONSTRUCTION ENGINEERING SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT DEERPATH RD (PS #38) SKOKIE HWY PUMP STATION DRAINAGE UTILITY ADJUSTMENT RETAINING WALL ADA IMPROVEMENTS BRIDGE REPAIR MISCELLANEOUS IMPROVEMENTS US 41 AT DEERPATH RD (PS #38) LANDSCAPING SKOKIE HWY MISCELLANEOUS IMPROVEMENTS 1 - 130 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 41 Location AT DEERPATH RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $46,000 LAKE FOREST 1 2020 $1,300,000 LAKE FOREST 1 2021-2025 $5,000,000 LAKE FOREST 3 2021-2025 $150,000 LAKE FOREST 1 2021-2025 HIGHLAND PARK 3 2021-2025 SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT DEERPATH RD (PS #38) CONSTRUCTION ENGINEERING SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT UP RR S OF ILL 60 (TOWNLINE RD) SKOKIE HWY DRAINAGE STORM SEWER (NEW) STORM SEWER INSPECTION MISCELLANEOUS IMPROVEMENTS US 41 AT UP RR S OF ILL 60 (TOWNLINE RD) RR FLAGGER SKOKIE HWY MISCELLANEOUS IMPROVEMENTS US 41 AT DEERFIELD RD BRIDGE NEW DECK $2,820,000 SKOKIE HWY REHABILITATION - BRIDGES 1 - 131 Structure Information Str Number AADT 18,200 0490074 Truck Pct NHS 5 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street US 41 Location AT DEERFIELD RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $762,000 HIGHLAND PARK 1 2020 $991,000 HIGHLAND PARK 1 2021-2025 8 2021-2025 SKOKIE HWY REHABILITATION - BRIDGES US 41 AT DEERFIELD RD CONSTRUCTION ENGINEERING SKOKIE HWY REHABILITATION - BRIDGES US 45 AT ILL 173 (ROSECRANS RD) LAKE ST INTERSECTION RECONSTN CHANNELIZATION $2,095,000 MISCELLANEOUS IMPROVEMENTS US 45 LAKE ST WOODLAWN DR TO ILL 83 Miles = 1.73 Roadway Information Miles AADT Truck Pct 1.73 26,847 4.1 US 45 DESIGNED OVERLAY ADA IMPROVEMENTS $1,660,000 MUNDELEIN 4 2020 $3,500,000 MUNDELEIN INDIAN CREEK VERNON HILLS LINCOLNSHIRE 11 2021-2025 REHABILITATION - PAVEMENTS NHS Y ILL 60 (TOWNLINE RD) TO ILL 22 (HALF DAY RD) LAND ACQUISITION ILL 83 OLDE HALF DAY RD INITIAL CONSTRUCTION - PAVEMENTS 1 - 132 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 21 MILWAUKEE AVE Location BILL MADOLE WAY TO CHURCH ST Miles = 0.98 Roadway Information Miles AADT Truck Pct 0.98 26,800 2.2 ILL 22 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER Est. Cost City MYP Years Past Current $350,000 LIBERTYVILLE 3 2021-2025 $5,000,000 LONG GROVE 1 2021-2025 $500,000 LONG GROVE 1 2021-2025 $650,000 LONG GROVE 1 2021-2025 $500,000 LONG GROVE 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT IL 83 INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS ILL 22 AT IL 83 P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS ILL 22 AT IL 83 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS ILL 22 AT IL 83 LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 1 - 133 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 22 HALF DAY RD Location QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES Est. Cost City MYP Years Past Current $31,200,000 KILDEER LONG GROVE LAKE ZURICH 19 2021-2025 $300,000 KILDEER LONG GROVE LAKE ZURICH 1 2020 $20,800,000 KILDEER LONG GROVE LAKE ZURICH 2 2021-2025 $1,000,000 KILDEER LONG GROVE LAKE ZURICH 8 2021-2025 $5,200,000 KILDEER LONG GROVE LAKE ZURICH 15 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 22 QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) DEMOLITION HALF DAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 22 HALF DAY RD QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Miles = 3.53 Roadway Information Miles AADT Truck Pct 3.53 17,409 4.7 ILL 22 RECONSTRUCTION CULVERT REPLACEMENT RETAINING WALL CULVERT (NEW) RECONSTRUCTION - PAVEMENTS NHS Y QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) UTILITY ADJUSTMENT HALF DAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 22 QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) CONSTRUCTION ENGINEERING HALF DAY RD INITIAL CONSTRUCTION - PAVEMENTS 1 - 134 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 22 Location QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Improvements TAMP Category TREE REMOVAL Est. Cost City MYP Years Past Current $200,000 KILDEER LONG GROVE LAKE ZURICH 1 2021-2025 $890,000 PARK CITY WAUKEGAN 4 2020 $737,000 DEERFIELD 2 2021-2025 $2,035,000 FOX LAKE 4 2021-2025 $2,410,000 VOLO ROUND LAKE ROUND LAKE PARK 4 2021-2025 HALF DAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 43 WAUKEGAN RD US 41 (SKOKIE HWY) TO MCGAW RD / PULASKI DR Miles = 1.10 Roadway Information Miles AADT Truck Pct 1.10 20,040 7.1 ILL 43 WAUKEGAN RD ILL 59 ILL 83 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y ILL 120 (BELVIDERE RD) TO ILL 176 Miles = 6.86 Roadway Information Miles AADT Truck Pct 6.86 15,578 9.0 STANDARD OVERLAY ADA IMPROVEMENTS NHS Y ILL 132 (GRAND AVE) TO LONGWOOD DR Miles = 3.87 Roadway Information Miles AADT Truck Pct 3.87 11,880 4.5 ILL 60 REHABILITATION - PAVEMENTS NHS N NORTH AVE TO N OF KATES RD Miles = 1.70 Roadway Information Miles AADT Truck Pct 1.70 19,850 3.2 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y 1 - 135 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 60 Location AT WILSON RD Improvements TAMP Category INTERSECTION IMPROVEMENT Est. Cost City MYP Years Past Current $950,000 10 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 60 ILL 83 ILL 176 (MAPLE AVE) TO CN RR Miles = 0.01 ADDITIONAL LANES $56,623,000 MUNDELEIN LONG GROVE 1 2021-2025 $15,190,000 MUNDELEIN LONG GROVE 1 2021-2025 $22,559,000 MUNDELEIN LONG GROVE 1 2021-2025 $11,700,000 MUNDELEIN LONG GROVE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 83 ILL 176 (MAPLE AVE) TO CN RR Miles = 3.03 Roadway Information Miles AADT Truck Pct 3.03 12,750 3.1 ILL 60 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y ILL 176 (MAPLE AVE) TO CN RR RR GRADE SEPARATION ILL 83 INITIAL CONSTRUCTION - BRIDGES ILL 60 ILL 176 (MAPLE AVE) TO CN RR CONSTRUCTION ENGINEERING ILL 83 INITIAL CONSTRUCTION - PAVEMENTS 1 - 136 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 60 Location ILL 176 (MAPLE AVE) TO CN RR Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $4,500,000 MUNDELEIN LONG GROVE 1 2020 $4,500,000 MUNDELEIN LONG GROVE 1 2021-2025 $4,500,000 MUNDELEIN LONG GROVE 1 2020 $4,500,000 MUNDELEIN LONG GROVE 1 2021-2025 $4,350,000 MUNDELEIN LONG GROVE 1 2021-2025 $1,000,000 MUNDELEIN LONG GROVE 1 2021-2025 ILL 83 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 176 (MAPLE AVE) TO CN RR P.E. (PHASE II) ILL 83 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 176 (MAPLE AVE) TO CN RR LAND ACQUISITION ILL 83 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 176 (MAPLE AVE) TO CN RR LAND ACQUISITION ILL 83 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 176 (MAPLE AVE) TO CN RR RR FLAGGER ILL 83 INITIAL CONSTRUCTION - PAVEMENTS ILL 60 ILL 176 (MAPLE AVE) TO CN RR UTILITY ADJUSTMENT ILL 83 INITIAL CONSTRUCTION - PAVEMENTS 1 - 137 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 60 Location ILL 176 TO 0.1 MI E OF CN RR Miles = 3.03 ILL 83 Roadway Information Miles AADT Truck Pct 3.03 12,750 3.1 ILL 83 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER Est. Cost City MYP Years Past Current $1,082,000 MUNDELEIN LONG GROVE 4 2020 LAKE VILLA ROUND LAKE BEACH GRAYSLAKE 9 2021-2025 $4,800,000 GRAYSLAKE 1 2021-2025 $6,400,000 GRAYSLAKE 19 2021-2025 $1,500,000 GRAYSLAKE 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y PETITE LAKE RD TO ILL 120 (BELVIDERE RD) P.E. (PHASE II) $10,500,000 INITIAL CONSTRUCTION - PAVEMENTS ILL 83 ILL 137 BARRON BLVD ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD (STAGE 1B) Miles = 1.14 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS ILL 83 ILL 137 BARRON BLVD ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD (STAGE 1B) Miles = 1.14 Roadway Information Miles AADT Truck Pct 0.57 6,300 11.8 MISCELLANEOUS IMPROVEMENTS NHS Y 0.32 13,400 3.9 N 0.25 3,200 13.4 N ILL 83 BARRON BLVD INTERSECTION RECONSTN RECONSTRUCTION ADA IMPROVEMENTS ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 138 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 83 ILL 137 Location AT ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $2,520,000 GRAYSLAKE 1 2020 $500,000 GRAYSLAKE 1 2021-2025 $900,000 GRAYSLAKE 1 2021-2025 3 2020 10 2021-2025 BARRON BLVD MISCELLANEOUS IMPROVEMENTS ILL 83 BARRON BLVD ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD (STAGE 1B) UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 83 BARRON BLVD ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD RR FLAGGER MISCELLANEOUS IMPROVEMENTS ILL 83 AT WINCHESTER RD IVANHOE RD TRAF SIGNAL INSTALLATION CHANNELIZATION $1,050,000 IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 83 LAKE ST US 45 TO N BUFFALO GROVE RD PATCHING ADA IMPROVEMENTS MAINTENANCE - PAVEMENTS 1 - 139 $2,975,000 LONG GROVE BUFFALO GROVE MUNDELEIN FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 120 Location ASHFORD LN TO US 45 Miles = 0.77 Improvements TAMP Category ADDITIONAL LANES Est. Cost City MYP Years Past Current $13,410,000 GRAYSLAKE 1 2021-2025 $8,940,000 GRAYSLAKE 1 2021-2025 $1,350,000 GRAYSLAKE 1 2020 $2,235,000 GRAYSLAKE 1 2021-2025 $750,000 GRAYSLAKE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 120 ASHFORD LN TO US 45 Miles = 0.77 Roadway Information Miles AADT Truck Pct 0.77 15,900 5.0 ILL 120 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y ASHFORD LN TO US 45 P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS ILL 120 ASHFORD LN TO US 45 P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS ILL 120 ASHFORD LN TO US 45 LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS 1 - 140 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 120 Location ASHFORD LN TO US 45 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $2,900,000 GRAYSLAKE 1 2021-2025 1 2020 INITIAL CONSTRUCTION - PAVEMENTS ILL 120 0.25 MILES EAST OF WILSON RD DRAINAGE $145,000 BELVIDERE RD MAINTENANCE - PAVEMENTS ILL 120 BELVIDERE RD E OF I-94 TO ILL 43 (WAUKEGAN RD) & AT ILL 43 RAMPS Miles = 3.81 Roadway Information Miles AADT Truck Pct 1.57 32,041 9.0 ILL 120 STANDARD OVERLAY NEW SHOULDERS MILLED RUMBLE STRIP ADA IMPROVEMENTS $2,000,000 WAUKEGAN GURNEE PARK CITY 1 2020 $2,500,000 GURNEE 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT DES PLAINES RIVER BRIDGE NEW DECK BELVIDERE RD REHABILITATION - BRIDGES ILL 120 BELVIDERE RD AT O'PLAINE RD TRAF SIGNAL MODERNIZATION CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 1 - 141 Structure Information Str Number AADT 18,300 0490044 18,300 0490045 18,500 0490046 18,500 0490047 $1,000,000 GURNEE Truck Pct NHS 6 Y 6 Y 9 Y 9 Y 5 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 120 Location AT O'PLAINE RD Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $500,000 GURNEE 5 2020 $2,245,000 WAUKEGAN 4 2021-2025 $500,000 WAUKEGAN 1 2021-2025 $12,000,000 BEACH PARK WAUKEGAN 1 2020 $1,000,000 BEACH PARK WAUKEGAN 1 2021-2025 BELVIDERE RD MISCELLANEOUS IMPROVEMENTS ILL 120 BELVIDERE ST KNIGHT AVE TO ILL 137 (AMSTUTZ EXPWY) Miles = 2.67 Roadway Information Miles AADT Truck Pct 2.67 20,531 8.3 ILL 120 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N AT DITCH 0.4 MI W OF ILL 131 CULVERT REPLACEMENT BELVIDERE ST MISCELLANEOUS IMPROVEMENTS ILL 131 WADSWORTH RD TO SUNSET AVE LAND ACQUISITION GREEN BAY RD RECONSTRUCTION - PAVEMENTS ILL 131 WADSWORTH RD TO SUNSET AVE UTILITY ADJUSTMENT GREEN BAY RD RECONSTRUCTION - PAVEMENTS 1 - 142 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 131 GREEN BAY RD Location WADSWORTH RD TO SUNSET AVE Miles = 2.55 Improvements TAMP Category ADDITIONAL LANES Est. Cost City MYP Years Past Current $26,280,000 BEACH PARK WAUKEGAN 1 2021-2025 $17,520,000 BEACH PARK WAUKEGAN 1 2021-2025 $4,400,000 BEACH PARK WAUKEGAN 1 2020 $12,000,000 BEACH PARK WAUKEGAN 1 2021-2025 $1,000,000 BEACH PARK WAUKEGAN 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 131 GREEN BAY RD WADSWORTH RD TO SUNSET AVE Miles = 2.55 Roadway Information Miles AADT Truck Pct 2.55 18,759 9.3 ILL 131 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N WADSWORTH RD TO SUNSET AVE P.E. (PHASE II) GREEN BAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 131 WADSWORTH RD TO SUNSET AVE LAND ACQUISITION GREEN BAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 131 WADSWORTH RD TO SUNSET AVE UTILITY ADJUSTMENT GREEN BAY RD INITIAL CONSTRUCTION - PAVEMENTS 1 - 143 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 131 Location WADSWORTH RD TO SUNSET AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $5,700,000 BEACH PARK WAUKEGAN 1 2021-2025 $3,624,000 BEACH PARK 5 2020 $3,348,000 WAUKEGAN NORTH CHICAGO 4 2021-2025 $2,500,000 WAUKEGAN 1 2021-2025 $250,000 WAUKEGAN 1 2021-2025 GREEN BAY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 131 29TH ST TO PROPOSED KENOSHA RD INTERSECTION RECONSTN GREEN BAY RD MISCELLANEOUS IMPROVEMENTS ILL 131 GREEN BAY RD S OF ILL 132 (GRAND AVE) TO EJ & E RR Miles = 4.17 Roadway Information Miles AADT Truck Pct 4.17 14,467 3.7 ILL 131 STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N AT WASHINGTON ST TURNING LANES GREEN BAY RD MISCELLANEOUS IMPROVEMENTS ILL 131 AT WASHINGTON ST LAND ACQUISITION GREEN BAY RD MISCELLANEOUS IMPROVEMENTS 1 - 144 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 131 Location AT ILL 120 (BELVIDERE RD) Improvements TAMP Category TRAF SIGNAL MODERNIZATION Est. Cost City MYP Years Past Current $100,000 WAUKEGAN 1 2020 $6,957,000 LAKE VILLA 10 2021-2025 $1,000,000 LAKE VILLA 1 2021-2025 LINDENHURST LAKE VILLA 4 2021-2025 GREEN BAY RD MISCELLANEOUS IMPROVEMENTS ILL 132 DRY LAND BRIDGE E OF CEDAR LAKE RD GRAND AVE BRIDGE REPLACEMENT RR FLAGGER ADA IMPROVEMENTS RECONSTRUCTION - BRIDGES ILL 132 DRY LAND BRIDGE E OF CEDAR LAKE RD CONSTRUCTION ENGINEERING GRAND AVE RECONSTRUCTION - BRIDGES ILL 132 GRAND AVE W OF SHEEHAN DR TO MUNN RD Miles = 0.80 Roadway Information Miles AADT Truck Pct 0.80 16,700 1.9 BRIDGE REPLACEMENT CULVERT REPLACEMENT NEW MEDIAN LEFT TURN LANES CURB AND GUTTER DRAINAGE STANDARD OVERLAY ADA IMPROVEMENTS WIDENING EXISTING PAVEMENT RECONSTRUCTION - BRIDGES NHS Y 1 - 145 $15,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 132 Location W OF SHEEHAN DR TO MUNN RD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost City MYP Years Past Current $500,000 LINDENHURST LAKE VILLA 1 2021-2025 $1,900,000 LINDENHURST 4 2021-2025 $500,000 LINDENHURST 3 2020 $5,250,000 WINTHROP HARBOR ZION BEACH PARK WAUKEGAN 4 2021-2025 $5,000,000 BEACH PARK 3 2021-2025 GRAND AVE RECONSTRUCTION - BRIDGES ILL 132 DEEP LAKE RD TO MUNN RD (DRY LAND BRIDGE) CONSTRUCTION ENGINEERING GRAND AVE RECONSTRUCTION - BRIDGES ILL 132 MUNN RD TO DEERPATH DR CONSTRUCTION ENGINEERING GRAND AVE REHABILITATION - PAVEMENTS ILL 137 SHERIDAN RD RUSSELL RD TO GREENWOOD RD Miles = 7.59 Roadway Information Miles AADT Truck Pct 7.59 16,834 3.8 ILL 137 SHERIDAN RD STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y BULL CREEK 0.2 MI S OF WADSWORTH RD CULVERT REPLACEMENT ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 146 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 137 Location BULL CREEK 0.2 MI S OF WADSWORTH RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $500,000 BEACH PARK 1 2020 $2,800,000 WAUKEGAN NORTH CHICAGO 3 2021-2025 $2,030,000 NORTH CHICAGO 4 2021-2025 $2,860,000 LIBERTYVILLE GRAYSLAKE 7 2021-2025 12 2021-2025 SHERIDAN RD MISCELLANEOUS IMPROVEMENTS ILL 137 GENESEE ST BELVIDERE ST TO BUCKLEY RD Miles = 3.46 Roadway Information Miles AADT Truck Pct 3.46 11,356 3.7 ILL 137 BUCKLEY RD ILL 137 REHABILITATION - PAVEMENTS NHS Y W OF FRONTENAC ST TO ILL 137 (BOBBY THOMPSON EXPWY) Miles = 1.83 Roadway Information Miles AADT Truck Pct 1.83 18,844 4.7 STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER PEDESTRIAN SIGNALS REHABILITATION - PAVEMENTS NHS Y ILL 83 (IVANHOE RD) TO PETERSEN RD P.E. (PHASE II) BUCKLEY RD INITIAL CONSTRUCTION - PAVEMENTS ILL 173 AT LAKE AVE SIGNAL TIMING/PROGRESSION CHANNELIZATION TRAF SIGNAL INSTALLATION MISCELLANEOUS IMPROVEMENTS 1 - 147 $1,560,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 173 Location W OF ILL 59 TO E OF US 41 Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $5,000,000 ANTIOCH OLD MILL CREEK 5 2021-2025 $1,000,000 ANTIOCH 2 2021-2025 $250,000 ANTIOCH 2 2021-2025 $1,560,000 ANTIOCH OLD MILL CREEK 4 2021-2025 $1,625,000 OLD MILL CREEK WADSWORTH ZION 4 2021-2025 ROSECRANS RD INITIAL CONSTRUCTION - PAVEMENTS ILL 173 AT GRIMM RD LEFT TURN LANES ROSECRANS RD MISCELLANEOUS IMPROVEMENTS ILL 173 AT GRIMM RD LAND ACQUISITION ROSECRANS RD MISCELLANEOUS IMPROVEMENTS ILL 173 ROSECRANS RD BROWN AVE TO HUNT CLUB RD Miles = 5.12 Roadway Information Miles AADT Truck Pct 5.12 15,746 5.9 ILL 173 ROSECRANS RD REHABILITATION - PAVEMENTS NHS Y HUNT CLUB RD TO ILL 131 (GREEN BAY RD) Miles = 4.64 Roadway Information Miles AADT Truck Pct 4.64 11,617 5.2 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y 1 - 148 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 173 ROSECRANS RD Location ILL 131 (GREEN BAY RD) TO ILL 137 (SHERIDAN RD) Miles = 3.06 Roadway Information Miles AADT Truck Pct 3.06 10,324 5.9 ILL 173 Improvements TAMP Category DESIGNED OVERLAY NEW SHOULDERS ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,100,000 ZION 4 2020 $250,000 ZION 3 2021-2025 $20,000 ZION 2 2021-2025 WAUCONDA 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.5 MI E OF ILL 131 CULVERT REPLACEMENT ROSECRANS RD MISCELLANEOUS IMPROVEMENTS ILL 173 0.5 MI E OF ILL 131 LAND ACQUISITION ROSECRANS RD MISCELLANEOUS IMPROVEMENTS ILL 176 AT BANGS LAKE OUTLET CULVERT REPLACEMENT $1,000,000 LIBERTY ST RECONSTRUCTION - BRIDGES ILL 176 AT BANGS LAKE OUTLET LAND ACQUISITION LIBERTY ST RECONSTRUCTION - BRIDGES 1 - 149 Structure Information Str Number AADT 16,500 0490113 $150,000 WAUCONDA Truck Pct NHS 4 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street ILL 176 LIBERTY ST Location E OF HILLTOP TERRACE TO ILL 60/83 Miles = 1.18 Roadway Information Miles AADT Truck Pct 1.18 11,700 7.9 ILL 176 PARK AVE BARRINGTON RD DEERFIELD RD $620,000 MUNDELEIN 3 2020 DESIGNED OVERLAY NEW SHOULDERS ADA IMPROVEMENTS RR FLAGGER $2,193,000 LAKE BLUFF GREEN OAKS LAKE FOREST 12 2020 WAUCONDA 10 2021-2025 HIGHLAND PARK 5 2021-2025 REHABILITATION - PAVEMENTS NHS N DESIGNED OVERLAY ADA IMPROVEMENTS $250,000 REHABILITATION - PAVEMENTS NHS N AT UP RR & OLD SKOKIE RD ILL 131 (GREENBAY RD) TO ILL 137 (AMSTUTZ EXPWY) Miles = 2.86 Roadway Information Miles AADT Truck Pct 2.86 17,062 9.1 MYP Years Past Current BRIDGE NEW DECK $4,800,000 REHABILITATION - BRIDGES GRAND AVE City REHABILITATION - PAVEMENTS ILL 176 (LIBERTY ST) TO US 12 (RAND RD) Miles = 0.55 Roadway Information Miles AADT Truck Pct 0.55 5,050 5.5 STANDARD OVERLAY MILLED RUMBLE STRIP ADA IMPROVEMENTS Est. Cost NHS Y CRESCENT KNOLL DR TO W OF US 41 Miles = 2.25 Roadway Information Miles AADT Truck Pct 2.25 17,290 6.1 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 1 - 150 Structure Information Str Number AADT 18,200 0490073 $2,260,000 WAUKEGAN Truck Pct NHS 5 N 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways LAKE COUNTY Route / Street PETERSON RD Location DITCH 0.4 MI E OF US 45 (LAKE ST) Improvements TAMP Category CULVERT REPAIR Est. Cost City MYP Years Past Current $250,000 LIBERTYVILLE 3 2021-2025 HIGHLAND PARK 4 2021-2025 1 2020 4 2021-2025 MAINTENANCE - BRIDGES SHERIDAN RD CREEK 1 MI & 1.3 MI N OF LAKE COOK RD CULVERT REPLACEMENT $5,000,000 MISCELLANEOUS IMPROVEMENTS VARIOUS GUARDRAIL END TERMINAL REPLACEMENT – ROUND 4 – NORTH REGION GUARDRAIL END-SECT REPL $600,000 MISCELLANEOUS IMPROVEMENTS WASHINGTON ST AT UP RR 0.1 MI E OF US 41 BRIDGE NEW DECK RR FLAGGER REHABILITATION - BRIDGES 1 - 151 $2,000,000 PARK CITY Structure Information Str Number AADT 27,900 0490097 Truck Pct NHS 7 N MCHENRY COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street US 12 MAIN ST Location ILL 173 (KENOSHA ST) TO TRYON GROVE RD Miles = 2.00 Roadway Information Miles AADT Truck Pct 2.00 11,900 6.9 US 14 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER MILLED RUMBLE STRIP NEW SHOULDERS Est. Cost City MYP Years Past Current $1,448,000 RICHMOND 4 2020 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT DITCH 3 MI S OF STATE LINE CULVERT REPLACEMENT $250,000 MISCELLANEOUS IMPROVEMENTS US 14 BUNKER HILL RD TO ILL 47 Miles = 8.57 Roadway Information Miles AADT Truck Pct 8.57 8,225 7.2 US 14 NORTHWEST HWY US 20 GRANT HWY WOODSTOCK 3 2021-2025 $4,950,000 CRYSTAL LAKE CARY FOX RIVER GROVE 4 2021-2025 $4,060,000 MARENGO 4 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y WEST ST TO KANE CO LINE Miles = 8.85 Roadway Information Miles AADT Truck Pct 8.85 9,104 14.5 $2,995,000 NHS Y TECKLER BLVD TO LAKE CO LINE Miles = 6.98 Roadway Information Miles AADT Truck Pct 6.98 26,537 5.5 STANDARD OVERLAY NEW SHOULDERS STANDARD OVERLAY NEW SHOULDERS ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 1 - 152 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street US 20 Location AT WEST UNION RD & AT CORAL RD Improvements TAMP Category CHANNELIZATION Est. Cost City MYP Years Past Current $1,800,000 7 2020 $5,013,000 10 2020 $910,000 1 2020 $3,240,000 10 2020 4 2021-2025 GRANT HWY MISCELLANEOUS IMPROVEMENTS US 20 AT CREEK 0.4 MI W OF BECK RD CULVERT REPLACEMENT GRANT HWY MISCELLANEOUS IMPROVEMENTS US 20 AT CREEK 0.4 MI W OF BECK RD CONSTRUCTION ENGINEERING GRANT HWY MISCELLANEOUS IMPROVEMENTS US 20 AT MARENGO-BECK RD / SOUTH UNION RD INTERSECTION RECONSTN GRANT HWY MISCELLANEOUS IMPROVEMENTS ILL 23 STATE ST DRAINAGE DITCH 0.1 MI N OF ILL 176 CULVERT REPLACEMENT ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 153 $500,000 MARENGO FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 23 Location AT I-90 (JANE ADDAMS MEMORIAL TOLLWAY) Improvements TAMP Category INTERCHANGE (NEW) Est. Cost City MYP Years Past Current $8,500,000 1 2020 RINGWOOD MC HENRY 2 2021-2025 $43,890,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE 1 2021-2025 $31,360,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE 1 2021-2025 $1,700,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2020 INITIAL CONSTRUCTION - PAVEMENTS ILL 31 RICHMOND RD N OF DIAMOND DR TO MCCULLUM LAKE RD Miles = 1.02 Roadway Information Miles AADT Truck Pct 1.02 25,500 7.0 ILL 31 $650,000 REHABILITATION - PAVEMENTS NHS Y S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 Miles = 0.01 FRONT ST STANDARD OVERLAY PATCHING ADA IMPROVEMENTS MILLED RUMBLE STRIP ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS ILL 31 S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 Miles = 6.31 FRONT ST Roadway Information Miles AADT Truck Pct 1.43 18,800 3.9 4.88 ILL 31 FRONT ST 22,659 6.0 RECONSTRUCTION CULVERT REPLACEMENT RECONSTRUCTION - PAVEMENTS NHS Y Y S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 1 - 154 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 31 FRONT ST Location S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $5,800,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 11 2021-2025 $8,000,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2021-2025 $8,000,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2021-2025 $4,000,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2021-2025 $9,750,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 2 2021-2025 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. INITIAL CONSTRUCTION - PAVEMENTS ILL 31 FRONT ST S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 31 FRONT ST S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 31 FRONT ST S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS ILL 31 FRONT ST S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 CONSTRUCTION ENGINEERING SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. INITIAL CONSTRUCTION - PAVEMENTS 1 - 155 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 31 FRONT ST Location S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 Improvements TAMP Category P.E. (ROW) Est. Cost City MYP Years Past Current $500,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2020 $200,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE RINGWOOD 1 2020 $1,056,000 MC HENRY PRAIRIE GROVE 4 2020 $850,000 CRYSTAL LAKE 2 2020 $131,000 ALGONQUIN 4 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 31 FRONT ST S OF ILL 120 (BELVIDERE RD) TO N OF ILL 176 (TERRA COTTA AVE) & DRAINAGE DITCH 4 MI S OF US 12 P.E. SURVEYS (ROW) INITIAL CONSTRUCTION - PAVEMENTS ILL 31 SHAMROCK LN TO N OF EDGEWOOD RD Miles = 2.14 Roadway Information Miles AADT Truck Pct 2.14 22,200 6.1 ILL 31 ILL 31 MAIN ST PRESERVATION - PAVEMENTS NHS Y N OF US 14 (NORTHWEST HWY) TO JAMES R. RAKOW RD Miles = 1.37 Roadway Information Miles AADT Truck Pct 1.37 29,695 10.4 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y EDGEWOOD DR TO KANE CO LINE Miles = 0.31 Roadway Information Miles AADT Truck Pct 0.31 17,600 13.1 STANDARD OVERLAY MILLED RUMBLE STRIP NEW SHOULDERS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1 - 156 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 47 MAIN ST Location STATE LINE RD TO ILL 173 (MAPLE AVE) Miles = 1.86 Roadway Information Miles AADT Truck Pct 1.86 5,000 7.7 ILL 47 SEMINARY ST Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS MILLED RUMBLE STRIP Est. Cost City MYP Years Past Current $695,000 HEBRON 4 2020 $23,160,000 WOODSTOCK 1 2021-2025 $15,440,000 WOODSTOCK 1 2021-2025 $800,000 WOODSTOCK 1 2021-2025 $1,025,000 WOODSTOCK 6 2021-2025 REHABILITATION - PAVEMENTS NHS Y N OF ILL 120 (MCHENRY AVE) TO US 14 Miles = 1.99 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS ILL 47 SEMINARY ST N OF ILL 120 (MCHENRY AVE) TO US 14 Miles = 1.99 Roadway Information Miles AADT Truck Pct 1.99 14,805 3.7 ILL 47 RECONSTRUCTION INTERSECTION IMPROVEMENT CULVERT REPLACEMENT INITIAL CONSTRUCTION - PAVEMENTS NHS Y N OF ILL 120 (MCHENRY AVE) TO US 14 RR FLAGGER SEMINARY ST INITIAL CONSTRUCTION - PAVEMENTS ILL 47 N OF ILL 120 (MCHENRY AVE) TO US 14 P.E. (PHASE II) EASTWOOD AVE INITIAL CONSTRUCTION - PAVEMENTS 1 - 157 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 47 Location N OF ILL 120 (MCHENRY AVE) TO US 14 Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $9,600,000 WOODSTOCK 1 2020 $3,600,000 WOODSTOCK 1 2021-2025 $5,000,000 WOODSTOCK 1 2021-2025 $55,000 WOODSTOCK 1 2020 $1,373,000 WOODSTOCK 6 2021-2025 SEMINARY ST INITIAL CONSTRUCTION - PAVEMENTS ILL 47 N OF ILL 120 (MCHENRY AVE) TO US 14 UTILITY ADJUSTMENT SEMINARY ST INITIAL CONSTRUCTION - PAVEMENTS ILL 47 N OF ILL 120 (MCHENRY AVE) TO US 14 CONSTRUCTION ENGINEERING SEMINARY ST INITIAL CONSTRUCTION - PAVEMENTS ILL 47 US 14 TO S OF ILL 176 P.E. (PHASE II) ILL 176 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 US 14 TO S OF ILL 176 P.E. (PHASE II) ILL 176 INITIAL CONSTRUCTION - PAVEMENTS 1 - 158 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 47 Location AT ILL 176 (N & S JCT) & AT PLEASANT VALLEY RD Improvements TAMP Category INTERSECTION RECONSTN Est. Cost City MYP Years Past Current $35,000,000 1 2021-2025 $3,500,000 1 2020 $4,550,000 1 2021-2025 1 2020 7 2020 ILL 176 PLEASANT VALLEY RD MISCELLANEOUS IMPROVEMENTS ILL 47 AT ILL 176 (N & S JCT) & AT PLEASANT VALLEY RD LAND ACQUISITION ILL 176 MISCELLANEOUS IMPROVEMENTS ILL 47 AT ILL 176 (N & S JCT) & AT PLEASANT VALLEY RD CONSTRUCTION ENGINEERING ILL 176 PLEASANT VALLEY RD MISCELLANEOUS IMPROVEMENTS ILL 47 S OF ILL 176 TO REED RD P.E. (PHASE II) $200,000 LAKEWOOD ILL 176 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 AT KISHWAUKEE RIVER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 159 $7,100,000 Structure Information Str Number AADT 17,900 0560025 17,900 0560025 Truck Pct NHS 6 Y 6 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 47 Location AT KISHWAUKEE RIVER Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $450,000 4 2020 $450,000 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 47 AT KISHWAUKEE RIVER CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES ILL 62 AT FOX RIVER ALGONQUIN RD BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR $1,350,000 ALGONQUIN 3 2020 $3,225,000 MC HENRY WOODSTOCK 4 2020 $5,840,000 HEBRON RICHMOND 3 2021-2025 PRESERVATION - BRIDGES ILL 120 ELM ST ILL 47 TO MARTIN RD Miles = 7.84 Roadway Information Miles AADT Truck Pct 7.84 11,264 9.6 ILL 173 MAPLE AVE PRESERVATION - PAVEMENTS NHS Y ALDEN RD TO LAKE CO LINE Miles = 16.68 Roadway Information Miles AADT Truck Pct 16.68 5,212 9.0 STANDARD OVERLAY MILLED RUMBLE STRIP DRAINAGE ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y 1 - 160 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 173 Location AT N BRANCH NIPPERSINK E OF HUNT CLUB RD Improvements TAMP Category CULVERT REPAIR Est. Cost City MYP Years Past Current $375,000 3 2021-2025 $10,000 2 2021-2025 $1,500,000 3 2021-2025 $100,000 3 2021-2025 $250,000 3 2021-2025 $10,000 2 2021-2025 KENOSHA ST MISCELLANEOUS IMPROVEMENTS ILL 173 AT N BRANCH NIPPERSINK E OF HUNT CLUB RD LAND ACQUISITION KENOSHA ST MISCELLANEOUS IMPROVEMENTS ILL 173 AT SOLON RD & AT LAKEVIEW RD CHANNELIZATION KENOSHA ST MISCELLANEOUS IMPROVEMENTS ILL 173 AT SOLON RD & AT LAKEVIEW RD LAND ACQUISITION KENOSHA ST MISCELLANEOUS IMPROVEMENTS ILL 173 DRAINAGE DITCH 1.7 MI E OF US 12 / ILL 31 CULVERT REPLACEMENT KENOSHA ST MISCELLANEOUS IMPROVEMENTS ILL 173 DRAINAGE DITCH 1.7 MI E OF US 12 / ILL 31 LAND ACQUISITION KENOSHA ST MISCELLANEOUS IMPROVEMENTS 1 - 161 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 176 Location DEERPASS RD TO DEAN ST TELEGRAPH ST Improvements TAMP Category LEFT TURN LANES MILLED RUMBLE STRIP GUARDRAIL WIDENING EXISTING PAVEMENT Est. Cost City MYP Years Past Current $5,700,000 7 2021-2025 $382,000 6 2020 $800,000 1 2021-2025 $340,000 5 2021-2025 8 2020 MISCELLANEOUS IMPROVEMENTS ILL 176 DEERPASS RD TO DEAN ST LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 176 DEERPASS RD TO DEAN ST CONSTRUCTION ENGINEERING TELEGRAPH ST MISCELLANEOUS IMPROVEMENTS ILL 176 TELEGRAPH ST AT DEERPASS RD & DITCHES 0.4 MI W & 0.2 MI E OF DEAN ST CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 176 AT HALIGUS RD / MT TABOR RD INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION MISCELLANEOUS IMPROVEMENTS 1 - 162 $3,500,000 CRYSTAL LAKE FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways MCHENRY COUNTY Route / Street ILL 176 Location US 14 (VIRGINIA ST) TO MISTWOOD LN Miles = 2.80 Roadway Information Miles AADT Truck Pct 2.80 13,415 6.5 ILL 176 Improvements TAMP Category STANDARD OVERLAY NEW SHOULDERS ADA IMPROVEMENTS RR FLAGGER Est. Cost City MYP Years Past Current $1,075,000 CRYSTAL LAKE 4 2021-2025 $1,800,000 2 2021-2025 $700,000 2 2021-2025 $1,720,000 12 2021-2025 $310,000 1 2020 REHABILITATION - PAVEMENTS NHS Y AT BUHL RD & AT BAY VIEW BEACH RD LEFT TURN LANES MISCELLANEOUS IMPROVEMENTS ILL 176 AT BUHL RD & AT BAY VIEW BEACH RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 176 AT NISH RD CHANNELIZATION TRAF SIGNAL INSTALLATION MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS DISTRICTWIDE LOCATIONS (NORTH) GUARDRAIL END-SECT REPL MISCELLANEOUS IMPROVEMENTS 1 - 163 WILL COUNTY FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location AT ILL 113 Improvements TAMP Category BRIDGE REPAIR Est. Cost City MYP Years Past Current $842,000 3 2020 $600,000 1 2020 $800,000 1 2021-2025 $14,375,000 13 2021-2025 $14,375,000 2 2021-2025 MAINTENANCE - BRIDGES I 55 ILL 129 TO LORENZO RD P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS I 55 ILL 129 TO LORENZO RD P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS I 55 ILL 129 TO LORENZO RD Miles = 2.45 Roadway Information Miles AADT Truck Pct 2.45 34,675 16.6 I 55 WIDENING EXISTING PAVEMENT STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y ILL 129 TO LORENZO RD ADD AUXILIARY LANES INITIAL CONSTRUCTION - PAVEMENTS 1 - 164 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location ILL 129 TO LORENZO RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $8,500,000 13 2021-2025 $3,500,000 13 2021-2025 $3,500,000 11 2021-2025 $500,000 7 2021-2025 $15,000,000 13 2021-2025 $46,000,000 13 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 55 ILL 129 TO LORENZO RD LAND ACQUISITION REHABILITATION - PAVEMENTS I 55 ILL 129 TO LORENZO RD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS I 55 ILL 129 TO LORENZO RD UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 55 ILL 129 TO LORENZO RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 55 AT ILL 129 INTERCHANGE RECONSTRUCTION BRIDGE REPLACEMENT RECONSTRUCTION - PAVEMENTS 1 - 165 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location AT ILL 129 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost City MYP Years Past Current $2,000,000 5 2021-2025 $23,000,000 13 2021-2025 1 2020 $1,000,000 5 2021-2025 $500,000 2 2021-2025 RECONSTRUCTION - PAVEMENTS I 55 AT LORENZO RD INTERCHANGE RECONSTRUCTION RECONSTRUCTION - PAVEMENTS I 55 I 80 I-55: LORENZO RD TO JOLIET RD I-80: ILL 43 (HARLEM AVE) TO US 30 SURVEILLANCE $637,000 JOLIET CHANNAHON BOLINGBROOK ROMEOVILLE SHOREWOOD TINLEY PARK MOKENA NEW LENOX MAINTENANCE - PAVEMENTS I 55 AT LORENZO RD UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS I 55 AT BNSF RR & GRANT CREEK CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES 1 - 166 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location S OF I-80 TO S OF WEBER RD Miles = 13.45 Roadway Information Miles AADT Truck Pct 13.45 88,935 14.3 I 55 City MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $23,500,000 CHANNAHON SHOREWOOD JOLIET ROMEOVILLE 2 2021-2025 $4,700,000 JOLIET ROMEOVILLE 2 2021-2025 $36,600,000 SHOREWOOD 1 2021-2025 $24,400,000 SHOREWOOD 1 2021-2025 $7,930,000 SHOREWOOD 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y US 30 (LINCOLN HWY) TO ILL 126 (MAIN ST) STEVENSON EXPWY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES I 55 I-80 TO US 52 (JEFFERSON ST) ADD AUXILIARY LANES INITIAL CONSTRUCTION - PAVEMENTS I 55 I-80 TO US 52 (JEFFERSON ST) INTERCHANGE RECONSTRUCTION RECONSTRUCTION - PAVEMENTS I 55 I-80 TO US 52 (JEFFERSON ST) CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 1 - 167 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location I-80 TO US 52 (JEFFERSON ST) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,500,000 SHOREWOOD 1 2020 $3,600,000 SHOREWOOD 1 2021-2025 $2,785,000 SHOREWOOD 1 2020 $2,000,000 SHOREWOOD 1 2021-2025 $1,900,000 JOLIET 6 2021-2025 RECONSTRUCTION - PAVEMENTS I 55 I-80 TO US 52 (JEFFERSON ST) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS I 55 I-80 TO US 52 (JEFFERSON ST) LAND ACQUISITION RECONSTRUCTION - PAVEMENTS I 55 I-80 TO US 52 (JEFFERSON ST) UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS I 55 US 52 (JEFFERSON ST) TO BLACK RD NOISE BARRIERS IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS 1 - 168 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location AT AIRPORT RD / LOCKPORT RD Improvements TAMP Category INTERCHANGE CONSTRUCTION Est. Cost City MYP Years Past Current $70,000,000 ROMEOVILLE 1 2021-2025 $5,700,000 ROMEOVILLE 1 2021-2025 $6,000,000 ROMEOVILLE 1 2021-2025 $7,410,000 ROMEOVILLE 1 2021-2025 $1,000,000 ROMEOVILLE 1 2021-2025 $70,000,000 ROMEOVILLE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 55 AT AIRPORT RD / LOCKPORT RD P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 55 AT AIRPORT RD / LOCKPORT RD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS I 55 AT AIRPORT RD / LOCKPORT RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 55 AT AIRPORT RD / LOCKPORT RD UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 55 AT ILL 126 INTERCHANGE CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS 1 - 169 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location AT ILL 126 Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $4,900,000 ROMEOVILLE 1 2021-2025 $6,000,000 ROMEOVILLE 1 2021-2025 $4,000,000 ROMEOVILLE 1 2021-2025 $6,370,000 ROMEOVILLE 1 2021-2025 $6,000,000 JOLIET BOLINGBROOK DARIEN WILLOWBROOK BURR RIDGE WOODRIDGE ROMEOVILLE INDIAN HEAD PARK COUNTRYSIDE 2 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 55 AT ILL 126 LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS I 55 AT ILL 126 UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 55 AT ILL 126 CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 55 WEBER RD TO WILLOW SPRINGS RD CRACK & JOINT SEALING STEVENSON EXPWY PRESERVATION - PAVEMENTS 1 - 170 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 55 Location AT WEBER RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $330,000 ROMEOVILLE 1 2020 $3,520,000 ROMEOVILLE JOLIET BOLINGBROOK WOODRIDGE BURR RIDGE INDIAN HEAD PARK COUNTRYSIDE HODGKINS SUMMIT FOREST VIEW STICKNEY CHICAGO DARIEN WILLOWBROOK 4 2021-2025 $3,050,000 BOLINGBROOK 2 2021-2025 RECONSTRUCTION - PAVEMENTS I 55 I 90 I 94 I-55: PULASKI RD TO WEBER RD & I-90/94: HALSTED ST TO ROOSEVELT RD RAMP MODIFICATIONS RECONSTRUCTION - PAVEMENTS I 55 AT ILL 53 BRIDGE NEW DECK REHABILITATION - BRIDGES I 55 AT JOLIET RD EXIT BRIDGE NEW DECK REHABILITATION - BRIDGES 1 - 171 Structure Information Str Number AADT 118,400 0990260 $5,180,000 BOLINGBROOK Structure Information Str Number AADT 93,800 0990028 Truck Pct NHS 12 Y 5 2021-2025 Truck Pct NHS 15 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 57 Location AT EAGLE LAKE RD Improvements TAMP Category INTERCHANGE (NEW) Est. Cost City MYP Years Past Current $150,000,000 1 2021-2025 $7,000,000 1 2020 $15,000,000 1 2021-2025 $19,500,000 1 2021-2025 $2,000,000 1 2021-2025 $10,000,000 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 57 AT EAGLE LAKE RD P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS I 57 AT EAGLE LAKE RD P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 57 AT EAGLE LAKE RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 57 AT EAGLE LAKE RD UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 57 AT EAGLE LAKE RD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS 1 - 172 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 57 Location AT EAGLE LAKE RD Improvements TAMP Category RR CROSSING CONSTRUCTION Est. Cost City MYP Years Past Current $2,000,000 1 2021-2025 2 2021-2025 3 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 57 STEGER RD TO KANKAKEE CO LINE (INCL REST AREAS & WEIGH STATIONS) Miles = 13.10 Roadway Information Miles AADT Truck Pct 13.10 36,456 20.4 I 57 STANDARD OVERLAY REST AREA IMPROVEMENT WEIGH STATION REPAIRS $14,500,000 REHABILITATION - PAVEMENTS NHS Y AT PAULING RD BRIDGE REPLACEMENT $3,000,000 RECONSTRUCTION - BRIDGES I 57 MONEE UNIVERSITY PARK AT PAULING RD LAND ACQUISITION Structure Information Str Number AADT 1,300 0990204 $50,000 Truck Pct NHS 3 N 1 2021-2025 1 2021-2025 RECONSTRUCTION - BRIDGES I 80 RIDGE RD TO US 30 (LINCOLN HWY) ADD AUXILIARY LANES INITIAL CONSTRUCTION - PAVEMENTS 1 - 173 $323,004,000 JOLIET NEW LENOX MINOOKA FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location RIDGE RD TO US 30 (LINCOLN HWY) Miles = 16.00 Roadway Information Miles AADT Truck Pct 1.01 60,500 25.3 14.99 I 80 65,849 23.8 Improvements TAMP Category RECONSTRUCTION WIDENING EXISTING PAVEMENT BRIDGE WIDENING BRIDGE REPLACEMENT BRIDGE DECK REPAIRS BRIDGE DECK OVERLAY BRIDGE SUBSTRUCTURE CULVERT REPLACEMENT Est. Cost $215,336,000 RECONSTRUCTION - PAVEMENTS JOLIET NEW LENOX MINOOKA Structure Information Str Number AADT 30,250 0990040 30,250 0990041 30,250 0990042 30,250 0990043 30,250 0990044 Y P.E. (PHASE I) MYP Years Past Current NHS Y RIDGE RD TO US 30 (LINCOLN HWY) City 1 2021-2025 Truck Pct NHS 25 Y 25 Y 25 Y 25 Y 25 Y $2,000,000 JOLIET NEW LENOX MINOOKA 1 2020 $500,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $1,700,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) RR FLAGGER RR ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) RR FLAGGER INITIAL CONSTRUCTION - PAVEMENTS 1 - 174 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location AT DES PLAINES RIVER BRIDGE & CHICAGO ST & CENTER ST INTCHGS Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $13,450,000 JOLIET NEW LENOX MINOOKA 1 2020 $13,450,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $13,450,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $7,000,000 JOLIET NEW LENOX MINOOKA 1 2020 $6,000,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $6,000,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 80 AT DES PLAINES RIVER BRIDGE & CHICAGO ST & CENTER ST INTCHGS P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 AT DES PLAINES RIVER BRIDGE & CHICAGO ST & CENTER ST INTCHGS P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 CHICAGO ST TO US 30, BRIGGS ST INTCHG, & GROUP A BRIDGES P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 CHICAGO ST TO US 30, BRIGGS ST INTCHG, & GROUP A BRIDGES P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 CHICAGO ST TO US 30, BRIGGS ST INTCHG, & GROUP A BRIDGES P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 1 - 175 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location E OF RIDGE RD TO RIVER RD, RIVER RD TO HOUBOLT RD, & AT I-55 INTCHG Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $5,400,000 JOLIET NEW LENOX MINOOKA 1 2020 $5,400,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $5,400,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $4,700,000 JOLIET NEW LENOX MINOOKA 1 2020 $5,700,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $5,700,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 80 E OF RIDGE RD TO RIVER RD, RIVER RD TO HOUBOLT RD, & AT I-55 INTCHG P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 E OF RIDGE RD TO RIVER RD, RIVER RD TO HOUBOLT RD, & AT I-55 INTCHG P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 HOUBOLT RD TO CENTER ST, LARKIN AVE INTCHG, & CORRIDOR MANAGEMENT P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 HOUBOLT RD TO CENTER ST, LARKIN AVE INTCHG, & CORRIDOR MANAGEMENT P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 80 HOUBOLT RD TO CENTER ST, LARKIN AVE INTCHG, & CORRIDOR MANAGEMENT P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 1 - 176 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location RIDGE RD TO US 30 (LINCOLN HWY) Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,925,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $23,000,000 JOLIET NEW LENOX MINOOKA 1 2020 $2,200,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $31,600,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $31,600,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 $31,800,000 JOLIET NEW LENOX MINOOKA 1 2021-2025 RECONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS I 80 RIDGE RD TO US 30 (LINCOLN HWY) CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 1 - 177 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location RIDGE RD TO US 30 (LINCOLN HWY) Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $15,000 JOLIET NEW LENOX MINOOKA 1 2020 17 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 80 AT RIVER RD BRIDGE REPLACEMENT BRIDGE REMOVAL/DEMOLITION $2,010,000 RECONSTRUCTION - BRIDGES I 80 AT ROCK RUN CREEK BRIDGE REPLACEMENT Structure Information Str Number AADT 1,550 0990177 $10,600,000 RECONSTRUCTION - BRIDGES I 80 OVER JOLIET JUNCTION TRAIL (ABANDONED RR) BRIDGE REPLACEMENT BRIDGE WIDENING RECONSTRUCTION - BRIDGES 1 - 178 JOLIET Structure Information Str Number AADT 30,950 0990046 30,950 0990047 $15,595,000 JOLIET Structure Information Str Number AADT 30,050 0990048 30,050 0990049 Truck Pct NHS 12 N 3 2021-2025 Truck Pct NHS 24 Y 24 Y 3 2021-2025 Truck Pct NHS 23 Y 23 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location AT US 6 & DES PLAINES RIVER Improvements TAMP Category INTERCHANGE RECONSTRUCTION BRIDGE (NEW) BRIDGE SUBSTRUCTURE BRIDGE SUPERSTRUCTURE BRIDGE REMOVAL/DEMOLITION BRIDGE NEW DECK MEDIAN REMOVAL BRIDGE REPLACEMENT Est. Cost 80 AT US 6 & DES PLAINES RIVER CONSTRUCTION ENGINEERING MYP Years Past Current $310,000,000 INITIAL CONSTRUCTION - BRIDGES I City JOLIET Structure Information Str Number AADT 42,700 0990056 42,700 0990057 36,900 0990058 42,700 0990059 29,300 0990083 1 2021-2025 Truck Pct NHS 18 Y 18 Y 23 Y 18 Y 22 Y $35,000,000 JOLIET 1 2021-2025 $6,315,000 JOLIET 2 2020 INITIAL CONSTRUCTION - BRIDGES I 80 ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES EB) BRIDGE FABRICATION MISCELLANEOUS IMPROVEMENTS 1 - 179 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES EB) Miles = 1.05 Roadway Information Miles AADT Truck Pct 1.05 72,334 23.7 I 80 Improvements TAMP Category BRIDGE SUPERSTRUCTURE BRIDGE REPLACEMENT BRIDGE WIDENING RECONSTRUCTION RR FLAGGER Est. Cost $41,176,000 RECONSTRUCTION - BRIDGES CONSTRUCTION ENGINEERING MYP Years Past Current JOLIET Structure Information Str Number AADT 36,900 0990060 36,900 0990062 36,900 0990064 35,550 0990066 36,900 0990065 NHS Y ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES EB) City 7 2020 Truck Pct NHS 23 Y 23 Y 23 Y 23 Y 23 Y $1,250,000 JOLIET 3 2020 $35,130,000 JOLIET 7 2021-2025 RECONSTRUCTION - BRIDGES I 80 (WESTBOUND) ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES WB) Miles = 1.05 Roadway Information Miles AADT Truck Pct 1.05 72,334 23.7 I 80 BRIDGE REPLACEMENT BRIDGE SUPERSTRUCTURE BRIDGE WIDENING RECONSTRUCTION BRIDGE REPAIR RR FLAGGER RECONSTRUCTION - BRIDGES Structure Information Str Number AADT 36,900 0990061 36,900 0990063 35,550 0990067 NHS Y RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES WB) RR FLAGGER MAINTENANCE - PAVEMENTS 1 - 180 $901,000 JOLIET NEW LENOX MINOOKA Truck Pct NHS 23 Y 23 Y 23 Y 5 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES WB) Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost City MYP Years Past Current $1,100,000 JOLIET NEW LENOX MINOOKA 5 2021-2025 $5,300,000 JOLIET 2 2021-2025 3 2021-2025 RECONSTRUCTION - PAVEMENTS I 80 ILL 53 (CHICAGO ST) TO ROWELL AVE (GROUP A STRUCTURES WB) CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES I 80 AT BRIGGS ST BRIDGE REPLACEMENT BRIDGE WIDENING $8,391,000 RECONSTRUCTION - BRIDGES I 80 AT GOUGAR RD BRIDGE REPLACEMENT Structure Information Str Number AADT 13,600 0990216 $4,300,000 RECONSTRUCTION - BRIDGES I 80 US 30 (LINCOLN HWY) TO US 45 (96TH AVE) P.E. (PHASE II) P.E. (CONSULTANT PLANS) ILLINOIS JOBS NOW! PROJECT MISCELLANEOUS IMPROVEMENTS 1 - 181 NEW LENOX Structure Information Str Number AADT 9,050 0990203 $50,000 NEW LENOX MOKENA Truck Pct NHS 9 N 3 2021-2025 Truck Pct NHS 8 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street I 80 Location AT US 30 (LINCOLN HWY) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $3,500,000 NEW LENOX 1 2020 $1,800,000 NEW LENOX 1 2021-2025 3 2021-2025 RECONSTRUCTION - PAVEMENTS I 80 AT US 30 (LINCOLN HWY) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 80 AT FRANCIS RD BRIDGE REPLACEMENT $3,000,000 RECONSTRUCTION - BRIDGES I 80 AT WOLF RD BRIDGE NEW DECK SUBSTRUCTURE WIDENING BIKEWAY DRAINAGE SHOULDER RECONSTRUCTION CURB AND GUTTER Structure Information Str Number AADT 3,800 0990205 $3,305,000 REHABILITATION - BRIDGES I 80 AT WOLF RD P.E. (PHASE II) REHABILITATION - BRIDGES 1 - 182 MOKENA Structure Information Str Number AADT 16,800 0990192 $500,000 MOKENA Truck Pct NHS 4 N 3 2021-2025 Truck Pct NHS 5 N 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street US 6 CHANNAHON RD Location HOUBOLT RD TO SW OF MCCLINTOCK RD Miles = 0.93 Roadway Information Miles AADT Truck Pct 0.93 9,000 9.7 US 6 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS MILLED RUMBLE STRIP Est. Cost City MYP Years Past Current $385,000 JOLIET 4 2021-2025 NEW LENOX 8 2020 $850,000 HOMER GLEN NEW LENOX 3 2020 $1,100,000 HOMER GLEN NEW LENOX 3 2021-2025 JOLIET 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT GOUGAR RD MAPLE RD INTERSECTION RECONSTN LIGHTING LANDSCAPING DRAINAGE ADA IMPROVEMENTS $3,120,000 MISCELLANEOUS IMPROVEMENTS US 6 E OF CEDAR RD TO WILL-COOK RD CONSTRUCTION ENGINEERING SOUTHWEST HWY RECONSTRUCTION - PAVEMENTS US 6 E OF CEDAR RD TO WILL-COOK RD CONSTRUCTION ENGINEERING SOUTHWEST HWY RECONSTRUCTION - PAVEMENTS US 30 AT DES PLAINES RIVER BRIDGE SUPERSTRUCTURE $10,000,000 JEFFERSON ST REHABILITATION - BRIDGES 1 - 183 Structure Information Str Number AADT 11,410 0990166 Truck Pct NHS 3 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street US 30 Location AT DES PLAINES RIVER Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,300,000 JOLIET 1 2020 NEW LENOX 1 2021-2025 JOLIET 3 2021-2025 JEFFERSON ST REHABILITATION - BRIDGES US 30 LINCOLN HWY I-80 TO E OF CEDAR RD Miles = 1.51 MICROSURFACING 2 PASS $900,000 PRESERVATION - PAVEMENTS US 30 A AT DES PLAINES RIVER BRIDGE SUPERSTRUCTURE $10,000,000 CASS ST REHABILITATION - BRIDGES US 30 A AT DES PLAINES RIVER P.E. (PHASE II) Structure Information Str Number AADT 15,210 0990101 Truck Pct NHS 3 Y $1,000,000 JOLIET 3 2020 $1,000,000 JOLIET 1 2021-2025 $1,500,000 JOLIET 3 2021-2025 CASS ST REHABILITATION - BRIDGES US 30 A AT DES PLAINES RIVER P.E. (PHASE II) CASS ST REHABILITATION - BRIDGES US 30 A AT DES PLAINES RIVER CONSTRUCTION ENGINEERING CASS ST REHABILITATION - BRIDGES 1 - 184 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street US 45 Location LAPORTE RD TO STEGER RD Miles = 4.67 Roadway Information Miles AADT Truck Pct 4.67 17,569 6.0 US 52 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $4,000,000 MOKENA FRANKFORT 1 2021-2025 $4,203,000 SHOREWOOD 1 2021-2025 $200,000 SHOREWOOD 1 2020 JOLIET 2 2020 SHOREWOOD JOLIET 1 2021-2025 PRESERVATION - PAVEMENTS NHS Y AT I-55 & AT NE/SE FR RD JEFFERSON ST TRAF SIGNAL REPLACEMENT CHANNELIZATION BRIDGE REPAIR MISCELLANEOUS IMPROVEMENTS US 52 AT I-55 & AT NE/SE FR RD P.E. (PHASE II) JEFFERSON ST MISCELLANEOUS IMPROVEMENTS US 52 JEFFERSON ST EDEN LN TO JOYCE RD Miles = 1.36 Roadway Information Miles AADT Truck Pct 1.36 25,500 10.7 US 52 JEFFERSON ST $1,280,000 REHABILITATION - PAVEMENTS NHS Y RIVER RD TO HOUBOLT RD Miles = 2.50 Roadway Information Miles AADT Truck Pct 2.50 22,329 8.1 DESIGNED OVERLAY ADA IMPROVEMENTS RECONSTRUCTION BRIDGE WIDENING CULVERT EXTENSION WIDENING EXISTING PAVEMENT TURNING LANES BRIDGE REPAIR RECONSTRUCTION - PAVEMENTS NHS P 1 - 185 $76,000,000 Structure Information Str Number AADT 12,400 0990276 25,500 0990294 Truck Pct NHS 3 Y 10 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street US 52 Location RIVER RD TO HOUBOLT RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $7,600,000 SHOREWOOD JOLIET 1 2021-2025 $3,000,000 SHOREWOOD JOLIET 1 2021-2025 $1,000,000 SHOREWOOD JOLIET 1 2021-2025 $9,880,000 SHOREWOOD JOLIET 1 2021-2025 $250,000 3 2021-2025 $50,000 2 2021-2025 JEFFERSON ST RECONSTRUCTION - PAVEMENTS US 52 RIVER RD TO HOUBOLT RD LAND ACQUISITION JEFFERSON ST RECONSTRUCTION - PAVEMENTS US 52 RIVER RD TO HOUBOLT RD UTILITY ADJUSTMENT JEFFERSON ST RECONSTRUCTION - PAVEMENTS US 52 RIVER RD TO HOUBOLT RD CONSTRUCTION ENGINEERING JEFFERSON ST RECONSTRUCTION - PAVEMENTS US 52 AT DITCH N OF FORKED CREEK 2.9 MI S OF HOFF RD CULVERT REPLACEMENT CEDAR RD MISCELLANEOUS IMPROVEMENTS US 52 AT DITCH N OF FORKED CREEK 2.9 MI S OF HOFF RD LAND ACQUISITION CEDAR RD MISCELLANEOUS IMPROVEMENTS 1 - 186 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 1 Location RICHTON RD TO S/O INDIANA AVE Miles = 8.54 MAIN ST Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $2,750,000 CRETE BEECHER 1 2021-2025 $2,460,000 CRETE 3 2021-2025 $900,000 CRETE 5 2021-2025 DIXIE HWY CALUMET EXPWY DIXIE HWY (UNMARKE Roadway Information Miles AADT Truck Pct 4.25 7,795 7.3 4.29 10,900 ILL 1 MAIN ST 17.2 Y UNION AVE TO ILL 394 Miles = 4.25 Roadway Information Miles AADT Truck Pct 4.25 7,795 7.3 ILL 1 PRESERVATION - PAVEMENTS NHS Y STANDARD OVERLAY ADA IMPROVEMENTS RR FLAGGER REHABILITATION - PAVEMENTS NHS Y DEER CREEK S OF CHICAGO RD MAIN ST BRIDGE REPLACEMENT ADA IMPROVEMENTS CULVERT (NEW) RECONSTRUCTION - BRIDGES ILL 7 ILL 53 N OF CATON FARM RD TO ILL 7 (THEODORE ST) Miles = 1.07 STANDARD OVERLAY RR FLAGGER BROADWAY ST Roadway Information Miles AADT Truck Pct 1.07 19,867 7.7 REHABILITATION - PAVEMENTS NHS Y 1 - 187 Structure Information Str Number AADT 11,300 0990076 $710,000 CREST HILL Truck Pct NHS 4 Y 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 7 Location DITCH 0.8 MI E OF ILL 171 (STATE ST) Improvements TAMP Category CULVERT REPLACEMENT Est. Cost City MYP Years Past Current $250,000 LOCKPORT 3 2021-2025 $200,000 UNIVERSITY PARK 1 2021-2025 $1,100,000 UNIVERSITY PARK 3 2020 $38,500,000 JOLIET ELWOOD WILMINGTON 1 2021-2025 $3,800,000 JOLIET ELWOOD WILMINGTON 1 2021-2025 9TH ST IDOT PARTICIPATION IN PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 50 AT GOVERNOR'S HWY & AT DRALLE RD LAND ACQUISITION CICERO AVE MISCELLANEOUS IMPROVEMENTS ILL 50 GOVERNORS HWY S OF ILL 50 (CICERO AVE) TO MANHATTAN-MONEE RD Miles = 1.24 Roadway Information Miles AADT Truck Pct 1.24 8,050 12.1 ILL 53 DESIGNED OVERLAY RR FLAGGER REHABILITATION - PAVEMENTS NHS Y US 52 TO ARSENAL RD CHICAGO ST INTERSECTION IMPROVEMENT CHANNELIZATION MISCELLANEOUS IMPROVEMENTS ILL 53 US 52 TO ARSENAL RD P.E. (PHASE II) CHICAGO ST MISCELLANEOUS IMPROVEMENTS 1 - 188 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 53 Location US 52 TO ARSENAL RD Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $2,000,000 JOLIET ELWOOD WILMINGTON 1 2021-2025 $750,000 JOLIET ELWOOD WILMINGTON 1 2021-2025 $5,000,000 JOLIET ELWOOD WILMINGTON 1 2021-2025 $1,000,000 4 2021-2025 $10,000 2 2020 CHICAGO ST MISCELLANEOUS IMPROVEMENTS ILL 53 US 52 TO ARSENAL RD UTILITY ADJUSTMENT CHICAGO ST MISCELLANEOUS IMPROVEMENTS ILL 53 US 52 TO ARSENAL RD CONSTRUCTION ENGINEERING CHICAGO ST MISCELLANEOUS IMPROVEMENTS ILL 53 GRANT CREEK 0.6 MI S OF W HOFF RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 53 GRANT CREEK 0.6 MI S OF W HOFF RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 1 - 189 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 53 INDEPENDENCE BLVD Location JOLIET RD TO BELMONT DR Miles = 1.70 Roadway Information Miles AADT Truck Pct 1.70 31,944 10.7 ILL 53 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost City MYP Years Past Current $1,571,000 ROMEOVILLE 4 2021-2025 $200,000 ROMEOVILLE 1 2021-2025 $1,496,000 ROMEOVILLE LOCKPORT 6 2020 $775,000 NAPERVILLE 3 2021-2025 $600,000 PLAINFIELD 1 2020 REHABILITATION - PAVEMENTS NHS Y AT NORMANTOWN RD / DEVONWOOD AVE LAND ACQUISITION INDEPENDENCE BLVD MISCELLANEOUS IMPROVEMENTS ILL 53 S OF MURPHY DR TO ILL 7 (RENWICK RD) NEW SHOULDERS INDEPENDENCE BLVD MISCELLANEOUS IMPROVEMENTS ILL 59 AT CHAMPION DR TRAF SIGNAL INSTALLATION CHANNELIZATION ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 126 LOCKPORT ST KENDALL CO LINE TO WALLIN DR Miles = 1.91 Roadway Information Miles AADT Truck Pct 1.91 15,400 16.9 STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS N 1 - 190 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 126 Location AT COUNTY LINE RD Improvements TAMP Category CHANNELIZATION Est. Cost City MYP Years Past Current $1,975,000 6 2021-2025 $200,000 6 2020 $200,000 4 2021-2025 $750,000 12 2021-2025 $180,000 6 2021-2025 12 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 126 AT COUNTY LINE RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 126 AT COUNTY LINE RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 129 AT STRIP MINE RD INTERSECTION RECONSTN WASHINGTON ST MISCELLANEOUS IMPROVEMENTS ILL 129 AT STRIP MINE RD LAND ACQUISITION WASHINGTON ST MISCELLANEOUS IMPROVEMENTS ILL 129 AT COAL CITY RD INTERSECTION RECONSTN WASHINGTON ST MISCELLANEOUS IMPROVEMENTS 1 - 191 $1,500,000 WILMINGTON FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street ILL 129 WASHINGTON ST Location S OF COAL CITY RD TO GRUNDY CO LINE (KANKAKEE ST) Miles = 4.33 Roadway Information Miles AADT Truck Pct 4.33 1,626 0.0 ILL 171 ARCHER AVE I 55 E FR RD I 55 W FR RD I 55 E FR RD City MYP Years Past Current $1,515,000 BRAIDWOOD GODLEY 3 2021-2025 $475,000 4 2021-2025 $15,000,000 13 2021-2025 $500,000 8 2021-2025 2 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y KAVANAUGH RD TO LORENZO RD Miles = 5.69 Roadway Information Miles AADT Truck Pct 2.32 0.0 STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS Est. Cost NHS N SW OF BOULA AVE TO I-355 (VETERANS MEMORIAL TOLLWAY) Miles = 0.83 Roadway Information Miles AADT Truck Pct 0.83 11,751 13.6 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N ILL 129 TO LORENZO RD UTILITY ADJUSTMENT I 55 W FR RD RECONSTRUCTION - PAVEMENTS I 55 W FR RD BLUFF RD TO FRONTAGE RD W Miles = 1.34 Roadway Information Miles AADT Truck Pct 1.34 0.0 STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS REHABILITATION - PAVEMENTS NHS N 1 - 192 $460,000 CHANNAHON FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street JACKSON ST Location AT DES PLAINES RIVER Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost AT DES PLAINES RIVER P.E. (PHASE I) MYP Years Past Current $3,450,000 REHABILITATION - BRIDGES JACKSON ST City JOLIET Structure Information Str Number AADT 8,000 0990239 2 2021-2025 Truck Pct NHS 2 N $350,000 JOLIET 2 2021-2025 $350,000 JOLIET 2 2021-2025 BOLINGBROOK ROMEOVILLE 4 2021-2025 2 2021-2025 REHABILITATION - BRIDGES JACKSON ST AT DES PLAINES RIVER P.E. (PHASE II) REHABILITATION - BRIDGES JOLIET RD I-55 TO SHERMAN RD Miles = 1.60 Roadway Information Miles AADT Truck Pct 1.60 27,236 23.0 MONEE-MANHATTAN RD DESIGNED OVERLAY NEW SHOULDERS ADA IMPROVEMENTS RR FLAGGER $1,245,000 REHABILITATION - PAVEMENTS NHS N BRYNN DR TO CENTER RD NEW SHOULDERS MILLED RUMBLE STRIP MISCELLANEOUS IMPROVEMENTS 1 - 193 $3,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street MONEE-MANHATTAN RD Location DITCHES 0.3 MI & 3 MI W OF US 45 Improvements TAMP Category CULVERT REPLACEMENT CULVERT REMOVAL DRAINAGE GUARDRAIL SHOULDER REPAIR GRADING Est. Cost City MYP Years Past Current $1,600,000 5 2020 $1,310,000 3 2021-2025 15 2021-2025 MISCELLANEOUS IMPROVEMENTS OLD CHICAGO RD S OF KAHLER RD TO ILL 102 Miles = 3.73 Roadway Information Miles AADT Truck Pct 3.73 1,500 0.0 RICHARDS ST STANDARD OVERLAY ADA IMPROVEMENTS NEW SHOULDERS MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N AT HICKORY CREEK N OF I-80 BRIDGE SUPERSTRUCTURE SUBSTRUCTURE WIDENING BRIDGE SUBSTRUCTURE $3,190,000 REHABILITATION - BRIDGES VARIOUS VARIOUS LOCATIONS IN JOLIET TRAF SIGNAL MODERNIZATION SAFETY IMPROVEMENTS PAVEMENT MARKING MISCELLANEOUS IMPROVEMENTS 1 - 194 JOLIET Structure Information Str Number AADT 8,800 0990123 $2,885,000 JOLIET Truck Pct NHS 10 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways WILL COUNTY Route / Street VARIOUS Location MOVABLE BRIDGES IN JOLIET AREA Improvements TAMP Category CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 195 Est. Cost City MYP Years Past Current $862,000 JOLIET 1 2020 DISTRICT-WIDE FY 2020-2025 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION Improvements TAMP Category STANDARD OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY Est. Cost City MYP Years Past Current $77,101,000 1 2020 $3,837,000 1 2020 $13,300,000 1 2020 $382,502,000 1 2021-2025 $64,887,000 1 2021-2025 PRESERVATION - PAVEMENTS VARIOUS VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION P.E. (PHASE II) PRESERVATION - PAVEMENTS VARIOUS VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION CONSTRUCTION ENGINEERING PRESERVATION - PAVEMENTS VARIOUS VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION STANDARD OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY PRESERVATION - PAVEMENTS VARIOUS VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION CONSTRUCTION ENGINEERING PRESERVATION - PAVEMENTS 1 - 196 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location VARIOUS DISTRICT WIDE PAVEMENT & BRIDGE PRESERVATION Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $31,298,000 1 2021-2025 $1,500,000 1 2020 $100,000 1 2020 $7,500,000 1 2021-2025 $2,150,000 1 2021-2025 $4,000,000 1 2020 PRESERVATION - PAVEMENTS VARIOUS VARIOUS EXPRESSWAY LOCATIONS IMPACT ATTENUATORS MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS - USACOE PERMIT REVIEW SERVICES MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS EXPRESSWAY LOCATIONS IMPACT ATTENUATORS MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS DRAINAGE MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ADA) ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 1 - 197 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location VARIOUS LOCATIONS (ADA) City MYP Years Improvements TAMP Category Est. Cost ADA IMPROVEMENTS $20,000,000 1 2021-2025 $1,600,000 3 2021-2025 $1,000,000 1 2020 $5,000,000 1 2021-2025 $1,400,000 1 2020 $2,000,000 1 2020 Past Current MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS BRIDGE DECK OVERLAY PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS BUREAU OF MAINTENANCE - VARIOUS CONTRACT MAINTENANCE CE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF MATERIALS - VARIOUS QUALITY ASSURANCE TESTING CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS 1 - 198 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF MATERIALS - VARIOUS QUALITY ASSURANCE TESTING Improvements TAMP Category CE QA/MATERIALS TESTING Est. Cost City MYP Years Past Current $1,500,000 1 2021-2025 $750,000 5 2020 $750,000 1 2020 $3,250,000 1 2020 $750,000 1 2021-2025 $750,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF CONSTRUCTION - VARIOUS BRIDGE PAINTING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 199 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF MAINTENANCE - VARIOUS LANDSCAPE ARCHITECTURAL SERVICES Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $750,000 5 2020 $1,250,000 1 2020 $3,750,000 1 2021-2025 $300,000 1 2020 $400,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF MAINTENANCE - VARIOUS LANDSCAPE ARCHITECTUAL SERVICES/ ROADSIDE P.E. (PHASE I) P.E. (PHASE II) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF MAINTENANCE - VARIOUS LANDSCAPE ARCHITECTUAL SERVICES/ ROADSIDE P.E. (PHASE I) P.E. (PHASE II) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - VARIOUS DRAINAGE STUDIES & HYDRAULIC REPORTS P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - VARIOUS DRAINAGE STUDIES & HYDRAULIC REPORTS - PROJECT MANAGEMENT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS 1 - 200 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF PROGRAMMING - VARIOUS DRAINAGE STUDIES & HYDRAULIC REPORTS Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $800,000 1 2021-2025 $1,000,000 1 2020 $1,000,000 1 2021-2025 $1,000,000 1 2020 $1,000,000 1 2021-2025 $1,150,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES/ IN-HOUSE UNIT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES/ IN-HOUSE UNIT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES/ IN-HOUSE UNIT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES/ IN-HOUSE UNIT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - SURVEY P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS 1 - 201 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF PROGRAMMING - SURVEY Improvements TAMP Category P.E. SURVEYS (PHASE I) Est. Cost City MYP Years Past Current $1,500,000 1 2020 $2,000,000 1 2021-2025 $3,000,000 5 2020 $1,500,000 1 2021-2025 $600,000 5 2020 $500,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - SURVEY P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - DATA BANK P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - ENVIRONMENTAL STUDIES UNIT P.E. (PHASE I) P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 1 - 202 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF PROGRAMMING - ENVIRONMENTAL STUDIES UNIT Improvements TAMP Category P.E. (PHASE I) P.E. PROJECT MANAGERS Est. Cost City MYP Years Past Current $500,000 1 2021-2025 $500,000 1 2021-2025 $700,000 4 2020 $300,000 5 2021-2025 $300,000 1 2020 $600,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - ENVIRONMENTAL STUDIES UNIT P.E. (PHASE I) P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MANAGEMENT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MANAGEMENT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - ROADWAY, STREAM & NPDES/SURVEY P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - DRAINAGE INVESTIGATIONS, DRAINAGE STUDIES & HYDRAULIC REPORTS P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS 1 - 203 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF PROGRAMMING - VARIOUS GEOMETRIC ENGINEERING Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $500,000 1 2020 $700,000 1 2021-2025 $500,000 1 2020 $500,000 1 2020 $1,500,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - VARIOUS GEOMETRIC ENGINEERING P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES CONSULTANT STUDIES UNIT/PROGRAM MANAGEMENT P.E. (PHASE I) P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES CONSULTANT STUDIES UNIT/PROGRAM MANAGEMENT P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES/CONSULTANT STUDIES UNIT P.E. (PHASE I) P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 1 - 204 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF PROGRAMMING - PROJECT STUDIES CONSULTANT STUDIES UNIT/PROGRAM MANAGEMENT Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $1,500,000 1 2021-2025 $400,000 1 2021-2025 $400,000 1 2020 $400,000 1 2021-2025 $800,000 1 2020 $400,000 2 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - VARIOUS TRAFFIC STUDIES P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS 1 - 205 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF TRAFFIC OPERATIONS - VARIOUS PAVEMENT MARKING & OTHER TRAFFIC CONTROL DEVICES Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $200,000 1 2020 $200,000 1 2021-2025 $200,000 1 2020 $200,000 1 2021-2025 $300,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC OPERATIONS - VARIOUS PAVEMENT MARKING & OTHER TRAFFIC CONTROL DEVICES CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC OPERATIONS - VARIOUS PAVEMENT MARKING & OTHER TRAFFIC CONTROL DEVICES CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC OPERATIONS - VARIOUS PAVEMENT MARKING & OTHER TRAFFIC CONTROL DEVICES CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - SIGNAL DESIGN P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 206 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF TRAFFIC - SIGNAL DESIGN Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $300,000 1 2021-2025 $400,000 1 2020 $400,000 1 2021-2025 $400,000 1 2020 $400,000 1 2021-2025 $250,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - TRAFFIC STUDIES P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - TRAFFIC STUDIES P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - TRAFFIC STUDIES P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - TRAFFIC STUDIES P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - VARIOUS ELECTRICAL DESIGN P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 207 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF TRAFFIC - VARIOUS ELECTRICAL PROJECT MANAGEMENT Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $250,000 1 2020 $400,000 3 2020 $200,000 3 2020 $600,000 3 2021-2025 $1,000,000 1 2021-2025 $3,700,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC/ELECTRICAL - VARIOUS ITS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF ELECTRICAL - VARIOUS PUMP STATIONS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF ELECTRICAL - VARIOUS PUMP STATIONS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 208 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - ROADWAYS Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,250,000 2 2020 $2,750,000 1 2021-2025 $1,000,000 1 2020 $2,500,000 1 2021-2025 $3,250,000 1 2020 $2,000,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - ROADWAYS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - ROADWAYS & VALUE ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - ROADWAYS & VALUE ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 209 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF DESIGN - PLAN PREPARATION Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $750,000 3 2020 $500,000 1 2021-2025 $675,000 3 2020 $1,000,000 1 2020 $3,000,000 3 2020 $4,000,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - PLAN PREPARATION P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - PROJECT SUPPORT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - WASTE ASSESSMENT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - WASTE ASSESMENT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - WASTE ASSESSMENT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 210 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF DESIGN - WASTE ASSESMENT Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $1,500,000 3 2021-2025 $250,000 3 2020 $500,000 1 2021-2025 $2,000,000 3 2020 $1,000,000 2 2021-2025 $250,000 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VALUE ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - PLAN PREPARATION/ VALUE ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS SUBSURFACE UTILITY ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS SUBSURFACE UTILITY ENGINEERING P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS SUE P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 211 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF DESIGN - VARIOUS SUE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $4,750,000 1 2021-2025 $1,000,000 1 2020 $5,000,000 1 2021-2025 $500,000 3 2020 $500,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PROJECT SUPPORT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF DESIGN - VARIOUS PROJECT SUPPORT P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - OVERHEAD SIGN STRUCTURE & HIGH MAST TOWER STRUCTURAL INSPECTIONS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF TRAFFIC - OVERHEAD SIGN STRUCTURE & HIGH MAST TOWER STRUCTURAL INSPECTIONS P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 1 - 212 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF MAINTENANCE - VARIOUS BRIDGE INSPECTIONS Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $350,000 3 2020 $700,000 2 2020 $800,000 1 2021-2025 $1,000,000 1 2020 $250,000 1 2020 $750,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - TRAFFIC COUNTS/CRASH ANALYSIS P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF PROGRAMMING - TRAFFIC COUNTS/CRASH ANALYSIS P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF MATERIALS - VARIOUS QA FOR AGGREGATE/HMA/PCC P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - PROJECT MANAGERS CONSULTANT P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - PROJECT MANAGERS CONSULTANT P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 1 - 213 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location BUREAU OF LAND ACQUISITION - VARIOUS PE ROW LAND SURVEYING SERVICES Improvements TAMP Category P.E. (ROW) Est. Cost City MYP Years Past Current $500,000 1 2020 $250,000 1 2021-2025 $500,000 1 2021-2025 $1,250,000 1 2020 $500,000 1 2020 $1,750,000 2 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - VARIOUS PE ROW P.E. (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - VARIOUS PE ROW P.E. (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - VARIOUS PE ROW LAND SURVEYING SERVICES P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS BUREAU OF LAND ACQUISITION - VARIOUS PE ROW P.E. (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS LOCAL ROADS CONSULTANT P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 1 - 214 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 1 State Highways DISTRICT-WIDE Route / Street VARIOUS Location LOCAL ROADS CONSULTANT Improvements TAMP Category P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 1 - 215 Est. Cost City MYP Years Past Current $2,500,000 2 2021-2025 DISTRICT 1 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street US 30 Location RIDGELAND AVE TO CENTRAL AVE Improvements TAMP Category LIGHTING Est. Cost City MYP Years Past Current $906,000 MATTESON 7 2021-2025 $7,000,000 CHICAGO 1 2020 $1,000,000 ORLAND PARK 4 2020 $1,168,000 CRESTWOOD 5 2020 MATTESON 5 2021-2025 LINCOLN HWY MISCELLANEOUS IMPROVEMENTS US 41 GRAND AVE TO HOLLYWOOD AVE P.E. (PHASE I) LAKE SHORE DR REHABILITATION - PAVEMENTS ILL 7 WOLF RD TO US 45 (LAGRANGE RD) P.E. (PHASE II) 143RD ST REHABILITATION - PAVEMENTS ILL 50 128TH ST TO 143RD ST ILL 83 CICERO AVE INTERSECTION IMPROVEMENT LIGHTING SIDEWALKS LANDSCAPING MISCELLANEOUS IMPROVEMENTS ILL 50 N OF 205TH ST TO US 30 (LINCOLN HWY) LIGHTING CICERO AVE MISCELLANEOUS IMPROVEMENTS 1 - 216 $155,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street ILL 53 NERGE RD ROHLWING RD Location NERGE RD: MITCHELL TRAIL TO DEVON AVE; ROHLWING RD: S OF HUNTINGTON DR TO N OF DEVON AVE Miles = 0.83 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $1,200,000 ELK GROVE VILLAGE 1 2020 $80,000 ELK GROVE VILLAGE 1 2020 $32,000 SCHAUMBURG 1 2020 MELROSE PARK 3 2021-2025 MELROSE PARK 3 2020 REHABILITATION - PAVEMENTS ILL 53 NERGE RD ROHLWING RD NERGE RD:MITCHELL TRAIL TO DEVON AVE; ROHLWING RD:S OF HUNTINGTON DR TO N OF DEVON AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS ILL 62 PLUM GROVE RD TO WEST OF ILL 53 P.E. (PHASE II) ALGONQUIN RD RECONSTRUCTION - PAVEMENTS 9TH AVE AT SILVER CREEK BRIDGE REPLACEMENT $1,760,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 17TH AVE AT SILVER CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 217 $1,750,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 17TH AVE Location AT SILVER CREEK Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $140,000 MELROSE PARK 3 2020 $940,000 SCHILLER PARK 1 2021-2025 $88,000 SCHILLER PARK 1 2021-2025 $315,000 BEDFORD PARK 4 2020 $100,000 BEDFORD PARK 4 2021-2025 CHICAGO 2 2020 RECONSTRUCTION - BRIDGES 25TH AVE LAWRENCE AVE TO WAVELAND AVE Miles = 1.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS 25TH AVE LAWRENCE AVE TO WAVELAND AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 71ST ST AT ILL 43 (HARLEM AVE) CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 71ST ST AT SAYRE AVE CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 71ST ST STONY ISLAND AVE TO JEFFERY BLVD LANDSCAPING MISCELLANEOUS IMPROVEMENTS 1 - 218 $1,530,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 71ST ST Location STONY ISLAND AVE TO JEFFERY BLVD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $170,000 CHICAGO 2 2020 $980,000 TINLEY PARK 8 2020 $67,000 TINLEY PARK 5 2020 JUSTICE 1 2020 CHICAGO RIDGE 2 2020 MISCELLANEOUS IMPROVEMENTS 84TH AVE 159TH ST TO 171ST ST Miles = 1.52 DESIGNED OVERLAY REHABILITATION - PAVEMENTS 84TH AVE 159TH ST TO 171ST ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 88TH AVE / CORK AVE ARCHER RD TO 81ST ST Miles = 0.38 RECONSTRUCTION $24,450,000 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS 111TH ST RIDGELAND AVE TO CENTRAL AVE Miles = 1.01 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 219 $523,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 111TH ST Location RIDGELAND AVE TO CENTRAL AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $42,000 CHICAGO RIDGE 2 2020 $53,000 PALOS PARK 5 2020 $613,000 PALOS PARK 7 2021-2025 $53,000 PALOS PARK 7 2021-2025 $111,000 PALOS HEIGHTS 1 2020 $1,530,000 PALOS HEIGHTS 4 2021-2025 REHABILITATION - PAVEMENTS 123RD ST 86TH AVE 123RD ST: S 87TH AVE TO ILL 7; 86TH AVE: 122ND PL TO ILL 7 P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 123RD ST 86TH AVE 123RD ST: S 87TH AVE TO ILL 7; 86TH AVE: 122ND PL TO ILL 7 CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 123RD ST 86TH AVE 123RD ST: S 87TH AVE TO ILL 7; 86TH AVE: 122ND PL TO ILL 7 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 123RD ST 76TH AVE TO HARLEM AVE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS 123RD ST 76TH AVE TO HARLEM AVE Miles = 0.50 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 220 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 123RD ST Location 76TH AVE TO HARLEM AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $184,000 PALOS HEIGHTS 4 2021-2025 $240,000 CALUMET PARK 5 2021-2025 $12,000 CALUMET PARK 5 2021-2025 $880,000 LEMONT 5 2020 $120,000 LEMONT 5 2020 ALSIP 4 2021-2025 RECONSTRUCTION - PAVEMENTS 124TH ST ASHLAND AVE TO HALSTED ST LIGHTING MISCELLANEOUS IMPROVEMENTS 124TH ST ASHLAND AVE TO HALSTED ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 131ST ST DERBY RD TO BELL RD BIKEWAY MISCELLANEOUS IMPROVEMENTS 131ST ST DERBY RD TO BELL RD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 131ST ST PULASKI RD TO KEDZIE AVE Miles = 0.99 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 221 $4,656,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 131ST ST Location PULASKI RD TO KEDZIE AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $240,000 ALSIP 4 2021-2025 $940,000 CRESTWOOD 3 2020 $132,000 CRESTWOOD 3 2020 ORLAND PARK 5 2020 $190,000 SOUTH HOLLAND PHOENIX 5 2021-2025 $14,000 SOUTH HOLLAND PHOENIX 5 2021-2025 RECONSTRUCTION - PAVEMENTS 135TH ST LARAMIE BLVD TO CICERO AVE BIKEWAY MISCELLANEOUS IMPROVEMENTS 135TH ST LARAMIE BLVD TO CICERO AVE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 151ST ST WEST AVE TO US 45 (LAGRANGE RD) Miles = 0.50 RECONSTRUCTION $6,460,000 RECONSTRUCTION - PAVEMENTS 154TH ST 9TH AVE TO STATE ST Miles = 0.37 STANDARD OVERLAY REHABILITATION - PAVEMENTS 154TH ST 9TH AVE TO STATE ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 222 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 171ST ST Location PARK AVE TO ASHLAND AVE Improvements TAMP Category LAND ACQUISITION Est. Cost City MYP Years Past Current $70,000 EAST HAZEL CREST 3 2020 $500,000 SOUTH HOLLAND THORNTON 2 2020 $54,000 SOUTH HOLLAND THORNTON 2 2020 $545,000 HOMEWOOD 1 2020 $4,000,000 GLENWOOD 8 2021-2025 RECONSTRUCTION - PAVEMENTS 172ND ST WESTVIEW AVE W ARMORY DR 172ND ST: S HALSTED ST TO WESTVIEW AVE; WESTVIEW AVE: 172ND ST TO W ARMORY DR; W ARMORY DR: WESTVIEW AVE TO VINCENNES AVE Miles = 1.13 STANDARD OVERLAY REHABILITATION - PAVEMENTS 172ND ST WESTVIEW AVE W ARMORY DR 172ND ST: S HALSTED ST TO WESTVIEW AVE; WESTVIEW AVE: 172ND ST TO W ARMORY DR; W ARMORY DR: WESTVIEW AVE TO VINCENNES AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 175TH ST ASHLAND AVE TO HALSTED ST Miles = 0.99 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 187TH ST AT CHICAGO HEIGHTS-GLENWOOD RD INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 1 - 223 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street 187TH ST Location AT CHICAGO HEIGHTS-GLENWOOD RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $210,000 GLENWOOD 8 2021-2025 $1,276,000 INDIAN HEAD PARK 1 2021-2025 $134,000 INDIAN HEAD PARK 1 2021-2025 $3,222,000 MORTON GROVE 5 2020 $247,000 MORTON GROVE 5 2020 CICERO 3 2020 MISCELLANEOUS IMPROVEMENTS ACACIA DR WOLF RD TO WOLF RD Miles = 0.47 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS ACACIA DR WOLF RD TO WOLF RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS AUSTIN AVE LINCOLN AVE TO OAKTON ST Miles = 0.61 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS AUSTIN AVE LINCOLN AVE TO OAKTON ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS AUSTIN BLVD CERMAK RD TO 29TH ST Miles = 0.80 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 224 $1,651,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street AUSTIN BLVD Location CERMAK RD TO 29TH ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $149,000 CICERO 3 2020 WESTCHESTER 2 2021-2025 $68,000 ELK GROVE VILLAGE 4 2020 $520,000 ELK GROVE VILLAGE 4 2020 $40,000 ELK GROVE VILLAGE 4 2020 MELROSE PARK 1 2020 REHABILITATION - PAVEMENTS BALMORAL AVE ROOSEVELT RD TO CANTERBURY ST Miles = 0.50 RECONSTRUCTION $1,650,000 RECONSTRUCTION - PAVEMENTS BRICKVALE DR AT WILLOW CREEK P.E. (PHASE II) RECONSTRUCTION - BRIDGES BRICKVALE DR AT WILLOW CREEK CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES BRICKVALE DR AT WILLOW CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES BROADWAY AVE ILL 64 TO DIVISION ST Miles = 0.51 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 225 $754,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street BROADWAY AVE Location ILL 64 TO DIVISION ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $72,000 MELROSE PARK 1 2020 $1,200,000 MELROSE PARK 3 2020 $96,000 MELROSE PARK 3 2020 $1,570,000 BROOKFIELD 4 2020 $96,000 BROOKFIELD 4 2020 $68,000 FLOSSMOOR 1 2020 REHABILITATION - PAVEMENTS BROADWAY ST / AT SILVER CREEK BRIDGE REPLACEMENT 19TH AVE RECONSTRUCTION - BRIDGES BROADWAY ST / AT SILVER CREEK CONSTRUCTION ENGINEERING 19TH AVE RECONSTRUCTION - BRIDGES BROOKFIELD AVE AT SALT CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES BROOKFIELD AVE AT SALT CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES BROOKWOOD DR AT BUTTERFIELD RD P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES 1 - 226 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street BURNHAM AVE Location SIBLEY BLVD TO E 154TH ST Improvements TAMP Category LIGHTING Est. Cost City MYP Years Past Current $546,000 CALUMET CITY 7 2020 $38,000 CALUMET CITY 7 2020 $14,400,000 CHICAGO 1 2020 $1,600,000 CHICAGO 1 2020 $2,991,000 WESTERN SPRINGS 3 2020 $251,000 WESTERN SPRINGS 3 2020 MISCELLANEOUS IMPROVEMENTS BURNHAM AVE SIBLEY BLVD TO E 154TH ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS CANAL ST VIADUCT ADAMS ST TO MADISON ST BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CANAL ST VIADUCT ADAMS ST TO MADISON ST CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES CENTRAL AVE BURLINGTON AVE TO 47TH ST Miles = 0.27 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CENTRAL AVE BURLINGTON AVE TO 47TH ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 227 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street CENTRAL AVE Location GREEN BAY RD TO SHERIDAN RD Miles = 1.10 Improvements TAMP Category RECONSTRUCTION Est. Cost City MYP Years Past Current $7,190,000 WILMETTE 3 2020 $605,000 WILMETTE 3 2020 $91,000 MATTESON 5 2021-2025 $189,000 MATTESON 8 2021-2025 $2,300,000 MATTESON 8 2021-2025 $5,500,000 EVANSTON 3 2021-2025 RECONSTRUCTION - PAVEMENTS CENTRAL AVE GREEN BAY RD TO SHERIDAN RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS CENTRAL AVE US 30 (LINCOLN HWY) TO CN RR P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS CENTRAL AVE US 30 (LINCOLN HWY) TO CN RR P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS CENTRAL AVE US 30 (LINCOLN HWY) TO CN RR Miles = 1.00 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CENTRAL ST AT N SHORE CHANNEL BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 228 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street CENTRAL ST Location AT N SHORE CHANNEL Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $440,000 EVANSTON 3 2021-2025 $1,200,000 WINNETKA 4 2020 $96,000 WINNETKA 4 2020 $3,800,000 LINCOLNWOOD 3 2020 $200,000 LINCOLNWOOD 3 2020 $636,000 BLUE ISLAND 2 2020 RECONSTRUCTION - BRIDGES CHERRY ST AT METRA / UP RR BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CHERRY ST AT METRA / UP RR CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES DEVON AVE LINCOLN AVE TO MCCORMICK BLVD LANDSCAPING MISCELLANEOUS IMPROVEMENTS DEVON AVE LINCOLN AVE TO MCCORMICK BLVD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS DIVISION ST VERMONT ST TO BROADWAY ST Miles = 0.34 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 229 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street DIVISION ST Location VERMONT ST TO BROADWAY ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $76,000 BLUE ISLAND 2 2020 WILMETTE 1 2021-2025 WILMETTE 1 2021-2025 $1,430,000 RIVERDALE 9 2021-2025 $97,000 RIVERDALE 9 2021-2025 REHABILITATION - PAVEMENTS EAST LAKE AVE AT N BRANCH CHICAGO RIVER BRIDGE REPLACEMENT $4,300,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES EAST LAKE AVE AT N BRANCH CHICAGO RIVER CONSTRUCTION ENGINEERING $336,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES FORESTVIEW AVE 134TH ST HALSTED ST TO S PERRY AVE Miles = 0.85 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS FORESTVIEW AVE HALSTED ST TO S PERRY AVE CONSTRUCTION ENGINEERING 134TH ST RECONSTRUCTION - PAVEMENTS 1 - 230 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street GLADSTONE ST Location AT ADDISON CREEK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $700,000 WESTCHESTER 4 2021-2025 $56,000 WESTCHESTER 4 2021-2025 $2,909,000 WESTERN SPRINGS 1 2020 $262,000 WESTERN SPRINGS 1 2020 $4,321,000 NILES CHICAGO 6 2020 $343,000 NILES CHICAGO 6 2020 RECONSTRUCTION - BRIDGES GLADSTONE ST AT ADDISON CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES GRAND AVE PEDESTRIAN OVERPASS OVER BNSF RR BRIDGE (NEW) MISCELLANEOUS IMPROVEMENTS GRAND AVE PEDESTRIAN OVERPASS OVER BNSF RR CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS HOWARD ST MILWAUKEE AVE TO LEHIGH AVE LIGHTING MISCELLANEOUS IMPROVEMENTS HOWARD ST MILWAUKEE AVE TO LEHIGH AVE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 231 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street JOE ORR RD Location BURNHAM AVE TO INDIANA STATE LINE Miles = 0.26 Improvements TAMP Category NEW CONSTRUCTION Est. Cost City MYP Years Past Current $2,042,000 LYNWOOD 18 2021-2025 MERRIONETTE PARK 1 2020 $680,000 KENILWORTH 1 2020 $38,000 KENILWORTH 1 2020 $1,599,000 ARLINGTON HEIGHTS 1 2020 $128,000 ARLINGTON HEIGHTS 1 2020 INITIAL CONSTRUCTION - PAVEMENTS KEDZIE AVE AT 119TH ST INTERSECTION RECONSTN $70,000 MISCELLANEOUS IMPROVEMENTS KENILWORTH AVE GREEN BAY RD TO SHERIDAN RD Miles = 0.61 STANDARD OVERLAY REHABILITATION - PAVEMENTS KENILWORTH AVE GREEN BAY RD TO SHERIDAN RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS KENSINGTON RD DRYDEN PL TO REGENCY DR W Miles = 1.00 STANDARD OVERLAY REHABILITATION - PAVEMENTS KENSINGTON RD DRYDEN PL TO REGENCY DR W CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 232 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street LAKE KATHERINE DR Location ILL 83 TO CAL SAG TRAIL Improvements TAMP Category PARKING (NEW) Est. Cost City MYP Years Past Current $634,000 PALOS HEIGHTS 1 2021-2025 $76,000 PALOS HEIGHTS 1 2021-2025 OAK PARK 3 2020 $140,000 MELROSE PARK 5 2021-2025 $13,000 MELROSE PARK 5 2021-2025 ELK GROVE VILLAGE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS LAKE KATHERINE DR ILL 83 TO CAL SAG TRAIL CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS LAKE ST ILL 43 (HARLEM AVE) TO EUCLID AVE Miles = 0.70 RECONSTRUCTION $10,162,000 RECONSTRUCTION - PAVEMENTS LAKE ST AT BROADWAY AVE (N 19TH AVE) TRAF SIGNAL REPLACEMENT MISCELLANEOUS IMPROVEMENTS LAKE ST AT BROADWAY AVE (N 19TH AVE) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS LEICESTER RD AT LAKE COSMAN P.E. (PHASE II) WELLINGTON AVE RECONSTRUCTION - BRIDGES 1 - 233 $120,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street LEICESTER RD Location AT LAKE COSMAN Improvements TAMP Category CULVERT REPLACEMENT Est. Cost City MYP Years Past Current $2,000,000 ELK GROVE VILLAGE 1 2021-2025 $160,000 ELK GROVE VILLAGE 1 2021-2025 $6,480,000 CHICAGO 4 2020 $720,000 CHICAGO 4 2020 CHICAGO HEIGHTS 8 2021-2025 WELLINGTON AVE RECONSTRUCTION - BRIDGES LEICESTER RD AT LAKE COSMAN CONSTRUCTION ENGINEERING WELLINGTON AVE RECONSTRUCTION - BRIDGES LINCOLN AVE BELMONT AVE LINCOLN AVE: 0.7 MI N OF BELMONT AVE TO WELLINGTON AVE; BELMONT AVE: ASHLAND AVE TO SOUTHPORT AVE LANDSCAPING MISCELLANEOUS IMPROVEMENTS LINCOLN AVE BELMONT AVE LINCOLN AVE: 0.7 MI N OF BELMONT AVE TO WELLINGTON AVE; BELMONT AVE: ASHLAND AVE TO SOUTHPORT AVE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS MAIN ST BUTLER ST EAST END AVE TO 21ST ST Miles = 0.42 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 234 $1,620,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street MAIN ST Location EAST END AVE TO 21ST ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $170,000 CHICAGO HEIGHTS 8 2021-2025 $1,600,000 LEMONT 5 2020 $192,000 LEMONT 5 2020 $364,000 MATTESON 8 2021-2025 LEMONT 4 2020 CRESTWOOD MIDLOTHIAN 2 2021-2025 BUTLER ST RECONSTRUCTION - PAVEMENTS MAIN ST ILLINOIS ST TO ILL 83 BIKEWAY BICYCLE SIDE PATH MISCELLANEOUS IMPROVEMENTS MAIN ST ILLINOIS ST TO ILL 83 CONSTRUCTION ENGINEERING BICYCLE SIDE PATH MISCELLANEOUS IMPROVEMENTS MATTESON AVE AT ILL 50 (CICERO AVE) TRAF SIGNAL INSTALLATION MISCELLANEOUS IMPROVEMENTS MCCARTHY RD ILLINOIS ST TO WALKER RD P.E. (PHASE II) $96,000 MISCELLANEOUS IMPROVEMENTS MIDLOTHIAN CENTRAL AVE TO PULASKI RD BIKEWAY TURNPIKE MISCELLANEOUS IMPROVEMENTS 1 - 235 $1,650,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street NATIONAL PKWY Location GOLF RD TO HIGGINS RD Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $600,000 SCHAUMBURG 1 2020 $200,000 SCHAUMBURG 1 2020 $827,000 SCHILLER PARK 4 2020 $79,000 SCHILLER PARK 4 2020 $420,000 NORTHLAKE 1 2020 $34,000 NORTHLAKE 1 2020 RECONSTRUCTION - PAVEMENTS NATIONAL PKWY GOLF RD TO HIGGINS RD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS OLD RIVER RD AT ILL 19 (IRVING PARK RD) INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS OLD RIVER RD AT ILL 19 (IRVING PARK RD) CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS PRATER AVE AT ADDISON CREEK BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES PRATER AVE AT ADDISON CREEK CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES 1 - 236 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street PROVISO DR Location RR YARD ENT TO WOLF RD Miles = 0.52 Improvements TAMP Category RECONSTRUCTION Est. Cost City MYP Years Past Current $2,000,000 BERKELEY 1 2021-2025 $268,000 BERKELEY 1 2021-2025 $966,000 COUNTRY CLUB HILLS 1 2020 $27,000 COUNTRY CLUB HILLS 1 2020 BRIDGEVIEW JUSTICE HICKORY HILLS 15 2021-2025 PALOS HILLS 2 2021-2025 RECONSTRUCTION - PAVEMENTS PROVISO DR RR YARD ENT TO WOLF RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS PULASKI RD AT 183RD ST LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS PULASKI RD AT 183RD ST P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS ROBERTS RD 79TH ST TO 87TH ST P.E. (PHASE I) P.E. (PHASE II) $5,000 MISCELLANEOUS IMPROVEMENTS ROBERTS RD AT 111TH ST INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 1 - 237 $1,300,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street ROBERTS RD Location AT 111TH ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $80,000 PALOS HILLS 2 2021-2025 $480,000 CHICAGO 1 2021-2025 $13,079,000 CHICAGO 1 2021-2025 $159,000 RICHTON PARK 1 2021-2025 $19,000 RICHTON PARK 1 2021-2025 MISCELLANEOUS IMPROVEMENTS S BUTLER DR S STONY ISLAND AVE S BUTLER DR: S DOTY AVE TO S STONY ISLAND AVE; S STONY ISLAND AVE: S BUTLER DR TO 130TH ST P.E. (PHASE II) ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS S BUTLER DR S STONY ISLAND AVE S BUTLER DR: S DOTY AVE TO S STONY ISLAND AVE; S STONY ISLAND AVE: S BUTLER DR TO 130TH ST Miles = 1.15 RECONSTRUCTION ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS SAUK TRAIL RICHTON SQUARE RD TO CENTRAL PARK AVE Miles = 0.21 STANDARD OVERLAY REHABILITATION - PAVEMENTS SAUK TRAIL RICHTON SQUARE RD TO CENTRAL PARK AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 238 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street SCHOENBECK RD Location CAMP MCDONALD RD TO WILLOW RD Improvements TAMP Category SIDEWALKS Est. Cost City MYP Years Past Current $150,000 PROSPECT HEIGHTS 1 2020 $2,787,000 PARK FOREST 1 2020 $223,000 PARK FOREST 1 2020 $448,000 STEGER 1 2020 $45,000 STEGER 1 2020 CHICAGO 1 2020 MISCELLANEOUS IMPROVEMENTS SHABBONA DR SAUK TRAIL TO INDIANWOOD BLVD Miles = 0.86 STANDARD OVERLAY REHABILITATION - PAVEMENTS SHABBONA DR SAUK TRAIL TO INDIANWOOD BLVD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS UNION AVE E 30TH ST TO E STEGER RD Miles = 0.52 STANDARD OVERLAY REHABILITATION - PAVEMENTS UNION AVE E 30TH ST TO E STEGER RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN CHICAGO MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 1 - 239 $50,000,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL STREET ADA RAMPS Improvements TAMP Category SIDEWALKS Est. Cost City MYP Years Past Current $1,800,000 CHICAGO 2 2021-2025 $200,000 CHICAGO 2 2021-2025 $7,200,000 CHICAGO 4 2020 $800,000 CHICAGO 4 2020 $7,200,000 CHICAGO 4 2020 $800,000 CHICAGO 4 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ARTERIAL STREET ADA RAMPS CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ARTERIAL ST RESURFACING (#87 NORTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#87 NORTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#88 CENTRAL) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#88 CENTRAL) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 240 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL ST RESURFACING (#89 SOUTH) Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $7,200,000 CHICAGO 4 2020 $800,000 CHICAGO 4 2020 $7,200,000 CHICAGO 4 2020 $800,000 CHICAGO 4 2020 $7,200,000 CHICAGO 3 2021-2025 $800,000 CHICAGO 3 2021-2025 REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#89 SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#90 FAR SOUTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#90 FAR SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#91 NORTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#91 NORTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 241 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL ST RESURFACING (#92 CENTRAL) Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $7,200,000 CHICAGO 3 2021-2025 $800,000 CHICAGO 3 2021-2025 $7,200,000 CHICAGO 3 2021-2025 $800,000 CHICAGO 3 2021-2025 $7,200,000 CHICAGO 3 2021-2025 $800,000 CHICAGO 3 2021-2025 REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#92 CENTRAL) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#93 SOUTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#93 SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#94 FAR SOUTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#94 FAR SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 242 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL ST RESURFACING (#95 NORTH) Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $7,200,000 CHICAGO 2 2021-2025 $800,000 CHICAGO 2 2021-2025 $7,200,000 CHICAGO 2 2021-2025 $800,000 CHICAGO 2 2021-2025 $7,200,000 CHICAGO 2 2021-2025 $800,000 CHICAGO 2 2021-2025 REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#95 NORTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#96 CENTRAL) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#96 CENTRAL) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#97 SOUTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#97 SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 243 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL ST RESURFACING (#98 FAR SOUTH) Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $7,200,000 CHICAGO 2 2021-2025 $800,000 CHICAGO 2 2021-2025 $7,200,000 CHICAGO 1 2021-2025 $800,000 CHICAGO 1 2021-2025 $7,200,000 CHICAGO 1 2021-2025 $800,000 CHICAGO 1 2021-2025 REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#98 FAR SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#99 NORTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#99 NORTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#100 CENTRAL) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#100 CENTRAL) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 244 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location ARTERIAL ST RESURFACING (#101 SOUTH) Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $7,200,000 CHICAGO 1 2021-2025 $800,000 CHICAGO 1 2021-2025 $7,200,000 CHICAGO 1 2021-2025 $800,000 CHICAGO 1 2021-2025 $5,760,000 CHICAGO 3 2021-2025 $640,000 CHICAGO 3 2021-2025 REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#101 SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#102 FAR SOUTH) STANDARD OVERLAY REHABILITATION - PAVEMENTS VARIOUS ARTERIAL ST RESURFACING (#102 FAR SOUTH) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS BRIDGE INSPECTION SERVICES #2 P.E. (BRIDGE INSPECTION) MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE INSPECTION SERVICES #2 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 245 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location BRIDGE INSPECTION SERVICES #3 Improvements TAMP Category P.E. (BRIDGE INSPECTION) Est. Cost City MYP Years Past Current $5,760,000 CHICAGO 1 2021-2025 $640,000 CHICAGO 1 2021-2025 $1,080,000 CHICAGO 5 2020 $120,000 CHICAGO 5 2020 $1,080,000 CHICAGO 5 2020 $120,000 CHICAGO 5 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE INSPECTION SERVICES #3 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #11 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #11 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #12 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #12 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES 1 - 246 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location BRIDGE / VIADUCT PAINTING - PROJECT #13 Improvements TAMP Category BRIDGE PAINTING Est. Cost City MYP Years Past Current $1,080,000 CHICAGO 4 2021-2025 $120,000 CHICAGO 4 2021-2025 $1,080,000 CHICAGO 4 2021-2025 $120,000 CHICAGO 4 2021-2025 $1,080,000 CHICAGO 3 2021-2025 $120,000 CHICAGO 3 2021-2025 PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #13 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #14 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #14 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #15 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #15 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES 1 - 247 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VARIOUS Location BRIDGE / VIADUCT PAINTING - PROJECT #16 Improvements TAMP Category BRIDGE PAINTING Est. Cost City MYP Years Past Current $1,080,000 CHICAGO 3 2021-2025 $120,000 CHICAGO 3 2021-2025 $1,080,000 CHICAGO 2 2021-2025 $120,000 CHICAGO 2 2021-2025 $1,080,000 CHICAGO 2 2021-2025 $120,000 CHICAGO 2 2021-2025 PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #16 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #17 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #17 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #18 BRIDGE PAINTING PRESERVATION - BRIDGES VARIOUS BRIDGE / VIADUCT PAINTING - PROJECT #18 CONSTRUCTION ENGINEERING PRESERVATION - BRIDGES 1 - 248 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street VINCENNES RD Location OLD VINCENNES RD (152ND ST) TO US 6 Miles = 0.97 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $186,000 SOUTH HOLLAND 5 2021-2025 $13,000 SOUTH HOLLAND 5 2021-2025 $1,080,000 SOUTH HOLLAND 2 2020 $76,000 SOUTH HOLLAND 2 2020 $2,670,000 MAYWOOD 1 2021-2025 $206,000 MAYWOOD 1 2021-2025 REHABILITATION - PAVEMENTS VINCENNES RD OLD VINCENNES RD (152ND ST) TO US 6 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VINCENNES RD US 6 (162ND ST) TO ARMORY DR Miles = 1.12 STANDARD OVERLAY REHABILITATION - PAVEMENTS VINCENNES RD US 6 (162ND ST) TO ARMORY DR CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS WASHINGTON BLVD WCL OF MAYWOOD TO 1ST AVE Miles = 1.30 STANDARD OVERLAY REHABILITATION - PAVEMENTS WASHINGTON BLVD WCL OF MAYWOOD TO 1ST AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 249 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street WENTWORTH AVE Location BERNICE RD TO RIDGE RD Miles = 1.06 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $720,000 LANSING 2 2020 $54,000 LANSING 2 2020 $3,134,000 WINNETKA 10 2021-2025 $219,000 WINNETKA 10 2021-2025 $200,000 ORLAND PARK 5 2020 $6,000 ORLAND PARK 5 2020 REHABILITATION - PAVEMENTS WENTWORTH AVE BERNICE RD TO RIDGE RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS WILLOW RD WINNETKA WCL TO PROVIDENT AVE Miles = 1.10 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS WILLOW RD WINNETKA WCL TO PROVIDENT AVE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS WOLF RD AT 183RD ST TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS WOLF RD AT 183RD ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 1 - 250 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways COOK COUNTY Route / Street WOODFIELD RD Location MEACHAM RD TO ILL 53 E FR RD Miles = 0.82 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 251 Est. Cost City MYP Years Past Current $6,400,000 SCHAUMBURG 5 2020 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street ILL 19 Location E OF EICKLEMANN DR TO RUSH ST IRVING PARK RD Improvements TAMP Category INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION Est. Cost City MYP Years Past Current $611,000 ITASCA 3 2020 $252,000 WOODRIDGE 1 2020 $778,000 WEST CHICAGO 3 2020 $1,640,000 DOWNERS GROVE OAK BROOK 7 2021-2025 $2,437,000 DOWNERS GROVE 2 2020 MISCELLANEOUS IMPROVEMENTS ILL 53 MULLIGAN DR TO HOBSON RD SIDEWALKS LINCOLN AVE MISCELLANEOUS IMPROVEMENTS ILL 59 W BRANCH DUPAGE W DUPAGE WOODS FOREST PRESERVE TO BLACKWELL FOREST PRESERVE BIKEWAY RIVER TRAIL MISCELLANEOUS IMPROVEMENTS 31ST ST HIGHLAND AVE TO MEYERS RD BIKEWAY MISCELLANEOUS IMPROVEMENTS 75TH ST LYMAN AVE TO S WILLIAMS ST Miles = 0.99 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS 1 - 252 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street 83RD ST Location ILL 53 TO JANES AVE Miles = 1.16 Improvements TAMP Category STANDARD OVERLAY Est. Cost City MYP Years Past Current $854,000 WOODRIDGE 1 2020 4 2021-2025 REHABILITATION - PAVEMENTS E BRANCH DUPAGE RIVER TRAIL MAPLE AVE TO MULLIGAN DR IN S LISLE & WOODRIDGE BIKEWAY $878,000 MISCELLANEOUS IMPROVEMENTS EASTERN AVE FLAGG CREEK AT HARRIS ST BRIDGE REPLACEMENT $191,000 CLARENDON HILLS 1 2021-2025 $14,000 CLARENDON HILLS 1 2021-2025 ITASCA HANOVER PARK ROSELLE 2 2020 PEDESTRIAN BRIDGE MISCELLANEOUS IMPROVEMENTS EASTERN AVE FLAGG CREEK AT HARRIS ST CONSTRUCTION ENGINEERING PEDESTRIAN BRIDGE MISCELLANEOUS IMPROVEMENTS ELGIN O'HARE WESTE ACCESS CORRIDOR AT LAKE ST (HANOVER PARK), ROSELLE RD (ROSELLE), PLUM GROVE RD (ROSELLE), W OF ILL 53/ROHLWING RD (ITASCA) LANDSCAPING MISCELLANEOUS IMPROVEMENTS 1 - 253 $167,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street EOLA RD ILLINOIS PRAIRIE Location N OF FERRY RD TO I-88 (RONALD REAGAN MEMORIAL TOLLWAY) Improvements TAMP Category BIKEWAY Est. Cost City MYP Years Past Current $1,653,000 4 2020 PATH MISCELLANEOUS IMPROVEMENTS GARY AVE GREAT WESTERN TRAIL (ST. CHARLES RD) TO ARMY TRAIL RD BIKEWAY $2,493,000 BLOOMINGDALE CAROL STREAM 1 2020 $260,000 BLOOMINGDALE CAROL STREAM 1 2020 1 2021-2025 2 2021-2025 MISCELLANEOUS IMPROVEMENTS GARY AVE GREAT WESTERN TRAIL (ST. CHARLES RD) TO ARMY TRAIL RD CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS GENEVA RD AT W BRANCH DUPAGE RIVER P.E. (PHASE II) $288,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES GENEVA RD AT W BRANCH DUPAGE RIVER BRIDGE REHABILITATION $3,600,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES 1 - 254 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street GENEVA RD Location AT W BRANCH DUPAGE RIVER Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $146,000 2 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES GREENBROOK BLVD LAKE ST TO ARLINGTON DR Miles = 0.61 RECONSTRUCTION $1,990,000 HANOVER PARK 20 2020 $392,000 CAROL STREAM 4 2021-2025 $3,783,000 WARRENVILLE 1 2021-2025 $299,000 WARRENVILLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS KUHN RD ARMY TRAIL RD TO 0.1 MI S OF LIES RD BIKEWAY MISCELLANEOUS IMPROVEMENTS MACK RD AT W BRANCH DUPAGE RIVER BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES MACK RD AT W BRANCH DUPAGE RIVER CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES 1 - 255 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street MACK RD Location ILL 59 TO MCKEE MARSH PARKING LOT IN BLACKWELL FOREST PRESERVE Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $200,000 WARRENVILLE 1 2020 $683,000 WARRENVILLE 2 2021-2025 $52,000 WARRENVILLE 2 2021-2025 $838,000 BENSENVILLE 17 2021-2025 $289,000 GLEN ELLYN 4 2020 LOMBARD 1 2021-2025 REHABILITATION - BRIDGES MACK RD ILL 59 TO MCKEE MARSH PARKING LOT IN BLACKWELL FOREST PRESERVE BIKEWAY MISCELLANEOUS IMPROVEMENTS MACK RD ILL 59 TO MCKEE MARSH PARKING LOT IN BLACKWELL FOREST PRESERVE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS MAIN ST CHURCH RD TO YORK RD Miles = 0.47 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS MAIN ST S OF LINDEN ST TO S OF PENNSYLVANIA AVE Miles = 0.40 STANDARD OVERLAY REHABILITATION - PAVEMENTS MAIN ST ST CHARLES TO WILSON RD Miles = 1.38 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 256 $1,377,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street N MAIN ST Location COLE AVE TO SEMINARY AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $29,000 WHEATON 1 2020 NAPERVILLE 1 2021-2025 $979,000 WEST CHICAGO 1 2020 $34,000 WEST CHICAGO 1 2020 GLEN ELLYN 1 2021-2025 REHABILITATION - PAVEMENTS NORTH AURORA RD FRONTENAC RD TO FAIRWAY DR Miles = 0.92 RECONSTRUCTION $11,700,000 RECONSTRUCTION - PAVEMENTS PRINCE CROSSING RD GENEVA RD TO NORTH AVE Miles = 1.79 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS PRINCE CROSSING RD GENEVA RD TO NORTH AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS PROSPECT AVE PENNSYLVANIA AVE MAIN ST CRESCENT BLVD PROSPECT AVE: PENNSYLVANIA AVE TO S OF DUANE ST; PENNSYLVANIA AVE: PROSPECT AVE TO PARK BLVD; MAIN ST: ANTHONY ST TO HILLSIDE AVE; CRESCENT BLVD: MAIN ST TO PARK BLVD Miles = 1.00 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 257 $864,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street RIVER TRAIL E BRANCH DUPAGE Location MAPLE AVE TO MULLIGAN DR IN S LISLE & WOODRIDGE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $155,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS S SCHMALE RD GUNDERSON DR S PRESIDENT ST S SCHMALE RD: N OF GUNDERSON DR TO MAIN PL; GUNDERSON DR: S SCHMALE RD TO S PRESIDENT ST; S PRESIDENT ST: GREAT WESTERN TRAIL TO GUNDERSON DR & COMMUNITY PK TO GENEVA RD BIKEWAY $1,021,000 CAROL STREAM 3 2020 $535,000 BLOOMINGDALE 3 2020 $52,000 1 2020 $360,000 1 2021-2025 MISCELLANEOUS IMPROVEMENTS SPRINGFIELD DR LAKE ST TO SCHICK RD Miles = 1.13 STANDARD OVERLAY REHABILITATION - PAVEMENTS TIMBER LN AT TRIB W BRANCH DUPAGE RIVER P.E. (PHASE II) RECONSTRUCTION - BRIDGES TIMBER LN AT TRIB W BRANCH DUPAGE RIVER CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 258 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street TIMBER LN Location AT TRIB W BRANCH DUPAGE RIVER Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $40,000 1 2021-2025 LISLE 7 2021-2025 WARRENVILLE 6 2020 LISLE 3 2021-2025 LISLE 3 2021-2025 RECONSTRUCTION - BRIDGES VARIOUS E BRANCH DUPAGE RIVER TRAIL - BENEDICTINE CONNECTOR BIKEWAY $2,410,000 MISCELLANEOUS IMPROVEMENTS WARRENVILLE RD BATAVIA RD RIVER RD WARRENVILLE RD: BEHRS CIRCLE DR E TO WINFIELD RD; BATAVIA RD: 0.1 MI S OF MAIN ST TO WARRENVILLE RD; RIVER RD: 0.1 MI N OF ROGERS AVE TO WARRENVILLE RD CHANNELIZATION $787,000 MISCELLANEOUS IMPROVEMENTS WARRENVILLE RD CH AT E BRANCH DUPAGE RIVER BRIDGE REPLACEMENT $3,900,000 3 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES WARRENVILLE RD CH AT E BRANCH DUPAGE RIVER CONSTRUCTION ENGINEERING $240,000 3 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 1 - 259 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DUPAGE COUNTY Route / Street WASHINGTON ST Location AT W BRANCH DUPAGE RIVER Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $6,194,000 NAPERVILLE 4 2020 $434,000 NAPERVILLE 4 2020 $960,000 WOODRIDGE 1 2020 $3,300,000 OAK BROOK ELMHURST 2 2021-2025 $182,000 OAK BROOK ELMHURST 2 2021-2025 RECONSTRUCTION - BRIDGES WASHINGTON ST AT W BRANCH DUPAGE RIVER CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES WOODWARD AVE WOODRIDGE NCL TO 75TH ST Miles = 0.40 STANDARD OVERLAY REHABILITATION - PAVEMENTS YORK RD HARGER RD YORK RD: BRUSH HILL RD TO HARGER RD; HARGER RD: I-88 RAMP (WB) TO YORK RD Miles = 0.42 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS YORK RD HARGER RD YORK RD: BRUSH HILL RD TO HARGER RD; HARGER RD: I-88 RAMP (WB) TO YORK RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 1 - 260 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways KANE COUNTY Route / Street ILL 38 STATE ST Location ILL 25 TO KIRK RD Miles = 1.25 Improvements TAMP Category RECONSTRUCTION Est. Cost City MYP Years Past Current $9,013,000 GENEVA 1 2021-2025 $1,133,000 ELBURN 1 2020 $71,000 ELBURN 1 2020 $1,600,000 SUGAR GROVE 4 2020 $63,000 SUGAR GROVE 4 2020 2 2020 RECONSTRUCTION - PAVEMENTS ANDERSON RD KESLINGER RD TO FREEDOM RD Miles = 0.01 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS ANDERSON RD KESLINGER RD TO FREEDOM RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS BLISS RD AT ILL 47 INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS BLISS RD AT ILL 47 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS COOMBS RD OVER DM&E RR LAND ACQUISITION INITIAL CONSTRUCTION - BRIDGES 1 - 261 $58,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways KANE COUNTY Route / Street COOMBS RD Location OVER DM&E RR Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $1,890,000 3 2020 $71,000 3 2020 $10,415,000 1 2021-2025 RECONSTRUCTION - BRIDGES COOMBS RD OVER DM&E RR CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES DAUBERMAN RD EXT US 30 TO GRANART RD Miles = 0.62 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS FARNSWORTH AVE AT INDIAN CREEK P.E. (PHASE II) $160,000 AURORA 1 2020 $1,400,000 AURORA 1 2021-2025 $120,000 AURORA 1 2021-2025 RECONSTRUCTION - BRIDGES FARNSWORTH AVE AT INDIAN CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES FRANSWORTH AVE AT INDIAN CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 1 - 262 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways KANE COUNTY Route / Street KIRK RD Location OVER UP RR 0.3 MI S OF ILL 38 (ROOSEVELT RD) Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $19,000,000 4 2021-2025 $608,000 4 2021-2025 RECONSTRUCTION - BRIDGES KIRK RD OVER UP RR 0.3 MI S OF ILL 38 (ROOSEVELT RD) CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES MAIN ST VAN NORTWICK AVE TO WATER ST Miles = 0.59 RECONSTRUCTION $7,400,000 BATAVIA 8 2020 $50,000 BATAVIA 8 2020 $83,000 AURORA 1 2020 $1,034,000 AURORA 3 2021-2025 RECONSTRUCTION - PAVEMENTS MAIN ST VAN NORTWICK AVE TO WATER ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS MONTGOMERY RD AT WAUBONSIE CREEK P.E. (PHASE II) RECONSTRUCTION - BRIDGES MONTGOMERY RD AT WAUBONSIE CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 263 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways KANE COUNTY Route / Street MONTGOMERY RD Location AT WAUBONSIE CREEK Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $83,000 AURORA 3 2021-2025 $1,500,000 2 2020 $120,000 2 2020 RECONSTRUCTION - BRIDGES MUIRHEAD RD OVER CN RR BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES MUIRHEAD RD OVER CN RR CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES PRAIRIE ST WILSON ST TO PINE ST Miles = 0.46 RECONSTRUCTION $1,669,000 BATAVIA 3 2021-2025 $188,000 BATAVIA 3 2021-2025 RECONSTRUCTION - PAVEMENTS PRAIRIE ST WILSON ST TO PINE ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 264 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street ATKINSON RD Location AT MIDDLEFORK N BRANCH 0.2 MI E OF I-94 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $450,000 GREEN OAKS 9 2021-2025 $40,000 GREEN OAKS 5 2021-2025 $142,000 HIGHLAND PARK 1 2020 $1,750,000 HIGHLAND PARK 1 2021-2025 $174,000 HIGHLAND PARK 1 2021-2025 WAUKEGAN 11 2021-2025 RECONSTRUCTION - BRIDGES ATKINSON RD AT MIDDLEFORK N BRANCH 0.2 MI E OF I-94 CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES BEECH ST AT RAVINE N OF BEECH LN P.E. (PHASE II) RECONSTRUCTION - BRIDGES BEECH ST AT RAVINE N OF BEECH LN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES BEECH ST AT RAVINE N OF BEECH LN CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES BELVIDERE ST OVER CNW RR & ILL 137 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 265 $3,810,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street BELVIDERE ST Location OVER CNW RR & ILL 137 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $240,000 WAUKEGAN 11 2021-2025 $1,951,000 METTAWA 7 2021-2025 $137,000 METTAWA 7 2021-2025 $3,176,000 BUFFALO GROVE 3 2021-2025 $413,000 BUFFALO GROVE 3 2021-2025 3 2021-2025 RECONSTRUCTION - BRIDGES BRADLEY RD RIVERWOODS BLVD I-94 TO ILL 60 Miles = 1.76 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS BRADLEY RD I-94 TO ILL 60 CONSTRUCTION ENGINEERING RIVERWOODS BLVD RECONSTRUCTION - PAVEMENTS BRANDYWYN LN PRAIRIE RD TO DEERFIELD PKWY Miles = 2.10 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS BRANDYWYN LN PRAIRIE RD TO DEERFIELD PKWY CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS CASEY RD US 45 TO ILL 20 (MILWAUKEE AVE) Miles = 2.25 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 266 $1,110,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street CASEY RD Location US 45 TO ILL 20 (MILWAUKEE AVE) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $88,000 3 2021-2025 RECONSTRUCTION - PAVEMENTS CENTRAL AVE AT UNNAMED RAVINE 0.1 MI W OF LAKE MICHIGAN BRIDGE REPLACEMENT $1,210,000 HIGHLAND PARK 4 2020 $116,000 HIGHLAND PARK 4 2020 $10,252,000 HIGHLAND PARK 4 2020 $760,000 HIGHLAND PARK 4 2020 RIVERWOODS 4 2021-2025 RECONSTRUCTION - BRIDGES CENTRAL AVE AT UNNAMED RAVINE 0.1 MI W OF LAKE MICHIGAN CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES CLAVEY RD AT SKOKIE DITCH BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CLAVEY RD AT SKOKIE DITCH CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES DEERFIELD RD MILWAUKEE AVE TO SAUNDERS RD Miles = 2.00 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 1 - 267 $24,000,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street DIVISION ST Location OVER METRA STATION / CN RR Improvements TAMP Category BRIDGE (NEW) Est. Cost City MYP Years Past Current $500,000 MUNDELEIN 2 2020 $945,000 NORTH CHICAGO 9 2021-2025 $95,000 NORTH CHICAGO 9 2021-2025 $1,505,000 LONG GROVE 4 2020 $144,000 LONG GROVE 4 2020 $2,519,000 LAKE FOREST 2 2020 INITIAL CONSTRUCTION - BRIDGES DUGDALE RD 14TH ST TO ARGONNE DR Miles = 0.61 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS DUGDALE RD 14TH ST TO ARGONNE DR CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS E CUBA RD S KRUEGER RD TO OLD MCHENRY RD Miles = 2.02 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS E CUBA RD S KRUEGER RD TO OLD MCHENRY RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS EVERETT RD AT ILL 43 (WAUKEGAN RD) CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 1 - 268 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street FISH LAKE RD Location NIPPERSINK RD TO ILL 120 Improvements TAMP Category INTERSECTION RECONSTN Est. Cost City MYP Years Past Current $1,364,000 VOLO 4 2021-2025 $96,000 VOLO 4 2021-2025 $88,000 LAKE BLUFF 1 2020 $8,800,000 HIGHLAND PARK 3 2020 $448,000 HIGHLAND PARK 3 2020 BARRINGTON 1 2020 RECONSTRUCTION - PAVEMENTS FISH LAKE RD NIPPERSINK RD TO ILL 120 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS GREEN BAY RD OVER UP RR N OF BATH & TENNIS CLUB RD P.E. (PHASE I) REHABILITATION - BRIDGES GREEN BAY RD CENTRAL AVE TO CLAVEY RD Miles = 1.99 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS GREEN BAY RD CENTRAL AVE TO CLAVEY RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS HART RD AT US 14 CHANNELIZATION INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 1 - 269 $6,441,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street HOOK DR Location ORCHARD LN TO NICOLE LN Improvements TAMP Category P.E. (PHASE II) Est. Cost City MYP Years Past Current $311,000 ROUND LAKE BEACH 1 2021-2025 $3,113,000 ROUND LAKE BEACH 1 2021-2025 $374,000 ROUND LAKE BEACH 1 2021-2025 $141,000 HIGHLAND PARK 1 2020 $1,750,000 HIGHLAND PARK 1 2021-2025 $174,000 HIGHLAND PARK 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS HOOK DR ORCHARD LN TO NICOLE LN Miles = 0.36 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS HOOK DR ORCHARD LN TO NICOLE LN CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS JUDSON AVE AT UNNAMED RAVINE 0.1 MI SE OF MARSHMAN ST P.E. (PHASE II) RECONSTRUCTION - BRIDGES JUDSON AVE AT UNNAMED RAVINE 0.1 MI SE OF MARSHMAN ST BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES JUDSON AVE AT UNNAMED RAVINE 0.1 MI SE OF MARSHMAN ST CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 1 - 270 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street LAKE RD Location AT UNNAMED RAVINE N OF WOODBINE LN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $1,400,000 LAKE FOREST 8 2021-2025 $148,000 LAKE FOREST 8 2021-2025 $300,000 ANTIOCH 17 2021-2025 $22,000 ANTIOCH 17 2021-2025 $3,839,000 BARRINGTON 3 2021-2025 $350,000 BARRINGTON 3 2021-2025 RECONSTRUCTION - BRIDGES LAKE RD AT UNNAMED RAVINE N OF WOODBINE LN CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES LAKE ST ST PETER ST TO ILL 83 (MAIN ST) Miles = 0.38 STANDARD OVERLAY REHABILITATION - PAVEMENTS LAKE ST ST PETER ST TO ILL 83 (MAIN ST) CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS LAKE ZURICH RD CITIZENS PARK DR TO US 14 INTERSECTION RECONSTN RECONSTRUCTION - PAVEMENTS LAKE ZURICH RD CITIZENS PARK DR TO US 14 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 271 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street LAKEVIEW PKWY Location CENTER DR TO FAIRWAY DR Miles = 0.70 Improvements TAMP Category STANDARD OVERLAY WIDENING EXISTING PAVEMENT Est. Cost City MYP Years Past Current $3,721,000 VERNON HILLS 8 2020 $363,000 VERNON HILLS 1 2020 $336,000 VERNON HILLS 8 2020 $102,000 LONG GROVE 1 2020 $1,001,000 LONG GROVE 4 2021-2025 $96,000 LONG GROVE 4 2021-2025 REHABILITATION - PAVEMENTS LAKEVIEW PKWY CENTER DR TO FAIRWAY DR P.E. (PHASE II) REHABILITATION - PAVEMENTS LAKEVIEW PKWY CENTER DR TO FAIRWAY DR CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS N KRUEGER RD GILMER RD TO ILL 22 PRELIMINARY ENGINEERING RECONSTRUCTION - PAVEMENTS N KRUEGER RD GILMER RD TO ILL 22 Miles = 1.13 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS N KRUEGER RD GILMER RD TO ILL 22 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 272 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street NIPPERSINK BLVD Location OAK ST TO GRAND AVE Miles = 0.28 Improvements TAMP Category RECONSTRUCTION Est. Cost City MYP Years Past Current $1,873,000 FOX LAKE 1 2021-2025 $121,000 FOX LAKE 1 2021-2025 $2,500,000 4 2021-2025 $220,000 4 2021-2025 6 2021-2025 RECONSTRUCTION - PAVEMENTS NIPPERSINK BLVD OAK ST TO GRAND AVE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS OAK SPRING RD AT DES PLAINES RIVER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES OAK SPRING RD AT DES PLAINES RIVER CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES PARK AVE W AT SKOKIE DITCH BRIDGE REPLACEMENT $4,004,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 1 - 273 HIGHLAND PARK FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street PARK AVE W Location AT SKOKIE DITCH Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $320,000 HIGHLAND PARK 5 2021-2025 $124,000 LINCOLNSHIRE 1 2020 $650,000 LONG GROVE 4 2020 $52,000 LONG GROVE 4 2020 $2,890,000 LIBERTYVILLE 3 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES RIVERWOODS RD WESTMINSTER WAY RIVERWOODS RD: N OF BRAMPTON LN TO N OF SURREY LN; WESTMINSTER WAY: NW OF STORY BOOK LN TO 0.1 MI SE OF STORY BOOK LN BIKEWAY MISCELLANEOUS IMPROVEMENTS ROBERT PARKER AT BUFFALO CREEK BRIDGE REPLACEMENT COFFIN RD RECONSTRUCTION - BRIDGES ROBERT PARKER AT BUFFALO CREEK CONSTRUCTION ENGINEERING COFFIN RD RECONSTRUCTION - BRIDGES ROCKLAND RD AT DES PLAINES RIVER BRIDGE REHABILITATION REHABILITATION - BRIDGES 1 - 274 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street ROCKLAND RD Location AT DES PLAINES RIVER Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $347,000 LIBERTYVILLE 3 2021-2025 $1,977,000 LIBERTYVILLE GREEN OAKS 3 2020 $199,000 LIBERTYVILLE GREEN OAKS 3 2020 $3,210,000 WAUKEGAN 11 2021-2025 $206,000 WAUKEGAN 11 2021-2025 $560,000 FOX LAKE 4 2020 REHABILITATION - BRIDGES ROCKLAND RD DES PLAINES RIVER TO ST. MARYS RD Miles = 0.76 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS ROCKLAND RD DES PLAINES RIVER TO ST. MARYS RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS S GENESEE ST AT WAUKEGAN RIVER S OF W WATER ST BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES S GENESEE ST AT WAUKEGAN RIVER S OF W WATER ST CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES SAYTON RD S OF HONING RD TO ROLLINS RD Miles = 0.33 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 275 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street SAYTON RD Location S OF HONING RD TO ROLLINS RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $27,000 FOX LAKE 4 2020 $6,236,000 BUFFALO GROVE 3 2020 $649,000 BUFFALO GROVE 3 2020 $11,090,000 BUFFALO GROVE 1 2020 $956,000 BUFFALO GROVE 1 2020 $139,000 HIGHLAND PARK 1 2020 REHABILITATION - PAVEMENTS THOMPSON BLVD ARLINGTON HEIGHTS RD TO WEILAND RD Miles = 2.07 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS THOMPSON BLVD ARLINGTON HEIGHTS RD TO WEILAND RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS W APTAKISIC RD WEILAND RD W APTAKISIC RD: JOSEPH CT TO BOND ST; WEILAND RD: APTAKISIC RD TO DEERFIELD PKWY Miles = 1.11 RECONSTRUCTION RR CROSSING IMPROVEMENT INTERSECTION IMPROVEMENT RECONSTRUCTION - PAVEMENTS W APTAKISIC RD WEILAND RD W APTAKISIC RD: JOSEPH CT TO BOND ST; WEILAND RD: APTAKISIC RD TO DEERFIELD PKWY CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS WADE ST AT UNNAMED RAVINE 0.2 MI N OF MARSHMAN ST P.E. (PHASE II) RECONSTRUCTION - BRIDGES 1 - 276 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways LAKE COUNTY Route / Street WADE ST Location AT UNNAMED RAVINE 0.2 MI N OF MARSHMAN ST Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $1,750,000 HIGHLAND PARK 1 2021-2025 $174,000 HIGHLAND PARK 1 2021-2025 RECONSTRUCTION - BRIDGES WADE ST AT UNNAMED RAVINE 0.2 MI N OF MARSHMAN ST CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 1 - 277 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways MCHENRY COUNTY Route / Street HUNTER RD Location AT LITTLE BEAVER CREEK Improvements TAMP Category P.E. (PHASE I) Est. Cost City MYP Years Past Current $150,000 1 2020 $96,000 1 2020 $800,000 1 2021-2025 $240,000 1 2021-2025 $2,400,000 1 2021-2025 8 2021-2025 REHABILITATION - BRIDGES HUNTER RD AT LITTLE BEAVER CREEK P.E. (PHASE II) REHABILITATION - BRIDGES HUNTER RD AT LITTLE BEAVER CREEK BRIDGE REHABILITATION REHABILITATION - BRIDGES JOHNSON RD AT NIPPERSINK CREEK P.E. (PHASE II) THAYER RD REHABILITATION - BRIDGES JOHNSON RD AT NIPPERSINK CREEK BRIDGE REHABILITATION THAYER RD REHABILITATION - BRIDGES LAKEVIEW DR AT ISLAND LAKE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 278 $1,000,000 ISLAND LAKE FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways MCHENRY COUNTY Route / Street LAKEVIEW DR Location AT ISLAND LAKE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $80,000 ISLAND LAKE 8 2021-2025 $77,000 SPRING GROVE 1 2020 $3,520,000 CRYSTAL LAKE 7 2020 $235,000 CRYSTAL LAKE 2 2020 1 2021-2025 4 2020 RECONSTRUCTION - BRIDGES MAIN ST W OF WINN RD TO 0.3 MI W OF BLIVIN ST SIDEWALKS CULVERT REPAIR MISCELLANEOUS IMPROVEMENTS MAIN ST AT CRYSTAL LAKE AVE INTERSECTION RECONSTN RECONSTRUCTION - PAVEMENTS MAIN ST CRYSTAL LAKE AVE TO US 14 RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS MILLSTREAM RD AT KISHWAUKEE RIVER & S BRANCH KISHWAUKEE RIVER BRIDGE REPLACEMENT $2,300,000 RECONSTRUCTION - BRIDGES N MAIN ST ILL 176 TO UP RR Miles = 0.32 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 279 $2,733,000 CRYSTAL LAKE FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways MCHENRY COUNTY Route / Street S MADISON ST Location AT SOUTH ST & LAKE AVE Improvements TAMP Category INTERSECTION RECONSTN Est. Cost City MYP Years Past Current $2,515,000 WOODSTOCK 3 2020 $100,000 WOODSTOCK 3 2020 $120,000 1 2021-2025 $1,000,000 1 2021-2025 RECONSTRUCTION - PAVEMENTS S MADISON ST AT SOUTH ST & LAKE ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS WHITE OAKS RD AT W BRANCH PISCASAW CREEK P.E. (PHASE II) REHABILITATION - BRIDGES WHITE OAKS RD AT W BRANCH PISCASAW CREEK BRIDGE REHABILITATION REHABILITATION - BRIDGES 1 - 280 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street ILL 50 Location UNIVERSITY PKWY TO MONEE NCL Improvements TAMP Category LIGHTING Est. Cost City MYP Years Past Current $1,000,000 UNIVERSITY PARK 5 2020 $50,000 UNIVERSITY PARK 5 2020 $2,320,000 TINLEY PARK 2 2020 $240,000 TINLEY PARK 2 2020 PLAINFIELD 9 2021-2025 JOLIET 5 2021-2025 CICERO AVE MISCELLANEOUS IMPROVEMENTS ILL 50 UNIVERSITY PKWY TO MONEE NCL CONSTRUCTION ENGINEERING CICERO AVE MISCELLANEOUS IMPROVEMENTS 80TH AVE AT 191ST ST CHANNELIZATION MISCELLANEOUS IMPROVEMENTS 80TH AVE AT 191ST ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 143RD ST LINCOLN HWY TO ILL 59 Miles = 1.00 RECONSTRUCTION $20,000,000 RECONSTRUCTION - PAVEMENTS ABE ST AT SPRING CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 281 $2,500,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street ABE ST Location AT SPRING CREEK Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $200,000 JOLIET 5 2021-2025 $1,000,000 4 2020 $120,000 4 2020 CHANNAHON 1 2020 $1,528,000 CRETE 4 2021-2025 $1,500,000 CRETE 2 2020 RECONSTRUCTION - BRIDGES BAKER RD AT JACKSON CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES BAKER RD AT JACKSON CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES BRIDGE ST MULTI-USE PATH W OF MCKINLEY WOODS RD AT HUNTERS CROSSING SUBDIVISION TO I&M CANAL BIKEWAY $71,000 MISCELLANEOUS IMPROVEMENTS CRETE RD RICHTON RD TO EXCHANGE ST Miles = 0.86 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS DANNE RD AT PLUM CREEK BRANCH 0.7 MI E OF KLEMME RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1 - 282 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street DANNE RD Location AT PLUM CREEK BRANCH 0.7 MI E OF KLEMME RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $120,000 CRETE 2 2020 $40,000 JOLIET 1 2020 $16,000 JOLIET 1 2020 $25,000 CRETE 8 2021-2025 $883,000 CRETE 8 2021-2025 $37,000 CRETE 8 2021-2025 RECONSTRUCTION - BRIDGES ESSINGTON RD CATON FARM RD ESSINGTON RD: BILTMORE ST TO CATON FARM RD; CATON FARM RD: COSMIC DR TO JUNE ST CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS ESSINGTON RD AT ROCK RUN CREEK LAND ACQUISITION REHABILITATION - BRIDGES EXCHANGE ST CRETE RD TO ILL 394 P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS EXCHANGE ST CRETE RD TO ILL 394 Miles = 1.65 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS EXCHANGE ST CRETE RD TO ILL 394 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 283 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street INDIAN BOUNDARY RD Location AT SPRING HOLE CREEK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost City MYP Years Past Current $1,400,000 PLAINFIELD 2 2021-2025 $134,000 PLAINFIELD 2 2021-2025 $994,000 WILMINGTON 8 2021-2025 $48,000 WILMINGTON 7 2021-2025 $7,950,000 NEW LENOX 1 2020 $2,500,000 MONEE 4 2021-2025 RECONSTRUCTION - BRIDGES INDIAN BOUNDARY RD AT SPRING HOLE CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES KANKAKEE ST AT FORKED CREEK 0.3 MI N OF ILL 53 BRIDGE REHABILITATION REHABILITATION - BRIDGES KANKAKEE ST AT FORKED CREEK 0.3 MI N OF ILL 53 CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES LARAWAY ROAD US 52 TO CEDAR RD Miles = 3.34 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS MONEE-MANHATTAN RD HAMILTON AVE TO CLEVELAND AVE Miles = 0.06 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1 - 284 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street MONEE-MANHATTAN RD Location HAMILTON AVE TO CLEVELAND AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost City MYP Years Past Current $200,000 MONEE 4 2021-2025 $3,320,000 BEECHER 3 2020 $354,000 BEECHER 3 2020 $1,600,000 PLAINFIELD 1 2020 $128,000 PLAINFIELD 1 2020 ELWOOD 10 2020 REHABILITATION - PAVEMENTS PENFIELD ST GOULD ST TO ILL 1 Miles = 0.56 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS PENFIELD ST GOULD ST TO ILL 1 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS RENWICK RD RIVER RD TO ILL 59 Miles = 1.00 STANDARD OVERLAY REHABILITATION - PAVEMENTS RENWICK RD RIVER RD TO ILL 59 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS ST LOUIS ST MISSISSIPPI AVE TO ILL 53 Miles = 0.12 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 1 - 285 $3,215,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways WILL COUNTY Route / Street ST LOUIS ST Location MISSISSIPPI AVE TO ILL 53 Improvements TAMP Category CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 1 - 286 Est. Cost City MYP Years Past Current $201,000 ELWOOD 10 2020 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 1 Local Highways DISTRICT-WIDE Route / Street VARIOUS Location DISTRICTWIDE CMAQ PROJECTS Improvements TAMP Category MISCELLANEOUS Est. Cost City MYP Years Past Current $100,952,000 4 2020 $487,146,000 3 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS RECONSTRUCTION - PAVEMENTS 1 - 287 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 2 District 2 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 2, DISTRICT 2, DIXON Overview Highway District 2 encompasses 10 counties in northwestern Illinois and includes the cities of Rockford, Rock Island-Moline, Geneseo, Rochelle, Dixon, Freeport, Belvidere, Kewanee and Sterling-Rock Falls, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming area. The state highway system in District 2 consists of 1,606 miles of highways and 838 bridges, supporting 10.6 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.28 billion will be provided during FY 2020-2025 for improvements to state highways in District 2. The following table summarizes anticipated accomplishments on the state highway system in District 2 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 25 122 81 3 658,514 206,746 42,416 30,437 0 2 1 0 24 0 12 1 0 1,497 55.631 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 39/US 20/US 51 from 0.4 mile north of Baxter Road to Interstate 90 0.3 mile north of Harrison Avenue Interchange and US 20 from 0.7 mile west of Alpine Road to Interstate 39 in Winnebago County. Resurfacing on 11.5 miles (including ramp repair) is programmed in FY 2020 at a cost of $21 million. 2-i • Interstate 74/US 6 (new bridge) over the Mississippi River in Moline. Iowa is the lead agency on the project, and Illinois will reimburse Iowa as projects are let for construction and work is completed. The Central Section of the new bridge was split into multiple construction contracts: two contracts for the river bridge, three contracts on the Illinois side and multiple contracts on the Iowa side. The reimbursement to Iowa for the Central Section for construction of the new bridges across the Mississippi River including lighting and construction engineering is programmed during FY 2020-2025 at a cost of $74.5 million. Of this total, $45.4 million is programmed in FY 2020. In addition, landscaping on the Illinois side of the river is programmed during FY 2021-2025 at a cost of $1.5 million. • Interstate 74 from 0.4 mile south of Illinois 81 to 0.2 mile north of Illinois 17 in Henry County. Resurfacing, patching and cold milling on 7.3 miles are programmed in FY 2020 at a cost of $14.5 million. • Interstate 80 over the Mississippi River in Rock Island County. A bridge replacement, reconstruction of 0.6 mile, engineering for a project and environmental linkage study, engineering for location, environmental and design studies, engineering for contract plans, land acquisition, railroad engineering, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $304.5 million. Of this total, engineering for the completion of a project and environmental linkage study is funded in FY 2020 at a cost of $20,000. Illinois is the lead agency for this project with Iowa sharing equally in the costs. • Interstate 80 from Rock River to US 6 in Henry County. Resurfacing and patching on 3 miles and a new bridge deck are programmed during FY 2021-2025 at a cost of $9.5 million. • Interstate 280 at the Mississippi River southwest of Rock Island in Rock Island County. A new bridge deck and bridge painting are programmed during FY 2021-2025 at a cost of $36 million. Illinois is the lead agency for this project with Iowa sharing equally in the costs. • Illinois 2 over the Rock River in Rockton. A bridge replacement, median crossover, engineering for contract plans and construction engineering are programmed during FY 2020-2025 at a cost of $18.4 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $700,000. This project has been approved for Illinois Special Bridge Program funding. • Illinois 2 from Illinois 72 (E) in Byron to Beltline Road south of Rockford. Reconstruction of 10.6 miles, bridge replacement, culvert replacement, engineering for location, environmental and design studies, engineering for contract plans, land acquisition, railroad engineering, utility adjustments and construction engineering are programmed during FY 2020-2025 for $72.5 million. Of this total, engineering for location, environmental and design studies is programmed in FY 2020 at a cost of $3.5 million. • Illinois 251 over the Union Pacific Railroad 2.5 miles south of Illinois 75 and over Rockton Road 2.6 miles south of Illinois 75 in Roscoe. Replacement of four bridges, engineering for contract plans and land acquisition are programmed during FY 2021-2025 at a cost of $13 million. 2-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 39 Location ILL 38 INTCHG E OF ROCHELLE US 51 Improvements TAMP Category BRIDGE NEW DECK INTERCHANGE RECONSTRUCTION Est. Cost 39 ILL 38 INTCHG E OF ROCHELLE US 51 P.E. (PHASE I) P.E. (CONSULTANT TSL) MYP Years Past Current $7,200,000 REHABILITATION - BRIDGES I County OGLE Structure Information Str Number AADT 6,400 0710058 1 2021-2025 Truck Pct NHS 12 Y $720,000 OGLE 1 2020 $720,000 OGLE 1 2021-2025 $6,600,000 OGLE 1 2021-2025 $660,000 OGLE 1 2020 REHABILITATION - BRIDGES I 39 ILL 38 INTCHG E OF ROCHELLE P.E. (PHASE II) US 51 REHABILITATION - BRIDGES I 39 KILBUCK CREEK 3 MI N OF ILL 64 US 51 BRIDGE DECK REPAIRS BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY MAINTENANCE - BRIDGES I 39 US 51 KILBUCK CREEK 3 MI N OF ILL 64 P.E. (PHASE I) P.E. (CONSULTANT TSL) MAINTENANCE - BRIDGES 2-1 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 39 Location KILBUCK CREEK 3 MI N OF ILL 64 US 51 Improvements TAMP Category P.E. (PHASE II) P.E. (CONSULTANT PLANS) Est. Cost County MYP Years Past Current $660,000 OGLE 1 2021-2025 $21,000,000 WINNEBAGO 4 2020 $270,000 WINNEBAGO 1 2020 $1,000,000 WINNEBAGO 4 2020 $11,695,000 WINNEBAGO 4 2021-2025 MAINTENANCE - BRIDGES I 39 US 20 US 51 I-39: 0.4 MI N OF BAXTER RD TO I-90 0.3 MI N OF HARRISON AVE INTCHG & US 20: 0.7 MI W OF ALPINE RD TO I-39 Miles = 11.47 DESIGNED OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS I 39 KISHWAUKEE RIVER 0.8 MI S OF BLACKHAWK RD P.E. (BRIDGE INSPECTION) US 51 REHABILITATION - BRIDGES I 39 US 20 US 51 I-39: 0.8 MI N OF BLACKHAWK RD TO I-90 & US 20: I-39 TO 0.3 MI E OF KISHWAUKEE RIVER & HARRISON AVE: BELL SCHOOL RD TO I-39 P.E. (PHASE II) ROCKFORD BYP RECONSTRUCTION - BRIDGES I 39 US 20 US 51 I-39: 0.8 MI N OF BLACKHAWK RD TO I-90 & US 20: I-39 TO 0.3 MI E OF KISHWAUKEE RIVER & HARRISON AVE: BELL SCHOOL RD TO I-39 P.E. (PHASE II) ROCKFORD BYP RECONSTRUCTION - BRIDGES 2-2 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 39 Location UNDER PERRYVILLE RD SE OF ROCKFORD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $4,350,000 WINNEBAGO 7 2021-2025 US 20 ROCKFORD BYP RECONSTRUCTION - BRIDGES I US 74 MISSISSIPPI RIVER 6 BRIDGE REPLACEMENT BRIDGE REMOVAL/DEMOLITION LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING Structure Information Str Number AADT 7,900 1010098 $45,398,000 ROCK ISLAND Truck Pct NHS 7 N 6 2020 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. RECONSTRUCTION - BRIDGES I US 74 MISSISSIPPI RIVER 6 BRIDGE REPLACEMENT BRIDGE REMOVAL/DEMOLITION LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING Structure Information Str Number AADT 34,850 0819901 34,850 0819902 $29,086,000 ROCK ISLAND Truck Pct NHS 2 Y 2 Y 5 2021-2025 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. RECONSTRUCTION - BRIDGES I US 74 6 MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE LANDSCAPING RECONSTRUCTION - PAVEMENTS 2-3 Structure Information Str Number AADT 34,850 0819901 34,850 0819902 $1,530,000 ROCK ISLAND Truck Pct NHS 2 Y 2 Y 5 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 74 US Location UNDER ILL 5 IN MOLINE Improvements TAMP Category BRIDGE REPAIR Est. Cost County MYP Years Past Current $500,000 ROCK ISLAND 1 2021-2025 HENRY 8 2020 ROCK ISLAND 1 2021-2025 6 MAINTENANCE - BRIDGES I 74 0.4 MI S OF ILL 81 TO 0.2 MI N OF ILL 17 Miles = 7.31 Roadway Information Miles AADT Truck Pct 7.31 15,300 32.7 I 80 DESIGNED OVERLAY PATCHING COLD MILLING $14,500,000 REHABILITATION - PAVEMENTS NHS Y MISSISSIPPI RIVER, ILL 84, & RR Miles = 0.60 BRIDGE REPLACEMENT RECONSTRUCTION $245,000,000 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR (PROJECT AND ENVIRONMENTAL LINKAGE STUDY) PRELIMINARY ENGINEERING Structure Information Str Number AADT 26,600 0810011 Truck Pct NHS 33 Y $20,000 ROCK ISLAND 1 2020 $17,000,000 ROCK ISLAND 1 2021-2025 RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR P.E. (PHASE I) ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES 2-4 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 80 Location Improvements TAMP Category MISSISSIPPI RIVER, ILL 84, & RR P.E. (PHASE II) Est. Cost County MYP Years Past Current $17,000,000 ROCK ISLAND 1 2021-2025 $500,000 ROCK ISLAND 1 2021-2025 $500,000 ROCK ISLAND 1 2021-2025 $500,000 ROCK ISLAND 1 2021-2025 $24,000,000 ROCK ISLAND 1 2021-2025 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR LAND ACQUISITION ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR RR ENGINEERING ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR UTILITY ADJUSTMENT ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 80 MISSISSIPPI RIVER, ILL 84, & RR CONSTRUCTION ENGINEERING ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES 2-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 80 Location ROCK RIVER TO US 6 Miles = 3.04 Roadway Information Miles AADT Truck Pct 1.77 23,600 32.3 1.27 I 80 I 74 22,600 34.5 Improvements TAMP Category STANDARD OVERLAY PATCHING BRIDGE NEW DECK Est. Cost $9,500,000 REHABILITATION - PAVEMENTS HENRY Structure Information Str Number AADT 11,300 0370023 11,300 0370024 11,300 0370027 11,300 0370028 11,300 0370029 Y BRIDGE REPLACEMENT RECONSTRUCTION MYP Years Past Current NHS Y AT I-74 Miles = 0.51 County $14,500,000 HENRY 4 2021-2025 Truck Pct NHS 34 Y 34 Y 34 Y 34 Y 34 Y 5 2021-2025 I 280 Roadway Information Miles AADT Truck Pct 0.26 22,800 34.2 0.25 I 80 I 74 16,308 32.1 RECONSTRUCTION - BRIDGES Structure Information Str Number AADT 11,400 0370031 11,400 0370032 NHS Y Y AT I-74 P.E. (PHASE I) P.E. (CONSULTANT TSL) Truck Pct NHS 34 Y 34 Y $1,450,000 HENRY 3 2020 $1,450,000 HENRY 3 2021-2025 I 280 RECONSTRUCTION - BRIDGES I 80 I 74 AT I-74 P.E. (PHASE II) I 280 RECONSTRUCTION - BRIDGES 2-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 80 Location 0.5 MI E OF I-74/80 INTCHG TO 0.5 MI W OF ILL 82 Improvements TAMP Category CRACK & JOINT SEALING Est. Cost County MYP Years Past Current $500,000 HENRY 2 2020 $4,000,000 HENRY 7 2021-2025 PRESERVATION - PAVEMENTS I 80 MINERAL CREEK 2.9 MI E OF I-74 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 80 MINERAL CREEK 2.9 MI E OF I-74 P.E. (PHASE I) P.E. (CONSULTANT TSL) Structure Information Str Number AADT 10,100 0370107 10,100 0370108 Truck Pct NHS 44 Y 44 Y $400,000 HENRY 7 2021-2025 $400,000 HENRY 4 2021-2025 $875,000 HENRY 3 2020 RECONSTRUCTION - BRIDGES I 80 MINERAL CREEK 2.9 MI E OF I-74 P.E. (PHASE II) RECONSTRUCTION - BRIDGES I 80 0.5 MI W OF ILL 82 TO BUREAU CO LINE CRACK & JOINT SEALING PRESERVATION - PAVEMENTS 2-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 88 Location 0.2 MI NE OF 122ND AVE N / FARGO RD TO 0.1 MI E OF SAND RD Miles = 3.10 Roadway Information Miles AADT Truck Pct 3.10 12,600 31.0 I 88 Improvements TAMP Category PATCHING STANDARD OVERLAY Est. Cost County MYP Years Past Current $5,580,000 WHITESIDE 1 2021-2025 $250,000 WHITESIDE 2 2021-2025 BOONE 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.1 MI E OF SAND RD TO 0.6 MI W OF ILL 78 DRAINAGE MISCELLANEOUS IMPROVEMENTS I 90 0.4 MI W OF WHEELER RD TO 0.1 MI E OF IPSEN RD BRIDGE REPLACEMENT $1,680,000 RECONSTRUCTION - BRIDGES I 280 MISSISSIPPI RIVER SW OF ROCK ISLAND BRIDGE NEW DECK Structure Information Str Number AADT 9,700 0049900 9,700 0040004 $34,000,000 ROCK ISLAND Truck Pct NHS 15 Y 15 Y 10 2021-2025 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. REHABILITATION - BRIDGES I 280 MISSISSIPPI RIVER SW OF ROCK ISLAND BRIDGE PAINTING ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES 2-8 Structure Information Str Number AADT 28,000 0810106 $2,000,000 ROCK ISLAND Truck Pct NHS 29 Y 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street I 280 Location MISSISSIPPI RIVER TO E OF ILL 92 INTCHG Miles = 1.26 Roadway Information Miles AADT Truck Pct 1.26 27,194 30.1 I 280 Improvements TAMP Category STANDARD OVERLAY PATCHING COLD MILLING Est. Cost County MYP Years Past Current $4,000,000 ROCK ISLAND 2 2021-2025 $525,000 ROCK ISLAND 1 2021-2025 $6,300,000 ROCK ISLAND 6 2021-2025 $240,000 JO DAVIESS 3 2020 $3,000,000 JO DAVIESS 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y ILL 92 INTCHG IN MILAN LIGHTING MISCELLANEOUS IMPROVEMENTS I 280 E OF ILL 92 INTCHG TO 0.4 MI E OF AIRPORT RD IN MILAN Miles = 4.13 Roadway Information Miles AADT Truck Pct 4.13 24,713 32.6 US 20 STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y MISSISSIPPI RIVER IN EAST DUBUQUE (FENCING) MISCELLANEOUS IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. MISCELLANEOUS IMPROVEMENTS US 20 BARGE TERMINAL RD E OF EAST DUBUQUE INTERSECTION RECONSTN GREAT RIVER RD MISCELLANEOUS IMPROVEMENTS 2-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 Location BARGE TERMINAL RD E OF EAST DUBUQUE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $400,000 JO DAVIESS 1 2021-2025 $20,400,000 JO DAVIESS 16 2021-2025 $100,000 JO DAVIESS 16 2021-2025 $1,000,000 JO DAVIESS 4 2021-2025 $2,000,000 JO DAVIESS 1 2021-2025 GREAT RIVER RD MISCELLANEOUS IMPROVEMENTS US 20 ILL 84 GEAR ST TO MAIN ST IN GALENA Miles = 1.06 Roadway Information Miles AADT Truck Pct 1.06 10,200 13.5 US 20 RECONSTRUCTION STORM SEWER (NEW) SANITARY SEWER WATER MAIN CULVERT REMOVAL RETAINING WALL ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS Y GEAR ST TO MAIN ST IN GALENA UTILITY ADJUSTMENT ILL 84 RECONSTRUCTION - PAVEMENTS US 20 0.5 MI E TO 1.3 MI E OF POWDER HOUSE HILL RD DRAINAGE ILL 84 MISCELLANEOUS IMPROVEMENTS US 20 GALENA OAKS RD TO 0.2 MI W OF LOGEMANN RD Miles = 4.64 Roadway Information Miles AADT Truck Pct 4.64 4,250 24.4 STANDARD OVERLAY COLD MILLING ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 2 - 10 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 Location 0.2 MI W OF LOGEMANN RD TO RUSH ST IN STOCKTON Miles = 4.07 Roadway Information Miles AADT Truck Pct 4.07 4,697 23.2 US 20 Improvements TAMP Category RECONSTRUCTION BRIDGE REPLACEMENT HORIZONTAL REALIGNMENT VERTICAL REALIGNMENT CULVERT REPLACEMENT CULVERT REMOVAL CULVERT (NEW) TRUCK CLIMBING LANE Est. Cost $22,900,000 RECONSTRUCTION - PAVEMENTS P.E. (PHASE II) MYP Years Past Current JO DAVIESS Structure Information Str Number AADT 4,250 0430036 NHS Y 0.2 MI W OF LOGEMANN RD TO RUSH ST IN STOCKTON County 15 2021-2025 Truck Pct NHS 25 Y $150,000 JO DAVIESS 1 2020 $400,000 JO DAVIESS 4 2021-2025 $350,000 JO DAVIESS 15 2021-2025 $775,000 JO DAVIESS 1 2021-2025 RECONSTRUCTION - PAVEMENTS US 20 0.2 MI W OF LOGEMANN RD TO RUSH ST IN STOCKTON LAND ACQUISITION RECONSTRUCTION - PAVEMENTS US 20 0.2 MI W OF LOGEMANN RD TO RUSH ST IN STOCKTON UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS US 20 ILL 78 RUSH ST IN STOCKTON TO 0.1 MI E OF ILL 78 (N) Miles = 1.71 Roadway Information Miles AADT Truck Pct 1.71 6,901 14.8 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 2 - 11 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 Location 0.1 MI E OF ILL 78 (N) TO 0.2 MI W OF STEPHENSON CO LINE Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,200,000 JO DAVIESS 1 2021-2025 $1,200,000 JO DAVIESS 1 2021-2025 $6,100,000 STEPHENSON 10 2021-2025 $400,000 STEPHENSON 4 2021-2025 $390,000 WINNEBAGO 1 2020 RECONSTRUCTION - PAVEMENTS US 20 0.1 MI E OF ILL 78 (N) TO 0.2 MI W OF STEPHENSON CO LINE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS US 20 US 20: 0.4 MI W OF ILL 73 TO 1 MI E (REES RD) & ILL 73: 0.4 MI N TO 0.2 MI S OF US 20 Miles = 1.93 ILL 73 Roadway Information Miles AADT Truck Pct 1.38 6,400 19.4 MISCELLANEOUS IMPROVEMENTS NHS Y 0.39 3,450 8.1 N 0.16 2,300 19.4 N US 20 ILL 73 INTERSECTION RECONSTN RECONSTRUCTION TURNING LANES TRAF SIGNAL INSTALLATION CULVERT (NEW) CULVERT REPLACEMENT US 20: 0.4 MI W OF ILL 73 TO 1 MI E (REES RD) & ILL 73: 0.4 MI N TO 0.2 MI S OF US 20 UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS US 20 (WESTBOUND) GROVE CREEK 0.3 MI E OF STEPHENSON CO LINE BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS PRESERVATION - BRIDGES 2 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 Location REES RD TO 0.4 MI W OF FLANSBURG RD Miles = 4.63 Roadway Information Miles AADT Truck Pct 4.63 9,006 16.0 US 20 County MYP Years Improvements TAMP Category Est. Cost RECONSTRUCTION DESIGNED OVERLAY $10,000,000 STEPHENSON 2 2021-2025 $1,000,000 STEPHENSON 2 2021-2025 $1,000,000 STEPHENSON 2 2021-2025 $300,000 STEPHENSON 1 2021-2025 $900,000 STEPHENSON 1 2021-2025 $100,000 STEPHENSON 1 2021-2025 Past Current RECONSTRUCTION - PAVEMENTS NHS Y REES RD TO 0.4 MI W OF FLANSBURG RD P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS US 20 REES RD TO 0.4 MI W OF FLANSBURG RD P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS US 20 REES RD TO 0.4 MI W OF FLANSBURG RD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS US 20 REES RD TO 0.4 MI W OF FLANSBURG RD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS US 20 REES RD TO 0.4 MI W OF FLANSBURG RD UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 2 - 13 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 Location 0.2 MI W OF PECATONICA RD TO 0.2 MI W OF FALCONER RD Miles = 7.54 Roadway Information Miles AADT Truck Pct 7.54 16,700 15.9 US 20 ROCKFORD BYP US 20 ROCKFORD BYP US 20 $17,000,000 WINNEBAGO 3 2021-2025 DESIGNED OVERLAY PATCHING COLD MILLING $14,500,000 WINNEBAGO 1 2021-2025 $8,700,000 WINNEBAGO 3 2021-2025 $2,800,000 WINNEBAGO 15 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY COLD MILLING REHABILITATION - PAVEMENTS NHS Y UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD BRIDGE REPLACEMENT BRIDGE APPROACH ROADWAY RECONSTRUCTION - BRIDGES HARRISON AVE MYP Years Past Current NHS Y ROCKFORD BYP US 20 County RECONSTRUCTION - PAVEMENTS ROCK RIVER TO I-39 / US 51 IN ROCKFORD Miles = 3.93 Roadway Information Miles AADT Truck Pct 3.93 35,000 13.2 RUBBLIZATION COLD MILLING Est. Cost NHS Y 0.2 MI W OF FALCONER RD TO SIMPSON RD SW OF ROCKFORD Miles = 6.70 Roadway Information Miles AADT Truck Pct 6.70 17,194 13.8 Improvements TAMP Category I-39: 0.8 MI N OF BLACKHAWK RD TO I-90 & US 20: I-39 TO 0.3 MI E OF KISHWAUKEE RIVER & HARRISON AVE: BELL SCHOOL RD TO I-39 P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS 2 - 14 Structure Information Str Number AADT 4,500 1010116 $180,000 WINNEBAGO Truck Pct NHS 7 N 2 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 HARRISON AVE Location I-39: 0.8 MI N OF BLACKHAWK RD TO I-90 & US 20: I-39 TO 0.3 MI E OF KISHWAUKEE RIVER & HARRISON AVE: BELL SCHOOL RD TO I-39 Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $2,125,000 WINNEBAGO 2 2021-2025 $13,600,000 BOONE 1 2021-2025 $250,000 BOONE 1 2021-2025 $2,460,000 STEPHENSON 3 2021-2025 $1,800,000 WINNEBAGO 4 2020 RECONSTRUCTION - PAVEMENTS US 20 0.4 MI W OF WHEELER RD TO 0.1 MI E OF IPSEN RD Miles = 0.82 Roadway Information Miles AADT Truck Pct 0.82 19,923 13.9 US 20 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 0.4 MI W OF WHEELER RD TO 0.1 MI E OF IPSEN RD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS US 20 BUS GALENA AVE PARK BLVD TO CLARK ST IN FREEPORT Miles = 1.33 Roadway Information Miles AADT Truck Pct 1.33 11,258 4.6 US 20 BUS W STATE ST REHABILITATION - PAVEMENTS NHS N MERIDIAN RD TO SPRINGFIELD AVE IN ROCKFORD Miles = 1.53 Roadway Information Miles AADT Truck Pct 1.53 8,633 16.0 STANDARD OVERLAY ADA IMPROVEMENTS TRAF SIGNAL MODERNIZATION COLD MILLING STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 2 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 BUS W STATE ST Location DAY AVE TO INDEPENDENCE AVE IN ROCKFORD Miles = 0.57 Improvements TAMP Category RECONSTRUCTION TRAF SIGNAL MODERNIZATION INTERSECTION IMPROVEMENT ADA IMPROVEMENTS LANDSCAPING Est. Cost County MYP Years Past Current $6,730,000 WINNEBAGO 10 2021-2025 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. Roadway Information Miles AADT Truck Pct 0.57 7,134 7.5 US 20 BUS W STATE ST RECONSTRUCTION - PAVEMENTS NHS Y DAY AVE TO INDEPENDENCE AVE IN ROCKFORD Miles = 0.01 ADDITIONAL LANES $1,270,000 WINNEBAGO 2 2021-2025 $6,200,000 WINNEBAGO 1 2021-2025 $243,000 WINNEBAGO 1 2020 INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS MID AMERICAN DR TO BUCKLEY DR IN ROCKFORD Miles = 0.62 Roadway Information Miles AADT Truck Pct 0.62 28,739 4.9 US 20 BUS INTERSECTION RECONSTN STANDARD OVERLAY TRAF SIGNAL MODERNIZATION WATER MAIN BIKEWAY ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS NHS Y MID AMERICAN DR TO BUCKLEY DR IN ROCKFORD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 2 - 16 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 BUS Location SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES INTERSECTION IMPROVEMENT DRAINAGE Est. Cost County MYP Years Past Current $25,200,000 BOONE 1 2021-2025 $16,800,000 BOONE 1 2021-2025 $4,200,000 BOONE 1 2020 $4,200,000 BOONE 1 2021-2025 $4,000,000 BOONE 1 2021-2025 $250,000 BOONE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE Miles = 3.96 Roadway Information Miles AADT Truck Pct 3.96 13,646 8.5 US 20 BUS RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS 2 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 BUS Location SHAW RD E OF WINNEBAGO CO LINE TO 0.1 MI NE OF STATE ST IN BELVIDERE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $4,200,000 BOONE 1 2021-2025 $18,000,000 BOONE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: ILL 76 TO US 20 Miles = 3.93 ADDITIONAL LANES BRIDGE REPLACEMENT INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: LAWRENCEVILLE RD TO US 20 IN BELVIDERE Miles = 1.55 Roadway Information Miles AADT Truck Pct 1.55 11,657 10.7 US 20 BUS US 20 BUS Truck Pct NHS 13 Y $11,250,000 BOONE 1 2021-2025 $3,500,000 BOONE 1 2021-2025 $3,000,000 BOONE 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y BELVIDERE BYP: STATE ST TO LAWRENCEVILLE RD Miles = 2.96 Roadway Information Miles AADT Truck Pct 2.96 9,024 8.7 RECONSTRUCTION CULVERT REPLACEMENT Structure Information Str Number AADT 11,100 0040013 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y BELVIDERE BYP: UNDER POPLAR GROVE RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 2 - 18 Structure Information Str Number AADT 4,900 0040015 Truck Pct NHS 4 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 20 BUS Location BELVIDERE BYP: STATE ST TO US 20 IN BELVIDERE Improvements TAMP Category P.E. (PHASE I) P.E. (CONSULTANT TSL) Est. Cost County MYP Years Past Current $3,600,000 BOONE 1 2021-2025 $3,600,000 BOONE 1 2021-2025 $5,000,000 BOONE 1 2021-2025 $200,000 BOONE 1 2021-2025 $3,600,000 BOONE 1 2021-2025 $1,500,000 WHITESIDE 8 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: STATE ST TO US 20 IN BELVIDERE P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: STATE ST TO US 20 IN BELVIDERE LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: STATE ST TO US 20 IN BELVIDERE UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 20 BUS BELVIDERE BYP: STATE ST TO US 20 IN BELVIDERE CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS US 30 MISSISSIPPI RIVER 1 MI W OF ILL 84 BRIDGE REPAIR ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. MAINTENANCE - BRIDGES 2 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 30 Location MISSISSIPPI RIVER 1 MI W OF ILL 84 Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $60,000 WHITESIDE 3 2021-2025 $2,300,000 WHITESIDE 3 2020 $1,250,000 WHITESIDE 1 2020 $2,600,000 WHITESIDE 1 2021-2025 $850,000 WHITESIDE 4 2021-2025 PRESERVATION - BRIDGES US 30 FRENCH CREEK E OF MORRISON TO EMERSON RD Miles = 6.32 Roadway Information Miles AADT Truck Pct 6.32 6,602 17.5 US 30 Roadway Information Miles AADT Truck Pct 0.23 7,465 8.9 0.39 REHABILITATION - PAVEMENTS NHS Y US 30: W OF ILL 40 TO 0.2 MI E & ILL 40: US 30 TO 0.4 MI S IN ROCK FALLS Miles = 0.62 ILL 40 8,110 US 30 17.4 REHABILITATION - PAVEMENTS Y REHABILITATION - PAVEMENTS 5,300 30.2 N 0.29 4,000 21.9 N ROCK FALLS RD STANDARD OVERLAY PATCHING COLD MILLING NHS N 0.70 US 30 STANDARD OVERLAY COLD MILLING DRAINAGE NHS N 0.2 MI E OF ILL 40 IN ROCK FALLS TO LEE CO LINE Miles = 2.89 Roadway Information Miles AADT Truck Pct 1.90 6,351 18.6 STANDARD OVERLAY PATCHING COLD MILLING I&M FEEDER CANAL 0.3 MI E OF ILL 40 IN ROCK FALLS Miles = 0.08 BRIDGE REPAIR STANDARD OVERLAY MAINTENANCE - BRIDGES 2 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 30 Location 0.1 MI W OF ATKINSON RD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $500,000 LEE 3 2021-2025 $20,000 LEE 3 2021-2025 $1,200,000 CARROLL 3 2020 $300,000 CARROLL 1 2021-2025 $300,000 CARROLL 4 2021-2025 MISCELLANEOUS IMPROVEMENTS US 30 0.1 MI W OF ATKINSON RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 52 MISSISSIPPI RIVER & BNSF RR IN SAVANNA BRIDGE DECK OVERLAY ILL 64 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES US 52 0.3 MI E OF DAUPHIN RD ILL 64 CULVERT REPAIR SLOPE STABILIZATION MISCELLANEOUS IMPROVEMENTS US 52 0.5 MI E OF N GRANGE RD E OF LANARK CULVERT REPLACEMENT ILL 64 MISCELLANEOUS IMPROVEMENTS 2 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 52 Location 0.5 MI E OF N GRANGE RD E OF LANARK Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $20,000 CARROLL 4 2021-2025 OGLE 4 2021-2025 ILL 64 MISCELLANEOUS IMPROVEMENTS US 52 ELKHORN CREEK 0.5 MI S OF ILL 64 BRIDGE REPLACEMENT $2,055,000 RECONSTRUCTION - BRIDGES US 52 ELKHORN CREEK 0.5 MI S OF ILL 64 LAND ACQUISITION Structure Information Str Number AADT 800 0710070 Truck Pct NHS 26 N $20,000 OGLE 4 2021-2025 $261,000 OGLE 1 2020 $4,700,000 OGLE LEE 3 2020 RECONSTRUCTION - BRIDGES US 52 E ELKHORN ST TO W DEMENT ST IN POLO ADA IMPROVEMENTS ILL 26 MISCELLANEOUS IMPROVEMENTS US 52 WILSON ST IN POLO TO 0.1 MI N OF LIBERTY CT IN DIXON Miles = 9.84 ILL 26 Roadway Information Miles AADT Truck Pct 3.23 4,173 15.1 6.61 3,501 16.8 STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y Y 2 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 52 Location 0.3 MI S OF US 30 N OF AMBOY Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $600,000 LEE 3 2021-2025 $20,000 LEE 3 2021-2025 $250,000 LEE 1 2021-2025 $90,000 LEE 1 2020 $4,450,000 LEE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 52 0.3 MI S OF US 30 N OF AMBOY LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 52 WASSON RD TO WATER ST IN AMBOY ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 52 MAIN ST IN AMBOY ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 52 WATER ST IN AMBOY TO N OF HENKLE RD Miles = 10.16 Roadway Information Miles AADT Truck Pct 10.16 2,550 18.7 DESIGNED OVERLAY PATCHING COLD MILLING ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 2 - 23 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street US 67 Location ILL 92, RR & MISSISSIPPI RIVER IN ROCK ISLAND Improvements TAMP Category BRIDGE REPAIR Est. Cost County MYP Years Past Current $2,000,000 ROCK ISLAND 1 2020 $6,000,000 ROCK ISLAND 1 2021-2025 $170,000 ROCK ISLAND 1 2021-2025 $150,000 ROCK ISLAND 1 2021-2025 $150,000 HENRY 1 2021-2025 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. MAINTENANCE - BRIDGES US 67 ILL 92, RR & MISSISSIPPI RIVER IN ROCK ISLAND BRIDGE PAINTING ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES US 67 BIG ISLAND RD TO W 5TH AVE IN MILAN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 150 W 3RD ST TO 114TH ST IN COAL VALLEY ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 150 A ST TO E ST IN ALPHA ADA IMPROVEMENTS ILL 17 MISCELLANEOUS IMPROVEMENTS 2 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 2 (WESTBOUND) Location 4TH AVE TO 2ND AVE IN STERLING Miles = 0.18 Roadway Information Miles AADT Truck Pct 0.18 3,600 2.8 ILL 2 Improvements TAMP Category RECONSTRUCTION ADA IMPROVEMENTS TRAF SIGNAL REPLACEMENT Est. Cost County MYP Years Past Current $1,200,000 WHITESIDE 1 2021-2025 $50,000 WHITESIDE 1 2020 $940,000 LEE 3 2021-2025 $550,000 OGLE 3 2020 $207,000 OGLE 1 2020 RECONSTRUCTION - PAVEMENTS NHS Y 4TH AVE TO 2ND AVE IN STERLING LAND ACQUISITION (WESTBOUND) RECONSTRUCTION - PAVEMENTS ILL 2 PALMYRA AVE W OF PAGE DR TO US 52 / ILL 26 IN DIXON Miles = 0.82 EVERETT ST Roadway Information Miles AADT Truck Pct 0.82 14,524 7.3 ILL 2 ILL 2 REHABILITATION - PAVEMENTS NHS Y N OF PINES RD TO JEFFERSON ST IN OREGON Miles = 0.71 Roadway Information Miles AADT Truck Pct 0.71 9,500 7.4 STANDARD OVERLAY COLD MILLING PATCHING ADA IMPROVEMENTS TRAF SIGNAL MODERNIZATION STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y 5TH ST TO FORD ST IN OREGON ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 2 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 2 Location ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD Miles = 10.60 Roadway Information Miles AADT Truck Pct 6.64 7,504 7.7 3.96 ILL 2 6,774 10.2 Improvements TAMP Category RECONSTRUCTION BRIDGE REPLACEMENT CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $55,000,000 OGLE WINNEBAGO 1 2021-2025 $3,500,000 OGLE WINNEBAGO 1 2020 $5,000,000 OGLE WINNEBAGO 1 2021-2025 $3,000,000 OGLE WINNEBAGO 1 2021-2025 $500,000 OGLE WINNEBAGO 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y Y ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD P.E. (PHASE I) P.E. (CONSULTANT TSL) RECONSTRUCTION - PAVEMENTS ILL 2 ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 2 ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 2 ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD RR ENGINEERING RECONSTRUCTION - PAVEMENTS 2 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 2 Location ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $500,000 OGLE WINNEBAGO 1 2021-2025 $5,000,000 OGLE WINNEBAGO 1 2021-2025 $1,500,000 OGLE WINNEBAGO 4 2021-2025 $125,000 WINNEBAGO 1 2020 $14,000,000 WINNEBAGO 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 2 ILL 72 (E) IN BYRON TO BELTLINE RD S OF ROCKFORD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 2 0.1 MI N OF LUTHER DR IN BYRON TO 0.1 MI S OF BELTLINE RD S OF ROCKFORD GUARDRAIL MISCELLANEOUS IMPROVEMENTS ILL 2 N MAIN ST 0.5 MI N OF ELMWOOD RD TO 0.5 MI N OF LATHAM RD N OF ROCKFORD CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 2 N MAIN ST 0.4 MI N OF LATHAM RD TO 0.8 MI N OF ROSCOE RD Miles = 0.19 ADDITIONAL LANES CULVERT (NEW) CULVERT REHABILITATION CULVERT REPAIR INITIAL CONSTRUCTION - PAVEMENTS 2 - 27 Structure Information Str Number AADT 9,000 1012032 Truck Pct NHS 6 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 2 N MAIN ST Location 0.4 MI N OF LATHAM RD TO 0.8 MI N OF ROSCOE RD Miles = 3.08 Roadway Information Miles AADT Truck Pct 3.08 8,987 6.0 ILL 2 Improvements TAMP Category RECONSTRUCTION INTERSECTION IMPROVEMENT Est. Cost County MYP Years Past Current $6,000,000 WINNEBAGO 1 2021-2025 $2,750,000 WINNEBAGO 1 2020 $250,000 WINNEBAGO 1 2021-2025 $7,200,000 WINNEBAGO 3 2021-2025 $16,000,000 WINNEBAGO 5 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y 0.4 MI N OF LATHAM RD TO 0.8 MI N OF ROSCOE RD LAND ACQUISITION N MAIN ST INITIAL CONSTRUCTION - PAVEMENTS ILL 2 0.4 MI N OF LATHAM RD TO 0.8 MI N OF ROSCOE RD UTILITY ADJUSTMENT N MAIN ST INITIAL CONSTRUCTION - PAVEMENTS ILL 2 ILL 75 0.8 MI N OF ROSCOE RD TO PRAIRIE HILL RD IN SOUTH BELOIT Miles = 3.81 Roadway Information Miles AADT Truck Pct 3.81 7,996 4.4 ILL 2 STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y ROCK RIVER IN ROCKTON BRIDGE REPLACEMENT MEDIAN CROSSOVER ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 2 - 28 Structure Information Str Number AADT 4,150 1010125 4,150 1010126 Truck Pct NHS 4 Y 4 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 2 Location ROCK RIVER IN ROCKTON Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $700,000 WINNEBAGO 5 2020 $300,000 WINNEBAGO 1 2021-2025 $1,400,000 WINNEBAGO 5 2021-2025 $500,000 WINNEBAGO 3 2020 $500,000 WINNEBAGO 2 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 2 ROCK RIVER IN ROCKTON P.E. (PHASE II) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 2 ROCK RIVER IN ROCKTON CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 2 ILL 75 PRAIRIE HILL RD TO WISCONSIN STATE LINE IN SOUTH BELOIT P.E. (PHASE I) REHABILITATION - PAVEMENTS ILL 2 ILL 75 PRAIRIE HILL RD TO WISCONSIN STATE LINE IN SOUTH BELOIT P.E. (PHASE I) REHABILITATION - PAVEMENTS 2 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 5 JOHN DEERE RD Location E OF 16TH ST TO 0.3 MI E OF I-74 IN MOLINE Miles = 0.91 Roadway Information Miles AADT Truck Pct 0.91 33,422 3.2 ILL 5 JOHN DEERE RD ILL 5 STANDARD OVERLAY COLD MILLING PATCHING BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $1,700,000 ROCK ISLAND 1 2021-2025 $2,550,000 ROCK ISLAND 4 2020 $325,000 ROCK ISLAND 1 2021-2025 $2,000,000 ROCK ISLAND 2 2020 HENRY 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.3 MI E OF 70TH ST IN MOLINE TO COLONA RD IN CARBON CLIFF Miles = 2.45 Roadway Information Miles AADT Truck Pct 2.45 13,379 8.1 Improvements TAMP Category STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y INTCHG ILL 5/84/92 IN SILVIS & CARBON CLIFF LIGHTING ILL 84 ILL 92 MISCELLANEOUS IMPROVEMENTS ILL 5 IAIS RR 0.2 MI NE OF ILL 84 JCT ILL 92 BRIDGE DECK OVERLAY BRIDGE PAINTING PRESERVATION - BRIDGES ILL 17 DIVISION ST TO 3RD ST IN WOODHULL ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 2 - 30 $40,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 26 Location CEDAR CREEK N OF CEDARVILLE Improvements TAMP Category BRIDGE NEW DECK Est. Cost CEDAR CREEK AT NCL OF CEDARVILLE TO 0.3 MI N OF FAIRVIEW RD Miles = 3.43 Roadway Information Miles AADT Truck Pct 3.43 7,506 10.2 ILL 26 STANDARD OVERLAY COLD MILLING ADA IMPROVEMENTS MYP Years Past Current $1,500,000 REHABILITATION - BRIDGES ILL 26 County STEPHENSON Structure Information Str Number AADT 5,350 0890043 2 2021-2025 Truck Pct NHS 12 Y $1,600,000 STEPHENSON 3 2021-2025 $1,600,000 STEPHENSON 1 2020 $2,000,000 OGLE 1 2021-2025 $30,000 OGLE 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y PECATONICA RIVER 1 MI S OF US 20 IN FREEPORT BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES ILL 26 ILL 72 S OF ILL 72 (W) TO S OF WILLOW ST IN FORRESTON Miles = 4.51 Roadway Information Miles AADT Truck Pct 4.51 2,740 15.2 ILL 26 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y S OF ILL 72 (W) TO S OF WILLOW ST IN FORRESTON LAND ACQUISITION ILL 72 REHABILITATION - PAVEMENTS 2 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 26 Location BLOODY GULCH RD TO 0.3 MI S OF PROGRESS DR IN DIXON Miles = 1.04 Roadway Information Miles AADT Truck Pct 1.04 5,280 23.4 ILL 26 ILL 38 0.67 ILL 38 6,400 12.5 County MYP Years Past Current $900,000 LEE 1 2020 $1,100,000 LEE 3 2020 $10,000,000 OGLE 1 2021-2025 $1,200,000 OGLE 1 2020 $1,200,000 OGLE 1 2021-2025 PRESERVATION - PAVEMENTS DESIGNED OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS Y DEMENT RD E OF ROCHELLE TO 0.5 MI W OF MULFORD RD Miles = 1.24 Roadway Information Miles AADT Truck Pct 0.57 12,761 27.8 STANDARD OVERLAY COLD MILLING PATCHING Est. Cost NHS Y 0.3 MI S OF PROGRESS DR S OF DIXON TO US 30 Miles = 3.66 Roadway Information Miles AADT Truck Pct 3.66 2,400 19.2 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y Y DEMENT RD E OF ROCHELLE TO 0.5 MI W OF MULFORD RD P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 38 DEMENT RD E OF ROCHELLE TO 0.5 MI W OF MULFORD RD P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS 2 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 38 Location DEMENT RD E OF ROCHELLE TO 0.5 MI W OF MULFORD RD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 OGLE 1 2021-2025 $200,000 OGLE 1 2021-2025 $300,000 WHITESIDE 1 2021-2025 $3,000,000 WHITESIDE 1 2021-2025 $1,500,000 WHITESIDE 1 2020 RECONSTRUCTION - PAVEMENTS ILL 38 DEMENT RD E OF ROCHELLE TO 0.5 MI W OF MULFORD RD UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 40 0.1 MI N TO LYNN BLVD & 0.1 MI N TO 0.1 MI S OF LEFEVRE RD IN STERLING Miles = 0.26 Roadway Information Miles AADT Truck Pct 0.07 7,293 11.7 0.19 ILL 40 9,489 11.0 ILL 40 REHABILITATION - PAVEMENTS NHS N N LYNN BLVD TO 0.1 MI N OF LEFEVRE RD IN STERLING Miles = 0.54 Roadway Information Miles AADT Truck Pct 0.54 10,021 13.2 STANDARD OVERLAY COLD MILLING ADA IMPROVEMENTS RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N 0.1 MI N OF LYNN BLVD TO LEFEVRE RD IN STERLING LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 2 - 33 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 40 Location 0.1 MI N OF LYNN BLVD TO LEFEVRE RD IN STERLING Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $200,000 WHITESIDE 1 2021-2025 $5,400,000 WHITESIDE BUREAU 1 2021-2025 OGLE 1 2020 $5,300,000 WINNEBAGO 1 2021-2025 $75,000 WINNEBAGO 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 40 0.4 MI S OF I-88 TO ILL 92 Miles = 12.69 Roadway Information Miles AADT Truck Pct 1.57 2,350 22.6 REHABILITATION - PAVEMENTS NHS N 2.16 4,707 28.9 N 8.96 3,124 21.8 N ILL 64 STANDARD OVERLAY ILLINOIS ST TO N JONES TERRACE IN OREGON ADA IMPROVEMENTS $262,000 MISCELLANEOUS IMPROVEMENTS ILL 70 PECATONICA RIVER TO 0.1 MI W OF SAFFORD RD IN ROCKFORD Miles = 8.64 Roadway Information Miles AADT Truck Pct 5.29 3,226 3.2 3.35 4,357 ILL 70 2.8 DESIGNED OVERLAY PATCHING REHABILITATION - PAVEMENTS NHS N N SPRINGFIELD AVE INT IN ROCKFORD TRAF SIGNAL MODERNIZATION SPRINGFIELD AVE MISCELLANEOUS IMPROVEMENTS 2 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 70 KILBURN AVE Location 0.1 MI W OF SAFFORD RD TO GLENWOOD AVE IN ROCKFORD Miles = 0.78 Roadway Information Miles AADT Truck Pct 0.78 5,290 6.0 ILL 72 Improvements TAMP Category DESIGNED OVERLAY PATCHING ADA IMPROVEMENTS TRAF SIGNAL MODERNIZATION Est. Cost County MYP Years Past Current $1,500,000 WINNEBAGO 1 2021-2025 OGLE 1 2020 $1,350,000 CARROLL 7 2021-2025 $40,000 CARROLL 7 2021-2025 STEPHENSON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N ROCK RIVER IN BYRON BRIDGE DECK OVERLAY BRIDGE PAINTING BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR $850,000 PRESERVATION - BRIDGES ILL 73 ILL 72 ILL 73: 0.4 MI N & 0.3 & 0.8 MI S OF ILL 72 N OF LANARK & ILL 72: 0.1 MI E OF APACHE RD CULVERT (NEW) CULVERT REPLACEMENT INITIAL CONSTRUCTION - BRIDGES ILL 73 ILL 72 ILL 73: 0.4 MI N & 0.3 & 0.8 MI S OF ILL 72 N OF LANARK & ILL 72: 0.1 MI E OF APACHE RD LAND ACQUISITION INITIAL CONSTRUCTION - BRIDGES ILL 75 0.1 MI E TO 0.5 MI E OF TOWER RD IN FREEPORT Miles = 0.39 CULVERT REPLACEMENT DESIGNED OVERLAY RECONSTRUCTION - BRIDGES 2 - 35 $1,100,000 Structure Information Str Number AADT 2,650 0891047 Truck Pct NHS 11 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 75 Location 0.1 MI E TO 0.5 MI E OF TOWER RD IN FREEPORT Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $40,000 STEPHENSON 4 2021-2025 WINNEBAGO 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 75 ROCK RIVER IN ROCKTON BRIDGE REPLACEMENT $12,500,000 RECONSTRUCTION - BRIDGES ILL 75 ROCK RIVER IN ROCKTON P.E. (PHASE I) P.E. (CONSULTANT TSL) Structure Information Str Number AADT 7,100 1010109 Truck Pct NHS 3 N $1,250,000 WINNEBAGO 1 2020 $1,250,000 WINNEBAGO 1 2021-2025 $100,000 WINNEBAGO 1 2021-2025 $100,000 WINNEBAGO 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 75 ROCK RIVER IN ROCKTON P.E. (PHASE II) RECONSTRUCTION - BRIDGES ILL 75 ROCK RIVER IN ROCKTON LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 75 ROCK RIVER IN ROCKTON UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 2 - 36 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 75 Location ROCK RIVER IN ROCKTON Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,250,000 WINNEBAGO 1 2021-2025 $3,300,000 JO DAVIESS 7 2021-2025 RECONSTRUCTION - BRIDGES ILL 78 PLUM RIVER 6.3 MI S OF US 20 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 78 PLUM RIVER 6.3 MI S OF US 20 P.E. (PHASE II) Structure Information Str Number AADT 900 0430040 Truck Pct NHS 12 N $280,000 JO DAVIESS 1 2020 $2,435,000 WHITESIDE 9 2021-2025 $3,200,000 WHITESIDE 10 2021-2025 RECONSTRUCTION - BRIDGES ILL 78 CARROLL CO LINE TO US 30 W OF MORRISON Miles = 7.49 Roadway Information Miles AADT Truck Pct 7.49 1,137 22.3 ILL 78 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N CARROLL CO LINE TO US 30 (VARIOUS CULVERTS) CULVERT REPLACEMENT CULVERT EXTENSION MISCELLANEOUS IMPROVEMENTS 2 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 78 Location CARROLL CO LINE TO US 30 (VARIOUS CULVERTS) Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $40,000 WHITESIDE 10 2021-2025 $3,800,000 WHITESIDE 1 2021-2025 $150,000 WHITESIDE 1 2021-2025 $500,000 WHITESIDE 1 2020 $100,000 WHITESIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 78 0.1 MI S OF US 30 TO 0.1 MI S OF ACADEMIC DR IN MORRISON Miles = 0.62 Roadway Information Miles AADT Truck Pct 0.62 3,190 11.7 ILL 78 RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N 0.1 MI S OF US 30 TO 0.1 MI S OF ACADEMIC DR IN MORRISON LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 78 0.1 MI S OF US 30 TO 0.1 MI S OF ACADEMIC DR IN MORRISON RR CROSSING IMPROVEMENT RECONSTRUCTION - PAVEMENTS ILL 78 0.1 MI S OF US 30 TO 0.1 MI S OF ACADEMIC DR IN MORRISON UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 2 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 78 Location ROCK RIVER N OF PROPHETSTOWN Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE PAINTING BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $1,000,000 WHITESIDE 1 2020 $3,500,000 HENRY 2 2020 $1,200,000 HENRY 1 2021-2025 $180,000 HENRY 1 2021-2025 $30,000 HENRY 1 2021-2025 PRESERVATION - BRIDGES ILL 78 ILL 92 0.2 MI N OF ILL 92 (W) TO 0.4 MI N OF I-80 Miles = 10.60 Roadway Information Miles AADT Truck Pct 10.60 1,374 29.0 ILL 81 ILL 81 REHABILITATION - PAVEMENTS NHS N US 150 TO 0.4 MI W OF I-74 Miles = 1.81 Roadway Information Miles AADT Truck Pct 1.81 1,614 14.3 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY COLD MILLING ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 1ST ST TO PLEASANT ST IN CAMBRIDGE ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 81 LOCUST ST TO ELM ST IN ANDOVER ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 2 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 81 Location GALVA-ATKINSON RD TO WEST ST IN KEWANEE Miles = 6.27 Roadway Information Miles AADT Truck Pct 5.88 1,469 11.2 0.39 ILL 81 2,031 13.0 Improvements TAMP Category STANDARD OVERLAY COLD MILLING PATCHING GUARDRAIL Est. Cost County MYP Years Past Current $3,500,000 HENRY 1 2021-2025 $50,000 HENRY 1 2020 $4,000,000 HENRY 1 2021-2025 $400,000 HENRY 1 2020 $400,000 HENRY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N GALVA-ATKINSON RD TO WEST ST IN KEWANEE LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 81 0.1 MI W OF UNION ST TO 0.3 MI W OF ILL 78 IN KEWANEE Miles = 0.85 Roadway Information Miles AADT Truck Pct 0.85 2,233 11.4 ILL 81 RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N 0.1 MI W OF UNION ST TO 0.3 MI W OF ILL 78 IN KEWANEE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 81 0.1 MI W OF UNION ST TO 0.3 MI W OF ILL 78 IN KEWANEE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS 2 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 81 Location 0.1 MI W OF UNION ST TO 0.3 MI W OF ILL 78 IN KEWANEE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $400,000 HENRY 1 2021-2025 $200,000 HENRY 1 2021-2025 $2,000,000 HENRY 4 2020 $350,000 HENRY 1 2021-2025 $20,000 HENRY 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 81 0.1 MI W OF UNION ST TO 0.3 MI W OF ILL 78 IN KEWANEE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 82 ILL 92 TO N OF SMITH ST IN GENESEO Miles = 6.22 Roadway Information Miles AADT Truck Pct 5.02 2,397 12.3 1.20 ILL 82 4,600 17.0 STANDARD OVERLAY PATCHING COLD MILLING REHABILITATION - PAVEMENTS NHS N N DITCH 0.3 MI N OF 1700 N CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 82 DITCH 0.3 MI N OF 1700 N LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 2 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 84 Location 1 MI N OF BLACKJACK RD & 0.9 MI NW OF WHITTON RD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $1,500,000 JO DAVIESS 3 2021-2025 $30,000 JO DAVIESS 3 2021-2025 $900,000 JO DAVIESS 1 2021-2025 $50,000 JO DAVIESS 1 2021-2025 $3,500,000 WHITESIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 84 1 MI N OF BLACKJACK RD & 0.9 MI NW OF WHITTON RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 84 DUKE CREEK N OF HANOVER TO SE OF GARFIELD ST IN HANOVER Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 2,551 19.8 ILL 84 STANDARD OVERLAY PATCHING ADA IMPROVEMENTS COLD MILLING REHABILITATION - PAVEMENTS NHS Y DUKE CREEK N OF HANOVER TO SE OF GARFIELD ST IN HANOVER LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 84 US 30 TO 0.2 MI N OF 10TH AVE N (RIVERVIEW DR) N OF ALBANY Miles = 4.68 Roadway Information Miles AADT Truck Pct 4.68 4,900 11.3 STANDARD OVERLAY NEW SHOULDERS COLD MILLING REHABILITATION - PAVEMENTS NHS Y 2 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 84 CLEVELAND RD Location ILL 84: ROCK RIVER AT ROCK ISLAND CO LINE TO 0.2 MI N OF US 6 & CLEVELAND RD: ILL 84 TO 0.2 MI E Miles = 2.43 Roadway Information Miles AADT Truck Pct 0.72 12,518 3.2 1.71 6,798 ILL 84 CLEVELAND RD 6.0 Improvements TAMP Category RECONSTRUCTION DRAINAGE BI-DIRECT LEFT TURN LANE TRAF SIGNAL INSTALLATION Est. Cost County MYP Years Past Current $10,000,000 HENRY 1 2021-2025 $4,000,000 HENRY 1 2021-2025 $250,000 HENRY 1 2021-2025 $200,000 HENRY 1 2021-2025 $1,000,000 HENRY 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y N ILL 84: ROCK RIVER AT ROCK ISLAND CO LINE TO 0.2 MI N OF US 6 & CLEVELAND RD: ILL 84 TO 0.2 MI E LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 84 CLEVELAND RD ILL 84: ROCK RIVER AT ROCK ISLAND CO LINE TO 0.2 MI N OF US 6 & CLEVELAND RD: ILL 84 TO 0.2 MI E UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 84 CLEVELAND RD ILL 84: ROCK RIVER AT ROCK ISLAND CO LINE TO 0.2 MI N OF US 6 & CLEVELAND RD: ILL 84 TO 0.2 MI E RR ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 84 CLEVELAND RD ILL 84: ROCK RIVER AT ROCK ISLAND CO LINE TO 0.2 MI N OF US 6 & CLEVELAND RD: ILL 84 TO 0.2 MI E CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 2 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 92 Location MISSISSIPPI RIVER Improvements TAMP Category BRIDGE REPAIR Est. Cost County MYP Years Past Current $200,000 ROCK ISLAND 1 2021-2025 $4,000,000 ROCK ISLAND 1 2021-2025 $100,000 ROCK ISLAND 1 2021-2025 $20,000 ROCK ISLAND 1 2021-2025 $1,000,000 ROCK ISLAND 1 2021-2025 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. MAINTENANCE - BRIDGES ILL 92 115TH ST (W) IN ANDALUSIA TO 0.4 MI E OF ILL 92 (N) Miles = 6.00 Roadway Information Miles AADT Truck Pct 6.00 6,269 16.5 ILL 92 STANDARD OVERLAY PATCHING COLD MILLING ADA IMPROVEMENTS GUARDRAIL REHABILITATION - PAVEMENTS NHS N 115TH ST (W) IN ANDALUSIA TO 0.4 MI E OF ILL 92 (N) LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 92 1ST ST IN ANDALUSIA ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 92 1.2, 1 & 0.9 MI W OF TURKEY HOLLOW RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 2 - 44 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 92 Location 1.2, 1 & 0.9 MI W OF TURKEY HOLLOW RD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $20,000 ROCK ISLAND 1 2021-2025 $475,000 ROCK ISLAND 1 2021-2025 $60,000 ROCK ISLAND 1 2021-2025 $300,000 WHITESIDE 3 2021-2025 $20,000 WHITESIDE 3 2020 $100,000 WHITESIDE 1 2020 MISCELLANEOUS IMPROVEMENTS ILL 92 INTCHG 7TH AVE, 18TH AVE & 31ST AVE IN ROCK ISLAND LIGHTING MISCELLANEOUS IMPROVEMENTS ILL 94 MADISON ST TO FRONT ST IN REYNOLDS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 172 0.5 MI S OF HAHNAMAN RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 172 0.5 MI S OF HAHNAMAN RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 172 0.5 MI S OF HAHNAMAN RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS 2 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 173 WEST LANE RD Location 0.8 MI W OF I-90 TO 0.4 MI E OF LYFORD RD Miles = 1.71 Roadway Information Miles AADT Truck Pct 1.71 10,137 12.3 ILL 173 ILL 173 STANDARD OVERLAY PATCHING COLD MILLING Est. Cost County MYP Years Past Current $950,000 WINNEBAGO 1 2020 $425,000 WINNEBAGO 1 2021-2025 $500,000 BOONE 3 2021-2025 $100,000 BOONE 3 2021-2025 $13,900,000 BOONE 4 2021-2025 PRESERVATION - PAVEMENTS NHS Y 0.4 MI E OF LYFORD RD TO 0.1 MI W OF WINNEBAGO CO LINE Miles = 0.52 Roadway Information Miles AADT Truck Pct 0.52 7,901 7.6 Improvements TAMP Category STANDARD OVERLAY COLD MILLING REHABILITATION - PAVEMENTS NHS Y 0.2 MI E OF ILL 76 CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES ILL 173 0.2 MI E OF ILL 76 LAND ACQUISITION INITIAL CONSTRUCTION - BRIDGES ILL 173 0.4 MI E OF ILL 76 TO MCHENRY CO LINE Miles = 7.97 Roadway Information Miles AADT Truck Pct 7.97 4,872 13.0 DESIGNED OVERLAY ADA IMPROVEMENTS CULVERT REPLACEMENT REHABILITATION - PAVEMENTS NHS Y 2 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 173 Location 0.4 MI E OF ILL 76 TO MCHENRY CO LINE Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $850,000 BOONE 4 2021-2025 $1,400,000 BOONE 4 2021-2025 $300,000 BOONE 4 2021-2025 $375,000 ROCK ISLAND 1 2021-2025 $14,000 ROCK ISLAND 1 2021-2025 REHABILITATION - PAVEMENTS ILL 173 0.4 MI E OF ILL 76 TO MCHENRY CO LINE LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 173 0.4 MI E OF ILL 76 TO MCHENRY CO LINE UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 192 0.3 MI W OF 140TH ST W IN EDGINGTON TO 123RD ST W Miles = 1.53 Roadway Information Miles AADT Truck Pct 1.53 1,573 13.1 ILL 192 STANDARD OVERLAY COLD MILLING ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 140TH ST W IN EDGINGTON ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 2 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 251 US 51 Location WISCONSIN STATE LINE TO S OF FOREST HILLS RD IN MACHESNEY PARK Miles = 7.96 Roadway Information Miles AADT Truck Pct 7.96 20,216 5.1 ILL 251 Est. Cost STANDARD OVERLAY COLD MILLING PATCHING $14,600,000 WINNEBAGO 3 2020 $12,000,000 WINNEBAGO 4 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y UP RR 2.5 MI S OF ILL 75 & ROCKTON RD 2.6 MI S OF ILL 75 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 251 County MYP Years Improvements TAMP Category UP RR 2.5 MI S OF ILL 75 & ROCKTON RD 2.6 MI S OF ILL 75 P.E. (PHASE II) Structure Information Str Number AADT 7,300 1010029 7,300 1010030 9,000 1010031 9,000 1010032 Truck Pct NHS 6 Y 6 Y 4 Y 4 Y $900,000 WINNEBAGO 4 2021-2025 $75,000 WINNEBAGO 4 2021-2025 RECONSTRUCTION - BRIDGES ILL 251 UP RR 2.5 MI S OF ILL 75 & ROCKTON RD 2.6 MI S OF ILL 75 LAND ACQUISITION RECONSTRUCTION - BRIDGES 2 - 48 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 251 Location DRY CREEK 0.3 MI N OF MCCURRY RD, N KINNIKINNICK CREEK 0.1 MI S OF HONONEGAH RD, & S KINNIKINNICK CREEK 0.8 MI S OF HONONEGAH RD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost DRY CREEK 0.3 MI N OF MCCURRY RD, N KINNIKINNICK CREEK 0.1 MI S OF HONONEGAH RD, & S KINNIKINNICK CREEK 0.8 MI S OF HONONEGAH RD P.E. (PHASE I) P.E. (CONSULTANT TSL) MYP Years Past Current $11,600,000 RECONSTRUCTION - BRIDGES ILL 251 County WINNEBAGO Structure Information Str Number AADT 9,000 1010033 9,000 1010034 13,900 1010035 13,900 1010036 13,900 1010037 1 2021-2025 Truck Pct NHS 4 Y 4 Y 3 Y 3 Y 3 Y $1,200,000 WINNEBAGO 1 2021-2025 $1,200,000 WINNEBAGO 1 2021-2025 $150,000 WINNEBAGO 1 2021-2025 $1,000,000 WINNEBAGO 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 251 DRY CREEK 0.3 MI N OF MCCURRY RD, N KINNIKINNICK CREEK 0.1 MI S OF HONONEGAH RD, & S KINNIKINNICK CREEK 0.8 MI S OF HONONEGAH RD P.E. (PHASE II) RECONSTRUCTION - BRIDGES ILL 251 DRY CREEK 0.3 MI N OF MCCURRY RD, N KINNIKINNICK CREEK 0.1 MI S OF HONONEGAH RD & S KINNIKINNICK CREEK 0.8 MI S OF HONONEGAH RD LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 251 0.3 MI N OF AUBURN ST / SPRING CREEK RD RETAINING WALL MISCELLANEOUS IMPROVEMENTS 2 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 251 Location SOO LINE RR 0.1 MI S OF ILL 72 Improvements TAMP Category BRIDGE NEW DECK BRIDGE REPAIR Est. Cost ILL 251: 0.3 MI N OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) & ILL 38: ILL 251 TO 0.1 MI E IN ROCHELLE Miles = 1.08 ILL 38 Roadway Information Miles AADT Truck Pct 0.81 8,933 7.2 0.27 ILL 251 ILL 38 9,333 5.7 RECONSTRUCTION BI-DIRECT LEFT TURN LANE STORM SEWER (NEW) BIKEWAY ADA IMPROVEMENTS MYP Years Past Current $1,800,000 REHABILITATION - BRIDGES ILL 251 County OGLE Structure Information Str Number AADT 3,000 0710001 4 2021-2025 Truck Pct NHS 10 N $6,425,000 OGLE 16 2021-2025 $2,575,000 OGLE 2 2021-2025 $1,500,000 OGLE 9 2021-2025 $100,000 OGLE 16 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N Y ILL 251: 0.3 MI N OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) & ILL 38: ILL 251 TO 0.1 MI E IN ROCHELLE Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS ILL 251 ILL 38 ILL 251: 0.3 MI N OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) & ILL 38: ILL 251 TO 0.1 MI E IN ROCHELLE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 251 ILL 38 ILL 251: 0.3 MI N OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) & ILL 38: ILL 251 TO 0.1 MI E IN ROCHELLE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 2 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street ILL 251 Location 1.4 MI S OF US 30 TO 0.3 MI N OF TOWER RD (VARIOUS CULVERTS) Improvements TAMP Category CULVERT REPLACEMENT CULVERT REMOVAL CULVERT (NEW) Est. Cost County MYP Years Past Current $1,555,000 LEE 1 2021-2025 $50,000 LEE 1 2021-2025 ROCK ISLAND 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 251 1.4 MI S OF US 30 TO 0.3 MI N OF TOWER RD (VARIOUS CULVERTS) LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 27TH ST 27TH ST: STREAM 0.2 MI N OF JOHN DEERE RD & 39TH AVE: W EDGE OF 27TH ST IN MOLINE CULVERT REPLACEMENT $1,200,000 RECONSTRUCTION - BRIDGES ANDALUSIA RD 0.4 MI E OF ILL 92(N) TO US 67 IN MILAN Miles = 2.39 Roadway Information Miles AADT Truck Pct 2.39 7,671 8.2 ANDALUSIA RD STANDARD OVERLAY PATCHING COLD MILLING ADA IMPROVEMENTS Structure Information Str Number AADT 7,300 0812039 500 0812041 Truck Pct NHS 7 N N/A N $2,000,000 ROCK ISLAND 1 2021-2025 $40,000 ROCK ISLAND 1 2021-2025 REHABILITATION - PAVEMENTS NHS N W 8 1/2 ST TO W 4TH ST IN MILAN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 2 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street FREEPORT RD Location JORDON CREEK 0.4 MI N OF LEE / WHITESIDE CO LINE Improvements TAMP Category CULVERT (NEW) Est. Cost County MYP Years Past Current $400,000 OGLE WHITESIDE 10 2021-2025 $20,000 OGLE WHITESIDE 11 2021-2025 $400,000 WHITESIDE 10 2021-2025 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. INITIAL CONSTRUCTION - BRIDGES FREEPORT RD JORDON CREEK 0.4 MI N OF LEE / WHITESIDE CO LINE LAND ACQUISITION ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. INITIAL CONSTRUCTION - BRIDGES FREEPORT RD JORDON CREEK 6 MI N OF STERLING BRIDGE REPLACEMENT ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. RECONSTRUCTION - BRIDGES FREEPORT RD JORDON CREEK 6 MI N OF STERLING LAND ACQUISITION Structure Information Str Number AADT 1,800 0980049 Truck Pct NHS 3 N $20,000 WHITESIDE 11 2021-2025 $60,000 WHITESIDE 2 2020 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. RECONSTRUCTION - BRIDGES GARDEN PLAIN RD 0.3 MI NE OF MILLARD RD SCOUR MITIGATION MAINTENANCE - BRIDGES 2 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street MELUGINS GROVE RD Location DITCHES IN US 30 ROW 1 MI & 1.5 MI W OF ILL 251 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $3,000,000 LEE 9 2021-2025 TOWN HALL RD ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. RECONSTRUCTION - BRIDGES MELUGINS GROVE RD DITCHES IN US 30 ROW 1 MI & 1.5 MI W OF ILL 251 P.E. (PHASE II) Structure Information Str Number AADT 25 0520040 10 0520041 Truck Pct NHS N/A N N/A N $400,000 LEE 1 2021-2025 $115,000 LEE 7 2021-2025 HENRY 1 2021-2025 WINNEBAGO 1 2021-2025 TOWN HALL RD RECONSTRUCTION - BRIDGES MELUGINS GROVE RD DITCHES IN US 30 ROW 1 MI & 1.5 MI W OF ILL 251 LAND ACQUISITION TOWN HALL RD ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. RECONSTRUCTION - BRIDGES OSCO RD N RAILROAD ST TO SOUTH ST IN OSCO ADA IMPROVEMENTS $30,000 MISCELLANEOUS IMPROVEMENTS SPRINGFIELD AVE N FORK KENT CREEK 0.5 MI S OF ILL 70 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 2 - 53 $1,825,000 Structure Information Str Number AADT 8,550 1010100 Truck Pct NHS 4 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street SPRINGFIELD AVE Location N FORK KENT CREEK 0.5 MI S OF ILL 70 Improvements TAMP Category P.E. (PHASE I) P.E. (CONSULTANT TSL) Est. Cost County MYP Years Past Current $150,000 WINNEBAGO 1 2020 $150,000 WINNEBAGO 1 2021-2025 $240,000 OGLE 1 2020 $3,000,000 DISTRICT-WIDE 4 2021-2025 $50,000 DISTRICT-WIDE 4 2020 $250,000 DISTRICT-WIDE 4 2021-2025 RECONSTRUCTION - BRIDGES SPRINGFIELD AVE N FORK KENT CREEK 0.5 MI S OF ILL 70 P.E. (PHASE II) P.E. (CONSULTANT TSL) RECONSTRUCTION - BRIDGES THORP RD S KLONDIKE RD THORP RD: ILL 38 TO TR 326 & S KLONDIKE RD: ILL 38 TO DEAD END JURISDICTIONAL TRANSFER MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ADA RAMPS) ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION FOR ADA RAMPS LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION FOR ADA RAMPS LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 2 - 54 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street VARIOUS Location VARIOUS LOCATIONS DISTRICTWIDE Improvements TAMP Category BRIDGE CLEANING Est. Cost County MYP Years Past Current $93,000 HENRY LEE ROCK ISLAND WHITESIDE 1 2020 $32,000 WINNEBAGO 1 2020 $10,000 WINNEBAGO 1 2021-2025 BOONE CARROLL JO DAVIESS OGLE STEPHENSON WHITESIDE 1 2020 DISTRICT-WIDE 2 2021-2025 PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS DISTRICTWIDE BRIDGE CLEANING PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS DISTRICTWIDE BRIDGE CLEANING PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS DISTRICTWIDE BRIDGE CLEANING $116,000 PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES 2 - 55 $3,350,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street VARIOUS Location HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS Improvements TAMP Category SAFETY IMPROVEMENTS Est. Cost County MYP Years Past Current $4,604,000 DISTRICT-WIDE 7 2020 $17,388,000 DISTRICT-WIDE 5 2021-2025 $17,580,000 DISTRICT-WIDE 2 2021-2025 $16,000,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT PRESERVATION MISCELLANEOUS PROJECTS CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS (PRESERVATION) MISCELLANEOUS PROJECTS CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS SURVEY & RIGHT-OF-WAY DOCUMENTS P.E. (ROW) P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS SURVEY & RIGHT-OF-WAY DOCUMENTS P.E. (ROW) P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS 2 - 56 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street VARIOUS Location ON-CALL ENGINEERING Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT PLANS) Est. Cost County MYP Years Past Current $2,000,000 DISTRICT-WIDE 1 2020 $500,000 DISTRICT-WIDE 2 2021-2025 $500,000 DISTRICT-WIDE 1 2020 $1,000,000 DISTRICT-WIDE 2 2020 $50,000 DISTRICT-WIDE 6 2020 $250,000 DISTRICT-WIDE 5 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS 2 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 2 State Highways Route / Street VARIOUS Location POST-LAND ACQUISITION ACTIVITY Improvements TAMP Category POST-ACQUISITION ACTIVITY Est. Cost County MYP Years Past Current $50,000 DISTRICT-WIDE 6 2020 $250,000 DISTRICT-WIDE 5 2021-2025 $250,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 4 2020 $13,000,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS CONSTRUCTION ENGINEERING CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 2 - 58 DISTRICT 2 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street 4TH AVE DIVISION ST Location 4TH AVE: N GALENA AVE TO PALMYRA ST; DIVISION ST: GALENA AVE TO EASTERN AVE Miles = 1.36 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $680,000 LEE 1 2020 $46,000 LEE 1 2020 CARROLL 1 2021-2025 1 2021-2025 REHABILITATION - PAVEMENTS 4TH AVE DIVISION ST 4TH AVE: N GALENA AVE TO PALMYRA ST; DIVISION ST: GALENA AVE TO EASTERN AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS BIG CUT RD OVER BNSF RR BRIDGE REPLACEMENT $850,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES BIG CUT RD OVER BNSF RR CONSTRUCTION ENGINEERING $96,000 CARROLL ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES BLACKHAWK BLVD TURTLE CREEK TO CP RR IN SOUTH BELOIT Miles = 0.06 STANDARD OVERLAY $35,000 WINNEBAGO 1 2020 $600,000 JO DAVIESS 7 2021-2025 REHABILITATION - PAVEMENTS CH 5 AT SCRUB CREEK 6 MI SE OF DERINDA CENTER BRIDGE REPLACEMENT MASSBACH RD RECONSTRUCTION - BRIDGES 2 - 59 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street CH 6 Location AT MUDDY PLUM RIVER 5.5 MI SE OF STOCKTON Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $600,000 JO DAVIESS 7 2020 CARROLL 2 2020 18 2020 16 2020 2 2020 WILLOW RD RECONSTRUCTION - BRIDGES CH 8 OVER BNSF RR 2 MI NW OF MILLEDGEVILLE UTILITY ADJUSTMENT $40,000 IDEAL RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES CH 8 OVER BNSF RR 2 MI NW OF MILLEDGEVILLE BRIDGE REPLACEMENT $5,684,000 CARROLL IDEAL RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES CH 8 OVER BNSF RR 2 MI NW OF MILLEDGEVILLE CONSTRUCTION ENGINEERING $613,000 CARROLL IDEAL RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES CH 12 FREEPORT RD ILL 26 TO LANARK RD Miles = 4.12 STANDARD OVERLAY REHABILITATION - PAVEMENTS 2 - 60 $650,000 OGLE FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street CH 15 Location AT FIVE MILE BRANCH CREEK 7 MI SW OF DIXON Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $400,000 LEE 2 2020 $800,000 OGLE 2 2021-2025 STEPHENSON 2 2020 OGLE 2 2021-2025 $1,500,000 WHITESIDE 1 2021-2025 $96,000 WHITESIDE 1 2021-2025 HARMON RD RECONSTRUCTION - BRIDGES CH 16 MERIDIAN RD ILL 72 TO ILL 64 Miles = 7.03 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 19 ILL 26 TO AFOLKEY RD COLD IN-PLACE RECYCLING $4,940,000 MCCONNELL RD PRESERVATION - PAVEMENTS CH 35 MT MORRIS RD ILL 72 TO NCL OF MT MORRIS Miles = 4.41 STANDARD OVERLAY $770,000 REHABILITATION - PAVEMENTS DIXON AVE ILL 40 TO I&M FEEDER CANAL Miles = 0.53 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS DIXON AVE ILL 40 TO I&M FEEDER CANAL CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 2 - 61 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street E STAGECOACH TRAIL Location AT CLEAR CREEK 1 MI W OF WARREN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $600,000 JO DAVIESS 5 2020 $1,000,000 WHITESIDE 1 2020 $40,000 WHITESIDE 1 2020 $630,000 WINNEBAGO 2 2020 $128,000 CARROLL 1 2020 $800,000 CARROLL 1 2021-2025 RECONSTRUCTION - BRIDGES GENESEE CT AT ROCK CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES GENESEE CT AT ROCK CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES GLEASMAN RD AT UNNAMED CREEK 0.2 MI E OF ROCKTON AVE & AT UNNAMED CREEK 0.1 MI E OF RIVERVIEW TRAIL CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES KELTNER RD AT E FORK PLUM RIVER 0.5 MI S OF JODAVIESS CO LINE P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES KELTNER RD AT E FORK PLUM RIVER 0.5 MI S OF JODAVIESS CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 2 - 62 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street KELTNER RD Location AT E FORK PLUM RIVER 0.5 MI S OF JODAVIESS CO LINE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $60,000 CARROLL 1 2021-2025 WHITESIDE 3 2020 $402,000 STEPHENSON 1 2020 $680,000 CARROLL 5 2020 WINNEBAGO 3 2021-2025 WINNEBAGO 1 2021-2025 RECONSTRUCTION - BRIDGES LE FEVRE RD L AVE TO ILL 40 Miles = 0.69 RECONSTRUCTION $1,200,000 RECONSTRUCTION - PAVEMENTS LORAN RD FAIRGROUNDS RD LORAN RD: CARROLL CO LINE TO KENT RD; FAIRGROUNDS RD: ILL 26 TO WALNUT RD COLD IN-PLACE RECYCLING PRESERVATION - PAVEMENTS MILL RD OVER BNSF RR 2 MI NE OF ARGO FAY RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N ALPINE RD AT FOREST HILLS RD 0.2 MI S OF WINDSOR RD BRIDGE SUBSTRUCTURE $2,700,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES N ALPINE RD AT FOREST HILLS RD 0.2 MI S OF WINDSOR RD CONSTRUCTION ENGINEERING $216,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES 2 - 63 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street PARK CT Location AT YELLOW CREEK AT KRAPE PARK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,900,000 STEPHENSON 2 2020 $80,000 STEPHENSON 1 2020 BOONE 2 2020 BOONE 2 2020 WINNEBAGO 3 2021-2025 RECONSTRUCTION - BRIDGES PARK CT AT YELLOW CREEK AT KRAPE PARK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES POPLAR GROVE RD AT KISHWAUKEE RIVER IN BELVIDERE BRIDGE REPLACEMENT $3,509,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES POPLAR GROVE RD AT KISHWAUKEE RIVER IN BELVIDERE CONSTRUCTION ENGINEERING $240,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES PRAIRIE HILL RD AT ROCK RIVER 0.4 MI W OF ILL 2 BRIDGE REPLACEMENT $5,026,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 2 - 64 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street PRAIRIE HILL RD Location AT ROCK RIVER 0.4 MI W OF ILL 2 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $480,000 WINNEBAGO 3 2021-2025 $645,000 ROCK ISLAND 1 2021-2025 $40,000 ROCK ISLAND 1 2021-2025 $1,000,000 JO DAVIESS 1 2020 $400,000 JO DAVIESS 7 2020 $120,000 WINNEBAGO 1 2020 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES RIVER RD 34TH ST TO 41ST ST Miles = 0.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS RIVER RD 34TH ST TO 41ST ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS S APPLE RIVER RD AT APPLE RIVER 1.5 M NW OF WOODBINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES SCHAPVILLE RD AT MILL CREEK 6 MI N OF ELIZABETH BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES SEMINARY ST AT KEITH CREEK 0.5 MI N OF 15TH AVE P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES 2 - 65 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street SEMINARY ST Location AT KEITH CREEK 0.5 MI N OF 15TH AVE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,400,000 WINNEBAGO 1 2021-2025 $120,000 WINNEBAGO 1 2021-2025 CARROLL 4 2020 STEPHENSON 1 2020 LEE 1 2020 RECONSTRUCTION - BRIDGES SEMINARY ST AT KEITH CREEK 0.5 MI N OF 15TH AVE CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES TR 46 AT PLUM RIVER 5 MI NW OF MT. CARROLL BRIDGE REPLACEMENT $1,000,000 OLD GALENA TRAIL RECONSTRUCTION - BRIDGES VARIOUS VARIOUS LOCATIONS IN STEPHENSON CO Miles = 10.02 BIT SURFACE TREATMENT-A2 $156,000 PRESERVATION - PAVEMENTS W 1ST ST W 7TH ST N PEORIA AVE E MCKENNEY ST FARGO AVE W 1ST ST: VANBUREN AVE TO MADISON AVE; W 7TH ST: S LINCOLN AVE TO DEPOT AVE; N PEORIA AVE: W EVERETT ST TO LINCOLN STATUE DR; E MCKENNEY ST: N GALENA AVE TO ASSEMBLY PL; FARGO AVE: CHICAGO AVE TO DIVISION ST Miles = 1.80 STANDARD OVERLAY REHABILITATION - PAVEMENTS 2 - 66 $1,506,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 2 Local Highways Route / Street W 1ST ST W 7TH ST N PEORIA AVE E MCKENNEY ST Location W 1ST ST: VANBUREN AVE TO MADISON AVE; W 7TH ST: S LINCOLN AVE TO DEPOT AVE; N PEORIA AVE: W EVERETT ST TO LINCOLN STATUE DR; E MCKENNEY ST: N GALENA AVE TO ASSEMBLY PL; FARGO AVE: CHICAGO AVE TO DIVISION ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $102,000 LEE 1 2020 $280,000 OGLE 1 2020 $900,000 WHITESIDE 1 2020 FARGO AVE REHABILITATION - PAVEMENTS WATER RD AT MILL CREEK 5 MI NE OF LEAF RIVER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES YORKTOWN RD STAR RD TO HAHNAMAN RD COLD IN-PLACE RECYCLING PRESERVATION - PAVEMENTS 2 - 67 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 2 District 3 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 2, DISTRICT 3, OTTAWA Overview Highway District 3 encompasses 9 counties in east central Illinois and includes the cities of DeKalb, Kankakee, LaSalle-Peru, Mendota, Morris, Oswego, Ottawa, Pontiac, Princeton, Streator and Watseka, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming area. The state highway system in District 3 consists of 1,687 miles of highways and 788 bridges, supporting 11.6 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.36 billion will be provided during FY 2020-2025 for improvements to state highways in District 3. The following table summarizes anticipated accomplishments on the state highway system in District 3 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 84 139 476 27 328,884 106,005 136,697 71,795 0 0 0 0 3 0 10 1 0 0 53.817 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 55 at Illinois 47 Interchange in Dwight in Grundy County. Reconstruction on 0.7 mile, a bridge replacement and construction engineering are programmed during FY 2021-2025 at a cost of $14.8 million. This project has been approved for Illinois Special Bridge funding. 3-i • Interstate 55 from 0.3 mile south of Gardner Road in Gardner to the Will County line (Reed Road) in Grundy County. Resurfacing on 7 miles, a bridge deck overlay, bridge joint replace/repair, bridge repair, bridge deck sealing and scour mitigation are programmed in FY 2020 at a cost of $22 million. • Interstate 57 from Ford County line to 2.4 miles north of US 24 in Iroquois County. Resurfacing on 22 miles, a bridge deck overlay, bridge joint replace/repair, bridge repair, culvert repair, a new bridge deck under County Highway 9 at the Buckley interchange and bridge replacements at the Illinois 54 interchange at Onarga are programmed during FY 2021-2025 at a cost of $66 million. • Interstate 57 from 0.5 mile north of Clifton to 0.4 mile north of the Kankakee River Bridges in Kankakee County. Resurfacing on 12.8 miles, a new bridge deck, bridge repair, bridge joint replace/repair, a bridge deck overlay, culvert repair and a bridge replacement, engineering for location, environmental and design studies and engineering for contract plans at the US 45/52 interchange are programmed during FY 2020-2025 at a cost of $43 million. Of this total, engineering for location, environmental and design studies for the bridge replacement at the US 45/52 interchange is programmed in FY 2020 at a cost of $1.5 million. • Interstate 80 from Henry County line to east of Illinois 40 in Bureau County. Resurfacing on 9.5 miles, a bridge deck overlay, bridge joint replace/repair and bridge repair are programmed during FY 2021-2025 at a cost of $25 million. • Interstate 180/Illinois 26 at Illinois River in Hennepin in Bureau and Putnam Counties. A new bridge deck, bridge painting and construction engineering are programmed in FY 2020 at a cost of $35.5 million. This project has been approved for Illinois Special Bridge Program funding. • Illinois 38 from Ogle County line to Kane County line. Resurfacing on 17.2 miles, ADA improvements and reconstruction of 0.9 mile from Peace Road in DeKalb to 0.1 mile west of Loves Road in Cortland are programmed during FY 2020-2025 at a cost of $13.6 million. Of this total, resurfacing on 7.5 miles from Ogle County line to John Huber Parkway (S) in DeKalb County is programmed in FY 2020 at a cost of $4.3 million. • Illinois 47 from south of Galena Road to Kennedy Road in Yorkville. Additional lanes and reconstruction of 2.3 miles, a railroad crossing improvement, railroad engineering, a bridge replacement, bridge widening, engineering for contract plans, land acquisition, utility adjustments and construction engineering is programmed during FY 2020-2025 at a cost of $61.5 million. Of this total, railroad engineering, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $3 million. • Illinois 47 from Illinois 71 to Caton Farm Road in Kendall County. Additional lanes and reconstruction of 4.2 miles, culvert replacement, culvert extension, utility adjustments, land acquisition and engineering for contract plans are programmed during FY 2020-2025 at a cost of $46.6 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $1.1 million. • Armour Road over the Illinois Central Gulf Railroad 0.3 mile west of Illinois 50 in Bourbonnais. A bridge replacement, railroad flagger, railroad engineering and railroad insurance are programmed during FY 2021-2025 at a cost of $5.7 million. 3-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 39 Location B&N RR 0.8 MI N OF US 34 US 51 Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS Est. Cost County MYP Years Past Current $300,000 LASALLE 2 2020 $300,000 LASALLE 2 2020 $50,000 LASALLE 1 2020 $1,440,000 LIVINGSTON 1 2020 $18,500,000 LIVINGSTON 2 2021-2025 (SOUTHBOUND) PRESERVATION - BRIDGES I 39 B&N RR 0.8 MI N OF US 34 US 51 BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS (NORTHBOUND) PRESERVATION - BRIDGES I 39 B&N RR 0.8 MI N OF US 34 US 51 RR FLAGGER MISCELLANEOUS PRESERVATION - BRIDGES I 55 VARIOUS LOCATIONS IN LIVINGSTON CO STANDARD OVERLAY MAINTENANCE - PAVEMENTS I 55 4.2 MI N OF ILL 23 IN PONTIAC TO 2.6 MI N OF ODELL Miles = 7.07 Roadway Information Miles AADT Truck Pct 7.07 22,376 30.6 STANDARD OVERLAY BRIDGE DECK REPAIRS CULVERT REPAIR REHABILITATION - PAVEMENTS NHS Y 3-1 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 55 Location 2.6 MI N OF ODELL TO 1.7 MI S OF ILL 17 Miles = 3.59 Roadway Information Miles AADT Truck Pct 3.59 22,500 29.8 I 55 Improvements TAMP Category STANDARD OVERLAY BRIDGE REPAIR Est. Cost 55 MYP Years Past Current $9,500,000 LIVINGSTON 2 2021-2025 $3,900,000 LIVINGSTON 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y UNDER ILL 17 1.6 MI W OF ILL 47 BRIDGE NEW DECK REHABILITATION - BRIDGES I County AT ILL 47 INTCHG IN DWIGHT BRIDGE REPLACEMENT Structure Information Str Number AADT 2,600 0530114 $10,300,000 GRUNDY Truck Pct NHS 23 N 3 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 AT ILL 47 INTCHG IN DWIGHT CONSTRUCTION ENGINEERING Structure Information Str Number AADT 10,300 0320079 Truck Pct NHS 29 Y $1,200,000 GRUNDY 3 2021-2025 $11,000,000 GRUNDY 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 55 1.2 MI N OF ILL 47 TO GARDNER RD IN GARDNER Miles = 5.49 Roadway Information Miles AADT Truck Pct 5.49 25,000 31.4 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 3-2 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 55 Location S OF GARDNER INTCHG & S OF WILL CO LINE (REED RD) Improvements TAMP Category MEDIAN CROSSOVER Est. Cost County MYP Years Past Current $4,000,000 GRUNDY 1 2020 $22,000,000 GRUNDY 11 2020 $300,000 FORD 1 2020 $4,250,000 FORD 1 2021-2025 MISCELLANEOUS IMPROVEMENTS I 55 0.3 MI S OF GARDNER RD IN GARDNER TO WILL CO LINE (REED RD) Miles = 6.93 DESIGNED OVERLAY BRIDGE DECK OVERLAY BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING SCOUR MITIGATION ILLINOIS JOBS NOW! PROJECT Roadway Information Miles AADT Truck Pct 6.93 27,470 25.3 I 57 REHABILITATION - PAVEMENTS NHS Y BIG FOUR DITCH 2.4 MI S OF ILL 9 BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS BRIDGE REPAIR MAINTENANCE - BRIDGES I 57 BIG FOUR DITCH 2.4 MI S OF ILL 9 BRIDGE REPLACEMENT (SOUTHBOUND) RECONSTRUCTION - BRIDGES I 57 BIG FOUR DITCH 2.4 MI S OF ILL 9 BRIDGE REPLACEMENT Structure Information Str Number AADT 9,350 0270052 $4,250,000 FORD Truck Pct NHS 33 Y 1 2021-2025 (NORTHBOUND) RECONSTRUCTION - BRIDGES 3-3 Structure Information Str Number AADT 9,350 0270053 Truck Pct NHS 33 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location FORD CO LINE TO 0.8 MI S OF BUCKLEY INTCHG Miles = 7.81 Roadway Information Miles AADT Truck Pct 7.81 16,800 38.1 I 57 I 57 STANDARD OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR CULVERT REPAIR Est. Cost 57 $20,000,000 IROQUOIS 3 2021-2025 $18,000,000 IROQUOIS 3 2021-2025 $2,000,000 IROQUOIS 6 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR REHABILITATION - PAVEMENTS NHS Y UNDER CH 9 AT BUCKLEY INTCHG 2 MI S OF ILL 54 TO 2.4 MI N OF US 24 Miles = 7.33 Roadway Information Miles AADT Truck Pct 7.33 17,170 39.1 MYP Years Past Current BRIDGE NEW DECK REHABILITATION - BRIDGES I County NHS Y 0.8 MI S OF BUCKLEY INTCHG TO 2 MI S OF ILL 54 Miles = 6.83 Roadway Information Miles AADT Truck Pct 6.83 16,800 37.6 Improvements TAMP Category STANDARD OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR CULVERT REPAIR REHABILITATION - PAVEMENTS NHS Y 3-4 Structure Information Str Number AADT 900 0380076 $20,550,000 IROQUOIS Truck Pct NHS 10 N 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location ILL 54 INTCHG IN ONARGA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 57 0.5 MI N OF ILL 116 TO 0.5 MI S OF CH 29 Miles = 4.89 MICROSURFACING 1 PASS MYP Years Past Current $5,400,000 RECONSTRUCTION - BRIDGES I County IROQUOIS Structure Information Str Number AADT 1,400 0380048 2 2021-2025 Truck Pct NHS 11 N $1,200,000 IROQUOIS 1 2021-2025 $11,000,000 KANKAKEE IROQUOIS 3 2021-2025 PRESERVATION - PAVEMENTS I 57 0.5 MI N OF CLIFTON TO 0.7 MI N OF IROQUOIS CO LINE Miles = 4.45 Roadway Information Miles AADT Truck Pct 3.74 18,864 38.9 0.71 I 57 20,000 26.5 I 57 REHABILITATION - PAVEMENTS Structure Information Str Number AADT 1,050 0380088 NHS Y Truck Pct NHS 9 N Y 0.7 MI N OF IROQUOIS CO LINE TO 0.4 MI N OF KANKAKEE RIVER BRIDGES Miles = 8.32 Roadway Information Miles AADT Truck Pct 8.32 21,874 26.4 DESIGNED OVERLAY BRIDGE NEW DECK BRIDGE REPAIR DESIGNED OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR CULVERT REPAIR $20,500,000 KANKAKEE 6 2021-2025 $8,500,000 KANKAKEE 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT US 45/52 INTCHG IN KANKAKEE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3-5 Structure Information Str Number AADT 9,850 0460052 Truck Pct NHS 22 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location AT US 45/52 INTCHG IN KANKAKEE Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,500,000 KANKAKEE 1 2020 $1,500,000 KANKAKEE 1 2021-2025 $65,000 KANKAKEE 1 2020 $3,000,000 KANKAKEE 6 2021-2025 $8,400,000 KANKAKEE 14 2021-2025 RECONSTRUCTION - BRIDGES I 57 AT US 45/52 INTCHG IN KANKAKEE P.E. (PHASE II) RECONSTRUCTION - BRIDGES I 57 S OF NORFOLK RR STRUCTURES 0.9 MI N OF ILL 17 TO S OF WALDRON RD P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS I 57 0.9 MI N OF ILL 17 TO S OF WALDRON RD P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS I 57 UNDER WALDRON RD AT KANKAKEE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 57 UNDER WALDRON RD AT KANKAKEE LAND ACQUISITION RECONSTRUCTION - BRIDGES 3-6 Structure Information Str Number AADT 4,600 0460080 $50,000 KANKAKEE Truck Pct NHS 7 N 2 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location UNDER WALDRON RD AT KANKAKEE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 KANKAKEE 2 2020 $6,300,000 KANKAKEE 3 2021-2025 $15,200,000 KANKAKEE 4 2021-2025 RECONSTRUCTION - BRIDGES I 57 0.7 MI N OF ILL 17 TO 0.8 MI S OF NORTH ST IN KANKAKEE Miles = 0.60 RECONSTRUCTION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. Roadway Information Miles AADT Truck Pct 0.60 30,800 19.7 I 57 RECONSTRUCTION - PAVEMENTS NHS Y OVER NORFOLK SOUTHERN RR, DITCH & GRINNELL RD N OF ILL 17 IN KANKAKEE BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 0.6 MI S OF NORFOLK SOUTHERN RR AND 0.3 MI N OF GRINNELL RD IN KANKAKEE MEDIAN CROSSOVER Structure Information Str Number AADT 15,400 0460008 15,400 0460009 15,400 0460010 15,400 0460011 Truck Pct NHS 19 Y 19 Y 19 Y 19 Y $1,500,000 KANKAKEE 1 2021-2025 $200,000 KANKAKEE 4 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS I 57 OVER NORFOLK SOUTHERN RR, DITCH & GRINNELL RD N OF ILL 17 IN KANKAKEE RR FLAGGER MISCELLANEOUS ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 3-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location OVER NORFOLK SOUTHERN RR, DITCH & GRINNELL RD N OF ILL 17 IN KANKAKEE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 KANKAKEE 1 2020 $500,000 KANKAKEE 4 2020 $1,500,000 KANKAKEE 3 2021-2025 $3,700,000 KANKAKEE 15 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 OVER NORFOLK SOUTHERN RR, DITCH & GRINNELL RD N OF ILL 17 IN KANKAKEE UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 OVER NORFOLK SOUTHERN RR, DITCH & GRINNELL RD N OF ILL 17 IN KANKAKEE CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 LARRY POWER RD 1.2 MI N OF ILL 50 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 57 MANTENO INTCHG N OF KANKAKEE INTERCHANGE RECONSTRUCTION BRIDGE REPLACEMENT RETAINING WALL RECONSTRUCTION - PAVEMENTS 3-8 Structure Information Str Number AADT 8,400 0460087 $25,000,000 KANKAKEE Structure Information Str Number AADT 12,500 0460058 Truck Pct NHS 11 N 1 2021-2025 Truck Pct NHS 10 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 57 Location MANTENO INTCHG N OF KANKAKEE Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $750,000 KANKAKEE 1 2020 $600,000 KANKAKEE 1 2021-2025 $100,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 BUREAU 2 2021-2025 RECONSTRUCTION - PAVEMENTS I 57 MANTENO INTCHG N OF KANKAKEE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS I 57 MANTENO INTCHG N OF KANKAKEE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS I 57 MANTENO INTCHG N OF KANKAKEE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS I 80 HENRY CO LINE TO E OF ILL 40 Miles = 9.49 Roadway Information Miles AADT Truck Pct 9.49 18,967 42.9 DESIGNED OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR REHABILITATION - PAVEMENTS NHS Y 3-9 $25,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 80 Location UNDER TR 60B 4.8 MI E OF HENRY CO LINE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 80 UNDER TR 82C 1.5 MI N OF SHEFFIELD BRIDGE REPLACEMENT $3,400,000 80 UNDER ILL 40 3.5 MI N OF BUDA BRIDGE NEW DECK BRIDGE REHABILITATION BRIDGE PAINTING $3,500,000 80 MAPLE GROVE CREEK 2 MI N OF WYANET BRIDGE SUPERSTRUCTURE BUREAU Structure Information Str Number AADT 275 0060117 $2,100,000 REHABILITATION - BRIDGES I BUREAU Structure Information Str Number AADT 100 0060121 RECONSTRUCTION - BRIDGES I MYP Years Past Current RECONSTRUCTION - BRIDGES I County BUREAU Structure Information Str Number AADT 2,300 0060089 $2,300,000 BUREAU 1 2021-2025 Truck Pct NHS 4 N 1 2021-2025 Truck Pct NHS 3 N 1 2021-2025 Truck Pct NHS 54 N 3 2021-2025 (EASTBOUND) REHABILITATION - BRIDGES I 80 MAPLE GROVE CREEK 2 MI N OF WYANET BRIDGE SUPERSTRUCTURE Structure Information Str Number AADT 10,100 0060014 $2,300,000 BUREAU Truck Pct NHS 41 Y 3 2021-2025 (WESTBOUND) REHABILITATION - BRIDGES 3 - 10 Structure Information Str Number AADT 10,100 0060015 Truck Pct NHS 41 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 80 Location 1.1 MI W OF ILL 89 TO 0.7 MI W OF ILL 251 Miles = 5.27 Roadway Information Miles AADT Truck Pct 3.91 27,609 34.0 1.36 I 80 28,676 33.7 I 80 Est. Cost STANDARD OVERLAY $10,500,000 BUREAU LASALLE 1 2021-2025 $3,000,000 LASALLE 5 2021-2025 $15,100,000 LASALLE 3 2020 Past Current REHABILITATION - PAVEMENTS NHS Y Y 1.4 MI E OF BUREAU CO LINE TO 0.1 MI E OF ILL 351 Miles = 2.42 Roadway Information Miles AADT Truck Pct 2.42 29,158 34.8 County MYP Years Improvements TAMP Category STANDARD OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - PAVEMENTS NHS Y 0.5 MI W OF LASALLE RD TO 0.5 MI E OF LITTLE VERMILION RIVER IN LASALLE BRIDGE SUPERSTRUCTURE PIER REPAIR BRIDGE DECK OVERLAY BRIDGE REPAIR ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 80 0.5 MI W OF LASALLE RD TO 0.5 MI E OF LITTLE VERMILION RIVER IN LASALLE MEDIAN CROSSOVER SHOULDER RECONSTRUCTION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS 3 - 11 Structure Information Str Number AADT 14,600 0500220 14,600 0500221 14,750 0500003 14,750 0500004 $700,000 LASALLE Truck Pct NHS 39 Y 39 Y 34 Y 34 Y 3 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 80 Location 0.5 MI W OF LASALLE RD TO 0.5 MI E OF LITTLE VERMILION RIVER IN LASALLE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,000,000 LASALLE 3 2020 $500,000 LASALLE 1 2021-2025 $10,000,000 LASALLE 1 2021-2025 $4,200,000 LASALLE 4 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 80 0.5 MI W OF LASALLE RD TO 0.5 MI E OF LITTLE VERMILION RIVER IN LASALLE CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 80 0.1 MI E OF ILL 351 TO 0.3 MI W OF ILL 178 Miles = 4.08 Roadway Information Miles AADT Truck Pct 4.08 31,150 39.9 I 80 STANDARD OVERLAY BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR CULVERT REPAIR REHABILITATION - PAVEMENTS NHS Y UNDER CH 9 4 MI E OF ILL 178 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 80 UNDER CH 61T 8.2 MI W OF ILL 47 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 12 Structure Information Str Number AADT 325 0500081 $2,500,000 GRUNDY Structure Information Str Number AADT 125 0320052 Truck Pct NHS 18 N 2 2021-2025 Truck Pct NHS 16 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 80 Location E OF SENECA INTCHG TO W OF ILL 47 Miles = 6.30 Roadway Information Miles AADT Truck Pct 6.30 34,100 33.4 I 80 County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $14,400,000 GRUNDY 2 2021-2025 $7,000,000 GRUNDY KENDALL 9 2021-2025 $50,000 GRUNDY KENDALL 6 2020 $2,000,000 GRUNDY KENDALL 4 2021-2025 $6,100,000 BUREAU 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y UNDER CN RR 0.4 MI E OF MINOOKA INTCHG RR SEPARATION REPLACEMENT RECONSTRUCTION - BRIDGES I 80 UNDER CN RR 0.4 MI E OF MINOOKA INTCHG LAND ACQUISITION RECONSTRUCTION - BRIDGES I 80 UNDER CN RR 0.4 MI E OF MINOOKA INTCHG (RR REIMBURSEMENT) MISCELLANEOUS RECONSTRUCTION - BRIDGES I 180 BUREAU CREEK 1.2 MI S OF JCT ILL 26 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 13 Structure Information Str Number AADT 2,150 0060051 Truck Pct NHS 24 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street I 180 Location OVER BOTTOM RD 1.4 MI S OF JCT ILL 26 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost ILLINOIS RIVER AT HENNEPIN ILL 26 BRIDGE NEW DECK BRIDGE PAINTING MYP Years Past Current $3,400,000 RECONSTRUCTION - BRIDGES I 180 County BUREAU Structure Information Str Number AADT 2,150 0060053 $34,000,000 BUREAU PUTNAM 1 2021-2025 Truck Pct NHS 24 Y 3 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 180 ILLINOIS RIVER AT HENNEPIN CONSTRUCTION ENGINEERING Structure Information Str Number AADT 3,450 0780001 Truck Pct NHS 34 Y $1,500,000 BUREAU PUTNAM 3 2020 $2,800,000 BUREAU 1 2021-2025 $1,600,000 BUREAU 1 2021-2025 ILL 26 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 6 1 MI E OF HENRY CO LINE TO US 34 (S) IN SHEFFIELD Miles = 4.71 Roadway Information Miles AADT Truck Pct 4.71 750 8.0 US 6 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N KING CREEK AT WCL OF MINERAL BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 14 Structure Information Str Number AADT 1,400 0060061 Truck Pct NHS 14 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 6 Location ILL 40 TO HAZELWOOD DR IN WYANET Miles = 5.75 US 34 Roadway Information Miles AADT Truck Pct 5.75 2,160 6.1 US 6 MYP Years Past Current $1,700,000 BUREAU 1 2020 RECONSTRUCTION $28,000,000 BUREAU 1 2021-2025 $1,000,000 BUREAU 1 2021-2025 $1,000,000 BUREAU 1 2021-2025 $500,000 BUREAU 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N 2,800 10.7 N 0.50 3,300 14.6 N 0.99 3,150 11.0 N 6 County PRESERVATION - PAVEMENTS 0.64 US STANDARD OVERLAY Est. Cost NHS N ILL 26 (S) TO ILL 89 Miles = 12.36 Roadway Information Miles AADT Truck Pct 10.23 3,941 14.9 Improvements TAMP Category ILL 26 (S) TO ILL 89 P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS US 6 ILL 26 (S) TO ILL 89 P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS US 6 ILL 26 (S) TO ILL 89 LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 3 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 6 Location ILL 26 (S) TO ILL 89 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 BUREAU 1 2021-2025 $1,000,000 BUREAU 1 2021-2025 $5,000,000 BUREAU 1 2021-2025 $300,000 LASALLE 4 2021-2025 $30,000 LASALLE 1 2021-2025 $200,000 LASALLE 1 2020 RECONSTRUCTION - PAVEMENTS US 6 ILL 26 (S) TO ILL 89 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS US 6 UNDER BN RR 0.8 MI E OF JCT ILL 89 / US 6 IN SPRING VALLEY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 6 PERU ST TO STERLING ST IN LASALLE ADA IMPROVEMENTS ILL 351 MISCELLANEOUS IMPROVEMENTS US 6 0.3 MI E OF I-39 TO ILL 178 IN UTICA CRACK & JOINT SEALING PRESERVATION - PAVEMENTS US 6 AT ILL 178 IN UTICA LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 3 - 16 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 6 Location 0.8 MI W OF BOYCE MEMORIAL DR TO CHAMPLAIN ST IN OTTAWA Miles = 2.67 ILL 71 Roadway Information Miles AADT Truck Pct 2.02 7,922 9.8 0.65 US 6 13,985 7.3 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $5,400,000 LASALLE 3 2020 $100,000 LASALLE GRUNDY 1 2021-2025 $9,000,000 GRUNDY 1 2021-2025 $6,000,000 GRUNDY 1 2021-2025 $1,000,000 GRUNDY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N Y JEFFERSON ST IN MARSEILLES TO WALKERS CORNER CRACK & JOINT SEALING PRESERVATION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS Miles = 1.12 Roadway Information Miles AADT Truck Pct 1.12 12,679 7.2 US 6 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N LAKEWOOD DR TO ILL 47 IN MORRIS P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS 3 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 6 Location LAKEWOOD DR TO ILL 47 IN MORRIS Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,500,000 GRUNDY 1 2021-2025 $1,500,000 GRUNDY 1 2021-2025 $1,500,000 GRUNDY 1 2021-2025 $1,000,000 GRUNDY 1 2021-2025 $2,000,000 GRUNDY 1 2021-2025 $1,900,000 GRUNDY 2 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 6 LAKEWOOD DR TO ILL 47 IN MORRIS CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS US 6 ILL 47 IN MORRIS TO GUN CLUB RD & BRISBIN RD TO 0.1 MI E OF NIGAS RD IN CHANNAHON Miles = 5.59 Roadway Information Miles AADT Truck Pct 2.58 7,432 12.0 3.01 6,171 11.1 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 3 - 18 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 6 Location GUN CLUB RD TO BRISBIN RD Miles = 1.24 Roadway Information Miles AADT Truck Pct 1.24 7,850 12.1 US 6 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $1,500,000 GRUNDY 1 2021-2025 $2,200,000 GRUNDY 4 2021-2025 $1,200,000 GRUNDY 1 2021-2025 $800,000 GRUNDY 1 2021-2025 $250,000 LIVINGSTON 4 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N OVER CSX RR 5.3 MI E OF ILL 47 BRIDGE NEW DECK RR INSURANCE RR FLAGGER REHABILITATION - BRIDGES US 6 0.7 MI W OF MCLINDON RD TO 0.5 MI E OF MCLINDON RD IN CHANNAHON Miles = 1.15 Roadway Information Miles AADT Truck Pct 1.15 6,250 11.6 US 6 US 24 REHABILITATION - PAVEMENTS NHS N 0.5 MI E OF MCLINDON RD IN CHANNAHON TO 0.2 MI W OF WILL CO LINE Miles = 1.36 Roadway Information Miles AADT Truck Pct 1.36 8,457 9.8 DESIGNED OVERLAY STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N JACKSON ST TO 7TH ST IN FAIRBURY ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 3 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 24 Location 0.3 MI E OF 7TH ST IN FAIRBURY TO 0.3 MI E OF ILL 47 IN FORREST Miles = 5.15 Roadway Information Miles AADT Truck Pct 5.15 5,159 21.5 US 24 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $2,900,000 LIVINGSTON 2 2021-2025 $10,000 LIVINGSTON 4 2021-2025 $4,500,000 LIVINGSTON 1 2021-2025 $2,900,000 FORD 1 2020 $3,200,000 IROQUOIS 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y OAK ST TO BEECH ST IN FORREST ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS US 24 0.3 MI E OF ILL 47 IN FORREST TO FORD CO LINE Miles = 8.75 Roadway Information Miles AADT Truck Pct 8.75 2,797 23.7 US 24 ILL 115 US 24 REHABILITATION - PAVEMENTS NHS Y LIVINGSTON CO LINE TO IROQUOIS CO LINE Miles = 6.00 Roadway Information Miles AADT Truck Pct 6.00 2,343 24.6 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN Miles = 6.46 Roadway Information Miles AADT Truck Pct 6.46 3,025 25.1 DESIGNED OVERLAY RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 3 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 24 ILL 1 Location SUGAR CREEK W OF ILL 1 (N) TO ILL 1 (S) IN WATSEKA Miles = 3.01 Roadway Information Miles AADT Truck Pct 3.01 7,657 12.5 US 24 US 52 US 30 US 30 County MYP Years Past Current $2,400,000 IROQUOIS 3 2021-2025 $6,700,000 IROQUOIS 3 2020 $2,200,000 DEKALB 1 2021-2025 $55,000 DEKALB 1 2020 $3,200,000 BUREAU 2 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y LEE CO LINE TO 0.5 MI E OF SHABBONA RD IN SHABBONA Miles = 3.96 Roadway Information Miles AADT Truck Pct 3.96 2,643 22.1 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS Y ILL 1 (S) IN WATSEKA TO INDIANA STATE LINE Miles = 9.05 Roadway Information Miles AADT Truck Pct 9.05 4,038 15.6 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 0.2 MI E OF HICKORY ST IN WATERMAN TO LITTLE ROCK CREEK & 0.3 MI E OF REES ST IN HINCKLEY TO KANE CO LINE CRACK & JOINT SEALING PRESERVATION - PAVEMENTS US 34 HENRY CO LINE TO 1200N RD Miles = 6.53 Roadway Information Miles AADT Truck Pct 6.53 1,940 6.7 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 34 Location ECL OF DOVER TO ILL 89 IN LAMOILLE Miles = 8.62 Roadway Information Miles AADT Truck Pct 8.62 1,024 10.1 US 34 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $3,900,000 BUREAU 1 2021-2025 $400,000 BUREAU 1 2021-2025 $1,200,000 LASALLE 1 2020 $2,400,000 LASALLE 1 2021-2025 $3,100,000 LASALLE 1 2020 REHABILITATION - PAVEMENTS NHS N ILL 92 TO LASALLE CO LINE Miles = 5.85 MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS US 34 BUREAU CO LINE TO ILL 251 IN MENDOTA Miles = 2.04 Roadway Information Miles AADT Truck Pct 1.54 1,900 5.8 0.50 US 34 3,050 5.7 US 34 REHABILITATION - PAVEMENTS NHS N N 0.6 MI E OF I-39 TO E 12TH RD IN EARLVILLE Miles = 7.10 Roadway Information Miles AADT Truck Pct 7.10 2,088 11.3 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N E 12TH RD AT EARLVILLE TO ILL 23 (S) Miles = 6.43 Roadway Information Miles AADT Truck Pct 6.43 2,598 8.1 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 3 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 34 Location SUTPHENS RUN 0.6 MI E OF E 12TH RD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost INDIAN CREEK AT SCL OF EARLVILLE BRIDGE REPLACEMENT $1,700,000 ILL 23 (N) TO ILL 23 (S) Miles = 4.13 Roadway Information Miles AADT Truck Pct 4.13 3,915 9.7 US 34 $3,800,000 2.75 4,100 US 34 6.1 0.63 4,450 7.0 Structure Information Str Number AADT 2,250 0500040 2021-2025 Truck Pct NHS 19 N 1 2021-2025 Truck Pct NHS 8 N $2,700,000 LASALLE 1 2021-2025 $2,400,000 LASALLE DEKALB 1 2021-2025 $2,500,000 DEKALB 1 2021-2025 RECONSTRUCTION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N LASALLE CO LINE TO MAPLE ST IN SOMONAUK Miles = 0.73 Roadway Information Miles AADT Truck Pct 0.10 4,450 7.0 LASALLE 3 NHS N ILL 23 (N) TO DEKALB CO LINE; MAPLE ST TO E OF SOMONAUK RD IN SOMONAUK Miles = 3.96 Roadway Information Miles AADT Truck Pct 1.21 5,555 5.4 RECONSTRUCTION LASALLE Structure Information Str Number AADT 2,250 0500039 RECONSTRUCTION - BRIDGES US 34 MYP Years Past Current RECONSTRUCTION - BRIDGES US 34 County RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N N 3 - 23 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 34 Location LASALLE CO LINE TO MAPLE ST IN SOMONAUK Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,000,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $500,000 DEKALB 1 2021-2025 $100,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $3,400,000 DEKALB KENDALL 1 2021-2025 RECONSTRUCTION - PAVEMENTS US 34 LASALLE CO LINE TO MAPLE ST IN SOMONAUK P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS US 34 LASALLE CO LINE TO MAPLE ST IN SOMONAUK LAND ACQUISITION RECONSTRUCTION - PAVEMENTS US 34 LASALLE CO LINE TO MAPLE ST IN SOMONAUK UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS US 34 LASALLE CO LINE TO MAPLE ST IN SOMONAUK CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS US 34 W OF GLETTY RD IN SANDWICH TO CHILTON WAY IN PLANO Miles = 4.01 Roadway Information Miles AADT Truck Pct 2.03 10,983 5.1 1.98 12,506 6.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 3 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 34 Location W OF ORCHARD RD TO FOX RIVER IN OSWEGO Miles = 1.42 Roadway Information Miles AADT Truck Pct 1.42 11,300 4.9 US 45 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,000,000 KENDALL 1 2021-2025 $90,000 KANKAKEE 1 2020 $1,700,000 KANKAKEE 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y WILL CO LINE TO N OF MANTENO-DESELM RD MICROSURFACING JOINT REPAIR US 52 PRESERVATION - PAVEMENTS US 45 ROCK CREEK 1.5 MI N OF MANTENO RD BRIDGE REPLACEMENT US 52 RECONSTRUCTION - BRIDGES US 45 S BRANCH ROCK CREEK 0.5 MI N OF 7000 N RD BRIDGE REPAIR Structure Information Str Number AADT 7,300 0460046 Truck Pct NHS 14 Y $500,000 KANKAKEE 4 2021-2025 $400,000 KANKAKEE 4 2021-2025 US 52 MAINTENANCE - BRIDGES US 45 INDIAN OAKS RD TO RIVER ST IN KANKAKEE ADA IMPROVEMENTS US 52 ILL 17 MISCELLANEOUS IMPROVEMENTS 3 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 45 Location 0.1 MI N OF ARMOUR RD IN BOURBONNAIS TO ILL 17 IN KANKAKEE Miles = 3.11 US 52 Roadway Information Miles AADT Truck Pct 3.11 22,987 3.0 US 45 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $3,200,000 KANKAKEE 3 2020 $60,000 KANKAKEE 1 2020 $8,500,000 KANKAKEE IROQUOIS 2 2020 $2,200,000 IROQUOIS 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y JCT ILL 115 TO INDUSTRIAL PARK DR IN KANKAKEE CRACK & JOINT SEALING US 52 ILL 50 PRESERVATION - PAVEMENTS US 45 0.2 MI S OF I-57 IN KANKAKEE TO ILL 49 4.5 MI E OF ASHKUM Miles = 12.90 US 52 Roadway Information Miles AADT Truck Pct 8.06 3,882 18.1 REHABILITATION - PAVEMENTS NHS N 0.80 7,825 16.9 N 4.04 5,120 14.6 N US 45 DESIGNED OVERLAY LANGAN CREEK 5.2 MI N OF US 52 BRIDGE REPLACEMENT US 52 RECONSTRUCTION - BRIDGES US 45 PRAIRIE CREEK 1.3 MI N OF ILL 116 BRIDGE REPLACEMENT Structure Information Str Number AADT 4,200 0380115 $1,600,000 IROQUOIS Truck Pct NHS 19 N 3 2021-2025 US 52 RECONSTRUCTION - BRIDGES 3 - 26 Structure Information Str Number AADT 3,350 0380117 Truck Pct NHS 14 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 45 Location PRAIRIE CREEK 2.4 MI N OF US 24 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost NORTH ST IN DANFORTH TO US 24 Miles = 4.09 Roadway Information Miles AADT Truck Pct 4.09 1,849 9.6 US 45 $1,500,000 US 45 IROQUOIS Structure Information Str Number AADT 1,900 0380039 4 2020 Truck Pct NHS 10 N $2,200,000 IROQUOIS 1 2021-2025 $7,800,000 IROQUOIS 4 2021-2025 $1,000,000 IROQUOIS 1 2021-2025 $1,000,000 IROQUOIS 1 2021-2025 $500,000 IROQUOIS 1 2021-2025 REHABILITATION - PAVEMENTS NHS N US 24 TO ILL 54 Miles = 3.01 Roadway Information Miles AADT Truck Pct 3.01 3,101 7.3 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current RECONSTRUCTION - BRIDGES US 45 County RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N US 24 TO ILL 54 P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS US 45 US 24 TO ILL 54 P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS US 45 US 24 TO ILL 54 LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 3 - 27 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 45 Location US 24 TO ILL 54 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 IROQUOIS 1 2021-2025 $1,000,000 IROQUOIS 1 2021-2025 $5,600,000 IROQUOIS 1 2021-2025 $4,300,000 IROQUOIS 1 2021-2025 $1,900,000 FORD 1 2020 RECONSTRUCTION - PAVEMENTS US 45 US 24 TO ILL 54 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS US 45 ILL 54 IN ONARGA TO NORTH ST IN BUCKLEY (NCL) Miles = 8.04 Roadway Information Miles AADT Truck Pct 8.04 1,444 10.0 US 45 US 45 REHABILITATION - PAVEMENTS NHS N BUCKLEY NCL (NORTH ST) TO N 1ST ST (JEFFERSON ST) IN LODA Miles = 5.94 Roadway Information Miles AADT Truck Pct 5.94 2,374 10.1 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N DAWN AVE IN PAXTON TO CHAMPAIGN CO LINE Miles = 3.47 Roadway Information Miles AADT Truck Pct 3.47 4,119 5.9 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3 - 28 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 52 ILL 251 Location ILL 251 TO US 34 IN MENDOTA Miles = 0.95 Roadway Information Miles AADT Truck Pct 0.95 5,911 7.6 US 52 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $4,000,000 LASALLE 1 2021-2025 $1,000,000 LASALLE 1 2021-2025 $1,000,000 LASALLE 1 2021-2025 $500,000 LASALLE 1 2021-2025 $100,000 LASALLE 1 2021-2025 $1,000,000 LASALLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N ILL 251 TO US 34 IN MENDOTA P.E. (PHASE I) ILL 251 RECONSTRUCTION - PAVEMENTS US 52 ILL 251 TO US 34 IN MENDOTA P.E. (PHASE II) ILL 251 RECONSTRUCTION - PAVEMENTS US 52 ILL 251 TO US 34 IN MENDOTA LAND ACQUISITION ILL 251 RECONSTRUCTION - PAVEMENTS US 52 ILL 251 TO US 34 IN MENDOTA UTILITY ADJUSTMENT ILL 251 RECONSTRUCTION - PAVEMENTS US 52 ILL 251 TO US 34 IN MENDOTA CONSTRUCTION ENGINEERING ILL 251 RECONSTRUCTION - PAVEMENTS 3 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 52 Location US 34 TO 0.3 MI S OF BN RR IN MENDOTA Miles = 0.77 ILL 251 Roadway Information Miles AADT Truck Pct 0.77 5,393 6.8 US 52 Roadway Information Miles AADT Truck Pct 10.95 1,423 20.7 $1,800,000 LASALLE 1 2021-2025 DESIGNED OVERLAY $6,100,000 LASALLE 1 2021-2025 $4,500,000 LASALLE 1 2021-2025 $2,000,000 LASALLE 4 2020 REHABILITATION - PAVEMENTS 1,400 24.3 N 2,300 12.6 N US 52 ILL 23 (N) TO ILL 71 Miles = 8.77 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N INDIAN CREEK 2.1 MI E OF ILL 23 BRIDGE NEW DECK REHABILITATION - BRIDGES US 52 MYP Years Past Current NHS N 0.22 Roadway Information Miles AADT Truck Pct 8.77 1,771 12.4 County REHABILITATION - PAVEMENTS 0.46 US 52 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS N 0.5 MI W OF I-39 TO 0.2 MI E OF ILL 23 (S) Miles = 11.63 ILL 23 Improvements TAMP Category FOX RIVER 2.1 MI W OF ILL 71 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 30 Structure Information Str Number AADT 1,450 0500201 $6,500,000 LASALLE Structure Information Str Number AADT 2,000 0500058 Truck Pct NHS 13 N 3 2021-2025 Truck Pct NHS 12 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 52 Location ILL 71 TO TOWNHOUSE RD Miles = 5.62 Roadway Information Miles AADT Truck Pct 3.06 1,100 15.5 2.56 US 52 1,918 12.9 US 52 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $2,900,000 LASALLE KENDALL 1 2021-2025 $3,300,000 KENDALL 1 2021-2025 $100,000 KENDALL 1 2020 $2,400,000 IROQUOIS 1 2021-2025 $3,800,000 IROQUOIS 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N TOWNHOUSE RD (N) TO ILL 47 Miles = 6.38 Roadway Information Miles AADT Truck Pct 6.38 1,346 17.3 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N AT GROVE RD FLASHING LIGHT MISCELLANEOUS IMPROVEMENTS US 52 US 45 TO ILL 1 Miles = 7.02 Roadway Information Miles AADT Truck Pct 7.02 1,906 19.6 US 52 REHABILITATION - PAVEMENTS NHS N ILL 1 TO SCL OF DONOVAN Miles = 6.82 Roadway Information Miles AADT Truck Pct 6.82 1,787 21.4 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street US 52 Location SCL OF DONOVAN TO US 24 IN SHELDON Miles = 7.71 Roadway Information Miles AADT Truck Pct 7.71 1,573 25.4 ILL 1 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $4,200,000 IROQUOIS 1 2021-2025 $115,000 KANKAKEE 1 2020 $900,000 IROQUOIS 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 1 (N) IN GRANT PARK TO 0.5 MI E OF ILL 1 (S) CRACK & JOINT SEALING ILL 17 PRESERVATION - PAVEMENTS ILL 1 LITTLE BEAVER CREEK 1.2 MI N OF PAPINEAU RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 1 PIKE CREEK 0.2 MI N OF US 52 BRIDGE REPLACEMENT Structure Information Str Number AADT 2,400 0380017 $1,252,000 RECONSTRUCTION - BRIDGES ILL 1 0.1 MI N OF US 52 TO US 24 IN WATSEKA Miles = 7.94 Roadway Information Miles AADT Truck Pct 7.94 2,622 11.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 3 - 32 IROQUOIS Structure Information Str Number AADT 2,450 0380020 $4,500,000 IROQUOIS Truck Pct NHS 10 Y 9 2021-2025 Truck Pct NHS 11 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 1 Location COON CREEK 5.4 MI S OF US 24 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost GAY CREEK 0.2 MI S OF WELLINGTON BRIDGE REPLACEMENT $1,500,000 MCLEAN CO LINE TO ILL 47 IN GIBSON CITY Miles = 4.30 Roadway Information Miles AADT Truck Pct 4.30 1,771 19.7 ILL 9 $700,000 Truck Pct NHS 16 Y 4 2021-2025 Truck Pct NHS 46 Y $2,100,000 FORD MCLEAN 1 2020 DESIGNED OVERLAY ADA IMPROVEMENTS PATCHING $7,200,000 FORD 1 2021-2025 $50,000 FORD 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.50 5,432 8.0 N 10.03 2,176 14.0 N ILL 9 Structure Information Str Number AADT 2,700 0380028 2021-2025 REHABILITATION - PAVEMENTS ILL 54 Roadway Information Miles AADT Truck Pct 0.50 5,184 22.2 IROQUOIS 17 NHS N ILL 47 IN GIBSON CITY TO ILL 115 Miles = 11.03 ILL 47 DESIGNED OVERLAY IROQUOIS Structure Information Str Number AADT 2,750 0380023 RECONSTRUCTION - BRIDGES ILL 9 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 1 County S LOTT BLVD TO ILL 47 IN GIBSON CITY ADA IMPROVEMENTS ILL 54 MISCELLANEOUS IMPROVEMENTS 3 - 33 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 9 Location STOCKHOLM RD IN PAXTON TO VERMILION CO LINE Miles = 7.68 Roadway Information Miles AADT Truck Pct 7.68 2,350 22.3 ILL 17 $3,900,000 FORD 1 2021-2025 DESIGNED OVERLAY $6,700,000 LIVINGSTON LASALLE MARSHALL 1 2021-2025 $1,000,000 LIVINGSTON 4 2021-2025 REHABILITATION - PAVEMENTS 1,600 15.6 N 1,470 11.0 N DRAINAGE DITCH 0.6 MI W OF MANVILLE RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 18 TO W FORK MAZON RIVER 1.4 MI W OF I-55 Miles = 11.59 Roadway Information Miles AADT Truck Pct 11.59 1,852 16.5 ILL 17 MYP Years Past Current NHS N 0.15 ILL 17 County REHABILITATION - PAVEMENTS 5.10 ILL 17 DESIGNED OVERLAY Est. Cost NHS N ILL 251 IN WENONA TO ILL 23 S OF STREATOR Miles = 11.36 Roadway Information Miles AADT Truck Pct 6.11 1,200 14.2 Improvements TAMP Category DESIGNED OVERLAY Structure Information Str Number AADT 725 0530029 Truck Pct NHS 26 N $5,600,000 LIVINGSTON 1 2021-2025 $330,000 LIVINGSTON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N CLINTON ST TO S ST. LOUIS ST IN DWIGHT ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 3 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 17 Location W OF REDDICK TO 0.3 MI W OF TR 4B Miles = 1.96 Roadway Information Miles AADT Truck Pct 0.25 2,214 17.4 1.71 ILL 17 2,092 17.9 Improvements TAMP Category DESIGNED OVERLAY Est. Cost $1,200,000 LIVINGSTON KANKAKEE GRUNDY 2 2020 $1,000,000 KANKAKEE 4 2021-2025 REHABILITATION - PAVEMENTS NHS N N GRANARY CREEK 1.3 MI E OF ESSEX RD BRIDGE REPLACEMENT E BRANCH HORSE CREEK 0.2 MI E OF HERSCHER RD BRIDGE REPLACEMENT Structure Information Str Number AADT 3,100 0460030 $1,600,000 RECONSTRUCTION - BRIDGES ILL 17 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 17 County NS RR TO US 45/52 IN KANKAKEE CRACK & JOINT SEALING KANKAKEE Structure Information Str Number AADT 4,200 0460032 Truck Pct NHS 16 N 4 2021-2025 Truck Pct NHS 11 N $120,000 KANKAKEE 1 2021-2025 $3,452,000 KANKAKEE 1 2021-2025 PRESERVATION - PAVEMENTS ILL 17 ILL 1 (N) IN GRANT PARK TO INDIANA STATE LINE Miles = 5.97 Roadway Information Miles AADT Truck Pct 5.97 4,191 41.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 3 - 35 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 18 Location ILL 89 TO ILL 251 Miles = 7.07 Roadway Information Miles AADT Truck Pct 4.41 2,550 11.4 3,200 16.1 Y 2,664 14.1 N ILL 251 TO WCL OF STREATOR Miles = 10.91 ILL 18 County MYP Years Past Current $3,500,000 PUTNAM LASALLE 1 2021-2025 $5,700,000 LASALLE 2 2020 $130,000 LASALLE 4 2021-2025 LASALLE LIVINGSTON 1 2021-2025 REHABILITATION - PAVEMENTS 2.06 Roadway Information Miles AADT Truck Pct 10.91 3,161 15.9 DESIGNED OVERLAY Est. Cost NHS N 0.60 ILL 18 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y ILL 23 (NB) TO THIRD AVE IN STREATOR ADA IMPROVEMENTS ILL 18 A MISCELLANEOUS IMPROVEMENTS ILL 18 0.1 MI W OF OTTER CREEK RD IN STREATOR TO ILL 17 (E) Miles = 7.97 Roadway Information Miles AADT Truck Pct 1.07 2,757 10.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 5.82 1,869 13.3 N 1.08 1,750 13.7 N 3 - 36 $4,300,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 23 Location STATE ST IN GENOA TO ILL 23 (S); ILL 23 (N) TO 0.2 MI E OF ILL 23 (S) Miles = 2.49 ILL 72 Roadway Information Miles AADT Truck Pct 1.74 7,750 7.1 0.75 9,000 ILL 23 6.4 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $2,300,000 DEKALB 4 2020 $100,000 DEKALB 1 2020 $3,800,000 DEKALB 3 2020 $6,300,000 DEKALB LASALLE 1 2021-2025 $5,000,000 LASALLE 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y N 0.2 MI E OF ILL 23 (S) TO ILL 23 (S) IN GENOA PATCHING ILL 72 MAINTENANCE - PAVEMENTS ILL 23 N OF CENTRAL AVE IN GENOA TO ILL 64 & MAIN ST TO SACRAMENTO ST IN SYCAMORE Miles = 7.74 ILL 64 STATE ST Roadway Information Miles AADT Truck Pct 7.74 8,780 6.7 ILL 23 1.01 1,300 ILL 23 14.6 5,866 12.8 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N US 52 (W) TO N OF I-80 IN OTTAWA Miles = 6.36 Roadway Information Miles AADT Truck Pct 5.07 3,805 15.8 1.29 REHABILITATION - PAVEMENTS NHS Y US 30 IN WATERMAN TO US 34 Miles = 10.69 Roadway Information Miles AADT Truck Pct 9.68 2,115 14.2 STANDARD OVERLAY ADA IMPROVEMENTS RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N N 3 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 23 Location COVEL CREEK 5 MI S OF ILL 71 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 0.3 MI N OF OAKLEY AVE TO GROVE ST IN STREATOR CRACK & JOINT SEALING MYP Years Past Current $1,700,000 RECONSTRUCTION - BRIDGES ILL 23 County LASALLE Structure Information Str Number AADT 7,500 0500048 8 2021-2025 Truck Pct NHS 9 Y $35,000 LASALLE 1 2020 $370,000 LASALLE 4 2021-2025 $65,000 LIVINGSTON 1 2020 $80,000 LIVINGSTON 4 2021-2025 ILL 23 A PRESERVATION - PAVEMENTS ILL 23 OAKLEY AVE TO ILL 18 (EB) IN STREATOR ADA IMPROVEMENTS ILL 23 A MISCELLANEOUS IMPROVEMENTS ILL 23 0.9 MI S OF LASALLE CO LINE TO 9TH ST IN CORNELL CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 23 6TH ST TO 7TH ST IN CORNELL ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 3 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 23 Location ECL OF CORNELL TO ILL 116 IN PONTIAC Miles = 11.33 Roadway Information Miles AADT Truck Pct 6.79 2,420 9.3 3,424 13.7 N 3,980 9.7 Y ILL 92 TO S OF RED COVERED BRIDGE RD Miles = 9.99 ILL 26 County MYP Years Past Current $6,400,000 LIVINGSTON 2 2020 $4,600,000 BUREAU 1 2020 $250,000 BUREAU 2 2021-2025 $30,000 BUREAU 1 2020 $3,400,000 BUREAU 1 2021-2025 REHABILITATION - PAVEMENTS 2.77 Roadway Information Miles AADT Truck Pct 9.99 2,803 22.2 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS N 1.77 ILL 26 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y STREAM 0.2 MI S OF ILL 92 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 26 I-80 TO S OF RAILROAD AVE IN PRINCETON CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 26 US 6 TO ILL 29 (N) IN BUREAU JUNCTION Miles = 7.45 Roadway Information Miles AADT Truck Pct 1.68 3,250 8.4 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 3.48 2,609 9.4 N 2.29 750 28.0 N 3 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 29 Location UNNAMED STREAM 0.5 MI W OF DEPUE RD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $300,000 BUREAU 3 2021-2025 $800,000 BUREAU 6 2021-2025 $800,000 BUREAU 4 2021-2025 $600,000 BUREAU 3 2021-2025 $400,000 BUREAU 3 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 29 UNNAMED STREAM 0.4 MI W OF DEPUE RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 29 UNNAMED STREAM 0.3 MI W OF DEPUE RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 29 UNNAMED STREAM 0.2 MI W OF DEPUE RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 29 UNNAMED STREAM 0.1 MI W OF DEPUE RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 3 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 29 Location UNNAMED STREAM 0.1 MI E OF DEPUE RD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $500,000 BUREAU 3 2021-2025 $2,300,000 BUREAU 1 2021-2025 $4,300,000 DEKALB 5 2020 $3,000,000 DEKALB 1 2021-2025 $5,300,000 DEKALB 2 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 29 0.4 MI N OF PUTNAM CO LINE TO KANSAS ST IN BUREAU JUNCTION Miles = 4.01 ILL 26 Roadway Information Miles AADT Truck Pct 1.11 1,342 16.8 REHABILITATION - PAVEMENTS NHS N 2.59 575 0.0 N 0.31 3,000 14.7 Y ILL 38 OGLE CO LINE TO JOHN HUBER PKWY (S) Miles = 7.47 Roadway Information Miles AADT Truck Pct 7.47 8,114 5.7 ILL 38 ILL 38 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y ILL 23 TO PEACE RD IN DEKALB & 0.1 MI W OF LOVES RD IN CORTLAND TO KANE CO LINE Miles = 7.29 Roadway Information Miles AADT Truck Pct 1.55 9,889 6.3 DESIGNED OVERLAY NHS Y JOHN HUBER PKWY (S) TO ILL 23 IN DEKALB Miles = 2.48 Roadway Information Miles AADT Truck Pct 2.48 11,417 5.4 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 3.63 8,481 6.9 N 2.11 7,250 4.4 N 3 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 38 Location PEACE RD IN DEKALB TO 0.1 MI W OF LOVES RD IN CORTLAND Miles = 0.91 Roadway Information Miles AADT Truck Pct 0.91 9,050 8.0 ILL 40 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $1,000,000 DEKALB 1 2021-2025 $280,000 BUREAU 1 2020 $1,800,000 BUREAU 1 2021-2025 $2,800,000 BUREAU 2 2020 $1,800,000 KENDALL 3 2020 RECONSTRUCTION - PAVEMENTS NHS N 0.1 MI N OF 2600N RD TO I-80 MICROSURFACING JOINT REPAIR PRESERVATION - PAVEMENTS ILL 40 US 6/34 TO BNSF RR S OF BUDA Miles = 3.04 Roadway Information Miles AADT Truck Pct 3.04 1,689 17.1 ILL 40 ILL 47 REHABILITATION - PAVEMENTS NHS N BNSF RR S OF BUDA TO STARK CO LINE Miles = 6.03 Roadway Information Miles AADT Truck Pct 6.03 1,300 29.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N S OF GALENA RD TO S OF KENNEDY RD IN YORKVILLE Miles = 2.45 Roadway Information Miles AADT Truck Pct 2.45 17,435 13.4 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 3 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 Location S OF GALENA RD TO KENNEDY RD IN YORKVILLE Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES Est. Cost County MYP Years Past Current $20,000,000 KENDALL 1 2021-2025 $10,000,000 KENDALL 1 2021-2025 $17,500,000 KENDALL 1 2021-2025 $4,000,000 KENDALL 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 S OF GALENA RD TO KENNEDY RD IN YORKVILLE Miles = 2.28 Roadway Information Miles AADT Truck Pct 2.28 17,429 13.3 ILL 47 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y BNSF-MENDOTA RR 1.8 MI N OF US 34 IN YORKVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 47 BLACKBERRY CREEK 1 MI N OF US 34 IN YORKVILLE BRIDGE WIDENING REHABILITATION - BRIDGES ILL 47 S OF GALENA RD TO KENNEDY RD IN YORKVILLE P.E. (PHASE II) Structure Information Str Number AADT 17,500 0470053 Truck Pct NHS 15 Y $1,500,000 KENDALL 1 2020 $1,500,000 KENDALL 1 2020 US 30 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 S OF GALENA RD TO KENNEDY RD IN YORKVILLE LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS 3 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 Location S OF GALENA RD TO KENNEDY RD IN YORKVILLE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $2,000,000 KENDALL 1 2021-2025 $1,000,000 KENDALL 1 2021-2025 $1,500,000 KENDALL 1 2021-2025 $2,500,000 KENDALL 1 2021-2025 $30,000 KENDALL 1 2020 $20,000,000 KENDALL 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 S OF GALENA RD TO KENNEDY RD IN YORKVILLE UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS ILL 47 S OF GALENA RD TO KENNEDY RD IN YORKVILLE CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS ILL 47 BNSF-MENDOTA RR 1.8 MI N OF US 34 IN YORKVILLE RR FLAGGER MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS ILL 47 BNSF-MENDOTA RR 1.8 MI N OF US 34 IN YORKVILLE RR ENGINEERING RECONSTRUCTION - BRIDGES ILL 47 ILL 71 TO CATON FARM RD Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 3 - 44 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 Location ILL 71 TO CATON FARM RD Miles = 4.21 Roadway Information Miles AADT Truck Pct 4.21 7,476 23.6 ILL 47 Improvements TAMP Category RECONSTRUCTION CULVERT REPLACEMENT CULVERT EXTENSION Est. Cost $18,000,000 RECONSTRUCTION - PAVEMENTS P.E. (PHASE II) MYP Years Past Current KENDALL Structure Information Str Number AADT 6,850 0472006 NHS Y ILL 71 TO CATON FARM RD County 1 2021-2025 Truck Pct NHS 27 Y $1,100,000 KENDALL 1 2020 $1,000,000 KENDALL 1 2021-2025 $2,000,000 KENDALL 1 2021-2025 $3,000,000 KENDALL 1 2021-2025 $1,500,000 KENDALL 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 47 ILL 71 TO CATON FARM RD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 47 ILL 71 TO CATON FARM RD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 47 ILL 71 TO CATON FARM RD UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS ILL 47 ILL 71 TO CATON FARM RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 3 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 US 6 Location 0.1 MI S OF GREEN ACRES DR TO ARMSTRONG ST IN MORRIS Improvements TAMP Category CRACK & JOINT SEALING Est. Cost County MYP Years Past Current $80,000 GRUNDY 1 2021-2025 $3,250,000 GRUNDY 3 2021-2025 $5,000,000 LIVINGSTON 1 2020 $3,200,000 LIVINGSTON 1 2021-2025 $150,000 LIVINGSTON 4 2021-2025 PRESERVATION - PAVEMENTS ILL 47 AT I-55 INTCHG IN DWIGHT Miles = 0.72 RECONSTRUCTION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. Roadway Information Miles AADT Truck Pct 0.72 7,236 27.2 ILL 47 0.9 MI S OF ILL 17 IN DWIGHT TO ILL 116 IN SAUNEMIN Miles = 13.16 Roadway Information Miles AADT Truck Pct 13.16 2,453 37.6 ILL 47 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y ILL 116 IN SAUNEMIN TO US 24 IN FORREST Miles = 9.80 Roadway Information Miles AADT Truck Pct 9.80 2,767 31.3 ILL 47 RECONSTRUCTION - PAVEMENTS NHS Y STANDARD OVERLAY ADA IMPROVEMENTS PRESERVATION - PAVEMENTS NHS Y JAMES ST TO WALNUT ST IN FORREST ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 3 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 Location WALTER ST TO EBERSOL ST IN STRAWN Improvements TAMP Category ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $40,000 LIVINGSTON 4 2021-2025 $5,500,000 LIVINGSTON 1 2021-2025 $3,500,000 FORD 1 2021-2025 $554,000 FORD 1 2021-2025 $100,000 FORD 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 47 US 24 IN FORREST TO FORD CO LINE Miles = 9.31 Roadway Information Miles AADT Truck Pct 9.31 3,073 32.6 ILL 47 ILL 47 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 19TH ST TO 9TH ST IN GIBSON CITY Miles = 0.93 Roadway Information Miles AADT Truck Pct 0.93 3,350 34.2 ILL 47 REHABILITATION - PAVEMENTS NHS Y LIVINGSTON CO LINE TO 9TH ST IN GIBSON CITY Miles = 10.58 Roadway Information Miles AADT Truck Pct 10.58 3,058 33.6 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 9TH ST IN GIBSON CITY TO 0.3 MI S OF ILL 9 (N JCT) PATCHING ILL 9 MAINTENANCE - PAVEMENTS 3 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 47 Location 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE Miles = 3.92 Roadway Information Miles AADT Truck Pct 3.92 4,261 23.4 ILL 47 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $10,200,000 FORD 1 2021-2025 $1,000,000 FORD 1 2021-2025 $1,000,000 FORD 1 2021-2025 $500,000 FORD 1 2021-2025 $100,000 FORD 1 2021-2025 $1,000,000 FORD 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 47 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 47 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 47 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 47 0.1 MI S OF ILL 9 TO CHAMPAIGN CO LINE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 3 - 48 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 49 Location US 24 TO US 45/52 Miles = 8.09 Roadway Information Miles AADT Truck Pct 8.09 2,474 17.7 ILL 50 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $4,000,000 IROQUOIS 1 2020 $120,000 KANKAKEE 1 2020 $85,000 KANKAKEE 1 2020 $7,500,000 KANKAKEE 1 2021-2025 $700,000 KANKAKEE 2 2020 $300,000 KANKAKEE 1 2020 REHABILITATION - PAVEMENTS NHS N N OF 6TH ST IN MANTENO TO 0.7 MI N OF ST. GEORGE RD IN BOURBONNAIS CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 50 0.1 MI N OF ARMOUR RD TO BROOKMONT BLVD IN KANKAKEE CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 50 AT ARMOUR RD INTERSECTION IMPROVEMENT ARMOUR RD MISCELLANEOUS IMPROVEMENTS ILL 50 AT ARMOUR RD LAND ACQUISITION ARMOUR RD MISCELLANEOUS IMPROVEMENTS ILL 50 AT ARMOUR RD UTILITY ADJUSTMENT ARMOUR RD MISCELLANEOUS IMPROVEMENTS 3 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 50 Location S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE Miles = 4.03 ILL 50 A Roadway Information Miles AADT Truck Pct 2.72 6,735 6.3 1.31 ILL 50 ILL 50 A 3,352 5.6 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $17,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $500,000 KANKAKEE 1 2021-2025 $100,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y Y S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 50 ILL 50 A S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 50 ILL 50 A S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 50 ILL 50 A S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 50 ILL 50 A S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 3 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 50 Location S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE ILL 50 A Improvements TAMP Category RR ENGINEERING Est. Cost County MYP Years Past Current $30,000 KANKAKEE 1 2021-2025 $100,000 KANKAKEE 1 2021-2025 $1,800,000 IROQUOIS 1 2021-2025 $3,400,000 FORD IROQUOIS 1 2021-2025 $6,600,000 FORD 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 50 S OF BROOKMONT BLVD TO N OF US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE ILL 50 A RR INSURANCE RR FLAGGER MISCELLANEOUS RECONSTRUCTION - PAVEMENTS ILL 54 0.4 MI W OF I-57 TO US 45 IN ONARGA Miles = 1.56 Roadway Information Miles AADT Truck Pct 1.17 1,573 8.4 0.39 1,400 ILL 54 11.4 2.70 ILL 54 ILL 115 REHABILITATION - PAVEMENTS NHS N N ILL 115 IN ROBERTS TO SPRING CREEK Miles = 7.18 Roadway Information Miles AADT Truck Pct 4.48 1,000 20.8 1,071 16.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N ILL 115 IN ROBERTS TO ILL 9 IN GIBSON CITY Miles = 15.62 Roadway Information Miles AADT Truck Pct 15.62 1,612 17.4 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 3 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 54 Location ILL 9/47 IN GIBSON CITY TO CHAMPAIGN CO LINE Miles = 5.52 Roadway Information Miles AADT Truck Pct 5.52 1,379 20.2 ILL 64 1.67 ILL 64 7,785 8.5 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $2,600,000 FORD 1 2021-2025 $14,000,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $500,000 DEKALB 1 2021-2025 REHABILITATION - PAVEMENTS NHS N CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE Miles = 6.59 Roadway Information Miles AADT Truck Pct 4.92 4,943 11.6 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N N CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 64 CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 64 CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 3 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 64 Location CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $3,200,000 DEKALB 5 2021-2025 $300,000 LASALLE PUTNAM 1 2020 $5,700,000 LASALLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 64 CLARE RD TO 0.4 MI W OF ILL 23 (S) IN SYCAMORE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 64 ILL 23 (N) IN SYCAMORE TO KANE CO LINE Miles = 4.48 Roadway Information Miles AADT Truck Pct 1.41 8,203 7.6 3.07 ILL 71 5,750 10.4 RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N N ILL 89 TO CEDAR CREEK IN CEDAR POINT Miles = 3.88 MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS ILL 71 US FOX RIVER 0.7 MI E OF ILL 23 IN OTTAWA BRIDGE REPLACEMENT 6 RECONSTRUCTION - BRIDGES 3 - 53 Structure Information Str Number AADT 10,400 0500033 Truck Pct NHS 10 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 71 Location LASALLE CO LINE TO 0.2 MI W OF ILL 47 IN YORKVILLE Miles = 10.24 Roadway Information Miles AADT Truck Pct 10.24 7,241 16.3 ILL 71 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $5,000,000 KENDALL 2 2021-2025 $20,000,000 KENDALL 1 2021-2025 $17,000,000 KENDALL 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS ILL 71 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO Miles = 3.72 Roadway Information Miles AADT Truck Pct 3.72 10,406 11.4 ILL 71 RECONSTRUCTION BRIDGE REPLACEMENT CULVERT REPLACEMENT RECONSTRUCTION - PAVEMENTS Structure Information Str Number AADT 11,300 0470059 NHS Y 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO P.E. (PHASE II) Truck Pct NHS 8 Y $1,300,000 KENDALL 1 2020 $1,000,000 KENDALL 1 2020 $1,500,000 KENDALL 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 71 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 71 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS 3 - 54 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 71 Location 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $1,000,000 KENDALL 1 2021-2025 $1,500,000 KENDALL 1 2021-2025 $1,100,000 DEKALB 3 2020 INITIAL CONSTRUCTION - PAVEMENTS ILL 71 0.5 MI E OF ILL 126 TO W OF ORCHARD RD W OF OSWEGO CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS ILL 72 STREAM 0.1 MI E OF OGLE CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 72 OWENS CREEK 1.3 MI W OF KIRKLAND BRIDGE REPLACEMENT Structure Information Str Number AADT 1,900 0190021 $2,300,000 RECONSTRUCTION - BRIDGES ILL 72 BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA Miles = 8.08 Roadway Information Miles AADT Truck Pct 3.35 3,183 11.0 4.73 4,156 9.7 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N N 3 - 55 DEKALB Structure Information Str Number AADT 2,250 0190030 $21,000,000 DEKALB Truck Pct NHS 18 N 1 2021-2025 Truck Pct NHS 14 N 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 72 Location BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,000,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $500,000 DEKALB 1 2021-2025 $100,000 DEKALB 1 2021-2025 $1,000,000 DEKALB 1 2021-2025 $4,700,000 BUREAU 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 72 BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 72 BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 72 BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 72 BULL RUN CREEK IN KIRKLAND TO STATE ST IN GENOA CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 89 US 34 IN LAMOILLE TO 0.2 MI S OF PLANK RD IN CHERRY Miles = 7.55 Roadway Information Miles AADT Truck Pct 7.55 1,554 7.5 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3 - 56 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 92 Location I&M FEEDER CANAL 1 MI E OF ILL 172 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost GREEN RIVER 1.4 MI W OF ILL 40 BRIDGE REPLACEMENT $1,700,000 ILL 40 TO WCL OF WALNUT Miles = 4.49 Roadway Information Miles AADT Truck Pct 4.49 1,432 10.3 ILL 92 $3,000,000 ILL 92 Structure Information Str Number AADT 475 0060097 2021-2025 Truck Pct NHS 11 N 1 2021-2025 Truck Pct NHS 12 N $2,600,000 BUREAU 2 2021-2025 $400,000 BUREAU 1 2021-2025 $3,200,000 BUREAU 1 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N VALLEY VIEW ST IN WALNUT TO ILL 26 IN OHIO Miles = 6.24 Roadway Information Miles AADT Truck Pct 6.24 1,600 21.8 BUREAU 2 NHS N WCL OF WALNUT TO VALLEY VIEW ST IN WALNUT Miles = 1.06 Roadway Information Miles AADT Truck Pct 1.06 1,683 12.3 DESIGNED OVERLAY BUREAU Structure Information Str Number AADT 450 0060096 RECONSTRUCTION - BRIDGES ILL 92 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 92 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 3 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 92 Location ILL 26 IN OHIO TO US 34 N OF LAMOILLE Miles = 10.07 Roadway Information Miles AADT Truck Pct 10.07 747 11.7 ILL 102 ILL 102 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $5,000,000 BUREAU 1 2021-2025 $5,500,000 KANKAKEE 1 2021-2025 $100,000 KANKAKEE 4 2021-2025 $4,100,000 GRUNDY 1 2020 $2,000,000 GRUNDY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N WILL CO LINE TO US 45/52 IN BOURBONNAIS Miles = 8.14 Roadway Information Miles AADT Truck Pct 8.14 7,024 5.9 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N BRIARCLIFF LN TO US 45/52 IN BOURBONNAIS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 113 ILL 47 TO MARY AVE IN COAL CITY Miles = 6.77 Roadway Information Miles AADT Truck Pct 5.02 4,700 4.0 1.75 ILL 113 6,299 8.4 REHABILITATION - PAVEMENTS NHS N N LINCOLN ST IN COAL CITY TO WILL CO LINE Miles = 1.58 Roadway Information Miles AADT Truck Pct 1.58 10,737 7.1 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3 - 58 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 113 Location WILL CO LINE TO EDGEWATER DR (N) IN LIMESTONE Miles = 6.05 Roadway Information Miles AADT Truck Pct 6.05 2,893 13.6 ILL 113 ILL 113 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $3,300,000 KANKAKEE 1 2021-2025 $5,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $500,000 KANKAKEE 1 2021-2025 $100,000 KANKAKEE 1 2021-2025 REHABILITATION - PAVEMENTS NHS N EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE Miles = 2.26 Roadway Information Miles AADT Truck Pct 2.26 4,150 9.0 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 113 EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 113 EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 113 EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 3 - 59 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 113 Location EDGEWATER DR (W) IN LIMESTONE TO INDIAN TRAIL IN KANKAKEE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,000,000 KANKAKEE 1 2021-2025 $2,200,000 KANKAKEE 1 2021-2025 $19,100,000 KANKAKEE 2 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $500,000 KANKAKEE 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 113 INDIAN TRAIL TO ILL 17 IN KANKAKEE Miles = 1.91 Roadway Information Miles AADT Truck Pct 1.91 6,417 7.1 ILL 114 ILL 114 REHABILITATION - PAVEMENTS NHS N ILL 1/17 TO INDIANA STATE LINE Miles = 7.40 Roadway Information Miles AADT Truck Pct 7.40 4,223 35.6 DESIGNED OVERLAY ADA IMPROVEMENTS RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N ILL 1/17 TO INDIANA STATE LINE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 114 ILL 1/17 TO INDIANA STATE LINE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 114 ILL 1/17 TO INDIANA STATE LINE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 3 - 60 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 114 Location ILL 1/17 TO INDIANA STATE LINE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $2,200,000 KANKAKEE 2 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $500,000 KANKAKEE 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 114 ILL 1/17 TO INDIANA STATE LINE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 115 US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE Miles = 0.47 Roadway Information Miles AADT Truck Pct 0.47 3,830 8.6 ILL 115 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 115 US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 115 US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 3 - 61 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 115 Location US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 KANKAKEE 1 2021-2025 $1,000,000 KANKAKEE 1 2021-2025 $1,300,000 KANKAKEE 1 2021-2025 $3,700,000 KANKAKEE 1 2021-2025 $4,700,000 KANKAKEE FORD 2 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 115 US 45/52 (WATER ST) TO JEFFERY ST IN KANKAKEE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 115 S WASHINGTON AVE TO 1 MI W OF CURTIS AVE W OF KANKAKEE Miles = 2.02 Roadway Information Miles AADT Truck Pct 0.12 2,800 4.3 1.90 4,243 ILL 115 6.8 REHABILITATION - PAVEMENTS NHS N N S 13000W RD IN HERSCHER TO S 6000W RD N OF IRWIN Miles = 6.84 Roadway Information Miles AADT Truck Pct 6.84 2,004 7.5 ILL 115 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N CH 18 TO 0.3 MI S OF MAIN ST IN CABERY & CH 18 TO WCL OF HERSCHER Miles = 9.26 Roadway Information Miles AADT Truck Pct 0.25 700 20.0 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 3.97 675 10.4 N 5.04 1,106 6.2 N 3 - 62 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 115 Location SCL OF CABERY TO ILL 116 Miles = 7.83 Roadway Information Miles AADT Truck Pct 7.83 609 20.4 ILL 115 ILL 115 ILL 115 County MYP Years Past Current $3,400,000 FORD 2 2021-2025 $1,400,000 FORD 1 2021-2025 $4,400,000 FORD 1 2021-2025 $500,000 FORD 4 2020 LIVINGSTON 4 2020 REHABILITATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N US 24 TO ILL 54 (N) IN ROBERTS Miles = 9.04 Roadway Information Miles AADT Truck Pct 9.04 917 19.7 DESIGNED OVERLAY Est. Cost NHS N W OF PINE ST TO US 24 IN PIPER CITY Miles = 1.09 Roadway Information Miles AADT Truck Pct 1.09 875 15.8 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N STREAM 7.2 MI S OF US 24 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 116 ROOKS CREEK 2.7 MI W OF I-55 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 63 $3,100,000 Structure Information Str Number AADT 2,900 0530065 Truck Pct NHS 11 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 116 Location ILL 23 TO PEARL ST IN PONTIAC Miles = 1.72 Roadway Information Miles AADT Truck Pct 1.72 6,607 6.8 ILL 116 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,900,000 LIVINGSTON 3 2021-2025 $30,000 LIVINGSTON 4 2021-2025 $4,000,000 LIVINGSTON 1 2020 $60,000 LIVINGSTON 4 2021-2025 KENDALL 3 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 47 TO PLUM ST IN SAUNEMIN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 116 0.7 MI E OF ILL 47 IN SAUNEMIN TO WCL OF CULLOM Miles = 7.28 Roadway Information Miles AADT Truck Pct 7.28 1,303 21.3 ILL 116 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N OAK ST TO ASH ST IN CULLOM ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 126 ILL 71 TO WING RD IN YORKVILLE & E BRANCH MORGAN CREEK TO WILL CO LINE Miles = 6.43 Roadway Information Miles AADT Truck Pct 0.38 7,550 8.6 6.05 7,981 8.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 3 - 64 $3,100,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 126 Location WING RD IN YORKVILLE TO E BRANCH MORGAN CREEK Miles = 2.74 Roadway Information Miles AADT Truck Pct 2.74 7,550 8.6 ILL 170 ILL 170 RECONSTRUCTION Est. Cost County MYP Years Past Current $2,500,000 KENDALL 1 2021-2025 $9,000,000 LASALLE 1 2021-2025 $1,000,000 LASALLE 1 2021-2025 $1,000,000 LASALLE 1 2021-2025 $500,000 LASALLE 1 2021-2025 $100,000 LASALLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N CSX RR TO SOUTH ST IN SENECA Miles = 1.07 Roadway Information Miles AADT Truck Pct 1.07 6,094 8.9 Improvements TAMP Category RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N CSX RR TO SOUTH ST IN SENECA P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 170 CSX RR TO SOUTH ST IN SENECA P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 170 CSX RR TO SOUTH ST IN SENECA LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 170 CSX RR TO SOUTH ST IN SENECA UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 3 - 65 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ILL 170 Location CSX RR TO SOUTH ST IN SENECA Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,000,000 LASALLE 1 2021-2025 $2,400,000 LASALLE 1 2021-2025 $3,500,000 LASALLE 1 2021-2025 $200,000 LASALLE 4 2021-2025 $1,100,000 LASALLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 178 ILL 71 TO ED LAMBERT RD Miles = 4.32 Roadway Information Miles AADT Truck Pct 4.32 2,204 12.9 ILL 351 US REHABILITATION - PAVEMENTS NHS N 0.4 MI S OF I-80 TO S OF CANAL ST IN LASALLE Miles = 2.79 6 Roadway Information Miles AADT Truck Pct 2.41 6,101 4.4 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 0.16 7,600 4.5 Y 0.22 5,300 2.9 N ILL 351 DESIGNED OVERLAY 24TH ST TO 5TH ST & 1ST ST TO US 6 IN LASALLE ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 351 ILL 351: WALNUT ST TO LONE STAR CEMENT RR BRIDGE IN OGLESBY; ILL 71: ILL 351 TO VERMILION RIVER Miles = 1.20 ILL 71 Roadway Information Miles AADT Truck Pct 0.92 4,800 4.4 0.28 2,900 3.2 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 3 - 66 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street ARMOUR RD Location OVER ICG RR 0.3 MI W OF ILL 50 Improvements TAMP Category BRIDGE REPLACEMENT RR INSURANCE RR FLAGGER RR ENGINEERING Est. Cost County MYP Years Past Current $5,680,000 KANKAKEE 4 2021-2025 $1,000,000 KENDALL 1 2021-2025 RECONSTRUCTION - BRIDGES GALENA RD ROB ROY CREEK AT ILL 47 IN YORKVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 80 FR RD CH 9 (E 12TH RD) TO A DEAD END JURISDICTIONAL TRANSFER Structure Information Str Number AADT 6,400 0473018 $46,000 Truck Pct NHS 16 N LASALLE 1 2020 $2,500,000 IROQUOIS 1 2021-2025 $2,000,000 IROQUOIS 1 2021-2025 CONTINGENT UPON A JURISDICTIONAL TRANSFER. MISCELLANEOUS IMPROVEMENTS MAIN ST OLD US 45 FIRST SOUTH ST IN CHEBANSE TO THIRD AVE IN CLIFTON Miles = 4.73 Roadway Information Miles AADT Truck Pct 4.73 2,335 5.5 MAIN ST REHABILITATION - PAVEMENTS NHS N THIRD AVE TO CH 4 IN CLIFTON Miles = 0.46 Roadway Information Miles AADT Truck Pct 0.46 3,200 5.3 DESIGNED OVERLAY ADA IMPROVEMENTS RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N 3 - 67 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street MAIN ST Location THIRD AVE TO CH 4 IN CLIFTON Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,000,000 IROQUOIS 1 2021-2025 $1,000,000 IROQUOIS 1 2021-2025 $500,000 IROQUOIS 1 2021-2025 $100,000 IROQUOIS 1 2021-2025 $1,000,000 IROQUOIS 1 2021-2025 $6,600,000 LIVINGSTON 1 2020 RECONSTRUCTION - PAVEMENTS MAIN ST THIRD AVE TO CH 4 IN CLIFTON P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS MAIN ST THIRD AVE TO CH 4 IN CLIFTON LAND ACQUISITION RECONSTRUCTION - PAVEMENTS MAIN ST THIRD AVE TO CH 4 IN CLIFTON UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS MAIN ST THIRD AVE TO CH 4 IN CLIFTON CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS OLD ILL 66 ILL 23 IN PONTIAC TO PRAIRIE ST IN ODELL Miles = 10.19 Roadway Information Miles AADT Truck Pct 0.52 3,174 9.5 9.67 2,408 11.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 3 - 68 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street OLD US 66 Location PRAIRIE ST IN ODELL TO ILL 47 IN DWIGHT Miles = 9.83 Roadway Information Miles AADT Truck Pct 9.83 1,598 10.0 S LADD ST OLD ILL 66 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $4,900,000 LIVINGSTON 1 2021-2025 $600,000 LIVINGSTON 1 2021-2025 $1,200,000 BUREAU 1 2021-2025 $2,000,000 DISTRICT-WIDE 1 2021-2025 $20,062,000 DISTRICT-WIDE 2 2021-2025 REHABILITATION - PAVEMENTS NHS N MCLEAN CO LINE TO ILL 116 (W) IN PONTIAC; REYNOLDS ST TO 0.4 MI S OF REYNOLDS ST PATCHING MAINTENANCE - PAVEMENTS TISKILWA "SPUR" PARK AVE IN PRINCETON TO 0.7 MI N OF LOVERS LANE RD Miles = 1.34 Roadway Information Miles AADT Truck Pct 1.34 2,176 6.3 VARIOUS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N PAVEMENT PRESERVATION STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING PRESERVATION - PAVEMENTS 3 - 69 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION Improvements TAMP Category STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING Est. Cost County MYP Years Past Current $2,000,000 DISTRICT-WIDE 1 2021-2025 $2,000,000 DISTRICT-WIDE 1 2021-2025 $2,000,000 DISTRICT-WIDE 1 2021-2025 $2,500,000 DISTRICT-WIDE 2 2021-2025 FORD IROQUOIS KANKAKEE 1 2020 PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES 3 - 70 $486,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION Improvements TAMP Category STANDARD OVERLAY MICROSURFACING 1 PASS MICROSURFACING 2 PASS LONGITUDINAL JOINT REPAIR CRACK & JOINT SEALING Est. Cost County MYP Years Past Current $2,000,000 DISTRICT-WIDE 1 2021-2025 $25,940,000 DISTRICT-WIDE 5 2021-2025 $5,088,000 DISTRICT-WIDE 6 2020 $500,000 DISTRICT-WIDE 1 2020 $3,000,000 DISTRICT-WIDE 1 2020 PRESERVATION - PAVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS 3 - 71 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street VARIOUS Location ON-CALL ENGINEERING Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $3,000,000 DISTRICT-WIDE 1 2021-2025 $2,000,000 DISTRICT-WIDE 1 2020 $6,000,000 DISTRICT-WIDE 1 2020 $25,500,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 2 2020 $25,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS IN-PLANT QUALITY ASSURANCE & MATERIALS TESTING FOR PRE-STRESSED & PRE-CAST CONCRETE PRODUCTS CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS 3 - 72 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street VARIOUS Location POST-LAND ACQUISITION ACTIVITY Improvements TAMP Category POST-ACQUISITION ACTIVITY Est. Cost County MYP Years Past Current $25,000 DISTRICT-WIDE 1 2020 $100,000 DISTRICT-WIDE 1 2020 $200,000 DISTRICT-WIDE 1 2020 $200,000 DISTRICT-WIDE 1 2020 $250,000 DISTRICT-WIDE 1 2020 $100,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING SURVEYS FOR LAND ACQUISITION P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING SURVEYS FOR LAND ACQUISITION P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS RR CROSSING IMPROVEMENTS RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS UTILITY RELOCATIONS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS 3 - 73 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 3 State Highways Route / Street WATER ST / Location INDIAN CREEK 0.4 MI N OF US 34 IN EARLVILLE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,000,000 LASALLE 1 2021-2025 N 4550TH RD RECONSTRUCTION - BRIDGES 3 - 74 Structure Information Str Number AADT 275 0500254 Truck Pct NHS 1 N DISTRICT 3 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street US 6 Location AT LOCUST ST Improvements TAMP Category INTERSECTION RECONSTN Est. Cost County MYP Years Past Current $724,000 GRUNDY 1 2021-2025 LASALLE LIVINGSTON 2 2021-2025 $475,000 LASALLE 4 2021-2025 $350,000 LIVINGSTON 2 2021-2025 $300,000 LIVINGSTON 2 2021-2025 $250,000 LIVINGSTON 2 2020 BEDFORD RD RECONSTRUCTION - PAVEMENTS 12TH ST ILL 23 TO SMITH DOUGLAS RD Miles = 1.22 DESIGNED OVERLAY $2,500,000 REHABILITATION - PAVEMENTS 24TH AVE OWENS ST 24TH AVE: OTTAWA AVE TO OWENS ST; OWENS ST: 24TH AVE TO 23RD AVE Miles = 0.28 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 100 E RD AT MOLE CREEK DITCH 2.5 MI NW OF FLANAGAN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1000 E RD AT MUD CREEK 2.5 MI SE OF MANVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 2800 N RD AT MUD CREEK 3.5 MI SE OF BLACKSTONE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 75 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street 2900 E RD Location AT DRAINAGE DITCH 2.5 MI N OF EMINGTON Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $300,000 LIVINGSTON 2 2021-2025 $400,000 LIVINGSTON 1 2021-2025 $350,000 LIVINGSTON 1 2021-2025 $300,000 BUREAU 4 2021-2025 $12,000 BUREAU 4 2021-2025 LIVINGSTON 2 2020 RECONSTRUCTION - BRIDGES 3000 N RD AT TRIB E FORK MAZON RIVER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3200 E RD AT GOOSEBERRY CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 600 AVE N AT SILVER CREEK 7 MI S OF BUDA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 600 AVE N AT SILVER CREEK 7 MI S OF BUDA CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 600 E RD AT MOLE CREEK 4 MI E OF LONG POINT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 76 $350,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street AUTUMNWOOD DR EVANS ST Location N 30TH RD TO BLUFF ST Miles = 0.58 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $1,225,000 LASALLE 1 2021-2025 $554,000 KANKAKEE 3 2021-2025 $520,000 FORD 2 2020 LIVINGSTON 4 2020 $400,000 FORD 1 2021-2025 $700,000 IROQUOIS 5 2020 RECONSTRUCTION - PAVEMENTS BONFIELD RD CH 6 TO ILL 17 Miles = 2.02 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 2 AT WALL TOWN DRAINAGE DITCH 5 MI W OF LODA BRIDGE REPLACEMENT LAKE LODA RD RECONSTRUCTION - BRIDGES CH 3 CAMPUS RD ILL 17 TO CH 1 Miles = 5.04 STANDARD OVERLAY $1,375,000 REHABILITATION - PAVEMENTS CH 4 ELLIOTT RD 1200N RD TO ILL 54 Miles = 1.70 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 4 AT PIKE CREEK 2.3 MI W OF ILL 1 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 77 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 4 3000N RD Location FORD CO LINE TO 500E RD Miles = 5.45 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $2,400,000 IROQUOIS 2 2021-2025 $1,370,000 LASALLE 9 2020 LASALLE 4 2020 LASALLE 6 2020 LASALLE 5 2020 REHABILITATION - PAVEMENTS CH 5 AT WOLF CREEK 2.3 MI E OF ILL 23 BRIDGE REPLACEMENT RICHARDS RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 5 AT WOLF CREEK 2.3 MI E OF ILL 23 CONSTRUCTION ENGINEERING $88,000 RICHARDS RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 5 AT VERMILION RIVER BRIDGE REPLACEMENT $9,550,000 LEONORE BLKTP ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 5 AT VERMILION RIVER CONSTRUCTION ENGINEERING $480,000 LEONORE BLKTP ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 78 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 6 FAIRBURY RD Location 300 RD N TO MCLEAN CO LINE Miles = 3.88 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $750,000 LIVINGSTON 3 2021-2025 $1,075,000 LIVINGSTON 2 2021-2025 $500,000 DEKALB 1 2021-2025 $20,000 DEKALB 1 2021-2025 $400,000 BUREAU 9 2021-2025 $12,000 BUREAU 9 2021-2025 REHABILITATION - PAVEMENTS CH 6 2200E RD US 24 TO 300 RD N Miles = 5.24 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 7 AT BRANCH BATTLE CREEK BRIDGE REPLACEMENT PERRY RD RECONSTRUCTION - BRIDGES CH 7 AT BRANCH BATTLE CREEK CONSTRUCTION ENGINEERING PERRY RD RECONSTRUCTION - BRIDGES CH 8 AT MAPLE CREEK 2 MI N OF WYANET BRIDGE REPLACEMENT WYANET RD RECONSTRUCTION - BRIDGES CH 8 AT MAPLE CREEK 2 MI N OF WYANET CONSTRUCTION ENGINEERING WYANET RD RECONSTRUCTION - BRIDGES 3 - 79 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 9 KEMPTON RD Location 1200 E RD / CO LINE RD TO ILL 115 Miles = 1.98 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $350,000 FORD 3 2021-2025 $2,553,000 KANKAKEE 4 2020 $1,481,000 KANKAKEE 2 2021-2025 $1,950,000 BUREAU 4 2021-2025 REHABILITATION - PAVEMENTS CH 9 THIRD ST ILL 50 TO ILL 1 / DIXIE HWY Miles = 9.78 STANDARD OVERLAY E 9000 N RD N 8000 E RD REHABILITATION - PAVEMENTS CH 9 MANTENO RD 5000W RD TO US 45 Miles = 5.02 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 10 CH 16 CH 12 CH 33 CH 13 KENTVILLE RD CH 10: 2500 AVE N TO 1ST ST IN MINERAL & US 6 IN MINERAL TO 7TH ST IN NEPONSET; KENTVILLE RD (CH 16): ILL 40 TO 1500 E RD; 2200 AVE N (CH 12): WYANET RD TO ILL 26; ANGLING RD (CH 33): 2750 E RD TO ILL 89; PLANK RD (CH 13): ILL 89 TO LASALLE CO LINE Miles = 38.74 CRACK & JOINT SEALING BIT SURFACE TREATMENT-A1 2200 AVE N ANGLING RD PLANK RD PRESERVATION - PAVEMENTS 3 - 80 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 15 NATE FLEMING RD Location ILL 71 TO I-80 Miles = 3.49 Improvements TAMP Category DESIGNED OVERLAY WIDENING EXISTING PAVEMENT Est. Cost County MYP Years Past Current $2,181,000 LASALLE 8 2020 $5,890,000 LASALLE 3 2021-2025 FORD 1 2021-2025 BUREAU 2 2021-2025 FORD 2 2021-2025 IROQUOIS 4 2021-2025 REHABILITATION - PAVEMENTS CH 15 E 22ND RD N 21ST RD TO LIVINGSTON CO LINE Miles = 9.05 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS CH 18 AT W BRANCH HORSE CREEK BRIDGE REPLACEMENT $500,000 BUCKINGHAM RD RECONSTRUCTION - BRIDGES CH 19 2750 E RD ANGLING RD TO US 6 Miles = 4.54 STANDARD OVERLAY $1,200,000 REHABILITATION - PAVEMENTS CH 22 BUCKLEY RD ILL 54 TO IROQUOIS CO LINE Miles = 4.04 DESIGNED OVERLAY $800,000 REHABILITATION - PAVEMENTS CH 23 700 E RD CH 4 TO ILL 116 Miles = 3.57 DESIGNED OVERLAY REHABILITATION - PAVEMENTS 3 - 81 $1,200,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 24 Location AT BRANCH POND CREEK 2 MI S OF WYANET Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $300,000 BUREAU 7 2021-2025 $12,000 BUREAU 7 2021-2025 $900,000 BUREAU 5 2020 $750,000 IROQUOIS 1 2021-2025 $413,000 LASALLE 2 2021-2025 $50,000 LASALLE 2 2021-2025 1200 N RD RECONSTRUCTION - BRIDGES CH 24 AT BRANCH POND CREEK 2 MI S OF WYANET CONSTRUCTION ENGINEERING 1200 N RD RECONSTRUCTION - BRIDGES CH 24 LOCK 11 RD WYANET RD TO TISKILWA SPUR Miles = 4.08 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 31 AT IROQUOIS RIVER BRIDGE REPLACEMENT 2230 E RD RECONSTRUCTION - BRIDGES CH 33 AT PECUMSAUGEM CREEK 0.2 MI E OF E 9TH RD BRIDGE REPLACEMENT N 33RD RD RECONSTRUCTION - BRIDGES CH 33 AT PECUMSAUGEM CREEK 0.2 MI E OF E 9TH RD CONSTRUCTION ENGINEERING N 33RD RD RECONSTRUCTION - BRIDGES 3 - 82 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 34 PEACE RD Location ILL 64 TO BETHANY RD Miles = 1.89 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,200,000 DEKALB 1 2021-2025 $48,000 DEKALB 1 2021-2025 $750,000 GRUNDY 1 2021-2025 $4,150,000 GRUNDY 8 2020 $2,600,000 GRUNDY 1 2020 $640,000 GRUNDY 1 2020 REHABILITATION - PAVEMENTS CH 34 ILL 64 TO BETHANY RD CONSTRUCTION ENGINEERING PEACE RD REHABILITATION - PAVEMENTS CH 34C AT WAUPECAN CREEK BRIDGE REPLACEMENT DUPONT RD RECONSTRUCTION - BRIDGES CH 37V RIDGE RD W MONDAMIN ST TO MCEVILLY RD Miles = 0.50 RECONSTRUCTION BIKEWAY SIDEWALKS RECONSTRUCTION - PAVEMENTS CH 37V RIDGE RD W MONDAMIN ST TO MCEVILLY RD Miles = 0.50 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS CH 37V W MONDAMIN ST TO MCEVILLY RD CONSTRUCTION ENGINEERING RIDGE RD RECONSTRUCTION - PAVEMENTS 3 - 83 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 37V RIDGE RD Location AT RR VIADUCT 0.2 MI S OF MINOOKA RD IN MINOOKA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $2,125,000 GRUNDY 2 2020 $600,000 IROQUOIS 1 2021-2025 $565,000 KANKAKEE 1 2021-2025 $560,000 LASALLE 1 2021-2025 $1,300,000 GRUNDY 1 2021-2025 $700,000 GRUNDY 1 2021-2025 RECONSTRUCTION - BRIDGES CH 40 AT POSSUM TROT DITCH BRIDGE REPLACEMENT 1400 N RD RECONSTRUCTION - BRIDGES CH 41 ESSEX RD WILL CO LINE TO SOUTH ST Miles = 1.81 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 41 E 1351 RD DEKALB CO LINE TO BROWN ST Miles = 2.84 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 41C AT WAUPECAN CREEK BRIDGE REPLACEMENT GRAND RIDGE RD RECONSTRUCTION - BRIDGES CH 41C AT MURRAY SLOUGH BRIDGE REPLACEMENT GRAND RIDGE RD RECONSTRUCTION - BRIDGES 3 - 84 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street CH 42 1000 E RD Location AT TRIB LITTLE MUD CREEK 3 MI NW OF CISSNA PARK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $550,000 IROQUOIS 2 2021-2025 $540,000 IROQUOIS 1 2021-2025 $4,140,000 LASALLE 6 2021-2025 $272,000 LASALLE 2 2021-2025 $300,000 IROQUOIS 1 2021-2025 $400,000 FORD 1 2021-2025 RECONSTRUCTION - BRIDGES CH 47 1200 N RD FORD CO LINE TO ILL 54 Miles = 0.81 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 57 AT VERMILION RIVER 1.2 MI N OF 18TH RD BRIDGE SUPERSTRUCTURE E 1251ST RD REHABILITATION - BRIDGES CH 57 AT VERMILION RIVER 1.2 MI N OF 18TH RD CONSTRUCTION ENGINEERING E 1251ST RD REHABILITATION - BRIDGES CH 42 AT BRANCH PRAIRIE CREEK BRIDGE REPLACEMENT 1100 E RD RECONSTRUCTION - BRIDGES CLARENCE RD 2600 E RD 600N RD TO ILL 9 Miles = 2.01 STANDARD OVERLAY REHABILITATION - PAVEMENTS 3 - 85 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street COMMERCIAL ST MAIN ST BROADWAY ST Location COMMERCIAL ST: 0.1 M W OF MAIN ST TO MAIN ST; MAIN ST: BROADWAY ST TO COMMERCIAL ST; BROADWAY ST: MAIN ST TO 0.1 MI E Improvements TAMP Category INTERSECTION RECONSTN Est. Cost County MYP Years Past Current $290,000 LASALLE 3 2021-2025 $470,000 LASALLE 2 2021-2025 $56,000 LASALLE 2 2021-2025 $470,000 BUREAU 5 2020 $12,000 BUREAU 5 2020 KENDALL LASALLE 1 2021-2025 RECONSTRUCTION - PAVEMENTS E 1250TH RD AT TRIB INDIAN CREEK 0.5 MI N OF EARLVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 1250TH RD AT TRIB INDIAN CREEK 0.5 MI N OF EARLVILLE CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES EPPERSON RD AT EPPERSON RUN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES EPPERSON RD AT EPPERSON RUN CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES FUTURE ELDAMAIN RD RIVER RD TO W HIGHPOINT RD Miles = 3.20 NEW CONSTRUCTION BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS 3 - 86 $30,000,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street FUTURE ELDAMAIN RD Location RIVER RD TO W HIGHPOINT RD Miles = 0.01 Improvements TAMP Category Est. Cost NEW CONSTRUCTION BRIDGE (NEW) $15,000,000 County MYP Years Past Current KENDALL LASALLE 1 2021-2025 $4,000,000 KANKAKEE 4 2020 $320,000 KANKAKEE 4 2020 $1,375,000 LIVINGSTON 2 2021-2025 $20,000 LIVINGSTON 2 2021-2025 BUREAU 5 2020 INITIAL CONSTRUCTION - PAVEMENTS HOBBIE AVE ILL 50 TO ILL 17 Miles = 0.83 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS HOBBIE AVE ILL 50 TO ILL 17 CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS INDIANA AVE ILLINI DR TO ECL OF PONTIAC Miles = 0.38 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS INDIANA AVE ILLINI DR TO ECL OF PONTIAC CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS JEFFERSON ST AT ROCKY RUN CREEK IN TISKILWA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3 - 87 $315,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street JEFFERSON ST Location AT ROCKY RUN CREEK IN TISKILWA Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 BUREAU 5 2020 $335,000 BUREAU 2 2020 $19,000 BUREAU 2 2020 $700,000 KENDALL 1 2020 $49,000 KENDALL 1 2020 DEKALB 3 2021-2025 RECONSTRUCTION - BRIDGES LADD RD US 6 TO DAKOTA ST Miles = 0.44 STANDARD OVERLAY REHABILITATION - PAVEMENTS LADD RD US 6 TO DAKOTA ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS LEW ST CHURCH ST TO MAIN ST Miles = 0.46 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS LEW ST CHURCH ST TO MAIN ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS LUCINDA AVE AT S BRANCH KISHWAUKEE RIVER BRIDGE REPLACEMENT $2,938,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 88 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street LUCINDA DR Location STADIUM DR W TO STADIUM DR E Miles = 0.10 Improvements TAMP Category PAVING Est. Cost County MYP Years Past Current $293,000 DEKALB 8 2021-2025 IROQUOIS 5 2020 IROQUOIS 5 2020 BUREAU 3 2021-2025 BUREAU 3 2021-2025 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. INITIAL CONSTRUCTION - PAVEMENTS MAIN ST AT SUGAR CREEK IN WOODLAND BRIDGE SUPERSTRUCTURE $1,476,000 1400 N RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES MAIN ST AT SUGAR CREEK IN WOODLAND CONSTRUCTION ENGINEERING $65,000 1400 N RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES MAPLE AVE AT HICKORY CREEK IN MANLIUS BRIDGE REPLACEMENT $1,256,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES MAPLE AVE AT HICKORY CREEK IN MANLIUS CONSTRUCTION ENGINEERING $120,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 89 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street MINKLER RD COLLINS RD (PROPOSED) Location MINKLER RD: ILL 71 TO PROPOSED COLLINS RD; PROPOSED COLLINS RD: MINKLER RD TO GROVE RD Miles = 2.67 Improvements TAMP Category NEW CONSTRUCTION Est. Cost County MYP Years Past Current $5,000,000 KENDALL 1 2021-2025 $10,000,000 KENDALL 1 2021-2025 LIVINGSTON 4 2021-2025 DEKALB 3 2021-2025 DEKALB 3 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS MINKLER RD PROPOSED COLLINS R MINKLER RD: ILL 71 TO PROPOSED COLLINS RD; PROPOSED COLLINS RD: MINKLER RD TO GROVE RD Miles = 2.67 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS N 1400 RD E MUD CREEK 3.5 MI NE OF CORNELL BRIDGE REPLACEMENT $300,000 RECONSTRUCTION - BRIDGES N FIRST ST AT S BRANCH KISHWAUKEE RIVER BRIDGE REPLACEMENT $2,663,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES N FIRST ST AT S BRANCH KISHWAUKEE RIVER CONSTRUCTION ENGINEERING $237,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 90 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street NEW LEBANON RD Location AT COON CREEK 0.3 MI S OF ILL 72 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $650,000 DEKALB 2 2021-2025 $26,000 DEKALB 2 2021-2025 $1,900,000 DEKALB 4 2021-2025 $76,000 DEKALB 1 2021-2025 $3,123,000 DEKALB 5 2021-2025 DEKALB 5 2021-2025 RECONSTRUCTION - BRIDGES NEW LEBANON RD AT COON CREEK 0.3 MI S OF ILL 72 CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES PEACE RD FAIRVIEW DR TO I-88 RAMPS (WB) Miles = 0.35 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS PEACE RD FAIRVIEW DR TO I-88 RAMPS (WB) CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS PEARL ST AT S BRANCH KISHWAUKEE RIVER 0.3 MI N OF ILL 72 BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES PEARL ST AT S BRANCH KISHWAUKEE RIVER 0.3 MI N OF ILL 72 CONSTRUCTION ENGINEERING $124,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 91 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street PLANK RD Location AT PERU INDUSTRIAL RR YARD FOR RR TRACK WORK Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $1,561,000 LASALLE 1 2020 DEKALB 3 2021-2025 DEKALB 3 2021-2025 $1,500,000 DEKALB 5 2021-2025 $60,000 DEKALB 3 2021-2025 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS SUYDAM RD AT INDIAN CREEK 7 MI S OF SHABBONA BRIDGE REPLACEMENT $945,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES SUYDAM RD AT INDIAN CREEK 7 MI S OF SHABBONA CONSTRUCTION ENGINEERING $84,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES SUYDAM RD ROLLO RD TO ILL 23 Miles = 7.71 STANDARD OVERLAY REHABILITATION - PAVEMENTS SUYDAM RD ROLLO RD TO ILL 23 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 3 - 92 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street SUYDAM RD Location ILL 23 TO GLETTY RD Miles = 6.23 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,250,000 DEKALB 2 2021-2025 $50,000 DEKALB 2 2021-2025 $2,600,000 DEKALB 6 2020 $120,000 DEKALB 3 2020 $600,000 DEKALB 3 2021-2025 $24,000 DEKALB 3 2021-2025 REHABILITATION - PAVEMENTS SUYDAM RD ILL 23 TO GLETTY RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS TR 11 MCNEAL RD AT S BRANCH KISHWAUKEE RIVER E OF COUNTY LINE RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES TR 11 MCNEAL RD AT S BRANCH KISHWAUKEE RIVER E OF COUNTY LINE RD CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES TR 175 AT BATTLE CREEK 0.3 MI E OF HINCKLEY RD BRIDGE REPLACEMENT MCGIRR RD RECONSTRUCTION - BRIDGES TR 175 AT BATTLE CREEK 0.3 MI E OF HINCKLEY RD CONSTRUCTION ENGINEERING MCGIRR RD RECONSTRUCTION - BRIDGES 3 - 93 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street UNYTITE DR Location PLANK RD TO DONLAR AVE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $160,000 LASALLE 1 2020 $60,000 LASALLE 1 2020 $1,550,000 LASALLE 1 2020 $112,000 LASALLE 1 2020 DEKALB 5 2021-2025 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS UNYTITE DR PLANK RD TO DONLAR AVE UTILITY ADJUSTMENT ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS UNYTITE DR PLANK RD TO DONLAR AVE Miles = 0.73 NEW CONSTRUCTION ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS UNYTITE DR PLANK RD TO DONLAR AVE CONSTRUCTION ENGINEERING ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN DEKALB TRAF SIGNAL REPLACEMENT MISCELLANEOUS IMPROVEMENTS 3 - 94 $1,425,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 3 Local Highways Route / Street W MOTEL RD Location AT E BRANCH KISHWAUKEE RIVER 0.5 MI N OF ILL 64 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,100,000 DEKALB 5 2020 DEKALB 5 2020 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES W MOTEL RD AT E BRANCH KISHWAUKEE RIVER 0.5 MI N OF ILL 64 CONSTRUCTION ENGINEERING $44,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 3 - 95 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 3 District 4 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 3, DISTRICT 4, PEORIA Overview Highway District 4 encompasses 12 counties in west central Illinois and includes the cities of Peoria, Canton, Chillicothe, Galesburg, Macomb, Monmouth and Pekin, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 4 consists of 1,634 miles of highways and 693 bridges, supporting 9.3 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.52 billion will be provided during FY 2020-2025 for improvements to state highways in District 4. The following table summarizes anticipated accomplishments on the state highway system in District 4 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 42 66 96 4 504,264 377,244 114,144 75,407 0 1 4 0 20 0 13 0 0 1,152 102.571 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 74 from east of Illinois 78 to 0.7 mile east of Interstate 474 in Peoria County. Resurfacing on 20 miles and bridge improvements including a new bridge deck, bridge repair, bridge superstructure replacement, bridge rehabilitation, bridge approach roadway and lighting at Bell School Road, North Brimfield Road, Maher Road and Township Road 119 are programmed during FY 2020-2025 at a cost of $42.6 million. Of this total, resurfacing on 14.3 miles from east of Illinois 78 to west of Kickapoo/Edwards Road and a new bridge deck, bridge repair, bridge 4-i superstructure replacement, bridge approach roadway and lighting at Bell School Road are programmed in FY 2020 at a cost of $17.3 million. • Interstate 74/Illinois 29 at Illinois River (Murray Baker Bridge) in Tazewell and Peoria Counties. A new bridge deck, bridge superstructure rehabilitation, bridge substructure rehabilitation, bridge painting and lighting are programmed in FY 2020 at a cost of $38.5 million. This project has been approved for Illinois Special Bridge Program funding. • Interstate 474/US 24 from Interstate 74 to Illinois River in Peoria County. Resurfacing on 14.2 miles (including ramp repair), bridge superstructure replacement, bridge substructure rehabilitation, a bridge deck overlay and bridge joint replace/repair at Illinois 6, a new bridge deck, bridge rehabilitation, engineering for location, environmental and design studies, engineering for contract plans and construction engineering at Kickapoo Creek and Burlington Northern Railroad, bridge replacement over Illinois 116, and a bridge replacement at Airport Road over Interstate 474 are programmed during FY 2020-2025 at a cost of $51.1 million. Of this total, engineering for location, environmental and design studies and engineering for contract plans at Kickapoo Creek and Burlington Northern Railroad are programmed in FY 2020 at a cost of $900,000. A portion of this project has been approved for Illinois Special Bridge Program funding. • US 24/Illinois 9 from Banner to Kingston Mines (for 4 lanes) and over Copperas Creek at the east edge of Banner in Fulton and Peoria Counties. Additional lanes for 8.1 miles, archaeological surveys, land acquisition, a bridge replacement, a new bridge, retaining wall, utility adjustments, construction engineering and a culvert extension are programmed during FY 2020-2025 at a cost of $124.9 million. Of this total, archaeological surveys, land acquisition and the bridge replacement, utility adjustments and construction engineering over Copperas Creek are programmed in FY 2020 at a cost of $11.7 million. The bridge replacement project over Copperas Creek has been approved for Illinois Special Bridge Program funding. • Illinois 8/Illinois 116 (Cedar Street Extension) over the Tazewell and Peoria Railroad and Illinois 29 in East Peoria. A bridge replacement, interchange reconstruction, land acquisition, utility adjustments, railroad flagger and construction engineering are programmed during FY 2020-2025 at a cost of $39.9 million. Of this total, land acquisition is programmed in FY 2020 at a cost of $300,000. This project has been approved for Illinois Special Bridge Program funding. • Illinois 18 at Illinois River Bridge at Henry. A bridge replacement, engineering for location, environmental and design studies, engineering for contract plans, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $133 million. Of this total, engineering for location, environmental and design studies and engineering for contract plans is programmed in FY 2020 at a cost of $5 million. • Illinois 29 (North Galena Road) from north of Gardner Lane to McClugage Bridge in Peoria. Resurfacing on 2.9 miles, a bi-directional turn lane, a retaining wall, engineering for contract plans, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $68.5 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $1.5 million. • Illinois 116 (Harmon Highway) over Burlington, Northern, Sante Fe (BNSF) Railroad, Union Pacific (UP) Railroad and Kickapoo Creek 0.1 mile east of Airport Road. A bridge replacement, utility adjustments, railroad flagger and construction engineering are programmed during FY 2021-2025 at a cost of $18.7 million. This project has been approved for Illinois Special Bridge Program funding. 4-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 39 US 51 Location 0.2 MI N OF US 24 TO 3.1 MI S OF ILL 116 Miles = 4.62 Roadway Information Miles AADT Truck Pct 4.62 16,900 36.0 I 39 US 51 I 39 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $9,200,000 WOODFORD 3 2020 $8,000,000 WOODFORD 3 2020 $445,000 MARSHALL 1 2020 $150,000 TAZEWELL 1 2020 HENRY 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y 3.1 MI S OF ILL 116 TO 1 MI N OF ILL 116 Miles = 5.34 Roadway Information Miles AADT Truck Pct 4.14 16,800 36.5 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 2 MI S OF ILL 17 TO LASALLE CO LINE CRACK & JOINT SEALING US 51 PRESERVATION - PAVEMENTS I 74 BRIDGE DECK SEALING (INTERSTATE STRUCTURES) BRIDGE DECK SEALING I 155 I 474 ILL 29 ILL 122 PRESERVATION - BRIDGES I 74 AT ILL 17 W OF WOODHULL BRIDGE NEW DECK $3,600,000 ILL 110 REHABILITATION - BRIDGES 4-1 Structure Information Str Number AADT 7,600 0370019 7,600 0370020 Truck Pct NHS 42 Y 42 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 74 Location 0.3 MI N OF US 34 TO 0.4 MI N OF MAIN ST IN GALESBURG Miles = 2.57 Roadway Information Miles AADT Truck Pct 2.57 16,113 29.0 I 74 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $5,000,000 KNOX 12 2020 $1,000,000 KNOX 1 2020 $800,000 KNOX 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT INTCHG I-74 & US 34 RAMP REPAIR US 34 REHABILITATION - PAVEMENTS I 74 OVER BNSF RR IN GALESBURG BRIDGE REHABILITATION REHABILITATION - BRIDGES I 74 SPOON RIVER & OVER TR 238A BRIDGE NEW DECK BRIDGE REHABILITATION Structure Information Str Number AADT 8,150 0480007 8,150 0480008 $5,700,000 REHABILITATION - BRIDGES I 74 FRENCH CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4-2 KNOX Structure Information Str Number AADT 7,750 0480051 7,750 0480052 $4,000,000 KNOX Structure Information Str Number AADT 7,750 0480055 7,750 0480054 Truck Pct NHS 28 Y 28 Y 3 2021-2025 Truck Pct NHS 30 Y 30 Y 3 2020 Truck Pct NHS 30 Y 30 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 74 Location E OF ILL 78 TO W OF KICKAPOO / EDWARDS RD Miles = 14.28 Roadway Information Miles AADT Truck Pct 11.17 19,462 25.9 I 74 Est. Cost STANDARD OVERLAY $17,000,000 PEORIA 5 2020 $3,100,000 PEORIA 6 2020 Past Current REHABILITATION - PAVEMENTS NHS Y BELL SCHOOL RD 3 MI E OF KNOX CO LINE BRIDGE NEW DECK BRIDGE REPAIR BRIDGE SUPERSTRUCTURE BRIDGE APPROACH ROADWAY LIGHTING REHABILITATION - BRIDGES I 74 OVER N BRIMFIELD RD BRIDGE NEW DECK BRIDGE REHABILITATION Structure Information Str Number AADT 2,000 0720073 $4,710,000 REHABILITATION - BRIDGES I 74 MAHER RD E OF BRIMFIELD BRIDGE SUPERSTRUCTURE BRIDGE REPAIR 74 OVER TR 119 3.5 MI W OF KICKAPOO BRIDGE REHABILITATION BRIDGE REPAIR REHABILITATION - BRIDGES 4-3 PEORIA Structure Information Str Number AADT 8,950 0720074 8,950 0720075 $3,500,000 REHABILITATION - BRIDGES I County MYP Years Improvements TAMP Category PEORIA Structure Information Str Number AADT 2,250 0720076 $250,000 PEORIA Structure Information Str Number AADT 10,250 0720077 10,250 0720078 Truck Pct NHS 10 N 3 2021-2025 Truck Pct NHS 27 Y 27 Y 5 2021-2025 Truck Pct NHS 8 N 1 2021-2025 Truck Pct NHS 24 Y 24 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 74 Location W OF KICKAPOO / EDWARDS RD TO 0.7 MI E OF I-474 Miles = 5.75 Roadway Information Miles AADT Truck Pct 5.75 25,722 18.7 I 74 ILL 29 B Improvements TAMP Category Est. Cost DESIGNED OVERLAY $14,000,000 County MYP Years Past Current PEORIA 1 2021-2025 $1,000,000 PEORIA TAZEWELL 1 2020 $3,500,000 TAZEWELL PEORIA 1 2020 $35,000,000 TAZEWELL PEORIA 3 2020 REHABILITATION - PAVEMENTS NHS Y DETOUR ROUTE SIGNS THROUGH EAST PEORIA & PEORIA ILL 29 MISCELLANEOUS PAVEMENT MARKING MISC TRAFFIC CONTROL I 474 US 24 ILL 40 ILL 40 A VARIOUS ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS I 74 ILLINOIS RIVER (MURRAY BAKER BRIDGE) LIGHTING ILL 29 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS I 74 ILLINOIS RIVER (MURRAY BAKER BRIDGE) ILL 29 BRIDGE NEW DECK BRIDGE SUBSTRUCTURE BRIDGE SUPERSTRUCTURE BRIDGE PAINTING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 4-4 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 74 Location PINECREST DR IN EAST PEORIA Improvements TAMP Category BRIDGE REPLACEMENT INTERCHANGE RECONSTRUCTION Est. Cost 74 0.8 MI E OF MORTON AVE TO WOODFORD CO LINE Miles = 6.46 Roadway Information Miles AADT Truck Pct 6.46 26,900 19.7 I 155 STANDARD OVERLAY $7,200,000 TAZEWELL Structure Information Str Number AADT 5,100 0900091 8 2020 Truck Pct NHS 10 N $15,000,000 TAZEWELL 1 2021-2025 $4,020,000 TAZEWELL 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT INDIAN CREEK ILL 122 BRIDGE NEW DECK BRIDGE REHABILITATION REHABILITATION - BRIDGES I 155 MYP Years Past Current RECONSTRUCTION - BRIDGES I County AT MACKINAW RIVER BRIDGE SUPERSTRUCTURE BRIDGE REPAIR Structure Information Str Number AADT 5,700 0900093 5,700 0900094 $14,526,000 TAZEWELL Truck Pct NHS 19 Y 19 Y 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 155 AT MACKINAW RIVER P.E. (PHASE I) P.E. (PHASE II) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 4-5 Structure Information Str Number AADT 6,700 0900092 6,700 0900100 $910,000 TAZEWELL Truck Pct NHS 19 Y 19 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 155 Location AT MACKINAW RIVER Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $910,000 TAZEWELL 1 2021-2025 $654,000 TAZEWELL 1 2021-2025 $400,000 TAZEWELL 2 2020 $500,000 TAZEWELL 3 2020 PEORIA 4 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 155 AT MACKINAW RIVER CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 155 MAIN ST IN MORTON (SOUTHBOUND) BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 155 I-155 RAMP (NB) OVER BNSF RR AT ILL 98 BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 474 US 24 I-74 TO ILLINOIS RIVER Miles = 14.24 Roadway Information Miles AADT Truck Pct 7.60 29,771 12.2 STANDARD OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y 4-6 $14,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 474 Location AT INTCHG I-74/474 & ILL 6 Improvements TAMP Category BRIDGE SUBSTRUCTURE BRIDGE SUPERSTRUCTURE BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY Est. Cost KICKAPOO CREEK & BN RR E OF I-74 INTCHG BRIDGE REHABILITATION BRIDGE NEW DECK MYP Years Past Current $6,815,000 REHABILITATION - BRIDGES I 474 County PEORIA Structure Information Str Number AADT 13,800 0720111 16,800 0720106 16,800 0720107 13,800 0720108 9,500 0720109 $13,640,000 PEORIA 4 2021-2025 Truck Pct NHS 5 Y 6 Y 6 Y 5 Y 8 Y 3 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 474 KICKAPOO CREEK & BN RR E OF I-74 INTCHG P.E. (PHASE I) P.E. (PHASE II) Structure Information Str Number AADT 16,700 0720114 16,700 0720115 Truck Pct NHS 10 Y 10 Y $900,000 PEORIA 1 2020 $800,000 PEORIA 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 474 KICKAPOO CREEK & BN RR E OF I-74 INTCHG P.E. (PHASE I) P.E. (PHASE II) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 4-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street I 474 Location KICKAPOO CREEK & BN RR E OF I-74 INTCHG Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $682,000 PEORIA 1 2021-2025 $7,300,000 PEORIA 9 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 474 OVER ILL 116 (PLANK RD) IN BELLEVUE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 474 AIRPORT RD OVER I-474 BRIDGE REPLACEMENT Structure Information Str Number AADT 14,600 0720121 14,600 0720122 $7,000,000 RECONSTRUCTION - BRIDGES US 24 ECL OF ASTORIA TO 0.1 MI W OF IZAAK WALTON RD Miles = 4.04 MICROSURFACING 1 PASS PEORIA Structure Information Str Number AADT 11,100 0720126 Truck Pct NHS 13 Y 13 Y 10 2021-2025 Truck Pct NHS 4 Y $450,000 FULTON 1 2020 $3,500,000 FULTON 1 2020 PRESERVATION - PAVEMENTS US 24 ILL 100 AVE F IN LEWISTOWN TO N OF RUT RD Miles = 2.88 Roadway Information Miles AADT Truck Pct 2.88 2,954 17.9 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 4-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 24 Location COPPERAS CREEK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $10,000,000 FULTON 4 2020 ILL 9 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 24 COPPERAS CREEK CONSTRUCTION ENGINEERING Structure Information Str Number AADT 8,900 0290001 Truck Pct NHS 10 Y $700,000 FULTON 3 2020 $200,000 FULTON 4 2020 $500,000 FULTON PEORIA 1 2020 $1,500,000 FULTON PEORIA 1 2021-2025 ILL 9 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 24 COPPERAS CREEK UTILITY ADJUSTMENT ILL 9 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 24 BANNER TO KINGSTON MINES (FOR 4-LANES) ARCHAEOLOGICAL SURVEY ILL 9 INITIAL CONSTRUCTION - PAVEMENTS US 24 BANNER TO KINGSTON MINES (FOR 4-LANES) ARCHAEOLOGICAL SURVEY ILL 9 INITIAL CONSTRUCTION - PAVEMENTS 4-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 24 Location BANNER TO KINGSTON MINES (FOR 4-LANES) Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $300,000 FULTON PEORIA 1 2020 $33,000,000 FULTON 1 2021-2025 ILL 9 INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 BANNER TO PEORIA CO LINE (FOR 4-LANES) Miles = 2.41 ADDITIONAL LANES BRIDGE REPLACEMENT BRIDGE (NEW) RETAINING WALL INITIAL CONSTRUCTION - PAVEMENTS US 24 BANNER TO PEORIA CO LINE (FOR 4-LANES) CONSTRUCTION ENGINEERING Structure Information Str Number AADT 9,100 0290002 Truck Pct NHS 10 Y $2,000,000 FULTON 1 2021-2025 $700,000 FULTON 1 2021-2025 $700,000 FULTON 1 2021-2025 $24,000,000 PEORIA 1 2021-2025 ILL 9 INITIAL CONSTRUCTION - PAVEMENTS US 24 BANNER TO PEORIA CO LINE (FOR 4-LANES) LAND ACQUISITION ILL 9 INITIAL CONSTRUCTION - PAVEMENTS US 24 BANNER TO PEORIA CO LINE (FOR 4-LANES) UTILITY ADJUSTMENT ILL 9 INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 PEORIA CO LINE TO W OF PEYTON CREEK (FOR 4-LANES) Miles = 2.05 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 4 - 10 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 24 ILL 9 Location PEORIA CO LINE TO W OF PEYTON CREEK (FOR 4-LANES) Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,500,000 PEORIA 1 2021-2025 $800,000 PEORIA 1 2021-2025 $700,000 PEORIA 1 2021-2025 $44,000,000 PEORIA 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 PEORIA CO LINE TO W OF PEYTON CREEK (FOR 4-LANES) LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 PEORIA CO LINE TO W OF PEYTON CREEK (FOR 4-LANES) UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 W OF PEYTON CREEK TO KINGSTON MINES (FOR 4-LANES) Miles = 3.65 ADDITIONAL LANES BRIDGE REPLACEMENT CULVERT EXTENSION INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 W OF PEYTON CREEK TO KINGSTON MINES (FOR 4-LANES) CONSTRUCTION ENGINEERING Structure Information Str Number AADT 10,400 0720007 9,100 0722028 Truck Pct NHS 7 Y 10 Y $3,000,000 PEORIA 1 2021-2025 $700,000 PEORIA 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 24 ILL 9 W OF PEYTON CREEK TO KINGSTON MINES (FOR 4-LANES) LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS 4 - 11 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 24 Location W OF PEYTON CREEK TO KINGSTON MINES (FOR 4-LANES) ILL 9 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $600,000 PEORIA 1 2021-2025 $7,035,000 PEORIA 3 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 24 LITTLE LAMARSH CREEK 1 MI W OF MAPLETON & KJRY RR 1 MI E OF MAPLETON ILL 9 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 24 N OF WESLEY RD TO S OF CAMP ST Miles = 1.02 ILL 29 DESIGNED OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 6,500 0720008 6,800 0720009 Truck Pct NHS 6 Y 6 Y $2,500,000 TAZEWELL 1 2021-2025 $250,000 TAZEWELL 1 2021-2025 ILL 116 ILL 8 Roadway Information Miles AADT Truck Pct 0.57 22,400 6.4 0.45 US 24 ILL 29 26,840 3.8 REHABILITATION - PAVEMENTS NHS Y Y MAIN ST FROM N OF WESLEY RD TO S OF CAMP ST; WASHINGTON ST FROM W OF I-74 TO S OF CAMP ST LAND ACQUISITION ILL 116 ILL 8 REHABILITATION - PAVEMENTS 4 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 24 Location MAIN ST FROM N OF WESLEY RD TO S OF CAMP ST; WASHINGTON ST FROM W OF I-74 TO S OF CAMP ST ILL 29 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $250,000 TAZEWELL 1 2021-2025 $2,800,000 TAZEWELL WOODFORD 1 2020 $3,250,000 HENDERSON 3 2020 $800,000 HENDERSON 1 2020 $53,330,000 HENDERSON WARREN 1 2021-2025 ILL 116 ILL 8 REHABILITATION - PAVEMENTS US 24 BUS WASHINGTON RD E OF LYNN ST IN WASHINGTON TO US 24 Miles = 5.56 Roadway Information Miles AADT Truck Pct 3.28 2,775 5.0 REHABILITATION - PAVEMENTS NHS N 1.91 2,335 4.8 N 0.37 547 0.0 N US 34 DESIGNED OVERLAY MISSISSIPPI RIVER AT GULFPORT / BURLINGTON BRIDGE DECK OVERLAY IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES US 34 GULFPORT INTCHG Miles = 1.31 Roadway Information Miles AADT Truck Pct 0.24 419 0.0 0.33 US 34 11,518 14.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N Y TR 190 E OF BIGGSVILLE TO WARREN CO LINE S OF KIRKWOOD Miles = 4.56 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 4 - 13 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 34 Location TR 190 E OF BIGGSVILLE TO WARREN CO LINE S OF KIRKWOOD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $3,245,000 HENDERSON WARREN 1 2021-2025 $1,960,000 HENDERSON WARREN 1 2020 $1,210,000 HENDERSON WARREN 1 2021-2025 $6,750,000 WARREN 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 34 TR 190 E OF BIGGSVILLE TO WARREN CO LINE S OF KIRKWOOD LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS US 34 TR 190 E OF BIGGSVILLE TO WARREN CO LINE S OF KIRKWOOD UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 34 US 34: 0.1 MI W OF 20TH ST TO US 67; 20TH ST: US 34 TO NORTH ST; NORTH ST: 20TH ST TO US 34; 108TH AVE: US 67 TO MAIN ST Miles = 8.99 Roadway Information Miles AADT Truck Pct 6.23 4,345 28.1 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 0.12 2,950 25.6 0.09 2,800 28.9 Y Y 0.57 1,800 6.7 N 1.88 430 0.0 N 0.10 425 0.0 N 4 - 14 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 34 Location OVER US 67 SW OF MONMOUTH Improvements TAMP Category BRIDGE PAINTING BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR BRIDGE APPROACH ROADWAY BRIDGE DECK OVERLAY BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $1,400,000 WARREN 3 2020 $1,500,000 WARREN 4 2021-2025 $1,420,000 WARREN 3 2021-2025 PRESERVATION - BRIDGES US 34 AT MAIN ST IN MONMOUTH INTERSECTION IMPROVEMENT ILL 110 ILL 164 MISCELLANEOUS IMPROVEMENTS US 34 ILL 110 CEDAR CREEK TRIB 0.3 MI E OF 11TH ST IN MONMOUTH CULVERT REPLACEMENT ILL 164 RECONSTRUCTION - BRIDGES US 34 OVER 120TH ST (TR 162) BRIDGE REPLACEMENT Structure Information Str Number AADT 9,550 0942000 $5,200,000 WARREN Truck Pct NHS 16 Y 3 2021-2025 ILL 110 RECONSTRUCTION - BRIDGES US 34 CEDAR CREEK 0.9 MI W OF KNOX CO LINE CULVERT REPLACEMENT Structure Information Str Number AADT 4,825 0940025 4,825 0940026 $1,570,000 WARREN Truck Pct NHS 19 Y 19 Y 3 2021-2025 ILL 110 RECONSTRUCTION - BRIDGES 4 - 15 Structure Information Str Number AADT 10,000 0942004 Truck Pct NHS 13 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 34 Location 0.2 MI W OF US 150 TO 1.1 MI E OF I-74 IN GALESBURG Miles = 3.96 ILL 110 Roadway Information Miles AADT Truck Pct 2.81 11,957 21.2 DESIGNED OVERLAY SHOULDER RECONSTRUCTION UNDERDRAINS RAMP REPAIR Est. Cost County MYP Years Past Current $8,000,000 KNOX 5 2021-2025 $1,000,000 KNOX 1 2021-2025 $8,500,000 KNOX 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.89 5,315 16.5 N 0.26 6,050 14.5 Y US 34 Improvements TAMP Category INTCHGS AT US 150 (HENDERSON ST) & SEMINARY ST RAMP REPAIR SHOULDER RECONSTRUCTION UNDERDRAINS MAINTENANCE - PAVEMENTS US 34 ILL 110 FARNHAM ST & LINCOLN PARK DR OVER US 34 IN GALESBURG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 34 SEMINARY ST OVER US 34 IN GALESBURG BRIDGE REPLACEMENT Structure Information Str Number AADT 125 0480065 1,100 0480068 $12,650,000 KNOX Truck Pct NHS 8 N 6 N 1 2021-2025 ILL 110 RECONSTRUCTION - BRIDGES US 34 SEMINARY ST OVER US 34 IN GALESBURG LAND ACQUISITION ILL 110 RECONSTRUCTION - BRIDGES 4 - 16 Structure Information Str Number AADT 7,400 0480067 $750,000 KNOX Truck Pct NHS 5 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 34 Location SEMINARY ST OVER US 34 IN GALESBURG Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $750,000 KNOX 1 2021-2025 MERCER 12 2021-2025 ILL 110 RECONSTRUCTION - BRIDGES US 67 POPE CREEK 3 MI S OF VIOLA BRIDGE REPLACEMENT $1,600,000 RECONSTRUCTION - BRIDGES US 67 POPE CREEK 3 MI S OF VIOLA LAND ACQUISITION Structure Information Str Number AADT 2,600 0660003 Truck Pct NHS 23 Y $100,000 MERCER 10 2021-2025 $70,000 MERCER 10 2021-2025 $3,450,000 MERCER 13 2021-2025 RECONSTRUCTION - BRIDGES US 67 POPE CREEK 3 MI S OF VIOLA UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES US 67 HENDERSON CREEK 6.7 MI S OF VIOLA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4 - 17 Structure Information Str Number AADT 2,400 0660004 Truck Pct NHS 20 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 67 ILL 135 Location ILL 135 / ALEXIS RD TO 270TH AVE / CH 3 Miles = 4.59 Roadway Information Miles AADT Truck Pct 4.59 2,340 20.7 US 67 US 67 US 67 County MYP Years Past Current $10,425,000 WARREN MERCER 8 2021-2025 $18,600,000 WARREN MERCER 5 2021-2025 $3,500,000 WARREN MERCER 4 2021-2025 $2,000,000 WARREN 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY WIDENING EXISTING PAVEMENT NEW SHOULDERS CULVERT REPLACEMENT REHABILITATION - PAVEMENTS NHS Y 210TH AVE TO N OF US 34 IN MONMOUTH Miles = 0.70 Roadway Information Miles AADT Truck Pct 0.70 4,771 17.8 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT NEW SHOULDERS Est. Cost NHS Y 270TH AVE / CH 3 TO 210TH AVE Miles = 6.18 Roadway Information Miles AADT Truck Pct 6.18 3,252 17.5 Improvements TAMP Category DESIGNED OVERLAY WIDENING EXISTING PAVEMENT NEW SHOULDERS REHABILITATION - PAVEMENTS NHS Y OVER BNSF RR 0.8 MI N OF JCT US 34/67 BRIDGE NEW DECK US 34 ILL 110 REHABILITATION - BRIDGES US 67 MAIN US 136 (E) TO GRINDSTONE CREEK Miles = 8.68 Roadway Information Miles AADT Truck Pct 8.68 2,649 21.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 4 - 18 Structure Information Str Number AADT 3,875 0940024 $30,000,000 MCDONOUGH Truck Pct NHS 22 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 67 Location US 136 (E) TO GRINDSTONE CREEK Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $1,000,000 MCDONOUGH 1 2020 $1,000,000 MCDONOUGH 1 2021-2025 $2,000,000 MCDONOUGH 2 2021-2025 $1,295,000 WARREN MERCER 10 2021-2025 KNOX 1 2021-2025 MAIN REHABILITATION - PAVEMENTS US 67 US 136 (E) TO GRINDSTONE CREEK UTILITY ADJUSTMENT MAIN REHABILITATION - PAVEMENTS US 67 GRINDSTONE CREEK TO N 200TH RD Miles = 2.16 Roadway Information Miles AADT Truck Pct 2.16 2,636 20.2 US 67 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y ILL 135 / ALEXIS RD TO US 34 AT MONMOUTH LAND ACQUISITION ILL 135 REHABILITATION - PAVEMENTS US 150 MAIN ST: ALLENS RD TO GRAND AVE & GRAND AVE: MAIN ST TO LOGISTICS PKWY Miles = 2.21 Roadway Information Miles AADT Truck Pct 1.97 5,278 7.1 0.24 7,792 6.3 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N Y 4 - 19 $26,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 150 Location MAIN ST TO LOGISTICS PKWY Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $250,000 KNOX 1 2020 $150,000 KNOX 1 2021-2025 $30,000,000 PEORIA 1 2021-2025 $3,000,000 PEORIA 1 2021-2025 $750,000 PEORIA 1 2021-2025 RECONSTRUCTION - PAVEMENTS US 150 MAIN ST TO LOGISTICS PKWY UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS US 150 W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE Miles = 3.64 Roadway Information Miles AADT Truck Pct 0.77 21,939 3.2 2.87 US 150 24,754 4.2 STANDARD OVERLAY SHOULDER RECONSTRUCTION CURB AND GUTTER SIDEWALKS INTERSECTION RECONSTN REHABILITATION - PAVEMENTS NHS N Y W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS US 150 W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE LAND ACQUISITION REHABILITATION - PAVEMENTS 4 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 150 Location W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,000,000 PEORIA 1 2021-2025 $2,000,000 PEORIA 1 2021-2025 $700,000 PEORIA 1 2021-2025 $4,000,000 PEORIA 1 2020 $5,000,000 PEORIA TAZEWELL 2 2021-2025 REHABILITATION - PAVEMENTS US 150 W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS US 150 W OF ORANGE PRAIRIE RD TO W OF INT STERLING AVE & GLEN AVE UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS US 150 W OF NORTHLAND AVE TO 0.1 MI W OF BRANDYWINE DR Miles = 1.03 Roadway Information Miles AADT Truck Pct 1.03 27,251 2.7 US 150 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y ILLINOIS RIVER CONSTRUCTION ENGINEERING WAR MEMORIAL DR (EASTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 4 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 150 Location OVER ILL 29 Improvements TAMP Category BRIDGE NEW DECK BRIDGE REPAIR Est. Cost County MYP Years Past Current $2,500,000 TAZEWELL PEORIA 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 150 OVER ILL 29 P.E. (PHASE I) Structure Information Str Number AADT 18,950 0720168 Truck Pct NHS 2 Y $425,000 PEORIA 1 2020 $275,000 PEORIA 1 2021-2025 $300,000 PEORIA 1 2021-2025 TAZEWELL PEORIA 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 150 OVER ILL 29 P.E. (PHASE II) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 150 OVER ILL 29 CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 150 ILLINOIS RIVER (WESTBOUND) BRIDGE PAINTING BRIDGE REPAIR ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES 4 - 22 $18,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street US 150 Location ILLINOIS RIVER Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,275,000 TAZEWELL PEORIA 1 2020 $825,000 TAZEWELL PEORIA 1 2021-2025 $900,000 TAZEWELL PEORIA 1 2021-2025 $750,000 WOODFORD 3 2021-2025 $500,000 WOODFORD 2 2021-2025 (WESTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES US 150 ILLINOIS RIVER P.E. (PHASE II) (WESTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES US 150 ILLINOIS RIVER CONSTRUCTION ENGINEERING (WESTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES US 150 0.9 MI E OF MACKINAW RIVER CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS US 150 STREAM 0.2 MI E OF TR 150 E OF CONGERVILLE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 4 - 23 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 6 Location ILL 40 (KNOXVILLE AVE) TO 0.7 MI N OF HOERR'S POND Miles = 2.85 Roadway Information Miles AADT Truck Pct 2.85 23,397 9.0 ILL 6 Improvements TAMP Category DESIGNED OVERLAY PATCHING SHOULDER REPAIR Est. Cost County MYP Years Past Current $7,500,000 PEORIA 7 2020 $2,500,000 PEORIA 4 2020 $42,000,000 PEORIA 1 2021-2025 $2,200,000 PEORIA 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT ALLEN RD INTCHG & AT ILL 40 INTCHG (RAMPS) RAMP REPAIR SHOULDER REPAIR MAINTENANCE - PAVEMENTS ILL 6 AT PROPOSED PIONEER PKWY EXTENSION INTERCHANGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS ILL 6 OVER CHARTER OAK RD IN PEORIA BRIDGE REHABILITATION REHABILITATION - BRIDGES ILL 8 HICKORY CREEK 0.7 MI E OF ILL 97 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4 - 24 Structure Information Str Number AADT 16,800 0720138 16,800 0720139 $935,000 KNOX Structure Information Str Number AADT 1,000 0480017 Truck Pct NHS 6 Y 6 Y 12 2021-2025 Truck Pct NHS 24 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 8 Location HICKORY CREEK 0.7 MI E OF ILL 97 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $95,000 KNOX 12 2021-2025 $95,000 KNOX 12 2021-2025 PEORIA 10 2021-2025 RECONSTRUCTION - BRIDGES ILL 8 HICKORY CREEK 0.7 MI E OF ILL 97 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 8 KICKAPOO CREEK 0.5 MI E OF OAK HILL BRIDGE REPLACEMENT $2,000,000 RECONSTRUCTION - BRIDGES ILL 8 KICKAPOO CREEK 0.5 MI E OF OAK HILL LAND ACQUISITION Structure Information Str Number AADT 1,750 0720043 Truck Pct NHS 10 N $150,000 PEORIA 10 2020 $12,000,000 PEORIA 12 2021-2025 RECONSTRUCTION - BRIDGES ILL 8 OVER BNSF RR AT EDWARDS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 8 OVER BNSF RR AT EDWARDS LAND ACQUISITION RECONSTRUCTION - BRIDGES 4 - 25 Structure Information Str Number AADT 2,450 0720049 $695,000 PEORIA Truck Pct NHS 6 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 8 Location FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) Miles = 1.36 Roadway Information Miles AADT Truck Pct 1.36 13,643 3.6 ILL 8 County MYP Years Improvements TAMP Category Est. Cost RECONSTRUCTION SIDEWALKS ADA IMPROVEMENTS $22,100,000 PEORIA 1 2021-2025 $1,960,000 PEORIA 1 2021-2025 $900,000 PEORIA 1 2020 $1,600,000 PEORIA 1 2021-2025 $800,000 PEORIA 1 2021-2025 $1,000,000 PEORIA 1 2021-2025 Past Current RECONSTRUCTION - PAVEMENTS NHS N FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 8 FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 8 FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 8 FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 8 FARMINGTON RD TO ILL 116 / LINCOLN AVE (EB) UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 4 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 8 Location CEDAR ST BRIDGE TO TP&W RR BRIDGE ILL 116 Improvements TAMP Category BRIDGE NEW DECK BRIDGE SUBSTRUCTURE BRIDGE SUPERSTRUCTURE Est. Cost ILL 116 CEDAR ST BRIDGE TO TP&W RR BRIDGE Miles = 0.63 Roadway Information Miles AADT Truck Pct 0.63 9,837 6.3 ILL 8 ILL 116 STANDARD OVERLAY MYP Years Past Current $1,500,000 REHABILITATION - BRIDGES ILL 8 County TAZEWELL Structure Information Str Number AADT 11,300 0900031 8,350 0900032 11,400 0900033 2 2021-2025 Truck Pct NHS 5 Y 6 Y 5 Y $2,500,000 TAZEWELL 3 2021-2025 $37,000,000 TAZEWELL 5 2021-2025 REHABILITATION - PAVEMENTS NHS Y OVER TAZEWELL & PEORIA RR (TZPR) & ILL 29 IN EAST PEORIA BRIDGE REPLACEMENT INTERCHANGE RECONSTRUCTION CEDAR ST EXT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 8 ILL 116 OVER TAZEWELL & PEORIA RR (TZPR) & ILL 29 IN EAST PEORIA RR FLAGGER CEDAR ST EXT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 4 - 27 Structure Information Str Number AADT 11,400 0900034 11,400 0900035 $300,000 TAZEWELL Truck Pct NHS 5 Y 5 Y 5 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 8 Location OVER TAZEWELL & PEORIA RR (TZPR) & ILL 29 IN EAST PEORIA ILL 116 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $300,000 TAZEWELL 2 2020 $500,000 TAZEWELL 5 2021-2025 $43,000,000 TAZEWELL 1 2021-2025 $3,000,000 TAZEWELL 1 2021-2025 $2,000,000 TAZEWELL 1 2021-2025 CEDAR ST EXT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 8 OVER TAZEWELL & PEORIA RR (TZPR) & ILL 29 IN EAST PEORIA ILL 116 UTILITY ADJUSTMENT CEDAR ST EXT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 8 US 24 BUS LEGION RD TO ECL OF WASHINGTON Miles = 3.83 Roadway Information Miles AADT Truck Pct 2.98 15,866 4.1 0.79 5,215 ILL 8 4.3 RECONSTRUCTION CURB AND GUTTER DRAINAGE SIDEWALKS ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N N LEGION RD TO ECL OF WASHINGTON CONSTRUCTION ENGINEERING US 24 BUS RECONSTRUCTION - PAVEMENTS ILL 8 US 24 BUS LEGION RD TO ECL OF WASHINGTON P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS 4 - 28 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 8 Location LEGION RD TO ECL OF WASHINGTON US 24 BUS Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $2,000,000 TAZEWELL 1 2021-2025 $250,000 TAZEWELL 1 2021-2025 $750,000 TAZEWELL 1 2021-2025 $1,000,000 TAZEWELL 1 2021-2025 $1,800,000 TAZEWELL 2 2021-2025 $425,000 TAZEWELL 2 2020 RECONSTRUCTION - PAVEMENTS ILL 8 LEGION RD TO ECL OF WASHINGTON LAND ACQUISITION US 24 BUS RECONSTRUCTION - PAVEMENTS ILL 8 LEGION RD TO ECL OF WASHINGTON LAND ACQUISITION US 24 BUS RECONSTRUCTION - PAVEMENTS ILL 8 LEGION RD TO ECL OF WASHINGTON UTILITY ADJUSTMENT US 24 BUS RECONSTRUCTION - PAVEMENTS ILL 8 ILL 116 OVER TAZEWELL & PEORIA RR (TZPR) & ILL 29 IN EAST PEORIA CONSTRUCTION ENGINEERING CEDAR ST EXT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 9 WCL OF TREMONT TO W OF I-155 RAMPS LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 4 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 9 Location WCL OF TREMONT TO W OF I-155 RAMPS Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $150,000 TAZEWELL 1 2021-2025 FULTON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 9 SPOON RIVER 1 MI S OF BLYTON BRIDGE REPLACEMENT $17,250,000 RECONSTRUCTION - BRIDGES ILL 9 SPOON RIVER 1 MI S OF BLYTON LAND ACQUISITION Structure Information Str Number AADT 1,100 0290036 Truck Pct NHS 11 N $150,000 FULTON 1 2020 $75,000 FULTON 1 2021-2025 $4,100,000 PEORIA 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 9 SPOON RIVER 1 MI S OF BLYTON UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 9 KJRY RR 1 MI E OF MAPLETON BRIDGE SUPERSTRUCTURE US 24 REHABILITATION - BRIDGES ILL 9 0.1 MI E OF US 24 TO MCNAUGHTON BRIDGE Miles = 1.05 Roadway Information Miles AADT Truck Pct 1.05 14,574 6.5 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 4 - 30 Structure Information Str Number AADT 6,800 0720135 $1,600,000 PEORIA Truck Pct NHS 6 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 9 Location MCNAUGHTON BRIDGE IN PEKIN Improvements TAMP Category BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR BRIDGE DECK REPAIRS NAVIGATION LGHTNG REPAIRS BRIDGE ELECTRICAL WORK BRIDGE APPROACH ROADWAY LIGHTING Est. Cost County MYP Years Past Current $4,500,000 TAZEWELL PEORIA 1 2020 $842,000 TAZEWELL 1 2021-2025 PRESERVATION - BRIDGES ILL 9 DILLON CREEK 1 MI W OF TREMONT BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES ILL 9 WCL OF TREMONT TO W OF I-155 RAMPS Miles = 1.08 Roadway Information Miles AADT Truck Pct 1.08 7,696 9.2 ILL 9 BI-DIRECT LEFT TURN LANE STANDARD OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 6,550 0900060 Truck Pct NHS 9 Y $4,300,000 TAZEWELL 8 2021-2025 $50,000 TAZEWELL 1 2021-2025 MERCER 1 2021-2025 MISCELLANEOUS IMPROVEMENTS NHS Y WCL OF TREMONT TO W OF I-155 RAMPS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 17 FIRST ST IN NEW BOSTON TO BRYANT RD Miles = 5.40 Roadway Information Miles AADT Truck Pct 5.40 1,722 13.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 4 - 31 $4,500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 17 Location SPOON RIVER 0.6 MI W OF WYOMING Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $4,800,000 STARK 13 2021-2025 ILL 91 RECONSTRUCTION - BRIDGES ILL 17 SPOON RIVER 0.6 MI W OF WYOMING UTILITY ADJUSTMENT Structure Information Str Number AADT 1,950 0880002 $100,000 Truck Pct NHS 11 N STARK 5 2021-2025 $8,000,000 MARSHALL 1 2021-2025 $1,000,000 MARSHALL 1 2020 $108,000,000 MARSHALL 1 2021-2025 ILL 91 RECONSTRUCTION - BRIDGES ILL 17 ILLINOIS RIVER BRIDGE AT LACON BRIDGE JOINT REPLACE/REPAIR PIER REPAIR NAVIGATION LGHTNG REPAIRS BRIDGE REPAIR BRIDGE PAINTING PRESERVATION - BRIDGES ILL 17 ILLINOIS RIVER BRIDGE AT LACON P.E. (PHASE I) P.E. (PHASE II) PRESERVATION - BRIDGES ILL 18 ILLINOIS RIVER BRIDGE AT HENRY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4 - 32 Structure Information Str Number AADT 2,550 0620036 Truck Pct NHS 5 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 18 Location ILLINOIS RIVER BRIDGE AT HENRY Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $12,000,000 MARSHALL 1 2021-2025 $5,000,000 MARSHALL 1 2021-2025 $5,000,000 MARSHALL 1 2020 $2,000,000 MARSHALL 1 2021-2025 $1,000,000 MARSHALL 1 2021-2025 $2,500,000 WOODFORD 1 2020 RECONSTRUCTION - BRIDGES ILL 18 ILLINOIS RIVER BRIDGE AT HENRY P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES ILL 18 ILLINOIS RIVER BRIDGE AT HENRY P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES ILL 18 ILLINOIS RIVER BRIDGE AT HENRY LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 18 ILLINOIS RIVER BRIDGE AT HENRY UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 26 TREMONT ST MARSHALL CO LINE TO GALENA ST IN SPRING BAY Miles = 9.19 Roadway Information Miles AADT Truck Pct 9.19 1,726 8.8 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N 4 - 33 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 29 Location SENACHWINE CREEK 1.3 MI N OF PUTNAM Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost BARRVILLE CREEK 2 MI S OF SPARLAND BRIDGE REPLACEMENT $1,300,000 SENACHWINE CREEK IN CHILLICOTHE TO GIMLET CREEK IN SPARLAND; S RAILROAD ST: ELM ST TO WILLOW ST Miles = 7.15 Roadway Information Miles AADT Truck Pct 3.91 7,673 8.7 3.09 0.15 ILL 29 8,277 $750,000 ILL 29 Structure Information Str Number AADT 7,550 0620008 2021-2025 Truck Pct NHS 14 Y 3 2021-2025 Truck Pct NHS 8 Y $8,100,000 MARSHALL PEORIA 1 2020 $2,000,000 PEORIA 1 2020 $9,600,000 PEORIA 1 2020 REHABILITATION - PAVEMENTS 8.2 Y N SENACHWINE CREEK TO N OF TRUITT AVE Miles = 0.93 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 0.2 MI S OF CLOVERDALE RD TO DICKISON RUN CREEK N OF ILL 6 Miles = 6.61 Roadway Information Miles AADT Truck Pct 6.61 15,828 7.6 MARSHALL 1 NHS Y 0.0 Roadway Information Miles AADT Truck Pct 0.93 9,361 7.7 DESIGNED OVERLAY PATCHING PUTNAM Structure Information Str Number AADT 3,000 0780003 RECONSTRUCTION - BRIDGES ILL 29 MYP Years Past Current REHABILITATION - BRIDGES ILL 29 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 4 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 29 Location AT OLD GALENA RD N OF ILL 6 Improvements TAMP Category INTERSECTION IMPROVEMENT Est. Cost County MYP Years Past Current $3,000,000 PEORIA 1 2021-2025 $2,300,000 PEORIA 10 2021-2025 HILLCREST MISCELLANEOUS IMPROVEMENTS ILL 29 DICKISON RUN CREEK 0.3 MI N OF ILL 6 BRIDGE REPLACEMENT (NORTHBOUND) RECONSTRUCTION - BRIDGES ILL 29 DICKISON RUN CREEK 0.3 MI N OF ILL 6 BRIDGE REPLACEMENT Structure Information Str Number AADT 10,100 0720015 $2,300,000 PEORIA Truck Pct NHS 4 Y 3 2021-2025 (SOUTHBOUND) RECONSTRUCTION - BRIDGES ILL 29 N GALENA RD N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA Miles = 2.94 Roadway Information Miles AADT Truck Pct 2.94 13,759 6.5 ILL 29 N GALENA RD BI-DIRECT LEFT TURN LANE DESIGNED OVERLAY RETAINING WALL Structure Information Str Number AADT 10,100 0720016 Truck Pct NHS 4 Y $54,500,000 PEORIA 1 2021-2025 $5,000,000 PEORIA 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 4 - 35 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 29 N GALENA RD Location N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,500,000 PEORIA 2 2020 $3,000,000 PEORIA 1 2021-2025 $17,000,000 PEORIA 1 2021-2025 $1,500,000 PEORIA 1 2021-2025 $1,700,000 PEORIA 1 2021-2025 $3,000,000 PEORIA 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 29 N GALENA RD N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 29 S OF US 150 TO ABINGTON ST IN PEORIA Miles = 1.35 ILL 29 B Roadway Information Miles AADT Truck Pct 1.07 14,216 5.5 0.28 8,800 ILL 29 N GALENA RD 9.1 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y Y N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 29 S OF US 150 TO ABINGTON ST IN PEORIA CONSTRUCTION ENGINEERING ILL 29 B RECONSTRUCTION - PAVEMENTS ILL 29 N GALENA RD N OF GARDNER LN TO MCCLUGAGE BRIDGE IN PEORIA UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 4 - 36 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 29 Location S OF US 150 TO ABINGTON ST IN PEORIA ILL 29 B Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,000,000 PEORIA 1 2020 $1,000,000 PEORIA 1 2021-2025 $1,000,000 PEORIA 1 2021-2025 $1,000,000 PEORIA 1 2021-2025 $105,000 TAZEWELL 1 2020 $531,000 PEORIA TAZEWELL 1 2020 RECONSTRUCTION - PAVEMENTS ILL 29 S OF US 150 TO ABINGTON ST IN PEORIA ILL 29 B P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 29 S OF US 150 TO ABINGTON ST IN PEORIA LAND ACQUISITION ILL 29 B RECONSTRUCTION - PAVEMENTS ILL 29 S OF US 150 TO ABINGTON ST IN PEORIA UTILITY ADJUSTMENT ILL 29 B RECONSTRUCTION - PAVEMENTS ILL 29 POPLAR ST TO MARGARET DR P.E. (PHASE II) US 24 MISCELLANEOUS IMPROVEMENTS ILL 29 B ILL 29 VARIOUS ROUTES IN PEORIA & TAZEWELL COUNTIES SAFETY IMPROVEMENTS ILL 8 US 24 BUS MISCELLANEOUS IMPROVEMENTS 4 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 40 Location BNSF RR S OF EDELSTEIN Improvements TAMP Category BRIDGE REPLACEMENT RR FLAGGER Est. Cost County MYP Years Past Current $2,900,000 PEORIA 14 2021-2025 $100,000 PEORIA 4 2021-2025 $3,000,000 PEORIA 1 2020 $21,000,000 PEORIA 1 2021-2025 $2,100,000 PEORIA 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 40 BNSF RR S OF EDELSTEIN LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 40 RAVINSWOOD RD TO N OF TIMBER LN Miles = 0.84 Roadway Information Miles AADT Truck Pct 0.27 20,800 5.1 0.57 24,200 ILL 40 KNOXVILLE AVE 3.6 ILL 40 REHABILITATION - PAVEMENTS NHS N Y I-74 TO N OF US 150 (WAR MEMORIAL DR) Miles = 1.87 Roadway Information Miles AADT Truck Pct 1.87 24,301 4.1 DESIGNED OVERLAY INTERSECTION RECONSTN RECONSTRUCTION ADA IMPROVEMENTS STORM SEWER (NEW) INTERSECTION IMPROVEMENT TURNING LANES SIDEWALKS RECONSTRUCTION - PAVEMENTS NHS Y I-74 TO N OF US 150 (WAR MEMORIAL DR) CONSTRUCTION ENGINEERING KNOXVILLE AVE RECONSTRUCTION - PAVEMENTS 4 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 40 Location I-74 TO N OF US 150 (WAR MEMORIAL DR) KNOXVILLE AVE Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,000,000 PEORIA 1 2021-2025 $500,000 PEORIA 1 2021-2025 $500,000 PEORIA 1 2021-2025 $18,000,000 PEORIA TAZEWELL 1 2021-2025 $2,000,000 PEORIA TAZEWELL 1 2020 RECONSTRUCTION - PAVEMENTS ILL 40 I-74 TO N OF US 150 (WAR MEMORIAL DR) LAND ACQUISITION KNOXVILLE AVE RECONSTRUCTION - PAVEMENTS ILL 40 I-74 TO N OF US 150 (WAR MEMORIAL DR) UTILITY ADJUSTMENT KNOXVILLE AVE RECONSTRUCTION - PAVEMENTS ILL 40 BOB MICHEL BRIDGE AT ILLINOIS RIVER BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR NAVIGATION LGHTNG REPAIRS MISCELLANEOUS PRESERVATION - BRIDGES ILL 40 BOB MICHEL BRIDGE AT ILLINOIS RIVER P.E. (PHASE I) P.E. (PHASE II) PRESERVATION - BRIDGES 4 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 40 Location I-74 TO N OF US 150 (WAR MEMORIAL DR) KNOXVILLE AVE Improvements TAMP Category P.E. (PHASE II) P.E. (PHASE I) Est. Cost County MYP Years Past Current $1,000,000 PEORIA 1 2021-2025 $1,600,000 PEORIA TAZEWELL 1 2020 $19,000,000 FULTON KNOX 1 2021-2025 $750,000 FULTON KNOX 1 2021-2025 $750,000 FULTON KNOX 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 40 A DETOUR ROUTE IN PEORIA & EAST PEORIA ILL 40 RAMP MODIFICATIONS MISCELLANEOUS INTERSECTION IMPROVEMENT TURNING LANES SIGNAL TIMING/PROGRESSION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MISCELLANEOUS IMPROVEMENTS ILL 41 ILL 116 TO SCL OF AVON Miles = 5.44 Roadway Information Miles AADT Truck Pct 4.34 2,252 16.5 1.10 ILL 41 2,367 14.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N ILL 116 TO SCL OF AVON LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 41 ILL 116 TO SCL OF AVON UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 4 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 41 Location 0.3 MI N OF HATCH RD TO 0.2 MI N OF CAPP RD Improvements TAMP Category CULVERT EXTENSION CULVERT REPAIR SLOPE STABILIZATION Est. Cost County MYP Years Past Current $750,000 FULTON 1 2021-2025 $1,800,000 FULTON 4 2020 $3,400,000 MCDONOUGH 1 2020 $2,200,000 STARK 1 2020 KNOX 3 2020 MISCELLANEOUS IMPROVEMENTS ILL 41 DITCH 0.4 MI S OF CH 17 E OF PRAIRIE CITY CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES ILL 61 ILL 336 TO CH 24 IN COLMAR Miles = 4.12 Roadway Information Miles AADT Truck Pct 4.12 1,050 4.6 ILL 78 ILL 78 REHABILITATION - PAVEMENTS NHS N HENRY CO LINE TO ILL 17 (W) Miles = 2.99 Roadway Information Miles AADT Truck Pct 2.99 2,050 12.2 DESIGNED OVERLAY DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N KICKAPOO CREEK 1 MI S OF ILL 8 (DETOUR RD REPAIR) MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 4 - 41 $359,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 78 Location KICKAPOO CREEK 1 MI S OF ILL 8 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost KICKAPOO CREEK 1 MI S OF ILL 8 CULVERT REPLACEMENT BRIDGE APPROACH ROADWAY MYP Years Past Current $1,080,000 RECONSTRUCTION - BRIDGES ILL 78 County KNOX Structure Information Str Number AADT 1,600 0480018 12 2020 Truck Pct NHS 3 N $1,620,000 KNOX 1 2020 $115,000 KNOX 11 2020 $5,250,000 FULTON 3 2021-2025 $1,130,000 PUTNAM 10 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 78 KICKAPOO CREEK 1 MI S OF ILL 8 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 78 ILL 97 0.1 MI S OF N CLARK RD TO US 136 Miles = 5.19 Roadway Information Miles AADT Truck Pct 5.02 3,247 11.0 ILL 89 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N CLEAR CREEK TRIB 2.8 MI N OF ILL 18 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4 - 42 Structure Information Str Number AADT 1,900 0780024 Truck Pct NHS 19 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 89 Location CLEAR CREEK TRIB 2.8 MI N OF ILL 18 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $97,000 PUTNAM 11 2021-2025 $1,100,000 PUTNAM 13 2021-2025 RECONSTRUCTION - BRIDGES ILL 89 CLEAR CREEK 1.4 MI N OF ILL 18 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 89 CLEAR CREEK 1.4 MI N OF ILL 18 UTILITY ADJUSTMENT Structure Information Str Number AADT 1,500 0780025 $100,000 Truck Pct NHS 3 N PUTNAM 10 2021-2025 PEORIA 1 2020 HENDERSON 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 91 N HOLMES RD TO S OF PARKS SCHOOL RD IN DUNLAP Miles = 4.27 ILL 90 ILL 91 Roadway Information Miles AADT Truck Pct 4.10 2,332 4.4 0.17 ILL 94 3,400 4.4 DESIGNED OVERLAY $4,000,000 REHABILITATION - PAVEMENTS NHS N N FALL CREEK 4.3 MI N OF ILL 164 BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 4 - 43 $500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 96 Location 0.2 MI E OF HANCOCK CO LINE Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $1,000,000 HENDERSON 2 2021-2025 $10,000,000 KNOX FULTON 1 2021-2025 $500,000 KNOX FULTON 1 2021-2025 $500,000 KNOX FULTON 1 2021-2025 FULTON SCHUYLER 1 2020 RECONSTRUCTION - BRIDGES ILL 97 S OF LITTLERS CREEK TO ILL 116 Miles = 2.92 Roadway Information Miles AADT Truck Pct 0.52 1,400 10.7 2.40 1,321 ILL 97 21.9 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N S OF LITTLERS CREEK TO ILL 116 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 97 S OF LITTLERS CREEK TO ILL 116 UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 100 US 136 TO 0.4 MI S OF THE SCHUYLER CO LINE Miles = 10.48 Roadway Information Miles AADT Truck Pct 9.99 612 22.4 0.37 600 33.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 4 - 44 $6,800,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 110 US 67 Location 0.4 MI S OF N 2100TH RD TO N OF 40TH AVE Miles = 7.63 Improvements TAMP Category MICROSURFACING 1 PASS Est. Cost County MYP Years Past Current $1,680,000 WARREN MCDONOUGH 1 2020 $2,037,000 MCDONOUGH 1 2020 $6,500,000 WARREN 2 2020 WOODFORD 12 2020 PRESERVATION - PAVEMENTS ILL 110 ILL 336 US 136 CH US 136: HANCOCK CO LINE TO ILL 336 & ILL 336: US 136 (W) TO 0.5 MI S OF US 136 W OF MACOMB Miles = 10.54 MICROSURFACING 1 PASS 8 PRESERVATION - PAVEMENTS ILL 116 TR 154 (115TH ST) TO KNOX CO LINE Miles = 6.49 Roadway Information Miles AADT Truck Pct 6.49 996 22.2 ILL 116 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N W BRANCH PANTHER CREEK IN ROANOKE BRIDGE SUPERSTRUCTURE $900,000 ILL 117 REHABILITATION - BRIDGES ILL 116 I CULVERTS IN VARIOUS LOCATIONS CULVERT REPAIR 74 ILL 9 ILL 98 MISCELLANEOUS IMPROVEMENTS 4 - 45 Structure Information Str Number AADT 2,700 1020042 $750,000 TAZEWELL PEORIA Truck Pct NHS 17 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 116 HARMON HWY Location OVER BNSF RR, UP RR & KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Improvements TAMP Category BRIDGE REPLACEMENT RR FLAGGER Est. Cost County MYP Years Past Current $15,200,000 PEORIA 6 2021-2025 $2,200,000 PEORIA 3 2021-2025 $1,300,000 PEORIA 6 2021-2025 $1,750,000 WOODFORD 1 2021-2025 $4,506,000 WOODFORD 5 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 116 HARMON HWY OVER BNSF RR, UP RR & KICKAPOO CREEK 0.1 MI E OF AIRPORT RD UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 116 HARMON HWY OVER BNSF RR, UP RR & KICKAPOO CREEK 0.1 MI E OF AIRPORT RD CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 117 MAIN ST MILL ST IN EUREKA TO 700 N RD S OF EUREKA Miles = 2.33 Roadway Information Miles AADT Truck Pct 2.33 7,247 12.0 ILL 117 REHABILITATION - PAVEMENTS NHS N 700 N RD S OF EUREKA TO N OF RAYMOND ST IN GOODFIELD Miles = 4.10 Roadway Information Miles AADT Truck Pct 4.10 6,170 13.4 DESIGNED OVERLAY NEW SHOULDERS MILLED RUMBLE STRIP STANDARD OVERLAY MISCELLANEOUS IMPROVEMENTS NHS N 4 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 122 Location ILL 29 TO I-155 Miles = 10.00 Roadway Information Miles AADT Truck Pct 10.00 1,165 11.5 ILL 164 ILL 167 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $8,500,000 TAZEWELL 1 2021-2025 $6,400,000 HENDERSON 1 2020 $800,000 KNOX 4 2020 $800,000 KNOX 4 2020 $106,000 KNOX 1 2020 REHABILITATION - PAVEMENTS NHS N 8TH ST IN OQUAWKA TO WARREN CO LINE Miles = 8.64 Roadway Information Miles AADT Truck Pct 8.64 1,893 14.1 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N CREEK 0.1 MI SE OF US 34 CULVERT (NEW) BRIDGE APPROACH ROADWAY INITIAL CONSTRUCTION - BRIDGES ILL 167 CREEK 1.3 MI W OF TR 146 CULVERT (NEW) BRIDGE APPROACH ROADWAY INITIAL CONSTRUCTION - BRIDGES ILL 167 CREEK 0.1 MI SE OF US 34 & CREEK 1.3 MI W OF TR 146 MISCELLANEOUS MAINTENANCE - PAVEMENTS 4 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ILL 167 Location 0.1 MI W OF WEST ST IN VICTORIA TO ILL 180 Miles = 3.30 Roadway Information Miles AADT Truck Pct 3.30 963 10.4 ILL 180 ILL 180 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $2,000,000 KNOX 12 2021-2025 $35,000,000 KNOX 6 2021-2025 $550,000 KNOX 6 2020 $500,000 KNOX 4 2021-2025 PEORIA 3 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 167 TO US 150 Miles = 10.40 Roadway Information Miles AADT Truck Pct 10.40 662 11.2 Improvements TAMP Category WIDENING & RESURFACING REHABILITATION - PAVEMENTS NHS N ILL 167 TO US 150 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 180 ILL 167 TO US 150 UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ADAMS ST OVER BNSF & UP RR AT WCL OF PEORIA BRIDGE REPLACEMENT BRIDGE REHABILITATION RR FLAGGER ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 4 - 48 $22,000,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street ADAMS ST Location OVER BN RR & CNW RR AT WCL OF PEORIA Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,500,000 PEORIA 3 2021-2025 $500,000 PEORIA 3 2021-2025 $500,000 PEORIA 3 2021-2025 $1,500,000 PEORIA 3 2021-2025 $51,000 PEORIA 1 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ADAMS ST OVER BNSF RR & UP RR AT WCL OF PEORIA LAND ACQUISITION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ADAMS ST OVER BNSF RR & UP RR AT WCL OF PEORIA UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ADAMS ST OVER BNSF RR & UP RR AT WCL OF PEORIA CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES BELL SCHOOL RD 0.1 TO 0.2 MI S OF BELL SCHOOL RD OVER I-74 Miles = 0.06 STANDARD OVERLAY REHABILITATION - PAVEMENTS 4 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street E WASHINGTON ST Location W OF I-74 TO FARM CREEK Miles = 0.36 Roadway Information Miles AADT Truck Pct 0.36 10,506 4.4 VARIOUS Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $500,000 TAZEWELL 1 2021-2025 $200,000 TAZEWELL PEORIA 2 2020 $5,000,000 DISTRICT-WIDE 1 2021-2025 $5,000,000 DISTRICT-WIDE 1 2021-2025 $1,750,000 DISTRICT-WIDE 2 2021-2025 $10,844,000 DISTRICT-WIDE 2 2021-2025 REHABILITATION - PAVEMENTS NHS N BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS PAVEMENT PRESERVATION STANDARD OVERLAY PRESERVATION - PAVEMENTS VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS PRESERVATION - BRIDGES 4 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $10,811,000 DISTRICT-WIDE 2 2021-2025 $300,000 DISTRICT-WIDE FULTON MCDONOUGH 1 2020 $1,225,000 DISTRICT-WIDE 4 2020 $5,017,000 DISTRICT-WIDE 4 2021-2025 $1,000,000 DISTRICT-WIDE 2 2020 $1,000,000 DISTRICT-WIDE 1 2020 Past Current PRESERVATION - PAVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS ADA IMPROVEMENTS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ADA IMPROVEMENTS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL CONSTRUCTION INSPECTION CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL CONSTRUCTION INSPECTION CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 4 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street VARIOUS Location ON-CALL CONSTRUCTION ENGINEERING Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,712,000 DISTRICT-WIDE 3 2020 $18,000,000 DISTRICT-WIDE 1 2021-2025 $6,000,000 DISTRICT-WIDE 1 2021-2025 $365,000 DISTRICT-WIDE 4 2020 $6,000,000 DISTRICT-WIDE 1 2020 $1,000,000 DISTRICT-WIDE 5 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL CONSTRUCTION INSPECTION CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. SOILS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. SOILS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS SURVEY ENGINEERING P.E. SURVEYS (ROW) PRELIMINARY ENGINEERING P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) MISCELLANEOUS IMPROVEMENTS 4 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street VARIOUS Location MISCELLANEOUS SURVEY ENGINEERING Improvements TAMP Category PRELIMINARY ENGINEERING P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) P.E. SURVEYS (ROW) Est. Cost County MYP Years Past Current $300,000 DISTRICT-WIDE 4 2020 $3,000,000 DISTRICT-WIDE 1 2021-2025 $1,500,000 DISTRICT-WIDE 1 2020 $1,500,000 DISTRICT-WIDE 1 2021-2025 $600,000 DISTRICT-WIDE 1 2020 $500,000 DISTRICT-WIDE 8 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS CONSULTANT MANAGERS P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS CONSULTANT MANAGERS MATERIALS CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS VARIOUS CONSULTANT MANAGERS MATERIALS P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS ON CALL SOIL BORINGS P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS 4 - 53 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 4 State Highways Route / Street VARIOUS Location UTILITY ADJUSTMENTS Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 DISTRICT-WIDE 1 2020 $1,017,000 DISTRICT-WIDE 6 2020 $17,615,000 DISTRICT-WIDE 5 2021-2025 $837,000 VARIOUS 1 2020 $317,000 VARIOUS 1 2020 $500,000 PEORIA 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ROUTES AT VARIOUS LOCATIONS IN WESTERN HALF OF DISTRICT 4 CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS ROUTES AT VARIOUS LOCATIONS IN EASTERN HALF OF DISTRICT 4 CRACK & JOINT SEALING PRESERVATION - PAVEMENTS W GLEN AVE STERLING AVE AT US 150 Miles = 0.20 STANDARD OVERLAY REHABILITATION - PAVEMENTS 4 - 54 DISTRICT 4 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street 270TH ST Location AT HENDERSON CREEK Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost County MYP Years Past Current $250,000 MERCER 1 2020 $40,000 MERCER 1 2020 TAZEWELL 4 2020 STARK 7 2021-2025 $1,500,000 WARREN 1 2020 $1,400,000 FULTON 1 2020 JOHN LINE RD REHABILITATION - BRIDGES 270TH ST AT HENDERSON CREEK CONSTRUCTION ENGINEERING JOHN LINE RD REHABILITATION - BRIDGES CAMP ST AT RIVER RD Miles = 0.02 ADDITIONAL LANES $3,476,000 INITIAL CONSTRUCTION - PAVEMENTS CH 1 S CASTLETON RD CASTLETON RD TO ILL 17 Miles = 2.86 RECONSTRUCTION $280,000 RECONSTRUCTION - PAVEMENTS CH 1 KELLY ST / MERCER CO LINE TO ILL 164 Miles = 8.05 120TH ST STANDARD OVERLAY WIDENING EXISTING PAVEMENT COLD IN-PLACE RECYCLING REHABILITATION - PAVEMENTS CH 2 ELROD RD TO AIRPORT RD Miles = 1.51 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 4 - 55 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 2 Location ELROD RD TO AIRPORT RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $80,000 FULTON 1 2020 STARK 2 2021-2025 WARREN 2 2021-2025 WARREN 1 2021-2025 $900,000 MERCER 2 2021-2025 $80,000 MERCER 2 2021-2025 RECONSTRUCTION - PAVEMENTS CH 4 DUNCAN RD 700 E RD TO 0.2 MI E OF 900 E RD Miles = 2.19 RECONSTRUCTION $470,000 RECONSTRUCTION - PAVEMENTS CH 4 AT HENDERSON CREEK 4.5 MI SE OF ALEXIS BRIDGE REPLACEMENT $1,771,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 4 AT HENDERSON CREEK 4.5 MI SE OF ALEXIS CONSTRUCTION ENGINEERING $145,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 4 AT CAMP CREEK 1.5 MI N OF SWEDONA BRIDGE REPLACEMENT KNOXVILLE RD RECONSTRUCTION - BRIDGES CH 4 AT CAMP CREEK 1.5 MI N OF SWEDONA CONSTRUCTION ENGINEERING KNOXVILLE RD RECONSTRUCTION - BRIDGES 4 - 56 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 6 Location 0.5 MI E OF 1000 E RD TO 2.5 MI W OF ILL 29 WESTERN AVE Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $410,000 MARSHALL 5 2021-2025 $216,000 MARSHALL 5 2021-2025 $6,417,000 MARSHALL 3 2021-2025 $610,000 MARSHALL 3 2021-2025 MERCER 1 2020 RECONSTRUCTION - PAVEMENTS CH 6 0.5 MI E OF 1000 E RD TO 2.5 MI W OF ILL 29 LAND ACQUISITION WESTERN AVE RECONSTRUCTION - PAVEMENTS CH 6 WESTERN AVE 0.5 MI E OF 1000 E RD TO 2.5 MI W OF ILL 29 Miles = 1.34 RELOCATION RECONSTRUCTION - PAVEMENTS CH 6 0.5 MI E OF 1000 E RD TO 2.5 MI W OF ILL 29 CONSTRUCTION ENGINEERING WESTERN AVE RECONSTRUCTION - PAVEMENTS CH 6 RIDGE RD CH 15 CH 22 CH 6 (40TH AVE) FROM 205TH ST TO W OF 270TH ST; CH 15 (RIDGE RD) FROM 195TH ST TO 210TH ST AND FROM 240TH ST TO 255TH ST; CH 22 (280TH ST) FROM ALEXIS NCL TO 20TH AVE; CH 22 (20TH AVE) FROM 280TH ST TO N HENDERSON WCL BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS 4 - 57 $53,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 7 Location AT CEDAR CREEK 3.4 MI NE OF MONMOUTH Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 WARREN 2 2021-2025 WOODFORD 1 2021-2025 WOODFORD 1 2021-2025 $750,000 HENDERSON 17 2021-2025 $575,000 KNOX 8 2021-2025 MERCER 4 2021-2025 225TH AVE RECONSTRUCTION - BRIDGES CH 7 MERIDIAN RD AT PANTHER CREEK AND AT PANTHER CREEK OVERFLOW 3.5 MI S OF US 24 BRIDGE REPLACEMENT BRIDGE SUPERSTRUCTURE $1,760,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 7 MERIDIAN RD AT PANTHER CREEK AND AT PANTHER CREEK OVERFLOW 3.5 MI S OF US 24 CONSTRUCTION ENGINEERING $98,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 8 1900 E RD S OF ILL 116 TO RARITAN RD Miles = 2.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 8 AT BRUSH CREEK 5 MI E OF ABINGDON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CH 9 AT EDWARDS RIVER 1.4 MI N OF JOY P.E. (PHASE I) JOY RD RECONSTRUCTION - BRIDGES 4 - 58 $64,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 9 Location AT EDWARDS RIVER 1.4 MI N OF JOY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 MERCER 5 2021-2025 $56,000 MERCER 5 2021-2025 $330,000 MERCER 2 2021-2025 $1,250,000 MCDONOUGH 2 2020 $40,000 MCDONOUGH 2 2020 MERCER 5 2021-2025 JOY RD RECONSTRUCTION - BRIDGES CH 9 AT EDWARDS RIVER 1.4 MI N OF JOY CONSTRUCTION ENGINEERING JOY RD RECONSTRUCTION - BRIDGES CH 9 JOY RD AT UNNAMED CREEK 1.2 MI S OF ROCK ISLAND CO LINE CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES CH 9 AT SUGAR CREEK 2 MI W OF VERMONT BRIDGE REPLACEMENT ELMIRA RD RECONSTRUCTION - BRIDGES CH 9 AT SUGAR CREEK 2 MI W OF VERMONT CONSTRUCTION ENGINEERING ELMIRA RD RECONSTRUCTION - BRIDGES CH 9 110TH ST ROCK ISLAND CO LINE TO 160TH AVE CULVERT REPLACEMENT DRAINAGE MISCELLANEOUS IMPROVEMENTS 4 - 59 $500,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 9 Location ROCK ISLAND CO LINE TO 160TH AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $44,000 MERCER 5 2021-2025 $516,000 MERCER 5 2021-2025 $40,000 MERCER 5 2021-2025 $750,000 KNOX 1 2021-2025 $100,000 STARK MARSHALL 13 2021-2025 WOODFORD 1 2021-2025 110TH ST MISCELLANEOUS IMPROVEMENTS CH 9 160TH AVE TO 130TH AVE 110TH ST CULVERT REPLACEMENT CULVERT REPAIR DRAINAGE MISCELLANEOUS IMPROVEMENTS CH 9 160TH AVE TO 130TH AVE CONSTRUCTION ENGINEERING 110TH ST MISCELLANEOUS IMPROVEMENTS CH 12 CH 7 TO US 150 Miles = 5.80 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 13 CH 15 ILL 91 TO ILL 40 Miles = 6.51 STANDARD OVERLAY N VALLEY RD REHABILITATION - PAVEMENTS CH 13 1800 E RD 1150 N RD TO N OF TP&W RR Miles = 1.59 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS 4 - 60 $1,870,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 16 E BOTTOM RD Location ILL 89 TO LASALLE CO LINE Miles = 1.92 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $420,000 PUTNAM 1 2021-2025 $775,000 MERCER 3 2021-2025 $32,000 MERCER 3 2021-2025 $3,375,000 TAZEWELL 5 2021-2025 $1,709,000 TAZEWELL 2 2021-2025 $1,200,000 PEORIA 1 2021-2025 REHABILITATION - PAVEMENTS CH 16 AT SNAKE CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CH 16 AT SNAKE CREEK CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES CH 19 VETERANS DR TO SPRINGFIELD RD BROADWAY RD DRAINAGE SHOULDER REPAIR MISCELLANEOUS IMPROVEMENTS CH 19 BROADWAY RD VETERANS DR TO SPRINGFIELD RD Miles = 2.53 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 23R AT W FORK KICKAPOO CREEK SE OF ELMWOOD BRIDGE REPLACEMENT DOGTOWN LN RECONSTRUCTION - BRIDGES 4 - 61 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 25 GRANT ST Location 0.5 MI E OF CANDY LN TO US 67 Miles = 1.47 Improvements TAMP Category STANDARD OVERLAY WIDENING EXISTING PAVEMENT Est. Cost County MYP Years Past Current $1,000,000 MCDONOUGH 16 2021-2025 $40,000 MCDONOUGH 1 2021-2025 $300,000 MCDONOUGH 1 2021-2025 $40,000 MCDONOUGH 1 2021-2025 $80,000 MCDONOUGH 2 2020 $1,000,000 MCDONOUGH 2 2021-2025 REHABILITATION - PAVEMENTS CH 25 0.5 MI E OF CANDY LN TO US 67 CONSTRUCTION ENGINEERING GRANT ST REHABILITATION - PAVEMENTS CH 26 AT E FORK LAMOINE RIVER E OF PLYMOUTH BRIDGE PAINTING N 75TH RD PRESERVATION - BRIDGES CH 26 AT E FORK LAMOINE RIVER E OF PLYMOUTH CONSTRUCTION ENGINEERING N 75TH RD PRESERVATION - BRIDGES CH 26 AT GRINDSTONE CREEK 0.4 MI N OF N 50TH RD BERGEN RD P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES CH 26 AT GRINDSTONE CREEK 0.4 MI N OF N 50TH RD BRIDGE REPLACEMENT BERGEN RD RECONSTRUCTION - BRIDGES 4 - 62 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 26 Location AT GRINDSTONE CREEK 0.4 MI N OF N 50TH RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $40,000 MCDONOUGH 2 2021-2025 PEORIA 5 2021-2025 PEORIA 3 2021-2025 $900,000 PEORIA 1 2021-2025 $800,000 PEORIA 1 2021-2025 BERGEN RD RECONSTRUCTION - BRIDGES CH 29D AT JUBILEE CREEK 2.7 MI E OF BRIMFIELD BRIDGE REPLACEMENT $1,700,000 BRIMFIELD JUBILEE RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 29D AT JUBILEE CREEK 2.7 MI E OF BRIMFIELD CONSTRUCTION ENGINEERING $72,000 BRIMFIELD JUBILEE RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 37D AT BRANCH KICKAPOO CREEK E OF KOERNER RD BRIDGE REPLACEMENT CHARTER OAK RD RECONSTRUCTION - BRIDGES CH 41D AT BRANCH TIBER CREEK BRIDGE REPLACEMENT GRAHAM CHAPEL RD RECONSTRUCTION - BRIDGES 4 - 63 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street CH 51R Location AT TRIB KICKAPOO CREEK 0.1 MI N OF ADAMS ST Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $2,000,000 PEORIA 3 2020 $1,750,000 PEORIA 5 2020 PEORIA 5 2020 $1,500,000 PEORIA 1 2021-2025 $2,300,000 PEORIA 3 2021-2025 KICKAPOO CREEK RD RECONSTRUCTION - BRIDGES CH 52D SMITHVILLE RD AT BRANCH COPPERAS CREEK 0.6 MI W OF TRIVOLI RD BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 52D SMITHVILLE RD AT BRANCH COPPERAS CREEK 0.6 MI W OF TRIVOLI RD CONSTRUCTION ENGINEERING $144,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 60R OLD GALENA RD NEAL LN TO RENCH RD Miles = 0.32 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CH 60R OLD GALENA RD RENCH RD TO DICKISON LN Miles = 0.19 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 4 - 64 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street DISTILLERY RD FRONT ST Location DISTILLERY RD: FRONT ST TO ILL 29; FRONT ST: FAYETTE ST TO DISTILLERY RD Miles = 1.28 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $5,116,000 TAZEWELL 1 2020 MCDONOUGH 2 2020 $1,000,000 TAZEWELL 3 2021-2025 $48,000 TAZEWELL 3 2021-2025 PEORIA 1 2021-2025 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS E 725TH ST MAY RD E 1800TH ST E 725TH ST: N 1850TH RD TO .2 MI N OF N 1500TH RD; MAY RD: ILL 110 TO W AIRPORT RD; E 1800TH ST: N 1450TH RD TO .1 MI N OF N 1300TH RD Miles = 13.40 BIT SURFACE TREATMENT-A2 $400,000 PRESERVATION - PAVEMENTS FURROW RD AT LOST CREEK 0.5 MI E OF SOUTH PEKIN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES FURROW RD AT LOST CREEK 0.5 MI E OF SOUTH PEKIN CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES GLEN AVE SHERIDAN RD TO KNOXVILLE AVE Miles = 0.51 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 4 - 65 $1,968,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street MAXWELL RD Location OVER C&NW RR Improvements TAMP Category BRIDGE REHABILITATION Est. Cost County MYP Years Past Current $2,250,000 PEORIA 1 2021-2025 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, RAILROAD AND LOCAL AGENCY. REHABILITATION - BRIDGES MAXWELL RD OVER C&NW RR CONSTRUCTION ENGINEERING $168,000 PEORIA ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, RAILROAD AND LOCAL AGENCY. REHABILITATION - BRIDGES N 2100 RD AT N FORK CROOKED CREEK 4.3 MI E OF ILL 110 / US 67 BRIDGE REPLACEMENT $500,000 MCDONOUGH 2 2021-2025 $40,000 MCDONOUGH 2 2021-2025 $740,000 PEORIA 1 2021-2025 $950,000 FULTON 2 2021-2025 RECONSTRUCTION - BRIDGES N 2100 RD AT N FORK CROOKED CREEK 4.3 MI E OF ILL 110 / US 67 CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES N ALLEN RD WALTON RD TO 0.2 MI S OF ALTORFER DR Miles = 0.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS N SEVILLE RD AT SHAW CREEK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 4 - 66 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street N SEVILLE RD Location AT SHAW CREEK Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $80,000 FULTON 2 2021-2025 STARK 2 2021-2025 $2,240,000 MCDONOUGH 1 2021-2025 $2,900,000 KNOX 2 2020 $500,000 TAZEWELL 3 2020 $24,000 TAZEWELL 3 2020 RECONSTRUCTION - BRIDGES N VALLEY RD AT CAMP RUN CREEK BRIDGE REPLACEMENT $1,728,000 400 N RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES S JOHNSON ST GRANT ST TO HARMONY LN Miles = 0.54 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS S SEMINARY ST E BERRIEN ST TO S FIFTH ST Miles = 0.66 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS TOBOGGAN AVE AT DRAINAGE DITCH 2.3 MI E OF GREEN VALLEY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES TOBOGGAN AVE AT DRAINAGE DITCH 2.3 MI E OF GREEN VALLEY CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 4 - 67 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street TR 7C Location AT BRANCH SPOON RIVER 1.6 MI SE OF DUNCAN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $800,000 PEORIA 3 2020 $250,000 HENDERSON 2 2020 $800,000 MERCER 2 2021-2025 $250,000 HENDERSON 1 2021-2025 $250,000 HENDERSON 2 2020 $600,000 WARREN 3 2021-2025 STREITMATTER RD RECONSTRUCTION - BRIDGES VARIOUS VARIOUS LOCATIONS IN HENDERSON CO Miles = 5.00 BIT SURFACE TREATMENT-A1 CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN MERCER CO Miles = 10.00 BIT SURFACE TREATMENT-A1 BIT SURFACE TREATMENT-A2 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN HENDERSON CO Miles = 5.00 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN HENDERSON CO Miles = 5.00 BIT SURFACE TREATMENT-A2 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN WARREN CO Miles = 5.00 CAPE SEAL PRESERVATION - PAVEMENTS 4 - 68 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 4 Local Highways Route / Street VARIOUS Location VARIOUS LOCATIONS IN MCDONOUGH CO Miles = 5.00 Improvements TAMP Category BIT SURFACE TREATMENT-A1 BIT SURFACE TREATMENT-A2 Est. Cost County MYP Years Past Current $400,000 MCDONOUGH 2 2020 $800,000 MCDONOUGH 2 2021-2025 $2,600,000 WARREN 2 2021-2025 $288,000 WARREN 2 2021-2025 MCDONOUGH 3 2021-2025 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN MCDONOUGH CO Miles = 10.00 BIT SURFACE TREATMENT-A1 BIT SURFACE TREATMENT-A2 PRESERVATION - PAVEMENTS W HARLEM AVE US 34 TO N MAIN ST Miles = 0.77 RECONSTRUCTION SIDEWALKS DRAINAGE RECONSTRUCTION - PAVEMENTS W HARLEM AVE US 34 TO N MAIN ST CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS WIGWAM HOLLOW RD TOWER RD TO N OF JANA RD Miles = 0.84 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 4 - 69 $2,000,000 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 3 District 5 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 3, DISTRICT 5, PARIS Overview Highway District 5 encompasses 7 counties in eastern Illinois and includes the cities of Bloomington-Normal, Champaign-Urbana, Clinton, Danville and Tuscola, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 5 consists of 1,296 miles of highways and 682 bridges, supporting 9.8 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $780 million will be provided during FY 2020-2025 for improvements to state highways in District 5. The following table summarizes anticipated accomplishments on the state highway system in District 5 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 58 92 220 65 269,921 67,932 49,470 159,387 0 0 0 0 23 0 0 0 0 154,215 77.856 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 55 from south of Lexington to Livingston County line in McLean County. Resurfacing on 11.6 miles (including ramp repair) is programmed in FY 2020 at a cost of $14.6 million. 5-i • Interstate 55 Business (Veterans Parkway) from Commerce Parkway to 0.1 mile north of East Washington Street and from Clearwater Avenue to Old Route 66 and at Illinois 9 in Bloomington in McLean County. Resurfacing on 4.7 miles, ADA improvements and engineering for continuation of a feasibility study at Illinois 9 are programmed during FY 2021-2025 at a cost of $10.9 million. • Interstate 57 at Interstate 74 Interchange in Champaign County. Interchange reconstruction, new bridges, a bridge replacement, a culvert replacement, a new culvert, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $120.2 million. Of this total, utility adjustments are programmed in FY 2020 at a cost of $300,000. This project has been approved for Illinois Special Bridge Program funding. • Interstate 57 under US 150 and Mattis Avenue and Interstate 74 under Mattis Avenue northwest of Champaign in Champaign County. Bridge replacements, utility adjustments, land acquisition and construction engineering are programmed in FY 2020 at a cost of $28.2 million. This project has been approved for Illinois Special Bridge Program funding. • Interstate 74 over Market Street and at Illinois Central Railroad and Township Road 158 in Champaign County. Bridge superstructure replacement and construction engineering are programmed in FY 2020 at a cost of $29.9 million. This project has been approved for Illinois Special Bridge Program funding. • Interstate 74 from US 150 west of Danville to Vermilion River in Vermilion County. Reconstruction on 5.8 miles, engineering for location, environmental and design studies, engineering for contract plans, a bridge deck overlay, bridge deck repairs and bridge repair are programmed during FY 2020-2025 at a cost of $31.1 million. Of this total, engineering for location, environmental and design studies and engineering for contract plans are programmed in FY 2020 at a cost of $1.5 million. • Interstate 74 at Salt Fork Vermilion River west of Danville in Vermilion County. Bridge superstructure replacement, median crossover and construction engineering are programmed during FY 2021-2025 at a cost of $19.5 million. This project has been approved for Illinois Special Bridge Program funding. • Illinois 9/US 150 from east of Interstate 74 to Royal Pointe Drive in Bloomington and from Locust Street to Towanda Avenue in Bloomington. Resurfacing on 6.9 miles, ADA improvements and engineering for contract plans are programmed during FY 2020-2025 at a cost of $10.6 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $1 million. • Illinois 133 from US 45 in Arcola to Illinois 16 in Paris and US 45 from Madison Street to Illinois 133 in Douglas and Edgar Counties. Resurfacing on 28.4 miles, ADA improvements, engineering for location, environmental and design studies and engineering for contract plans are programmed during FY 2020-2025 at a cost of $11.4 million. Of this total, resurfacing on 2 miles on Illinois 133 from US 45 in Arcola to 0.5 mile east of Interstate 57 and US 45 from Madison Street to Illinois 133 and ADA improvements are programmed in FY 2020 at a cost of $1.5 million. 5-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 39 Location 2100 N TO 2200 N AT HUDSON Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $3,800,000 MCLEAN 1 2020 $9,700,000 MCLEAN 1 2021-2025 $500,000 MCLEAN 1 2021-2025 $2,000,000 MCLEAN 2 2021-2025 $1,440,000 MCLEAN 1 2020 US 51 PRESERVATION - BRIDGES I 55 LOGAN CO LINE TO 1.8 MI S OF SHIRLEY Miles = 10.67 Roadway Information Miles AADT Truck Pct 10.67 25,278 29.3 I 55 I 74 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y LOGAN CO LINE TO 1.8 MI S OF SHIRLEY P.E. (PHASE I) P.E. (PHASE II) US 51 PRESERVATION - PAVEMENTS I 55 AT FUNKS GROVE REST AREA BRIDGE DECK OVERLAY BRIDGE REPAIR PRESERVATION - BRIDGES I 55 FUNKS GROVE REST AREA REST AREA IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 5-1 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 55 Location 1.8 MI S OF SHIRLEY TO I-55/74 INTCHG SW OF BLOOMINGTON Miles = 3.83 Roadway Information Miles AADT Truck Pct 3.83 24,442 31.5 I 55 I 74 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $5,750,000 MCLEAN 1 2021-2025 $6,285,000 MCLEAN 1 2020 $14,600,000 MCLEAN 5 2020 $3,800,000 MCLEAN 1 2021-2025 $516,000 MCLEAN 1 2020 REHABILITATION - PAVEMENTS NHS Y FOX CREEK RD TO SUGAR CREEK ULTRA-THIN BND WR COURSE US 51 MAINTENANCE - PAVEMENTS I 55 S OF LEXINGTON TO LIVINGSTON CO LINE Miles = 11.63 Roadway Information Miles AADT Truck Pct 10.05 26,205 25.9 I 55 DESIGNED OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y N OF LEXINGTON TO LIVINGSTON CO LINE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES I 55 BUS VETERANS PKWY 0.1 MI W OF MORRIS AVE TO 0.3 MI W OF US 51 BUS IN BLOOMINGTON Miles = 0.50 Roadway Information Miles AADT Truck Pct 0.50 19,180 5.3 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 5-2 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 55 BUS VETERANS PKWY Location COMMERCE PKWY TO 0.1 MI N OF E WASHINGTON ST Miles = 2.49 Roadway Information Miles AADT Truck Pct 2.49 30,469 5.1 I 55 BUS Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $5,850,000 MCLEAN 5 2021-2025 $600,000 MCLEAN 2 2021-2025 $4,425,000 MCLEAN 4 2021-2025 DOUGLAS 1 2021-2025 CHAMPAIGN 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT ILL 9 IN BLOOMINGTON P.E. (FEASIBILITY STUDY) VETERANS PKWY MISCELLANEOUS IMPROVEMENTS I 55 BUS VETERANS PKWY CLEARWATER AVE TO OLD RTE 66 Miles = 2.23 Roadway Information Miles AADT Truck Pct 2.23 33,713 5.3 I 57 I 57 REHABILITATION - PAVEMENTS NHS Y COLES CO LINE TO 0.3 MI N OF US 36 Miles = 10.48 Roadway Information Miles AADT Truck Pct 10.48 21,485 30.3 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY $14,150,000 REHABILITATION - PAVEMENTS NHS Y OVER US 45 AT PESOTUM BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 5-3 $3,650,000 Structure Information Str Number AADT 11,400 0100198 11,550 0100199 Truck Pct NHS 31 Y 30 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 57 Location UNDER CH 17 1.8 MI E OF SADORUS Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost 57 UNDER CH 17 1.8 MI E OF SADORUS P.E. (PHASE I) P.E. (PHASE II) MYP Years Past Current $2,000,000 REHABILITATION - BRIDGES I County CHAMPAIGN Structure Information Str Number AADT 1,000 0100124 2 2021-2025 Truck Pct NHS 8 N $300,000 CHAMPAIGN 1 2020 $1,450,000 CHAMPAIGN 16 2021-2025 $4,175,000 CHAMPAIGN 5 2021-2025 REHABILITATION - BRIDGES I 57 AT CURTIS RD SW OF CHAMPAIGN PEDESTRIAN OVERPASS MISCELLANEOUS IMPROVEMENTS I 57 UNDER KIRBY AVE W OF CHAMPAIGN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 57 UNDER KIRBY AVE W OF CHAMPAIGN P.E. (PHASE I) P.E. (PHASE II) Structure Information Str Number AADT 8,700 0100103 Truck Pct NHS 3 N $750,000 CHAMPAIGN 1 2021-2025 $50,000 CHAMPAIGN 1 2021-2025 RECONSTRUCTION - BRIDGES I 57 UNDER KIRBY AVE W OF CHAMPAIGN LAND ACQUISITION RECONSTRUCTION - BRIDGES 5-4 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 57 Location UNDER KIRBY AVE W OF CHAMPAIGN Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $500,000 CHAMPAIGN 1 2021-2025 $6,683,000 CHAMPAIGN 4 2020 RECONSTRUCTION - BRIDGES I 57 UNDER US 150 NW OF CHAMPAIGN BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 I 74 AT I-74 INTCHG INTERCHANGE RECONSTRUCTION BRIDGE (NEW) CULVERT REPLACEMENT CULVERT (NEW) BRIDGE REPLACEMENT Structure Information Str Number AADT 7,400 0100050 Truck Pct NHS 12 N $114,350,000 CHAMPAIGN 4 2021-2025 $300,000 CHAMPAIGN 1 2020 $5,500,000 CHAMPAIGN 4 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 57 I 74 AT I-74 INTCHG UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 57 I 74 AT I-74 INTCHG CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS 5-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 57 I 74 Location AT I-74 INTCHG Improvements TAMP Category P.E. (PHASE II) P.E. (CONSULTANT PLANS) Est. Cost County MYP Years Past Current $400,000 CHAMPAIGN 1 2020 $18,875,000 CHAMPAIGN 5 2020 RECONSTRUCTION - PAVEMENTS I 57 UNDER MATTIS AVE NW OF CHAMPAIGN BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 I 74 I-57: UNDER MATTIS AVE & UNDER US 150; I-74: UNDER MATTIS AVE LAND ACQUISITION Structure Information Str Number AADT 5,800 0100100 17,100 0100270 Truck Pct NHS 11 N 6 N $457,000 CHAMPAIGN 1 2020 $1,185,000 CHAMPAIGN 1 2020 $1,000,000 CHAMPAIGN 5 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 I 74 I-57: UNDER MATTIS AVE & UNDER US 150; I-74: UNDER MATTIS AVE UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 I 74 I-57: UNDER MATTIS AVE & UNDER US 150; I-74: UNDER MATTIS AVE CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 5-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 57 Location 2 MI S OF THOMASBORO TO US 136 AT RANTOUL Miles = 6.91 Roadway Information Miles AADT Truck Pct 6.91 22,400 31.0 I 57 Est. Cost DESIGNED OVERLAY $11,000,000 CHAMPAIGN 3 2021-2025 $1,800,000 CHAMPAIGN 2 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y AT CR 2500N W OF THOMASBORO BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES I 72 County MYP Years Improvements TAMP Category UNDER BRIDGE ST 0.5 MI W OF MONTICELLO P.E. (PHASE I) P.E. (PHASE II) Structure Information Str Number AADT 1,600 0100156 Truck Pct NHS 10 N $500,000 PIATT 1 2021-2025 $3,200,000 PIATT 1 2021-2025 REHABILITATION - BRIDGES I 72 UNDER BRIDGE ST 0.5 MI W OF MONTICELLO BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES I 72 OVER NS RR N OF MONTICELLO BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 5-7 Structure Information Str Number AADT 1,400 0740065 $3,960,000 PIATT Structure Information Str Number AADT 6,200 0740069 6,200 0740070 Truck Pct NHS 10 Y 10 2021-2025 Truck Pct NHS 24 Y 24 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 72 Location WHITE HEATH RD 4.3 MI W OF CHAMPAIGN CO LINE Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost 72 WHITE HEATH RD NE OF WHITE HEATH TO I-57 W OF CHAMPAIGN Miles = 11.00 Roadway Information Miles AADT Truck Pct 8.39 16,612 18.7 2.61 I 15,658 72 21.6 STANDARD OVERLAY MICROSURFACING 2 PASS MYP Years Past Current $3,200,000 REHABILITATION - BRIDGES I County PIATT Structure Information Str Number AADT 900 0740026 9 2021-2025 Truck Pct NHS 5 N $14,000,000 PIATT CHAMPAIGN 1 2020 $500,000 CHAMPAIGN 1 2020 $4,000,000 CHAMPAIGN 12 2021-2025 PRESERVATION - PAVEMENTS NHS Y Y UNDER ILL 47 NE OF SEYMOUR BRIDGE DECK REPAIRS DIVISION ST MAINTENANCE - BRIDGES I 72 UNDER STALEY RD W OF CHAMPAIGN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 72 OVER I-57 W OF CHAMPAIGN BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 5-8 Structure Information Str Number AADT 8,000 0100168 $4,550,000 CHAMPAIGN Structure Information Str Number AADT 8,500 0100034 8,500 0100035 Truck Pct NHS 9 N 1 2021-2025 Truck Pct NHS 17 Y 17 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 72 Location OVER I-57 W OF CHAMPAIGN Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $500,000 CHAMPAIGN 1 2021-2025 $9,520,000 MCLEAN 2 2021-2025 $7,770,000 MCLEAN 1 2021-2025 $3,000,000 MCLEAN 1 2021-2025 REHABILITATION - BRIDGES I 74 TR 90 S OF CARLOCK TO I-55 N OF NORMAL Miles = 7.05 Roadway Information Miles AADT Truck Pct 7.05 27,954 17.0 I 74 I 74 REHABILITATION - PAVEMENTS NHS Y US 51 BUS S OF BLOOMINGTON TO CH 36 INTCHG AT DOWNS Miles = 8.64 Roadway Information Miles AADT Truck Pct 6.85 21,337 33.8 STANDARD OVERLAY STANDARD OVERLAY PATCHING DRAINAGE GUARDRAIL IMPACT ATTENUATORS REHABILITATION - PAVEMENTS NHS Y UNDER US 136 SE OF LEROY BRIDGE NEW DECK BRIDGE BEAM REPLACEMENT REHABILITATION - BRIDGES I 74 UNDER CH 29, CH 30 & CH 36 E OF US 51 BRIDGE NEW DECK REHABILITATION - BRIDGES 5-9 Structure Information Str Number AADT 1,450 0570135 $5,500,000 MCLEAN Structure Information Str Number AADT 3,150 0570127 1,800 0570122 1,650 0570124 Truck Pct NHS 26 Y 1 2021-2025 Truck Pct NHS 11 N 3 N 22 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 74 Location UNDER ILL 54 AT FARMER CITY Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost 74 1.3 MI W OF CHAMPAIGN CO LINE TO 0.2 MI W OF ILL 47 INTCHG IN MAHOMET Miles = 5.24 Roadway Information Miles AADT Truck Pct 3.25 22,700 32.6 1.99 I 22,700 74 32.6 $3,465,000 3.77 I 74 44,661 17.6 Structure Information Str Number AADT 3,450 0200034 74 1 2021-2025 Truck Pct NHS 21 N $4,050,000 CHAMPAIGN PIATT 1 2020 $2,400,000 CHAMPAIGN 1 2020 $2,840,000 CHAMPAIGN 2 2020 REHABILITATION - PAVEMENTS Y MICROSURFACING 2 PASS STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y Y OVER MARKET ST IN CHAMPAIGN BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES I DEWITT NHS Y PROSPECT AVE IN CHAMPAIGN TO UNIVERSITY AVE IN URBANA Miles = 4.63 Roadway Information Miles AADT Truck Pct 0.86 52,673 15.2 DESIGNED OVERLAY MYP Years Past Current REHABILITATION - BRIDGES I County AT IC RR & TR 158 IN CHAMPAIGN BRIDGE SUPERSTRUCTURE Structure Information Str Number AADT 63,100 0100020 $23,517,000 CHAMPAIGN Truck Pct NHS 13 Y 3 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 5 - 10 Structure Information Str Number AADT 63,100 0100021 Truck Pct NHS 13 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 74 Location AT IC RR & TR 158 & MARKET ST IN CHAMPAIGN Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $3,500,000 CHAMPAIGN 2 2020 $3,200,000 CHAMPAIGN 1 2021-2025 $1,955,000 CHAMPAIGN 4 2020 $4,600,000 VERMILION 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 74 SALINE BRANCH 1 MI E OF US 45; OVER I-74 E OF URBANA BRIDGE DECK OVERLAY PRESERVATION - BRIDGES I 74 HIGHCROSS RD E OF URBANA TO UP RR 1.5 MI E OF ST JOSEPH BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS PRESERVATION - BRIDGES I 74 STONY CREEK 2.4 MI E OF ILL 49 BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES I 74 2.1 MI NE OF MUNCIE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 11 Structure Information Str Number AADT 13,100 0920001 13,100 0920002 $2,500,000 VERMILION Structure Information Str Number AADT 75 0920148 Truck Pct NHS 29 Y 29 Y 2 2021-2025 Truck Pct NHS 2 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 74 Location US 150 W OF DANVILLE TO VERMILION RIVER IN DANVILLE Miles = 5.80 Roadway Information Miles AADT Truck Pct 5.80 24,877 31.6 I 74 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $23,000,000 VERMILION 6 2021-2025 $5,080,000 VERMILION 2 2021-2025 $1,500,000 VERMILION 1 2020 $1,500,000 VERMILION 1 2021-2025 $17,750,000 VERMILION 5 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y US 150 W OF DANVILLE TO VERMILION RIVER IN DANVILLE BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS BRIDGE REPAIR PRESERVATION - BRIDGES I 74 US 150 W OF DANVILLE TO VERMILION RIVER IN DANVILLE P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS I 74 US 150 W OF DANVILLE TO VERMILION RIVER IN DANVILLE P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS I 74 SALT FORK VERMILION RIVER W OF DANVILLE BRIDGE SUPERSTRUCTURE MEDIAN CROSSOVER ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES 5 - 12 Structure Information Str Number AADT 12,050 0920006 12,050 0920007 Truck Pct NHS 32 Y 32 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 74 Location SALT FORK VERMILION RIVER W OF DANVILLE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,736,000 VERMILION 5 2021-2025 $4,500,000 VERMILION 17 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 74 UNDER TILTON RD IN TILTON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 74 UNDER TILTON RD IN TILTON P.E. (PHASE I) P.E. (PHASE II) Structure Information Str Number AADT 1,550 0920087 Truck Pct NHS 2 N $500,000 VERMILION 2 2020 $9,649,000 VERMILION 4 2021-2025 $4,300,000 VERMILION 8 2021-2025 RECONSTRUCTION - BRIDGES I 74 VERMILION RIVER IN DANVILLE TO INDIANA STATE LINE Miles = 4.58 Roadway Information Miles AADT Truck Pct 4.58 19,629 39.2 I 74 DESIGNED OVERLAY UNDERDRAINS RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y UNDER PERRYSVILLE RD IN DANVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 13 Structure Information Str Number AADT 1,300 0920084 Truck Pct NHS 3 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street I 74 Location OVER GRIFFIN ST & STONY CREEK IN DANVILLE Improvements TAMP Category BRIDGE REPLACEMENT BRIDGE DECK REPAIRS Est. Cost 74 OVER GRIFFIN ST & STONY CREEK IN DANVILLE P.E. (PHASE I) P.E. (PHASE II) MYP Years Past Current $6,000,000 RECONSTRUCTION - BRIDGES I County VERMILION Structure Information Str Number AADT 9,450 0920016 9,450 0920017 4 2021-2025 Truck Pct NHS 40 Y 40 Y $500,000 VERMILION 1 2021-2025 $3,200,000 VERMILION 4 2021-2025 $2,030,000 MCLEAN 1 2021-2025 $1,555,000 MCLEAN 10 2021-2025 RECONSTRUCTION - BRIDGES I 74 AT LYNCH RD INTCHG BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS BRIDGE REPAIR PRESERVATION - BRIDGES US 24 WOODFORD CO LINE TO MCLEAN ST IN GRIDLEY Miles = 5.32 Roadway Information Miles AADT Truck Pct 5.32 3,800 21.1 US 24 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y INTERMITTENT STREAM 1 MI W OF CHENOA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 14 Structure Information Str Number AADT 3,050 0570070 Truck Pct NHS 20 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 24 Location GRANT ST IN CHENOA TO LIVINGSTON CO LINE Miles = 6.83 Roadway Information Miles AADT Truck Pct 6.83 4,288 19.5 US 24 Improvements TAMP Category STANDARD OVERLAY Est. Cost MYP Years Past Current $2,220,000 MCLEAN 1 2021-2025 $1,700,000 MCLEAN 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y UNKNOWN STREAM 0.5 MI E OF CHENOA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 36 County MOULTRIE CO LINE TO US 45 W OF TUSCOLA Miles = 9.57 CAPE SEAL Structure Information Str Number AADT 4,200 0570071 Truck Pct NHS 18 Y $1,265,000 PIATT DOUGLAS 1 2020 $1,075,000 CHAMPAIGN 4 2021-2025 $3,491,000 CHAMPAIGN 4 2021-2025 PRESERVATION - PAVEMENTS US 45 PROSPECT AVE TO WRIGHT ST IN CHAMPAIGN Miles = 1.52 US 150 DESIGNED OVERLAY ADA IMPROVEMENTS SPRINGFIELD AVE WRIGHT ST Roadway Information Miles AADT Truck Pct 0.76 12,974 3.4 0.76 US 45 NEIL ST 14,632 5.2 REHABILITATION - PAVEMENTS NHS Y Y SPRINGFIELD AVE IN CHAMPAIGN TO CURTIS RD IN SAVOY Miles = 3.06 Roadway Information Miles AADT Truck Pct 3.06 21,644 2.9 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 5 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 45 Location I-57 AT PESOTUM TO US 36 AT TUSCOLA Miles = 8.27 Roadway Information Miles AADT Truck Pct 0.08 3,250 8.9 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $6,000,000 CHAMPAIGN DOUGLAS 1 2021-2025 $4,600,000 CHAMPAIGN DOUGLAS 1 2021-2025 $500,000 CHAMPAIGN DOUGLAS 1 2021-2025 $1,000,000 CHAMPAIGN DOUGLAS 1 2021-2025 $1,000,000 CHAMPAIGN DOUGLAS 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 2.05 3,250 8.9 N 6.14 3,304 10.1 N US 45 Improvements TAMP Category I-57 AT PESOTUM TO US 36 AT TUSCOLA CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS US 45 I-57 AT PESOTUM TO US 36 AT TUSCOLA LAND ACQUISITION REHABILITATION - PAVEMENTS US 45 I-57 AT PESOTUM TO US 36 AT TUSCOLA P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS US 45 I-57 AT PESOTUM TO US 36 AT TUSCOLA P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS 5 - 16 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 45 Location I-57 AT PESOTUM TO US 36 AT TUSCOLA Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $1,000,000 CHAMPAIGN DOUGLAS 1 2021-2025 $300,000 MCLEAN 1 2021-2025 $50,000 MCLEAN 1 2021-2025 $50,000 MCLEAN 1 2021-2025 DEWITT 1 2021-2025 REHABILITATION - PAVEMENTS US 51 DITCH 0.1 MI N OF RAAB RD IN NORMAL CULVERT REPLACEMENT US 51 BUS MISCELLANEOUS IMPROVEMENTS US 51 DITCH 0.1 MI N OF RAAB RD IN NORMAL LAND ACQUISITION US 51 BUS MISCELLANEOUS IMPROVEMENTS US 51 DITCH 0.1 MI N OF RAAB RD IN NORMAL UTILITY ADJUSTMENT US 51 BUS MISCELLANEOUS IMPROVEMENTS US 51 MCLEAN CO LINE TO MACON CO LINE Miles = 10.91 ULTRA-THIN BND WR COURSE PRESERVATION - PAVEMENTS 5 - 17 $2,690,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 51 Location MCLEAN CO LINE TO MACON CO LINE Miles = 3.47 Roadway Information Miles AADT Truck Pct 2.14 9,650 15.8 1.33 9,754 US 51 BUS 12.9 2.35 12,197 US 51 BUS 5.9 STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,820,000 DEWITT 1 2021-2025 $18,000,000 MCLEAN 1 2021-2025 $3,600,000 MCLEAN 1 2020 $250,000 MCLEAN 1 2021-2025 $200,000 MCLEAN 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y COLLEGE AVE IN NORMAL TO OLIVE ST IN BLOOMINGTON Miles = 4.76 Roadway Information Miles AADT Truck Pct 2.41 11,633 9.1 Improvements TAMP Category STANDARD OVERLAY WIDENING EXISTING PAVEMENT ADA IMPROVEMENTS TRAF SIGNAL MODERNIZATION REHABILITATION - PAVEMENTS NHS Y Y COLLEGE AVE IN NORMAL TO OLIVE ST IN BLOOMINGTON P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS US 51 BUS COLLEGE AVE IN NORMAL TO OLIVE ST IN BLOOMINGTON LAND ACQUISITION REHABILITATION - PAVEMENTS US 51 BUS COLLEGE AVE IN NORMAL TO OLIVE ST IN BLOOMINGTON UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 5 - 18 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 51 BUS CENTER ST Location US 51 BYP (N) TO US 51 BYP (S) IN CLINTON Miles = 3.47 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $2,545,000 DEWITT 4 2021-2025 $2,725,000 MCLEAN 2 2021-2025 $2,950,000 MCLEAN 1 2021-2025 $4,620,000 MCLEAN 1 2021-2025 $50,000 MCLEAN 1 2021-2025 WOODLAWN AVE GRANT AVE Roadway Information Miles AADT Truck Pct 0.68 3,250 7.4 REHABILITATION - PAVEMENTS NHS Y 2.27 4,080 7.3 Y 0.52 4,000 11.4 Y US 51 BUSB DIVISION ST TO EMPIRE ST IN BLOOMINGTON Miles = 0.49 Roadway Information Miles AADT Truck Pct 0.49 12,567 10.6 US 136 US 136 US 136 1,600 23.1 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y OLD US 51 IN HEYWORTH TO US 150 Miles = 13.97 Roadway Information Miles AADT Truck Pct 12.71 1,662 23.7 1.26 RECONSTRUCTION - PAVEMENTS NHS Y I-55 AT MCLEAN TO US 51 AT HEYWORTH Miles = 9.03 Roadway Information Miles AADT Truck Pct 9.03 2,400 32.1 RECONSTRUCTION STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y P AT ILL 54 SW OF BELLFLOWER LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 5 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 136 Location MCLEAN CO LINE TO E OF FISHER Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 CHAMPAIGN 1 2021-2025 $50,000 CHAMPAIGN 1 2021-2025 $3,690,000 CHAMPAIGN 1 2021-2025 $300,000 CHAMPAIGN 2 2021-2025 $2,500,000 CHAMPAIGN 1 2021-2025 REHABILITATION - PAVEMENTS US 136 MCLEAN CO LINE TO E OF FISHER UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS US 136 MCLEAN CO LINE TO E OF FISHER Miles = 6.24 Roadway Information Miles AADT Truck Pct 6.24 2,003 16.7 US 136 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N DITCH W OF FISHER CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES US 136 MAPLEWOOD DR IN RANTOUL TO GIFFORD Miles = 6.12 Roadway Information Miles AADT Truck Pct 6.12 3,930 8.8 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 5 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 136 Location E OF GIFFORD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $875,000 CHAMPAIGN 3 2021-2025 $50,000 CHAMPAIGN 1 2021-2025 $50,000 CHAMPAIGN 1 2021-2025 $1,000,000 MCLEAN 2 2021-2025 $4,600,000 MCLEAN 1 2021-2025 $1,000,000 MCLEAN 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 136 E OF GIFFORD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 136 E OF GIFFORD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS US 150 US 150 F EMPIRE ST TO OAKLAND AVE & CLINTON ST TO HANNA ST IN BLOOMINGTON P.E. (PHASE I) REHABILITATION - PAVEMENTS US 150 MORRISEY AVE OAKLAND AVE TO VETERANS PKWY IN BLOOMINGTON Miles = 1.08 Roadway Information Miles AADT Truck Pct 1.08 8,231 14.9 US 150 MORRISEY AVE DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N OAKLAND AVE TO VETERANS PKWY IN BLOOMINGTON P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS 5 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 150 MORRISEY AVE Location OAKLAND AVE TO VETERANS PKWY IN BLOOMINGTON Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $300,000 MCLEAN 1 2021-2025 $100,000 MCLEAN 1 2021-2025 $3,775,000 MCLEAN 5 2021-2025 $2,500,000 PIATT 3 2021-2025 $750,000 PIATT 3 2021-2025 REHABILITATION - PAVEMENTS US 150 MORRISEY AVE OAKLAND AVE TO VETERANS PKWY IN BLOOMINGTON UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS US 150 LEROY TO DEWITT CO LINE Miles = 7.31 Roadway Information Miles AADT Truck Pct 7.31 2,142 9.0 US 150 US 150 REHABILITATION - PAVEMENTS NHS N DEWITT CO LINE TO MANSFIELD Miles = 5.03 Roadway Information Miles AADT Truck Pct 5.03 1,619 8.0 DESIGNED OVERLAY NEW SHOULDERS ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 1.7 & 2.6 MI E OF DEWITT CO LINE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 5 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 150 Location MANSFIELD TO MAHOMET Miles = 5.57 Roadway Information Miles AADT Truck Pct 3.06 3,962 9.1 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $4,000,000 CHAMPAIGN PIATT 4 2021-2025 $100,000 CHAMPAIGN 4 2021-2025 $15,500,000 CHAMPAIGN 1 2021-2025 $2,500,000 CHAMPAIGN 1 2020 $400,000 CHAMPAIGN 1 2021-2025 REHABILITATION - PAVEMENTS NHS N 0.15 1,650 6.7 N 2.36 2,046 3.9 N US 150 Improvements TAMP Category STREAM 2 MI W OF MAHOMET BRIDGE DECK REPAIRS MAINTENANCE - BRIDGES US 150 PROSPECT AVE I-74 INTCHG TO ILL 10 (SPRINGFIELD AVE) IN CHAMPAIGN Miles = 1.58 Roadway Information Miles AADT Truck Pct 1.58 19,524 4.5 US 150 WIDENING EXISTING PAVEMENT INTERSECTION IMPROVEMENT STANDARD OVERLAY TRAF SIGNAL MODERNIZATION REHABILITATION - PAVEMENTS NHS Y I-74 INTCHG TO ILL 10 (SPRINGFIELD AVE) IN CHAMPAIGN P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS US 150 I-74 INTCHG TO ILL 10 (SPRINGFIELD AVE) IN CHAMPAIGN LAND ACQUISITION REHABILITATION - PAVEMENTS 5 - 23 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 150 Location I-74 INTCHG TO ILL 10 (SPRINGFIELD AVE) IN CHAMPAIGN Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 CHAMPAIGN 1 2021-2025 $200,000 CHAMPAIGN 1 2020 $3,461,000 VERMILION EDGAR 4 2021-2025 $5,900,000 EDGAR 10 2021-2025 $2,000,000 EDGAR 1 2021-2025 REHABILITATION - PAVEMENTS US 150 WRIGHT ST TO CUNNINGHAM AVE IN URBANA LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 150 NCL OF RIDGE FARM TO US 36 Miles = 7.79 ILL 1 Roadway Information Miles AADT Truck Pct 6.25 2,630 14.1 1.54 2,815 US 150 12.5 Roadway Information Miles AADT Truck Pct 4.72 5,407 10.0 1.82 US 150 US 150 G REHABILITATION - PAVEMENTS NHS Y Y MOSS RD TO 0.5 MI S OF GIBSON DR S OF PARIS Miles = 6.54 ILL 1 4,479 8.9 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY COLD MILLING GUARDRAIL ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y Y MOSS RD TO 0.5 MI S OF GIBSON DR S OF PARIS P.E. (PHASE I) P.E. (PHASE II) ILL 1 ILL 1 A REHABILITATION - PAVEMENTS 5 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street US 150 Location LOWER TERRE HAUTE RD TO INDIANA STATE LINE Miles = 8.17 Roadway Information Miles AADT Truck Pct 1.93 4,453 10.3 6.24 US 150 3,066 10.5 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $4,740,000 EDGAR 4 2021-2025 $400,000 EDGAR 4 2021-2025 $1,714,000 EDGAR 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N AT VERMILION RD E OF PARIS CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS US 150 OVER CNRL RR 2.8 MI E OF PARIS BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES ILL 1 IROQUOIS CO LINE TO 0.2 MI N OF ROSSVILLE SCL Miles = 8.24 Roadway Information Miles AADT Truck Pct 8.24 4,835 11.7 ILL 1 STANDARD OVERLAY COLD MILLING GUARDRAIL ADA IMPROVEMENTS Structure Information Str Number AADT 3,300 0230014 Truck Pct NHS 11 N $3,927,000 VERMILION 7 2021-2025 $1,200,000 VERMILION 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 2 MI S OF HOOPESTON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 25 Structure Information Str Number AADT 4,950 0920032 Truck Pct NHS 10 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 1 Location N FORK VERMILION RIVER 2 MI N OF ROSSVILLE Improvements TAMP Category CULVERT REPLACEMENT Est. Cost 0.2 MI N OF LIBERTY LN TO WINTER AVE IN DANVILLE Miles = 1.29 US 136 Roadway Information Miles AADT Truck Pct 1.29 21,643 6.1 ILL 1 $300,000 VERMILION Structure Information Str Number AADT 4,950 0920130 4 2021-2025 Truck Pct NHS 10 Y $800,000 VERMILION 3 2021-2025 $875,000 VERMILION 1 2021-2025 $3,678,000 MCLEAN 2 2021-2025 $6,350,000 MCLEAN 5 2021-2025 REHABILITATION - PAVEMENTS NHS Y AT ROSS LN IN TILTON & HEGELER AVE S OF TILTON & LYONS RD N OF BELGIUM US 150 STANDARD OVERLAY ADA IMPROVEMENTS MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 1 County TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS ILL 9 ILL 122 TO WALTON DR IN BLOOMINGTON Miles = 7.07 Roadway Information Miles AADT Truck Pct 7.07 4,847 11.8 ILL 9 Roadway Information Miles AADT Truck Pct 3.89 10,245 6.9 1.16 REHABILITATION - PAVEMENTS NHS P E OF I-74 TO ROYAL POINTE DR IN BLOOMINGTON Miles = 5.05 US 150 20,290 4.9 STANDARD OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 5 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 9 Location LOCUST ST TO TOWANDA AVE IN BLOOMINGTON Miles = 1.83 US 150 F Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $2,520,000 MCLEAN 3 2021-2025 $1,000,000 MCLEAN 3 2020 $750,000 MCLEAN 1 2021-2025 $750,000 MCLEAN 6 2021-2025 ILL 9 B Roadway Information Miles AADT Truck Pct 1.83 6,592 6.9 ILL 9 REHABILITATION - PAVEMENTS NHS Y E OF I-74 TO ROYAL POINTE DR IN BLOOMINGTON & LOCUST ST TO TOWANDA AVE IN BLOOMINGTON US 150 P.E. (PHASE II) US 150 F ILL 9 B REHABILITATION - PAVEMENTS ILL 9 E OF I-74 TO ROYAL POINTE DR IN BLOOMINGTON & LOCUST ST TO TOWANDA AVE IN BLOOMINGTON US 150 P.E. (PHASE II) US 150 F ILL 9 B REHABILITATION - PAVEMENTS ILL 9 STREAM 8.8 MI E OF ILL 165 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 9 ARROWSMITH RD TO FORD CO LINE Miles = 10.53 Roadway Information Miles AADT Truck Pct 0.44 1,550 16.8 10.09 1,732 17.5 DESIGNED OVERLAY SAFETY IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 5 - 27 Structure Information Str Number AADT 1,750 0570077 $6,566,000 MCLEAN FORD Truck Pct NHS 14 N 10 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 9 Location HOOPESTON TO INDIANA STATE LINE Miles = 6.62 Roadway Information Miles AADT Truck Pct 6.62 1,294 19.6 ILL 10 VAN BUREN ST ILL 10 10.86 ILL 10 2,024 13.6 ILL 10 MYP Years Past Current $2,777,000 VERMILION 1 2021-2025 STANDARD OVERLAY ADA IMPROVEMENTS $4,050,000 DEWITT 1 2021-2025 $5,250,000 PIATT DEWITT 1 2021-2025 $1,645,000 CHAMPAIGN 4 2021-2025 $900,000 CHAMPAIGN 4 2021-2025 REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N STALEY RD TO MATTIS AVE IN CHAMPAIGN Miles = 1.99 Roadway Information Miles AADT Truck Pct 1.99 10,916 6.3 County REHABILITATION - PAVEMENTS ILL 48 AT WELDON TO I-72 Miles = 13.89 Roadway Information Miles AADT Truck Pct 3.03 1,700 14.1 STANDARD OVERLAY Est. Cost NHS N LOGAN CO LINE TO VAN BUREN ST IN CLINTON Miles = 9.45 Roadway Information Miles AADT Truck Pct 9.45 1,808 15.0 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y COPPER SLOUGH W OF DUNCAN RD BRIDGE NEW DECK BRIDGE BEAM REPLACEMENT REHABILITATION - BRIDGES 5 - 28 Structure Information Str Number AADT 8,200 0100247 Truck Pct NHS 6 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 10 Location COPPER SLOUGH E OF DUNCAN RD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost ILL 48 TO CERRO GORDO Miles = 9.63 Roadway Information Miles AADT Truck Pct 9.63 813 21.7 ILL 32 STANDARD OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,175,000 RECONSTRUCTION - BRIDGES ILL 32 County CHAMPAIGN Structure Information Str Number AADT 12,000 0100135 9 2021-2025 Truck Pct NHS 6 Y $4,660,000 PIATT 2 2021-2025 $550,000 PIATT 1 2021-2025 $25,000 PIATT 1 2021-2025 CHAMPAIGN 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 48 TO CERRO GORDO P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS ILL 32 ILL 48 TO CERRO GORDO LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 47 EASTWOOD DR IN MAHOMET TO ILL 10 Miles = 6.10 US 150 STANDARD OVERLAY ADA IMPROVEMENTS DIVISION ST Roadway Information Miles AADT Truck Pct 5.60 5,415 8.3 0.50 2,814 8.2 REHABILITATION - PAVEMENTS NHS Y N 5 - 29 $2,930,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 49 Location IROQUOIS CO LINE TO US 136 (W) Miles = 11.93 Roadway Information Miles AADT Truck Pct 11.93 1,472 21.3 ILL 49 Roadway Information Miles AADT Truck Pct 13.67 1,602 22.7 0.75 1,050 ILL 49 24.8 1.90 ILL 49 1,050 23.8 County MYP Years Past Current $4,245,000 VERMILION 1 2021-2025 $5,100,000 VERMILION 1 2021-2025 $2,400,000 CHAMPAIGN VERMILION 1 2020 $3,200,000 CHAMPAIGN VERMILION 1 2020 $1,395,000 EDGAR DOUGLAS 1 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N HOMER SCL TO EDGAR CO LINE Miles = 11.02 Roadway Information Miles AADT Truck Pct 9.12 1,396 21.3 STANDARD OVERLAY Est. Cost NHS N US 136 (W) TO US 150 W OF FITHIAN Miles = 14.42 US 136 Improvements TAMP Category STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N N HOMER SCL TO EDGAR CO LINE NEW SHOULDERS MILLED RUMBLE STRIP BRIDGE DECK OVERLAY MISCELLANEOUS IMPROVEMENTS ILL 49 VERMILION / EDGAR CO LINE TO 1800TH RD N OF BROCTON Miles = 10.38 Roadway Information Miles AADT Truck Pct 10.38 1,033 21.2 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N 5 - 30 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 49 Location US 36 TO ILL 133 Miles = 10.13 Roadway Information Miles AADT Truck Pct 10.13 1,197 27.6 ILL 49 Improvements TAMP Category STANDARD OVERLAY Est. Cost MYP Years Past Current $2,500,000 EDGAR 1 2021-2025 $2,500,000 EDGAR 10 2021-2025 PRESERVATION - PAVEMENTS NHS N CATFISH CREEK 2.5 MI N OF ILL 133 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 49 County CATFISH CREEK 2.5 MI N OF ILL 133 LAND ACQUISITION Structure Information Str Number AADT 1,250 0230019 Truck Pct NHS 26 N $40,000 EDGAR 4 2021-2025 $2,300,000 EDGAR 1 2021-2025 $2,500,000 DEWITT 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 49 ILL 133 TO ILL 16 Miles = 6.41 Roadway Information Miles AADT Truck Pct 6.41 813 19.1 ILL 54 REHABILITATION - PAVEMENTS NHS N LOGAN CO LINE TO 0.3 MI W OF US 51 AT CLINTON Miles = 9.91 Roadway Information Miles AADT Truck Pct 9.91 1,234 18.6 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 5 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 54 Location 0.3 MI W OF US 51 TO S SHERMAN ST IN CLINTON & ILL 54 TO MAGILL RD Miles = 3.08 ILL 10 Roadway Information Miles AADT Truck Pct 1.28 2,431 12.8 1.80 6,424 ILL 54 7.9 10.92 ILL 54 2,853 10.1 STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,300,000 DEWITT 1 2021-2025 $4,760,000 DEWITT 1 2021-2025 $550,000 DEWITT 1 2021-2025 $100,000 DEWITT 1 2021-2025 $50,000 DEWITT 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N ILL 10 IN CLINTON TO ILL 48 Miles = 12.16 Roadway Information Miles AADT Truck Pct 1.24 4,042 8.6 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N ILL 10 IN CLINTON TO ILL 48 P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS ILL 54 ILL 10 IN CLINTON TO ILL 48 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 54 ILL 10 IN CLINTON TO ILL 48 UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 5 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 54 Location ILL 48 TO MCLEAN CO LINE Miles = 9.86 Roadway Information Miles AADT Truck Pct 9.86 2,446 18.0 ILL 105 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $2,810,000 DEWITT 1 2021-2025 $310,000 PIATT 1 2020 $700,000 VERMILION EDGAR 2 2020 $3,036,000 MCLEAN 9 2021-2025 $4,895,000 DOUGLAS 8 2020 REHABILITATION - PAVEMENTS NHS N SCL OF BEMENT TO KRATZ RD IN MONTICELLO Miles = 7.32 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS ILL 119 US 36 ILL 119: 2.8 MI W OF ALVIN TO INDIANA STATE LINE & US 36: ILL 1 AT CHRISMAN TO INDIANA STATE LINE Miles = 15.42 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS ILL 122 TAZEWELL CO LINE TO ILL 9 Miles = 7.69 Roadway Information Miles AADT Truck Pct 7.69 1,577 7.1 ILL 130 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N EMBARRAS RIVER IN VILLA GROVE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 33 Structure Information Str Number AADT 4,500 0210028 Truck Pct NHS 7 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 133 Location VARIOUS LOCATIONS BETWEEN ARCOLA & HINDSBORO VARIOUS Improvements TAMP Category BRIDGE REPAIR BRIDGE DECK REPAIRS Est. Cost County MYP Years Past Current $950,000 DOUGLAS 1 2021-2025 $1,510,000 DOUGLAS 12 2020 $3,680,000 DOUGLAS 3 2021-2025 $5,500,000 EDGAR 1 2021-2025 $750,000 EDGAR 1 2021-2025 PRESERVATION - BRIDGES ILL 133 ILL 133: US 45 IN ARCOLA TO 0.5 MI E OF I-57; US 45: MADISON ST TO ILL 133 Miles = 2.04 US 45 Roadway Information Miles AADT Truck Pct 1.56 5,330 13.3 0.48 ILL 133 3,500 6.9 ILL 133 N DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N COLES CO LINE TO ILL 16 IN PARIS Miles = 14.43 Roadway Information Miles AADT Truck Pct 14.43 1,946 20.5 ILL 133 REHABILITATION - PAVEMENTS NHS N 0.5 MI E OF I-57 TO COLES CO LINE Miles = 11.90 Roadway Information Miles AADT Truck Pct 11.90 2,149 19.1 STANDARD OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N COLES CO LINE TO ILL 16 IN PARIS P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS 5 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ILL 165 Location COLFAX TO FORD CO LINE Miles = 8.77 Roadway Information Miles AADT Truck Pct 8.77 600 12.8 ILL 165 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,937,000 MCLEAN 5 2021-2025 $500,000 MCLEAN 5 2021-2025 $1,365,000 VERMILION 1 2021-2025 $3,000,000 VERMILION 1 2021-2025 REHABILITATION - PAVEMENTS NHS N NE OF ANCHOR CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS BISMARCK RD ILL 1 TO BOWMAN AVE Miles = 2.56 Roadway Information Miles AADT Truck Pct 2.56 1,395 8.0 BISMARCK RD DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N E BRANCH VERMILION RIVER 2 MI W OF BISMARCK BRIDGE NEW DECK REHABILITATION - BRIDGES BOWMAN AVE CH 0 ILL 119 TO NEWELL RD Miles = 5.60 Roadway Information Miles AADT Truck Pct 4.59 3,116 7.5 1.01 3,550 9.2 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N 5 - 35 Structure Information Str Number AADT 1,500 0920173 1,500 0920172 $2,000,000 VERMILION Truck Pct NHS 8 N 8 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street CATLIN / INDIANOLA RD Location S OF TILTON TO S OF CATLIN Miles = 3.79 Roadway Information Miles AADT Truck Pct 3.79 3,160 11.0 CATLIN / INDIANOLA RD CATLIN / STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,104,000 VERMILION 1 2021-2025 $5,500,000 VERMILION 1 2021-2025 $750,000 VERMILION 1 2021-2025 $100,000 VERMILION 1 2021-2025 $50,000 VERMILION 1 2021-2025 REHABILITATION - PAVEMENTS NHS N GEORGETOWN / INDIANOLA RD TO S OF CATLIN Miles = 6.21 Roadway Information Miles AADT Truck Pct 6.21 1,134 9.4 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N GEORGETOWN / INDIANOLA RD TO S OF CATLIN INDIANOLA RD P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS CATLIN / GEORGETOWN / INDIANOLA RD TO S OF CATLIN LAND ACQUISITION INDIANOLA RD REHABILITATION - PAVEMENTS CATLIN / GEORGETOWN / INDIANOLA RD TO S OF CATLIN UTILITY ADJUSTMENT INDIANOLA RD REHABILITATION - PAVEMENTS 5 - 36 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street CATLIN INDIANOLA RD Location ECL OF INDIANOLA TO GEORGETOWN / INDIANOLA RD Miles = 2.94 Roadway Information Miles AADT Truck Pct 2.94 1,050 8.6 CATLIN INDIANOLA RD CH 12 DESIGNED OVERLAY Est. Cost $1,940,000 VERMILION 1 2020 DESIGNED OVERLAY $2,143,000 VERMILION 1 2021-2025 CHAMPAIGN 4 2021-2025 REHABILITATION - PAVEMENTS NHS N LONG POINT SLOUGH 0.1 MI N OF LONGVIEW BRIDGE NEW DECK BRIDGE BEAM REPLACEMENT $700,000 REHABILITATION - BRIDGES MARKET ST TO US 45 Miles = 3.54 Roadway Information Miles AADT Truck Pct 3.54 2,425 10.3 OLD ILL 47 DESIGNED OVERLAY Structure Information Str Number AADT 600 0100255 Truck Pct NHS 11 N $1,380,000 CHAMPAIGN 1 2020 $2,908,000 PIATT 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 32 TO 1 MI W OF BRIDGE ST IN MONTICELLO Miles = 5.13 Roadway Information Miles AADT Truck Pct 5.13 860 5.8 MYP Years Past Current REHABILITATION - PAVEMENTS BLOCK RD LEVERETT RD County NHS N WCL TO ECL OF INDIANOLA Miles = 0.73 Roadway Information Miles AADT Truck Pct 0.73 896 12.4 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 5 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street OLD ROUTE 66 Location LOGAN CO LINE TO SHIRLEY Miles = 11.12 Roadway Information Miles AADT Truck Pct 2.73 1,235 12.6 8.39 953 OLD ROUTE 66 5.8 OLD ROUTE 66 OLD RTE 66 OLD US 51 MYP Years Past Current $3,000,000 MCLEAN 1 2021-2025 $900,000 MCLEAN 1 2020 $1,890,000 MCLEAN 1 2020 $500,000 MCLEAN 1 2021-2025 $250,000 MCLEAN 1 2021-2025 N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N VETERANS PKWY TO 1.7 MI SW OF TOWANDA Miles = 1.54 Roadway Information Miles AADT Truck Pct 1.54 2,215 7.1 County REHABILITATION - PAVEMENTS N OF LEXINGTON TO LIVINGSTON CO LINE Miles = 6.20 Roadway Information Miles AADT Truck Pct 6.20 1,939 10.7 STANDARD OVERLAY Est. Cost NHS N SHIRLEY TO I-74 Miles = 3.22 Roadway Information Miles AADT Truck Pct 3.22 1,279 7.7 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N KICKAPOO CREEK 1 MI N OF US 136 P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - BRIDGES 5 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street OLD US 51 Location KICKAPOO CREEK 1 MI N OF US 136 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 MCLEAN 1 2021-2025 $50,000 MCLEAN 1 2021-2025 $1,700,000 MCLEAN 1 2021-2025 REHABILITATION - BRIDGES OLD US 51 KICKAPOO CREEK 1 MI N OF US 136 UTILITY ADJUSTMENT REHABILITATION - BRIDGES OLD US 51 KICKAPOO CREEK 1 MI N OF US 136 BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES SIDNEY-LONGVIEW RD MAIN ST IN SIDNEY TO BLOCK RD Miles = 4.11 Roadway Information Miles AADT Truck Pct 4.11 995 8.0 ST JOE RD 2200 E Truck Pct NHS 9 N $1,000,000 CHAMPAIGN 4 2021-2025 $1,250,000 CHAMPAIGN 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ROYAL RD TO E GRAND ST IN ST JOSEPH Miles = 4.90 Roadway Information Miles AADT Truck Pct 4.90 1,555 6.0 DESIGNED OVERLAY Structure Information Str Number AADT 1,150 0570056 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 5 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street ST JOSEPH RD Location SALT FORK RIVER 0.5 MI NE OF SIDNEY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost SALT FORK RIVER 0.5 MI NE OF SIDNEY UTILITY ADJUSTMENT MYP Years Past Current $2,900,000 RECONSTRUCTION - BRIDGES ST JOSEPH RD County CHAMPAIGN Structure Information Str Number AADT 850 0100090 $25,000 6 2021-2025 Truck Pct NHS 8 N CHAMPAIGN 3 2021-2025 $3,000,000 DISTRICT-WIDE 2 2021-2025 $5,850,000 DISTRICT-WIDE 1 2021-2025 CHAMPAIGN 2 2020 DOUGLAS DISTRICT-WIDE 1 2021-2025 RECONSTRUCTION - BRIDGES VARIOUS PAVEMENT PRESERVATION MISCELLANEOUS CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION MISCELLANEOUS CRACK & JOINT SEALING PRESERVATION - PAVEMENTS VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING $275,000 PRESERVATION - BRIDGES VARIOUS STRUCTURE PRESERVATION BRIDGE DECK SEALING PRESERVATION - BRIDGES 5 - 40 $5,370,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street VARIOUS Location ON-CALL ENGINEERING Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $750,000 DISTRICT-WIDE 1 2020 $450,000 DISTRICT-WIDE 2 2021-2025 $550,000 DISTRICT-WIDE 2 2021-2025 $2,000,000 DISTRICT-WIDE 1 2020 $2,600,000 DISTRICT-WIDE 1 2021-2025 $1,000,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS STRUCTURE PRESERVATION BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS STRUCTURE PRESERVATION BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 5 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street VARIOUS Location MISCELLANEOUS LAND ACQUISITION Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 DISTRICT-WIDE 4 2021-2025 $2,940,000 DISTRICT-WIDE 6 2020 $14,700,000 DISTRICT-WIDE 4 2021-2025 CHAMPAIGN 2 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS W CHURCH ST OVER IC RR & COPPER SLOUGH W OF CHAMPAIGN BRIDGE SUPERSTRUCTURE $3,000,000 REHABILITATION - BRIDGES WESTVILLE RD CATLIN / INDIANOLA RD TO WESTVILLE Miles = 2.67 Roadway Information Miles AADT Truck Pct 2.25 700 5.7 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS NHS N 0.36 650 6.2 N 0.06 650 6.2 N 5 - 42 Structure Information Str Number AADT 5,600 0100037 5,600 0100036 $935,000 VERMILION Truck Pct NHS 7 Y 7 Y 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 5 State Highways Route / Street WESTVILLE RD Location CATLIN / INDIANOLA RD TO WESTVILLE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $100,000 VERMILION 1 2021-2025 $50,000 VERMILION 1 2021-2025 REHABILITATION - PAVEMENTS WESTVILLE RD CATLIN / INDIANOLA RD TO WESTVILLE UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 5 - 43 DISTRICT 5 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street US 36 N 750 E RD Location US 36: 0.3 MI W OF N 750 E RD TO 0.2 MI E OF N 750 E RD; N 750 E RD: CSX RR TO US 36 Miles = 0.93 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $2,279,000 DOUGLAS 5 2020 $3,270,000 DOUGLAS 5 2020 $300,000 VERMILION 1 2021-2025 $300,000 VERMILION 2 2021-2025 $300,000 VERMILION 2 2021-2025 $300,000 VERMILION 1 2021-2025 RECONSTRUCTION - PAVEMENTS US 45 E 1050 N RD N LINE ST US 45: 0.3 MI N OF E 1050N RD TO 0.3 MI S OF E 1050 N RD; E 1050 N RD / N LINE ST: 0.3 MI W OF US 45 TO CN RR Miles = 0.93 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 2250 N RD AT UNNAMED STREAM 1 MI SE OF HOPE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3900 N RD AT WHISKEY CREEK 2.5 MI SE OF RANKIN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 500 E RD AT BAUM BRANCH 2.5 MI SW OF JAMAICA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 880 E RD AT FOUNTAIN CREEK 2 MI SE OF EAST LYNN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 44 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street BRIDGE ST MARION ST Location W BRIDGE ST: MONTICELLO WCL TO ILL 105; MARION ST: ILL 105 TO PIATT ST Miles = 2.11 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,500,000 PIATT 3 2020 $850,000 DEWITT 1 2020 $375,000 DEWITT 2 2021-2025 DOUGLAS 3 2021-2025 DOUGLAS 3 2021-2025 MCLEAN 5 2020 REHABILITATION - PAVEMENTS CENTER ST ADAMS ST TO VANBUREN ST & WOODLAWN ST TO WASHINGTON ST Miles = 0.69 DESIGNED OVERLAY REHABILITATION - PAVEMENTS CH 4 AT TRENKLE SLOUGH 0.8 MI S OF FARMER CITY BRIDGE REPLACEMENT ROYAL RD RECONSTRUCTION - BRIDGES CH 6 AT KASKASKIA RIVER 4.7 MI N OF GARRETT BRIDGE REPLACEMENT $1,050,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 6 AT KASKASKIA RIVER 4.7 MI N OF GARRETT CONSTRUCTION ENGINEERING $120,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 14 HELY ST S JEFFERSON ST IN TOWANDA TO ILL 165 Miles = 5.00 STANDARD OVERLAY REHABILITATION - PAVEMENTS 5 - 45 $1,640,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street CH 16 Location AT TRIB FLEMINGTON CREEK 3.5 MI S OF ILL 16 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $875,000 EDGAR 3 2021-2025 EDGAR 1 2021-2025 $3,250,000 DEWITT 12 2021-2025 $1,250,000 MCLEAN 7 2021-2025 $450,000 VERMILION 1 2020 $50,000 CHAMPAIGN 3 2020 CONLOGUE RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 16 AT TRIB FLEMINGTON CREEK 3.5 MI S OF ILL 16 CONSTRUCTION ENGINEERING $68,000 CONLOGUE RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 18 WELDON SPRINGS RD REVERE RD TO OSPUR RD Miles = 3.30 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS CH 24 E 1400 N RD TAZEWELL CO LINE TO ILL 122 Miles = 4.05 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 36 BATESTOWN RD 0.1 MI S OF US 150 TO US 150 Miles = 0.09 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 55 MAPLEWOOD DR NCL OF RANTOUL TO VETERANS PKWY P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS 5 - 46 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street CH 55 MAPLEWOOD DR Location NCL OF RANTOUL TO VETERANS PKWY Miles = 1.41 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $1,000,000 CHAMPAIGN 3 2021-2025 $50,000 CHAMPAIGN 3 2021-2025 $4,050,000 CHAMPAIGN 1 2021-2025 $3,600,000 MCLEAN 3 2020 $7,400,000 MCLEAN 3 2021-2025 VERMILION 2 2021-2025 REHABILITATION - PAVEMENTS CH 55 NCL OF RANTOUL TO VETERANS PKWY CONSTRUCTION ENGINEERING MAPLEWOOD DR REHABILITATION - PAVEMENTS CURTIS RD PROSPECT AVE TO US 45 Miles = 0.45 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS HAMILTON RD 0.1 MI E OF BUNN ST TO COMMERCE PKWY LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS HAMILTON RD 0.1 MI E OF BUNN ST TO COMMERCE PKWY Miles = 0.47 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS INDIAN SPRINGS RD AT WINDFALL CREEK 3 MI SE OF JAMESBURG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 47 $300,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street KICKAPOO TRAIL Location GRAYS SIDING ROAD TO VERMILION COUNTY FAIRGROUNDS Improvements TAMP Category BIKEWAY Est. Cost County MYP Years Past Current $686,000 VERMILION 1 2020 $650,000 EDGAR 1 2021-2025 $600,000 DOUGLAS 1 2020 $600,000 CHAMPAIGN 1 2021-2025 $600,000 VERMILION 3 2021-2025 MISCELLANEOUS IMPROVEMENTS LOWER TERRE HAUTE RD 0.5 MI S OF 575TH RD TO FERREL ST (CH 5) Miles = 5.38 STANDARD OVERLAY REHABILITATION - PAVEMENTS N 1475 E RD AT SCATTERING FORK 4 MI SW OF CAMARGO BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N DIVISION ST MAIN ST STATE ST N DIVISION ST: N OF STATE ST TO MAPLE ST; MAIN ST: 0.1 MI W OF DIVISION ST TO E OF LINCOLN ST; STATE ST: 0.1 MI W OF DIVISION ST TO 0.1 MI E OF DIVISION ST Miles = 0.61 STANDARD OVERLAY REHABILITATION - PAVEMENTS OAKWOOD ST 0.1 MI N OF DOLBEE ST TO 0.2 MI S OF E LONGSTRETH ST Miles = 0.65 STANDARD OVERLAY REHABILITATION - PAVEMENTS 5 - 48 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street OLYMPIAN DR Location APOLLO DR TO LINCOLN AVE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $200,000 CHAMPAIGN 1 2020 $1,700,000 CHAMPAIGN 1 2021-2025 $250,000 VERMILION 2 2020 $44,000 VERMILION 7 2021-2025 $684,000 VERMILION 7 2021-2025 $77,000 VERMILION 7 2021-2025 ILLINOIS JOBS NOW! PROJECT RECONSTRUCTION - PAVEMENTS ST MARY'S RD NEIL ST (US 45) TO FOURTH ST Miles = 0.63 STANDARD OVERLAY REHABILITATION - PAVEMENTS STONEY CREEK RD AT UNNAMED STREAM 3 MI SW OF DANVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES THOMPSON AVE MARKET ST TO 9TH ST P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS THOMPSON AVE MARKET ST TO 9TH ST Miles = 0.64 STANDARD OVERLAY REHABILITATION - PAVEMENTS THOMPSON AVE MARKET ST TO 9TH ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 5 - 49 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 5 Local Highways Route / Street TR 42A Location AT UNNAMED STREAM 0.5 MI S OF ARMSTRONG Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $400,000 VERMILION 4 2020 $800,000 MCLEAN 7 2020 $300,000 VERMILION 2 2021-2025 350 E RD RECONSTRUCTION - BRIDGES TR 94 AT KINGSMILL CREEK 4.5 MI NW OF SHIRLEY BRIDGE REPLACEMENT N 750 E RD RECONSTRUCTION - BRIDGES TWIN HILLS RD AT GRAPE CREEK 1.5 MI E OF BELGIUM BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 5 - 50 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 4 District 6 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 4, DISTRICT 6, SPRINGFIELD Overview Highway District 6 encompasses 15 counties in west central Illinois and includes the cities of Springfield, Quincy, Jacksonville, Lincoln and Taylorville, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 6 consists of 2,077 miles of highways and 847 bridges, supporting 11.1 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.24 billion will be provided during FY 2020-2025 for improvements to state highways in District 6. The following table summarizes anticipated accomplishments on the state highway system in District 6 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 50 151 238 27 284,922 192,763 137,262 197,981 0 0 0 0 42 6 4 6 0 2,070 107.554 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 55 from 0.8 mile north of Illinois 16 to 0.7 mile south of County Highway 17 at Farmersville in Montgomery County. Resurfacing on 21.2 miles, a new bridge deck, bridge deck overlays, bridge raising, bridge repair, bridge joint replace/repair, bridge removal, ditch cleaning and slope wall repair are programmed during FY 2020-2025 at a cost of $49.8 million. Of this total, 6-i resurfacing on 9.3 miles, a new bridge deck, bridge raising, bridge removal, slope wall repair, bridge deck overlay, bridge repair and bridge joint replace/repair are programmed in FY 2020 at a cost of $22.9 million. • Interstate 55 from south of the Sangamon/Montgomery County line to 0.2 mile north of Lake Springfield Bridge in Sangamon County. Resurfacing on 19.3 miles, bridge deck overlay, bridge joint replace/repair, bridge repair and bridge approach roadway are programmed during FY 2020-2025 at a cost of $40.4 million. Of this total, resurfacing on 7.6 miles and bridge approach roadway are programmed in FY 2020 at a cost of $18.9 million. • Interstate 55 0.5 mile north of Illinois 54/Sangamon Avenue in Springfield to 2.7 miles south of Illinois 123 in Williamsville. Additional lanes and reconstruction on 7.8 miles, a bridge replacement, bridge widening, bridge new deck, engineering for contract plans, utility adjustments, land acquisition and construction engineering are programmed during FY 2021-2025 at a cost of $137.4 million. • Interstate 55/Interstate 55 Business from 1.3 miles south of Interstate 55 Business to 0.3 mile north of Illinois 10 west of Lincoln. Resurfacing on 10.7 miles (including ramp repair), bridge joint replace/repair, bridge deck repairs, bridge repair and slope wall repair are programmed in FY 2020 at a cost of $20.7 million. Also included are resurfacing and new shoulders on 1 mile on Interstate 55 Business from east of Old Route 66 to south of 1056 th Avenue south of Lincoln that are programmed in FY 2020 at a cost of $1.1 million. • Interstate 72 over Wabash Avenue and over Northern Southern Railroad 1.2 miles east of Wabash Avenue Interchange in Springfield in Sangamon County. A new bridge deck, slope wall repair and bridge painting are programmed during FY 2020 at a cost of $7.5 million. • Interstate 155 from 2 miles south of US 136 to Tazewell County line in Logan County. Resurfacing on 4.6 miles (including ramp repair), shoulder repair and bridge repair, bridge deck repairs, bridge joint replace/repair and a bridge deck overlay on structures at US 136 and Emden Road are programmed in FY 2020 at a cost of $8.9 million. • US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction on 1.4 miles, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $65.9 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $1.3 million. This project has been approved for Illinois Special Bridge Program funding. • Illinois 57 (3rd Street) from Maine Street in Quincy to south of Marblehead and York Street from 3rd Street to west of 4th Street, including structures at Payson Avenue and Curtis Creek in Adams County. Resurfacing on 7.2 miles, ADA improvements, a parking improvement, new bridge decks, bridge approach roadway, bridge repair, bridge substructure rehabilitation, slope wall repair and scour mitigation are programmed in FY 2020 at a cost of $6.4 million. • Illinois 100/Illinois 106 over the Illinois River Bridge at Florence. A bridge replacement, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $84.2 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $4.6 million. This project has been approved for Illinois Special Bridge Program funding. 6-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location MADISON CO LINE TO 0.8 MI N OF ILL 16 Improvements TAMP Category CRACK & JOINT SEALING Est. Cost County MYP Years Past Current $164,000 MACOUPIN MONTGOMERY 1 2020 $22,450,000 MONTGOMERY 9 2020 PRESERVATION - PAVEMENTS I 55 0.8 MI N OF ILL 16 TO 0.6 MI N OF ILL 108 Miles = 9.27 Roadway Information Miles AADT Truck Pct 7.39 28,820 32.2 I 55 STANDARD OVERLAY BRIDGE NEW DECK BRIDGE RAISING BRIDGE REMOVAL/DEMOLITION SLOPEWALL REPAIR REHABILITATION - PAVEMENTS Structure Information Str Number AADT 250 0680044 14,450 0680048 14,450 0680049 NHS Y UNDER TR 235 (N 13TH AVE) & TR 48 (E 2ND RD) 1.1 MI N & 2.3 MI N OF ILL 16 & UNDER ILL 108 BRIDGE DECK OVERLAY BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR Truck Pct NHS 3 N 32 Y 32 Y $430,000 MONTGOMERY 1 2020 $12,100,000 MONTGOMERY 6 2021-2025 PRESERVATION - BRIDGES I 55 0.6 MI N OF ILL 108 TO 1.3 MI S OF WAGGONER Miles = 6.71 Roadway Information Miles AADT Truck Pct 5.03 29,548 31.1 DESIGNED OVERLAY BRIDGE JOINT REPLACE/REPAIR DITCH CLEANING REHABILITATION - PAVEMENTS NHS Y 6-1 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location 1.3 MI S OF WAGGONER TO 0.7 MI S OF CH 17 AT FARMERSVILLE Miles = 5.21 Roadway Information Miles AADT Truck Pct 5.21 31,100 32.0 I 55 County MYP Years Improvements TAMP Category Est. Cost DESIGNED OVERLAY $13,600,000 MONTGOMERY 8 2021-2025 $1,200,000 MONTGOMERY 1 2021-2025 $2,100,000 MONTGOMERY 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y UNDER CH 16 E OF WAGGONER AVE & UNDER TR 37 S OF FARMERSVILLE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES I 55 UNDER CH 16 E OF WAGGONER AVE BRIDGE NEW DECK REHABILITATION - BRIDGES I 55 UNDER CH 17 BRIDGE NEW DECK Structure Information Str Number AADT 200 0680041 $3,600,000 REHABILITATION - BRIDGES I 55 UNDER TR 17 BRIDGE NEW DECK BRIDGE REPAIR REHABILITATION - BRIDGES 6-2 MONTGOMERY Structure Information Str Number AADT 4,250 0680037 $2,100,000 MONTGOMERY Structure Information Str Number AADT 50 0680036 Truck Pct NHS 18 N 1 2021-2025 Truck Pct NHS 12 N 1 2021-2025 Truck Pct NHS 60 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location UNDER TR 7 Improvements TAMP Category BRIDGE NEW DECK Est. Cost 55 S OF SANGAMON / MONTGOMERY CO LINE TO BRUSH CREEK 0.7 MI S OF ILL 104 Miles = 5.44 Roadway Information Miles AADT Truck Pct 0.03 32,200 28.1 3.86 I 55 32,744 30.2 $2,100,000 I 55 MONTGOMERY Structure Information Str Number AADT 75 0680035 $9,000,000 1 2021-2025 Truck Pct NHS 21 N SANGAMON MONTGOMERY 1 2021-2025 $10,200,000 SANGAMON 1 2021-2025 $2,300,000 SANGAMON 1 2021-2025 $18,900,000 SANGAMON 2 2020 REHABILITATION - PAVEMENTS NHS Y Y BRUSH CREEK 0.7 MI S OF ILL 104 TO N OF GLENARM INTCHG Miles = 6.23 Roadway Information Miles AADT Truck Pct 2.98 38,032 26.0 DESIGNED OVERLAY MYP Years Past Current REHABILITATION - BRIDGES I County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y OVER ILL 104 INTCHG & UNDER HORSE FARM RD 1.8 MI N OF ILL 104 BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 55 N OF GLENARM INTCHG TO 0.2 MI N OF LAKE SPRINGFIELD BRIDGE Miles = 7.59 Roadway Information Miles AADT Truck Pct 5.33 39,853 23.2 STANDARD OVERLAY BRIDGE APPROACH ROADWAY REHABILITATION - PAVEMENTS NHS Y 6-3 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location OVER ILLINOIS CENTRAL RR S OF SPRINGFIELD Improvements TAMP Category BRIDGE NEW DECK Est. Cost 55 I 72 I-55: LAKE SPRINGFIELD BRIDGE TO 0.2 MI N OF SOUTHWIND RD & I-72: FARMINGDALE RD TO W OF OLD CHATHAM RD & 0.4 MI E OF I-55 (N) TO 0.5 MI E OF OVERPASS RD (INSIDE SPFLD MPO) CRACK & JOINT SEALING MYP Years Past Current $7,000,000 REHABILITATION - BRIDGES I County SANGAMON Structure Information Str Number AADT 19,200 0840112 19,200 0840113 1 2021-2025 Truck Pct NHS 22 Y 22 Y $158,000 SANGAMON 1 2020 $1,600,000 SANGAMON 1 2021-2025 PRESERVATION - PAVEMENTS I 55 I 72 UNDER W LAKE SHORE DRIVE BRIDGE NEW DECK US 36 REHABILITATION - BRIDGES I 55 I 72 UNDER COOK ST IN SPRINGFIELD BRIDGE NEW DECK Structure Information Str Number AADT 4,150 0840092 $1,600,000 SANGAMON Truck Pct NHS 12 N 1 2021-2025 US 36 REHABILITATION - BRIDGES I 55 OVER ILL 54 & SANGAMON AVE IN SPRINGFIELD BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 6-4 Structure Information Str Number AADT 750 0840103 $6,200,000 SANGAMON Truck Pct NHS N/A N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES BRIDGE WIDENING Est. Cost County MYP Years Past Current $15,700,000 SANGAMON 1 2021-2025 $111,300,000 SANGAMON 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 55 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE Miles = 7.82 Roadway Information Miles AADT Truck Pct 6.41 33,300 29.3 I 55 RECONSTRUCTION BRIDGE NEW DECK BRIDGE REPLACEMENT RECONSTRUCTION - PAVEMENTS Structure Information Str Number AADT 16,650 0840023 16,650 0840022 950 0840100 16,650 0840021 16,650 0840020 NHS Y 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE P.E. (PHASE II) Truck Pct NHS 29 Y 29 Y 2 N 29 Y 29 Y $6,000,000 SANGAMON 5 2021-2025 $450,000 SANGAMON 1 2021-2025 $3,000,000 SANGAMON 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 55 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 55 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 6-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location UNDER BISSELL RD Improvements TAMP Category BRIDGE NEW DECK Est. Cost 55 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE LAND ACQUISITION MYP Years Past Current $1,600,000 REHABILITATION - BRIDGES I County SANGAMON Structure Information Str Number AADT 3,550 0840101 1 2021-2025 Truck Pct NHS 25 N $900,000 SANGAMON 1 2021-2025 $4,000,000 SANGAMON 2 2021-2025 $3,000,000 SANGAMON 3 2020 INITIAL CONSTRUCTION - PAVEMENTS I 55 SANGAMON RIVER BRIDGES 2.3 MI N OF SPRINGFIELD BRIDGE DECK OVERLAY PRESERVATION - BRIDGES I 55 UNDER ILL 123 (DINIUS RD) N OF WILLIAMSVILLE BRIDGE NEW DECK REHABILITATION - BRIDGES I 55 UNDER CH 10 W OF ELKHART BRIDGE NEW DECK REHABILITATION - BRIDGES 6-6 Structure Information Str Number AADT 5,650 0840171 $2,100,000 LOGAN Structure Information Str Number AADT 250 0540038 Truck Pct NHS 19 N 3 2021-2025 Truck Pct NHS 16 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 Location UNDER 800TH AVE AT BROADWELL INTCHG Improvements TAMP Category BRIDGE NEW DECK Est. Cost 55 I 55 BUS 1.3 MI S OF I-55 BUS TO 0.6 MI N OF ILL 10 W OF LINCOLN Miles = 10.66 Roadway Information Miles AADT Truck Pct 5.13 31,539 32.4 I $3,300,000 LOGAN Structure Information Str Number AADT 150 0540039 1 2021-2025 Truck Pct NHS 20 N $18,100,000 LOGAN 5 2020 $2,600,000 LOGAN 2 2020 $3,600,000 LOGAN 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.02 29,500 39.7 Y 0.59 4,272 3.0 N 0.35 375 10.4 N 55 STANDARD OVERLAY RAMP REPAIR MYP Years Past Current REHABILITATION - BRIDGES I County 1.2 MI S OF I-55 BUS TO 0.3 MI N OF ILL 10 W OF LINCOLN BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS SLOPEWALL REPAIR MAINTENANCE - BRIDGES I 55 UNDER I-55 BUS (OLD US 66) BRIDGE NEW DECK REHABILITATION - BRIDGES 6-7 Structure Information Str Number AADT 375 0540040 Truck Pct NHS 10 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 BUS Location I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD Miles = 2.51 6TH ST STEVENSON DR Roadway Information Miles AADT Truck Pct 1.16 27,405 4.5 I County MYP Years Past Current $19,000,000 SANGAMON 1 2021-2025 $6,000,000 SANGAMON 1 2021-2025 $4,300,000 SANGAMON 1 2021-2025 $1,000,000 SANGAMON 1 2021-2025 RECONSTRUCTION - PAVEMENTS 11,100 2.6 Y 0.06 1,900 0.0 N 0.14 1,882 0.0 N 0.16 4,350 0.0 N 0.02 400 0.0 N 0.07 400 0.0 N 55 BUS RECONSTRUCTION INTERSECTION IMPROVEMENT TURNING LANES SIDEWALKS Est. Cost NHS Y 0.13 6TH ST Improvements TAMP Category I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD Miles = 0.01 ADDITIONAL LANES TURNING LANES STEVENSON DR INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD LAND ACQUISITION 6TH ST STEVENSON DR INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD UTILITY ADJUSTMENT 6TH ST STEVENSON DR INITIAL CONSTRUCTION - PAVEMENTS 6-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 BUS Location I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $1,900,000 SANGAMON 1 2021-2025 $12,000,000 SANGAMON 1 2021-2025 $800,000 SANGAMON 1 2021-2025 $2,000,000 SANGAMON 1 2021-2025 6TH ST STEVENSON DR INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I 55 BUSA 6TH ST 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD Miles = 1.43 RECONSTRUCTION INTERSECTION RECONSTN TURNING LANES 5TH ST STANFORD AV Roadway Information Miles AADT Truck Pct 0.61 24,282 2.6 RECONSTRUCTION - PAVEMENTS NHS Y 0.15 15,700 7.9 Y 0.15 13,367 12.3 Y I 55 BUS I 55 BUSA 6TH ST 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD Miles = 0.01 ADDITIONAL LANES 5TH ST INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I 55 BUSA 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD LAND ACQUISITION 6TH ST 5TH ST INITIAL CONSTRUCTION - PAVEMENTS 6-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 BUS I 55 BUSA Location 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $500,000 SANGAMON 1 2021-2025 $200,000 SANGAMON 1 2021-2025 $2,900,000 SANGAMON 4 2021-2025 $4,100,000 SANGAMON 1 2021-2025 6TH ST 5TH ST INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I 55 BUSA 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD CONSTRUCTION ENGINEERING 6TH ST 5TH ST INITIAL CONSTRUCTION - PAVEMENTS I 55 BUS I 55 BUSA 6TH ST 5TH ST: SPRUCE ST TO N OF STANFORD AVE; 6TH ST: N OF STANFORD AVE TO MYRTLE ST IN SPRINGFIELD Miles = 2.16 DESIGNED OVERLAY ADA IMPROVEMENTS 5TH ST Roadway Information Miles AADT Truck Pct 1.03 14,860 7.4 1.13 I 55 BUS 14,482 7.2 REHABILITATION - PAVEMENTS NHS Y Y 0.2 MI N OF DIRKSEN PKWY TO 0.3 MI N OF ANDREW RD IN SPRINGFIELD Miles = 2.98 Roadway Information Miles AADT Truck Pct 2.98 13,094 5.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6 - 10 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 BUS Location E OF OLD ROUTE 66 TO S OF 1056TH AVE S OF LINCOLN Miles = 0.96 Roadway Information Miles AADT Truck Pct 0.96 5,196 7.4 I 55 BUS KICKAPOO ST I 72 STANDARD OVERLAY NEW SHOULDERS Est. Cost County MYP Years Past Current $1,100,000 LOGAN 2 2020 $1,300,000 LOGAN 1 2021-2025 $35,000 PIKE 1 2020 $12,300,000 PIKE 1 2021-2025 SCOTT 1 2021-2025 REHABILITATION - PAVEMENTS NHS N I-55 BUS TO ILL 10/121 IN LINCOLN Miles = 1.58 Roadway Information Miles AADT Truck Pct 1.58 3,871 10.1 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N MARK TWAIN MEMORIAL BRIDGE AT MISSISSIPPI RIVER IN HANNIBAL BRIDGE DECK SEALING MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES I 72 E OF US 54 / ILL 107 INTCHG TO 0.6 MI E OF 290TH AVE OVERHEAD Miles = 5.39 Roadway Information Miles AADT Truck Pct 5.39 8,650 33.5 I 72 STANDARD OVERLAY SHOULDER REPAIR REHABILITATION - PAVEMENTS NHS Y UNDER OLD US 36 AT WINCHESTER INTCHG BRIDGE NEW DECK $3,200,000 US 36 REHABILITATION - BRIDGES 6 - 11 Structure Information Str Number AADT 3,300 0860027 Truck Pct NHS 12 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 72 Location OVER ILL 104 & B&N RR E OF JACKSONVILLE (WB) Improvements TAMP Category BRIDGE NEW DECK Est. Cost 72 0.3 MI E OF JIMTOWN RD TO FARMINGDALE RD & 0.5 MI W OF KENT FARM RD TO MACON CO LINE (OUTSIDE SPFLD MPO) CRACK & JOINT SEALING MYP Years Past Current $2,500,000 REHABILITATION - BRIDGES I County MORGAN Structure Information Str Number AADT 5,550 0690041 1 2021-2025 Truck Pct NHS 31 Y $127,000 SANGAMON 1 2020 $7,500,000 SANGAMON 7 2020 PRESERVATION - PAVEMENTS I 72 OVER WABASH AVE & NS RR 1.2 MI E OF WABASH AVE INTCHG IN SPRINGFIELD BRIDGE NEW DECK SLOPEWALL REPAIR BRIDGE PAINTING REHABILITATION - BRIDGES I 72 US 36 UNDER CH 19 AT BUFFALO / MECHANICSBURG INTCHG BRIDGE NEW DECK Structure Information Str Number AADT 11,250 0840127 11,250 0840128 8,800 0840148 8,800 0840149 $3,000,000 REHABILITATION - BRIDGES I 72 BUS US 67 (SOUTHBOUND) 0.8 MI N OF I-72 BUS / MORTON AVE TO 1.1 MI N OF I-72 Miles = 3.02 Roadway Information Miles AADT Truck Pct 2.39 5,217 20.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6 - 12 SANGAMON Structure Information Str Number AADT 1,700 0840156 $2,900,000 MORGAN Truck Pct NHS 21 Y 21 Y 23 Y 23 Y 1 2021-2025 Truck Pct NHS 14 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 72 BUS Location MARKHAM RD (TR 78) TO 1.1 MI N OF I-72 Improvements TAMP Category PATCHING Est. Cost County MYP Years Past Current $250,000 MORGAN 1 2020 $3,600,000 MORGAN 3 2021-2025 US 67 MAINTENANCE - PAVEMENTS I 72 BUS MAUVAISE TERRE CREEK 0.7 MI E OF ILL 267 BRIDGE REPLACEMENT ILL 104 MORTON AVE RECONSTRUCTION - BRIDGES I 155 OVER I-155 (NB) & I-55 (SB) BRIDGE NEW DECK Structure Information Str Number AADT 11,600 0690009 $1,700,000 REHABILITATION - BRIDGES I 155 OVER ICG RR 2.8 MI S OF US 136 BRIDGE DECK OVERLAY BRIDGE REPAIR LOGAN Structure Information Str Number AADT 50 0540051 Truck Pct NHS 4 Y 1 2021-2025 Truck Pct NHS 20 Y $1,100,000 LOGAN 3 2020 $7,500,000 LOGAN 6 2020 PRESERVATION - BRIDGES I 155 2 MI S OF US 136 TO TAZEWELL CO LINE Miles = 4.60 Roadway Information Miles AADT Truck Pct 3.03 11,132 19.3 STANDARD OVERLAY RAMP REPAIR SHOULDER REPAIR REHABILITATION - PAVEMENTS NHS Y 6 - 13 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 155 Location UNDER EMDEN RD 1 MI S OF US 136 INTCHG Improvements TAMP Category BRIDGE REPAIR BRIDGE DECK REPAIRS BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $500,000 LOGAN 1 2020 $900,000 LOGAN 3 2020 $1,800,000 LOGAN 1 2021-2025 MAINTENANCE - BRIDGES I 155 UNDER US 136 1 MI S OF TAZEWELL CO LINE BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS BRIDGE REPAIR PRESERVATION - BRIDGES I 155 OVER I-55 (SB) BRIDGE NEW DECK REHABILITATION - BRIDGES I 172 N OF I-72 INTCHG TO N OF ILL 96 INTCHG CRACK & JOINT SEALING Structure Information Str Number AADT 5,500 0540050 Truck Pct NHS 19 Y $100,000 ADAMS 1 2020 $1,600,000 ADAMS 3 2021-2025 PRESERVATION - PAVEMENTS US 24 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER BRIDGE DECK OVERLAY ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES 6 - 14 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 24 Location QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Improvements TAMP Category BRIDGE PAINTING Est. Cost County MYP Years Past Current $5,000,000 ADAMS 3 2021-2025 $6,000,000 ADAMS 7 2021-2025 $4,000,000 ADAMS 3 2021-2025 $2,000,000 ADAMS 1 2021-2025 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES US 24 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER P.E. (CONSULTANT PLANS) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES US 24 US 24: MISSISSIPPI RIVER BRIDGES TO 0.1 MI N OF GARDNER PARK DR & ILL 57: W OF 4TH ST TO BROADWAY ST IN QUINCY & ILL 104: 3RD ST TO E OF 4TH ST Miles = 3.96 ILL 57 ILL 104 3RD ST DESIGNED OVERLAY ADA IMPROVEMENTS PATCHING 4TH ST BROADWAY ST MAINE ST Roadway Information Miles AADT Truck Pct 1.93 5,672 9.9 REHABILITATION - PAVEMENTS NHS Y 0.27 4,483 11.3 Y 1.46 5,538 12.3 Y 0.20 5,070 14.0 Y 0.10 10,460 4.9 Y US 24 HOMAN CREEK 0.1 MI N OF 12TH ST N OF QUINCY BRIDGE NEW DECK REHABILITATION - BRIDGES 6 - 15 Structure Information Str Number AADT 4,650 0010010 Truck Pct NHS 10 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 24 Location ECL OF CAMP POINT TO 0.1 MI E OF ILL 94 Miles = 1.49 Roadway Information Miles AADT Truck Pct 1.49 4,129 9.6 US 24 US 24 Roadway Information Miles AADT Truck Pct 0.41 3,928 12.2 0.27 US 24 4,519 6.1 County MYP Years Past Current $800,000 ADAMS 1 2021-2025 $1,900,000 BROWN 1 2021-2025 $860,000 SCHUYLER 4 2020 $342,000 SCHUYLER 1 2020 ADAMS 3 2020 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y US 24: 0.6 MI E OF OLD US 24 TO 0.1 MI W OF CEDAR ST IN RUSHVILLE & US 67: LAFAYETTE RD IN RUSHVILLE TO SCL Miles = 0.68 US 67 DESIGNED OVERLAY SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP Est. Cost NHS Y E OF TIMEWELL TO 0.2 MI W OF BUCKHORN / DAMON RD IN MOUNT STERLING Miles = 4.75 Roadway Information Miles AADT Truck Pct 4.75 3,394 15.7 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y Y AT US 67 IN RUSHVILLE TRAF SIGNAL REPLACEMENT MISCELLANEOUS IMPROVEMENTS US 24 A QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER BRIDGE DECK SEALING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES 6 - 16 $60,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 24 A Location QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $60,000 ADAMS 1 2021-2025 $1,500,000 ADAMS 2 2021-2025 $900,000 CHRISTIAN 1 2020 $2,200,000 CHRISTIAN 5 2021-2025 $2,030,000 PIKE 5 2020 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES US 24 A QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER P.E. (BRIDGE INSPECTION) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. MISCELLANEOUS IMPROVEMENTS US 51 0.2 MI W OF JCT US 51 / ILL 16 TO PINE ST IN PANA Miles = 1.19 ILL 16 Roadway Information Miles AADT Truck Pct 1.19 7,265 11.0 US 51 Roadway Information Miles AADT Truck Pct 3.62 4,524 14.7 US 54 ILL 106 S JACKSON ST 3,650 4.9 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y US 54: 0.1 MI N OF N MONROE ST TO 0.1 MI E OF GROVE ST & ILL 106: US 54 TO E OF ILLINOIS ST IN PITTSFIELD Miles = 1.78 Roadway Information Miles AADT Truck Pct 1.70 7,111 14.0 0.08 REHABILITATION - PAVEMENTS NHS Y PINE ST IN PANA TO SHELBY CO LINE Miles = 3.62 ILL 16 DESIGNED OVERLAY NEW SHOULDERS DESIGNED OVERLAY ADA IMPROVEMENTS PARKING IMPROVEMENT MISC TRAFFIC CONTROL REHABILITATION - PAVEMENTS NHS Y N 6 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 54 ILL 106 Location AT ILL 106 (JACKSON ST / WASHINGTON ST) IN PITTSFIELD Improvements TAMP Category INTERSECTION IMPROVEMENT Est. Cost County MYP Years Past Current $120,000 PIKE 3 2020 $1,500,000 PIKE 2 2020 $1,600,000 PIKE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 54 ILL 106 AT ILL 106 (JACKSON ST / WASHINGTON ST), MADISON ST, MEMORIAL ST, FRANKLIN ST & SHETLAND DR IN PITTSFIELD TRAF SIGNAL REPLACEMENT ADA IMPROVEMENTS LIGHTING MISCELLANEOUS IMPROVEMENTS US 54 PLUM POINT SLOUGH 0.8 MI N OF MISSOURI STATE LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 67 BLUFFS DITCH 1.8 MI NW OF ILL 100 BRIDGE REPLACEMENT Structure Information Str Number AADT 3,100 0750022 $2,300,000 RECONSTRUCTION - BRIDGES US 67 ILL 100 ILLINOIS RIVER BRIDGE AT BEARDSTOWN Miles = 1.41 BRIDGE REPLACEMENT NEW CONSTRUCTION SCHUYLER Structure Information Str Number AADT 4,050 0850002 $62,000,000 SCHUYLER CASS Truck Pct NHS 19 Y 3 2021-2025 Truck Pct NHS 10 Y 3 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 6 - 18 Structure Information Str Number AADT 6,500 0090001 Truck Pct NHS 18 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 67 Location ILLINOIS RIVER BRIDGE AT BEARDSTOWN Improvements TAMP Category ARCHAEOLOGICAL SURVEY Est. Cost County MYP Years Past Current $100,000 SCHUYLER CASS 3 2021-2025 $300,000 SCHUYLER CASS 1 2020 $1,000,000 SCHUYLER CASS 3 2020 $500,000 SCHUYLER CASS 3 2021-2025 $2,000,000 SCHUYLER CASS 3 2021-2025 ILL 100 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 ILLINOIS RIVER BRIDGE AT BEARDSTOWN P.E. (CONSULTANT PLANS) ILL 100 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 ILLINOIS RIVER BRIDGE AT BEARDSTOWN LAND ACQUISITION ILL 100 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 ILLINOIS RIVER BRIDGE AT BEARDSTOWN UTILITY ADJUSTMENT ILL 100 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 ILLINOIS RIVER BRIDGE AT BEARDSTOWN CONSTRUCTION ENGINEERING ILL 100 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 6 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 67 Location ILLINOIS RIVER BRIDGE TO 0.2 MI W OF ILL 125 IN BEARDSTOWN Miles = 0.51 ILL 100 Roadway Information Miles AADT Truck Pct 0.51 6,647 12.8 US 67 ILL 125 Roadway Information Miles AADT Truck Pct 0.32 6,130 9.6 5.29 5,689 US 67 16.6 ILL 104 Roadway Information Miles AADT Truck Pct 1.03 2,000 27.3 MYP Years Past Current $500,000 CASS 1 2020 DESIGNED OVERLAY ADA IMPROVEMENTS $3,900,000 CASS 2 2021-2025 $7,900,000 MORGAN CASS 1 2021-2025 $10,000,000 HANCOCK 5 2021-2025 REHABILITATION - PAVEMENTS NHS Y N DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6.12 3,156 21.7 Y 0.34 1,850 23.8 N US 136 County REHABILITATION - PAVEMENTS US 67: HONEY POINT RD 1 MI N OF CASS / MORGAN CO LINE TO 2 MI E OF ILL 100 & ILL 100: US 67 TO 0.3 MI S Miles = 7.49 ILL 100 DESIGNED OVERLAY Est. Cost NHS Y US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RD Miles = 5.61 ILL 100 Improvements TAMP Category MISSISSIPPI RIVER BRIDGE AT KEOKUK BRIDGE DECK OVERLAY ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES 6 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 136 Location E OF MARION ST IN CARTHAGE TO 0.3 MI E OF CARTHAGE Miles = 1.18 ILL 94 Roadway Information Miles AADT Truck Pct 1.14 5,322 11.4 0.04 3,500 US 136 6.0 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,400,000 HANCOCK 1 2021-2025 $1,300,000 HANCOCK 1 2021-2025 $5,800,000 MASON 5 2021-2025 $500,000 MASON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y N 3.1 MI S OF CARTHAGE TO 0.9 MI E Miles = 5.83 ILL 110 Improvements TAMP Category ILL 336 CAPE SEAL GRINDING FOG SEAL PRESERVATION - PAVEMENTS US 136 US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA) Miles = 0.91 ILL 78 ILL 97 Roadway Information Miles AADT Truck Pct 0.72 7,418 8.7 RECONSTRUCTION - PAVEMENTS NHS Y 0.10 3,700 8.7 N 0.09 3,850 7.5 N US 136 ILL 78 ILL 97 RECONSTRUCTION ADA IMPROVEMENTS VERTICAL REALIGNMENT BI-DIRECT LEFT TURN LANE US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA) LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 6 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 136 ILL 78 ILL 97 Location US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA) Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $250,000 MASON 1 2021-2025 $450,000 MASON 1 2021-2025 $5,700,000 MASON 1 2020 $200,000 LOGAN 1 2021-2025 $2,700,000 LOGAN 5 2020 RECONSTRUCTION - PAVEMENTS US 136 S OF RANDOLPH ST TO E OF CHARLOTTE AVE Miles = 0.40 Roadway Information Miles AADT Truck Pct 0.40 5,328 18.9 US 136 US 136 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 0.5 MI W OF I-155 TO W OF UNION RD Miles = 4.89 Roadway Information Miles AADT Truck Pct 4.89 1,999 27.5 STANDARD OVERLAY NHS Y 0.1 MI W TO 0.1 MI E OF PRAIRIE CREEK DITCH 1.5 MI E OF SAN JOSE Miles = 0.18 Roadway Information Miles AADT Truck Pct 0.18 2,200 34.1 US 136 REHABILITATION - PAVEMENTS NHS Y E OF CHARLOTTE AVE IN HAVANA TO 0.1 MI E OF FORREST CITY RD (CR 2800 E) Miles = 11.98 Roadway Information Miles AADT Truck Pct 11.98 2,034 18.0 DESIGNED OVERLAY ADA IMPROVEMENTS INTERSECTION IMPROVEMENT DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street US 136 Location 0.5 MI W OF I-155 TO W OF UNION RD Improvements TAMP Category SHOULDER RECONSTRUCTION Est. Cost County MYP Years Past Current $1,000,000 LOGAN 2 2020 $2,500,000 LOGAN 3 2021-2025 $1,400,000 LOGAN 1 2021-2025 $100,000 LOGAN 3 2021-2025 SANGAMON 1 2021-2025 MAINTENANCE - PAVEMENTS US 136 W OF UNION RD TO W OF MCLEAN CO LINE Miles = 5.51 Roadway Information Miles AADT Truck Pct 5.51 2,091 28.8 US 136 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y W OF UNION RD TO W OF MCLEAN CO LINE SHOULDER RECONSTRUCTION MAINTENANCE - PAVEMENTS US 136 W FORK SUGAR CREEK 2 MI E OF UNION RD & SUGAR CREEK 1.2 MI W OF MCLEAN CO LINE BRIDGE PAINTING BRIDGE JOINT REPLACE/REPAIR SCOUR MITIGATION PRESERVATION - BRIDGES ILL 4 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELD Miles = 2.96 Roadway Information Miles AADT Truck Pct 2.96 31,134 10.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6 - 23 $5,600,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 4 VETERANS PKWY Location 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELD Improvements TAMP Category PATCHING Est. Cost County MYP Years Past Current $500,000 SANGAMON 1 2020 $2,200,000 SANGAMON 1 2021-2025 $1,800,000 SANGAMON 1 2021-2025 $1,000,000 MACOUPIN 1 2021-2025 $5,100,000 MACOUPIN 1 2021-2025 MAINTENANCE - PAVEMENTS ILL 4 (SOUTHBOUND) OVER NS RR & GATEWAY W RR 0.1 M N OF I-72 INTCHG IN SPRINGFIELD BRIDGE DECK OVERLAY PRESERVATION - BRIDGES ILL 4 0.2 MI N OF MANSION RD TO N OF TEAL DR IN CHATHAM Miles = 1.18 Roadway Information Miles AADT Truck Pct 1.18 19,185 9.6 ILL 4 ILL 4 REHABILITATION - PAVEMENTS NHS Y S OF NORTH ST IN GIRARD TO N OF CAMBRIDGE RD S OF GIRARD Miles = 1.14 Roadway Information Miles AADT Truck Pct 1.14 3,036 5.5 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y S OF ALLEN RD TO N OF CARLINVILLE SQUARE Miles = 6.85 Roadway Information Miles AADT Truck Pct 6.85 4,081 11.5 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 6 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 4 Location S SIDE CARLINVILLE SQUARE TO CARLINVILLE SCL Miles = 0.82 ILL 108 Roadway Information Miles AADT Truck Pct 0.79 7,283 6.1 0.03 4,000 ILL 4 5.8 Roadway Information Miles AADT Truck Pct 0.75 2,801 12.3 0.18 ILL 4 5,100 5.8 DESIGNED OVERLAY PARKING IMPROVEMENT ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $900,000 MACOUPIN 1 2021-2025 $2,000,000 MACOUPIN 1 2021-2025 $450,000 MACOUPIN 1 2021-2025 $300,000 MACOUPIN 1 2021-2025 $150,000 MACOUPIN 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y N NCL OF EAST GILLESPIE TO ILL 16 Miles = 0.93 ILL 16 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y Y NCL OF EAST GILLESPIE TO ILL 16 ILL 16 P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS ILL 4 NCL OF EAST GILLESPIE TO ILL 16 LAND ACQUISITION ILL 16 REHABILITATION - PAVEMENTS ILL 4 NCL OF EAST GILLESPIE TO ILL 16 UTILITY ADJUSTMENT ILL 16 REHABILITATION - PAVEMENTS 6 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 10 Location CRANE CREEK 1.5 MI N OF EASTON Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost CHESTNUT ST 0.1 MI E OF ILL 29 TO W OF PRICE AVE IN MASON CITY Miles = 1.88 Roadway Information Miles AADT Truck Pct 1.88 2,629 13.6 ILL 10 CHESTNUT ST DESIGNED OVERLAY ADA IMPROVEMENTS PARKING IMPROVEMENT MYP Years Past Current $1,600,000 RECONSTRUCTION - BRIDGES ILL 10 County MASON Structure Information Str Number AADT 600 0630005 1 2021-2025 Truck Pct NHS 5 N $1,600,000 MASON 7 2021-2025 $150,000 MASON 1 2021-2025 $2,400,000 LOGAN 7 2021-2025 $600,000 LOGAN 9 2021-2025 REHABILITATION - PAVEMENTS NHS N DITCH 0.1 MI S OF ILL 10, DITCH AT ILL 10 & DITCH 0.1 MI E OF ILL 29 CULVERT (NEW) CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 10 0.1 MI E OF MASON CO LINE TO 2.5 MI E OF NEW HOLLAND Miles = 4.36 Roadway Information Miles AADT Truck Pct 4.36 1,871 13.8 ILL 10 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N DITCH 0.8 MI E OF MASON CO LINE CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES 6 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 10 ILL 121 I Location E OF ELM ST TO NW OF KICKAPOO ST IN LINCOLN Miles = 0.94 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,300,000 LOGAN 3 2021-2025 $8,000,000 MACOUPIN 7 2021-2025 $500,000 MACOUPIN 1 2021-2025 $1,000,000 MACOUPIN 4 2021-2025 55 BUS KEOKUK ST WOODLAWN ST Roadway Information Miles AADT Truck Pct 0.94 11,350 10.7 ILL 16 JERSEY CO LINE TO ROSE LN IN SHIPMAN Miles = 5.98 Roadway Information Miles AADT Truck Pct 5.98 2,095 4.7 ILL 16 REHABILITATION - PAVEMENTS NHS Y DESIGNED OVERLAY CULVERT (NEW) CULVERT REPLACEMENT CULVERT EXTENSION ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y JERSEY CO LINE TO ROSE LN IN SHIPMAN P.E. (PHASE II) P.E. (CONSULTANT PLANS) REHABILITATION - PAVEMENTS ILL 16 JERSEY CO LINE TO ROSE LN IN SHIPMAN LAND ACQUISITION REHABILITATION - PAVEMENTS 6 - 27 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 16 Location JERSEY CO LINE TO ROSE LN IN SHIPMAN Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $500,000 MACOUPIN 4 2021-2025 $1,600,000 MACOUPIN 10 2021-2025 REHABILITATION - PAVEMENTS ILL 16 PIASA CREEK 0.2 MI W OF PIASA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 16 PIASA CREEK 3.1 MI W OF SHIPMAN BRIDGE REPLACEMENT DRAINAGE Structure Information Str Number AADT 2,650 0590001 $1,600,000 RECONSTRUCTION - BRIDGES ILL 16 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159 Miles = 4.22 Roadway Information Miles AADT Truck Pct 4.22 2,018 4.8 ILL 16 DESIGNED OVERLAY BRIDGE REPLACEMENT CULVERT (NEW) CULVERT EXTENSION Structure Information Str Number AADT 1,950 0590002 $5,000,000 REHABILITATION - PAVEMENTS LAND ACQUISITION REHABILITATION - PAVEMENTS 6 - 28 MACOUPIN Structure Information Str Number AADT 2,100 0590004 NHS Y ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159 MACOUPIN $750,000 MACOUPIN Truck Pct NHS 8 Y 10 2021-2025 Truck Pct NHS 3 Y 3 2021-2025 Truck Pct NHS 3 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 16 Location ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $375,000 MACOUPIN 1 2021-2025 $400,000 MONTGOMERY 2 2020 $7,300,000 MONTGOMERY 1 2021-2025 $1,500,000 MONTGOMERY 1 2021-2025 REHABILITATION - PAVEMENTS ILL 16 ILL 127 ILL 16: N OF SEWARD ST TO ROUNTREE ST; ILL 127: SCHOOL ST TO S OF HILLTOP DR IN HILLSBORO ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 16 FREY AVE IN SCHRAM CITY TO GIBSON ST IN NOKOMIS Miles = 13.51 Roadway Information Miles AADT Truck Pct 13.51 2,507 13.3 ILL 16 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y BIG FOUR RESERVOIR OVERFLOW 1 MI E OF WCL OF SCHRAM CITY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 16 S FORK SANGAMON RIVER 2.4 MI E OF ELM ST IN NOKOMIS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 6 - 29 Structure Information Str Number AADT 4,700 0680011 $1,400,000 MONTGOMERY Structure Information Str Number AADT 1,550 0680016 Truck Pct NHS 8 Y 12 2021-2025 Truck Pct NHS 11 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 16 Location SANGAMON CREEK AT WCL OF OHLMAN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost DITCH 0.3 MI NE OF MONTGOMERY CO LINE CULVERT (NEW) MYP Years Past Current $1,400,000 RECONSTRUCTION - BRIDGES ILL 16 County MONTGOMERY Structure Information Str Number AADT 1,600 0680017 $950,000 12 2021-2025 Truck Pct NHS 15 Y CHRISTIAN 11 2021-2025 $3,000,000 SANGAMON 8 2021-2025 $4,250,000 SANGAMON 10 2021-2025 $900,000 SANGAMON 6 2021-2025 INITIAL CONSTRUCTION - BRIDGES ILL 29 MENARD CO LINE TO N OF FISHER RD S OF CANTRALL Miles = 3.07 Roadway Information Miles AADT Truck Pct 3.07 7,242 5.9 ILL 29 ILL 29 REHABILITATION - PAVEMENTS NHS N N OF FISHER RD S OF CANTRALL TO 0.1 MI S OF ANDREW RD (INCL INT AT ANDREW RD) Miles = 2.60 Roadway Information Miles AADT Truck Pct 2.60 6,595 5.5 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY INTERSECTION IMPROVEMENT LEFT TURN LANES SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N MENARD CO LINE TO ANDREW RD LAND ACQUISITION J DAVID JONES PKWY REHABILITATION - PAVEMENTS 6 - 30 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 29 Location MENARD CO LINE TO ANDREW RD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $300,000 SANGAMON 6 2021-2025 $16,000,000 SANGAMON 1 2021-2025 $1,500,000 SANGAMON 2 2020 $2,500,000 SANGAMON 1 2021-2025 $1,250,000 SANGAMON 1 2021-2025 $1,520,000 SANGAMON 4 2021-2025 J DAVID JONES PKWY REHABILITATION - PAVEMENTS ILL 29 AT DIRKSEN PKWY IN SPRINGFIELD SANGAMON AVE INTERSECTION RECONSTN LEFT TURN LANES MISCELLANEOUS IMPROVEMENTS ILL 29 AT DIRKSEN PKWY IN SPRINGFIELD SANGAMON AVE P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS ILL 29 AT DIRKSEN PKWY IN SPRINGFIELD LAND ACQUISITION SANGAMON AVE MISCELLANEOUS IMPROVEMENTS ILL 29 AT DIRKSEN PKWY IN SPRINGFIELD UTILITY ADJUSTMENT SANGAMON AVE MISCELLANEOUS IMPROVEMENTS ILL 29 DIRKSEN PKWY 0.2 MI S OF CLEAR LAKE AVE TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELD Miles = 1.07 Roadway Information Miles AADT Truck Pct 0.88 19,028 4.9 0.11 14,400 5.8 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y Y 6 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 29 Location 0.2 MI SE OF JOHNS ST TO 0.2 MI S OF CARDINAL HILL RD Miles = 0.51 Roadway Information Miles AADT Truck Pct 0.45 9,951 11.0 0.06 ILL 29 9,850 10.2 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $800,000 SANGAMON 1 2021-2025 $850,000 SANGAMON 1 2020 $880,000 SANGAMON 1 2020 $2,000,000 CHRISTIAN 1 2021-2025 $2,500,000 CHRISTIAN 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y 0.1 MI S OF CARDINAL HILL RD TO 0.4 MI S OF BRANER RD S OF ROCHESTER Miles = 2.14 EXPERIMENTAL PRESERVATION GRINDING FOG SEAL PRESERVATION - PAVEMENTS ILL 29 0.4 MI S OF BRANER RD S OF ROCHESTER TO 0.7 MI S OF JETT RD S OF BERRY Miles = 2.55 EXPERIMENTAL PRESERVATION GRINDING FOG SEAL PRESERVATION - PAVEMENTS ILL 29 0.2 MI S OF ILL 104 TO W OF MAIN CROSS ST IN TAYLORVILLE Miles = 2.15 Roadway Information Miles AADT Truck Pct 2.15 13,141 6.8 ILL 29 REHABILITATION - PAVEMENTS NHS Y W OF MAIN CROSS ST IN TAYLORVILLE TO S OF VELMA RD S OF TAYLORVILLE Miles = 3.57 Roadway Information Miles AADT Truck Pct 3.57 8,161 6.2 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 6 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 29 Location OVER ILL 48 IN TAYLORVILLE Improvements TAMP Category BRIDGE NEW DECK Est. Cost FLATT BRANCH 0.7 MI SE OF ILL 48 RAMP BRIDGE SUPERSTRUCTURE $1,600,000 S OF VELMA RD S OF TAYLORVILLE TO N OF MAGNOLIA ST IN PANA Miles = 10.63 Roadway Information Miles AADT Truck Pct 10.08 4,242 11.9 0.55 ILL 29 4,050 13.0 DESIGNED OVERLAY ADA IMPROVEMENTS $1,700,000 CHRISTIAN Structure Information Str Number AADT 10,200 0110011 1 2021-2025 Truck Pct NHS 5 Y 1 2021-2025 Truck Pct NHS 5 Y $7,100,000 CHRISTIAN 2 2020 $1,700,000 CHRISTIAN 5 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y LOCUST CREEK TRIB 0.3 MI SE OF MILLERSVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 29 CHRISTIAN Structure Information Str Number AADT 10,200 0110010 REHABILITATION - BRIDGES ILL 29 MYP Years Past Current REHABILITATION - BRIDGES ILL 29 County MAIN DRAINAGE DITCH 1.8 MI NW OF PANA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 6 - 33 Structure Information Str Number AADT 4,050 0110012 $1,800,000 CHRISTIAN Structure Information Str Number AADT 4,050 0110013 Truck Pct NHS 12 Y 1 2021-2025 Truck Pct NHS 12 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 29 Location N OF MAGNOLIA ST TO US 51 (E JACKSON ST) IN PANA Miles = 1.85 Roadway Information Miles AADT Truck Pct 1.27 4,587 13.8 0.58 3,666 ILL 48 11.1 ILL 48 Roadway Information Miles AADT Truck Pct 0.27 500 0.0 5 2021-2025 DESIGNED OVERLAY ADA IMPROVEMENTS $8,900,000 CHRISTIAN 1 2021-2025 STANDARD OVERLAY $1,000,000 MONTGOMERY 1 2021-2025 $760,000 LOGAN 6 2021-2025 $500,000 LOGAN 9 2021-2025 REHABILITATION - PAVEMENTS NHS N 19.7 N 250 0.0 N MCDONALD ST CHRISTIAN REHABILITATION - PAVEMENTS 4,846 ILL 54 $1,500,000 NHS N 0.19 S OF 700TH ST TO S OF ILL 121 Miles = 1.58 Roadway Information Miles AADT Truck Pct 1.58 1,050 21.0 MYP Years Past Current N 0.50 ILL 54 County REHABILITATION - PAVEMENTS AT I-55 INTCHG W OF RAYMOND Miles = 0.96 ILL 127 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS Y 0.9 MI SW OF OLD ILL 48 (SPRESSER ST) SW OF TAYLORVILLE TO MONTGOMERY CO LINE Miles = 15.24 Roadway Information Miles AADT Truck Pct 15.24 2,548 17.3 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N AT MCDONALD ST SE OF MT PULASKI INTERSECTION IMPROVEMENT LEFT TURN LANES RIGHT TURN LANE MISCELLANEOUS IMPROVEMENTS 6 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 54 Location ILL 121 TO SANGAMON CO LINE Miles = 9.12 Roadway Information Miles AADT Truck Pct 9.12 1,512 22.9 ILL 54 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $4,500,000 LOGAN 2 2020 $200,000 LOGAN 1 2020 $60,000 LOGAN 1 2020 $2,400,000 SANGAMON 2 2021-2025 $3,000,000 SANGAMON 15 2021-2025 REHABILITATION - PAVEMENTS NHS N AT CH 1 (1600TH AVE) S OF MT PULASKI INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS ILL 54 LAKE FORK CREEK 2 MI NE OF SANGAMON CO LINE BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES ILL 54 LOGAN CO LINE TO 0.2 MI E OF PRAIRIE SCHOOL RD Miles = 5.25 Roadway Information Miles AADT Truck Pct 5.25 1,825 15.2 ILL 54 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N WOLF CREEK 1.6 MI E OF BARCLAY Miles = 0.26 CULVERT REPLACEMENT VERTICAL REALIGNMENT RECONSTRUCTION - BRIDGES 6 - 35 Structure Information Str Number AADT 2,900 0842002 Truck Pct NHS 19 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 54 Location 0.1 MI W OF PRAIRIE SCHOOL RD TO N OF BISSELL RD IN SPRINGFIELD Miles = 5.44 Roadway Information Miles AADT Truck Pct 5.44 4,504 10.4 ILL 54 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $3,200,000 SANGAMON 1 2021-2025 $2,000,000 SANGAMON 1 2021-2025 $100,000 SANGAMON 1 2021-2025 $1,000,000 ADAMS 1 2021-2025 $4,825,000 ADAMS 16 2020 REHABILITATION - PAVEMENTS NHS N AT MAIN ST IN SPAULDING INTERSECTION RECONSTN LEFT TURN LANES TRAF SIGNAL INSTALLATION RR INTERCONNECT MISCELLANEOUS IMPROVEMENTS ILL 54 AT MAIN ST IN SPAULDING LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 57 ILL 104 (BROADWAY ST) IN QUINCY TO I-172 P.E. (FEASIBILITY STUDY) INITIAL CONSTRUCTION - PAVEMENTS ILL 57 ILL 57 A YORK ST (GRR) ILL 57 (3RD ST): MAINE ST IN QUINCY TO S OF MARBLEHEAD & YORK ST: 3RD ST TO W OF 4TH ST Miles = 7.21 Roadway Information Miles AADT Truck Pct 2.68 6,246 21.7 STANDARD OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS PARKING IMPROVEMENT REHABILITATION - PAVEMENTS NHS Y 4.47 4,304 24.4 Y 0.06 4,350 13.2 Y 6 - 36 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 57 Location PAYSON AVE 0.5 MI S OF US 24 IN QUINCY Improvements TAMP Category BRIDGE NEW DECK BRIDGE APPROACH ROADWAY SLOPEWALL REPAIR Est. Cost CURTIS CREEK 1.6 MI S OF US 24 IN QUINCY BRIDGE NEW DECK BRIDGE REPAIR BRIDGE SUBSTRUCTURE SCOUR MITIGATION $1,150,000 MILL CREEK AT MARBLEHEAD BRIDGE REPLACEMENT $430,000 MILL CREEK AT MARBLEHEAD P.E. (CONSULTANT PLANS) P.E. (PHASE I) ADAMS Structure Information Str Number AADT 4,750 0010013 $3,650,000 RECONSTRUCTION - BRIDGES ILL 57 ADAMS Structure Information Str Number AADT 7,250 0010012 REHABILITATION - BRIDGES ILL 57 MYP Years Past Current REHABILITATION - BRIDGES ILL 57 County ADAMS Structure Information Str Number AADT 4,100 0010015 16 2020 Truck Pct NHS 21 Y 9 2020 Truck Pct NHS 26 Y 4 2021-2025 Truck Pct NHS 18 Y $750,000 ADAMS 1 2020 $250,000 ADAMS 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 57 MILL CREEK AT MARBLEHEAD LAND ACQUISITION RECONSTRUCTION - BRIDGES 6 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 57 Location HASKNESS CREEK AT BLUFF HALL Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost ILL 101 IN AUGUSTA TO MCDONOUGH CO LINE Miles = 5.06 Roadway Information Miles AADT Truck Pct 5.06 1,366 12.5 ILL 61 ILL 101 $1,500,000 ILL 61 Structure Information Str Number AADT 4,250 0010016 1 2021-2025 Truck Pct NHS 16 Y $2,800,000 HANCOCK 3 2021-2025 $4,400,000 HANCOCK 1 2021-2025 $1,700,000 HANCOCK 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N FLOUR CREEK 2.8 MI E OF ILL 94 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 61 ADAMS NHS N ILL 94 IN BOWEN TO SCHUYLER CO LINE Miles = 8.14 Roadway Information Miles AADT Truck Pct 8.14 1,441 11.0 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 61 County BIG NECK CREEK 0.5 MI N OF ILL 94 BRIDGE REPLACEMENT Structure Information Str Number AADT 1,550 0340006 $1,400,000 ADAMS Truck Pct NHS 12 N 1 2021-2025 ILL 94 RECONSTRUCTION - BRIDGES 6 - 38 Structure Information Str Number AADT 700 0010002 Truck Pct NHS 15 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 61 Location BIG NECK CREEK 0.1 MI W OF ILL 94 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost S OF ILLINOIS ST TO N OF IM RR IN HAVANA Miles = 0.82 Roadway Information Miles AADT Truck Pct 0.82 3,193 11.7 ILL 78 STANDARD OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,400,000 RECONSTRUCTION - BRIDGES ILL 78 County ADAMS Structure Information Str Number AADT 850 0010003 4 2021-2025 Truck Pct NHS 5 N $600,000 MASON 1 2021-2025 $450,000 MASON 3 2021-2025 $450,000 MASON 2 2021-2025 MORGAN 1 2021-2025 REHABILITATION - PAVEMENTS NHS N DITCH 0.8 MI S OF WHITE OAK CREEK S OF HAVANA CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 78 DITCH 0.8 MI N OF ELM ST IN BATH CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 78 CASS CO LINE TO 0.3 MI N OF VALEVUE ACRES DR Miles = 5.17 Roadway Information Miles AADT Truck Pct 5.17 2,119 10.4 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 6 - 39 $2,600,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 78 Location SNAKE CREEK 3.6 MI N OF JACKSONVILLE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 0.1 MI N OF OAK ST TO ILL 104 IN JACKSONVILLE Miles = 3.26 Roadway Information Miles AADT Truck Pct 3.26 4,504 9.0 ILL 94 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,500,000 RECONSTRUCTION - BRIDGES ILL 78 County MORGAN Structure Information Str Number AADT 2,500 0690004 $2,600,000 1 2021-2025 Truck Pct NHS 8 N MORGAN 1 2021-2025 $40,000 HANCOCK 1 2020 $1,800,000 HANCOCK 1 2020 $1,500,000 HANCOCK 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ROCK CREEK 2.5 MI N OF CH 29 (FERRIS RD) BRIDGE DECK REPAIRS MAINTENANCE - BRIDGES ILL 94 POWELLTON RD TO 1.1 MI N OF CH 29 (FERRIS RD) Miles = 4.01 Roadway Information Miles AADT Truck Pct 4.01 1,823 18.5 ILL 94 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N SHORT CREEK 3 MI N OF US 136 N OF CARTHAGE BRIDGE (NEW) INITIAL CONSTRUCTION - BRIDGES 6 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 96 Location TYSON CREEK 1.7 MI S OF ILL 9 IN NIOTA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost SHERIDAN CREEK 0.9 MI S OF NAUVOO BRIDGE REPLACEMENT $1,700,000 BEAR CREEK TO S OF BIRCH ST IN URSA Miles = 3.90 Roadway Information Miles AADT Truck Pct 3.90 3,396 7.8 ILL 96 $1,710,000 Structure Information Str Number AADT 1,250 0340020 2021-2025 Truck Pct NHS 2 N 4 2020 Truck Pct NHS 3 N $2,100,000 ADAMS 1 2021-2025 $2,500,000 ADAMS 3 2021-2025 $250,000 ADAMS 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 0.04 3,800 12.5 N 1.35 5,450 13.7 N ILL 96 HANCOCK 1 NHS N US 24 TO N OF KOCHS LN IN QUINCY Miles = 2.45 Roadway Information Miles AADT Truck Pct 1.06 3,430 9.0 DESIGNED OVERLAY HANCOCK Structure Information Str Number AADT 1,850 0340054 RECONSTRUCTION - BRIDGES ILL 96 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 96 County US 24 TO N OF KOCHS LN IN QUINCY P.E. (PHASE II) REHABILITATION - PAVEMENTS 6 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 96 Location US 24 TO N OF KOCHS LN IN QUINCY Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 ADAMS 1 2021-2025 $250,000 ADAMS 1 2021-2025 $880,000 ADAMS 8 2021-2025 $800,000 ADAMS 1 2021-2025 $900,000 ADAMS 1 2021-2025 REHABILITATION - PAVEMENTS ILL 96 US 24 TO N OF KOCHS LN IN QUINCY UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 96 DITCH 1 MI N OF KOCHS LN N OF QUINCY CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES ILL 96 N OF KOCHS LN TO LOCUST ST IN QUINCY Miles = 1.12 Roadway Information Miles AADT Truck Pct 1.12 6,638 10.2 ILL 96 REHABILITATION - PAVEMENTS NHS N LOCUST ST TO SPRING ST IN QUINCY Miles = 0.95 Roadway Information Miles AADT Truck Pct 0.95 8,096 4.8 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 6 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 96 Location VERMONT ST TO S OF ALDO BLVD IN QUINCY Miles = 0.49 Roadway Information Miles AADT Truck Pct 0.49 8,134 4.1 ILL 96 7.3 N 3,050 8.8 N 0.3 MI N OF E CR 800 TO MENARD CO LINE Miles = 4.38 ADAMS 5 2021-2025 DESIGNED OVERLAY ADA IMPROVEMENTS $2,500,000 ADAMS 1 2021-2025 DESIGNED OVERLAY $2,600,000 MASON 1 2021-2025 $1,600,000 MENARD 3 2021-2025 REHABILITATION - PAVEMENTS NHS N N OF WARING RD S OF ATTERBERRY TO C&IM RR N OF PETERSBURG Miles = 3.25 Roadway Information Miles AADT Truck Pct 3.25 2,289 12.4 $2,500,000 REHABILITATION - PAVEMENTS 5,138 ILL 97 MYP Years Past Current NHS N 0.32 Roadway Information Miles AADT Truck Pct 4.38 1,944 13.6 County RECONSTRUCTION - PAVEMENTS 1.82 ILL 97 RECONSTRUCTION ADA IMPROVEMENTS Est. Cost NHS N S OF STATE ST IN QUINCY TO 0.5 MI S OF I-172 Miles = 4.04 Roadway Information Miles AADT Truck Pct 1.90 7,998 4.4 Improvements TAMP Category DESIGNED OVERLAY CULVERT REPAIR REHABILITATION - PAVEMENTS NHS N 6 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 97 Location ILL 97: C&IM RR N OF PETERSBURG TO 0.1 MI N OF LAKE PETERSBURG RD & ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURG Miles = 2.90 ILL 123 Roadway Information Miles AADT Truck Pct 2.48 4,694 6.5 0.42 ILL 97 ILL 123 5,500 4.4 Improvements TAMP Category DESIGNED OVERLAY INTERSECTION RECONSTN BRIDGE JOINT REPLACE/REPAIR CULVERT EXTENSION CULVERT REMOVAL ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $5,200,000 MENARD 10 2021-2025 $700,000 MENARD 1 2020 $250,000 MENARD 4 2021-2025 $500,000 MENARD 3 2021-2025 $1,300,000 MENARD 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N ILL 97: N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD; ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURG P.E. (PHASE II) REHABILITATION - PAVEMENTS ILL 97 ILL 123 N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 97 ILL 123 ILL 97: AT DITCH 0.1 MI S OF LINCOLN TRAIL RD & KELLY ST N OF PETERSBURG TO C&IM RR; ILL 123: VILLAGE GREEN RD (W INT) TO 0.7 MI E NEW SHOULDERS MAINTENANCE - PAVEMENTS ILL 97 ILL 123 0.1 MI N OF LAKE PETERSBURG RD TO N OF BOY SCOUT RD Miles = 2.13 Roadway Information Miles AADT Truck Pct 2.13 4,916 10.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 6 - 44 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 97 ILL 123 Location N OF BOY SCOUT RD TO SANGAMON CO LINE Miles = 5.65 Roadway Information Miles AADT Truck Pct 5.65 4,325 2.5 ILL 97 ILL 97 ILL 125 ILL 97 County MYP Years Past Current $3,300,000 MENARD 1 2021-2025 $4,300,000 SANGAMON 1 2021-2025 $19,000,000 SANGAMON 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD Miles = 2.19 Roadway Information Miles AADT Truck Pct 2.19 9,287 5.0 DESIGNED OVERLAY Est. Cost NHS N MENARD CO LINE TO ILL 125 Miles = 5.09 Roadway Information Miles AADT Truck Pct 5.09 4,671 4.1 Improvements TAMP Category RECONSTRUCTION BRIDGE REPLACEMENT INTERSECTION RECONSTN BRIDGE (NEW) RECONSTRUCTION - PAVEMENTS Structure Information Str Number AADT 10,050 0840046 NHS N 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD ARCHAEOLOGICAL SURVEY Truck Pct NHS 4 N $100,000 SANGAMON 1 2021-2025 $4,700,000 SANGAMON 1 2021-2025 ILL 125 RECONSTRUCTION - PAVEMENTS ILL 97 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD LAND ACQUISITION ILL 125 RECONSTRUCTION - PAVEMENTS 6 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 97 Location 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $2,150,000 SANGAMON 1 2021-2025 $1,000,000 SANGAMON 1 2021-2025 $13,000,000 SANGAMON 1 2021-2025 $23,000,000 SANGAMON 1 2021-2025 $150,000 SANGAMON 1 2021-2025 ILL 125 RECONSTRUCTION - PAVEMENTS ILL 97 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD CONSTRUCTION ENGINEERING ILL 125 RECONSTRUCTION - PAVEMENTS ILL 97 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD Miles = 0.01 ILL 125 ADDITIONAL LANES BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS ILL 97 JEFFERSON ST CH 17 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD Miles = 4.28 Roadway Information Miles AADT Truck Pct 1.05 10,050 4.7 2.04 10,062 ILL 97 ILL 125 4.7 RECONSTRUCTION BRIDGE REMOVAL/DEMOLITION PEDESTRIAN OVERPASS RECONSTRUCTION - PAVEMENTS NHS N N COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD ARCHAEOLOGICAL SURVEY JEFFERSON ST RECONSTRUCTION - PAVEMENTS 6 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 97 JEFFERSON ST Location COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $5,400,000 SANGAMON 1 2021-2025 $2,500,000 SANGAMON 1 2021-2025 $2,500,000 SANGAMON 1 2021-2025 $13,000,000 SANGAMON 1 2021-2025 BROWN 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 97 JEFFERSON ST COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 97 JEFFERSON ST COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 97 JEFFERSON ST CH 17 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS ILL 99 SCHUYLER CO LINE TO 0.4 MI N OF MOUNT STERLING Miles = 7.32 Roadway Information Miles AADT Truck Pct 7.32 620 15.5 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 6 - 47 $3,700,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 99 Location 0.1 MI N OF VERSAILLES TO MCKEE DRAINAGE DITCH N OF ILL 104 Miles = 6.40 Roadway Information Miles AADT Truck Pct 5.69 1,783 19.9 0.71 ILL 100 1,850 17.3 ILL 100 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost MYP Years Past Current $4,300,000 BROWN PIKE 3 2021-2025 $4,400,000 SCHUYLER 2 2020 $2,400,000 SCHUYLER 2 2021-2025 REHABILITATION - PAVEMENTS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N ILLINOIS RIVER TRIBUTARIES E OF BROWNING BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 100 County NHS N DUTCHMAN'S CREEK AT ECL OF BROWNING TO 0.4 MI S OF FULTON CO LINE Miles = 8.81 Roadway Information Miles AADT Truck Pct 8.81 573 30.2 Improvements TAMP Category ILLINOIS RIVER BRIDGE AT FLORENCE ILL 106 BRIDGE DECK REPAIRS BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. MAINTENANCE - BRIDGES 6 - 48 Structure Information Str Number AADT 550 0850008 550 0850010 550 0850011 $1,800,000 SCOTT Truck Pct NHS 27 N 27 N 27 N 4 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 100 Location ILLINOIS RIVER BRIDGE AT FLORENCE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $77,000,000 SCOTT 1 2021-2025 ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 100 ILLINOIS RIVER BRIDGE AT FLORENCE ARCHAEOLOGICAL SURVEY Structure Information Str Number AADT 1,500 0860001 Truck Pct NHS 7 N $325,000 SCOTT 1 2021-2025 $3,850,000 SCOTT 1 2020 $700,000 SCOTT 1 2020 $350,000 SCOTT 1 2021-2025 ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 100 ILLINOIS RIVER BRIDGE AT FLORENCE P.E. (CONSULTANT PLANS) ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 100 ILLINOIS RIVER BRIDGE AT FLORENCE LAND ACQUISITION ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 100 ILLINOIS RIVER BRIDGE AT FLORENCE UTILITY ADJUSTMENT ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 6 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 100 Location ILLINOIS RIVER BRIDGE AT FLORENCE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $2,000,000 SCOTT 1 2021-2025 $2,600,000 SCHUYLER 2 2021-2025 $3,700,000 SCHUYLER 2 2021-2025 $5,500,000 ADAMS 3 2021-2025 $5,100,000 ADAMS PIKE 1 2021-2025 ILL 106 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 101 0.2 MI W OF FREEMAN MINE RD TO US 67 Miles = 5.71 Roadway Information Miles AADT Truck Pct 5.71 444 13.3 ILL 103 ILL 104 11,700 ILL 104 9.0 9.14 REHABILITATION - PAVEMENTS 625 44.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 0.2 MI W OF FISHHOOK CREEK TO ILL 107 Miles = 10.96 Roadway Information Miles AADT Truck Pct 1.82 625 19.2 DESIGNED OVERLAY NHS N 14TH ST IN QUINCY TO 0.4 MI E OF I-172 Miles = 4.00 Roadway Information Miles AADT Truck Pct 3.79 22,560 5.3 0.21 REHABILITATION - PAVEMENTS NHS N US 24 TO 1.7 MI W OF US 67 Miles = 7.39 Roadway Information Miles AADT Truck Pct 7.39 1,364 11.5 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 6 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 104 Location 0.4 MI W OF ILL 78/104 JCT NW OF JACKSONVILLE TO MORTON AVE IN JACKSONVILLE Miles = 2.45 Roadway Information Miles AADT Truck Pct 2.45 2,669 9.7 ILL 104 ILL 104 ILL 104 County MYP Years Past Current $1,500,000 MORGAN 1 2021-2025 $150,000 MORGAN 1 2020 $1,500,000 MORGAN 3 2021-2025 $200,000 MORGAN 3 2020 $100,000 MORGAN 3 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 3,100 7.4 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS N 0.1 MI W TO 0.1 MI E OF GATEWAY WESTERN RR BRIDGE Miles = 0.12 Roadway Information Miles AADT Truck Pct 0.12 2,000 13.3 Improvements TAMP Category STANDARD OVERLAY SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS N WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 104 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 6 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 104 Location DITCH 1.9 MI W OF ILL 4 Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $625,000 SANGAMON 3 2021-2025 $1,300,000 PIKE 3 2021-2025 $4,100,000 PIKE 1 2021-2025 $1,200,000 MACOUPIN 6 2021-2025 $200,000 MACOUPIN 3 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 106 1.1 MI E OF E BRANCH KISER CREEK TO US 54 W OF PITTSFIELD Miles = 2.52 Roadway Information Miles AADT Truck Pct 2.52 1,688 9.8 ILL 107 ILL 108 ILL 108 2,630 16.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE Miles = 0.97 Roadway Information Miles AADT Truck Pct 0.30 1,850 5.4 0.67 REHABILITATION - PAVEMENTS NHS N 0.2 MI N OF ILL 104 TO WALL ST IN GRIGGSVILLE Miles = 7.86 Roadway Information Miles AADT Truck Pct 7.86 1,970 15.9 DESIGNED OVERLAY DESIGNED OVERLAY SHOULDER RECONSTRUCTION DRAINAGE STORM SEWER REPAIR GUARDRAIL REHABILITATION - PAVEMENTS NHS N N 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE LAND ACQUISITION REHABILITATION - PAVEMENTS 6 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 108 Location 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 MACOUPIN 3 2021-2025 $1,700,000 MACOUPIN 2 2021-2025 $5,300,000 MACOUPIN 1 2021-2025 $1,100,000 MONTGOMERY 1 2020 $1,950,000 HANCOCK 1 2020 REHABILITATION - PAVEMENTS ILL 108 0.1 MI E ALTON RD IN CARLINVILLE TO ILL 4 AT W SIDE OF CARLINVILLE SQUARE Miles = 0.30 Roadway Information Miles AADT Truck Pct 0.30 8,050 7.8 ILL 108 RECONSTRUCTION - PAVEMENTS NHS N ILL 4 (S) IN CARLINVILLE TO MONTGOMERY CO LINE Miles = 9.01 Roadway Information Miles AADT Truck Pct 9.01 2,524 12.1 ILL 108 REHABILITATION - PAVEMENTS REHABILITATION - PAVEMENTS 1,200 9.2 N 0.12 1,150 3.2 N ILL 336 DESIGNED OVERLAY MEDIAN REPAIR LIGHTING NHS N 0.27 ILL 110 DESIGNED OVERLAY NHS N AT I-55 INTCHG Miles = 0.97 Roadway Information Miles AADT Truck Pct 0.49 2,723 11.2 RECONSTRUCTION PARKING IMPROVEMENT ADA IMPROVEMENTS 3.1 MI S OF CARTHAGE TO 0.8 MI N OF WEST POINT RD Miles = 7.27 CAPE SEAL GRINDING FOG SEAL PRESERVATION - PAVEMENTS 6 - 53 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 111 Location APPLE CREEK 2.1 MI S OF ILL 104 IN WAVERLY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost JERSEY CO LINE TO ILL 16 Miles = 5.19 ILL 267 Roadway Information Miles AADT Truck Pct 5.19 3,623 14.4 ILL 111 $1,600,000 Roadway Information Miles AADT Truck Pct 0.04 4,150 13.7 5.66 ILL 111 4,585 18.9 MORGAN Structure Information Str Number AADT 1,950 0690023 1 2021-2025 Truck Pct NHS 17 N $3,000,000 MACOUPIN 1 2021-2025 $3,400,000 MACOUPIN 1 2021-2025 $1,700,000 MACOUPIN 22 2021-2025 REHABILITATION - PAVEMENTS NHS N N OF ILL 16 TO JERSEY CO LINE IN BRIGHTON Miles = 5.70 ILL 267 DESIGNED OVERLAY MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 111 County DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N Y PIASA CREEK 0.2 MI S OF ILL 16 BRIDGE REPLACEMENT ILL 267 RECONSTRUCTION - BRIDGES ILL 111 LITTLE PIASA CREEK 3.7 MI S OF ILL 16 BRIDGE REPLACEMENT Structure Information Str Number AADT 4,400 0590017 $1,600,000 MACOUPIN Truck Pct NHS 12 Y 22 2021-2025 ILL 267 RECONSTRUCTION - BRIDGES 6 - 54 Structure Information Str Number AADT 4,450 0590019 Truck Pct NHS 23 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 111 Location LITTLE PIASA CREEK 4 MI S OF ILL 16 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,600,000 MACOUPIN 22 2021-2025 ILL 267 RECONSTRUCTION - BRIDGES ILL 121 S OF PULASKI ST IN LINCOLN TO 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING) Miles = 3.91 Roadway Information Miles AADT Truck Pct 3.91 3,834 35.2 ILL 121 ILL 121 ILL 121 MCDONALD ST $2,700,000 LOGAN 1 2021-2025 $4,100,000 LOGAN 1 2021-2025 $500,000 LOGAN 3 2021-2025 $1,000,000 LOGAN 9 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 0.1 MI S OF IC RR IN MT PULASKI TO ILL 54 Miles = 0.60 Roadway Information Miles AADT Truck Pct 0.60 3,500 27.1 Truck Pct NHS 23 Y NHS Y 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING) TO 0.1 MI S OF IC RR IN MT PULASKI Miles = 6.12 Roadway Information Miles AADT Truck Pct 6.12 3,628 37.4 DESIGNED OVERLAY Structure Information Str Number AADT 4,450 0590020 DESIGNED OVERLAY SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP REHABILITATION - PAVEMENTS NHS Y AT MCDONALD ST SE OF MT PULASKI INTERSECTION IMPROVEMENT LEFT TURN LANES RIGHT TURN LANE MISCELLANEOUS IMPROVEMENTS 6 - 55 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 121 Location AT MCDONALD ST SE OF MT PULASKI Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $200,000 LOGAN 7 2021-2025 $100,000 LOGAN 6 2021-2025 $2,500,000 LOGAN 12 2021-2025 MCDONALD ST MISCELLANEOUS IMPROVEMENTS ILL 121 AT MCDONALD ST SE OF MT PULASKI UTILITY ADJUSTMENT MCDONALD ST MISCELLANEOUS IMPROVEMENTS ILL 121 UNDER ILL 54 AT SCL OF MT PULASKI BRIDGE NEW DECK BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES ILL 123 RICHLAND CREEK 0.6 MI N OF ILL 125 Miles = 0.18 BRIDGE REPLACEMENT VERTICAL REALIGNMENT Structure Information Str Number AADT 1,050 0540030 $1,600,000 RECONSTRUCTION - BRIDGES ILL 123 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55 Miles = 6.09 Roadway Information Miles AADT Truck Pct 6.09 2,507 9.2 ILL 123 DESIGNED OVERLAY SHOULDER RECONSTRUCTION SANGAMON Structure Information Str Number AADT 1,150 0840090 Truck Pct NHS 20 N 14 2021-2025 Truck Pct NHS 11 N $4,200,000 SANGAMON 8 2021-2025 $500,000 SANGAMON 2 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 29 E OF ATHENS TO 0.6 MI W OF I-55 LAND ACQUISITION REHABILITATION - PAVEMENTS 6 - 56 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 123 Location ILL 29 E OF ATHENS TO 0.6 MI W OF I-55 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $200,000 SANGAMON 2 2021-2025 $1,365,000 SANGAMON 3 2020 REHABILITATION - PAVEMENTS ILL 123 E OF ILL 29 TO 0.3 MI E Miles = 0.36 CULVERT REPLACEMENT CULVERT (NEW) VERTICAL REALIGNMENT STANDARD OVERLAY RELOCATION CULVERT REMOVAL MISCELLANEOUS RECONSTRUCTION - BRIDGES ILL 123 FANCY CREEK 2.7 MI E OF ILL 29 BRIDGE REPLACEMENT Structure Information Str Number AADT 2,700 0847099 $2,200,000 RECONSTRUCTION - BRIDGES ILL 123 E OF WEST OUTER RD TO W OF OLD US 66 IN WILLIAMSVILLE Miles = 0.53 Roadway Information Miles AADT Truck Pct 0.25 5,650 19.5 0.28 ILL 125 5,700 9.5 STANDARD OVERLAY PATCHING SANGAMON Structure Information Str Number AADT 2,650 0840097 Truck Pct NHS 7 N 9 2021-2025 Truck Pct NHS 7 N $400,000 SANGAMON 1 2020 $900,000 CASS 2 2021-2025 PRESERVATION - PAVEMENTS NHS N N OVER BNSF RR IN BEARDSTOWN BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 6 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 125 Location US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RD Improvements TAMP Category NEW SHOULDERS SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP Est. Cost County MYP Years Past Current $700,000 CASS 2 2021-2025 $5,000,000 CASS 5 2021-2025 $3,700,000 MACOUPIN 2 2021-2025 $900,000 MACOUPIN 7 2020 $2,000,000 MACOUPIN 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 125 ILL 125: 0.2 MI E OF S BLUFF SPRINGS RD TO 0.1 MI SE OF ILL 78 IN VIRGINIA & ILL 78: 0.1 MI NE TO 0.1 MI SW OF ILL 125 Miles = 8.00 ILL 78 Roadway Information Miles AADT Truck Pct 7.87 3,950 16.4 0.13 ILL 138 3,281 7.8 ILL 138 N REHABILITATION - PAVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS PARKING IMPROVEMENT REHABILITATION - PAVEMENTS NHS N NORTH ST TO ALTON ST IN BUNKER HILL Miles = 0.99 Roadway Information Miles AADT Truck Pct 0.99 3,535 14.0 DESIGNED OVERLAY ADA IMPROVEMENTS NHS N ILL 4 TO 8TH ST IN BENLD Miles = 0.72 Roadway Information Miles AADT Truck Pct 0.72 3,646 6.8 ILL 159 REHABILITATION - PAVEMENTS NHS N ILL 159 TO MT CLARE RD Miles = 6.88 Roadway Information Miles AADT Truck Pct 6.88 1,218 7.0 DESIGNED OVERLAY SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP DESIGNED OVERLAY STORM SEWER (NEW) CURB AND GUTTER PARKING IMPROVEMENT ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 6 - 58 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street ILL 159 Location NORTH ST TO ALTON ST IN BUNKER HILL Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $450,000 MACOUPIN 1 2021-2025 $300,000 MACOUPIN 1 2021-2025 $150,000 MACOUPIN 1 2021-2025 $100,000 MACOUPIN 7 2021-2025 $3,400,000 MORGAN 1 2021-2025 $3,100,000 MORGAN 1 2021-2025 REHABILITATION - PAVEMENTS ILL 159 NORTH ST TO ALTON ST IN BUNKER HILL LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 159 NORTH ST TO ALTON ST IN BUNKER HILL UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 159 AT ALTON ST IN BUNKER HILL DRAINAGE MISCELLANEOUS IMPROVEMENTS ILL 267 S OF I-72 TO 1.4 MI S OF WOODSON Miles = 5.30 Roadway Information Miles AADT Truck Pct 5.30 4,194 17.0 ILL 267 REHABILITATION - PAVEMENTS NHS N 1.4 MI S OF WOODSON TO GREENE CO LINE Miles = 6.40 Roadway Information Miles AADT Truck Pct 6.40 2,345 18.6 DESIGNED OVERLAY NEW SHOULDERS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 6 - 59 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street BROWN ST E DIVERNON RD Location E OF STATE ST IN DIVERNON TO 0.1 MI E OF SULLIVAN RD Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.23 775 24.5 0.42 2,529 DIRKSEN PKWY 3.6 DIRKSEN PKWY E LAKE SHORE DR HORSE FARM RD OLD ROUTE 66 0.38 900 0.0 $600,000 SANGAMON 1 2021-2025 DESIGNED OVERLAY ADA IMPROVEMENTS $2,700,000 SANGAMON 1 2021-2025 $2,400,000 SANGAMON 4 2021-2025 $775,000 SANGAMON 1 2020 $630,000 SANGAMON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N AT I-55 INTCHG E OF GLENARM Miles = 0.73 Roadway Information Miles AADT Truck Pct 0.35 680 0.0 MYP Years Past Current N W OF HUNT RD TO 0.6 MI N OF CHATHAM RD Miles = 0.73 Roadway Information Miles AADT Truck Pct 0.73 4,601 5.2 County REHABILITATION - PAVEMENTS 0.1 MI N OF STEVENSON DR TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELD Miles = 1.88 Roadway Information Miles AADT Truck Pct 1.88 12,934 8.7 DESIGNED OVERLAY Est. Cost NHS N PEORIA RD TO N OF NORTHFIELD DR IN SPRINGFIELD Miles = 1.83 Roadway Information Miles AADT Truck Pct 1.83 14,997 6.7 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 6 - 60 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street I 55 E FR RD Location W WAGGONER AVE E OF WAGGONER TO MORRISONVILLE AVE S OF FARMERSVILLE Miles = 3.01 Roadway Information Miles AADT Truck Pct 3.01 125 0.0 I 55 W FR RD I 55 W FR RD OLD US 66 LINCOLN TRAIL 0.74 1,849 MACARTHUR BLVD 38.8 $1,200,000 MONTGOMERY 1 2021-2025 DESIGNED OVERLAY $2,300,000 MONTGOMERY 1 2021-2025 LOGAN 1 2021-2025 $1,100,000 CHRISTIAN 1 2021-2025 $15,000,000 SANGAMON 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY $900,000 REHABILITATION - PAVEMENTS NHS N DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD Miles = 1.49 Roadway Information Miles AADT Truck Pct 1.49 20,760 6.4 MYP Years Past Current NHS N E OF ILL 48 TO CH 6 (1350N RD) Miles = 2.41 Roadway Information Miles AADT Truck Pct 1.67 2,500 46.6 County RECONSTRUCTION - PAVEMENTS 1.4 MI N OF I-55 N OF LINCOLN TO KICKAPOO CREEK Miles = 1.98 Roadway Information Miles AADT Truck Pct 1.98 3,250 10.8 RECONSTRUCTION Est. Cost NHS N W WAGGONER AVE E OF WAGGONER TO 0.1 MI S OF MACOUPIN CREEK S OF FARMERSVILLE Miles = 4.08 Roadway Information Miles AADT Truck Pct 4.08 520 5.4 Improvements TAMP Category RECONSTRUCTION TRAF SIGNAL REPLACEMENT ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS Y 6 - 61 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street MACARTHUR BLVD Location WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $2,500,000 SANGAMON 1 2020 $11,000,000 SANGAMON 1 2021-2025 $1,000,000 SANGAMON 1 2021-2025 $1,000,000 SANGAMON 1 2021-2025 $260,000 CHRISTIAN 1 2021-2025 $150,000 LOGAN 9 2021-2025 RECONSTRUCTION - PAVEMENTS MACARTHUR BLVD WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD LAND ACQUISITION RECONSTRUCTION - PAVEMENTS MACARTHUR BLVD WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS MACARTHUR BLVD WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS MCADAM DR ILL 48 TO ILL 29 IN TAYLORVILLE Miles = 0.57 Roadway Information Miles AADT Truck Pct 0.57 2,582 0.0 MCDONALD ST REHABILITATION - PAVEMENTS NHS N ILL 54 TO ILL 121 IN MT PULASKI Miles = 0.32 Roadway Information Miles AADT Truck Pct 0.32 1,300 22.3 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 6 - 62 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street OLD ILL 29 Location S OF ILL 123 TO 0.2 MI S Improvements TAMP Category BIT SURFACE TREATMENT-A2 BASE Est. Cost County MYP Years Past Current $65,000 SANGAMON 1 2020 SCOTT 1 2021-2025 MAINTENANCE - PAVEMENTS OLD US 36 WALNUT CREEK 1 MI N OF WINCHESTER BRIDGE REPLACEMENT $1,650,000 RECONSTRUCTION - BRIDGES OLD US 36 DITCH 1.7 MI NE OF I-72 W OF RIGGSTON CULVERT REPLACEMENT DITCH CLEANING Structure Information Str Number AADT 3,350 0860004 $450,000 Truck Pct NHS 13 N SCOTT 4 2021-2025 $1,300,000 MONTGOMERY 1 2021-2025 $1,400,000 MONTGOMERY 1 2021-2025 MISCELLANEOUS IMPROVEMENTS OLD US 66 ILL 127 TO ILL 108 E OF I-55 Miles = 3.34 Roadway Information Miles AADT Truck Pct 3.34 571 0.0 OLD US 66 0.85 REHABILITATION - PAVEMENTS NHS N 3.5 MI N OF FARMERSVILLE TO E OF FARMERSVILLE E OF I-55 Miles = 3.52 Roadway Information Miles AADT Truck Pct 2.67 25 0.0 25 0.0 DESIGNED OVERLAY DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 6 - 63 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street OLD US 66 Location SANGAMON CO LINE TO 1.7 MI S Miles = 1.71 Roadway Information Miles AADT Truck Pct 1.71 25 0.0 STEVENSON DR E LAKE SHORE DR DIRKSEN PKWY County MYP Years Past Current $700,000 MONTGOMERY 1 2021-2025 SANGAMON 4 2021-2025 ADAMS MORGAN 1 2021-2025 ADAMS CHRISTIAN BROWN CASS HANCOCK MASON MENARD MORGAN SCHUYLER 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS SIDEWALKS $5,700,000 REHABILITATION - PAVEMENTS NHS Y 1.60 18,204 7.8 0.29 17,600 2.2 Y 0.15 17,600 2.2 N VARIOUS DESIGNED OVERLAY Est. Cost NHS N STEVENSON DR: 0.1 MI E OF I-55 BUS (6TH ST) TO SPAULDING BRIDGE 0.3 MI E OF I-55 & DIRKSEN PKWY: STEVENSON DR TO 0.1 MI N (IN SPRINGFIELD) Miles = 2.19 Roadway Information Miles AADT Truck Pct 0.15 20,893 11.2 Improvements TAMP Category Y BRIDGE DECK SEALING BRIDGE DECK SEALING $85,000 PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES 6 - 64 $415,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street VARIOUS Location BRIDGE DECK SEALING Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $500,000 1 2021-2025 PRESERVATION - BRIDGES VARIOUS MISCELLANEOUS RAILROAD ENGINEERING RR ENGINEERING $50,000 DISTRICT-WIDE 1 2020 $2,000,000 DISTRICT-WIDE 1 2020 $30,000,000 DISTRICT-WIDE 1 2021-2025 $28,000,000 DISTRICT-WIDE 1 2021-2025 BROWN SCHUYLER 2 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS BRIDGE DECK OVERLAY PRESERVATION - BRIDGES VARIOUS PAVEMENT PRESERVATION MICROSURFACING 1 PASS MISCELLANEOUS PRESERVATION - PAVEMENTS VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS PRESERVATION - BRIDGES VARIOUS VARIOUS LOCATIONS IN MOUNT STERLING & CAMDEN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 6 - 65 $400,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION Improvements TAMP Category MICROSURFACING 1 PASS GRINDING Est. Cost County MYP Years Past Current $3,980,000 DISTRICT-WIDE 2 2021-2025 $318,000 VARIOUS PIKE SCOTT 5 2020 $182,000 VARIOUS PIKE SCOTT CASS 1 2020 $1,919,000 DISTRICT-WIDE 7 2020 $18,805,000 DISTRICT-WIDE 6 2021-2025 $500,000 DISTRICT-WIDE 6 2020 PRESERVATION - PAVEMENTS VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS 6 - 66 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street VARIOUS Location DISTRICT MISCELLANEOUS Improvements TAMP Category MISCELLANEOUS PROJECTS Est. Cost County MYP Years Past Current $500,000 DISTRICT-WIDE 4 2021-2025 $500,000 DISTRICT-WIDE 2 2021-2025 $250,000 DISTRICT-WIDE 6 2020 $2,000,000 DISTRICT-WIDE 1 2021-2025 $480,000 DISTRICT-WIDE 5 2020 $500,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 6 - 67 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street VARIOUS Location MISCELLANEOUS LAND ACQUISITION Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $4,500,000 DISTRICT-WIDE 1 2021-2025 $2,500,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 4 2020 $500,000 DISTRICT-WIDE 6 2020 $2,250,000 DISTRICT-WIDE 1 2020 $9,750,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS LAND ACQUISITION & DESIGN SURVEYS P.E. (ROW) P.E. SURVEYS (ROW) P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS SOIL BORINGS & PAVEMENT CORINGS P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS 6 - 68 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 6 State Highways Route / Street WARSAW SPUR Location CEDAR GLEN CREEK 0.7 MI W OF ILL 96 Improvements TAMP Category BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 6 - 69 Est. Cost County MYP Years Past Current $1,400,000 HANCOCK Structure Information Str Number AADT 1,650 0340043 1 2021-2025 Truck Pct NHS 18 N DISTRICT 6 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street 5TH ST 6TH ST Location AT NORFOLK SOUTHERN RR S OF BROAD PL IN SPRINGFIELD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $30,410,000 SANGAMON 1 2020 $2,500,000 LOGAN 3 2021-2025 $160,000 LOGAN 3 2021-2025 SANGAMON 4 2021-2025 SANGAMON 4 2021-2025 SANGAMON 2 2020 RECONSTRUCTION - BRIDGES 5TH ST 1550TH ST LINCOLN QUARRY RD TO I-55 Miles = 2.44 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 5TH ST LINCOLN QUARRY RD TO I-55 CONSTRUCTION ENGINEERING 1550TH ST RECONSTRUCTION - PAVEMENTS 8TH ST AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD BRIDGE REPLACEMENT $1,000,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 8TH ST AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD CONSTRUCTION ENGINEERING $120,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES ARCHER ELEVATOR RD 0.1 MI N OF GREENBRIAR RD TO 0.2 MI N OF ILES AVE & N OF FIELD LN TO YUCAN DR IN SPRINGFIELD Miles = 0.91 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 6 - 70 $3,876,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 1 Location 200TH ST TO SANGAMON CO LINE ILLIOPOLIS BLKTP Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $56,000 LOGAN 1 2020 $850,000 LOGAN 1 2021-2025 $54,000 LOGAN 1 2021-2025 $158,000 BROWN 3 2021-2025 $212,000 BROWN 2 2021-2025 1600TH AVE REHABILITATION - PAVEMENTS CH 1 ILLIOPOLIS BLKTP 200TH ST TO SANGAMON CO LINE Miles = 2.00 STANDARD OVERLAY 1600TH AVE REHABILITATION - PAVEMENTS CH 1 200TH ST TO SANGAMON CO LINE CONSTRUCTION ENGINEERING ILLIOPOLIS BLKTP 1600TH AVE REHABILITATION - PAVEMENTS CH 3 CH 11 CH 3: US 24 TO 1400 E RD AND 1400 E RD TO 1600 E ST; CH 11: 825 N AVE TO ILL 99 Miles = 10.80 BIT SURFACE TREATMENT-A3 PRESERVATION - PAVEMENTS CH 3 CH 12 1600 E RD TO ECL OF VERSAILLES Miles = 12.91 BIT SURFACE TREATMENT-A1 LAGRANGE RD PRESERVATION - PAVEMENTS 6 - 71 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 4 Location SCL OF FOREST CITY TO US 136 Miles = 4.32 Improvements TAMP Category CAPE SEAL Est. Cost County MYP Years Past Current $340,000 MASON 5 2021-2025 $500,000 CASS 2 2020 $40,000 CASS 2 2020 $2,000,000 HANCOCK 3 2021-2025 $1,100,000 LOGAN 4 2020 $70,000 LOGAN 4 2020 PRESERVATION - PAVEMENTS CH 4 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE BRIDGE REPLACEMENT NEWMANSVILLE RD RECONSTRUCTION - BRIDGES CH 4 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE CONSTRUCTION ENGINEERING NEWMANSVILLE RD RECONSTRUCTION - BRIDGES CH 6 BENTLEY RD AT LA MOINE RIVER 0.3 MI W OF MCDONOUGH CO LINE BRIDGE REHABILITATION REHABILITATION - BRIDGES CH 6 AT SALT CREEK 2 MI N OF CHESTNUT BRIDGE NEW DECK BEASON RD REHABILITATION - BRIDGES CH 6 AT SALT CREEK 2 MI N OF CHESTNUT CONSTRUCTION ENGINEERING BEASON RD REHABILITATION - BRIDGES 6 - 72 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 6 Location OVER ABANDONED RR IN PETERSBURG Improvements TAMP Category BRIDGE REMOVAL/DEMOLITION Est. Cost County MYP Years Past Current $450,000 MENARD 2 2020 $24,000 MENARD 2 2020 $200,000 ADAMS 4 2021-2025 $700,000 CASS 13 2021-2025 $60,000 CASS 4 2021-2025 $730,000 CASS 13 2021-2025 DOUGLAS AVE MISCELLANEOUS IMPROVEMENTS CH 6 OVER ABANDONED RR IN PETERSBURG CONSTRUCTION ENGINEERING DOUGLAS AVE MISCELLANEOUS IMPROVEMENTS CH 7 BOTTOM RD (GRR) N 1850TH AVE TO WESTPOINT PLEASANT RD Miles = 2.34 CAPE SEAL PRESERVATION - PAVEMENTS CH 7 CHANDLERVILLE RD N BLUFF SPRINGS RD TO HICKORY RD Miles = 4.94 DESIGNED OVERLAY REHABILITATION - PAVEMENTS CH 7 N BLUFF SPRINGS RD TO HICKORY RD CONSTRUCTION ENGINEERING CHANDLERVILLE RD REHABILITATION - PAVEMENTS CH 7 CHANDLERVILLE RD HICKORY RD TO ILL 78 Miles = 4.42 DESIGNED OVERLAY REHABILITATION - PAVEMENTS 6 - 73 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 7 Location HICKORY RD TO ILL 78 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $60,000 CASS 4 2021-2025 MONTGOMERY 10 2020 $625,000 CASS 2 2021-2025 $50,000 CASS 2 2021-2025 $510,000 CASS 2 2021-2025 $48,000 CASS 2 2021-2025 CHANDLERVILLE RD REHABILITATION - PAVEMENTS CH 7 TAYLORVILLE RD CHRISTIAN CO LINE TO NOKOMIS BLKTP Miles = 2.98 DESIGNED OVERLAY $1,800,000 REHABILITATION - PAVEMENTS CH 8 ARENZVILLE RD ILL 125 TO 0.3 MI S OF PINE ST Miles = 0.85 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 8 ILL 125 TO 0.3 MI S OF PINE ST CONSTRUCTION ENGINEERING ARENZVILLE RD REHABILITATION - PAVEMENTS CH 8 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN BRIDGE REPLACEMENT ARENZVILLE RD RECONSTRUCTION - BRIDGES CH 8 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN CONSTRUCTION ENGINEERING ARENZVILLE RD RECONSTRUCTION - BRIDGES 6 - 74 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 8 Location 900 E RD TO SCHUYLER CO LINE Miles = 2.09 Improvements TAMP Category BIT SURFACE TREATMENT-A3 Est. Cost County MYP Years Past Current $548,000 BROWN 4 2020 $28,000 BROWN 4 2020 $500,000 CASS 2 2021-2025 $40,000 CASS 2 2021-2025 MONTGOMERY 4 2021-2025 MONTGOMERY 1 2021-2025 PRESERVATION - PAVEMENTS CH 8 900 E RD TO SCHUYLER CO LINE CONSTRUCTION ENGINEERING PRESERVATION - PAVEMENTS CH 9 AT MUD CREEK 1 MI W OF ARENZVILLE BRIDGE REPLACEMENT ARENZVILLE RD RECONSTRUCTION - BRIDGES CH 9 AT MUD CREEK 1 MI W OF ARENZVILLE CONSTRUCTION ENGINEERING ARENZVILLE RD RECONSTRUCTION - BRIDGES CH 9 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN BRIDGE REPLACEMENT $1,600,000 RED BALL TRAIL ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 9 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN CONSTRUCTION ENGINEERING $77,000 RED BALL TRAIL ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 6 - 75 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 11 MAIN ST Location W OF WCL OF BASCO TO E OF WASHINGTON ST Miles = 0.51 Improvements TAMP Category DESIGNED OVERLAY DRAINAGE SIDEWALKS Est. Cost County MYP Years Past Current $800,000 HANCOCK 4 2021-2025 $500,000 ADAMS 4 2021-2025 $700,000 CHRISTIAN 1 2021-2025 MONTGOMERY 9 2021-2025 MONTGOMERY 2 2021-2025 REHABILITATION - PAVEMENTS CH 11 E 2300TH ST ILL 61/94 TO N 2400TH AVE Miles = 2.01 DESIGNED OVERLAY REHABILITATION - PAVEMENTS CH 11 N 1800TH RD TO ILL 104 Miles = 1.55 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 11 WALSHVILLE TRAIL AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBORO Miles = 0.48 BRIDGE REPLACEMENT RECONSTRUCTION $2,000,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 11 WALSHVILLE TRAIL AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBORO CONSTRUCTION ENGINEERING $101,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 6 - 76 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 12 Location AT MAUVAISE TERRE CREEK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,525,000 SCOTT 1 2021-2025 SCOTT 1 2021-2025 $750,000 LOGAN 2 2021-2025 $48,000 LOGAN 2 2021-2025 $2,500,000 CHRISTIAN 4 2020 $115,000 CHRISTIAN 4 2020 CHAPIN RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 12 AT MAUVAISE TERRE CREEK CONSTRUCTION ENGINEERING $130,000 CHAPIN RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 12 AT LAKE FORK CREEK 1 MI E OF BROADWELL BRIDGE REPLACEMENT BROADWELL RD RECONSTRUCTION - BRIDGES CH 12 AT LAKE FORK CREEK 1 MI E OF BROADWELL CONSTRUCTION ENGINEERING BROADWELL RD RECONSTRUCTION - BRIDGES CH 12 BEAR CREEK RD S COUNTY RD TO ILL 29 Miles = 5.22 DESIGNED OVERLAY COLD IN-PLACE RECYCLING REHABILITATION - PAVEMENTS CH 12 S COUNTY RD TO ILL 29 CONSTRUCTION ENGINEERING BEAR CREEK RD REHABILITATION - PAVEMENTS 6 - 77 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 12 COLUMBUS / Location MCKEE CREEK TO SENATE ST IN COLUMBUS Miles = 1.51 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $600,000 ADAMS 4 2020 SANGAMON 3 2020 $144,000 MACOUPIN 4 2020 $92,000 MACOUPIN 4 2020 PIKE 4 2020 COATSBURG RD REHABILITATION - PAVEMENTS CH 12 MECHANICSBURG RD I-72 RAMP (EB) TO W OF SANGAMON RIVER BRIDGE Miles = 4.39 RECONSTRUCTION $2,300,000 RECONSTRUCTION - PAVEMENTS CH 13 CH 24 CH 37 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RD Miles = 0.86 RECONSTRUCTION NINE MILE RD RECONSTRUCTION - PAVEMENTS CH 13 CH 24 CH 37 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RD CONSTRUCTION ENGINEERING NINE MILE RD RECONSTRUCTION - PAVEMENTS CH 14 CH 2 TO NCL OF DETROIT Miles = 7.25 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS 6 - 78 $243,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 14 BLUE SPRUCE RD Location E MANITO RD TO TAZEWELL CO LINE Miles = 4.30 Improvements TAMP Category CAPE SEAL Est. Cost County MYP Years Past Current $325,000 MASON 1 2021-2025 $3,076,000 MACOUPIN 16 2020 $280,000 MACOUPIN 4 2020 LOGAN 3 2020 LOGAN 4 2021-2025 2400 N RD PRESERVATION - PAVEMENTS CH 14 BRIGHTON / ECL OF BRIGHTON TO WCL OF BUNKER HILL Miles = 9.51 RECONSTRUCTION BRIDGE REPLACEMENT BUNKER HILL RD SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. RECONSTRUCTION - PAVEMENTS CH 14 ECL OF BRIGHTON TO WCL OF BUNKER HILL CONSTRUCTION ENGINEERING BRIGHTON / BUNKER HILL RD SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. RECONSTRUCTION - PAVEMENTS CH 15 MIDDLETOWN RD AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND P.E. (PHASE I) P.E. (PHASE II) $80,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES CH 15 MIDDLETOWN RD AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND BRIDGE REHABILITATION $1,100,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES 6 - 79 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 15 MIDDLETOWN RD Location AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $70,000 LOGAN 4 2021-2025 $80,000 LOGAN 2 2021-2025 $660,000 MASON 1 2021-2025 $3,118,000 SANGAMON 8 2021-2025 $1,882,000 SANGAMON 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. REHABILITATION - BRIDGES CH 15 ILL 10 TO 5TH ST MIDDLETOWN RD P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS CH 15 FISH HATCHERY RD 0.1 MI E OF TR 106 TO E MANITO RD Miles = 8.68 CAPE SEAL PRESERVATION - PAVEMENTS CH 17 BRADFORDTON RD WASHINGTON ST TO PAJIM LN Miles = 0.63 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CH 17 BRADFORDTON RD PAJIM LN TO OLD JACKSONVILLE RD Miles = 0.38 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 6 - 80 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 19 CH 23 CH 33 CH 20 DENVER/PLYMOUTH RD Location DENVER-PLYMOUTH RD/CH 19: 2100 E RD TO WCL OF PLYMOUTH; WEST POINT RD/CH 23: 1500 E RD TO WOLF ST IN WEST POINT; BOWEN RD/CH 33: ILL 336 TO WCL OF BOWEN; AUGUSTA RD/CH 20: ILL 61/101 IN AUGUSTA TO ADAMS CO LINE Miles = 17.14 Improvements TAMP Category BIT SURFACE TREATMENT-A1 Est. Cost County MYP Years Past Current $400,000 HANCOCK 2 2020 $370,000 MASON 1 2021-2025 $1,725,000 MASON 4 2021-2025 $875,000 MASON 1 2021-2025 $435,000 MASON 3 2021-2025 WEST POINT RD BOWEN RD AUGUSTA RD PRESERVATION - PAVEMENTS CH 20 MANITO RD NCL OF HAVANA TO 1950 N RD Miles = 4.96 CAPE SEAL PRESERVATION - PAVEMENTS CH 20 AT QUIVER CREEK 4 MI NE OF HAVANA BRIDGE REPLACEMENT MANITO RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 20 MANITO RD 0.1 MI N OF 1950 N RD TO 0.1 MI W OF CH 15 Miles = 0.63 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CH 20 MANITO RD 1950 E RD TO 2450 E RD Miles = 4.96 CAPE SEAL PRESERVATION - PAVEMENTS 6 - 81 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 20 MANITO RD Location 2450 E RD TO WCL OF FOREST CITY Miles = 3.69 Improvements TAMP Category COLD IN-PLACE RECYCLING CAPE SEAL Est. Cost County MYP Years Past Current $285,000 MASON 2 2021-2025 $4,000,000 SANGAMON 4 2021-2025 $462,000 SANGAMON 4 2020 PRESERVATION - PAVEMENTS CH 20 STANFORD AVE 11TH ST TO FOX BRIDGE RD Miles = 0.61 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT BIKEWAY SIDEWALKS REHABILITATION - PAVEMENTS CH 22 CH 23 WOODSIDE RD IRON BRIDGE RD WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD Miles = 0.81 PAVING WIDENING & RESURFACING SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. INITIAL CONSTRUCTION - PAVEMENTS CH 22 CH 23 WOODSIDE RD WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD BRIDGE (NEW) RR GRADE SEPARATION $4,125,000 SANGAMON 4 2020 $1,200,000 CHRISTIAN 1 2021-2025 IRON BRIDGE RD INITIAL CONSTRUCTION - BRIDGES CH 22 MT AUBURN RD SANGAMON CO LINE TO W ARCH ST (CH 19) Miles = 2.86 STANDARD OVERLAY REHABILITATION - PAVEMENTS 6 - 82 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 23 WOODSIDE RD Location W OF MACARTHUR BLVD EXT TO E OF N LAKE RD (PHASE II) Improvements TAMP Category RR GRADE SEPARATION Est. Cost County MYP Years Past Current $9,214,000 SANGAMON 2 2021-2025 $800,000 MACOUPIN 6 2021-2025 $51,000 MACOUPIN 6 2021-2025 $850,000 ADAMS 2 2020 $225,000 HANCOCK 2 2021-2025 INITIAL CONSTRUCTION - BRIDGES CH 26 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE BRIDGE REPLACEMENT SAWYERVILLE HILLS RD RECONSTRUCTION - BRIDGES CH 26 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE CONSTRUCTION ENGINEERING SAWYERVILLE HILLS RD RECONSTRUCTION - BRIDGES CH 30 MAINE ST S 24TH ST TO S 36TH ST Miles = 1.03 STANDARD OVERLAY PATCHING REHABILITATION - PAVEMENTS CH 33 FIFTH ST CH 20 CH 33: ILL 336 TO WCL OF BOWEN; FIFTH ST: WCL OF BOWEN TO ILL 94/61; CH 20: SCL OF AUGUSTA TO ADAMS CO LINE Miles = 5.39 MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS 6 - 83 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 37 48TH ST Location COLUMBUS RD TO BROADWAY ST Miles = 0.67 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $500,000 ADAMS 4 2021-2025 $650,000 MACOUPIN 12 2021-2025 $42,000 MACOUPIN 5 2021-2025 $1,400,000 SANGAMON 7 2021-2025 $2,000,000 SANGAMON 3 2021-2025 ADAMS 1 2021-2025 REHABILITATION - PAVEMENTS CH 37 AT SUGAR CREEK 3.8 MI W OF VIRDEN CULVERT REPLACEMENT NINE MILE RD RECONSTRUCTION - BRIDGES CH 37 AT SUGAR CREEK 3.8 MI W OF VIRDEN CONSTRUCTION ENGINEERING NINE MILE RD RECONSTRUCTION - BRIDGES CH 37 CARDINAL HILL RD 1.2 MI S OF ILL 29 TO 0.3 MI N OF ST HILAIRE RD & NEW CITY RD TO CHRISTIAN CO LINE COLD IN-PLACE RECYCLING CAPE SEAL PRESERVATION - PAVEMENTS CH 37 AT S FORK SANGAMON RIVER 1.5 MI N OF NEW CITY BRIDGE REPLACEMENT CARDINAL HILL RD RECONSTRUCTION - BRIDGES CH 48 E 1900TH ST (CH 12) TO E 1200TH ST (TR 354 ) COLD IN-PLACE RECYCLING KELLERVILLE BLKTP N 1200TH AVE PRESERVATION - PAVEMENTS 6 - 84 $750,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street CH 59 Location AT SPRING CREEK 0.5 MI SE OF ILL 4 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,500,000 SANGAMON 5 2021-2025 $1,150,000 SANGAMON 1 2021-2025 $120,000 SANGAMON 1 2021-2025 $750,000 SANGAMON 1 2021-2025 $80,000 SANGAMON 1 2021-2025 PIKE 2 2021-2025 BROWNING RD RECONSTRUCTION - BRIDGES CHURCHILL RD AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CHURCHILL RD AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES DRAWBRIDGE RD AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES DRAWBRIDGE RD AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES GRIGGSVILLE RD W OF BROWN ST IN NEW SALEM TO US 54 / ILL 107 IN GRIGGSVILLE Miles = 6.17 DESIGNED OVERLAY REHABILITATION - PAVEMENTS 6 - 85 $2,486,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street HAMPSHIRE ST Location N 8TH ST TO N 10TH ST IN QUINCY Miles = 0.18 Improvements TAMP Category STANDARD OVERLAY PATCHING SIDEWALKS Est. Cost County MYP Years Past Current $470,000 ADAMS 3 2021-2025 $900,000 SANGAMON 1 2021-2025 $625,000 SANGAMON 1 2021-2025 $400,000 SCHUYLER 2 2020 $50,000 SCHUYLER 2 2020 MORGAN 1 2021-2025 REHABILITATION - PAVEMENTS IRWIN BRIDGE RD AT RICHLAND CREEK 1.5 MI E OF SALISBURY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES KOKE MILL RD WASHINGTON ST TO OLD JACKSONVILLE RD IN SPRINGFIELD Miles = 0.98 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS LA PRAIRIE RD AT S FORK CEDAR CREEK E OF ADAMS CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES LA PRAIRIE RD AT S FORK CEDAR CREEK E OF ADAMS CO LINE CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES MURRAYVILLE RD ILL 267 TO US 67 Miles = 5.03 STANDARD OVERLAY REHABILITATION - PAVEMENTS 6 - 86 $1,550,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street N 1600 E RD Location AT LOCUST CREEK 2 MI NW OF OWANECO Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 CHRISTIAN 1 2021-2025 $310,000 CHRISTIAN MONTGOMERY 20 2021-2025 $32,000 CHRISTIAN MONTGOMERY 9 2021-2025 HANCOCK 1 2020 SANGAMON 9 2021-2025 RECONSTRUCTION - BRIDGES N 24TH AVE AT BEAR CREEK 2.5 MI E OF HARVEL BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 24TH AVE AT BEAR CREEK 2.5 MI E OF HARVEL CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES NIOTA RD COLUSA BLKTP CONNABLE RD POWELLTON RD / NIOTA RD: ILL 9/96 TO COLUSA BLKTP; COLUSA BLKTP: NIOTA RD TO 1400 E RD; CONNABLE RD: ILL 96 TO FERRIS RD; POWELLTON RD / ADRIAN RD: CONNABLE RD TO 1700 E RD Miles = 19.98 CAPE SEAL $300,000 ADRIAN RD PRESERVATION - PAVEMENTS OAK CREST RD AT SANGAMON RIVER 2 MI E OF CLEAR LAKE BRIDGE REPLACEMENT $2,600,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 6 - 87 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street OLD JACKSONVILLE RD BRADFORDTON RD Location OLD JACKSONVILLE RD: E OF MCKIBBIN LN TO 0.2 MI E OF BRADFORDTON RD; BRADFORDTON RD: N OF OLD JACKSONVILLE RD TO 0.1 MI S Miles = 0.81 Improvements TAMP Category ADDITIONAL LANES Est. Cost County MYP Years Past Current $2,900,000 SANGAMON 10 2021-2025 $1,260,000 ADAMS 3 2021-2025 $500,000 SCHUYLER 2 2021-2025 $160,000 HANCOCK 2 2021-2025 $850,000 CHRISTIAN 9 2020 $40,000 CHRISTIAN 9 2020 INITIAL CONSTRUCTION - PAVEMENTS S 24TH ST STATE ST TO HARRISON ST IN QUINCY Miles = 0.89 STANDARD OVERLAY PATCHING SIDEWALKS REHABILITATION - PAVEMENTS SUGAR GROVE RD US 67 TO ILL 103 Miles = 5.29 CAPE SEAL PRESERVATION - PAVEMENTS TR 6 AT BAPTIST CREEK 3.5 MI NE OF FOUNTAIN GREEN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES TR 13 AT MOSQUITO CREEK 3 MI E OF MT AUBURN BRIDGE REPLACEMENT 2850 N RD RECONSTRUCTION - BRIDGES TR 13 AT MOSQUITO CREEK 3 MI E OF MT AUBURN CONSTRUCTION ENGINEERING 2850 N RD RECONSTRUCTION - BRIDGES 6 - 88 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street TR 71 Location AT LAMOINE RIVER 3.3 MI SW OF LAHARPE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,000,000 HANCOCK 5 2021-2025 $260,000 CHRISTIAN 13 2021-2025 $32,000 CHRISTIAN 9 2021-2025 $415,000 CASS 2 2020 $32,000 CASS 2 2020 HANCOCK 5 2020 E 2500 N RD RECONSTRUCTION - BRIDGES TR 82 AT ACHENBACH BRANCH 3.5 MI N OF PALMER BRIDGE REPLACEMENT N 700 E RD RECONSTRUCTION - BRIDGES TR 82 AT ACHENBACH BRANCH 3.5 MI N OF PALMER CONSTRUCTION ENGINEERING N 700 E RD RECONSTRUCTION - BRIDGES TR 143 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA BRIDGE REPLACEMENT HALL RD RECONSTRUCTION - BRIDGES TR 143 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA CONSTRUCTION ENGINEERING HALL RD RECONSTRUCTION - BRIDGES TR 175 AT LA MOINE RIVER 4.5 MI NE OF CARTHAGE BRIDGE REPLACEMENT E 1720 N RD RECONSTRUCTION - BRIDGES 6 - 89 $915,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street TR 229 Location AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $600,000 CHRISTIAN 10 2021-2025 $32,000 CHRISTIAN 8 2021-2025 $500,000 CHRISTIAN 1 2021-2025 $450,000 ADAMS 4 2021-2025 PIKE 3 2021-2025 PIKE 3 2021-2025 E 1025 N RD RECONSTRUCTION - BRIDGES TR 229 AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE CONSTRUCTION ENGINEERING E 1025 N RD RECONSTRUCTION - BRIDGES TR 303 AT LAKE FORK 2 MI NW OF PANA BRIDGE REPLACEMENT E 450 N RD RECONSTRUCTION - BRIDGES TR 419 AT TOURNEAR CREEK 0.8 MI E OF PLAINVILLE RD BRIDGE REPLACEMENT N 900TH AVE RECONSTRUCTION - BRIDGES UNION ST AT SPRING CREEK 0.4 MI S OF W BRIDGE ST IN NEBO BRIDGE REPLACEMENT $1,200,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES UNION ST AT SPRING CREEK 0.4 MI S OF W BRIDGE ST CONSTRUCTION ENGINEERING $80,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 6 - 90 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 6 Local Highways Route / Street VARIOUS Location VARIOUS LOCATIONS IN PIKE CO Miles = 72.00 Improvements TAMP Category BIT SURFACE TREATMENT-A1 Est. Cost County MYP Years Past Current $1,124,000 PIKE 2 2021-2025 HANCOCK 1 2020 SANGAMON 1 2021-2025 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN HANCOCK CO P.E. (BRIDGE INSPECTION) $60,000 MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS IN SANGAMON CO COLD IN-PLACE RECYCLING PRESERVATION - PAVEMENTS 6 - 91 $2,055,000 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 4 District 7 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 4, DISTRICT 7, EFFINGHAM Overview Highway District 7 encompasses 16 counties in southeastern Illinois and includes the cities of Decatur, Charleston, Mattoon, Effingham, Sullivan and Vandalia, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 7 consists of 1,623 miles of highways and 777 bridges, supporting 9.4 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.29 billion will be provided during FY 2020-2025 for improvements to state highways in District 7. The following table summarizes anticipated accomplishments on the state highway system in District 7 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 83 288 162 88 221,782 244,380 189,964 72,123 0 0 0 0 20 0 1 0 0 2,205 117.420 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 57 at Eastern Illinois Railroad 0.3 mile south of Neoga interchange and US 45 at Neoga interchange in Cumberland County. Four bridge replacements, median crossovers and railroad flagger are programmed during FY 2021-2025 at a cost of $18.4 million. This project has been approved for Illinois Special Bridge Program funding. 7-i • Interstate 57 from US 45 at Neoga to Coles County line in Cumberland County. Resurfacing on 3.7 miles (including ramp repair) at the Neoga interchange, scour mitigation and wing wall repair are programmed in FY 2020 at a cost of $10.3 million. • Interstate 57 at Illinois 16 interchange east of Mattoon in Coles County. Two bridge replacements and interchange reconstruction are programmed during FY 2021-2025 at a cost of $31.2 million. This project has been approved for Illinois Special Bridge Funding. • Interstate 70 from abandoned railroad bridge at Altamont to 0.8 mile east of Altamont interchange in Effingham County. Reconstruction of 1 mile, bridge superstructure replacement, bridge removal and bridge raising are programmed during FY 2021-2025 at a cost of $14 million. • Interstate 72 from the Sangamon County line to 0.5 mile west of US 51 at Forsyth in Macon County. Resurfacing on 19.6 miles (including ramp repair) and a bridge superstructure replacement and railroad flagger over Illinois 121 and Illinois Central Railroad northwest of Decatur are programmed during FY 2021-2025 at a cost of $55 million. A portion of this project has been approved for Illinois Special Bridge Program funding. • Illinois 1 at Embarras River Overflow 1 mile north of US 50 and 0.5 mile north of US 50 in Lawrence County. A bridge replacement for each structure is programmed in FY 2020 at a total cost of $13.4 million. This project has been approved for Illinois Special Bridge Program funding. • Illinois 121 from 0.7 mile southeast of Dalton City to North 20th Street in Mattoon. Resurfacing on 29.2 miles and ADA improvements are programmed during FY 2020-2025 at a cost of $19 million. Of this total, resurfacing on 15.5 miles and ADA improvements from the eastern corporate limits of Sullivan to 20th Street in Mattoon are programmed in FY 2020 at a cost of $8.6 million. • Old US 51 Business/North Main Street/Franklin Street/North Water Street from Interstate 72 to US 36 in Decatur. Resurfacing on 7 miles, ADA improvements, land acquisition and engineering surveys are programmed during FY 2020-2025 at a cost of $11.2 million. Of this total, land acquisition and engineering surveys are programmed in FY 2020 at a cost of $750,000. 7-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 57 Location GREEN CREEK 1.5 MI S OF SHELBY CO LINE Improvements TAMP Category BRIDGE SUPERSTRUCTURE BRIDGE NEW DECK Est. Cost 57 EASTERN ILLINOIS RR 0.3 MI S OF NEOGA INTCHG & US 45 AT NEOGA INTCHG BRIDGE REPLACEMENT MEDIAN CROSSOVER RR FLAGGER MYP Years Past Current $3,260,000 REHABILITATION - BRIDGES I County EFFINGHAM Structure Information Str Number AADT 10,000 0250003 10,000 0250004 1 2021-2025 Truck Pct NHS 31 Y 31 Y $18,350,000 CUMBERLAND 2 2021-2025 $5,520,000 CUMBERLAND 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 BUSH CREEK 0.7 MI S OF COLES CO LINE BRIDGE NEW DECK REHABILITATION - BRIDGES I 57 US 45 AT NEOGA TO COLES CO LINE Miles = 3.71 Roadway Information Miles AADT Truck Pct 3.21 19,600 30.2 DESIGNED OVERLAY RAMP REPAIR WING WALL REPAIR SCOUR MITIGATION REHABILITATION - PAVEMENTS NHS Y 7-1 Structure Information Str Number AADT 9,800 0180005 9,800 0180006 $10,310,000 CUMBERLAND Truck Pct NHS 30 Y 30 Y 4 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 57 Location UNDER ETNA RD 1 MI E OF ETNA Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost 57 KICKAPOO CREEK 1 MI SE OF MATTOON CULVERT REPLACEMENT $2,710,000 57 OVER IC RR & TR 86 BRIDGE SUPERSTRUCTURE BRIDGE WIDENING BRIDGE RAISING $2,000,000 57 UNDER COUNTRY CLUB RD BRIDGE NEW DECK COLES Structure Information Str Number AADT 19,200 0152000 $7,190,000 REHABILITATION - BRIDGES I COLES Structure Information Str Number AADT 650 0150037 RECONSTRUCTION - BRIDGES I MYP Years Past Current REHABILITATION - BRIDGES I County COLES Structure Information Str Number AADT 9,600 0150004 9,600 0150003 $1,800,000 COLES 6 2021-2025 Truck Pct NHS 4 N 1 2021-2025 Truck Pct NHS 30 Y 3 2021-2025 Truck Pct NHS 30 Y 30 Y 1 2021-2025 OLD STATE RD REHABILITATION - BRIDGES 7-2 Structure Information Str Number AADT 3,400 0150032 Truck Pct NHS 4 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 57 Location ILL 16 INTCHG E OF MATTOON Improvements TAMP Category BRIDGE REPLACEMENT INTERCHANGE RECONSTRUCTION Est. Cost County MYP Years Past Current $31,150,000 COLES 4 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES I 57 0.5 MI W OF US 45 AT MATTOON TO 1 MI N OF ILL 16 Miles = 8.26 Roadway Information Miles AADT Truck Pct 6.83 19,387 30.2 I 57 DESIGNED OVERLAY RAMP REPAIR Structure Information Str Number AADT 9,600 0150005 9,600 0150006 10,150 0150051 10,150 0150052 $28,850,000 COLES 1 2021-2025 $2,460,000 COLES 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y UNDER CH 22 1.5 MI E OF DORANS BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES I 57 1 MI N OF ILL 16 TO DOUGLAS CO LINE Miles = 10.87 Roadway Information Miles AADT Truck Pct 10.87 21,401 29.4 I 64 RUBBLIZATION Structure Information Str Number AADT 175 0150044 Truck Pct NHS 22 N $71,750,000 COLES 1 2021-2025 $24,360,000 WAYNE 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y JEFFERSON CO LINE TO 7 MI W OF US 45 Miles = 14.51 Roadway Information Miles AADT Truck Pct 12.80 10,276 40.9 Truck Pct NHS 30 Y 30 Y 30 Y 30 Y DESIGNED OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y 7-3 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 64 Location 7 MI W OF US 45 TO 0.4 MI W OF US 45 Miles = 6.39 Roadway Information Miles AADT Truck Pct 6.39 9,600 45.6 I 64 County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $11,610,000 WAYNE 1 2021-2025 $2,000,000 WAYNE 1 2021-2025 $12,130,000 WAYNE 1 2021-2025 FAYETTE 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y VARIOUS STRUCTURES BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES I 64 0.4 MI W OF US 45 TO WHITE CO LINE Miles = 7.87 Roadway Information Miles AADT Truck Pct 6.01 11,599 40.6 I 70 STANDARD OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y HURRICANE CREEK 2.9 MI E OF BOND CO LINE BRIDGE NEW DECK $4,440,000 REHABILITATION - BRIDGES I 70 UNDER US 40 AT I-70 INTCHG IN VANDALIA BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR MAINTENANCE - BRIDGES 7-4 Structure Information Str Number AADT 10,750 0260009 10,750 0260010 $430,000 FAYETTE Truck Pct NHS 45 Y 45 Y 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 70 Location UNDER US 51 AT VANDALIA Improvements TAMP Category BRIDGE NEW DECK BRIDGE BEAM REPLACEMENT BRIDGE JOINT REPLACE/REPAIR BRIDGE PAINTING Est. Cost 70 (EASTBOUND) OVER CSXT RR 1.5 MI W OF US 40 (BROWNSTOWN INTCHG) BRIDGE REHABILITATION $5,480,000 70 KASKASKIA RIVER E OF VANDALIA TO 1 MI W OF US 40 Miles = 3.66 Roadway Information Miles AADT Truck Pct 3.66 22,900 36.9 I 70 $5,900,000 I 70 I 57 FAYETTE Structure Information Str Number AADT 11,450 0260021 $8,930,000 1 2021-2025 Truck Pct NHS 8 Y 1 2021-2025 Truck Pct NHS 36 Y FAYETTE 1 2021-2025 EFFINGHAM 5 2021-2025 REHABILITATION - PAVEMENTS NHS Y ABANDONED RR BRIDGE AT ALTAMONT TO 0.8 MI E OF ALTAMONT INTCHG Miles = 1.00 Roadway Information Miles AADT Truck Pct 1.00 21,800 41.2 DESIGNED OVERLAY FAYETTE Structure Information Str Number AADT 7,200 0260032 REHABILITATION - BRIDGES I MYP Years Past Current REHABILITATION - BRIDGES I County RECONSTRUCTION BRIDGE SUPERSTRUCTURE BRIDGE REMOVAL/DEMOLITION BRIDGE RAISING $14,000,000 RECONSTRUCTION - PAVEMENTS Structure Information Str Number AADT 10,900 0250007 10,900 0250008 NHS Y LITTLE WABASH RIVER TO US 40 & 4TH ST IN EFFINGHAM TO N TRI-LEVEL CRACK & JOINT SEALING PRESERVATION - PAVEMENTS 7-5 $600,000 EFFINGHAM Truck Pct NHS 38 Y 41 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 70 Location 1 MI E OF I-57 INTCHG TO CUMBERLAND CO LINE Miles = 7.82 Roadway Information Miles AADT Truck Pct 6.92 22,406 53.6 I 70 I 70 RUBBLIZATION BRIDGE SUPERSTRUCTURE RAMP REPAIR BRIDGE DECK REPAIRS BRIDGE REPAIR CULVERT REHABILITATION CULVERT REPAIR Est. Cost $51,610,000 RECONSTRUCTION - PAVEMENTS DESIGNED OVERLAY 72 US 36 I 72 MYP Years 1 2021-2025 Truck Pct NHS 45 Y 45 Y $15,650,000 CLARK 4 2021-2025 $2,350,000 CLARK 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y MILL CREEK W OF MARSHALL SANGAMON CO LINE TO 1.4 MI W OF US 51 W OF DECATUR Miles = 9.32 Roadway Information Miles AADT Truck Pct 7.86 15,450 19.9 EFFINGHAM Structure Information Str Number AADT 10,800 0250016 10,800 0250017 BRIDGE NEW DECK REHABILITATION - BRIDGES I County Past Current NHS Y 2 MI E OF CUMBERLAND CO LINE TO 0.3 MI W OF MARTINSVILLE Miles = 5.11 Roadway Information Miles AADT Truck Pct 5.11 22,400 45.5 Improvements TAMP Category DESIGNED OVERLAY RAMP REPAIR Structure Information Str Number AADT 11,250 0120052 Truck Pct NHS 44 Y $21,640,000 MACON 4 2021-2025 $60,000 MACON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y OVER US 36 (WB) AND US 51 (SB) IN HARRISTOWN BRIDGE REPAIR (EASTBOUND) MAINTENANCE - BRIDGES 7-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street I 72 Location OVER ILL 121 & IC RR NW OF DECATUR US 51 Improvements TAMP Category BRIDGE SUPERSTRUCTURE RR FLAGGER Est. Cost County MYP Years Past Current $10,510,000 MACON 2 2021-2025 $22,830,000 MACON 4 2021-2025 $600,000 MACON 1 2020 $28,650,000 MACON 1 2021-2025 $1,090,000 MACON 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 72 US 36 US 51 1.4 MI W OF US 51 W OF DECATUR TO 0.5 MI W OF US 51 AT FORSYTH Miles = 10.23 Roadway Information Miles AADT Truck Pct 8.45 13,648 24.2 I 72 DESIGNED OVERLAY RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y UNDER CH 20 1 MI E OF OREANA BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK REPAIRS BRIDGE DECK OVERLAY PRESERVATION - BRIDGES I 72 4.4 MI W TO 0.3 MI W OF PIATT CO LINE Miles = 5.95 Roadway Information Miles AADT Truck Pct 4.06 12,100 22.3 US 36 RUBBLIZATION RAMP REPAIR RECONSTRUCTION - PAVEMENTS NHS Y AT LONG CREEK TRIB W OF ESTHER AVE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7-7 Structure Information Str Number AADT 6,750 0580021 Truck Pct NHS 7 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 36 Location US 36: I-72 TO 0.2 MI W OF HARRISTOWN BLVD (INCLUDING RAMPS) & US 51: I-72 TO 0.3 MI S OF CANTRELL RD W OF DECATUR (INCLUDING RAMPS) Miles = 5.94 US 51 Roadway Information Miles AADT Truck Pct 1.30 5,217 10.2 1.52 4,705 US 36 20.9 Improvements TAMP Category STANDARD OVERLAY DESIGNED OVERLAY Est. Cost $6,720,000 MACON 2 2021-2025 $1,090,000 MACON 1 2021-2025 REHABILITATION - PAVEMENTS Y BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES W ELDORADO ST MYP Years Past Current NHS Y AT LONG CREEK 0.4 MI E OF S 70TH ST US 36 County US 36: ILL 48 TO CHURCH ST IN DECATUR & W ELDORADO ST: ILL 48 TO US 36 TRAF SIGNAL MODERNIZATION TRAF SIGNAL REPLACEMENT SAFETY IMPROVEMENTS Structure Information Str Number AADT 4,750 0580022 Truck Pct NHS 11 Y $2,000,000 MACON 1 2020 $2,360,000 MACON 1 2021-2025 $4,850,000 MACON 4 2020 MISCELLANEOUS IMPROVEMENTS US 36 ELDORADO ST CHURCH ST TO 19TH ST IN DECATUR Miles = 1.40 Roadway Information Miles AADT Truck Pct 1.40 16,576 4.5 US 36 REHABILITATION - PAVEMENTS NHS Y 19TH ST TO 0.4 MI E OF AIRPORT RD IN DECATUR Miles = 3.79 ILL 121 Roadway Information Miles AADT Truck Pct 3.09 17,518 6.0 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 0.30 11,880 5.0 Y 0.40 7,500 6.7 Y 7-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 36 Location 19TH ST TO 0.4 MI E OF AIRPORT RD IN DECATUR ILL 121 Improvements TAMP Category TRAF SIGNAL MODERNIZATION TRAF SIGNAL REPLACEMENT SAFETY IMPROVEMENTS Est. Cost County MYP Years Past Current $880,000 MACON 1 2020 $4,560,000 MACON MOULTRIE PIATT 1 2021-2025 $1,300,000 FAYETTE 1 2021-2025 $2,020,000 FAYETTE 3 2021-2025 $440,000 FAYETTE 1 2020 MISCELLANEOUS IMPROVEMENTS US 36 70TH ST IN LONG CREEK TO 0.2 MI W OF ILL 32 Miles = 6.55 Roadway Information Miles AADT Truck Pct 1.84 3,300 11.2 4.71 3,705 US 40 12.8 REHABILITATION - PAVEMENTS NHS Y Y BOND CO LINE TO 2.3 MI E Miles = 2.28 Roadway Information Miles AADT Truck Pct 2.28 1,729 13.4 US 40 REHABILITATION - PAVEMENTS REHABILITATION - PAVEMENTS 800 7.1 N 0.12 3,000 1.9 N ILL 185 DESIGNED OVERLAY NHS N 0.12 US 40 DESIGNED OVERLAY NHS N 0.3 MI W OF I-70 INTCHG TO ILL 185 IN VANDALIA & INTCHG RAMPS Miles = 3.17 Roadway Information Miles AADT Truck Pct 1.82 4,702 9.1 DESIGNED OVERLAY 0.1 MI E OF US 51 TO FR RD 1625N W OF BROWNSTOWN Miles = 4.36 MICROSURFACING 1 PASS PATCHING PRESERVATION - PAVEMENTS 7-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 40 Location STREAM 1.7 MI W OF BROWNSTOWN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $680,000 FAYETTE 1 2021-2025 $810,000 FAYETTE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 40 BRICKYARD BRANCH AT WCL OF ST. ELMO BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 40 I-70 W OF BROWNSTOWN TO EFFINGHAM CO LINE Miles = 11.37 Roadway Information Miles AADT Truck Pct 11.37 2,936 12.6 US 40 DESIGNED OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 2,650 0262006 $6,980,000 FAYETTE 1 2021-2025 $1,400,000 EFFINGHAM 5 2021-2025 REHABILITATION - PAVEMENTS NHS N SECOND CREEK 2 MI E OF ALTAMONT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 40 US 40: FAYETTE CO LINE TO DIVISION ST IN ALTAMONT & ILL 128: US 40 TO 0.1 MI S OF I-70 IN ALTAMONT Miles = 5.15 ILL 128 Roadway Information Miles AADT Truck Pct 4.25 3,549 4.5 0.90 6,223 5.7 Truck Pct NHS 15 N STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 7 - 10 Structure Information Str Number AADT 4,250 0252008 $2,800,000 EFFINGHAM Truck Pct NHS 6 N 4 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 40 Location 0.3 MI W OF LAKE SARA RD TO HENRIETTA ST IN EFFINGHAM Miles = 4.85 Improvements TAMP Category CAPE SEAL PATCHING Est. Cost County MYP Years Past Current $660,000 EFFINGHAM 1 2020 $1,300,000 EFFINGHAM 1 2021-2025 $15,200,000 EFFINGHAM 1 2021-2025 $14,000,000 EFFINGHAM 1 2021-2025 $2,400,000 EFFINGHAM 1 2021-2025 PRESERVATION PROJECT PRESERVATION - PAVEMENTS US 40 ILL 33 W OF RANEY ST TO BANKER ST IN EFFINGHAM Miles = 0.82 STANDARD OVERLAY FAYETTE AVE Roadway Information Miles AADT Truck Pct 0.82 15,365 6.6 US 40 ILL 33 REHABILITATION - PAVEMENTS NHS Y W OF RANEY ST TO BANKER ST IN EFFINGHAM Miles = 0.01 FAYETTE AVE ADDITIONAL LANES CURB AND GUTTER STORM SEWER (NEW) INITIAL CONSTRUCTION - PAVEMENTS US 40 W OF RANEY ST TO BANKER ST IN EFFINGHAM LAND ACQUISITION ILL 33 FAYETTE AVE INITIAL CONSTRUCTION - PAVEMENTS US 40 W OF RANEY ST TO BANKER ST IN EFFINGHAM UTILITY ADJUSTMENT ILL 33 FAYETTE AVE INITIAL CONSTRUCTION - PAVEMENTS 7 - 11 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 40 Location BANKER ST TO E OF WILLOW ST IN EFFINGHAM Miles = 0.01 ILL 33 US 45 FAYETTE AVE Improvements TAMP Category ADDITIONAL LANES STORM SEWER (NEW) CURB AND GUTTER ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $10,100,000 EFFINGHAM 1 2021-2025 $500,000 EFFINGHAM 1 2021-2025 $14,000,000 EFFINGHAM 1 2021-2025 $1,500,000 EFFINGHAM 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 40 BANKER ST TO E OF WILLOW ST IN EFFINGHAM Miles = 0.39 ILL 33 DESIGNED OVERLAY US 45 FAYETTE AVE Roadway Information Miles AADT Truck Pct 0.21 14,100 8.7 0.18 10,439 US 40 10.8 REHABILITATION - PAVEMENTS NHS Y N BANKER ST TO E OF WILLOW ST IN EFFINGHAM LAND ACQUISITION US 45 ILL 33 FAYETTE AVE INITIAL CONSTRUCTION - PAVEMENTS US 40 BANKER ST TO E OF WILLOW ST IN EFFINGHAM UTILITY ADJUSTMENT US 45 ILL 33 FAYETTE AVE INITIAL CONSTRUCTION - PAVEMENTS 7 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 40 Location BANKER ST TO E OF WILLOW ST IN EFFINGHAM Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $2,200,000 EFFINGHAM 1 2021-2025 $3,030,000 EFFINGHAM 8 2021-2025 $3,900,000 EFFINGHAM 1 2021-2025 $6,140,000 CUMBERLAND 1 2021-2025 US 45 ILL 33 FAYETTE AVE INITIAL CONSTRUCTION - PAVEMENTS US 40 SALT CREEK TO 1500TH AVE E OF TEUTOPOLIS Miles = 3.42 Roadway Information Miles AADT Truck Pct 2.38 6,813 9.8 1.04 US 40 8,450 8.0 US 40 REHABILITATION - PAVEMENTS NHS N N 1500TH AVE E OF TEUTOPOLIS TO CUMBERLAND CO LINE Miles = 5.81 Roadway Information Miles AADT Truck Pct 5.81 2,993 12.3 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N EMBARRAS RIVER 0.7 MI W OF GREENUP BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 40 ILL 130 IN GREENUP TO CLARK CO LINE Miles = 8.39 Roadway Information Miles AADT Truck Pct 8.39 2,186 15.5 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 7 - 13 Structure Information Str Number AADT 1,800 0180008 $5,510,000 CUMBERLAND Truck Pct NHS 17 N 2 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 40 Location STREAM 0.2 MI E OF ILL 130 Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $120,000 CUMBERLAND 1 2020 $950,000 CLARK 1 2021-2025 $3,850,000 CLARK 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 40 CUMBERLAND CO LINE TO ILL 49 Miles = 1.54 Roadway Information Miles AADT Truck Pct 1.54 1,917 14.5 US 40 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N FORK OF EMBARRAS RIVER 0.4 MI W OF MARTINSVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 40 EAST MILL CREEK 2 MI W OF MARSHALL BRIDGE REPLACEMENT Structure Information Str Number AADT 2,200 0120018 $2,400,000 RECONSTRUCTION - BRIDGES US 45 FLAT BRANCH W OF HUMBOLDT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 14 CLARK Structure Information Str Number AADT 3,300 0120021 $2,240,000 COLES Structure Information Str Number AADT 2,700 0150022 Truck Pct NHS 17 N 9 2021-2025 Truck Pct NHS 12 N 9 2021-2025 Truck Pct NHS 8 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 45 ILL 121 Location ILL 16 TO RUDY AVE IN MATTOON Miles = 0.84 Roadway Information Miles AADT Truck Pct 0.84 9,725 5.0 US 45 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,170,000 COLES 2 2021-2025 $60,000 CUMBERLAND 1 2020 $1,000,000 CUMBERLAND SHELBY 4 2021-2025 $510,000 EFFINGHAM 1 2020 $1,760,000 EFFINGHAM 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.2 MI S OF ILL 121 TO E 11TH ST IN NEOGA CRACK & JOINT SEALING PRESERVATION - PAVEMENTS US 45 STREAMS 0.6, 1.1, 1.7, 3.3, 4.3 & 6.2 MI S OF 4TH ST IN NEOGA CULVERT REPLACEMENT CULVERT EXTENSION CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES US 45 SHELBY CO LINE TO RICKLEMAN AVE IN EFFINGHAM Miles = 4.88 CAPE SEAL PRESERVATION - PAVEMENTS US 45 3RD ST S OF I-57/70 RAMP (EB) TO US 40 Miles = 1.59 Roadway Information Miles AADT Truck Pct 1.59 8,500 14.8 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 7 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 45 Location S OF I-57/70 RAMP (EB) TO US 40 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $150,000 EFFINGHAM 2 2021-2025 $30,000 EFFINGHAM 1 2020 $5,680,000 EFFINGHAM 1 2020 $2,560,000 EFFINGHAM 3 2020 3RD ST REHABILITATION - PAVEMENTS US 45 AT WABASH AVE IN EFFINGHAM Miles = 0.01 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS US 45 JAYCEE AVE TO 0.2 MI S OF ILL 37 Miles = 4.82 Roadway Information Miles AADT Truck Pct 4.82 8,636 9.9 US 45 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y RAMSEY CREEK 5.3 MI S OF ILL 37 & BISHOP CREEK 5 MI S OF ILL 37 BRIDGE SUPERSTRUCTURE BRIDGE NEW DECK ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES US 45 ILL 37 TO BIBLE GROVE RD Miles = 11.42 Roadway Information Miles AADT Truck Pct 3.09 2,650 16.2 8.33 3,247 16.2 DESIGNED OVERLAY VERTICAL REALIGNMENT HORIZONTAL REALIGNMENT BRIDGE DECK REPAIRS RETAINING WALL REHABILITATION - PAVEMENTS NHS Y Y 7 - 16 Structure Information Str Number AADT 2,800 0250081 2,800 0250080 $20,050,000 EFFINGHAM CLAY Truck Pct NHS 20 Y 20 Y 16 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 45 Location ILL 37 TO BIBLE GROVE RD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $800,000 EFFINGHAM CLAY 4 2021-2025 $600,000 CLAY EFFINGHAM 1 2021-2025 $4,910,000 CLAY 1 2021-2025 $3,030,000 CLAY 1 2021-2025 $2,610,000 WAYNE 1 2020 REHABILITATION - PAVEMENTS US 45 ILL 37 TO BIBLE GROVE RD UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS US 45 NCL OF LOUISVILLE TO US 50 Miles = 6.59 Roadway Information Miles AADT Truck Pct 6.59 4,856 10.9 US 45 US 45 REHABILITATION - PAVEMENTS NHS Y US 50 E OF FLORA TO WAYNE CO LINE Miles = 4.93 Roadway Information Miles AADT Truck Pct 4.93 2,437 17.1 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N SCL OF GEFF TO 0.2 MI N OF ILL 15 Miles = 3.74 Roadway Information Miles AADT Truck Pct 3.74 3,962 10.3 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 7 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 45 Location SE 9TH ST TO 0.1 MI W OF MARKET AVE (WB) & SW 7TH ST TO SE 9TH ST (EB) IN FAIRFIELD Miles = 3.32 ILL 15 Roadway Information Miles AADT Truck Pct 2.05 6,325 6.3 County MYP Years Past Current $3,650,000 WAYNE 6 2021-2025 $50,000 WAYNE 1 2020 $5,960,000 CLAY 1 2021-2025 $620,000 CLAY 2 2020 CLAY RICHLAND 1 2021-2025 REHABILITATION - PAVEMENTS 4,572 5.7 Y 0.34 4,600 8.7 Y 0.47 7,013 5.2 Y SE 9TH ST TO 0.1 MI W OF MARKET AVE (WB) & SW 7TH ST TO SE 9TH ST (EB) IN FAIRFIELD ILL 15 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost NHS Y 0.46 US 45 Improvements TAMP Category LAND ACQUISITION REHABILITATION - PAVEMENTS US 50 US 45 W OF FLORA TO 2.5 MI E OF US 45 Miles = 6.41 US 45 Roadway Information Miles AADT Truck Pct 6.41 5,732 17.1 US 50 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y LITTLE WABASH RIVER 2 MI W OF RICHLAND CO LINE BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES US 50 2.5 MI E OF US 45 E OF FLORA TO 1.6 MI E OF RICHLAND CO LINE Miles = 7.60 Roadway Information Miles AADT Truck Pct 5.96 4,571 19.0 1.64 4,273 17.0 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y Y 7 - 18 $4,300,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 50 Location 1.6 MI E OF CLAY CO LINE TO 0.6 MI W OF STE MARIE RD Miles = 11.73 Roadway Information Miles AADT Truck Pct 11.73 3,663 20.3 US 50 US 50 US 50 US 50 MYP Years Past Current $8,590,000 RICHLAND 1 2021-2025 DESIGNED OVERLAY $2,420,000 RICHLAND 3 2021-2025 $2,820,000 RICHLAND 1 2021-2025 $1,850,000 LAWRENCE 1 2021-2025 $1,950,000 LAWRENCE 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y RICHLAND CO LINE TO 0.2 MI E OF ILL 250 Miles = 2.47 Roadway Information Miles AADT Truck Pct 2.47 4,862 15.3 County REHABILITATION - PAVEMENTS 4 MI W OF LAWRENCE CO LINE TO LAWRENCE CO LINE Miles = 4.00 Roadway Information Miles AADT Truck Pct 4.00 5,341 19.9 DESIGNED OVERLAY Est. Cost NHS Y 0.6 MI W OF STE MARIE RD TO 4 MI W OF LAWRENCE CO LINE Miles = 3.60 Roadway Information Miles AADT Truck Pct 3.60 6,230 13.0 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y MUDDY CREEK 0.5 MI E OF SUMNER RD BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 7 - 19 Structure Information Str Number AADT 4,350 0510009 Truck Pct NHS 15 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 50 Location OVER STATE ST IN LAWRENCEVILLE Improvements TAMP Category BRIDGE NEW DECK Est. Cost BEAVER POND DITCH TO INDIANA STATE LINE Miles = 5.03 CAPE SEAL PATCHING MYP Years Past Current $1,740,000 REHABILITATION - BRIDGES US 50 County LAWRENCE Structure Information Str Number AADT 3,900 0510010 3 2021-2025 Truck Pct NHS 17 Y $1,250,000 LAWRENCE 1 2020 $2,730,000 LAWRENCE 1 2021-2025 PRESERVATION PROJECT PRESERVATION - PAVEMENTS US 50 OVER TR 262 2.4 MI E OF AIRPORT INT BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES US 50 RED SKELTON WABASH RIVER BRIDGES AT VINCENNES, INDIANA BRIDGE PAINTING Structure Information Str Number AADT 3,800 0510023 3,800 0510022 Truck Pct NHS 20 Y 20 Y $1,200,000 LAWRENCE 9 2021-2025 $120,000 LAWRENCE 1 2021-2025 INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES US 50 RED SKELTON WABASH RIVER BRIDGES AT VINCENNES, INDIANA P.E. (PHASE II) INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES 7 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 50 Location RED SKELTON WABASH RIVER BRIDGES AT VINCENNES, INDIANA Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $850,000 LAWRENCE 2 2021-2025 $170,000 LAWRENCE 1 2021-2025 $14,350,000 LAWRENCE 1 2021-2025 INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES US 50 RED SKELTON WABASH RIVER BRIDGES AT VINCENNES, INDIANA P.E. (PHASE II) INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES US 50 BUS AT EMBARRAS RIVER 0.5 MI E OF LAWRENCEVILLE BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES US 50 BUS ILL 250 0.1 MI W OF STATE ST IN LAWRENCEVILLE TO 0.1 MI W OF 990N E OF LAWRENCEVILLE Miles = 2.45 Roadway Information Miles AADT Truck Pct 1.97 5,780 8.0 0.48 US 51 7,793 3.9 $2,300,000 Truck Pct NHS 9 N LAWRENCE 1 2021-2025 MACON 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N DEWITT CO LINE TO 0.1 MI N OF FORSYTH RD Miles = 8.14 Roadway Information Miles AADT Truck Pct 8.14 12,010 14.4 STANDARD OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 5,950 0510053 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 21 $14,770,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 51 Location 0.1 MI N OF FORSYTH RD TO I-72 IN DECATUR Miles = 1.94 Roadway Information Miles AADT Truck Pct 1.94 20,021 6.9 US 51 BLOOMINGTON RD Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $4,620,000 MACON 2 2021-2025 $650,000 MACON 1 2020 $13,960,000 MACON 1 2020 $730,000 MACON 1 2020 $7,070,000 SHELBY MACON 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.8 MI S OF US 36 TO 0.3 MI E OF US 51 BUS SW OF DECATUR Miles = 4.64 MICROSURFACING 1 PASS PRESERVATION PROJECT PRESERVATION - PAVEMENTS US 51 US 51 BUS SW OF DECATUR TO 0.5 MI N OF SHELBY CO LINE Miles = 9.38 Roadway Information Miles AADT Truck Pct 9.38 6,632 10.2 US 51 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y OVER US 51 0.5 MI E OF ELWIN & 2 MI S OF ELWIN BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES US 51 0.5 MI N OF SHELBY CO LINE TO CHRISTIAN CO LINE Miles = 4.25 Roadway Information Miles AADT Truck Pct 3.76 4,983 16.7 0.49 6,800 10.9 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y Y 7 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street US 51 Location SHELBY CO LINE TO SCL OF RAMSEY Miles = 5.84 Roadway Information Miles AADT Truck Pct 5.84 3,099 19.8 US 51 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $4,360,000 FAYETTE 1 2021-2025 $170,000 FAYETTE 1 2021-2025 $7,280,000 FAYETTE 1 2021-2025 $930,000 FAYETTE 6 2021-2025 REHABILITATION - PAVEMENTS NHS Y ASH CREEK 3.8 MI S OF SHELBY CO LINE BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES US 51 SCL OF RAMSEY TO IMCO DR IN VANDALIA Miles = 10.90 Roadway Information Miles AADT Truck Pct 10.90 4,005 18.6 US 51 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y STREAM 3 MI S OF VANDALIA CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES US 51 US 40 / ILL 185 E OF VANDALIA TO SHOBONIER SPUR Miles = 6.98 Roadway Information Miles AADT Truck Pct 6.98 4,026 17.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 23 Structure Information Str Number AADT 4,100 0260088 $4,670,000 FAYETTE Truck Pct NHS 17 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 1 Location OVER CSX RR 0.5 MI N OF US 40 Improvements TAMP Category BRIDGE REPLACEMENT RR FLAGGER Est. Cost County MYP Years Past Current $3,340,000 CLARK 4 2020 $7,240,000 CLARK 1 2021-2025 $1,810,000 CRAWFORD 12 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 1 GRAND TURN RD TO CRAWFORD CO LINE Miles = 11.63 Roadway Information Miles AADT Truck Pct 11.63 2,546 23.6 ILL 1 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y SUGAR CREEK 2.3 MI N OF GORDON JCT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 1 SUGAR CREEK 0.5 MI N OF GORDON JCT BRIDGE REPLACEMENT Structure Information Str Number AADT 2,750 0170003 $2,020,000 RECONSTRUCTION - BRIDGES ILL 1 CLARK CO LINE TO ILL 33 Miles = 11.46 Roadway Information Miles AADT Truck Pct 11.46 3,496 20.6 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 24 CRAWFORD Structure Information Str Number AADT 2,850 0170004 $7,030,000 CRAWFORD Truck Pct NHS 21 Y 12 2020 Truck Pct NHS 16 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 1 Location STREAM 1.8 MI S OF ILL 33 Improvements TAMP Category CULVERT (NEW) Est. Cost County MYP Years Past Current $690,000 CRAWFORD 4 2021-2025 $2,460,000 CRAWFORD 11 2020 INITIAL CONSTRUCTION - BRIDGES ILL 1 SUGAR CREEK 1 MI N OF LAWRENCE CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 1 STREAM 0.3 MI N OF BIRDS RD BRIDGE REPLACEMENT Structure Information Str Number AADT 3,850 0170005 $1,150,000 RECONSTRUCTION - BRIDGES ILL 1 EMBARRAS RIVER OVERFLOW 1 MI N OF US 50 BRIDGE REPLACEMENT LAWRENCE Structure Information Str Number AADT 3,850 0510001 $4,120,000 LAWRENCE Truck Pct NHS 22 Y 2 2021-2025 Truck Pct NHS 22 Y 5 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 1 EMBARRAS RIVER OVERFLOW 0.5 MI N OF US 50 BRIDGE REPLACEMENT Structure Information Str Number AADT 5,150 0510004 $9,310,000 LAWRENCE Truck Pct NHS 13 Y 5 2020 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 7 - 25 Structure Information Str Number AADT 5,150 0510005 Truck Pct NHS 13 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 1 Location INDIAN CREEK 2 MI S OF LAWRENCEVILLE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost BIG SLOUGH 5 MI S OF LAWRENCEVILLE BRIDGE REPLACEMENT $2,450,000 CHARLES ST TO ORCHARD ST IN LAWRENCEVILLE Miles = 1.16 Roadway Information Miles AADT Truck Pct 1.16 4,838 16.2 ILL 1 DESIGNED OVERLAY ADA IMPROVEMENTS LAWRENCE Structure Information Str Number AADT 2,900 0510007 $990,000 RECONSTRUCTION - BRIDGES ILL 1 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 1 County LAWRENCE Structure Information Str Number AADT 2,400 0510008 3 2021-2025 Truck Pct NHS 23 Y 2 2021-2025 Truck Pct NHS 22 Y $1,620,000 LAWRENCE 8 2021-2025 $50,000 LAWRENCE 2 2020 $6,290,000 LAWRENCE 1 2020 REHABILITATION - PAVEMENTS NHS Y CHARLES ST TO ORCHARD ST IN LAWRENCEVILLE LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 1 ORCHARD ST IN LAWRENCEVILLE TO WABASH CO LINE Miles = 10.09 Roadway Information Miles AADT Truck Pct 10.09 2,535 21.8 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 1 Location STREAM 3.3 MI S OF ORCHARD ST IN LAWRENCEVILLE & STREAM 4.8 MI N OF WABASH CO LINE Improvements TAMP Category CULVERT REPAIR Est. Cost County MYP Years Past Current $60,000 LAWRENCE 1 2020 WABASH 7 2020 MISCELLANEOUS IMPROVEMENTS ILL 1 ABANDONED RR 0.1 MI N OF 11TH ST IN MT CARMEL BRIDGE REPLACEMENT $2,610,000 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 1 0.1 MI E OF OAK ST IN MT CARMEL TO EDWARDS CO LINE Miles = 12.32 Roadway Information Miles AADT Truck Pct 12.32 2,434 14.1 ILL 1 ILL 15 Truck Pct NHS 10 Y $7,890,000 WABASH 1 2021-2025 $2,820,000 EDWARDS 1 2020 $1,320,000 WAYNE 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y WABASH CO LINE TO WHITE CO LINE Miles = 3.82 Roadway Information Miles AADT Truck Pct 3.82 3,391 18.2 DESIGNED OVERLAY Structure Information Str Number AADT 4,850 0930006 DESIGNED OVERLAY BRIDGE DECK REPAIRS BRIDGE JOINT REPLACE/REPAIR REHABILITATION - PAVEMENTS NHS Y MILLER CREEK 1 MI W OF SIMS RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 27 Structure Information Str Number AADT 3,050 0960005 Truck Pct NHS 7 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 15 Location STREAM 4 MI E OF SIMS Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost JEFFERSON CO LINE TO 0.3 MI W OF US 45 W OF FAIRFIELD Miles = 17.43 Roadway Information Miles AADT Truck Pct 17.43 3,397 7.6 ILL 15 DESIGNED OVERLAY ADA IMPROVEMENTS $1,280,000 2021-2025 Truck Pct NHS 7 Y WAYNE 1 2021-2025 $1,350,000 WAYNE 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y POND CREEK 1.5 MI E OF FAIRFIELD LITTLE WABASH RIVER 4.5 MI W OF EDWARDS CO LINE E 9TH ST IN FAIRFIELD TO EDWARDS CO LINE Miles = 11.22 Roadway Information Miles AADT Truck Pct 11.22 3,230 7.4 1 $12,260,000 BRIDGE SUPERSTRUCTURE BRIDGE REPLACEMENT Structure Information Str Number AADT 4,200 0960064 $6,000,000 RECONSTRUCTION - BRIDGES ILL 15 WAYNE Structure Information Str Number AADT 3,200 0962000 REHABILITATION - BRIDGES ILL 15 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 15 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 28 WAYNE Structure Information Str Number AADT 2,800 0960010 $7,290,000 WAYNE Truck Pct NHS 9 Y 1 2021-2025 Truck Pct NHS 6 Y 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 15 Location STREAMS 1.8, 2, & 2.2 MI E OF E 9TH ST IN FAIRFIELD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $390,000 WAYNE 1 2021-2025 WABASH 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 15 STREAM 0.2 MI E OF BELMONT JCT BRIDGE REPLACEMENT $1,010,000 RECONSTRUCTION - BRIDGES ILL 15 0.1 MI W OF W 7TH ST TO CHERRY ST IN MT CARMEL Miles = 1.64 ILL 1 Roadway Information Miles AADT Truck Pct 1.27 7,317 4.7 0.37 ILL 15 7,657 3.4 DESIGNED OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 2,750 0930010 Truck Pct NHS 5 Y $1,750,000 WABASH 2 2021-2025 $1,200,000 WABASH 1 2021-2025 $7,370,000 SHELBY 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y WABASH RIVER AT MT CARMEL BRIDGE DECK OVERLAY ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES ILL 16 ILL 128 CHRISTIAN CO LINE TO SHELBY CO AIRPORT RD Miles = 10.46 Roadway Information Miles AADT Truck Pct 10.46 4,862 12.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 7 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 16 Location RICHLAND CREEK 2.3 MI W OF ILL 32 Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost US 45 (S) IN MATTOON TO 0.1 MI E OF SWORDS DR Miles = 2.56 Roadway Information Miles AADT Truck Pct 2.56 14,898 3.3 ILL 16 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,190,000 REHABILITATION - BRIDGES ILL 16 County SHELBY Structure Information Str Number AADT 4,150 0870024 8 2020 Truck Pct NHS 10 Y $3,390,000 COLES 3 2021-2025 $150,000 COLES 2 2021-2025 $9,100,000 COLES 1 2020 $3,520,000 COLES 4 2020 REHABILITATION - PAVEMENTS NHS Y US 45 (S) IN MATTOON TO 0.1 MI E OF SWORDS DR LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 16 W OF LERNA RD TO 0.2 MI W OF DOUGLAS DR IN CHARLESTON Miles = 6.21 Roadway Information Miles AADT Truck Pct 6.21 15,203 4.8 ILL 16 2.34 REHABILITATION - PAVEMENTS NHS Y 0.2 MI W OF DOUGLAS DR IN CHARLESTON TO 0.4 MI E OF MADISON ST Miles = 4.30 Roadway Information Miles AADT Truck Pct 1.96 18,027 3.7 5,883 6.1 DESIGNED OVERLAY STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 7 - 30 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 16 Location DOUGLAS DR TO HAWTHORNE DR IN CHARLESTON Improvements TAMP Category TRAF SIGNAL MODERNIZATION TRAF SIGNAL REPLACEMENT SAFETY IMPROVEMENTS Est. Cost County MYP Years Past Current $1,800,000 COLES 2 2020 $2,000,000 COLES 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 16 POLE CAT CREEK 1.5 MI E OF ASHMORE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 32 SPRINGFIELD RD US 36 TO W OF N ALLEN AVE IN LOVINGTON Miles = 7.48 CAPE SEAL Structure Information Str Number AADT 3,150 0150021 Truck Pct NHS 9 N $780,000 MOULTRIE 1 2020 $1,700,000 MOULTRIE 1 2021-2025 $2,240,000 MOULTRIE 1 2021-2025 PRESERVATION PROJECT PRESERVATION - PAVEMENTS ILL 32 ILL 121 TO 1200N IN SULLIVAN Miles = 1.52 Roadway Information Miles AADT Truck Pct 1.52 7,736 12.6 ILL 32 REHABILITATION - PAVEMENTS NHS N 0.1 MI N OF SLAUGHTER HOUSE RD (950N) TO SHELBY CO LINE Miles = 3.60 Roadway Information Miles AADT Truck Pct 3.60 3,418 16.8 DESIGNED OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 7 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 32 Location ILL 16 TO EFFINGHAM CO LINE Miles = 13.00 Improvements TAMP Category CAPE SEAL PATCHING Est. Cost County MYP Years Past Current $1,880,000 SHELBY 1 2020 $50,000 EFFINGHAM 1 2021-2025 $230,000 EFFINGHAM 2 2021-2025 $2,970,000 EFFINGHAM 1 2021-2025 $710,000 EFFINGHAM 1 2021-2025 PRESERVATION PROJECT PRESERVATION - PAVEMENTS ILL 32 SHELBY CO LINE TO ILL 33 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 32 STREAMS AT 0.5, 3 & 3.4 MI S OF SHELBY CO LINE CULVERT REPAIR CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 32 SHELBY CO LINE TO ILL 33 Miles = 3.68 Roadway Information Miles AADT Truck Pct 3.68 4,512 14.2 ILL 33 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N STREAM 1 MI E OF BEECHER CITY CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 32 Structure Information Str Number AADT 3,250 0252012 Truck Pct NHS 8 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 33 Location ILL 130 TO ILL 49 Miles = 6.58 Roadway Information Miles AADT Truck Pct 6.47 2,850 12.3 0.11 1,550 ILL 33 12.9 ILL 37 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $3,500,000 JASPER 1 2020 $870,000 CRAWFORD 1 2021-2025 $400,000 EFFINGHAM 1 2021-2025 MACON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N N 0.2 MI E OF N GLENDALE RD TO PARK FOREST DR IN ROBINSON Miles = 0.80 Roadway Information Miles AADT Truck Pct 0.80 9,557 12.4 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N STREAM 0.1 MI NE OF IOWA ST NE OF EDGEWOOD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 48 MOSQUITO CREEK 1.5 MI NE OF BLUE MOUND BRIDGE REPLACEMENT $1,100,000 RECONSTRUCTION - BRIDGES ILL 48 0.5 MI N OF US 51 TO CHRISTIAN CO LINE Miles = 10.93 Roadway Information Miles AADT Truck Pct 0.62 5,192 10.8 10.31 5,553 11.7 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y N 7 - 33 Structure Information Str Number AADT 5,650 0580029 $9,050,000 MACON Truck Pct NHS 12 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 48 Location STREAMS 0.9 & 8.6 MI NW OF CHRISTIAN CO LINE Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $60,000 MACON 1 2021-2025 $6,930,000 CLARK 1 2021-2025 $2,620,000 CLARK 1 2020 $5,850,000 JASPER 4 2020 $3,000,000 MACON 2 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 49 COLES CO LINE TO 0.3 MI N OF I-70 Miles = 10.73 Roadway Information Miles AADT Truck Pct 10.73 1,849 18.8 ILL 49 ILL 49 ILL 105 1,425 11.9 STANDARD OVERLAY PATCHING PRESERVATION - PAVEMENTS NHS N CUMBERLAND CO LINE TO MAIN ST IN WILLOW HILL Miles = 12.27 Roadway Information Miles AADT Truck Pct 11.27 849 13.3 1.00 REHABILITATION - PAVEMENTS NHS N TYLER AVE IN CASEY TO CUMBERLAND CO LINE Miles = 7.00 Roadway Information Miles AADT Truck Pct 7.00 1,524 24.0 DESIGNED OVERLAY STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N AT 24TH ST INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 7 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 105 Location AT 24TH ST Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $750,000 MACON 1 2021-2025 $1,500,000 MACON 1 2021-2025 $9,210,000 MACON 3 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 105 AT 24TH ST UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 105 WILLIAM ST BRIDGE (LAKE DECATUR) IN DECATUR BRIDGE SUPERSTRUCTURE ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES ILL 105 LONG CREEK 2.5 MI W OF PIATT CO LINE BRIDGE REPLACEMENT Structure Information Str Number AADT 5,400 0580048 5,400 0580047 $970,000 RECONSTRUCTION - BRIDGES ILL 105 0.3 MI E OF BENDER DR TO PIATT CO LINE Miles = 6.06 Roadway Information Miles AADT Truck Pct 1.01 3,425 18.0 5.05 2,761 18.6 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N 7 - 35 MACON Structure Information Str Number AADT 2,450 0580044 $3,830,000 MACON Truck Pct NHS 11 N 11 N 13 2021-2025 Truck Pct NHS 20 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 121 Location CREEK 0.5 MI W OF HEMAN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 0.6 MI NW OF I-72 TO UNIVERSITY AVE IN DECATUR Miles = 2.72 Roadway Information Miles AADT Truck Pct 2.72 7,330 12.5 ILL 121 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,040,000 RECONSTRUCTION - BRIDGES ILL 121 County MACON Structure Information Str Number AADT 3,900 0580040 1 2021-2025 Truck Pct NHS 23 Y $3,710,000 MACON 5 2021-2025 $1,690,000 MACON 2 2021-2025 REHABILITATION - PAVEMENTS NHS Y OVER LAKE SHORE DR IN DECATUR BRIDGE REPLACEMENT US 36 RECONSTRUCTION - BRIDGES ILL 121 LAKE DECATUR BRIDGE REPLACEMENT Structure Information Str Number AADT 21,300 0580019 $12,300,000 MACON Truck Pct NHS 5 Y 1 2021-2025 US 36 RECONSTRUCTION - BRIDGES ILL 121 US 36 TO SCL OF MT ZION Miles = 4.15 Roadway Information Miles AADT Truck Pct 4.15 12,041 8.1 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 7 - 36 Structure Information Str Number AADT 21,300 0580020 $7,140,000 MACON Truck Pct NHS 5 Y 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 121 Location WEST OKAW RIVER SE OF BETHANY Improvements TAMP Category BRIDGE NEW DECK BRIDGE REHABILITATION Est. Cost 0.7 MI SE OF DALTON CITY TO ILL 32 AT WCL OF SULLIVAN Miles = 11.27 Roadway Information Miles AADT Truck Pct 11.27 5,159 10.7 ILL 121 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current $3,950,000 REHABILITATION - BRIDGES ILL 121 County MOULTRIE Structure Information Str Number AADT 5,200 0700002 1 2021-2025 Truck Pct NHS 14 Y $8,510,000 MOULTRIE 1 2021-2025 $380,000 MOULTRIE 1 2021-2025 $1,870,000 MOULTRIE 1 2021-2025 $6,880,000 MOULTRIE COLES 12 2020 REHABILITATION - PAVEMENTS NHS Y WEST OKAW RIVER SE OF BETHANY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS PRESERVATION - BRIDGES ILL 121 ILL 32 AT WCL OF SULLIVAN TO ECL OF SULLIVAN Miles = 2.42 ILL 32 Roadway Information Miles AADT Truck Pct 2.42 7,832 9.3 ILL 121 9.84 REHABILITATION - PAVEMENTS NHS Y ECL OF SULLIVAN TO 0.2 MI W OF 300E IN MATTOON Miles = 13.24 Roadway Information Miles AADT Truck Pct 3.40 4,405 6.8 4,710 11.2 DESIGNED OVERLAY ADA IMPROVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y Y 7 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 121 Location 0.2 MI W OF 300E TO N 20TH ST IN MATTOON Miles = 2.24 Roadway Information Miles AADT Truck Pct 2.24 7,956 6.4 ILL 121 Improvements TAMP Category STANDARD OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,730,000 COLES 6 2020 $620,000 CUMBERLAND 1 2021-2025 $1,040,000 CUMBERLAND 8 2020 REHABILITATION - PAVEMENTS NHS Y MILLER CREEK 1.5 MI S OF US 45 BRIDGE REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 121 LONG POINT BRANCH 1.3 MI E OF MONTROSE RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 121 0.1 MI W OF JEFFERSON ST TO ILL 130 IN GREENUP Miles = 0.89 Roadway Information Miles AADT Truck Pct 0.89 3,929 8.3 ILL 128 DESIGNED OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 1,450 0180028 $1,050,000 Truck Pct NHS 17 N CUMBERLAND 1 2021-2025 MOULTRIE MACON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N CREEK 3.1 MI S OF DALTON CITY BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 7 - 38 $370,000 Structure Information Str Number AADT 2,400 0700038 Truck Pct NHS 16 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 128 Location 0.3 MI S OF ILL 121 IN DALTON CITY TO BETHANY BLACKTOP Miles = 6.34 Roadway Information Miles AADT Truck Pct 6.34 2,422 16.4 ILL 128 Improvements TAMP Category DESIGNED OVERLAY Est. Cost $5,300,000 MOULTRIE 1 2020 $920,000 MOULTRIE 7 2021-2025 REHABILITATION - PAVEMENTS BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES BETHANY BLACKTOP TO FINDLAY RD Miles = 7.01 Roadway Information Miles AADT Truck Pct 2.99 2,600 19.0 4.02 ILL 128 2,600 19.0 ILL 128 DESIGNED OVERLAY Structure Information Str Number AADT 2,600 0700036 Truck Pct NHS 19 N $6,210,000 MOULTRIE SHELBY 1 2021-2025 $5,310,000 SHELBY 1 2021-2025 $270,000 SHELBY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N N FINDLAY RD TO 0.2 MI N OF N 6TH ST IN SHELBYVILLE Miles = 7.34 Roadway Information Miles AADT Truck Pct 7.34 3,599 12.0 MYP Years Past Current NHS N WILBORN CREEK 1.3 MI S OF BETHANY RD ILL 128 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N STREAMS 2.2 & 2.8 MI S OF FINDLAY RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 7 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 128 Location STREAM 2 MI N OF COWDEN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost LITTLE MOCCASIN CREEK 3.3 MI S OF ILL 33 BRIDGE REPLACEMENT $830,000 BIG MOCCASIN CREEK 4.3 MI S OF ILL 33 BRIDGE REPLACEMENT $1,060,000 DOUGLAS CO LINE TO FAIRGRANGE RD Miles = 5.04 Roadway Information Miles AADT Truck Pct 5.04 2,180 13.2 ILL 130 $1,390,000 1.82 7,232 9.4 EFFINGHAM Structure Information Str Number AADT 1,050 0250065 5 2021-2025 Truck Pct NHS 16 N 6 2021-2025 Truck Pct NHS 17 N 4 2021-2025 Truck Pct NHS 17 N $3,600,000 COLES 1 2020 $2,650,000 COLES 1 2021-2025 REHABILITATION - PAVEMENTS NHS N MADISON AVE TO 1.8 MI S OF ILL 16 IN CHARLESTON Miles = 2.73 Roadway Information Miles AADT Truck Pct 0.91 8,313 6.1 DESIGNED OVERLAY EFFINGHAM Structure Information Str Number AADT 1,050 0250044 RECONSTRUCTION - BRIDGES ILL 130 SHELBY Structure Information Str Number AADT 2,850 0870015 RECONSTRUCTION - BRIDGES ILL 128 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 128 County DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 7 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 130 Location AT EMBARRAS RIVER NCL OF NEWTON Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost County MYP Years Past Current $12,260,000 JASPER 1 2021-2025 ILL 33 REHABILITATION - BRIDGES ILL 130 EDWARDS ST IN NEWTON TO RICHLAND CO LINE Miles = 10.26 Roadway Information Miles AADT Truck Pct 10.26 4,180 31.6 ILL 130 DESIGNED OVERLAY Structure Information Str Number AADT 5,600 0400016 $6,950,000 JASPER 1 2021-2025 $1,430,000 RICHLAND 1 2021-2025 REHABILITATION - PAVEMENTS NHS N AT EAST FORK FOX RIVER 6 MI S OF JASPER CO LINE BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES ILL 130 S OF W NORTH ST TO S OF US 50 IN OLNEY Miles = 0.86 ILL 250 Roadway Information Miles AADT Truck Pct 0.86 7,710 16.8 ILL 130 Roadway Information Miles AADT Truck Pct 0.21 5,000 15.2 DESIGNED OVERLAY Structure Information Str Number AADT 5,900 0800009 Truck Pct NHS 28 N $850,000 RICHLAND 1 2021-2025 $800,000 EDWARDS 1 2021-2025 REHABILITATION - PAVEMENTS NHS N PINE ST TO SOUTHERN RR IN ALBION Miles = 1.12 ILL 15 Truck Pct NHS 15 N DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 0.10 6,400 12.2 Y 0.81 4,650 18.8 N 7 - 41 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 133 Location DOUGLAS CO LINE TO EDGAR CO LINE Miles = 5.33 Roadway Information Miles AADT Truck Pct 5.33 2,346 20.6 ILL 185 ILL 185 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost $3,210,000 COLES 1 2021-2025 $6,000,000 FAYETTE 1 2021-2025 $860,000 FAYETTE 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y LONE GROVE BRANCH 0.5 MI N OF ST PETER BRIDGE REPLACEMENT LONE GROVE BRANCH 1 MI E OF ST PETER BRIDGE REPLACEMENT Structure Information Str Number AADT 1,200 0260067 $800,000 RECONSTRUCTION - BRIDGES ILL 242 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 185 County NHS N MONTGOMERY CO LINE TO US 40 IN VANDALIA Miles = 8.86 Roadway Information Miles AADT Truck Pct 8.86 3,064 12.3 Improvements TAMP Category S OF SECTION LINE RD IN WAYNE CITY TO 0.2 MI N OF I-64 Miles = 5.93 PATCHING CAPE SEAL PRESERVATION - PAVEMENTS 7 - 42 FAYETTE Structure Information Str Number AADT 1,400 0260068 $800,000 WAYNE Truck Pct NHS 18 N 4 2021-2025 Truck Pct NHS 20 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street ILL 250 Location US 50 AT SUMNER TO STREAM 0.7 MI W OF BRIDGEPORT RD Miles = 5.98 Roadway Information Miles AADT Truck Pct 5.98 1,879 13.6 1100N Improvements TAMP Category DESIGNED OVERLAY Est. Cost $3,490,000 LAWRENCE 1 2020 $600,000 LAWRENCE 5 2021-2025 REHABILITATION - PAVEMENTS NHS N STREAM 0.2 MI W OF BRIDGEPORT RD BRIDGE REPLACEMENT RILEY CREEK 3 MI W OF CHARLESTON BRIDGE REPLACEMENT Structure Information Str Number AADT 325 0510060 $1,690,000 RECONSTRUCTION - BRIDGES BROWNS LOOP STREAM IN BROWNS BRIDGE REPLACEMENT WHITLEY CREEK 1 MI & 1.5 MI E OF ILL 32 BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES 7 - 43 COLES Structure Information Str Number AADT 3,200 0150068 $1,600,000 RECONSTRUCTION - BRIDGES BRUCE / FINDLAY RD MYP Years Past Current RECONSTRUCTION - BRIDGES 900 N County EDWARDS Structure Information Str Number AADT 750 0240006 $3,840,000 MOULTRIE Structure Information Str Number AADT 1,650 0700030 1,650 0700031 Truck Pct NHS 12 N 4 2021-2025 Truck Pct NHS 8 N 1 2021-2025 Truck Pct NHS 13 N 3 2021-2025 Truck Pct NHS 9 N 9 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street BRUCE / FINDLAY RD Location 4.3 MI E OF ILL 32 TO 1.5 MI W OF ILL 121 Miles = 1.63 Roadway Information Miles AADT Truck Pct 1.63 1,548 12.9 CH 31 Improvements TAMP Category DESIGNED OVERLAY Est. Cost $950,000 DIETERICH BLACKTOP MOULTRIE 1 2021-2025 COLES 1 2021-2025 REHABILITATION - PAVEMENTS NHS N LITTLE WABASH RIVER 0.8 MI S OF PARADISE RD ILL 33 IN DIETERICH TO 3.5 MI S Miles = 3.48 Roadway Information Miles AADT Truck Pct 3.48 2,039 16.5 MYP Years Past Current BRIDGE SUPERSTRUCTURE $1,140,000 REHABILITATION - BRIDGES DIETERICH BLACKTOP County DESIGNED OVERLAY ADA IMPROVEMENTS Structure Information Str Number AADT 1,250 0150034 Truck Pct NHS 8 N $2,280,000 EFFINGHAM 1 2021-2025 $390,000 EFFINGHAM 1 2021-2025 $620,000 CLAY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N DIETERICH CREEK 0.5 MI S OF ILL 33 BRIDGE JOINT REPLACE/REPAIR MAINTENANCE - BRIDGES DIETERICH BLACKTOP LITTLE WABASH RIVER OVERFLOW 0.8 MI N OF CLAY CITY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 7 - 44 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street DIETERICH BLACKTOP Location 3 MI S OF DIETERICH TO 2 MI N OF EFFINGHAM CO LINE Miles = 4.80 Roadway Information Miles AADT Truck Pct 4.80 1,582 17.3 DIETERICH BLACKTOP 2.10 1,351 DIETERICH BLACKTOP 20.7 DESIGNED OVERLAY Est. Cost $3,260,000 EFFINGHAM 1 2021-2025 $2,390,000 EFFINGHAM CLAY 3 2020 $2,480,000 CLAY 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N LITTLE MUDDY OVERFLOW 3.5 MI N OF CLAY CITY BRIDGE REPLACEMENT LITTLE WABASH RIVER 1.5 MI N OF CLAY CITY BRIDGE REPLACEMENT Structure Information Str Number AADT 1,550 0130017 $4,400,000 RECONSTRUCTION - BRIDGES DIETERICH BLACKTOP MYP Years Past Current RECONSTRUCTION - BRIDGES DIETERICH BLACKTOP County NHS N 2 MI N OF EFFINGHAM CO LINE TO S OF BIBLE GROVE RD Miles = 5.43 Roadway Information Miles AADT Truck Pct 3.33 1,158 29.1 Improvements TAMP Category ZION LN TO S 1ST ST IN CLAY CITY Miles = 12.49 CAPE SEAL PRESERVATION - PAVEMENTS 7 - 45 CLAY Structure Information Str Number AADT 1,800 0130019 $1,220,000 CLAY Truck Pct NHS 30 N 1 2021-2025 Truck Pct NHS 20 N 2 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street DIETERICH BLACKTOP Location N OF S 1ST ST IN CLAY CITY TO US 50 Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 2,837 15.4 FR RD 505 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $610,000 CLAY 1 2021-2025 $200,000 LAWRENCE 1 2021-2025 $5,960,000 CLAY 1 2021-2025 $4,970,000 COLES 1 2021-2025 $6,110,000 COLES CUMBERLAND 2 2021-2025 REHABILITATION - PAVEMENTS NHS N STREAM 1.1 MI W OF BRIDGEPORT RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS KINMUNDY RD MARION CO LINE TO US 45 IN LOUISVILLE Miles = 10.17 Roadway Information Miles AADT Truck Pct 10.17 1,096 28.3 LAKE PARADISE RD LERNA RD DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 1.5 MI S OF ILL 16 TO CUMBERLAND CO LINE Miles = 10.47 Roadway Information Miles AADT Truck Pct 3.60 2,625 8.3 0.98 REHABILITATION - PAVEMENTS NHS N ILL 16 TO CUMBERLAND CO LINE Miles = 8.10 Roadway Information Miles AADT Truck Pct 8.10 1,613 7.5 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 2,150 6.5 N 1.03 800 0.0 N 4.30 1,815 7.7 N 0.44 148 0.0 N 7 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street MAIN ST Location 0.1 MI N OF ELDORADO ST IN HARRISTOWN TO N GLASGOW RD Miles = 2.26 Roadway Information Miles AADT Truck Pct 2.26 804 6.7 MONTROSE BLACKTOP Improvements TAMP Category DESIGNED OVERLAY Est. Cost $1,060,000 MACON 1 2021-2025 $1,590,000 CUMBERLAND 7 2020 REHABILITATION - PAVEMENTS NHS N SPRING POINT CREEK 0.5 MI N OF EFFINGHAM CO LINE BRIDGE SUPERSTRUCTURE STREAM 0.3 MI N OF EFFINGHAM CO LINE CULVERT REPLACEMENT Structure Information Str Number AADT 2,200 0180057 $690,000 RECONSTRUCTION - BRIDGES MONTROSE BLACKTOP ILL 121 TO EFFINGHAM CO LINE Miles = 7.26 Roadway Information Miles AADT Truck Pct 7.26 2,233 19.2 MONTROSE BLACKTOP DESIGNED OVERLAY CUMBERLAND Structure Information Str Number AADT 2,200 0182003 Truck Pct NHS 21 N 1 2021-2025 Truck Pct NHS 21 N $4,190,000 CUMBERLAND 1 2021-2025 $4,250,000 EFFINGHAM 1 2020 REHABILITATION - PAVEMENTS NHS N US 40 IN MONTROSE TO ILL 33 IN DIETERICH Miles = 7.13 Roadway Information Miles AADT Truck Pct 7.13 2,302 23.2 MYP Years Past Current REHABILITATION - BRIDGES MONTROSE BLACKTOP County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 7 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street OLD ILL 140 Location STREAM E OF HAGARSTOWN Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost STREAM 1 MI SW OF US 45 JCT BRIDGE REPLACEMENT $670,000 SANGAMON CO LINE TO US 36 IN DECATUR Miles = 9.67 Roadway Information Miles AADT Truck Pct 4.12 2,200 11.7 5.55 OLD US 50 1,188 9.7 DESIGNED OVERLAY $670,000 7 2021-2025 Truck Pct NHS 6 N 6 2021-2025 Truck Pct NHS N/A N $7,790,000 MACON 1 2020 $1,000,000 CLAY 2 2021-2025 REHABILITATION - PAVEMENTS NHS N N RACCOON CREEK 2.5 MI W OF US 45 (N) JCT US 50 W OF XENIA TO 0.3 MI E OF LINCOLN RD Miles = 7.46 Roadway Information Miles AADT Truck Pct 7.46 1,404 7.3 WAYNE Structure Information Str Number AADT 10 0960018 BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES OLD US 50 FAYETTE Structure Information Str Number AADT 900 0260058 RECONSTRUCTION - BRIDGES OLD US 36 MYP Years Past Current RECONSTRUCTION - BRIDGES OLD ILL 15 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 7 - 48 Structure Information Str Number AADT 1,500 0130037 $3,320,000 CLAY Truck Pct NHS 7 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street OLD US 51 Location LONG GROVE CREEK 0.5 MI N OF MOWEAQUA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost N MAIN ST I-72 TO ILL 121 IN DECATUR Miles = 2.68 DESIGNED OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,640,000 RECONSTRUCTION - BRIDGES OLD US 51 BUS County SHELBY Structure Information Str Number AADT 1,350 0870001 5 2021-2025 Truck Pct NHS 5 N $4,390,000 MACON 5 2021-2025 $160,000 MACON 5 2021-2025 $6,070,000 MACON 5 2021-2025 N WATER ST Roadway Information Miles AADT Truck Pct 2.21 20,041 4.5 0.47 11,100 OLD US 51 BUS N MAIN ST 4.5 REHABILITATION - PAVEMENTS NHS Y Y SPRING CREEK 0.3 MI N OF PERSHING RD IN DECATUR BRIDGE JOINT REPLACE/REPAIR N WATER ST PRESERVATION - BRIDGES OLD US 51 BUS N MAIN ST ILL 121 TO US 36 IN DECATUR Miles = 4.27 DESIGNED OVERLAY ADA IMPROVEMENTS FRANKLIN ST N WATER ST Roadway Information Miles AADT Truck Pct 2.13 12,278 3.0 2.14 12,180 4.2 REHABILITATION - PAVEMENTS NHS Y Y 7 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street OLD US 51 BUS Location ILL 121 TO US 36 IN DECATUR N MAIN ST Improvements TAMP Category P.E. (ROW) P.E. SURVEYS (ROW) Est. Cost County MYP Years Past Current $300,000 MACON 1 2020 $450,000 MACON 2 2020 $7,980,000 MACON 1 2021-2025 $1,110,000 MACON 1 2021-2025 FRANKLIN ST N WATER ST REHABILITATION - PAVEMENTS OLD US 51 BUS ILL 121 TO US 36 IN DECATUR LAND ACQUISITION N MAIN ST FRANKLIN ST N WATER ST REHABILITATION - PAVEMENTS OLD US 51 BUS ELWIN RD CLEVELAND AVE IN DECATUR TO US 51 1.9 MI S OF ELWIN RD Miles = 6.08 Roadway Information Miles AADT Truck Pct 5.86 8,300 8.1 0.22 8,800 OLD US 51 BUS 3.5 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y Y OVER ILL 105 IN DECATUR & US 51 2 MI S OF ELWIN BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 7 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street S 4TH STREET RD Location S 4TH ST RD: UNIVERSITY DR IN CHARLESTON TO LINCOLN LOG CABIN RD; LINCOLN LOG CABIN RD: S 4TH ST RD TO 0.6 MI E & 100 N: TR 1200 E TO S 4TH ST RD Miles = 9.29 Roadway Information Miles AADT Truck Pct 0.56 2,650 3.8 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost MYP Years Past Current $5,700,000 COLES 1 2021-2025 $1,040,000 LAWRENCE 1 2021-2025 REHABILITATION - PAVEMENTS 1,620 5.0 N 0.58 50 0.0 N 2.01 775 6.5 N ALLISON DITCH 2 MI E OF AIRPORT INTCHG BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES VARIOUS County NHS N 6.07 US 50 FR RD Improvements TAMP Category VARIOUS LOCATIONS IN LAWRENCE & RICHLAND COUNTIES GUARDRAIL END-SECT REPL GUARDRAIL Structure Information Str Number AADT 50 0510033 $1,011,000 Truck Pct NHS 8 N LAWRENCE RICHLAND 1 2020 $500,000 DISTRICT-WIDE 2 2020 $2,500,000 DISTRICT-WIDE 7 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE II) P.E. (PHASE I) PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS 7 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION Improvements TAMP Category MISCELLANEOUS PROJECTS MICROSURFACING 1 PASS Est. Cost County MYP Years Past Current $1,240,000 DISTRICT-WIDE 2 2021-2025 $8,000,000 DISTRICT-WIDE 1 2021-2025 $8,390,000 DISTRICT-WIDE 2 2021-2025 $5,350,000 DISTRICT-WIDE 1 2020 $2,000,000 DISTRICT-WIDE 1 2021-2025 PRESERVATION - PAVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (PHASE II) P.E. (PHASE I) PRELIMINARY ENGINEERING P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT PRESERVATION MISCELLANEOUS PROJECTS MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION MISCELLANEOUS PROJECTS MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 7 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION Improvements TAMP Category MISCELLANEOUS PROJECTS MICROSURFACING 1 PASS Est. Cost County MYP Years Past Current $25,000,000 DISTRICT-WIDE 1 2021-2025 $4,040,000 DISTRICT-WIDE 2 2021-2025 $50,000,000 DISTRICT-WIDE 1 2021-2025 $19,455,000 DISTRICT-WIDE 5 2021-2025 $300,000 EDWARDS LAWRENCE WABASH WAYNE 4 2020 $350,000 MACON MOULTRIE SHELBY 4 2021-2025 PRESERVATION - PAVEMENTS VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS PRESERVATION - BRIDGES VARIOUS STRUCTURE PRESERVATION MISCELLANEOUS PRESERVATION - BRIDGES VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES 7 - 53 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street VARIOUS Location BRIDGE DECK SEALING Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $1,350,000 DISTRICT-WIDE 4 2021-2025 $70,000 DISTRICT-WIDE 6 2020 $1,000,000 DISTRICT-WIDE 5 2021-2025 $100,000 DISTRICT-WIDE 6 2020 $800,000 DISTRICT-WIDE 5 2021-2025 $350,000 DISTRICT-WIDE 6 2020 PRESERVATION - BRIDGES VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS RAILROAD FLAGGERS RR FLAGGER MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS RAILROAD FLAGGERS RR FLAGGER MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 7 - 54 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 7 State Highways Route / Street VARIOUS Location MISCELLANEOUS LAND ACQUISITION Improvements TAMP Category LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 7 - 55 Est. Cost County MYP Years Past Current $3,200,000 DISTRICT-WIDE 5 2021-2025 DISTRICT 7 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street 11TH ST Location LINCOLN AVE TO MADISON AVE Miles = 0.84 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $450,000 COLES 3 2021-2025 $150,000 LAWRENCE 9 2021-2025 $12,000 LAWRENCE 8 2021-2025 $350,000 LAWRENCE 1 2020 $24,000 LAWRENCE 1 2020 $400,000 LAWRENCE 1 2021-2025 REHABILITATION - PAVEMENTS 13TH ST OVER CONRAD RR IN ST. FRANCISVILLE BRIDGE REMOVAL/DEMOLITION MISCELLANEOUS IMPROVEMENTS 13TH ST OVER CONRAD RR IN ST. FRANCISVILLE CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 20 N RD AT DRAINAGE DITCH 1 MI SW OF ST. FRANCISVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 20 N RD AT DRAINAGE DITCH 1 MI SW OF ST. FRANCISVILLE CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 1000 E RD AT INDIAN CREEK 2 MI E OF BRIDGEPORT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 56 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street 1000 E RD Location AT INDIAN CREEK 2 MI E OF BRIDGEPORT Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $24,000 LAWRENCE 1 2021-2025 $135,000 EDWARDS 8 2021-2025 $750,000 CUMBERLAND 6 2021-2025 $150,000 WAYNE 11 2021-2025 $325,000 MOULTRIE 4 2021-2025 $340,000 MOULTRIE 1 2021-2025 RECONSTRUCTION - BRIDGES 1050 E RD AT DRAINAGE DITCH 2 MI E OF BONE GAP BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1050 N RD BURMA RD TO ILL 130 Miles = 6.02 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1400 N RD AT LITTLE DRY FORK 6 MI N OF SIMS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1400 N RD AT TWO MILE BRANCH 2 MI E OF SULLIVAN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1400 N RD AT WILBORN CREEK 4.3 MI SW OF BETHANY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 57 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street 150 E RD Location AT BUGABOO CREEK 4.8 MI S OF CHAUNCEY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 LAWRENCE 1 2021-2025 $300,000 SHELBY 1 2021-2025 $700,000 LAWRENCE 1 2021-2025 $32,000 LAWRENCE 1 2021-2025 $270,000 CLAY 5 2021-2025 $500,000 LAWRENCE 1 2021-2025 RECONSTRUCTION - BRIDGES 1600 E RD AT SWAFFORD CREEK 3 MI SW OF SHELBYVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1600 N RD AT THE SLOUGH 4 MI SE OF CHAUNCEY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1600 N RD AT THE SLOUGH 4 MI SE OF CHAUNCEY CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 1700 N RD AT PANTHER CREEK 2 MI S OF HORD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1800 E RD AT ALLISON DRAINAGE DITCH #1 2.5 MI SW OF RUSSELLVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 58 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street 1800 N RD Location AT JONATHAN CREEK 1 MI S OF CADWELL Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $250,000 MOULTRIE 8 2020 $600,000 CLAY 8 2021-2025 $500,000 SHELBY 4 2021-2025 $275,000 WAYNE 2 2021-2025 $300,000 SHELBY 14 2021-2025 $735,000 WABASH 11 2021-2025 RECONSTRUCTION - BRIDGES 2000 E RD CH 23 TO WAYNE CO LINE Miles = 3.07 STANDARD OVERLAY REHABILITATION - PAVEMENTS 2600 E RD AT RICHLAND CREEK 2 MI W OF STRASBURG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 2800 E RD AT NEWTON BRANCH 2 MI E OF MT. ERIE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 3000 E RD AT LITTLE WABASH RIVER 4.7 MI W OF SIGEL BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 400 E RD 1750 N RD TO 1400 N RD Miles = 3.52 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 7 - 59 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street 400 E RD Location 1750 N RD TO 1300 N RD Miles = 4.57 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,355,000 WABASH 8 2021-2025 $390,000 MOULTRIE 2 2021-2025 $519,000 SHELBY 2 2020 $1,195,000 MACON 4 2020 $1,200,000 EDWARDS 5 2020 $1,600,000 MACON 1 2020 REHABILITATION - PAVEMENTS 675 N RD AT WHITLEY CREEK 2.5 MI N OF GAYS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 900 N RD AT DRAKE CREEK 4.5 MI E OF STRASBURG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES BROADWAY ST ILL 121 TO W MAIN ST Miles = 0.29 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS BROWNS / GRAYVILLE RD E 450 N RD TO ILL 1 Miles = 2.42 STANDARD OVERLAY REHABILITATION - PAVEMENTS BRUSH COLLEGE RD OVER FARIES PKWY & NS RR LAND ACQUISITION INITIAL CONSTRUCTION - BRIDGES 7 - 60 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street BRUSH COLLEGE RD Location OVER FARIES PKWY & NS RR Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $2,000,000 MACON 1 2020 $21,000,000 MACON 1 2021-2025 $2,078,000 EDWARDS 13 2021-2025 $1,000,000 EDWARDS 8 2021-2025 $3,000,000 SHELBY 4 2021-2025 INITIAL CONSTRUCTION - BRIDGES BRUSH COLLEGE RD OVER FARIES PKWY & NS RR BRIDGE (NEW) ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - BRIDGES CH 1 BONE GAP RD E 1300 N RD TO ILL 15 Miles = 4.11 RECONSTRUCTION THIS EARMARK WILL BE FUNDED SEPARATELY. RECONSTRUCTION - PAVEMENTS CH 1 BONE GAP RD E 1300 N RD TO ILL 15 Miles = 0.01 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 2 BETHANY / MOULTRIE CO LINE TO FINDLAY NCL Miles = 3.54 STANDARD OVERLAY FINDLAY RD REHABILITATION - PAVEMENTS 7 - 61 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CH 2 E 2000TH AVE Location JASPER CO LINE TO N 700TH ST IN ANNAPOLIS Miles = 7.16 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $3,000,000 CRAWFORD 3 2020 $5,260,000 CLAY 5 2020 CLAY 5 2020 $300,000 EFFINGHAM 16 2020 $80,000 EFFINGHAM 3 2021-2025 $1,200,000 EFFINGHAM 7 2021-2025 REHABILITATION - PAVEMENTS CH 3 AT LITTLE WABASH RIVER 0.5 MI E OF LOUISVILLE BRIDGE REPLACEMENT SAILOR SPRINGS RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 3 AT LITTLE WABASH RIVER 0.5 MI E OF LOUISVILLE CONSTRUCTION ENGINEERING $201,000 SAILOR SPRINGS RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 6 AT LAKE SARA 3 MI SE OF SHUMWAY BRIDGE REPLACEMENT E 1600TH AVE RECONSTRUCTION - BRIDGES CH 6 BEACH RD TO N 1000TH ST E 1600TH AVE P.E. (PHASE I) P.E. (PHASE II) REHABILITATION - PAVEMENTS CH 6 E 1600TH AVE BEACH RD TO N 1000TH ST Miles = 1.28 STANDARD OVERLAY REHABILITATION - PAVEMENTS 7 - 62 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CH 6 Location BEACH RD TO N 1000TH ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $80,000 EFFINGHAM 6 2021-2025 $800,000 CRAWFORD 1 2021-2025 $575,000 LAWRENCE 1 2021-2025 $32,000 LAWRENCE 1 2021-2025 CLARK 6 2021-2025 EFFINGHAM 1 2020 E 1600TH AVE REHABILITATION - PAVEMENTS CH 6 N 700 ST ANNAPOLIS RD TO N 800TH ST (CH 13) Miles = 4.81 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 8 AT RACCOON CREEK 8.5 MI S OF BRIDGEPORT BRIDGE REPLACEMENT BRIDGEPORT RD RECONSTRUCTION - BRIDGES CH 8 AT RACCOON CREEK 8.5 MI S OF BRIDGEPORT CONSTRUCTION ENGINEERING BRIDGEPORT RD RECONSTRUCTION - BRIDGES CH 10 CH 26 400TH RD CH 10 / CH 26 / 400TH RD: ILL 49 TO 420TH ST; CH 26 / 420TH ST: 400TH RD TO CRAWFORD CO LINE Miles = 5.34 RECONSTRUCTION $2,750,000 420TH ST RECONSTRUCTION - PAVEMENTS CH 16 E 1000TH AVE AT BISHOP CREEK 3 MI W OF DIETERICH P.E. (PHASE I) P.E. (PHASE II) RECONSTRUCTION - BRIDGES 7 - 63 $40,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CH 16 Location AT BISHOP CREEK 3 MI W OF DIETERICH Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 EFFINGHAM 2 2021-2025 $600,000 CLAY 8 2021-2025 $265,000 CLAY 1 2021-2025 $18,000 CLAY 1 2021-2025 $850,000 FAYETTE 5 2021-2025 $80,000 FAYETTE 5 2021-2025 E 1000TH AVE RECONSTRUCTION - BRIDGES CH 16 SYLVITE DR TO RICHLAND CO LINE Miles = 3.01 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 19 AT BUSH CREEK 1 MI E OF XENIA BRIDGE REPLACEMENT CAMPGROUND LN RECONSTRUCTION - BRIDGES CH 19 AT BUSH CREEK 1 MI E OF XENIA CONSTRUCTION ENGINEERING CAMPGROUND LN RECONSTRUCTION - BRIDGES CH 23 AT TRIB LITTLE HICKORY 4 MI W OF ST. PETER BRIDGE REPLACEMENT 900 N RD RECONSTRUCTION - BRIDGES CH 23 AT TRIB LITTLE HICKORY 4 MI W OF ST. PETER CONSTRUCTION ENGINEERING 900 N RD RECONSTRUCTION - BRIDGES 7 - 64 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CH 24 Location AT LAKE DECATUR N OF US 36 (WEST SIDE) Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $20,223,000 MACON 7 2021-2025 $1,600,000 MACON 11 2021-2025 $1,430,000 WAYNE 8 2021-2025 $64,000 WAYNE 7 2021-2025 $300,000 MACON 4 2020 $550,000 FAYETTE 1 2020 REA'S BRIDGE RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 25 ARGENTA RD ILL 48 TO I-72 RAMP (WB) Miles = 1.45 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS CH 25 1100 E RD CLAY CO LINE TO 1800 N RD Miles = 6.09 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 25 CLAY CO LINE TO 1800 N RD CONSTRUCTION ENGINEERING 1100 E RD REHABILITATION - PAVEMENTS CH 27 DAMERY RD AT UNNAMED STREAM & AT SPRING CREEK 3.1 MI NE OF BLUE MOUND BRIDGE REPLACEMENT BRIDGE REMOVAL/DEMOLITION RECONSTRUCTION - BRIDGES CH 28 AT DISMAL CREEK 4.5 MI N OF FARINA BRIDGE REPLACEMENT N 2650 ST RECONSTRUCTION - BRIDGES 7 - 65 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CH 28 Location AT DISMAL CREEK 4.5 MI N OF FARINA Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $60,000 FAYETTE 1 2020 $600,000 MACON 9 2021-2025 $300,000 MACON 1 2021-2025 $100,000 SHELBY 1 2020 $1,025,000 SHELBY 2 2021-2025 SHELBY 2 2021-2025 N 2650 ST RECONSTRUCTION - BRIDGES CH 30 AT FINLEY CREEK IN MT ZION BRIDGE REPLACEMENT MAIN ST RECONSTRUCTION - BRIDGES CH 38 AT FRIENDS CREEK 4.9 MI NE OF ARGENTA BRIDGE REPLACEMENT E WASHINGTON ST RD RECONSTRUCTION - BRIDGES CH 41 AT ROBINSON CREEK 0.6 MI S OF WESTERVELT P.E. (PHASE I) N 1525 E RD RECONSTRUCTION - BRIDGES CH 41 AT ROBINSON CREEK 0.6 MI S OF WESTERVELT BRIDGE REPLACEMENT N 1525 E RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES CH 41 AT ROBINSON CREEK 0.6 MI S OF WESTERVELT CONSTRUCTION ENGINEERING $203,000 N 1525 E RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 7 - 66 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street CR 2515 E Location AT BRANCH LITTLE WABASH RIVER 1.7 MI W OF GOLDEN GATE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $215,000 WAYNE 2 2020 $55,000 WAYNE 2 2020 CUMBERLAND 8 2021-2025 WABASH 2 2020 $650,000 CUMBERLAND 4 2020 $42,000 CUMBERLAND 1 2020 RECONSTRUCTION - BRIDGES CR 2515 E AT BRANCH LITTLE WABASH RIVER 1.7 MI W OF GOLDEN GATE CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES CUMBERLAND RD AT EMBARRAS RIVER OVERFLOW 0.5 MI W OF GREENUP BRIDGE REPLACEMENT $500,000 RECONSTRUCTION - BRIDGES E 1200 RD LAWRENCE CO LINE TO CH 11 Miles = 2.04 STANDARD OVERLAY $61,000 REHABILITATION - PAVEMENTS E 1250 N RD AT LAKE MATTOON 1.5 MI N OF NEOGA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 1250 N RD AT LAKE MATTOON 1.5 MI N OF NEOGA CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 7 - 67 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street E 1320 N RD Location AT DRAINAGE DITCH 3 MI E OF GEFF Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $250,000 WAYNE 6 2021-2025 $650,000 FAYETTE 4 2020 $250,000 MOULTRIE 2 2021-2025 $360,000 EFFINGHAM 3 2020 $700,000 FAYETTE 1 2021-2025 $60,000 FAYETTE 1 2021-2025 RECONSTRUCTION - BRIDGES E 1550 N RD AT HURRICANE CREEK 4.5 MI W OF VANDALIA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 1600 N RD AT TWO MILE BRANCH 2 MI N OF SULLIVAN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 200TH AVE AT LITTLE MUDDY CREEK 1 MI W OF WINTERROWD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 2625 AVE AT HURRICANE CREEK 0.2 MI NE OF BINGHAM BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 2625 AVE AT HURRICANE CREEK 0.2 MI NE OF BINGHAM CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 7 - 68 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street E 3200 AVE Location AT RAMSEY CREEK 3.5 MI NW OF RAMSEY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $500,000 FAYETTE 2 2021-2025 $300,000 SHELBY 1 2020 $400,000 CRAWFORD 1 2021-2025 $300,000 FAYETTE 1 2021-2025 $400,000 CRAWFORD 6 2020 $300,000 RICHLAND 1 2021-2025 RECONSTRUCTION - BRIDGES E 500 N RD AT BRUSH CREEK 3.7 MI NW OF STEWARDSON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 550TH AVE AT UNNAMED CREEK 0.6 MI E OF PIERCEBURG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E 700 AVE AT TRIB N FORK 6 MI W OF FARINA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E HIGHLAND AVE N RECTOR AVE E HIGHLAND AVE: W OF N CROSS ST TO E OF N RECTOR AVE; N RECTOR AVE: E HIGHLAND AVE TO S OF E MEFFORD DR IN ROBINSON Miles = 0.19 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS EBENEZER LN AT E FORK BONPAS CREEK 4.5 MI E OF CALHOUN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 69 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street GOLDENEYE RD Location AT BUCK CREEK 3.5 MI SE OF OSKALOOSA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $180,000 CLAY 6 2021-2025 $16,000 CLAY 3 2021-2025 $265,000 CLAY 7 2021-2025 $16,000 CLAY 2 2021-2025 $300,000 RICHLAND 1 2021-2025 $420,000 CLAY 9 2021-2025 RECONSTRUCTION - BRIDGES GOLDENEYE RD AT BUCK CREEK 3.5 MI SE OF OSKALOOSA CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES HONEY LOCUST LN AT UNNAMED CREEK 0.5 MI W OF XENIA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES HONEY LOCUST LN AT UNNAMED CREEK 0.5 MI W OF XENIA CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES HURRICANE LN AT W FORK COON CREEK 3 MI SW OF DUNDAS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES MARIGOLD LN AT ELM CREEK 2.5 MI SE OF FLORA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 70 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street MARSHALL AVE Location 17TH ST TO 14TH ST Miles = 0.22 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $1,025,000 COLES 1 2020 $772,000 RICHLAND 14 2021-2025 $400,000 SHELBY 1 2021-2025 $350,000 FAYETTE 2 2020 $138,000 WABASH 9 2021-2025 $250,000 EFFINGHAM 2 2020 RECONSTRUCTION - PAVEMENTS MT GILEAD LN AT FOX RIVER 2.5 MI SW OF DUNDAS BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 1100 E RD AT STREAM 4.8 MI SE OF MOWEAQUA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 1400 ST AT FLAT CREEK 5 MI SE OF SHOBONIER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 1900 BLVD AT UNNAMED CREEK 3 MI S OF LANCASTER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 2000TH ST AT DIETERICH CREEK 2 MI N OF ELLIOTSTOWN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 71 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street N 300 ST Location AT RACCOON CREEK 4 MI SW OF VANDALIA Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $300,000 FAYETTE 1 2021-2025 $275,000 EFFINGHAM 2 2020 $250,000 FAYETTE 1 2021-2025 $600,000 WABASH 5 2020 $3,000,000 MACON 1 2021-2025 $250,000 MACON 2 2020 RECONSTRUCTION - BRIDGES N 400TH ST AT LIMESTONE CREEK 3.5 MI W OF EDGEWOOD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N 725 ST AT STEVE BRANCH 3 MI SW OF SHOBONIER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES OAK ST 5TH ST OAK ST: COLLEGE DR TO POPLAR ST & ILL 15 TO W 3RD ST; 5TH ST: OAK ST TO N MULBERRY ST Miles = 2.30 STANDARD OVERLAY REHABILITATION - PAVEMENTS S BALTIMORE AVE FULTON AVE TO LOST BRIDGE RD Miles = 1.25 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS STRAWN RD AT WILLOW BRANCH 3.3 MI NE OF NIANTIC BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 7 - 72 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street TAYLOR RD Location AT WARD BRANCH 0.6 MI S OF ILL 48 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $1,000,000 MACON 1 2020 $2,022,000 LAWRENCE 1 2021-2025 1 2021-2025 LAWRENCE 5 2021-2025 LAWRENCE 5 2021-2025 RECONSTRUCTION - BRIDGES TR 92 OVER B&O RR BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES TR 92 OVER B&O RR CONSTRUCTION ENGINEERING $140,000 LAWRENCE ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. RECONSTRUCTION - BRIDGES TR 257 AT WABASH RIVER OVERFLOW BRIDGE REPLACEMENT $6,230,000 WABASH CANNON BALL RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES TR 257 AT WABASH RIVER OVERFLOW CONSTRUCTION ENGINEERING $200,000 WABASH CANNON BALL RD ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 7 - 73 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street VARIOUS Location VARIOUS LOCATIONS IN OREANA Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $1,500,000 MACON 8 2021-2025 SAFETEA-LU TRANSPORTATION IMPROVEMENT PROJECT. STATE AND OR LOCAL MATCH REQUIRED. PROJECT REQUIRES ADDITIONAL STATE OR LOCAL FUNDS TO FULLY IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS IN JASPER CO Miles = 24.28 BIT SURFACE TREATMENT-A1 $309,000 JASPER 4 2020 $295,000 JASPER 4 2021-2025 $330,000 JASPER 3 2021-2025 LAWRENCE 1 2020 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN JASPER CO Miles = 24.30 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN JASPER CO Miles = 26.50 BIT SURFACE TREATMENT-A1 PRESERVATION - PAVEMENTS VARIOUS VARIOUS LOCATIONS IN LAWRENCE CO P.E. (BRIDGE INSPECTION) MISCELLANEOUS IMPROVEMENTS 7 - 74 $32,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 7 Local Highways Route / Street VARIOUS Location VARIOUS LOCATIONS IN RICHLAND CO Improvements TAMP Category BIT SURFACE TREATMENT-A1 Est. Cost County MYP Years Past Current $164,000 RICHLAND 1 2020 $3,000,000 EFFINGHAM 13 2020 $80,000 EFFINGHAM 12 2020 $250,000 MACON 2 2021-2025 $1,500,000 MACON 6 2021-2025 PRESERVATION - PAVEMENTS W EVERGREEN EXT LAKE SARA RD TO NAZARENE RD Miles = 1.00 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS W EVERGREEN EXT LAKE SARA RD TO NAZARENE RD CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS W SCHOOL RD AT UNNAMED STREAM 6.5 MI NW OF WARRENSBURG BRIDGE REPLACEMENT 2400 N RD RECONSTRUCTION - BRIDGES WOOD ST AT S MARTIN LUTHER KING JR DR Miles = 0.01 ADDITIONAL LANES INITIAL CONSTRUCTION - PAVEMENTS 7 - 75 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 5 District 8 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 5, DISTRICT 8, COLLINSVILLE Overview Highway District 8 encompasses 11 counties in southwestern Illinois and includes the cities of Centralia, East St. Louis, Alton, Belleville, Edwardsville, Jerseyville, Highland, Greenville, Mascoutah and Chester, plus many smaller communities which serve as satellites for the larger employment centers. The state highway system in District 8 consists of 1,803 miles of highways and 1,012 bridges, supporting 16.7 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $2.36 billion will be provided during FY 2020-2025 for improvements to state highways in District 8. The following table summarizes anticipated accomplishments on the state highway system in District 8 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 48 148 145 3 789,607 82,736 169,144 44,381 0 0 0 0 12 4 9 0 4 0 192.115 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 55/Interstate 64 at Poplar Street Collector-Distributor eastbound from Poplar Street Bridge to Trendley Avenue in St. Clair County. Bridge substructure rehabilitation, a new bridge deck, bridge painting, a bridge deck overlay, bridge joint replace/repair and bridge repair are programmed during FY 2021-2025 at a cost of $34.9 million. A portion of this project has been approved for Illinois Special Bridge Program funding. 8-i • Interstate 55/64/US 40/Illinois 3 from Mississippi River to Interstate 64 (Tri-Level) interchange in St. Clair County. Reconstruction of 2.7 miles, lighting, bridge joint replace/repair, bridge deck overlay and bridge repair are programmed during FY 2021-2025 at a cost of $44.5 million. • Interstate 64 under Illinois 111 in St. Clair County. Interchange reconstruction, a bridge replacement, ramp repair, engineering for contract plans, land acquisition, utility adjustments, and construction engineering are programmed during FY 2020-2025 at a cost of $28.5 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $2 million. This project has been approved for Illinois Special Bridge Program funding. • Interstate 64/US 50 from west of Greenmount Road to 1.1 miles west of Illinois 158. Additional lanes and resurfacing on 2.2 miles, engineering for location, environmental and design studies and engineering for contract plans are programmed during FY 2021-2025 at a cost of $32 million. • Interstate 255/US 50 from Illinois 3 at Dupo to Collinsville Road in St. Clair and Madison Counties. Resurfacing on 30.2 miles (including ramp repair), patching, a bridge deck overlay, a new bridge deck, bridge repair, shoulder repair, scour mitigation, bridge joint replace/repair, bridge deck sealing and bridge painting are programmed during FY 2020-2025 at a cost of $138 million. Of this total, resurfacing on 17.8 miles (including ramp repair), bridge repair, patching, shoulder repair, scour mitigation, bridge painting, bridge deck overlay, bridge joint replace/repair, bridge deck sealing and a new bridge deck are programmed in FY 2020 at a cost of $64 million. • Interstate 255 at Imbs Station Road and Davis Street Ferry Road in Dupo. A new interchange, land acquisition, utility adjustments and construction engineering are programmed during FY 2021-2025 at a cost of $49 million. SAFETEA-LU High Priority project. • Interstate 270 at Mississippi River in Madison County. A bridge replacement, engineering for contract plans, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $211.6 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $1 million. Illinois is the lead agency for the project with Missouri sharing equally in the costs, except for the land acquisition and utility adjustments that are only on the Illinois side of the river. • Interstate 270 from Mississippi River to west of Illinois 203, including the Illinois 3 interchange in Madison County. Additional lanes and resurfacing on 2.3 miles, engineering for location, environmental and design studies, bridge superstructure work, land acquisition, utility adjustments and interchange reconstruction are programmed during FY 2020-2025 at a cost of $85 million. Of this total, engineering for location, environmental and design studies is programmed in FY 2020 at a cost of $500,000. • Interstate 270 at the Illinois 111 interchange in Madison County. Interchange reconstruction and construction engineering are programmed during FY 2021-2025 at a cost of $19 million. Provides for efficient freight movement. • US 67 at Delhi Bypass in Jersey County. New construction of 3.2 miles of a four-lane expressway for the bypass around Delhi including grading, paving, drainage, signing and lighting is programmed during FY 2021-2025 at a cost of $23 million. In addition, land acquisition and utility adjustments from the Madison County line to Jerseyville are programmed during FY 2021-2025 at a cost of $1.4 million. Rebuild Illinois project and SAFETEA-LU High Priority project. • Illinois 162/157 intersection relocation from the north junction of Illinois 157 to the south junction of Illinois 157 in Madison County. An intersection reconstruction, a new bridge, land acquisition, utility adjustments, engineering for contract plans and construction engineering are programmed during FY 2021-2025 at a cost of $19 million. Rebuild Illinois project. 8-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 55 I 64 Location POPLAR ST COLLECTOR-DISTRIBUTOR 0.2 MI E OF POPLAR ST BRIDGE Improvements TAMP Category BRIDGE NEW DECK BRIDGE REPAIR Est. Cost County MYP Years Past Current $23,600,000 ST. CLAIR 7 2021-2025 (EASTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 55 I 64 POPLAR ST COLLECTOR-DISTRIBUTOR 0.2 MI E OF POPLAR ST BRIDGE BRIDGE PAINTING Structure Information Str Number AADT 22,600 0820144 Truck Pct NHS 10 Y $1,400,000 ST. CLAIR 1 2021-2025 $4,700,000 ST. CLAIR 7 2021-2025 (EASTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES I 55 I 64 POPLAR ST COLLECTOR-DISTRIBUTOR 0.7 MI E OF POPLAR ST BRIDGE BRIDGE SUBSTRUCTURE BRIDGE REPAIR (EASTBOUND) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. REHABILITATION - BRIDGES I 55 I 64 POPLAR ST COLLECTOR-DISTRIBUTOR 0.7 MI E OF POPLAR ST BRIDGE (EASTBOUND) BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. PRESERVATION - BRIDGES 8-1 Structure Information Str Number AADT 19,300 0820256 $2,500,000 ST. CLAIR Truck Pct NHS 12 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 55 I 64 Location TRENDLEY AVE Improvements TAMP Category BRIDGE NEW DECK BRIDGE REPAIR Est. Cost County MYP Years Past Current $2,700,000 ST. CLAIR 2 2021-2025 I 64 EB COLLECTORDISTRIBUTOR REHABILITATION - BRIDGES I 55 I 64 MISSISSIPPI RIVER TO E OF I-64 (TRI-LEVEL) INTCHG LIGHTING Structure Information Str Number AADT 19,300 0820140 Truck Pct NHS 12 Y $5,000,000 ST. CLAIR 1 2021-2025 $20,000,000 ST. CLAIR 2 2021-2025 $19,500,000 ST. CLAIR 3 2021-2025 US 40 ILL 3 I 70 MISCELLANEOUS IMPROVEMENTS I 55 I 64 MISSISSIPPI RIVER TO I-64 (TRI-LEVEL) INTCHG Miles = 2.73 RECONSTRUCTION US 40 ILL 3 Roadway Information Miles AADT Truck Pct 2.73 60,432 10.0 I 55 I 64 US 40 RECONSTRUCTION - PAVEMENTS NHS Y MISSISSIPPI RIVER TO I-64 (TRI-LEVEL) INTCHG BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY BRIDGE REPAIR ILL 3 PRESERVATION - BRIDGES 8-2 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 55 I 70 Location B & O, CONRAIL & TRRA RR IN EAST ST LOUIS US 40 Improvements TAMP Category BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $15,000,000 ST. CLAIR 1 2021-2025 $3,000,000 ST. CLAIR 4 2021-2025 PRESERVATION - BRIDGES I 55 I 70 B & O, CONRAIL & TRRA RR IN EAST ST LOUIS US 40 BRIDGE REHABILITATION BRIDGE REPAIR BRIDGE APPROACH ROADWAY REHABILITATION - BRIDGES I 55 I 70 0.5 MI W OF ILL 203 TO FAIRMONT LN Miles = 9.97 US 40 Roadway Information Miles AADT Truck Pct 3.67 55,223 14.4 1.98 I 55 I 70 59,805 14.3 DESIGNED OVERLAY BRIDGE REPAIR BRIDGE PAINTING BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING RAMP REPAIR Structure Information Str Number AADT 68,700 0820017 Truck Pct NHS 14 Y $40,000,000 MADISON ST. CLAIR 6 2021-2025 $4,000,000 MADISON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y Y PLEASANT RIDGE RD BRIDGE REPLACEMENT US 40 RECONSTRUCTION - BRIDGES 8-3 Structure Information Str Number AADT 625 0600172 Truck Pct NHS 7 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 55 I 70 Location PLEASANT RIDGE RD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 MADISON 1 2021-2025 $500,000 MADISON 1 2021-2025 $3,000,000 MADISON 2 2021-2025 $750,000 MARION 1 2020 $24,300,000 MARION 8 2021-2025 US 40 RECONSTRUCTION - BRIDGES I 55 I 70 PLEASANT RIDGE RD UTILITY ADJUSTMENT US 40 RECONSTRUCTION - BRIDGES I 55 I 70 0.4 MI E OF ILL 159 TO 0.3 MI N OF I-270 Miles = 6.94 MICROSURFACING 2 PASS US 40 PRESERVATION - PAVEMENTS I 57 JEFFERSON CO LINE TO FAYETTE CO LINE PATCHING MAINTENANCE - PAVEMENTS I 57 JEFFERSON CO LINE TO 0.7 MI N OF ILL 161 Miles = 4.85 Roadway Information Miles AADT Truck Pct 3.76 22,562 42.1 RECONSTRUCTION RAMP REPAIR BRIDGE REPAIR BRIDGE APPROACH ROADWAY RECONSTRUCTION - PAVEMENTS NHS Y 8-4 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 57 Location JEFFERSON CO LINE TO 0.7 MI N OF ILL 161 Improvements TAMP Category BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $700,000 MARION 2 2021-2025 $400,000 ST. CLAIR 1 2020 $22,000,000 ST. CLAIR 3 2021-2025 PRESERVATION - BRIDGES I 64 US 50 0.6 MI E OF I-55/70 TO 0.3 MI W OF ILL 157 & 0.2 MI W OF GREENMOUNT RD TO 0.4 MI W OF ILL 4 CRACK & JOINT SEALING PRESERVATION - PAVEMENTS I 64 UNDER ILL 111 INTERCHANGE RECONSTRUCTION BRIDGE REPLACEMENT RAMP REPAIR ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 64 UNDER ILL 111 P.E. (PHASE II) Structure Information Str Number AADT 12,700 0820166 Truck Pct NHS 18 N $2,000,000 ST. CLAIR 3 2020 $1,000,000 ST. CLAIR 3 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 64 UNDER ILL 111 LAND ACQUISITION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS 8-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 64 Location UNDER ILL 111 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $1,000,000 ST. CLAIR 3 2021-2025 $2,500,000 ST. CLAIR 3 2021-2025 $24,000,000 ST. CLAIR 1 2021-2025 $2,000,000 ST. CLAIR 1 2021-2025 $6,000,000 ST. CLAIR 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 64 UNDER ILL 111 CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 64 US 50 W OF GREENMOUNT RD TO 1.1 MI W OF ILL 158 Miles = 0.01 ADDITIONAL LANES BRIDGE REPAIR INITIAL CONSTRUCTION - PAVEMENTS I 64 W OF GREENMOUNT RD TO 1.1 MI W OF ILL 158 US 50 P.E. (PHASE I) P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS I 64 US 50 W OF GREENMOUNT RD TO 1.1 MI W OF ILL 158 Miles = 2.18 Roadway Information Miles AADT Truck Pct 2.18 58,021 14.2 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 8-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 64 Location AT ILL 158 Improvements TAMP Category PATCHING Est. Cost County MYP Years Past Current $2,900,000 ST. CLAIR 1 2020 $3,800,000 CLINTON 1 2020 WASHINGTON 1 2021-2025 $1,000,000 ST. CLAIR 6 2021-2025 $14,475,000 MADISON 5 2021-2025 US 50 MAINTENANCE - PAVEMENTS I 64 ST. CLAIR CO LINE TO WASHINGTON CO LINE Miles = 7.50 ULTRA-THIN BND WR COURSE PATCHING PRESERVATION - PAVEMENTS I 64 0.5 MI W OF BEAVER POND CREEK TO 0.9 MI W OF CH 11 Miles = 11.01 Roadway Information Miles AADT Truck Pct 9.35 28,556 30.2 I 70 STANDARD OVERLAY BRIDGE REPAIR BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY RIP RAP $35,000,000 REHABILITATION - PAVEMENTS NHS Y MISSISSIPPI RIVER BRIDGE DECK SEALING MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES I 70 I 270 I-55 TO 2.5 MI E OF I-55/70/270 INTCHG Miles = 4.66 Roadway Information Miles AADT Truck Pct 2.56 37,079 26.9 STANDARD OVERLAY RAMP REPAIR BRIDGE DECK REPAIRS BRIDGE REPAIR BRIDGE APPROACH ROADWAY SCOUR MITIGATION REHABILITATION - PAVEMENTS NHS Y 8-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 70 Location I-55 TO 2.5 MI E OF I-55/70/270 INTCHG I 270 Improvements TAMP Category BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $625,000 MADISON 1 2021-2025 $200,000 MADISON 1 2020 BOND 4 2021-2025 PRESERVATION - BRIDGES I 70 2.5 MI E OF I-55/270 INTCHG TO 0.1 MI W OF PRAIRIE RD CRACK & JOINT SEALING PRESERVATION PROJECT PRESERVATION - PAVEMENTS I 70 MADISON CO LINE TO 0.3 MI W OF SUGAR LOAF RD Miles = 7.80 Roadway Information Miles AADT Truck Pct 6.39 23,057 41.3 I 70 STANDARD OVERLAY RAMP REPAIR BRIDGE NEW DECK BRIDGE REPAIR CULVERT REPAIR WING WALL REPAIR MISCELLANEOUS SCOUR MITIGATION $27,500,000 REHABILITATION - PAVEMENTS Structure Information Str Number AADT 1,250 0030015 11,200 0030003 11,200 0030004 NHS Y MADISON CO LINE TO 0.3 MI W OF SUGAR LOAF RD BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING PRESERVATION - BRIDGES 8-8 $2,700,000 BOND Truck Pct NHS 8 N 43 Y 43 Y 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 255 Location JEFFERSON BARRACKS BRIDGE US 50 Improvements TAMP Category BRIDGE PAINTING BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $20,000,000 MONROE 1 2021-2025 $50,000 MONROE 4 2021-2025 $28,000,000 ST. CLAIR 1 2021-2025 $33,675,000 ST. CLAIR 4 2021-2025 $12,325,000 ST. CLAIR 1 2021-2025 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES I 255 JEFFERSON BARRACKS BRIDGE BRIDGE DECK SEALING US 50 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. PRESERVATION - BRIDGES I 255 US 50 ILL 3 AT DUPO TO 0.2 MI N OF ILL 157 Miles = 5.36 ILL 3 Roadway Information Miles AADT Truck Pct 3.08 44,470 16.4 I 255 US 50 I 255 US 50 REHABILITATION - PAVEMENTS NHS Y 0.2 MI N OF ILL 157 TO ILL 15 Miles = 7.07 Roadway Information Miles AADT Truck Pct 3.51 59,361 13.9 DESIGNED OVERLAY BRIDGE REPAIR RAMP REPAIR DESIGNED OVERLAY BRIDGE REPAIR RAMP REPAIR REHABILITATION - PAVEMENTS NHS Y 0.2 MI N OF ILL 157 TO ILL 15 BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 8-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 255 US 50 Location ILL 15 TO S OF BUNKUM RD Miles = 11.06 Roadway Information Miles AADT Truck Pct 3.59 57,228 15.1 I 255 County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY BRIDGE REPAIR PATCHING RAMP REPAIR SHOULDER REPAIR SCOUR MITIGATION $30,100,000 ST. CLAIR 8 2020 $9,700,000 ST. CLAIR 2 2020 $20,150,000 ST. CLAIR MADISON 3 2020 Past Current REHABILITATION - PAVEMENTS NHS Y ILL 15 TO S OF BUNKUM RD US 50 BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK SEALING PRESERVATION - BRIDGES I 255 S OF BUNKUM RD TO COLLINSVILLE RD Miles = 6.71 Roadway Information Miles AADT Truck Pct 3.34 54,600 13.3 I 255 STANDARD OVERLAY BRIDGE NEW DECK BRIDGE REPAIR PATCHING SHOULDER REPAIR RAMP REPAIR REHABILITATION - PAVEMENTS Structure Information Str Number AADT 27,300 0820246 NHS Y S OF BUNKUM RD TO COLLINSVILLE RD BRIDGE PAINTING BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 8 - 10 $4,050,000 ST. CLAIR Truck Pct NHS 13 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 255 I 55 US 40 Location BOWMAN PUMP STATION, MCCAMBRIDGE AVE PUMP STATION, COLLINSVILLE PUMP STATION #1 S OF COLLINSVILLE RD & GREY'S FARM PUMP STATION N OF HORSESHOE LAKE RD Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $200,000 MADISON ST. CLAIR 2 2020 $80,000 MADISON 3 2020 $205,000,000 MADISON 2 2021-2025 ILL 203 VARIOUS MISCELLANEOUS IMPROVEMENTS I 270 MISSISSIPPI RIVER BRIDGE DECK SEALING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES I 270 MISSISSIPPI RIVER BRIDGE REPLACEMENT ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 270 MISSISSIPPI RIVER P.E. (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES 8 - 11 Structure Information Str Number AADT 51,500 0600035 51,500 0600035 $250,000 MADISON Truck Pct NHS 17 Y 17 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 270 Location MISSISSIPPI RIVER Improvements TAMP Category P.E. (CONSULTANT TSL) P.E. (PHASE II) P.E. (CONSULTANT PLANS) P.E. SURVEYS (PHASE II) Est. Cost County MYP Years Past Current $1,000,000 MADISON 6 2020 $1,300,000 MADISON 2 2021-2025 $500,000 MADISON 2 2021-2025 $3,500,000 MADISON 2 2021-2025 $500,000 MADISON 2 2020 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 270 MISSISSIPPI RIVER LAND ACQUISITION RECONSTRUCTION - BRIDGES I 270 MISSISSIPPI RIVER UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES I 270 MISSISSIPPI RIVER CONSTRUCTION ENGINEERING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 270 MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS 8 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 270 Location MISSISSIPPI RIVER TO CHAIN OF ROCKS CANAL BRIDGE Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES Est. Cost County MYP Years Past Current $15,000,000 MADISON 1 2021-2025 $5,000,000 MADISON 1 2021-2025 $200,000 MADISON 3 2020 $200,000 MADISON 2 2021-2025 $22,500,000 MADISON 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 270 MISSISSIPPI RIVER TO CHAIN OF ROCKS CANAL BRIDGE Miles = 1.35 Roadway Information Miles AADT Truck Pct 1.35 51,500 17.5 I 270 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y CHAIN OF ROCKS CANAL BRIDGE DECK SEALING PRESERVATION - BRIDGES I 270 CHAIN OF ROCKS CANAL BRIDGE DECK SEALING PRESERVATION - BRIDGES I 270 0.4 MI E OF ILL 3 TO 0.5 MI W OF ILL 203 Miles = 0.01 ADDITIONAL LANES BRIDGE SUPERSTRUCTURE INITIAL CONSTRUCTION - PAVEMENTS 8 - 13 Structure Information Str Number AADT 25,950 0600040 25,950 0600041 Truck Pct NHS 19 Y 19 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 270 Location 0.4 MI E OF ILL 3 TO 0.5 MI W OF ILL 203 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $1,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $3,500,000 MADISON 1 2021-2025 $35,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $500,000 MADISON 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS I 270 0.4 MI E OF ILL 3 TO 0.5 MI W OF ILL 203 UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS I 270 0.4 MI E OF ILL 3 TO 0.5 MI W OF ILL 203 Miles = 0.90 Roadway Information Miles AADT Truck Pct 0.90 51,900 19.2 I 270 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y AT ILL 3 INTERCHANGE RECONSTRUCTION RECONSTRUCTION - PAVEMENTS I 270 AT ILL 3 LAND ACQUISITION RECONSTRUCTION - PAVEMENTS I 270 AT ILL 3 UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 8 - 14 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street I 270 Location AT ILL 111 INTCHG Improvements TAMP Category INTERCHANGE RECONSTRUCTION Est. Cost County MYP Years Past Current $17,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $24,000,000 MADISON 1 2021-2025 $3,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS I 270 AT ILL 111 INTCHG CONSTRUCTION ENGINEERING ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS US 40 E OF FORMOSA RD TO BETHANY DR Miles = 2.90 ADDITIONAL LANES INTERSECTION RECONSTN BI-DIRECT LEFT TURN LANE INITIAL CONSTRUCTION - PAVEMENTS US 40 E OF FORMOSA RD TO BETHANY DR P.E. (PHASE I) INITIAL CONSTRUCTION - PAVEMENTS US 40 E OF FORMOSA RD TO BETHANY DR P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 8 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 40 Location E OF FORMOSA RD TO BETHANY DR Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $2,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $4,500,000 BOND 5 2020 $7,600,000 BOND 4 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 40 E OF FORMOSA RD TO BETHANY DR UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 40 E OF FORMOSA RD TO BETHANY DR CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS US 40 MILLERSBURG RD N FR RD US 40: POKEY RD TO OVERPASS RD; MILLERSBURG RD: US 40 TO S FR RD; N FR RD: US 40 TO 0.1 MI E Miles = 6.67 Roadway Information Miles AADT Truck Pct 6.31 1,514 4.2 REHABILITATION - PAVEMENTS NHS N 0.25 1,300 0.0 N 0.11 25 0.0 N US 40 0.3 MI W OF ILL 127 TO FAYETTE CO LINE Miles = 8.13 Roadway Information Miles AADT Truck Pct 1.86 2,675 7.7 6.27 1,939 7.5 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 8 - 16 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 40 Location B&N RR AT SMITHBORO Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $600,000 BOND 4 2021-2025 CLINTON 1 2020 ST. CLAIR 1 2020 $5,600,000 CLINTON 4 2020 $100,000 CLINTON 3 2020 PRESERVATION - BRIDGES US 50 0.2 MI W OF ILL 160 TO SUGAR CREEK OVERFLOW Miles = 3.35 Roadway Information Miles AADT Truck Pct 3.35 8,352 12.8 US 50 STANDARD OVERLAY $2,200,000 PRESERVATION - PAVEMENTS NHS Y SILVER CREEK 1.5 MI W OF ILL 4 BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY $600,000 PRESERVATION - BRIDGES US 50 1 MI E OF CRACKERNECK RD TO 0.2 MI W OF ST ROSE RD Miles = 3.93 Roadway Information Miles AADT Truck Pct 3.93 7,763 14.9 US 50 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y LAKE BRANCH CREEK 5.5 MI E OF TRENTON BRIDGE DECK REPAIRS MAINTENANCE - BRIDGES 8 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 50 Location SUGAR CREEK 3 MI E OF TRENTON Improvements TAMP Category BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $950,000 CLINTON 1 2020 $3,800,000 CLINTON 5 2021-2025 $2,400,000 CLINTON 1 2021-2025 $300,000 CLINTON 2 2021-2025 $220,000 CLINTON 4 2021-2025 PRESERVATION - BRIDGES US 50 11TH ST IN CARLYLE TO RIVERSIDE CAMPGROUND RD & HUEY RD TO SHATTUC RD Miles = 6.91 Roadway Information Miles AADT Truck Pct 1.80 6,607 11.9 5.11 US 50 3,904 21.5 US 50 REHABILITATION - PAVEMENTS NHS Y Y RIVERSIDE CAMPGROUND RD TO HUEY RD Miles = 2.56 Roadway Information Miles AADT Truck Pct 2.56 5,050 15.2 STANDARD OVERLAY ADA IMPROVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y KASKASKIA RIVER BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES US 50 11TH ST IN CARLYLE TO SHATTUC RD LAND ACQUISITION REHABILITATION - PAVEMENTS 8 - 18 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 50 Location DRAINAGE DITCH 0.5 MI E OF HUEY RD Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $150,000 CLINTON 5 2021-2025 $50,000 CLINTON 5 2021-2025 $50,000 CLINTON 5 2021-2025 $3,000,000 CLINTON 2 2021-2025 MARION 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 50 DRAINAGE DITCH 0.5 MI E OF HUEY RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS US 50 DRAINAGE DITCH 0.5 MI E OF HUEY RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS US 50 SHATTUC RD TO MARION CO LINE Miles = 3.25 Roadway Information Miles AADT Truck Pct 3.25 3,723 19.1 US 50 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y TRIB TURKEY CREEK 1 MI E OF ODIN CULVERT REPLACEMENT $500,000 RECONSTRUCTION - BRIDGES US 50 TRIB TURKEY CREEK 1 MI E OF ODIN LAND ACQUISITION RECONSTRUCTION - BRIDGES 8 - 19 Structure Information Str Number AADT 6,600 0612008 $50,000 MARION Truck Pct NHS 14 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 50 Location TRIB TURKEY CREEK 1 MI E OF ODIN Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MARION 1 2021-2025 $1,500,000 MARION 7 2021-2025 RECONSTRUCTION - BRIDGES US 51 LOUSE RUN 7.5 MI S OF FAYETTE CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 51 LOUSE RUN 7.5 MI S OF FAYETTE CO LINE LAND ACQUISITION Structure Information Str Number AADT 3,050 0610003 Truck Pct NHS 14 Y $50,000 MARION 1 2021-2025 $50,000 MARION 1 2021-2025 MADISON 2 2021-2025 RECONSTRUCTION - BRIDGES US 51 LOUSE RUN 7.5 MI S OF FAYETTE CO LINE UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES US 67 MISSISSIPPI RIVER (CLARK BRIDGE) P.E. (PHASE II) P.E. (BRIDGE INSPECTION) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. MISCELLANEOUS IMPROVEMENTS 8 - 20 $1,500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 67 Location MISSISSIPPI RIVER (CLARK BRIDGE) Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $300,000 MADISON 3 2020 JERSEY 9 2021-2025 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES US 67 DELHI BYP Miles = 3.15 NEW CONSTRUCTION GRADING PAVING DRAINAGE SIGNING (NEW) LIGHTING $23,000,000 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. INITIAL CONSTRUCTION - PAVEMENTS US 67 MADISON CO LINE TO JERSEYVILLE LAND ACQUISITION $500,000 JERSEY 8 2021-2025 $900,000 JERSEY 8 2021-2025 $500,000 JERSEY 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS US 67 MADISON CO LINE TO JERSEYVILLE UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS US 67 TRIB LITTLE PIASA CREEK 0.8 MI N OF NEW DELHI CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 8 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 67 Location TRIB LITTLE PIASA CREEK 0.8 MI N OF NEW DELHI Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 JERSEY 1 2021-2025 $50,000 JERSEY 1 2021-2025 $5,000,000 JERSEY 1 2020 $12,000,000 GREENE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS US 67 TRIB LITTLE PIASA CREEK 0.8 MI N OF NEW DELHI UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS US 67 0.5 MI N OF FULKERSON DR TO CRYSTAL LAKE RD Miles = 5.20 Roadway Information Miles AADT Truck Pct 1.10 5,700 6.8 4.10 US 67 10,433 7.5 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y Y MACOUPIN CREEK 4.8 MI S OF JCT ILL 108 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 67 MACOUPIN CREEK 4.8 MI S OF JCT ILL 108 LAND ACQUISITION RECONSTRUCTION - BRIDGES 8 - 22 Structure Information Str Number AADT 5,050 0310022 $1,000,000 GREENE Truck Pct NHS 10 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 67 Location MACOUPIN CREEK 4.8 MI S OF JCT ILL 108 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $1,000,000 GREENE 1 2021-2025 $1,000,000 GREENE 1 2021-2025 $5,300,000 GREENE JERSEY 1 2021-2025 $18,000,000 GREENE 1 2021-2025 RECONSTRUCTION - BRIDGES US 67 MACOUPIN CREEK 4.8 MI S OF JCT ILL 108 CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES US 67 0.1 MI N OF TR 285 TO 0.6 MI S OF TOLMAN RD Miles = 5.70 Roadway Information Miles AADT Truck Pct 3.97 5,262 11.6 1.73 US 67 5,758 9.0 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y Y APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL BRIDGE REPLACEMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES 8 - 23 Structure Information Str Number AADT 3,950 0310031 $1,000,000 GREENE Truck Pct NHS 10 Y 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street US 67 Location APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) Est. Cost County MYP Years Past Current $1,500,000 GREENE 1 2021-2025 $500,000 GREENE 1 2021-2025 $100,000 GREENE 1 2021-2025 $1,500,000 GREENE 1 2021-2025 $8,000,000 MADISON 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL LAND ACQUISITION ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL UTILITY ADJUSTMENT ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES US 67 APPLE CREEK OVERFLOW 3.5 MI S OF WHITE HALL CONSTRUCTION ENGINEERING ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT. RECONSTRUCTION - BRIDGES ILL 3 AT W DELMAR AVE & PIERCE LN INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS 8 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location AT W DELMAR AVE & PIERCE LN Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $1,000,000 MADISON 1 2021-2025 $1,500,000 MADISON 1 2021-2025 $1,500,000 MADISON 1 2021-2025 $5,500,000 MADISON 1 2021-2025 $35,000,000 MADISON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 3 AT W DELMAR AVE & PIERCE LN LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 3 AT W DELMAR AVE & PIERCE LN UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 3 ILL 111 ALBY ST TO BROADWAY ST IN ALTON Miles = 4.75 DESIGNED OVERLAY PATCHING HOMER M ADAMS PKWY Roadway Information Miles AADT Truck Pct 4.75 17,958 13.6 ILL 3 REHABILITATION - PAVEMENTS NHS Y NEW POAG RD TO INDUSTRIAL DR Miles = 4.50 Roadway Information Miles AADT Truck Pct 4.50 15,052 25.5 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 8 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location NEW POAG RD TO INDUSTRIAL DR Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $3,000,000 MADISON 1 2021-2025 $5,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $5,500,000 MADISON 1 2021-2025 $500,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 3 NEW POAG RD TO INDUSTRIAL DR UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 3 NEW POAG RD TO INDUSTRIAL DR CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 3 AT 20TH ST IN GRANITE CITY Miles = 0.30 Roadway Information Miles AADT Truck Pct 0.30 12,360 23.2 ILL 3 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y AT 20TH ST IN GRANITE CITY LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 3 AT 20TH ST IN GRANITE CITY UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 8 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location AT 20TH ST IN GRANITE CITY Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $500,000 MADISON 1 2021-2025 $49,500,000 ST. CLAIR 1 2021-2025 $4,000,000 MADISON ST. CLAIR 1 2021-2025 $1,500,000 ST. CLAIR 1 2021-2025 $1,500,000 ST. CLAIR 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF RIVER PARK CONNECTOR TO 0.1 MI S OF TRENDLEY AVE CONNECTOR IN EAST ST LOUIS Miles = 0.64 NEW CONSTRUCTION BRIDGE (NEW) GRADING PAVING DRAINAGE RETAINING WALL SIGNING (NEW) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF RIVER PARK CONNECTOR TO 0.1 MI S OF TRENDLEY AVE CONNECTOR IN EAST ST LOUIS P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF RIVER PARK CONNECTOR TO 0.1 MI S OF TRENDLEY AVE CONNECTOR IN EAST ST LOUIS LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF RIVER PARK CONNECTOR TO 0.1 MI S OF TRENDLEY AVE CONNECTOR IN EAST ST LOUIS UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS 8 - 27 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 RELOCATION Location 0.1 MI S OF RIVER PARK CONNECTOR TO 0.1 MI S OF TRENDLEY AVE CONNECTOR IN EAST ST LOUIS Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $2,500,000 MADISON ST. CLAIR 1 2021-2025 $36,000,000 ST. CLAIR 1 2021-2025 $3,000,000 ST. CLAIR 1 2021-2025 $10,000,000 ST. CLAIR 1 2021-2025 $5,000,000 ST. CLAIR 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF TRENDLEY AVE IN EAST ST LOUIS TO MONSANTO AVE IN SAUGET Miles = 1.03 NEW CONSTRUCTION PAVING GRADING BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF TRENDLEY AVE IN EAST ST LOUIS TO MONSANTO AVE IN SAUGET P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF TRENDLEY AVE IN EAST ST LOUIS TO MONSANTO AVE IN SAUGET LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 3 RELOCATION 0.1 MI S OF TRENDLEY AVE IN EAST ST LOUIS TO MONSANTO AVE IN SAUGET UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS 8 - 28 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 RELOCATION Location 0.1 MI S OF TRENDLEY AVE IN EAST ST LOUIS TO MONSANTO AVE IN SAUGET Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $2,000,000 ST. CLAIR 1 2021-2025 $8,000,000 ST. CLAIR 1 2021-2025 $3,000,000 ST. CLAIR 1 2021-2025 $2,000,000 ST. CLAIR 1 2021-2025 $4,200,000 MONROE 1 2020 INITIAL CONSTRUCTION - PAVEMENTS ILL 3 0.8 MI N OF MONSANTO AVE IN SAUGET TO 0.1 MI S OF RUBY ST IN CAHOKIA Miles = 3.66 Roadway Information Miles AADT Truck Pct 3.66 19,054 18.8 ILL 3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y S OF MONSANTO AVE TO S OF QUEENY AVE P.E. (PHASE I) P.E. (CONSULTANT TSL) PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 S OF MONSANTO AVE TO S OF QUEENY AVE P.E. (PHASE II) P.E. (CONSULTANT TSL) PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) INITIAL CONSTRUCTION - PAVEMENTS ILL 3 0.1 MI N OF GILMORE LAKE RD TO HALIFAX DR Miles = 3.41 Roadway Information Miles AADT Truck Pct 3.41 24,249 6.6 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 8 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location I-255 TO GILMORE LAKE RD Miles = 5.72 Roadway Information Miles AADT Truck Pct 5.72 30,848 5.9 ILL 3 ILL 3 Est. Cost DESIGNED OVERLAY $11,000,000 County MYP Years Past Current MONROE 1 2021-2025 $7,700,000 RANDOLPH 5 2020 $100,000 RANDOLPH 2 2020 $100,000 MONROE 1 2020 RANDOLPH 1 2020 REHABILITATION - PAVEMENTS NHS Y MONROE CO LINE TO 0.2 MI S OF 1ST ST IN RUMA Miles = 7.97 Roadway Information Miles AADT Truck Pct 7.97 6,517 9.8 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y HORSE CREEK OVERFLOW 2.6 MI S OF RED BUD SCOUR MITIGATION PRESERVATION - BRIDGES ILL 3 0.1 MI S OF COUNTRY CLUB LN TO RANDOLPH CO LINE CRACK & JOINT SEALING PRESERVATION - PAVEMENTS ILL 3 0.2 MI S OF 1ST ST IN RUMA TO 0.2 MI S OF S PRAIRIE RD Miles = 2.85 Roadway Information Miles AADT Truck Pct 2.85 3,300 10.9 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 8 - 30 $2,500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location NINE MILE CREEK 4 MI S OF EVANSVILLE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost NINE MILE CREEK 4 MI S OF EVANSVILLE LAND ACQUISITION MYP Years Past Current $3,600,000 RECONSTRUCTION - BRIDGES ILL 3 County RANDOLPH Structure Information Str Number AADT 2,950 0790005 3 2021-2025 Truck Pct NHS 16 Y $50,000 RANDOLPH 3 2021-2025 $30,000 RANDOLPH 1 2021-2025 $2,800,000 RANDOLPH 3 2021-2025 $100,000 RANDOLPH 3 2021-2025 RECONSTRUCTION - BRIDGES ILL 3 NINE MILE CREEK 4 MI S OF EVANSVILLE UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 3 ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER Miles = 0.96 ILL 150 STATE ST RECONSTRUCTION (WESTBOUND) Roadway Information Miles AADT Truck Pct 0.11 6,400 15.9 0.85 7,772 ILL 3 ILL 150 23.2 RECONSTRUCTION - PAVEMENTS NHS Y Y ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER LAND ACQUISITION STATE ST (WESTBOUND) RECONSTRUCTION - PAVEMENTS 8 - 31 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER ILL 150 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 RANDOLPH 3 2021-2025 $3,100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 STATE ST (WESTBOUND) RECONSTRUCTION - PAVEMENTS ILL 3 ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER Miles = 0.96 ILL 150 STATE ST RECONSTRUCTION (EASTBOUND) Roadway Information Miles AADT Truck Pct 0.11 6,400 15.9 0.85 7,772 ILL 3 ILL 150 23.2 RECONSTRUCTION - PAVEMENTS NHS Y Y ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER LAND ACQUISITION STATE ST (EASTBOUND) RECONSTRUCTION - PAVEMENTS ILL 3 ILL 150 ILL 3 (OPDYKE ST) TO MURPHYSBORO RD IN CHESTER UTILITY ADJUSTMENT STATE ST (EASTBOUND) RECONSTRUCTION - PAVEMENTS 8 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location HOLMES ST: NW OF SWANWICK ST TO STATE ST; SWANWICK ST: HOLMES ST TO STACY ST; STACY ST: SWANWICK ST TO STATE ST Miles = 0.17 STATE Roadway Information Miles AADT Truck Pct 0.14 4,568 9.2 0.03 ILL 3 4,900 0.0 Improvements TAMP Category RECONSTRUCTION INTERSECTION RECONSTN ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $1,000,000 RANDOLPH 1 2021-2025 $2,000,000 RANDOLPH 1 2021-2025 $2,000,000 RANDOLPH 1 2021-2025 $19,500,000 RANDOLPH 1 2021-2025 $1,100,000 RANDOLPH 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y N ILL 150 TO JACKSON CO LINE LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 3 ILL 150 TO JACKSON CO LINE UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 3 1 MI S OF PLEASANT RIDGE RD TO JACKSON CO LINE Miles = 5.52 Roadway Information Miles AADT Truck Pct 5.52 3,104 32.7 ILL 3 RECONSTRUCTION - PAVEMENTS NHS Y ILL 150 TO CROSBY ST (SB) Miles = 0.35 Roadway Information Miles AADT Truck Pct 0.35 4,086 24.8 RECONSTRUCTION DESIGNED OVERLAY RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS Y 8 - 33 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location ILL 150 TO CROSBY ST (SB) Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 RANDOLPH 1 2021-2025 $50,000 RANDOLPH 1 2021-2025 $1,100,000 RANDOLPH 1 2021-2025 $50,000 RANDOLPH 1 2021-2025 $50,000 RANDOLPH 1 2021-2025 $1,800,000 RANDOLPH 1 2021-2025 RECONSTRUCTION - PAVEMENTS ILL 3 ILL 150 TO CROSBY ST (SB) UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 3 ILL 150 TO CROSBY ST (NB) Miles = 0.35 Roadway Information Miles AADT Truck Pct 0.35 4,086 24.8 ILL 3 RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS Y ILL 150 TO CROSBY ST (NB) LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 3 ILL 150 TO CROSBY ST (NB) UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 3 CROSBY ST TO RIVERVIEW BLVD (SB) Miles = 0.92 Roadway Information Miles AADT Truck Pct 0.92 3,239 28.8 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 8 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 Location CROSBY ST TO RIVERVIEW BLVD (NB) Miles = 0.92 Roadway Information Miles AADT Truck Pct 0.92 3,239 28.8 ILL 3 (SOUTHBOUND) ILL 3 (SOUTHBOUND) RECONSTRUCTION Est. Cost County MYP Years Past Current $1,800,000 RANDOLPH 1 2021-2025 $3,800,000 RANDOLPH 3 2021-2025 $100,000 RANDOLPH 2 2021-2025 $100,000 RANDOLPH 2 2021-2025 $3,000,000 RANDOLPH 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y RIVERVIEW BLVD IN CHESTER TO 0.1 MI S OF WATER ST Miles = 1.56 Roadway Information Miles AADT Truck Pct 1.56 2,582 39.0 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y RIVERVIEW BLVD IN CHESTER TO 0.1 MI S OF WATER ST LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 3 (SOUTHBOUND) RIVERVIEW BLVD IN CHESTER TO 0.1 MI S OF WATER ST UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 3 (NORTHBOUND) RIVERVIEW BLVD IN CHESTER TO 0.1 MI S OF WATER ST Miles = 1.56 Roadway Information Miles AADT Truck Pct 1.56 2,582 39.0 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 8 - 35 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 (SOUTHBOUND) Location 0.1 MI S OF WATER ST TO PLEASANT RIDGE RD Miles = 1.04 Roadway Information Miles AADT Truck Pct 1.04 3,550 35.2 ILL 3 (NORTHBOUND) ILL 3 RECONSTRUCTION Est. Cost County MYP Years Past Current $2,000,000 RANDOLPH 1 2021-2025 $2,000,000 RANDOLPH 1 2021-2025 $1,400,000 RANDOLPH 2 2020 $100,000 RANDOLPH 1 2020 $3,800,000 RANDOLPH 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y 0.1 MI S OF WATER ST TO PLEASANT RIDGE RD Miles = 1.04 Roadway Information Miles AADT Truck Pct 1.04 3,550 35.2 Improvements TAMP Category RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y MARY'S RIVER 1.3 MI S OF CHESTER BRIDGE DECK WATERPROOFING BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES ILL 3 MARY'S RIVER 1.3 MI S OF CHESTER BRIDGE REPAIR MAINTENANCE - BRIDGES ILL 3 PLEASANT RIDGE TO 1 MI S Miles = 1.00 Roadway Information Miles AADT Truck Pct 1.00 3,550 35.2 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 8 - 36 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 4 Location 0.3 MI S OF I-55 TO 0.3 MI N OF ILL 143 Miles = 9.40 Roadway Information Miles AADT Truck Pct 9.40 3,768 16.3 ILL 4 ILL 4 Est. Cost DESIGNED OVERLAY NEW SHOULDERS $16,400,000 MADISON 4 2021-2025 $2,500,000 ST. CLAIR 1 2021-2025 $1,000,000 ST. CLAIR 1 2020 $2,000,000 ST. CLAIR 1 2021-2025 $3,000,000 ST. CLAIR 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y MADISON CO LINE TO CENTER ST IN LEBANON Miles = 3.51 Roadway Information Miles AADT Truck Pct 3.51 6,316 24.1 County MYP Years Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 P.E. SURVEYS (PHASE I) ILL 15 RECONSTRUCTION - BRIDGES ILL 4 KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 P.E. SURVEYS (PHASE I) ILL 15 VARIOUS RECONSTRUCTION - BRIDGES ILL 4 KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 P.E. (PHASE II) ILL 15 VARIOUS RECONSTRUCTION - BRIDGES 8 - 37 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 4 Location ILL 15 TO ILL 13 Miles = 8.37 Roadway Information Miles AADT Truck Pct 8.37 2,619 29.3 ILL 4 ILL 150 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $6,500,000 ST. CLAIR 1 2021-2025 RANDOLPH 1 2020 $55,000,000 ST. CLAIR 1 2021-2025 $10,000,000 ST. CLAIR 1 2021-2025 $6,000,000 ST. CLAIR 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 150: ILL 3 TO PERRY CO LINE ILL 3: ILL 150 TO JACKSON CO LINE PATCHING $650,000 ILL 3 MAINTENANCE - PAVEMENTS ILL 13 ILL 157 TO 23RD ST Miles = 5.88 Roadway Information Miles AADT Truck Pct 5.88 7,094 10.2 ILL 13 RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N ILL 157 TO 23RD ST LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 13 ILL 157 TO 23RD ST UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS 8 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 13 Location ILL 157 TO 23RD ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $4,000,000 ST. CLAIR 1 2021-2025 $700,000 ST. CLAIR 1 2021-2025 $5,800,000 ST. CLAIR 5 2020 $7,000,000 RANDOLPH 1 2021-2025 ST. CLAIR 1 2020 RECONSTRUCTION - PAVEMENTS ILL 13 SOUTH BELT EAST TO NOCTURNE CT IN BELLEVILLE Miles = 0.84 Roadway Information Miles AADT Truck Pct 0.84 2,486 8.9 ILL 13 Roadway Information Miles AADT Truck Pct 3.01 9,433 17.4 5.90 ILL 13 ILL 153 7,044 22.6 STANDARD OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y Y ILL 4 TO PERRY CO LINE Miles = 6.50 Roadway Information Miles AADT Truck Pct 6.50 3,219 11.1 ILL 15 REHABILITATION - PAVEMENTS NHS N RODGERS DR IN FREEBURG TO 0.1 MI S OF KASKASKIA RIVER Miles = 8.91 ILL 15 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N 0.3 MI W OF LAKEWOOD PL TO 0.4 MI E OF ILL 159 CRACK & JOINT SEALING PRESERVATION - PAVEMENTS 8 - 39 $100,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 15 Location KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $35,000,000 ST. CLAIR 1 2021-2025 ILL 4 RECONSTRUCTION - BRIDGES ILL 15 KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 LAND ACQUISITION Structure Information Str Number AADT 4,750 0820077 4,750 0820078 4,750 0820275 Truck Pct NHS 26 N 26 N 26 N $1,000,000 ST. CLAIR 1 2021-2025 $1,000,000 ST. CLAIR 1 2021-2025 $3,000,000 ST. CLAIR 1 2021-2025 $800,000 ST. CLAIR 1 2021-2025 ILL 4 RECONSTRUCTION - BRIDGES ILL 15 KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 UTILITY ADJUSTMENT ILL 4 RECONSTRUCTION - BRIDGES ILL 15 KASKASKIA RIVER 0.2 MI E OF JCT ILL 4 CONSTRUCTION ENGINEERING ILL 4 RECONSTRUCTION - BRIDGES ILL 15 SILVER CREEK 2.5 MI E OF FREEBURG BRIDGE DECK REPAIRS BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 8 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 15 ILL 4 W MAIN ST Location 0.1 MI W OF BLUEBIRD LN TO 1ST ST IN FAYETTEVILLE Miles = 4.94 Roadway Information Miles AADT Truck Pct 4.94 2,794 23.2 ILL 15 Improvements TAMP Category DESIGNED OVERLAY Est. Cost MYP Years Past Current $3,400,000 ST. CLAIR 2 2021-2025 WASHINGTON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N LUNTE CREEK 3.6 MI W OF ILL 127 BRIDGE REPLACEMENT $800,000 RECONSTRUCTION - BRIDGES ILL 15 County LUNTE CREEK 3.6 MI W OF ILL 127 LAND ACQUISITION Structure Information Str Number AADT 2,250 0950008 Truck Pct NHS 11 N $50,000 WASHINGTON 4 2021-2025 $50,000 WASHINGTON 4 2021-2025 $1,200,000 WASHINGTON 4 2021-2025 RECONSTRUCTION - BRIDGES ILL 15 LUNTE CREEK 3.6 MI W OF ILL 127 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 15 NASHVILLE CREEK 0.2 MI W OF NASHVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 41 Structure Information Str Number AADT 3,600 0950009 Truck Pct NHS 9 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 15 Location NASHVILLE CREEK 0.2 MI W OF NASHVILLE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 WASHINGTON 4 2021-2025 $50,000 WASHINGTON 4 2021-2025 GREENE CALHOUN 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 15 NASHVILLE CREEK 0.2 MI W OF NASHVILLE UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 16 ILL 100 JOE PAGE BRIDGE AT HARDIN Miles = 1.55 BRIDGE REPLACEMENT RECONSTRUCTION $130,000,000 RECONSTRUCTION - BRIDGES ILL 16 JOE PAGE BRIDGE AT HARDIN P.E. (PHASE I) Structure Information Str Number AADT 2,500 0310001 Truck Pct NHS 8 N $1,000,000 GREENE CALHOUN 1 2020 $9,000,000 GREENE CALHOUN 1 2021-2025 $5,000,000 GREENE CALHOUN 1 2021-2025 ILL 100 RECONSTRUCTION - BRIDGES ILL 16 JOE PAGE BRIDGE AT HARDIN P.E. (PHASE I) ILL 100 RECONSTRUCTION - BRIDGES ILL 16 JOE PAGE BRIDGE AT HARDIN P.E. (PHASE II) ILL 100 RECONSTRUCTION - BRIDGES 8 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 16 Location JOE PAGE BRIDGE AT HARDIN Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $2,000,000 GREENE CALHOUN 1 2021-2025 $3,000,000 GREENE CALHOUN 1 2021-2025 $10,000,000 GREENE CALHOUN 1 2021-2025 $3,000,000 JERSEY 3 2021-2025 $10,500,000 MARION 1 2021-2025 ILL 100 RECONSTRUCTION - BRIDGES ILL 16 JOE PAGE BRIDGE AT HARDIN UTILITY ADJUSTMENT ILL 100 RECONSTRUCTION - BRIDGES ILL 16 JOE PAGE BRIDGE AT HARDIN CONSTRUCTION ENGINEERING ILL 100 RECONSTRUCTION - BRIDGES ILL 16 GRANGE HALL RD TO MACOUPIN CO LINE Miles = 3.24 Roadway Information Miles AADT Truck Pct 3.24 2,441 10.3 ILL 37 0.47 REHABILITATION - PAVEMENTS NHS Y CHERRY ST IN KINMUNDY TO MADISON ST IN SALEM Miles = 11.50 Roadway Information Miles AADT Truck Pct 11.03 2,172 10.6 3,970 7.2 DESIGNED OVERLAY DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N N 8 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 37 Location 0.4 MI S OF CROSS ST TO JEFFERSON CO LINE Miles = 8.56 Roadway Information Miles AADT Truck Pct 8.56 3,866 4.1 ILL 100 ILL 100 STANDARD OVERLAY Est. Cost MYP Years Past Current $3,600,000 MARION 1 2020 $5,500,000 CALHOUN 1 2020 $1,350,000 JERSEY 1 2021-2025 PRESERVATION - PAVEMENTS DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N OTTER CREEK TRIB 1.7 MI S OF JCT ILL 16 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 100 County NHS N PIKE CO LINE TO ILL 96 Miles = 7.13 Roadway Information Miles AADT Truck Pct 7.13 447 7.8 Improvements TAMP Category OTTER CREEK TRIB 1.7 MI S OF JCT ILL 16 LAND ACQUISITION Structure Information Str Number AADT 2,650 0420011 Truck Pct NHS 5 N $50,000 JERSEY 1 2021-2025 $50,000 JERSEY 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 100 OTTER CREEK TRIB 1.7 MI S OF JCT ILL 16 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 8 - 44 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 100 Location AT BRUSSELS FERRY Miles = 0.01 Roadway Information Miles AADT Truck Pct 0.01 2,050 6.3 ILL 100 Improvements TAMP Category STANDARD OVERLAY RETAINING WALL DREDGING Est. Cost County MYP Years Past Current $2,000,000 JERSEY 1 2020 $101,000 GREENE JERSEY 1 2020 $1,486,000 GREENE JERSEY 2 2020 $1,204,000 GREENE JERSEY 1 2021-2025 $5,100,000 JERSEY 1 2021-2025 REHABILITATION - PAVEMENTS NHS N AT BRUSSELS FERRY & KAMPSVILLE FERRY MISCELLANEOUS ILL 108 MISCELLANEOUS IMPROVEMENTS ILL 100 AT BRUSSELS FERRY & KAMPSVILLE FERRY MISCELLANEOUS ILL 108 MISCELLANEOUS IMPROVEMENTS ILL 100 AT BRUSSELS FERRY & KAMPSVILLE FERRY MISCELLANEOUS ILL 108 MISCELLANEOUS IMPROVEMENTS ILL 109 US 67 IN JERSEYVILLE TO ILL 3 Miles = 8.22 Roadway Information Miles AADT Truck Pct 7.38 3,655 8.4 0.84 4,468 5.5 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N 8 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 111 Location POAG RD TO DENHAM DR Miles = 0.88 Roadway Information Miles AADT Truck Pct 0.88 8,848 26.8 ILL 111 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $10,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $10,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS N POAG RD TO DENHAM DR LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 111 POAG RD TO DENHAM DR UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 111 POAG RD TO DENHAM DR CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS ILL 111 AT CHAIN OF ROCKS RD INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS ILL 111 AT CHAIN OF ROCKS RD P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 8 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 111 Location AT CHAIN OF ROCKS RD Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $2,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $9,500,000 MADISON 1 2021-2025 $5,200,000 MADISON 3 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 111 AT CHAIN OF ROCKS RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 111 ILL 111 A 0.1 MI S OF PONTOON RD TO ST. CLAIR CO LINE Miles = 5.54 Roadway Information Miles AADT Truck Pct 5.54 6,420 13.0 ILL 111 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N CAHOKIA CANAL N OF I-55/70 INTCHG BRIDGE REPLACEMENT (SOUTHBOUND) RECONSTRUCTION - BRIDGES ILL 111 CAHOKIA CANAL N OF I-55/70 INTCHG LAND ACQUISITION Structure Information Str Number AADT 2,150 0600127 Truck Pct NHS 19 N $50,000 MADISON 3 2021-2025 $50,000 MADISON 3 2021-2025 (SOUTHBOUND) RECONSTRUCTION - BRIDGES ILL 111 CAHOKIA CANAL N OF I-55/70 INTCHG UTILITY ADJUSTMENT (SOUTHBOUND) RECONSTRUCTION - BRIDGES 8 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 111 Location CONRAIL & B&O RR AT FAIRMONT CITY SCL Improvements TAMP Category BRIDGE REHABILITATION Est. Cost CONRAIL & B&O RR AT FAIRMONT CITY SCL BRIDGE JOINT REPLACE/REPAIR BRIDGE DECK OVERLAY MYP Years Past Current $2,800,000 REHABILITATION - BRIDGES ILL 111 County ST. CLAIR Structure Information Str Number AADT 3,350 0820098 $2,200,000 4 2021-2025 Truck Pct NHS 19 N ST. CLAIR 1 2021-2025 $12,500,000 BOND 1 2020 $400,000 BOND 1 2021-2025 $50,000 BOND 1 2021-2025 PRESERVATION - BRIDGES ILL 127 MONTGOMERY CO LINE TO 0.1 MI N OF ILL 140 JCT Miles = 9.59 Roadway Information Miles AADT Truck Pct 9.59 2,341 12.8 ILL 127 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N ELM POINT BRANCH 1.5 MI S OF DONNELLSON SCL CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 127 ELM POINT BRANCH 1.5 MI S OF DONNELLSON SCL LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 8 - 48 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 127 Location ELM POINT BRANCH 1.5 MI S OF DONNELLSON SCL Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 BOND 1 2021-2025 $1,400,000 BOND 1 2020 $6,500,000 WASHINGTON 1 2020 $300,000 WASHINGTON 1 2021-2025 $50,000 WASHINGTON 1 2021-2025 $50,000 WASHINGTON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 127 E FORK SHOAL CREEK 0.2 MI W OF GREENVILLE ILL 140 BRIDGE DECK OVERLAY BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES ILL 127 CONSERVATION LAKE RD TO PERRY CO LINE Miles = 4.75 Roadway Information Miles AADT Truck Pct 4.75 4,651 10.3 ILL 127 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y S MIDDLE TRIB LOCUST CREEK 6.7 MI S OF ILL 15 CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES ILL 127 S MIDDLE TRIB LOCUST CREEK 6.7 MI S OF ILL 15 LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 127 S MIDDLE TRIB LOCUST CREEK 6.7 MI S OF ILL 15 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 8 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 140 Location MONUMENT AVE TO ANNEX ST IN ALTON Miles = 2.03 Roadway Information Miles AADT Truck Pct 2.03 8,470 11.1 ILL 140 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $25,000,000 MADISON 3 2021-2025 $2,500,000 MADISON 1 2021-2025 $1,500,000 MADISON 1 2021-2025 $3,000,000 MADISON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $3,000,000 MADISON 1 2021-2025 RECONSTRUCTION - PAVEMENTS NHS Y MONUMENT AVE TO ANNEX ST IN ALTON P.E. (PHASE I) RECONSTRUCTION - PAVEMENTS ILL 140 MONUMENT AVE TO ANNEX ST IN ALTON P.E. (PHASE II) RECONSTRUCTION - PAVEMENTS ILL 140 MONUMENT AVE TO ANNEX ST IN ALTON LAND ACQUISITION RECONSTRUCTION - PAVEMENTS ILL 140 MONUMENT AVE TO ANNEX ST IN ALTON UTILITY ADJUSTMENT RECONSTRUCTION - PAVEMENTS ILL 140 MONUMENT AVE TO ANNEX ST IN ALTON CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 8 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 140 Location 0.1 MI E OF S MORELAND RD TO 0.2 MI W OF ILL 159 Miles = 3.15 Roadway Information Miles AADT Truck Pct 3.15 7,477 15.1 ILL 140 ILL 143 ILL 143 County MYP Years Past Current $3,000,000 MADISON 1 2020 $3,500,000 MADISON 1 2021-2025 $2,900,000 MADISON 1 2020 $1,400,000 MADISON 1 2021-2025 $50,000 MADISON 1 2021-2025 REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 0.3 MI S OF DISCOVERY PKWY TO 0.2 MI N OF ILL 3 Miles = 3.28 Roadway Information Miles AADT Truck Pct 3.28 11,998 19.8 DESIGNED OVERLAY Est. Cost NHS Y ILL 160 TO BOND CO LINE Miles = 1.76 Roadway Information Miles AADT Truck Pct 1.76 2,107 18.2 Improvements TAMP Category STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y SILVER CREEK E TRIB 0.1 MI W OF MARINE BRIDGE REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 143 SILVER CREEK E TRIB 0.1 MI W OF MARINE LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 8 - 51 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 143 Location SILVER CREEK E TRIB 0.1 MI W OF MARINE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MADISON 1 2021-2025 $4,500,000 MADISON 1 2021-2025 $1,100,000 RANDOLPH 1 2020 $1,000,000 RANDOLPH 1 2021-2025 $6,600,000 RANDOLPH 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 143 US 40 ILL 4 TO WALNUT ST Miles = 6.87 Roadway Information Miles AADT Truck Pct 6.87 7,053 13.1 ILL 150 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y MISSISSIPPI RIVER AT CHESTER BRIDGE REPAIR MAINTENANCE - BRIDGES ILL 150 AT ILL 4 INTERSECTION IMPROVEMENT ILL 4 MISCELLANEOUS IMPROVEMENTS ILL 150 ILL 4 ILL 4 TO GREEN ST IN STEELEVILLE Miles = 3.13 RECONSTRUCTION (EASTBOUND) Roadway Information Miles AADT Truck Pct 3.13 5,565 28.2 RECONSTRUCTION - PAVEMENTS NHS N 8 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 150 Location ILL 4 TO GREEN ST IN STEELEVILLE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $6,600,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 ILL 4 (EASTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 ILL 4 TO GREEN ST IN STEELEVILLE UTILITY ADJUSTMENT ILL 4 (EASTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 ILL 4 ILL 4 TO GREEN ST IN STEELEVILLE Miles = 3.13 RECONSTRUCTION (WESTBOUND) Roadway Information Miles AADT Truck Pct 3.13 5,565 28.2 ILL 150 RECONSTRUCTION - PAVEMENTS NHS N ILL 4 TO GREEN ST IN STEELEVILLE LAND ACQUISITION ILL 4 (WESTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 ILL 4 TO GREEN ST IN STEELEVILLE UTILITY ADJUSTMENT ILL 4 (WESTBOUND) RECONSTRUCTION - PAVEMENTS 8 - 53 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 150 ILL 4 Location GREEN ST IN STEELEVILLE TO CLYDE STEELE ST IN PERCY Miles = 1.32 Roadway Information Miles AADT Truck Pct 1.32 5,741 27.8 ILL 150 ILL 4 Improvements TAMP Category DESIGNED OVERLAY Est. Cost County MYP Years Past Current $1,600,000 RANDOLPH 1 2021-2025 $3,500,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $3,300,000 RANDOLPH 1 2021-2025 REHABILITATION - PAVEMENTS NHS N CLYDE STEELE ST TO HOWARD AVE IN PERCY Miles = 1.06 RECONSTRUCTION (EASTBOUND) Roadway Information Miles AADT Truck Pct 1.06 5,700 26.5 ILL 150 RECONSTRUCTION - PAVEMENTS NHS N CLYDE STEELE ST TO HOWARD AVE IN PERCY LAND ACQUISITION ILL 4 (EASTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 CLYDE STEELE ST TO HOWARD AVE IN PERCY UTILITY ADJUSTMENT ILL 4 (EASTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 ILL 4 CLYDE STEELE ST TO HOWARD AVE IN PERCY Miles = 1.06 RECONSTRUCTION (WESTBOUND) Roadway Information Miles AADT Truck Pct 1.06 5,700 26.5 RECONSTRUCTION - PAVEMENTS NHS N 8 - 54 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 150 Location CLYDE STEELE ST TO HOWARD AVE IN PERCY Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $100,000 RANDOLPH 1 2021-2025 $100,000 RANDOLPH 1 2021-2025 $1,000,000 RANDOLPH 1 2021-2025 WASHINGTON RANDOLPH 1 2021-2025 RANDOLPH 4 2021-2025 ILL 4 (WESTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 CLYDE STEELE ST TO HOWARD AVE IN PERCY UTILITY ADJUSTMENT ILL 4 (WESTBOUND) RECONSTRUCTION - PAVEMENTS ILL 150 HOWARD AVE IN PERCY TO PERRY CO LINE Miles = 0.82 ILL 4 Roadway Information Miles AADT Truck Pct 0.82 5,050 32.7 ILL 153 10.03 ILL 153 REHABILITATION - PAVEMENTS NHS N ILL 15 TO ILL 13 IN COULTERVILLE Miles = 12.27 Roadway Information Miles AADT Truck Pct 2.24 1,318 16.4 1,227 17.8 DESIGNED OVERLAY DESIGNED OVERLAY $11,300,000 REHABILITATION - PAVEMENTS NHS N N MARY'S RIVER 1 MI N OF EDEN BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 55 $1,300,000 Structure Information Str Number AADT 1,850 0790018 Truck Pct NHS 10 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 153 Location MARY'S RIVER 1 MI N OF EDEN Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 RANDOLPH 4 2021-2025 $50,000 RANDOLPH 4 2021-2025 $1,100,000 RANDOLPH 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 153 MARY'S RIVER 1 MI N OF EDEN UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 155 STREAM IN PRAIRIE DU ROCHER BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 155 STREAM IN PRAIRIE DU ROCHER LAND ACQUISITION Structure Information Str Number AADT 1,100 0790032 Truck Pct NHS 7 N $50,000 RANDOLPH 1 2021-2025 $50,000 RANDOLPH 1 2021-2025 MADISON 1 2021-2025 RECONSTRUCTION - BRIDGES ILL 155 STREAM IN PRAIRIE DU ROCHER UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 157 ST. LOUIS ST TO S UNIVERSITY DR Miles = 4.61 Roadway Information Miles AADT Truck Pct 4.61 16,572 8.8 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS P 8 - 56 $8,500,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 157 ILL 162 Location GLENWOOD DR TO 0.2 MI N OF HORSESHOE LAKE RD Miles = 4.14 Roadway Information Miles AADT Truck Pct 4.14 7,428 15.7 ILL 157 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $3,300,000 MADISON 1 2021-2025 $4,000,000 MADISON 3 2021-2025 REHABILITATION - PAVEMENTS NHS Y JUDY'S BRANCH CREEK AT ILL 162 BRIDGE REPLACEMENT ILL 162 RECONSTRUCTION - BRIDGES ILL 157 JUDY'S BRANCH CREEK AT ILL 162 LAND ACQUISITION Structure Information Str Number AADT 12,200 0600087 Truck Pct NHS 11 Y $350,000 MADISON 3 2021-2025 $250,000 MADISON 3 2021-2025 $562,000 MADISON 5 2021-2025 $4,000,000 ST. CLAIR 1 2021-2025 ILL 162 RECONSTRUCTION - BRIDGES ILL 157 JUDY'S BRANCH CREEK AT ILL 162 UTILITY ADJUSTMENT ILL 162 RECONSTRUCTION - BRIDGES ILL 157 HORSESHOE LAKE RD TO W MAIN ST IN COLLINSVILLE MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS ILL 157 STATE ST IN EAST ST. LOUIS TO PETROFF DR IN CASEYVILLE Miles = 2.09 Roadway Information Miles AADT Truck Pct 2.09 12,424 16.4 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 8 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 157 Location ILL 3 TO LOUISE AVE IN CAHOKIA Miles = 2.49 Roadway Information Miles AADT Truck Pct 2.49 11,976 10.9 ILL 158 Roadway Information Miles AADT Truck Pct 4.47 14,106 11.8 ILL 158 Roadway Information Miles AADT Truck Pct 0.79 7,027 12.5 1 2021-2025 STANDARD OVERLAY $3,000,000 ST. CLAIR 1 2020 STANDARD OVERLAY $2,000,000 ST. CLAIR 1 2021-2025 $8,500,000 MADISON 1 2021-2025 $300,000 MADISON 1 2020 REHABILITATION - PAVEMENTS N 1.05 8,400 9.1 N ILL 157 ST. CLAIR NHS N 13.5 ILL 159 $3,500,000 PRESERVATION - PAVEMENTS 7,791 MACOUPIN CO LINE TO 0.3 MI N OF ILL 140 Miles = 6.77 Roadway Information Miles AADT Truck Pct 6.77 4,399 17.4 MYP Years Past Current NHS Y 1.11 ILL 159 County REHABILITATION - PAVEMENTS 0.3 MI W OF ILL 158 S JCT TO COUNTY RD Miles = 2.95 ILL 177 STANDARD OVERLAY Est. Cost NHS Y US 50 TO ILL 161 Miles = 4.47 US 50 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N ILL 159: PARK ST IN EDWARDSVILLE TO GLEN CROSSING RD IN GLEN CARBON; ILL 157: ST LOUIS ST IN EDWARDSVILLE TO MERIDIAN RD IN GLEN CARBON ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 8 - 58 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 159 Location TROY RD IN GLEN CARBON TO CUMBERLAND AVE IN COLLINSVILLE Miles = 6.51 Roadway Information Miles AADT Truck Pct 6.51 20,888 8.9 ILL 159 County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $12,000,000 MADISON 1 2021-2025 $3,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $1,000,000 MADISON 1 2021-2025 $1,500,000 ST. CLAIR 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS Y AT BELTLINE RD IN COLLINSVILLE INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS ILL 159 AT BELTLINE RD IN COLLINSVILLE LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 159 AT BELTLINE RD IN COLLINSVILLE UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 159 ALEXA DR TO 0.1 MI S OF DOUGLAS AVE IN BELLEVILLE Miles = 0.94 Roadway Information Miles AADT Truck Pct 0.94 16,335 5.7 DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS Y 8 - 59 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 159 Location WASHINGTON ST TO 0.2 MI S OF ILL 13/158 IN BELLEVILLE Miles = 0.87 Roadway Information Miles AADT Truck Pct 0.87 13,562 5.3 ILL 159 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost MYP Years Past Current $1,500,000 ST. CLAIR 1 2021-2025 $2,100,000 ST. CLAIR 10 2021-2025 REHABILITATION - PAVEMENTS NHS Y DOUGLAS CREEK 0.8 MI N OF SMITHTON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 159 County DOUGLAS CREEK 0.8 MI N OF SMITHTON LAND ACQUISITION Structure Information Str Number AADT 9,150 0820071 Truck Pct NHS 11 Y $100,000 ST. CLAIR 10 2021-2025 $100,000 ST. CLAIR 10 2021-2025 $4,200,000 MADISON 1 2020 RECONSTRUCTION - BRIDGES ILL 159 DOUGLAS CREEK 0.8 MI N OF SMITHTON UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 160 ILL 140 TO HERMAN ST IN GRANTFORK Miles = 3.88 Roadway Information Miles AADT Truck Pct 3.88 1,820 22.6 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 8 - 60 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 160 Location MADISON CO LINE TO 0.3 MI N OF US 50 Miles = 2.61 Roadway Information Miles AADT Truck Pct 2.61 5,863 6.9 ILL 160 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $900,000 CLINTON 1 2020 $1,300,000 CLINTON 1 2021-2025 $400,000 CLINTON 1 2021-2025 $500,000 CLINTON 1 2021-2025 $500,000 CLINTON 1 2021-2025 $300,000 CLINTON 1 2021-2025 PRESERVATION - PAVEMENTS NHS N AT WESCLIN HIGH SCHOOL LEFT TURN LANES RIGHT TURN LANE MISCELLANEOUS IMPROVEMENTS ILL 160 AT WESCLIN HIGH SCHOOL P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS ILL 160 AT WESCLIN HIGH SCHOOL LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 160 AT WESCLIN HIGH SCHOOL UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 160 AT WESCLIN HIGH SCHOOL CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS 8 - 61 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 160 ILL 177 Location CLINTON CO LINE TO 0.1 MI E OF R & R RD Miles = 5.38 Roadway Information Miles AADT Truck Pct 5.38 1,932 9.4 ILL 160 Improvements TAMP Category DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $6,000,000 WASHINGTON 1 2021-2025 $500,000 WASHINGTON 1 2021-2025 ST. CLAIR 1 2021-2025 $150,000 CLINTON 1 2020 $500,000 MARION 1 2021-2025 REHABILITATION - PAVEMENTS NHS N CLINTON CO LINE TO 0.1 MI E OF R & R RD LAND ACQUISITION ILL 177 REHABILITATION - PAVEMENTS ILL 161 0.1 MI E OF ILL 159 TO 0.1 MI W OF SHILOH STATION RD Miles = 4.71 Roadway Information Miles AADT Truck Pct 4.71 17,556 7.8 ILL 161 DESIGNED OVERLAY ADA IMPROVEMENTS $10,800,000 REHABILITATION - PAVEMENTS NHS Y CLINTON ST TO 11TH ST IN NEW BADEN ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ILL 161 W TRIB RACCOON CREEK AT ECL OF CENTRALIA CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES ILL 161 W TRIB RACCOON CREEK AT ECL OF CENTRALIA LAND ACQUISITION RECONSTRUCTION - BRIDGES 8 - 62 Structure Information Str Number AADT 9,950 0612013 $50,000 MARION Truck Pct NHS 5 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 161 Location W TRIB RACCOON CREEK AT ECL OF CENTRALIA Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MARION 1 2021-2025 $10,000,000 MADISON 2 2021-2025 $3,000,000 MADISON 2 2021-2025 $3,000,000 MADISON 2 2021-2025 $2,000,000 DISTRICT-WIDE MADISON 2 2021-2025 $1,000,000 MADISON 2 2021-2025 RECONSTRUCTION - BRIDGES ILL 162 ILL 157 (N JCT) RELOCATION TO ILL 157 (S JCT) ILL 157 INTERSECTION RECONSTN BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS ILL 162 ILL 157 (N JCT) RELOCATION TO ILL 157 (S JCT) LAND ACQUISITION ILL 157 INITIAL CONSTRUCTION - PAVEMENTS ILL 162 ILL 157 (N JCT) RELOCATION TO ILL 157 (S JCT) UTILITY ADJUSTMENT ILL 157 INITIAL CONSTRUCTION - PAVEMENTS ILL 162 ILL 157 (N JCT) RELOCATION TO ILL 157 (S JCT) ILL 157 P.E. (PHASE II) P.E. (CONSULTANT TSL) INITIAL CONSTRUCTION - PAVEMENTS ILL 162 ILL 157 (N JCT) RELOCATION TO ILL 157 (S JCT) CONSTRUCTION ENGINEERING ILL 157 INITIAL CONSTRUCTION - PAVEMENTS 8 - 63 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 162 Location ILL 157 TO 0.1 MI E OF ILL 159 Miles = 2.59 Roadway Information Miles AADT Truck Pct 2.59 7,549 6.4 ILL 177 ILL 177 DESIGNED OVERLAY ADA IMPROVEMENTS Est. Cost County MYP Years Past Current $2,400,000 MADISON 3 2020 $11,000,000 ST. CLAIR 1 2021-2025 $300,000 WASHINGTON 1 2021-2025 $50,000 WASHINGTON 1 2021-2025 $50,000 WASHINGTON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y COUNTY RD TO MINE RD IN MASCOUTAH Miles = 1.66 Roadway Information Miles AADT Truck Pct 1.66 5,546 10.2 Improvements TAMP Category RECONSTRUCTION ADA IMPROVEMENTS RECONSTRUCTION - PAVEMENTS NHS N W TRIB GRAND POINT CREEK 5.7 MI E OF HOYLETON CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES ILL 177 W TRIB GRAND POINT CREEK 5.7 MI E OF HOYLETON LAND ACQUISITION RECONSTRUCTION - BRIDGES ILL 177 W TRIB GRAND POINT CREEK 5.7 MI E OF HOYLETON UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 8 - 64 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 255 Location I-270 TO ILL 143 Miles = 15.84 Roadway Information Miles AADT Truck Pct 6.50 30,997 18.8 ILL 255 ILL 267 ILL 267 BROADWAY ST MYP Years Past Current $6,500,000 MADISON 1 2020 STANDARD OVERLAY $11,000,000 MADISON 1 2021-2025 $10,000,000 GREENE 1 2021-2025 $6,000,000 JERSEY 1 2020 WASHINGTON CLINTON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y DESIGNED OVERLAY ADA IMPROVEMENTS REHABILITATION - PAVEMENTS NHS N GREENE CO LINE TO MACOUPIN CO LINE Miles = 5.76 Roadway Information Miles AADT Truck Pct 5.76 2,001 18.7 County PRESERVATION - PAVEMENTS 0.4 MI S OF SHORT RD TO JERSEY CO LINE Miles = 10.07 Roadway Information Miles AADT Truck Pct 10.07 2,655 15.9 STANDARD OVERLAY Est. Cost NHS Y I-270 TO ILL 143 Miles = 15.22 Roadway Information Miles AADT Truck Pct 6.59 30,886 18.9 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 0.5 MI W OF ILL 160 IN TRENTON CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 8 - 65 $300,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street BROADWAY ST Location 0.5 MI W OF ILL 160 IN TRENTON Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $50,000 WASHINGTON CLINTON 1 2021-2025 $50,000 WASHINGTON CLINTON 1 2021-2025 $2,000,000 MADISON 1 2021-2025 $50,000 MADISON 1 2021-2025 $50,000 MADISON 1 2021-2025 $3,800,000 ST. CLAIR 4 2021-2025 MISCELLANEOUS IMPROVEMENTS BROADWAY ST 0.5 MI W OF ILL 160 IN TRENTON UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS CH 65 E TRIB SILVER CREEK 2 MI E OF I-55 BRIDGE REPLACEMENT NEW DOUGLAS RD RECONSTRUCTION - BRIDGES CH 65 E TRIB SILVER CREEK 2 MI E OF I-55 LAND ACQUISITION NEW DOUGLAS RD RECONSTRUCTION - BRIDGES CH 65 E TRIB SILVER CREEK 2 MI E OF I-55 UTILITY ADJUSTMENT NEW DOUGLAS RD RECONSTRUCTION - BRIDGES COLLINSVILLE RD SCHOENBERGER CREEK 0.5 MI E OF ILL 203 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 66 Structure Information Str Number AADT 3,600 0820031 Truck Pct NHS 16 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street COLLINSVILLE RD Location SCHOENBERGER CREEK 0.5 MI E OF ILL 203 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $100,000 ST. CLAIR 1 2021-2025 $100,000 ST. CLAIR 1 2021-2025 $350,000 ST. CLAIR 3 2020 $1,900,000 ST. CLAIR 1 2021-2025 RECONSTRUCTION - BRIDGES COLLINSVILLE RD SCHOENBERGER CREEK 0.5 MI E OF ILL 203 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES E HWY 50 3RD ST TO SEVEN HILLS RD IN O'FALLON ADA IMPROVEMENTS W HWY 50 MISCELLANEOUS IMPROVEMENTS FOREST BLVD CH 12 SCHOENBERGER CREEK W OF ILL 111 IN WASHINGTON PARK BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES FOREST BLVD CH 12 SCHOENBERGER CREEK W OF ILL 111 IN WASHINGTON PARK LAND ACQUISITION Structure Information Str Number AADT 1,100 0829951 Truck Pct NHS 8 N $50,000 ST. CLAIR 1 2021-2025 $50,000 ST. CLAIR 1 2021-2025 RECONSTRUCTION - BRIDGES FOREST BLVD CH 12 SCHOENBERGER CREEK W OF ILL 111 IN WASHINGTON PARK UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 8 - 67 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street GREENMOUNT RD Location ILL 161 TO ILL 158/177 Miles = 0.01 Improvements TAMP Category ADDITIONAL LANES BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $11,000,000 ST. CLAIR 7 2021-2025 CONTINGENT UPON A JURISDICTIONAL TRANSFER. INITIAL CONSTRUCTION - PAVEMENTS GREENMOUNT RD ILL 161 TO ILL 158/177 Miles = 1.00 STANDARD OVERLAY Structure Information Str Number AADT 17,800 0820147 Truck Pct NHS 7 N $1,000,000 ST. CLAIR 2 2021-2025 $400,000 ST. CLAIR 4 2021-2025 $1,500,000 ST. CLAIR 4 2021-2025 $16,000,000 ST. CLAIR 1 2021-2025 CONTINGENT UPON A JURISDICTIONAL TRANSFER. Roadway Information Miles AADT Truck Pct 1.00 17,621 6.9 GREENMOUNT RD REHABILITATION - PAVEMENTS NHS N ILL 161 TO ILL 158/177 LAND ACQUISITION CONTINGENT UPON A JURISDICTIONAL TRANSFER. INITIAL CONSTRUCTION - PAVEMENTS GREENMOUNT RD ILL 161 TO ILL 158/177 UTILITY ADJUSTMENT CONTINGENT UPON A JURISDICTIONAL TRANSFER. INITIAL CONSTRUCTION - PAVEMENTS ILL 158 RELOCATED ILL 177 TO ILL 161 Miles = 1.15 NEW CONSTRUCTION BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS 8 - 68 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 158 RELOCATED Location ILL 177 TO ILL 161 Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) AGRICULTURAL SURVEY Est. Cost County MYP Years Past Current $3,000,000 ST. CLAIR 1 2020 $500,000 ST. CLAIR 1 2021-2025 $500,000 ST. CLAIR 1 2021-2025 $56,000,000 ST. CLAIR 1 2021-2025 $5,000,000 ST. CLAIR 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 158 RELOCATED ILL 177 TO ILL 161 LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS ILL 158 RELOCATED ILL 177 TO ILL 161 UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS ILL 3 CONNECTOR COLLINSVILLE RD TO ILL 3/203 Miles = 0.30 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS ILL 3 CONNECTOR COLLINSVILLE RD TO ILL 3/203 P.E. (PHASE II) INITIAL CONSTRUCTION - PAVEMENTS 8 - 69 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street ILL 3 CONNECTOR Location COLLINSVILLE RD TO ILL 3/203 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $10,000,000 ST. CLAIR 1 2021-2025 $5,000,000 ST. CLAIR 1 2021-2025 $5,000,000 ST. CLAIR 1 2021-2025 $170,000 ST. CLAIR 3 2021-2025 $750,000 MARION 3 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS ILL 3 CONNECTOR COLLINSVILLE RD TO ILL 3/203 UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS ILL 3 CONNECTOR COLLINSVILLE RD TO ILL 3/203 CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS KING BRIDGE MLK BRIDGE IN EAST ST. LOUIS BRIDGE DECK SEALING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES KINLOU RD SKILLET FORK CREEK TRIB 0.1 MI W OF CLAY CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES KINLOU RD SKILLET FORK CREEK TRIB 0.1 MI W OF CLAY CO LINE LAND ACQUISITION RECONSTRUCTION - BRIDGES 8 - 70 Structure Information Str Number AADT 675 0610067 $50,000 MARION Truck Pct NHS 10 N 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street KINLOU RD Location SKILLET FORK CREEK TRIB 0.1 MI W OF CLAY CO LINE Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MARION 3 2021-2025 $33,000,000 ST. CLAIR 1 2021-2025 $1,300,000 ST. CLAIR 6 2021-2025 $500,000 ST. CLAIR 1 2021-2025 $4,000,000 ST. CLAIR 1 2021-2025 $2,500,000 ST. CLAIR 1 2021-2025 RECONSTRUCTION - BRIDGES LEBANON BYP ILL 4 TO US 50 E OF LEBANON Miles = 3.00 GRADING PAVING BRIDGE (NEW) INITIAL CONSTRUCTION - PAVEMENTS LEBANON BYP ILL 4 TO US 50 E OF LEBANON P.E. (PHASE II) P.E. (CONSULTANT PLANS) INITIAL CONSTRUCTION - PAVEMENTS LEBANON BYP ILL 4 TO US 50 E OF LEBANON LAND ACQUISITION INITIAL CONSTRUCTION - PAVEMENTS LEBANON BYP ILL 4 TO US 50 E OF LEBANON UTILITY ADJUSTMENT INITIAL CONSTRUCTION - PAVEMENTS LEBANON BYP ILL 4 TO US 50 E OF LEBANON CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - PAVEMENTS 8 - 71 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street MCKINLEY BRIDGE Location MISSISSIPPI RIVER Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $175,000 MADISON 3 2020 $3,000,000 MADISON 4 2021-2025 PRESERVATION - BRIDGES N SIU ENT RD N&W RR 1.3 MI S OF ILL 143 BRIDGE SUPERSTRUCTURE (NB & SB) REHABILITATION - BRIDGES OLD ALTON / EDWARDSVILLE RD 0.3 MI E OF WANDA RD TO CAHOKIA CREEK RD Miles = 1.21 Roadway Information Miles AADT Truck Pct 1.21 1,091 0.0 OLD ALTON / DESIGNED OVERLAY DRAINAGE Structure Information Str Number AADT 2,850 0600142 2,850 0600143 Truck Pct NHS 4 N 4 N $800,000 MADISON 5 2021-2025 $1,600,000 MADISON 4 2021-2025 $60,000 MADISON 4 2021-2025 REHABILITATION - PAVEMENTS NHS N INDIAN CREEK TRIB 1 MI E OF I-255 CULVERT REPLACEMENT EDWARDSVILLE RD MISCELLANEOUS IMPROVEMENTS OLD ALTON / INDIAN CREEK TRIB 1 MI E OF I-255 LAND ACQUISITION EDWARDSVILLE RD MISCELLANEOUS IMPROVEMENTS 8 - 72 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street OLD ALTON / Location INDIAN CREEK TRIB 1 MI E OF I-255 Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MADISON 4 2021-2025 $400,000 ST. CLAIR 1 2021-2025 $50,000 ST. CLAIR 1 2021-2025 $50,000 ST. CLAIR 1 2021-2025 MARION 1 2021-2025 EDWARDSVILLE RD MISCELLANEOUS IMPROVEMENTS OLD US 50 W TRIB E BRANCH TO SILVER CREEK E OF SUMMERFIELD RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS OLD US 50 W TRIB E BRANCH TO SILVER CREEK E OF SUMMERFIELD RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS OLD US 50 W TRIB E BRANCH TO SILVER CREEK E OF SUMMERFIELD RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS OLD US 51 CROOKED CREEK 0.3 MI N OF CENTRAL CITY BRIDGE REPLACEMENT $2,400,000 RECONSTRUCTION - BRIDGES OLD US 51 CROOKED CREEK 0.3 MI N OF CENTRAL CITY LAND ACQUISITION RECONSTRUCTION - BRIDGES 8 - 73 Structure Information Str Number AADT 1,500 0610007 $50,000 MARION Truck Pct NHS 3 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street OLD US 51 Location CROOKED CREEK 0.3 MI N OF CENTRAL CITY Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $50,000 MARION 1 2021-2025 $800,000 DISTRICT-WIDE 4 2020 $3,960,000 DISTRICT-WIDE 4 2021-2025 $17,390,000 DISTRICT-WIDE 2 2021-2025 $45,000,000 DISTRICT-WIDE 1 2021-2025 $4,000,000 DISTRICT-WIDE 1 2021-2025 RECONSTRUCTION - BRIDGES VARIOUS VARIOUS ADA RAMPS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS ADA RAMPS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT PRESERVATION MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION MICROSURFACING 1 PASS PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION CONSTRUCTION ENGINEERING PRESERVATION - PAVEMENTS 8 - 74 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS Improvements TAMP Category SAFETY IMPROVEMENTS Est. Cost County MYP Years Past Current $7,414,000 DISTRICT-WIDE 6 2020 $37,070,000 DISTRICT-WIDE 2 2021-2025 $10,000,000 DISTRICT-WIDE 1 2021-2025 $1,000,000 DISTRICT-WIDE 1 2020 $500,000 DISTRICT-WIDE 3 2020 $1,000,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. (ROW) MISCELLANEOUS IMPROVEMENTS 8 - 75 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location VARIOUS Improvements TAMP Category P.E. (ROW) Est. Cost County MYP Years Past Current $500,000 DISTRICT-WIDE 1 2020 $9,000,000 DISTRICT-WIDE 1 2021-2025 $250,000 DISTRICT-WIDE 1 2020 $100,000 DISTRICT-WIDE 1 2020 $2,150,000 DISTRICT-WIDE 3 2020 $5,000,000 DISTRICT-WIDE 2 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS (TRAFFIC SIGNAL PE) PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) MISCELLANEOUS IMPROVEMENTS 8 - 76 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location VARIOUS Improvements TAMP Category P.E. (PHASE I) P.E. (PHASE II) Est. Cost County MYP Years Past Current $5,000,000 DISTRICT-WIDE 1 2021-2025 $25,500,000 DISTRICT-WIDE 1 2021-2025 $5,000,000 DISTRICT-WIDE 1 2020 $500,000 DISTRICT-WIDE 1 2020 $400,000 DISTRICT-WIDE 4 2020 $450,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS 8 - 77 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location VARIOUS Improvements TAMP Category P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) Est. Cost County MYP Years Past Current $5,000,000 DISTRICT-WIDE 1 2021-2025 $5,000,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 7 2021-2025 $1,000,000 DISTRICT-WIDE 1 2020 $7,500,000 DISTRICT-WIDE 1 2021-2025 $200,000 DISTRICT-WIDE 4 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS VARIOUS CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS VARIOUS LOCAL ROADS CONSULTANT P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 8 - 78 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location LOCAL ROADS CONSULTANT Improvements TAMP Category P.E. PROJECT MANAGERS Est. Cost County MYP Years Past Current $400,000 DISTRICT-WIDE 4 2021-2025 $300,000 DISTRICT-WIDE 4 2020 $1,700,000 DISTRICT-WIDE 4 2021-2025 $250,000 DISTRICT-WIDE 3 2020 $750,000 DISTRICT-WIDE 2 2021-2025 $350,000 DISTRICT-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS 8 - 79 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location POST-LAND ACQUISITION ACTIVITY Improvements TAMP Category POST-ACQUISITION ACTIVITY Est. Cost County MYP Years Past Current $600,000 DISTRICT-WIDE 2 2021-2025 $70,000 DISTRICT-WIDE 1 2020 $1,000,000 DISTRICT-WIDE 1 2021-2025 $750,000 DISTRICT-WIDE 3 2020 $200,000 DISTRICT-WIDE 1 2020 $2,000,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS UTILITIES UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ISAS) ARCHAEOLOGICAL SURVEY MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ISAS) ARCHAEOLOGICAL SURVEY MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS LOCATIONS (ISAS) ARCHAEOLOGICAL SURVEY MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS ARCHAEOLOGICAL SURVEY MISCELLANEOUS IMPROVEMENTS 8 - 80 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location VARIOUS Improvements TAMP Category ARCHAEOLOGICAL SURVEY Est. Cost County MYP Years Past Current $1,000,000 DISTRICT-WIDE 1 2021-2025 $1,300,000 DISTRICT-WIDE 1 2021-2025 $1,100,000 DISTRICT-WIDE 1 2021-2025 $2,000,000 DISTRICT-WIDE 2 2021-2025 $2,248,000 DISTRICT-WIDE 5 2021-2025 $250,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT PATCHING PATCHING MISCELLANEOUS IMPROVEMENTS VARIOUS GUARDRAIL & MEDIAN CABLE INSTALLATION GUARDRAIL MEDIAN CABLE MISCELLANEOUS IMPROVEMENTS VARIOUS GUARDRAIL & MEDIAN CABLE INSTALLATION GUARDRAIL MEDIAN CABLE MISCELLANEOUS IMPROVEMENTS VARIOUS CONGESTION MITIGATION AIR QUALITY MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS UTILITY ENGINEERING COORDINATION P.E. SUBSURFACE UTILITIES MISCELLANEOUS IMPROVEMENTS 8 - 81 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 8 State Highways Route / Street VARIOUS Location UTILITY ENGINEERING COORDINATION Improvements TAMP Category P.E. SUBSURFACE UTILITIES Est. Cost County MYP Years Past Current $250,000 DISTRICT-WIDE 1 2021-2025 $500,000 DISTRICT-WIDE 1 2020 $9,000,000 DISTRICT-WIDE 1 2021-2025 $50,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING P.E. SUBSURFACE UTILITIES MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS P.E. SUBSURFACE UTILITIES MISCELLANEOUS IMPROVEMENTS VARIOUS RR FLAGGER AGREEMENT RR FLAGGER MISCELLANEOUS IMPROVEMENTS 8 - 82 DISTRICT 8 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street I 255 Location AT IMBS STATION RD & DAVIS ST FERRY RD IN DUPO Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $1,800,000 ST. CLAIR 1 2021-2025 $1,800,000 ST. CLAIR 14 2021-2025 $42,435,000 ST. CLAIR 13 2021-2025 $3,000,000 ST. CLAIR 2 2021-2025 $51,000 MADISON 2 2020 $51,000 MADISON 2 2020 US 50 INITIAL CONSTRUCTION - BRIDGES I 255 AT IMBS STATION RD & DAVIS ST FERRY RD IN DUPO UTILITY ADJUSTMENT US 50 INITIAL CONSTRUCTION - BRIDGES I 255 AT IMBS STATE RD & DAVIS ST FERRY RD IN DUPO BRIDGE (NEW) SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. INITIAL CONSTRUCTION - BRIDGES I 255 AT IMBS STATION RD & DAVIS ST FERRY RD IN DUPO CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - BRIDGES ILL 157 MADISON COUNTY TRANSIT (MCT) NATURE TRAIL TO CENTER GROVE RD BIKEWAY MISCELLANEOUS IMPROVEMENTS ILL 160 POPLAR ST ST. JOSEPH HOSPITAL SW ENTRANCE TO US 40 / ILL 143 IN HIGHLAND BIKEWAY MISCELLANEOUS IMPROVEMENTS 8 - 83 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street 1ST ST Location C ST TO E ST IN GRANITE CITY Miles = 0.62 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $2,000,000 MADISON 1 2020 $500,000 MADISON 3 2020 $569,000 ST. CLAIR 3 2020 $600,000 GREENE 3 2020 $900,000 MADISON 2 2021-2025 $1,250,000 CLINTON 2 2021-2025 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. RECONSTRUCTION - PAVEMENTS 6TH ST E EDWARDSVILLE RD TO ILL 143 IN WOOD RIVER Miles = 0.48 STANDARD OVERLAY REHABILITATION - PAVEMENTS 26TH ST LOUISIANA BLVD TO MISSOURI AVE IN EAST ST. LOUIS Miles = 0.33 STANDARD OVERLAY REHABILITATION - PAVEMENTS 1680 N RD AT APPLE CREEK NW OF CARROLLTON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ALBERS LN AT ROCKY BRANCH CREEK AT NCL OF BETHALTO BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES BARTELSO RD OLD US 50 IN BECKMEYER TO ILL 161 IN BARTELSO Miles = 6.12 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 84 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street BELL CLUB RD Location GREEN STREET RD TO ILL 161 Miles = 2.50 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,200,000 MARION 3 2020 $525,000 MONROE 3 2020 $42,000 MONROE 2 2020 $206,000 ST. CLAIR 2 2020 $677,000 MADISON 3 2020 $500,000 MONROE 1 2021-2025 REHABILITATION - PAVEMENTS BLUFF RD AT CARR CREEK SW OF COLUMBIA BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES BOLM-SCHUHKRAFT CONNECTOR TRAIL MONROE ST BIKETRAIL: BOLM-SCHUHKRAFT PARK TO MONROE ST; MONROE ST: 0.1 MI W OF KAEMPF ST TO MAIN ST IN COLUMBIA BIKEWAY SIDEWALKS MISCELLANEOUS IMPROVEMENTS BOUL AVE W OF ILL 159 AT METROLINK BIKE TRAIL TO MORGAN ST BIKEWAY MISCELLANEOUS IMPROVEMENTS BROADWAY ST HELVETIA DR TO IBERG RD IN HIGHLAND Miles = 0.53 STANDARD OVERLAY REHABILITATION - PAVEMENTS CARL ST AT WILSON CREEK IN COLUMBIA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 85 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street CENTREVILLE AVE Location STATE ST TO WASHINGTON ST IN BELLEVILLE Miles = 0.51 Improvements TAMP Category STANDARD OVERLAY BIKEWAY Est. Cost County MYP Years Past Current $720,000 ST. CLAIR 6 2020 $240,000 BOND 3 2020 $500,000 GREENE 1 2021-2025 RANDOLPH 1 2021-2025 $500,000 WASHINGTON 2 2020 $850,000 CALHOUN 4 2020 REHABILITATION - PAVEMENTS CH 1 OVER BNSF RR 2.5 MI N OF GREENVILLE BRIDGE REPLACEMENT RED BALL TRAIL RECONSTRUCTION - BRIDGES CH 2 ILL 267 TO MACOUPIN CO LINE Miles = 3.07 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 2 CH 5 ROCKCASTLE RD (CH 19) TO ILL 3 Miles = 8.82 STANDARD OVERLAY $2,000,000 WINE HILL RD ROCKWOOD RD REHABILITATION - PAVEMENTS CH 5 AT RAYSE CREEK BRANCH 0.5 MI E OF RICHVIEW BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES CH 6 BATCHTOWN RD 0.2 MI E OF PARK ST TO W OF HILLTOP RD Miles = 0.98 STANDARD OVERLAY GUARDRAIL REHABILITATION - PAVEMENTS 8 - 86 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street CH 8 MULBERRY GROVE RD Location MONTGOMERY CO LINE TO COLBURN DR Miles = 7.50 Improvements TAMP Category CAPE SEAL Est. Cost County MYP Years Past Current $350,000 BOND 3 2020 WASHINGTON 1 2021-2025 $500,000 MADISON 3 2021-2025 $500,000 MADISON 3 2020 $317,000 MADISON 1 2021-2025 $619,000 ST. CLAIR 1 2021-2025 PRESERVATION - PAVEMENTS CH 10 4 MI W OF OAKDALE WCL TO OAKDALE WCL Miles = 4.00 STANDARD OVERLAY $1,300,000 REHABILITATION - PAVEMENTS CH 32 AT MILL CREEK 2 MI E OF TROY-O'FALLON RD BRIDGE REPLACEMENT LEBANON RD RECONSTRUCTION - BRIDGES CH 42 AT LITTLE MOONEY CREEK E OF EDWARDSVILLE BRIDGE REPLACEMENT PIN OAK RD RECONSTRUCTION - BRIDGES CLAY ST N MAIN ST TO N HICKORY ST IN TROY Miles = 0.09 STANDARD OVERLAY REHABILITATION - PAVEMENTS COLLINSVILLE AVE ST CLAIR AVE TO SUMMIT AVE IN EAST ST. LOUIS Miles = 0.31 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 87 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street COLLINSVILLE AVE Location SUMMIT AVE TO MARTIN LUTHER KING DR IN EAST ST. LOUIS Miles = 0.28 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $644,000 ST. CLAIR 2 2021-2025 $55,000 ST. CLAIR 1 2020 $411,000 MADISON 3 2020 $585,000 MADISON 2 2021-2025 $300,000 BOND 1 2020 $400,000 MADISON 3 2020 REHABILITATION - PAVEMENTS CURTISS STEINBERG AT SAUGET INDUSTRIAL PKWY IN SAUGET INTERSECTION RECONSTN TURNING LANES RECONSTRUCTION - PAVEMENTS DELMAR AVE RAND AVE TO HAWTHORNE ST IN HARTFORD Miles = 0.51 STANDARD OVERLAY REHABILITATION - PAVEMENTS E CLAY ST HICKORY ST / STAUNTON RD TO N DEWEY ST IN TROY Miles = 0.26 STANDARD OVERLAY REHABILITATION - PAVEMENTS ELM ST E LOUIS LATZER DR TO US 40 IN GREENVILLE Miles = 0.78 STANDARD OVERLAY REHABILITATION - PAVEMENTS FAIRMONT AVE AT CANTEEN CANAL IN COLLINSVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 88 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street FRANK SCOTT PKWY Location W OF OLD COLLINSVILLE RD IN SWANSEA TO W OF GREEN MOUNT RD IN SHILOH Miles = 2.02 Improvements TAMP Category ADDITIONAL LANES BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $5,102,000 ST. CLAIR 2 2021-2025 $1,061,000 ST. CLAIR 4 2020 $651,000 MONROE 3 2020 $950,000 MARION 1 2021-2025 $52,000 MONROE 1 2020 $500,000 MONROE 1 2021-2025 INITIAL CONSTRUCTION - PAVEMENTS FREEBURG AVE AT ILL 158 & ILL 13 IN BELLEVILLE INTERSECTION RECONSTN RECONSTRUCTION - PAVEMENTS GHENT RD 0.1 MI S OF PALMER RD TO CHRISTINA CT IN COLUMBIA Miles = 0.37 STANDARD OVERLAY REHABILITATION - PAVEMENTS GRAGG ST LINCOLN BLVD TO COUNTRY CLUB RD IN CENTRALIA Miles = 1.62 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS HANOVER RD AT ILL 3 N OF WATERLOO TURNING LANES RECONSTRUCTION - PAVEMENTS HANOVER RD D RD TO GM&O RR BRIDGE NW OF WATERLOO Miles = 2.11 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 89 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street HARTMAN LN Location AT CENTRAL PARK DR IN OFALLON Improvements TAMP Category INTERSECTION IMPROVEMENT Est. Cost County MYP Years Past Current $398,000 ST. CLAIR 1 2021-2025 MARION 1 2021-2025 $400,000 WASHINGTON 1 2021-2025 $500,000 BOND 3 2020 ST. CLAIR 1 2021-2025 ST. CLAIR 1 2021-2025 MISCELLANEOUS IMPROVEMENTS HEINZMANN RD ILL 161 TO KELL RD Miles = 1.99 STANDARD OVERLAY $1,250,000 REHABILITATION - PAVEMENTS HOOVER RD AT ARCHIE CREEK SW OF ELKTON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES HUNTER SCHOOL AVE AT SPRING BRANCH NW OF KEYESPORT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES IMBS STATION RD AT PRAIRIE DUPONT CREEK S OF CAHOKIA BRIDGE REPLACEMENT $1,529,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES IMBS STATION RD AT PRAIRIE DUPONT CREEK S OF CAHOKIA CONSTRUCTION ENGINEERING $122,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES 8 - 90 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street JIMTOWN RD Location AT ELKHORN CREEK NW OF OAKDALE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $450,000 WASHINGTON 3 2020 $533,000 MADISON 2 2021-2025 $619,000 MADISON 1 2021-2025 $376,000 MADISON 3 2020 $415,000 MADISON 2 2020 $503,000 ST. CLAIR 2 2021-2025 RECONSTRUCTION - BRIDGES JOHNSON RD NAMEOKI RD TO TERRACE LN IN GRANITE CITY Miles = 0.20 STANDARD OVERLAY REHABILITATION - PAVEMENTS JOHNSON RD TERRACE LN TO WABASH AVE IN GRANITE CITY Miles = 0.33 STANDARD OVERLAY REHABILITATION - PAVEMENTS KEEBLER RD AT ILL 162 W OF MARYVILLE INTERSECTION IMPROVEMENT MISCELLANEOUS IMPROVEMENTS KEEBLER RD 0.1 MI S OF ILL 162 TO OLD KEEBLER RD Miles = 0.34 STANDARD OVERLAY REHABILITATION - PAVEMENTS LEBANON AVE F ST TO S OF ELMWOOD DR & BRISTOW ST TO ILL 161 IN BELLEVILLE Miles = 0.90 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 91 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street LEVEE RD Location AT LEVEE RD DOCK IN GRANITE CITY Miles = 0.01 Improvements TAMP Category PAVING Est. Cost County MYP Years Past Current $1,364,000 MADISON 1 2020 $1,000 MADISON 1 2020 $427,000 ST. CLAIR 2 2021-2025 $475,000 ST. CLAIR 4 2021-2025 $717,000 MONROE 2 2021-2025 $999,000 MONROE 4 2020 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS LEVEE RD AT LEVEE RD DOCK IN GRANITE CITY CONSTRUCTION ENGINEERING ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS MARKET PL E OF COMMERCE DR TO W OF LANAGHAN DR IN FAIRVIEW HEIGHTS Miles = 0.14 STANDARD OVERLAY REHABILITATION - PAVEMENTS MCALLISTER ST HERMAN ST TO ILL 4 IN LEBANON Miles = 0.15 RECONSTRUCTION SIDEWALKS RECONSTRUCTION - PAVEMENTS MOORE ST 0.2 MI S OF ILL 3 TO 0.1 MI N OF COLUMBIA AVE IN WATERLOO Miles = 0.10 STANDARD OVERLAY REHABILITATION - PAVEMENTS MOORE ST 0.1 MI N OF COLUMBIA AVE TO S OF COLUMBIA AVE IN WATERLOO Miles = 0.10 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 8 - 92 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street MORRIS ST Location 2ND ST TO ILL 157 IN CASEYVILLE Miles = 0.18 Improvements TAMP Category STANDARD OVERLAY SIDEWALKS Est. Cost County MYP Years Past Current $435,000 ST. CLAIR 3 2020 $676,000 ST. CLAIR 3 2020 $700,000 BOND 4 2020 $547,000 MADISON 2 2021-2025 $536,000 MADISON 2 2021-2025 $525,000 MADISON 1 2021-2025 REHABILITATION - PAVEMENTS MOUSETTE LN CAROL ST TO JEROME LN Miles = 0.62 STANDARD OVERLAY REHABILITATION - PAVEMENTS MULBERRY GROVE RD US 40 IN MULBERRY GROVE TO 0.6 MI S OF HUNTER SCHOOL AVE 3.7 MI N OF KEYESPORT Miles = 8.53 STANDARD OVERLAY REHABILITATION - PAVEMENTS N BUCHANAN ST E UNION ST TO HILLSBORO AVE IN EDWARDSVILLE Miles = 0.34 STANDARD OVERLAY REHABILITATION - PAVEMENTS N PRAIRIE ST CORBIN ST TO WILLIAMS ST IN BETHALTO Miles = 0.15 STANDARD OVERLAY REHABILITATION - PAVEMENTS N PRAIRIE ST WILLIAMS ST TO DOROTHY ST IN BETHALTO Miles = 0.14 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS 8 - 93 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street N SEVEN HILLS RD Location O'FALLON-TROY RD TO STATE ST IN OFALLON Miles = 2.46 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $579,000 ST. CLAIR 1 2021-2025 $500,000 BOND 4 2020 $430,000 MARION 2 2021-2025 $503,000 ST. CLAIR 1 2021-2025 $360,000 BOND 2 2020 $299,000 MADISON 3 2020 REHABILITATION - PAVEMENTS NEW DOUGLAS AVE MADISON CO LINE TO 0.5 MI W OF ELEVATOR RD Miles = 0.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS NORTON RD AT TURKEY CREEK 1 MI S OF RED STRIPE RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES OLD COLLINSVILLE RD ASHLAND AVE IN FAIRVIEW HEIGHTS TO LEBANON AVE IN SWANSEA Miles = 3.51 STANDARD OVERLAY PATCHING REHABILITATION - PAVEMENTS PANAMA AVE NCL OF SORENTO TO RENKEN RD Miles = 2.18 STANDARD OVERLAY REHABILITATION - PAVEMENTS PEARL ST KANSAS CITY SOUTHERN RR TO HUMBERT RD IN GODFREY Miles = 0.29 STANDARD OVERLAY SIDEWALKS REHABILITATION - PAVEMENTS 8 - 94 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street PEARL ST. Location AT UP RR Improvements TAMP Category RR CROSSING IMPROVEMENT Est. Cost County MYP Years Past Current $450,000 MADISON 1 2020 $645,000 MONROE 1 2021-2025 $300,000 JERSEY 3 2020 $600,000 MARION 3 2020 $335,000 MARION 3 2020 MISCELLANEOUS IMPROVEMENTS QUARRY RD GHENT RD TO PALMER CREEK DR IN COLUMBIA Miles = 0.53 STANDARD OVERLAY REHABILITATION - PAVEMENTS RYAN RD AT MACOUPIN CREEK TRIB 0.3 MI W OF MACOUPIN CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES S HICKORY ST 16TH ST S HICKORY ST: NOLEMAN ST TO 5TH ST & CALUMET ST TO 16TH ST; 16TH ST: S HICKORY ST TO WABASH AVE (ALL IN CENTRALIA) Miles = 0.95 DESIGNED OVERLAY REHABILITATION - PAVEMENTS S LOCUST ST E 3RD ST TO E 17TH ST IN CENTRALIA Miles = 1.02 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 95 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street SAUGET INDUSTRIAL PKWY SAUGET BUSINESS BLVD Location SAUGET INDUSTRIAL PKWY: CURTIS STEINBERG DR TO SAUGET BUSINESS BLVD & SAUGET BUSINESS BLVD TO MOUSETTE LN; SAUGET BUSINESS BLVD: SAUGET INDUSTRIAL PKWY 0.2 MI E OF CURTIS STEINBERG DR TO SAUGET INDUSTRIAL PKWY 0.1 MI W OF MOUSETTE LN (ALL IN SAUGET) Improvements TAMP Category GUARDRAIL LIGHTING Est. Cost County MYP Years Past Current $795,000 ST. CLAIR 1 2021-2025 $800,000 MADISON 1 2021-2025 $400,000 CLINTON 2 2021-2025 $939,000 ST. CLAIR 3 2020 $445,000 ST. CLAIR 1 2021-2025 MISCELLANEOUS IMPROVEMENTS SEILER RD BIVENS RD TO ILL 159 Miles = 1.68 STANDARD OVERLAY REHABILITATION - PAVEMENTS SHATTUC RD AT BREWSTER CREEK 0.5 MI S OF DIAMOND SPRINGS RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES SHILOH STATION RD S OF TIMBERLINE CT TO 0.5 MI N OF JOHNSON RD Miles = 0.20 RECONSTRUCTION BIKEWAY RECONSTRUCTION - PAVEMENTS SHILOH STATION RD 0.4 MI N OF JOHNSON RD TO 0.2 MI S Miles = 0.15 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 96 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street SILVER CREEK RD Location AT SILVER CREEK TRIB Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $800,000 MADISON 3 2020 $600,000 MADISON 1 2021-2025 $829,000 MADISON 8 2021-2025 $337,000 MADISON 1 2021-2025 $705,000 MADISON 3 2020 $436,000 MADISON 4 2021-2025 RECONSTRUCTION - BRIDGES SORENTO RD MAIN ST IN NEW DOUGLAS TO BOND CO LINE Miles = 1.51 STANDARD OVERLAY REHABILITATION - PAVEMENTS SPRING VALLEY RD 0.1 MI N OF AUSTIN DR TO 0.1 MI S OF CHARLESTON DR IN TROY Miles = 0.25 STANDARD OVERLAY SIDEWALKS REHABILITATION - PAVEMENTS ST. LOUIS ST N MAIN ST TO W VANDALIA ST IN EDWARDSVILLE Miles = 0.16 STANDARD OVERLAY REHABILITATION - PAVEMENTS STATE ST 0.1 MI N OF DELMAR AVE TO 0.1 MI S OF ROZIER ST IN ALTON Miles = 0.34 STANDARD OVERLAY REHABILITATION - PAVEMENTS SUGAR LOAF RD 0.1 MI W OF HONEY LN TO 0.2 MI NE OF ILL 157 IN COLLINSVILLE Miles = 0.11 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS 8 - 97 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street SUGAR LOAF RD Location 0.2 MI NE OF ILL 157 TO ILL 157 IN COLLINSVILLE Improvements TAMP Category INTERSECTION RECONSTN Est. Cost County MYP Years Past Current $395,000 MADISON 5 2021-2025 $687,000 ST. CLAIR 3 2020 $608,000 MADISON 1 2021-2025 $275,000 ST. CLAIR 1 2021-2025 $30,000 ST. CLAIR 1 2021-2025 $1,400,000 MADISON 1 2021-2025 RECONSTRUCTION - PAVEMENTS SULLIVAN DR UNION HILL RD S OF LONGACRE DR IN FAIRVIEW HEIGHTS TO 0.1 MI S OF FRANK SCOTT PKWY IN BELLEVILLE Miles = 1.20 STANDARD OVERLAY REHABILITATION - PAVEMENTS THIRD ST EWING AVE TO MCCAMBRIDGE AVE IN MADISON Miles = 0.27 STANDARD OVERLAY REHABILITATION - PAVEMENTS TRIPLE LAKES RD AT PRAIRIE DUPONT CREEK IN CAHOKIA BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES TRIPLE LAKES RD AT PRAIRIE DUPONT CREEK IN CAHOKIA CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES TROY-O'FALLON RD AT MILL CREEK 0.3 MI N OF LEBANON RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 8 - 98 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street TURNER HOLLOW RD Location MISSISSIPPI RIVER RD TO TWO RIVERS NATIONAL WILDLIFE REFUGE Miles = 0.61 Improvements TAMP Category STANDARD OVERLAY WIDENING EXISTING PAVEMENT Est. Cost County MYP Years Past Current $105,000 CALHOUN 1 2020 $5,078,000 DISTRICT-WIDE 4 2020 $24,503,000 DISTRICT-WIDE 3 2021-2025 $792,000 ST. CLAIR 2 2021-2025 $831,000 ST. CLAIR 4 2020 $814,000 ST. CLAIR 1 2021-2025 REHABILITATION - PAVEMENTS VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS RECONSTRUCTION - PAVEMENTS VENITA DR N OF TAYLOR RD TO 0.1 MI N OF O'FALLON SPORTS PARK ENT IN O'FALLON Miles = 0.32 STANDARD OVERLAY REHABILITATION - PAVEMENTS W MAIN ST 28TH ST TO 17TH ST IN BELLEVILLE Miles = 0.79 STANDARD OVERLAY REHABILITATION - PAVEMENTS W WASHINGTON ST CENTREVILLE AVE TO S ILLINOIS ST IN BELLEVILLE Miles = 0.32 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 99 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 8 Local Highways Route / Street WHITTAKER ST Location S COLLEGE ST TO ILL 37 IN SALEM Miles = 0.21 Improvements TAMP Category RECONSTRUCTION Est. Cost County MYP Years Past Current $1,035,000 MARION 1 2021-2025 $135,000 CALHOUN 1 2020 $550,000 MADISON 1 2021-2025 $575,000 MADISON 2 2021-2025 $451,000 MADISON 1 2021-2025 RECONSTRUCTION - PAVEMENTS WILDLIFE CONSERVATION RD TWO RIVERS NATIONAL WILDLIFE REFUGE TO CH 1 Miles = 1.39 STANDARD OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS WOOD RIVER AVE 2ND ST IN EAST ALTON TO EAST ALTON SCL Miles = 0.17 DESIGNED OVERLAY REHABILITATION - PAVEMENTS WOOD RIVER AVE WOOD RIVER NCL TO S OF ECKHARD AVE Miles = 0.48 STANDARD OVERLAY REHABILITATION - PAVEMENTS WOOD RIVER AVE S OF ECKHARD AVE TO FERGUSON AVE IN WOOD RIVER Miles = 0.47 STANDARD OVERLAY REHABILITATION - PAVEMENTS 8 - 100 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE D2 KANE DEKALB COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK D4 PEORIA Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT D5 ADAMS MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 5 District 9 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 5, DISTRICT 9, CARBONDALE Overview Highway District 9 encompasses 16 counties in southern Illinois and includes the cities of Carbondale, Mt. Vernon, Marion, Herrin, Harrisburg, Murphysboro, West Frankfort, Benton and Pinckneyville, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming and recreational area. The state highway system in District 9 consists of 1,462 miles of highways and 767 bridges, supporting 8.9 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.14 billion will be provided during FY 2020-2025 for improvements to state highways in District 9. The following table summarizes anticipated accomplishments on the state highway system in District 9 during this time frame. FY 2020-2025 Programmed Improvements Roadway Maintenance Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Bridges Interstate NHS (Sq. Ft.) Non-Interstate NHS (Sq. Ft.) Non-NHS Marked (Sq. Ft.) Non-NHS Unmarked (Sq. Ft.) Safety/System Modernization Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) Safety Locations (number) System Expansion Interstate NHS (miles) Non-Interstate NHS (miles) Non-NHS Marked (miles) Non-NHS Unmarked (miles) New Bridges (Sq. Ft.) Preservation Roads & Bridges ($M) 61 115 319 69 380,469 89,311 80,540 41,902 0 0 4 0 9 28 0 0 0 0 109.600 Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include: • Interstate 24 from Interstate 57 interchange to Ohio River in Massac County. Resurfacing on 38.7 miles, bridge deck overlays and a bridge replacement four miles south of Johnson County line are programmed during FY 2021-2025 at a cost of $76.5 million. 9-i • Interstate 57 (northbound) from 0.5 mile north of Illinois 146 to Interstate 24 in Union and Johnson Counties. Reconstruction on 12.7 miles of the northbound lanes is programmed during FY 2021-2025 at a cost of $21 million. • Interstate 57 from 1.6 miles south of Illinois 149 to 1.6 miles north of Illinois 149 in Franklin County. Additional lanes for 3.2 miles and a bridge replacement are programmed in FY 2020 at a cost of $19 million. Provides for efficient freight movement. • Interstate 57/64 at the Illinois 15 interchange in Mt. Vernon. An interchange reconstruction, a bridge replacement, engineering for location, environmental and design studies, engineering for contract plans, land acquisition and utility adjustments are programmed during FY 2021-2025 at a cost of $52 million. • Interstate 57 from Middle Fork of Big Muddy River north of West Frankfort to Interstate 64 south tri-level interchange in Mt. Vernon. Additional lanes for 25 miles, bridge replacements and a bridge deck overlay are programmed during FY 2021-2025 at a cost of $174.6 million. • Interstate 64 at Wabash River in White County. A bridge replacement, engineering for contract plans and construction engineering are programmed during FY 2020-2025 at a cost of $90.7 million. Of this total, engineering for contract plans is programmed in FY 2020 at a cost of $2.3 million. Illinois is the lead agency and will share the cost equally with Indiana. • Illinois 37 from Campground Road in Bonnie to Illinois 14 in Benton. Resurfacing on 13.8 miles, new shoulders, land acquisition and utility adjustments are programmed during FY 2021-2025 at a cost of $34.5 million. • Illinois 149 (Main Street) from Interstate 57 to Illinois 37 in West Frankfort. Resurfacing on 0.7 mile, land acquisition and utility adjustments are programmed during FY 2020-2025 at a cost of $5.5 million. Of this total, land acquisition is programmed in FY 2020 at a cost of $1.2 million. • Old US 51 from Union County line to Illinois 37 north of Cairo. Resurfacing on 18.5 miles is programmed during FY 2021-2025 at a cost of $6.8 million. 9-ii FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 24 Location I-57 INTCHG IN WILLIAMSON CO TO US 45 N OF VIENNA Miles = 13.64 Roadway Information Miles AADT Truck Pct 12.05 20,086 33.6 1.59 I 24 19,500 34.1 I 24 I 24 STANDARD OVERLAY $26,000,000 JOHNSON WILLIAMSON 1 2021-2025 $18,000,000 JOHNSON 1 2021-2025 $28,000,000 MASSAC 4 2021-2025 $4,500,000 MASSAC 3 2021-2025 Past Current REHABILITATION - PAVEMENTS Y STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y JOHNSON CO LINE TO OHIO RIVER Miles = 15.09 Roadway Information Miles AADT Truck Pct 15.09 19,855 34.3 Est. Cost NHS Y US 45 N OF VIENNA TO MASSAC CO LINE Miles = 9.95 Roadway Information Miles AADT Truck Pct 9.95 19,710 35.1 STANDARD OVERLAY BRIDGE DECK OVERLAY REHABILITATION - PAVEMENTS NHS Y 4 MI S OF JOHNSON CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 24 County MYP Years Improvements TAMP Category OHIO RIVER BRIDGE AT ECL OF METROPOLIS BRIDGE DECK OVERLAY BRIDGE REPAIR ILLINOIS LEAD AGENCY; KENTUCKY AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES 9-1 Structure Information Str Number AADT 9,350 0640017 9,350 0640018 $4,000,000 MASSAC Truck Pct NHS 36 Y 36 Y 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 57 Location MISSISSIPPI RIVER BRIDGE AT WCL OF CAIRO Improvements TAMP Category BRIDGE DECK SEALING Est. Cost County MYP Years Past Current $150,000 ALEXANDER 1 2021-2025 $30,000,000 ALEXANDER 1 2021-2025 $150,000 PULASKI 1 2020 $100,000 PULASKI 1 2020 UNION 12 2020 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES I 57 MISSISSIPPI RIVER BRIDGE AT WCL OF CAIRO BRIDGE PAINTING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. PRESERVATION - BRIDGES I 57 TR 44 1 MI N OF MOUNDS RD INTCHG US 51 BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 57 PERKS RD 1.3 MI S OF UNION CO LINE US 51 BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 57 BIG CREEK 2 MI N OF DONGOLA BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 9-2 $6,000,000 Structure Information Str Number AADT 5,750 0910005 5,750 0910006 Truck Pct NHS 59 Y 59 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 57 Location TRAIL OF TEARS REST AREA Improvements TAMP Category PARKING IMPROVEMENT Est. Cost County MYP Years Past Current $1,600,000 UNION 1 2021-2025 UNION JOHNSON 5 2021-2025 WILLIAMSON 3 2021-2025 MISCELLANEOUS IMPROVEMENTS I 57 (NORTHBOUND) 0.5 MI N OF ILL 146 TO I-24 Miles = 12.66 Roadway Information Miles AADT Truck Pct 4.25 15,000 48.4 8.41 I 57 13,808 45.4 RECONSTRUCTION $21,000,000 RECONSTRUCTION - PAVEMENTS NHS Y Y GRASSY RD 1.9 MI N OF ILL 148 BRIDGE REPLACEMENT $3,000,000 RECONSTRUCTION - BRIDGES I 57 WESTMINSTER DR 0.7 MI S OF OLD ILL 13 IN MARION BRIDGE REPLACEMENT Structure Information Str Number AADT 1,100 1000044 $3,000,000 RECONSTRUCTION - BRIDGES I 57 CEDAR GROVE RD 0.5 MI N OF MARION BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES 9-3 WILLIAMSON Structure Information Str Number AADT 75 1000055 $150,000 WILLIAMSON Truck Pct NHS 3 N 11 2021-2025 Truck Pct NHS 13 N 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 57 Location OLD ILL 13 IN MARION TO S OF HERRIN RD IN JOHNSTON CITY Miles = 4.94 Roadway Information Miles AADT Truck Pct 0.31 30,000 41.6 I STANDARD OVERLAY Est. Cost County MYP Years Past Current $5,500,000 WILLIAMSON 1 2021-2025 $300,000 WILLIAMSON 1 2020 $3,000,000 WILLIAMSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.40 40,600 36.7 Y 4.24 40,600 36.7 Y 57 Improvements TAMP Category STOTLAR RD 2.5 MI N OF MARION BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 57 HERRIN RD AT WCL OF JOHNSTON CITY BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 57 1.2 MI N OF JOHNSTON CITY BRIDGE NEW DECK Structure Information Str Number AADT 7,000 1000040 $3,000,000 REHABILITATION - BRIDGES I 57 1.6 MI S OF ILL 149 TO 1.6 MI N OF ILL 149 Miles = 3.16 ADDITIONAL LANES BRIDGE REPLACEMENT WILLIAMSON Structure Information Str Number AADT 1,000 1000053 $19,000,000 FRANKLIN Truck Pct NHS 7 N 6 2021-2025 Truck Pct NHS 3 N 1 2020 ILLINOIS COMPETITIVE FREIGHT PROGRAM PROJECT. INITIAL CONSTRUCTION - PAVEMENTS 9-4 Structure Information Str Number AADT 20,100 0280001 20,100 0280002 Truck Pct NHS 32 Y 32 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 57 Location MIDDLE FORK OF BIG MUDDY RIVER N OF W FRANKFORT TO 2.5 MI S OF ILL 154 Miles = 8.50 Improvements TAMP Category ADDITIONAL LANES BRIDGE REPLACEMENT Est. Cost 57 2.5 MI S OF ILL 154 TO I-64 S TRI-LEVEL INTCHG IN MT VERNON Miles = 16.48 ADDITIONAL LANES BRIDGE REPLACEMENT BRIDGE DECK OVERLAY $61,000,000 57 I 64 ILL 15 INTCHG IN MT VERNON INTERCHANGE RECONSTRUCTION BRIDGE REPLACEMENT $113,600,000 57 I 64 ILL 15 INTCHG IN MT VERNON PRELIMINARY ENGINEERING FRANKLIN JEFFERSON Structure Information Str Number AADT 19,550 0280013 19,550 0280014 18,250 0410003 18,250 0410004 17,150 0280011 $45,000,000 RECONSTRUCTION - PAVEMENTS I FRANKLIN Structure Information Str Number AADT 19,450 0280006 19,450 0280007 INITIAL CONSTRUCTION - PAVEMENTS I MYP Years Past Current INITIAL CONSTRUCTION - PAVEMENTS I County JEFFERSON Structure Information Str Number AADT 20,000 0410025 1 2021-2025 Truck Pct NHS 37 Y 37 Y 1 2021-2025 Truck Pct NHS 40 Y 40 Y 41 Y 41 Y 37 Y 1 2021-2025 Truck Pct NHS 13 Y $4,000,000 JEFFERSON 1 2021-2025 $2,000,000 JEFFERSON 1 2021-2025 RECONSTRUCTION - PAVEMENTS I 57 I 64 ILL 15 INTCHG IN MT VERNON LAND ACQUISITION RECONSTRUCTION - PAVEMENTS 9-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 57 I 64 Location ILL 15 INTCHG IN MT VERNON Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $1,000,000 JEFFERSON 1 2021-2025 $4,200,000 JEFFERSON 1 2021-2025 $6,000,000 JEFFERSON 4 2021-2025 RECONSTRUCTION - PAVEMENTS I 57 0.3 MI N OF I-64 N OF MT VERNON TO 2.7 MI S OF DIX INTCHG Miles = 4.16 Roadway Information Miles AADT Truck Pct 4.16 23,900 35.3 I 57 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y AT DIX INTCHG BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 57 0.2 MI N OF DIX INTCHG BRIDGE REPLACEMENT RR FLAGGER Structure Information Str Number AADT 11,950 0410014 12,300 0410015 $6,500,000 RECONSTRUCTION - BRIDGES I 64 WASHINGTON CO LINE TO I-57 Miles = 10.75 Roadway Information Miles AADT Truck Pct 10.75 26,440 27.9 RUBBLIZATION BRIDGE DECK OVERLAY RECONSTRUCTION - PAVEMENTS NHS Y 9-6 JEFFERSON Structure Information Str Number AADT 12,300 0410016 12,300 0410017 $38,000,000 JEFFERSON Truck Pct NHS 35 Y 33 Y 4 2021-2025 Truck Pct NHS 33 Y 33 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 64 Location WASHINGTON CO LINE TO I-57 Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $4,000,000 JEFFERSON 1 2020 $1,000,000 JEFFERSON 3 2020 $6,000,000 JEFFERSON 7 2021-2025 RECONSTRUCTION - PAVEMENTS I 64 I-57/64 N TRI-LEVEL INTCHG IN MT VERNON BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES I 64 ILL 37 INTCHG (EB) S OF MT VERNON BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES I 64 0.2 MI E OF ILL 37 BRIDGE REPLACEMENT Structure Information Str Number AADT 6,450 0410068 7,250 0410067 $9,000,000 RECONSTRUCTION - BRIDGES I 64 0.2 MI E OF ILL 37 UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES 9-7 JEFFERSON Structure Information Str Number AADT 6,450 0410090 6,450 0410089 $750,000 JEFFERSON Truck Pct NHS 33 Y 32 Y 1 2021-2025 Truck Pct NHS 33 Y 33 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 64 Location VARIOUS BRIDGES E OF MT VERNON Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $3,600,000 JEFFERSON 1 2021-2025 $500,000 JEFFERSON 1 2021-2025 $6,700,000 WHITE 1 2020 $450,000 WHITE 1 2021-2025 $250,000 WHITE 1 2021-2025 PRESERVATION - BRIDGES I 64 0.5 MI E OF BELLE RIVE INTCHG BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES I 64 WAYNE CO LINE TO 6.5 MI E Miles = 6.49 Roadway Information Miles AADT Truck Pct 6.49 12,700 39.6 I 64 STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y POND CREEK 0.2 MI E OF WAYNE CO LINE BRIDGE DECK OVERLAY (EASTBOUND) PRESERVATION - BRIDGES I 64 TRIB RANDOLPH DITCH 2.1 MI E OF WAYNE CO LINE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 9-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street I 64 Location 4.2 MI E OF WAYNE CO LINE Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $700,000 WHITE 1 2021-2025 $80,000,000 WHITE 7 2021-2025 PRESERVATION - BRIDGES I 64 WABASH RIVER BRIDGES BRIDGE REPLACEMENT ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 64 WABASH RIVER BRIDGES P.E. (PHASE II) Structure Information Str Number AADT 8,200 0970003 8,200 0970004 Truck Pct NHS 35 Y 35 Y $2,700,000 WHITE 1 2020 $8,000,000 WHITE 7 2021-2025 $750,000 WHITE 2 2021-2025 ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES I 64 WABASH RIVER BRIDGES CONSTRUCTION ENGINEERING ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. RECONSTRUCTION - BRIDGES US 45 1.5 MI N OF ENFIELD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 9-9 Structure Information Str Number AADT 1,800 0970023 Truck Pct NHS 23 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 45 Location ILL 14 TO ILL 1 IN NORRIS CITY Miles = 8.26 Roadway Information Miles AADT Truck Pct 8.26 1,438 16.6 US 45 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $2,800,000 WHITE 1 2020 $100,000 WHITE 4 2021-2025 $1,400,000 WHITE 3 2021-2025 REHABILITATION - PAVEMENTS NHS N 2.4 MI N OF NORRIS CITY CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS US 45 2 MI S OF ILL 1 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES US 45 OVER TR 381 (400 N) 2.5 MI S OF ILL 1 BRIDGE REPLACEMENT Structure Information Str Number AADT 2,450 0970013 $750,000 RECONSTRUCTION - BRIDGES US 45 1.5 MI N OF GALLATIN CO LINE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 10 WHITE Structure Information Str Number AADT 2,450 0970014 $150,000 WHITE Truck Pct NHS 14 Y 3 2021-2025 Truck Pct NHS 14 Y 2 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 45 Location N FORK SALINE RIVER 1 MI N OF TEXAS CITY Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost N FORK SALINE RIVER 0.5 MI N OF TEXAS CITY BRIDGE REPLACEMENT $1,800,000 ILL 142 IN ELDORADO TO LOCUST ST IN HARRISBURG Miles = 7.30 ILL 34 STANDARD OVERLAY SALINE Structure Information Str Number AADT 4,150 0830001 $2,000,000 RECONSTRUCTION - BRIDGES US 45 MYP Years Past Current RECONSTRUCTION - BRIDGES US 45 County SALINE Structure Information Str Number AADT 4,150 0830002 4 2021-2025 Truck Pct NHS 14 Y 4 2021-2025 Truck Pct NHS 14 Y $4,800,000 SALINE 1 2020 $1,500,000 SALINE 1 2021-2025 $2,100,000 SALINE 4 2021-2025 PRESERVATION PROJECT Roadway Information Miles AADT Truck Pct 7.30 9,834 7.0 US 45 PRESERVATION - PAVEMENTS NHS P POPLAR ST INT IN HARRISBURG INTERSECTION RECONSTN ILL 34 MISCELLANEOUS IMPROVEMENTS US 45 ILL 145 TO MILL ST IN CARRIER MILLS Miles = 6.36 Roadway Information Miles AADT Truck Pct 2.79 5,415 6.2 3.57 4,454 7.3 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N 9 - 11 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 45 Location FEAZEL ST IN HARRISBURG Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $250,000 SALINE 5 2021-2025 $3,000,000 SALINE 3 2021-2025 JOHNSON 2 2021-2025 MISCELLANEOUS IMPROVEMENTS US 45 MILL ST IN CARRIER MILLS TO WHITE OAK ST IN STONEFORT AT WILLIAMSON CO LINE Miles = 6.48 Roadway Information Miles AADT Truck Pct 6.48 1,900 11.1 US 45 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N STREAM 1 MI S OF NEW BURNSIDE CULVERT REPLACEMENT $600,000 RECONSTRUCTION - BRIDGES US 45 0.7 MI NE OF I-24 TO 1 MI SW OF I-24; ILL 146 IN VIENNA TO 1.8 MI S Miles = 3.52 Roadway Information Miles AADT Truck Pct 1.73 2,859 13.0 1.79 US 45 2,130 14.3 Truck Pct NHS 14 N $1,200,000 JOHNSON 1 2021-2025 $1,000,000 MASSAC 4 2020 REHABILITATION - PAVEMENTS NHS N N JOHNSON CO LINE TO ILL 169 Miles = 3.31 Roadway Information Miles AADT Truck Pct 3.31 1,150 7.0 STANDARD OVERLAY Structure Information Str Number AADT 1,900 0442007 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 45 Location 5.7 MI N OF METROPOLIS Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 10TH ST IN METROPOLIS TO BELGRADE RD E OF I-24 Miles = 4.49 Roadway Information Miles AADT Truck Pct 3.88 10,359 8.1 $1,500,000 5,070 11.3 N 5,750 1.7 N US 51 Structure Information Str Number AADT 2,200 0640003 2021-2025 Truck Pct NHS 7 N $2,600,000 MASSAC 3 2021-2025 BELGRADE RD TO OHIO RIVER BRIDGE IN BROOKPORT Miles = 4.90 STANDARD OVERLAY $1,800,000 MASSAC 1 2021-2025 PERRY 10 2021-2025 REHABILITATION - PAVEMENTS NHS N COLLIER CREEK 0.2 MI N OF TAMAROA BRIDGE REPLACEMENT $600,000 RECONSTRUCTION - BRIDGES US 51 2 REHABILITATION - PAVEMENTS 0.24 Roadway Information Miles AADT Truck Pct 4.90 5,557 2.2 MASSAC NHS P 0.37 US 45 STANDARD OVERLAY MYP Years Past Current RECONSTRUCTION - BRIDGES US 45 County 0.4 MI N OF ILL 154 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 13 Structure Information Str Number AADT 2,150 0730002 $200,000 PERRY Truck Pct NHS 16 N 4 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 51 Location HICKORY ST TO ILL 152 IN DUQUOIN Miles = 0.82 Roadway Information Miles AADT Truck Pct 0.82 5,441 10.7 US 51 US 51 RECONSTRUCTION Est. Cost $4,000,000 PERRY 1 2021-2025 $500,000 PERRY 1 2021-2025 $900,000 JACKSON 11 2021-2025 RECONSTRUCTION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y STREAM N OF KIMMEL ST IN ELKVILLE PERRY CO LINE TO HALLIDAYBORO RD S OF ELKVILLE Miles = 4.51 Roadway Information Miles AADT Truck Pct 4.51 6,127 11.6 US 51 BRIDGE REPLACEMENT STANDARD OVERLAY Structure Information Str Number AADT 6,950 0390002 Truck Pct NHS 7 Y $1,500,000 JACKSON 1 2021-2025 $3,600,000 JACKSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y HALLIDAYBORO RD S OF ELKVILLE TO 0.2 MI S OF INDUSTRIAL PARK RD IN CARBONDALE Miles = 10.02 Roadway Information Miles AADT Truck Pct 10.02 6,729 6.3 MYP Years Past Current RECONSTRUCTION - BRIDGES US 51 County NHS Y JACKSON CO LINE TO 0.2 MI S OF ILL 14 S OF DUQUOIN Miles = 1.33 Roadway Information Miles AADT Truck Pct 1.33 6,150 9.8 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 9 - 14 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 51 Location 2.6 MI N OF ILL 149 N OF DESOTO Improvements TAMP Category BRIDGE SUPERSTRUCTURE Est. Cost GRAND AVE TO OLD US 51 SPUR IN CARBONDALE Miles = 1.59 Roadway Information Miles AADT Truck Pct 1.59 11,448 7.8 US 51 US 51 A $1,500,000 US 51 JACKSON Structure Information Str Number AADT 5,950 0390052 1 2021-2025 Truck Pct NHS 10 Y $1,400,000 JACKSON 2 2020 $2,800,000 UNION 1 2021-2025 $2,000,000 ALEXANDER 2 2021-2025 $6,500,000 ALEXANDER 4 2021-2025 PRESERVATION - PAVEMENTS NHS Y ILL 146 IN ANNA TO I-57 Miles = 7.27 Roadway Information Miles AADT Truck Pct 7.27 3,750 7.8 STANDARD OVERLAY MYP Years Past Current REHABILITATION - BRIDGES US 51 County STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y OHIO RIVER BRIDGE 1 MI S OF CAIRO BRIDGE APPROACH ROADWAY US 60 US 62 MISCELLANEOUS IMPROVEMENTS US 51 OHIO RIVER BRIDGE 1 MI S OF CAIRO P.E. (PHASE II) US 60 US 62 KENTUCKY LEAD AGENCY; ILLINOIS' SHARE OF THE COST. RECONSTRUCTION - BRIDGES 9 - 15 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street US 51 Location OHIO RIVER BRIDGE 1 MI S OF CAIRO Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 ALEXANDER 2 2021-2025 $250,000 ALEXANDER 1 2020 $900,000 WHITE 2 2021-2025 US 60 US 62 RECONSTRUCTION - BRIDGES US 60 MISSISSIPPI RIVER IN CAIRO PIER REPAIR US 62 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. MAINTENANCE - BRIDGES ILL 1 FRENCH CREEK 2 MI S OF GRAYVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 1 NE OF 4TH ST IN CARMI CULVERT REPLACEMENT Structure Information Str Number AADT 4,300 0970005 Truck Pct NHS 16 Y $150,000 WHITE 1 2021-2025 $700,000 WHITE 8 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 1 4 MI NE OF US 45 JCT BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 9 - 16 Structure Information Str Number AADT 3,000 0970012 Truck Pct NHS 11 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 1 Location ILL 13 TO 2 MI S Miles = 2.04 Roadway Information Miles AADT Truck Pct 2.04 1,700 27.9 ILL 1 ILL 3 ILL 3 MYP Years Past Current $800,000 GALLATIN 1 2021-2025 DESIGNED OVERLAY $3,200,000 GALLATIN 3 2021-2025 $2,000,000 JACKSON 1 2021-2025 $500,000 JACKSON 12 2021-2025 REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y STREAM 1.8 MI S OF RANDOLPH CO LINE CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES ILL 3 County REHABILITATION - PAVEMENTS RANDOLPH CO LINE TO LOGAN HOLLOW RD Miles = 5.17 Roadway Information Miles AADT Truck Pct 5.17 2,302 16.6 STANDARD OVERLAY Est. Cost NHS N 0.1 MI S OF GRATER RD TO HARDIN CO LINE Miles = 8.49 Roadway Information Miles AADT Truck Pct 8.49 1,432 29.6 Improvements TAMP Category 0.1 MI SE OF RADDLE RD CULVERT REPLACEMENT RECONSTRUCTION - BRIDGES 9 - 17 Structure Information Str Number AADT 2,300 0392013 $600,000 JACKSON Structure Information Str Number AADT 2,550 0392014 Truck Pct NHS 16 Y 3 2021-2025 Truck Pct NHS 15 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 3 Location TALBOTT HOLLOW 1.1 MI NW OF ILL 151 Improvements TAMP Category CULVERT REPLACEMENT Est. Cost S OF HOWARDTON RD IN GRAND TOWER TO UNION CO LINE Miles = 4.51 Roadway Information Miles AADT Truck Pct 4.51 1,200 20.0 ILL 3 $600,000 ILL 3 ILL 3 Structure Information Str Number AADT 2,550 0392015 3 2021-2025 Truck Pct NHS 15 Y $1,800,000 JACKSON 1 2021-2025 $3,600,000 UNION 1 2021-2025 $500,000 ALEXANDER 1 2021-2025 $1,800,000 ALEXANDER 2 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y BROWNVILLE RD TO 0.1 MI W OF PIGEON ROOST RD Miles = 1.80 Roadway Information Miles AADT Truck Pct 1.80 3,100 15.8 JACKSON NHS Y JACKSON CO LINE TO ILL 146 IN WARE Miles = 9.00 Roadway Information Miles AADT Truck Pct 9.00 1,441 14.6 STANDARD OVERLAY MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 3 County DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N DRAINAGE DITCH 0.5 MI W OF ILL 127 BRIDGE REPLACEMENT BRIDGE APPROACH ROADWAY RECONSTRUCTION - BRIDGES 9 - 18 Structure Information Str Number AADT 2,350 0020012 Truck Pct NHS 14 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 4 Location ILL 150 TO ILL 151 IN AVA Miles = 10.91 Roadway Information Miles AADT Truck Pct 5.84 3,568 15.2 5.07 2,742 ILL 13 20.6 1.16 2,829 ILL 13 (EASTBOUND) 7.3 STANDARD OVERLAY $3,600,000 PERRY 6 2020 STANDARD OVERLAY $1,900,000 JACKSON 1 2020 $2,500,000 JACKSON 1 2021-2025 $500,000 JACKSON 1 2021-2025 REHABILITATION - PAVEMENTS N 6.0 N WALL ST TO MARION ST Miles = 0.29 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y LEWIS LN TO WALL ST IN CARBONDALE Miles = 0.49 Roadway Information Miles AADT Truck Pct 0.49 18,800 5.3 2021-2025 NHS Y 3.2 (WESTBOUND) 1 N 6,523 ILL 13 PERRY JACKSON RANDOLPH REHABILITATION - PAVEMENTS 4,750 Roadway Information Miles AADT Truck Pct 0.29 18,800 5.3 $3,500,000 NHS N 0.13 (WESTBOUND) MYP Years Past Current N 0.14 ILL 13 County REHABILITATION - PAVEMENTS OAKLAND AVE TO LEWIS LN IN CARBONDALE Miles = 1.90 Roadway Information Miles AADT Truck Pct 1.63 17,391 4.2 STANDARD OVERLAY Est. Cost NHS N 3.2 MI E OF RANDOLPH CO LINE TO ILL 154 IN PINCKNEYVILLE Miles = 9.75 Roadway Information Miles AADT Truck Pct 8.59 2,300 9.1 Improvements TAMP Category STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 9 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 13 Location AT REEDS STATION RD Improvements TAMP Category INTERSECTION RECONSTN Est. Cost County MYP Years Past Current $4,800,000 JACKSON 1 2020 $250,000 JACKSON 1 2020 $6,000,000 JACKSON WILLIAMSON 1 2021-2025 $1,000,000 JACKSON WILLIAMSON 1 2021-2025 $500,000 JACKSON WILLIAMSON 1 2021-2025 $4,000,000 WILLIAMSON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 13 AT REEDS STATION RD UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 13 AT SPILLWAY RD INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS ILL 13 AT SPILLWAY RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 13 AT SPILLWAY RD LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 13 1.1 MI E OF JACKSON CO LINE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 9 - 20 Structure Information Str Number AADT 13,350 1000018 Truck Pct NHS 9 Y FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 13 Location 1.6 MI E OF JACKSON CO LINE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost ILL 37 TO FAIR ST IN MARION Miles = 0.95 Roadway Information Miles AADT Truck Pct 0.95 20,721 7.8 ILL 13 $4,000,000 ILL 13 (EASTBOUND) ILL 13 Structure Information Str Number AADT 12,550 1000020 1 2021-2025 Truck Pct NHS 3 Y $900,000 WILLIAMSON 1 2020 $1,600,000 WILLIAMSON 3 2020 $2,800,000 WILLIAMSON 1 2021-2025 $350,000 WILLIAMSON 1 2020 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 0.9 MI E OF CRAB ORCHARD RD TO SALINE CO LINE Miles = 3.75 Roadway Information Miles AADT Truck Pct 3.75 9,389 12.9 WILLIAMSON NHS Y FAIR ST TO CRAB ORCHARD CREEK IN MARION Miles = 1.63 Roadway Information Miles AADT Truck Pct 1.63 14,162 11.1 STANDARD OVERLAY MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 13 County STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS Y 1.7 MI W OF SALINE CO LINE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 9 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 13 Location WILLIAMSON CO LINE TO CARRIER MILLS RD Miles = 4.07 Roadway Information Miles AADT Truck Pct 4.07 8,784 9.1 ILL 13 ILL 13 STANDARD OVERLAY Est. Cost $5,500,000 SALINE 1 2021-2025 $5,600,000 SALINE 1 2021-2025 $1,800,000 SALINE 3 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y MIDDLE FORK SALINE RIVER 1.6 MI E OF HARRISBURG ILL 1 TO KENTUCKY STATE LINE IN OLD SHAWNEETOWN Miles = 8.96 Roadway Information Miles AADT Truck Pct 8.96 3,426 29.0 ILL 14 BRIDGE REPLACEMENT STANDARD OVERLAY Structure Information Str Number AADT 3,400 0830045 Truck Pct NHS 7 Y $2,800,000 GALLATIN 5 2021-2025 $1,800,000 PERRY 1 2021-2025 REHABILITATION - PAVEMENTS NHS Y US 51 TO OLD ROUTE 14 Miles = 1.70 Roadway Information Miles AADT Truck Pct 1.70 3,200 18.0 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 13 County NHS Y CARRIER MILLS RD TO POPLAR ST IN HARRISBURG Miles = 3.98 Roadway Information Miles AADT Truck Pct 3.98 8,132 8.9 Improvements TAMP Category STANDARD OVERLAY SHOULDER RECONSTRUCTION REHABILITATION - PAVEMENTS NHS N 9 - 22 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 14 Location US 51 TO OLD ROUTE 14 Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $800,000 PERRY 1 2021-2025 $250,000 PERRY 1 2021-2025 $700,000 PERRY 2 2020 $1,100,000 FRANKLIN 5 2020 $5,000,000 FRANKLIN 1 2021-2025 REHABILITATION - PAVEMENTS ILL 14 US 51 TO OLD ROUTE 14 UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 14 OLD ILL 14 W CONNECTOR TO OLD ILL 14 E CONNECTOR Miles = 1.84 Roadway Information Miles AADT Truck Pct 1.84 3,108 14.8 ILL 14 0.10 ILL 14 PRESERVATION - PAVEMENTS NHS N N COURT ST TO GLEN ST IN BENTON Miles = 1.13 Roadway Information Miles AADT Truck Pct 1.03 9,724 10.1 14,200 6.2 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y N I-57 TO ILL 37 IN BENTON Miles = 0.51 Roadway Information Miles AADT Truck Pct 0.51 12,682 4.4 STANDARD OVERLAY DESIGNED OVERLAY CURB AND GUTTER STORM SEWER (NEW) REHABILITATION - PAVEMENTS NHS N 9 - 23 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 14 Location I-57 TO ILL 37 IN BENTON Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $2,500,000 FRANKLIN 1 2021-2025 $500,000 FRANKLIN 1 2021-2025 $4,800,000 FRANKLIN 1 2021-2025 $300,000 FRANKLIN 2 2021-2025 $150,000 FRANKLIN 3 2021-2025 REHABILITATION - PAVEMENTS ILL 14 I-57 TO ILL 37 IN BENTON UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 14 ILL 37 IN BENTON TO HAMILTON CO LINE Miles = 13.00 Roadway Information Miles AADT Truck Pct 13.00 2,389 9.8 ILL 14 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 1 MI E OF ILL 37 IN BENTON CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 14 1.1 MI W OF HAMILTON CO LINE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 24 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 14 Location FRANKLIN CO LINE TO CR 675E Miles = 6.98 Roadway Information Miles AADT Truck Pct 6.98 2,326 8.2 ILL 14 ILL 14 STANDARD OVERLAY Est. Cost $2,400,000 HAMILTON 1 2021-2025 $750,000 HAMILTON 1 2021-2025 $600,000 HAMILTON 2 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N BEAR CREEK W OF FAIRGROUND RD IN MCLEANSBORO ILL 1 (S STATE ST) IN CROSSVILLE TO INDIANA STATE LINE Miles = 7.05 Roadway Information Miles AADT Truck Pct 7.05 473 12.3 ILL 15 BRIDGE REPLACEMENT STANDARD OVERLAY Structure Information Str Number AADT 4,100 0330004 Truck Pct NHS 6 N $2,000,000 WHITE 10 2020 $3,500,000 JEFFERSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS N WASHINGTON CO LINE TO 0.4 MI W OF MT VERNON Miles = 9.19 Roadway Information Miles AADT Truck Pct 9.19 3,400 6.6 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 14 County NHS N CR 675E TO MARSHALL AVE IN MCLEANSBORO Miles = 2.39 Roadway Information Miles AADT Truck Pct 2.39 3,212 6.6 Improvements TAMP Category STANDARD OVERLAY PRESERVATION - PAVEMENTS NHS N 9 - 25 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 15 Location ELK HORN CREEK 4.4 MI E OF WASHINGTON CO LINE Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost 0.1 MI E OF I-57 INTCHG TO W OF 25TH ST IN MT VERNON Miles = 1.31 STANDARD OVERLAY ADA IMPROVEMENTS MYP Years Past Current $1,100,000 RECONSTRUCTION - BRIDGES ILL 15 County JEFFERSON Structure Information Str Number AADT 2,800 0410020 7 2020 Truck Pct NHS 7 N $1,550,000 JEFFERSON 1 2020 $4,200,000 JEFFERSON 1 2020 $250,000 JEFFERSON 1 2020 $250,000 FRANKLIN 12 2021-2025 REHABILITATION - PAVEMENTS ILL 15 OLD FAIRFIELD RD IN MT VERNON TO WAYNE CO LINE Miles = 10.44 Roadway Information Miles AADT Truck Pct 10.44 4,736 5.6 ILL 15 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 1.4 & 1.8 MI E OF MT VERNON CULVERT REHABILITATION REHABILITATION - BRIDGES ILL 34 DRAINAGE DITCH 5.5 MI E OF ILL 37 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 26 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 34 Location 1 MI SE OF THOMPSONVILLE Improvements TAMP Category CULVERT REPLACEMENT Est. Cost LEVEE N OF HARRISBURG TO POPLAR ST IN HARRISBURG Miles = 1.05 Roadway Information Miles AADT Truck Pct 0.71 4,325 6.4 ILL 34 $500,000 Roadway Information Miles AADT Truck Pct 1.30 5,875 8.4 4.65 ILL 34 4,800 9.4 FRANKLIN Structure Information Str Number AADT 2,400 0282008 2 2021-2025 Truck Pct NHS 16 N $800,000 SALINE 5 2021-2025 $2,400,000 SALINE 4 2021-2025 $1,000,000 SALINE 11 2021-2025 REHABILITATION - PAVEMENTS NHS N US 45 TO JCT ILL 34/145 Miles = 5.95 ILL 145 STANDARD OVERLAY MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 34 County STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N N PANKEY BRANCH 0.5 MI S OF HARRISBURG BRIDGE REPLACEMENT ILL 145 RECONSTRUCTION - BRIDGES ILL 34 CREEK 3.2 MI S OF US 45 CULVERT REPLACEMENT ILL 145 MISCELLANEOUS IMPROVEMENTS 9 - 27 Structure Information Str Number AADT 5,950 0830017 $100,000 SALINE Truck Pct NHS 8 N 4 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 34 Location POPE CO LINE TO ILL 146 Miles = 7.66 Roadway Information Miles AADT Truck Pct 7.66 1,570 22.4 ILL 34 Improvements TAMP Category STANDARD OVERLAY DESIGNED OVERLAY Est. Cost County MYP Years Past Current $2,300,000 HARDIN 4 2020 $250,000 HARDIN 3 2021-2025 $150,000 HARDIN 2 2021-2025 $250,000 HARDIN 3 2021-2025 $250,000 HARDIN 7 2020 REHABILITATION - PAVEMENTS NHS N 0.1 MI SE OF POPE CO LINE BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES ILL 34 0.7 MI S OF POPE CO LINE CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 34 1.7 MI S OF POPE CO LINE BRIDGE JOINT REPLACE/REPAIR PIER REPAIR PRESERVATION - BRIDGES ILL 34 DITCH 4.2 MI N OF ILL 146 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 28 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 34 Location 1.5 MI N OF ILL 146 Improvements TAMP Category CULVERT REPLACEMENT Est. Cost County MYP Years Past Current $150,000 HARDIN 2 2021-2025 $4,230,000 JEFFERSON 1 2020 $70,000 JEFFERSON 1 2020 $150,000 JEFFERSON 2 2021-2025 $1,500,000 JEFFERSON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 37 CAMPGROUND RD IN BONNIE TO I-64 Miles = 4.47 Roadway Information Miles AADT Truck Pct 4.47 3,977 6.3 ILL 37 NEW SHOULDERS MILLED RUMBLE STRIP STANDARD OVERLAY MISCELLANEOUS IMPROVEMENTS NHS N CAMPGROUND RD IN BONNIE TO I-64 TREE REMOVAL MISCELLANEOUS IMPROVEMENTS ILL 37 2.5 MI S OF DIX CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 37 5.9 MI S OF MARION CO LINE TO E HUTCHINSON RD N OF MT VERNON Miles = 3.16 Roadway Information Miles AADT Truck Pct 3.16 4,425 4.7 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 29 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 37 Location STREAM 1.5 MI S OF ILL 148 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost STREAM 5.2 MI S OF ILL 148 BRIDGE REPLACEMENT $650,000 CAMPGROUND RD IN BONNIE TO FRANKLIN CO LINE Miles = 5.50 Roadway Information Miles AADT Truck Pct 5.50 3,502 7.4 ILL 37 DESIGNED OVERLAY NEW SHOULDERS JEFFERSON Structure Information Str Number AADT 5,800 0410031 $750,000 RECONSTRUCTION - BRIDGES ILL 37 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 37 County JEFFERSON Structure Information Str Number AADT 3,850 0410035 3 2021-2025 Truck Pct NHS 10 Y 9 2020 Truck Pct NHS 6 N $10,000,000 JEFFERSON 2 2021-2025 $1,500,000 JEFFERSON 1 2021-2025 $2,000,000 JEFFERSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS N CAMPGROUND RD IN BONNIE TO FRANKLIN CO LINE LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 37 CAMPGROUND RD IN BONNIE TO FRANKLIN CO LINE UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 9 - 30 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 37 Location FRANKLIN CO LINE TO ILL 14 IN BENTON Miles = 8.25 Roadway Information Miles AADT Truck Pct 8.25 5,711 5.2 ILL 37 County MYP Years Improvements TAMP Category Est. Cost DESIGNED OVERLAY NEW SHOULDERS $15,000,000 FRANKLIN 1 2021-2025 $2,000,000 FRANKLIN 1 2021-2025 $4,000,000 FRANKLIN 1 2021-2025 $700,000 FRANKLIN 2 2020 WILLIAMSON 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS N FRANKLIN CO LINE TO ILL 14 IN BENTON LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 37 FRANKLIN CO LINE TO ILL 14 IN BENTON UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS ILL 37 ILL 14 BOND ST TO ILL 34 AT THE SQUARE IN BENTON Miles = 0.76 Roadway Information Miles AADT Truck Pct 0.76 9,324 4.7 ILL 37 REHABILITATION - PAVEMENTS NHS N SCL OF JOHNSTON CITY TO ILL 13 IN MARION Miles = 4.93 Roadway Information Miles AADT Truck Pct 4.93 8,415 7.9 DESIGNED OVERLAY STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 31 $1,800,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 37 Location AT BOYTON ST IN MARION Improvements TAMP Category TRAF SIGNAL MODERNIZATION INTERSECTION RECONSTN INTERSECTION IMPROVEMENT Est. Cost County MYP Years Past Current $5,000,000 WILLIAMSON 1 2021-2025 $1,500,000 WILLIAMSON 1 2021-2025 $750,000 WILLIAMSON 1 2021-2025 $15,000,000 WILLIAMSON 1 2021-2025 $2,000,000 WILLIAMSON 1 2021-2025 $750,000 WILLIAMSON 1 2021-2025 MISCELLANEOUS IMPROVEMENTS ILL 37 AT BOYTON ST IN MARION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 37 AT BOYTON ST IN MARION UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS ILL 37 0.1 MI N OF WILDCAT DR TO ILL 148 Miles = 7.84 Roadway Information Miles AADT Truck Pct 7.84 6,035 12.0 ILL 37 DESIGNED OVERLAY NEW SHOULDERS REHABILITATION - PAVEMENTS NHS N 0.1 MI N OF WILDCAT DR TO ILL 148 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 37 0.1 MI N OF WILDCAT DR TO ILL 148 UTILITY ADJUSTMENT REHABILITATION - PAVEMENTS 9 - 32 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 37 Location 0.5 MI S OF ILL 146 Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $400,000 JOHNSON 1 2020 $2,000,000 PULASKI 1 2021-2025 $1,200,000 PERRY 3 2020 $900,000 PERRY 2 2021-2025 PRESERVATION - BRIDGES ILL 37 INT OLD US 51 AT MOUNDS NATIONAL CEMETERY INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS ILL 127 N OF DEER RUN RD TO ILL 154 IN PINCKNEYVILLE Miles = 3.57 Roadway Information Miles AADT Truck Pct 3.57 4,160 16.4 ILL 127 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y OPOSSUM CREEK 1 MI N OF PINCKNEYVILLE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 127 ILL 13/127/154 INT AT THE PINCKNEYVILLE SQUARE INTERSECTION RECONSTN ILL 13 ILL 154 MISCELLANEOUS IMPROVEMENTS 9 - 33 Structure Information Str Number AADT 4,400 0730021 $4,000,000 PERRY Truck Pct NHS 18 Y 1 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 127 Location ILL 13/127/154 INT AT THE PINCKNEYVILLE SQUARE Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $750,000 PERRY 1 2021-2025 $250,000 PERRY 1 2021-2025 $3,500,000 PERRY 1 2020 $3,700,000 JACKSON 4 2020 $1,100,000 JACKSON 1 2021-2025 ILL 13 ILL 154 MISCELLANEOUS IMPROVEMENTS ILL 127 ILL 13/127/154 INT AT THE PINCKNEYVILLE SQUARE UTILITY ADJUSTMENT ILL 13 ILL 154 MISCELLANEOUS IMPROVEMENTS ILL 127 ILL 13 N OF CN RR IN PINCKNEYVILLE TO JACKSON CO LINE Miles = 9.80 Roadway Information Miles AADT Truck Pct 9.80 4,640 10.9 ILL 127 ILL 13 ILL 127 REHABILITATION - PAVEMENTS NHS Y PERRY CO LINE TO 2.1 MI N OF AVA RD N OF MURPHYSBORO Miles = 7.89 Roadway Information Miles AADT Truck Pct 7.89 4,156 8.0 STANDARD OVERLAY DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y AVA RD & GRANGE HALL RD LAND ACQUISITION ILL 13 MISCELLANEOUS IMPROVEMENTS 9 - 34 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 127 Location INT WALNUT ST & S 5TH ST IN MURPHYSBORO Improvements TAMP Category INTERSECTION RECONSTN Est. Cost County MYP Years Past Current $1,200,000 JACKSON 1 2021-2025 $2,000,000 JACKSON 1 2021-2025 $250,000 JACKSON 1 2021-2025 UNION 5 2021-2025 ILL 149 MISCELLANEOUS IMPROVEMENTS ILL 127 OLD ILL 13 IN MURPHYSBORO INTERSECTION RECONSTN MISCELLANEOUS IMPROVEMENTS ILL 127 OLD ILL 13 IN MURPHYSBORO LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS ILL 127 AT CHESTNUT ST IN ALTO PASS BRIDGE REPLACEMENT $1,200,000 RECONSTRUCTION - BRIDGES ILL 127 0.3 MI S OF CHESTNUT ST IN ALTO PASS SLOPE STABILIZATION Structure Information Str Number AADT 500 0910047 Truck Pct NHS 12 N $2,000,000 UNION 1 2020 $2,800,000 UNION 1 2020 MISCELLANEOUS IMPROVEMENTS ILL 127 ILL 146 IN JONESBORO TO ALEXANDER CO LINE Miles = 8.52 Roadway Information Miles AADT Truck Pct 8.52 1,577 10.3 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 35 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 127 Location UNION CO LINE TO ILL 3 Miles = 14.79 Roadway Information Miles AADT Truck Pct 14.79 879 12.3 ILL 141 ILL 142 ILL 142 $5,000,000 ALEXANDER 1 2021-2025 STANDARD OVERLAY $4,000,000 GALLATIN WHITE 1 2020 $1,900,000 JEFFERSON 1 2020 $600,000 JEFFERSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N STREAM 1.8 MI S OF MT VERNON I-64 TO HAMILTON CO LINE Miles = 9.69 Roadway Information Miles AADT Truck Pct 9.69 3,099 6.9 MYP Years Past Current BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 142 County REHABILITATION - PAVEMENTS ILL 37 IN MT VERNON TO I-64 Miles = 3.33 Roadway Information Miles AADT Truck Pct 3.33 5,514 4.8 STANDARD OVERLAY Est. Cost NHS N US 45 TO WHITE CO LN IN NEW HAVEN Miles = 12.62 Roadway Information Miles AADT Truck Pct 12.62 2,353 18.7 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 36 Structure Information Str Number AADT 4,000 0410043 $3,800,000 JEFFERSON Truck Pct NHS 5 N 1 2020 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 142 Location IC RR IN BELLE RIVE Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $250,000 JEFFERSON 1 2020 $200,000 HAMILTON 2 2020 $4,000,000 HAMILTON 1 2020 $100,000 HAMILTON 3 2021-2025 SALINE 1 2021-2025 PRESERVATION - BRIDGES ILL 142 5.5 MI N OF MCLEANSBORO CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 142 ILL 14 IN MCLEANSBORO TO SALINE CO LINE Miles = 13.57 Roadway Information Miles AADT Truck Pct 13.57 2,393 13.5 ILL 142 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 0.1 MI N OF MAIN ST IN BROUGHTON CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 142 HAMILTON CO LINE TO US 45 IN ELDORADO Miles = 7.19 Roadway Information Miles AADT Truck Pct 7.19 2,335 12.8 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 37 $2,400,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 142 Location INDIAN CREEK 3 MI N OF ELDORADO Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost US 45 IN ELDORADO TO 4.2 MI SE Miles = 4.20 Roadway Information Miles AADT Truck Pct 4.20 2,348 10.1 ILL 142 STANDARD OVERLAY MYP Years Past Current $800,000 RECONSTRUCTION - BRIDGES ILL 142 County SALINE Structure Information Str Number AADT 1,800 0830032 14 2021-2025 Truck Pct NHS 15 N $1,400,000 SALINE 1 2021-2025 $150,000 SALINE 2 2021-2025 $900,000 GALLATIN SALINE 3 2020 $900,000 SALINE 4 2021-2025 REHABILITATION - PAVEMENTS NHS N 1.4 MI SE OF ELDORADO CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 142 0.9 MI NW OF GALLATIN CO LINE TO N OF WCL OF EQUALITY Miles = 2.76 Roadway Information Miles AADT Truck Pct 1.23 1,989 22.7 REHABILITATION - PAVEMENTS NHS N 0.84 1,892 22.9 N 0.69 1,100 2.0 N ILL 145 ILL 34 TO POPE CO LINE Miles = 3.39 Roadway Information Miles AADT Truck Pct 3.39 2,053 11.2 STANDARD OVERLAY DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 38 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 145 Location 0.2 MI S OF ILL 146 TO KRAPER RD AT POPE CO LINE Miles = 5.15 Roadway Information Miles AADT Truck Pct 5.15 2,041 14.1 ILL 145 Improvements TAMP Category STANDARD OVERLAY Est. Cost $1,500,000 POPE 1 2020 $3,000,000 POPE 9 2021-2025 REHABILITATION - PAVEMENTS NHS N BAY CREEK 2.3 MI S OF ILL 146 BRIDGE REPLACEMENT 0.6 MI N OF MASSAC CO LINE BRIDGE REPLACEMENT Structure Information Str Number AADT 2,050 0760024 $800,000 RECONSTRUCTION - BRIDGES ILL 145 POPE CO LINE TO US 45 IN METROPOLIS Miles = 10.13 Roadway Information Miles AADT Truck Pct 10.13 2,928 11.1 ILL 145 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 145 County STANDARD OVERLAY POPE Structure Information Str Number AADT 2,000 0760019 Truck Pct NHS 14 N 1 2021-2025 Truck Pct NHS 14 N $3,500,000 MASSAC 1 2020 $150,000 MASSAC 1 2021-2025 REHABILITATION - PAVEMENTS NHS N 2.1 MI N OF ROSEBUD RD CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 39 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 146 Location MISSISSIPPI RIVER AT CAPE GIRARDEAU Improvements TAMP Category BRIDGE REPAIR BRIDGE SUBSTRUCTURE BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $600,000 ALEXANDER 1 2020 $1,000,000 ALEXANDER 3 2021-2025 $1,200,000 ALEXANDER 1 2020 $1,000,000 UNION 1 2021-2025 $10,000,000 UNION 1 2021-2025 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. MAINTENANCE - BRIDGES ILL 146 MISSISSIPPI RIVER AT CAPE GIRARDEAU BRIDGE REPAIR BRIDGE DECK SEALING BRIDGE JOINT REPLACE/REPAIR MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. MAINTENANCE - BRIDGES ILL 146 MISSISSIPPI RIVER BRIDGE TO BADER LN IN EAST CAPE GIRARDEAU Miles = 1.49 STANDARD OVERLAY PRESERVATION PROJECT Roadway Information Miles AADT Truck Pct 1.49 9,432 13.8 ILL 146 ILL 127 ILL 127 W OF JONESBORO TO ILL 127 IN JONESBORO Miles = 2.49 Roadway Information Miles AADT Truck Pct 2.49 5,806 14.5 ILL 146 ILL 127 PRESERVATION - PAVEMENTS NHS Y REHABILITATION - PAVEMENTS NHS Y ILL 127 IN JONESBORO TO OLD US 51 IN ANNA Miles = 1.40 Roadway Information Miles AADT Truck Pct 1.40 9,911 9.3 DESIGNED OVERLAY RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 9 - 40 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 146 Location ILL 127 IN JONESBORO TO OLD US 51 IN ANNA Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $500,000 UNION 1 2021-2025 $1,800,000 UNION 1 2021-2025 $1,500,000 JOHNSON 5 2020 $1,000,000 JOHNSON 3 2021-2025 ILL 127 RECONSTRUCTION - PAVEMENTS ILL 146 0.9 MI E OF I-57 TO JOHNSON CO LN Miles = 4.65 Roadway Information Miles AADT Truck Pct 4.65 2,790 19.6 ILL 146 ILL 146 REHABILITATION - PAVEMENTS NHS N UNION CO LINE TO 0.1 MI E OF ILL 37 Miles = 4.29 Roadway Information Miles AADT Truck Pct 4.29 2,764 22.1 STANDARD OVERLAY STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 0.1 MI E OF US 45 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 146 W OF INDUSTRIAL DR TO I-24 RAMPS (SB) IN VIENNA Miles = 0.55 Roadway Information Miles AADT Truck Pct 0.55 6,914 9.2 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT BI-DIRECT LEFT TURN LANE REHABILITATION - PAVEMENTS NHS N 9 - 41 Structure Information Str Number AADT 6,900 0440053 $5,000,000 JOHNSON Truck Pct NHS 8 N 5 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 146 Location OLD METROPOLIS RD IN VIENNA TO POPE CO LINE Miles = 9.67 Roadway Information Miles AADT Truck Pct 9.67 2,176 6.2 ILL 146 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $3,400,000 JOHNSON 1 2021-2025 $250,000 JOHNSON 3 2021-2025 POPE 2 2021-2025 REHABILITATION - PAVEMENTS NHS N 0.9 MI E OF I-24 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 146 LUSK CREEK 0.1 MI N OF GOLCONDA BRIDGE REPLACEMENT $4,000,000 RECONSTRUCTION - BRIDGES ILL 147 2.4 MI W OF SIMPSON BRIDGE DECK OVERLAY PIER REPAIR Structure Information Str Number AADT 2,300 0760005 Truck Pct NHS 10 N $160,000 JOHNSON 1 2020 $200,000 JOHNSON 1 2020 PRESERVATION - BRIDGES ILL 147 CEDAR CREEK 0.1 MI E OF TRIGG TOWER RD IN SIMPSON BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 9 - 42 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 147 Location 0.2 MI W OF POPE CO LINE Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $300,000 JOHNSON 1 2020 $5,300,000 JEFFERSON 1 2021-2025 $1,000,000 FRANKLIN 1 2021-2025 $150,000 FRANKLIN 3 2021-2025 $4,000,000 FRANKLIN 1 2021-2025 PRESERVATION - BRIDGES ILL 148 0.4 MI W OF ILL 37 TO FRANKLIN CO LINE Miles = 17.36 Roadway Information Miles AADT Truck Pct 17.36 3,675 5.1 ILL 148 ILL 148 REHABILITATION - PAVEMENTS NHS N 1 MI S OF ILL 154 TO ILL 14 IN CHRISTOPHER Miles = 6.00 Roadway Information Miles AADT Truck Pct 6.00 4,314 6.8 STANDARD OVERLAY STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 0.5 MI N OF ILL 14 N OF CHRISTOPHER CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 148 N OF YELLOWBANKS RD TO S OF RENFRO LAKE RD Miles = 1.25 Roadway Information Miles AADT Truck Pct 1.25 5,171 7.7 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS Y 9 - 43 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 148 Location MAPLE ST IN ZEIGLER TO 0.8 MI S OF WILLIAMSON CO LINE Miles = 2.82 Roadway Information Miles AADT Truck Pct 2.07 4,645 3.8 0.75 ILL 148 4,850 2.1 ILL 148 DESIGNED OVERLAY Est. Cost County MYP Years Past Current $900,000 FRANKLIN WILLIAMSON 1 2020 $1,200,000 WILLIAMSON 3 2021-2025 $350,000 WILLIAMSON 2 2020 $2,000,000 WILLIAMSON 5 2020 REHABILITATION - PAVEMENTS NHS Y Y HERRIN ST TO HEMLOCK ST IN HERRIN Miles = 1.28 Roadway Information Miles AADT Truck Pct 1.28 15,842 6.8 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS Y 1.8 MI N OF I-57 CULVERT REPAIR MAINTENANCE - BRIDGES ILL 148 WOLF CREEK 1 MI N OF I-57 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES ILL 149 2.8 MI E OF ILL 3 CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS 9 - 44 Structure Information Str Number AADT 5,350 1000038 $250,000 JACKSON Truck Pct NHS 14 N 3 2021-2025 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 149 Location 22ND ST TO ILL 13/127 IN MURPHYSBORO Miles = 1.32 Roadway Information Miles AADT Truck Pct 1.32 10,820 7.5 ILL 149 ILL 149 ILL 149 ILL 149 MYP Years Past Current $800,000 JACKSON 5 2020 STANDARD OVERLAY $2,400,000 JACKSON 2 2021-2025 $1,200,000 WILLIAMSON 1 2021-2025 $1,800,000 FRANKLIN 1 2021-2025 $2,000,000 FRANKLIN 1 2021-2025 REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N WILLIAMSON CO LINE TO 1.5 MI E OF ILL 184 E OF ROYALTON Miles = 4.79 Roadway Information Miles AADT Truck Pct 4.79 3,284 5.3 County REHABILITATION - PAVEMENTS JACKSON CO LINE TO FRANKLIN CO LINE Miles = 2.96 Roadway Information Miles AADT Truck Pct 2.96 3,961 6.1 STANDARD OVERLAY Est. Cost NHS Y ILL 13/127 IN MURPHYSBORO TO US 51 IN DESOTO Miles = 6.16 Roadway Information Miles AADT Truck Pct 6.16 3,029 5.7 Improvements TAMP Category STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N INT ILL 149 & ILL 184 N OF ROYALTON INTERSECTION RECONSTN ILL 184 MISCELLANEOUS IMPROVEMENTS 9 - 45 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 149 Location ILL 148 IN ZEIGLER TO 0.2 MI W OF ORIENT RD W OF WEST FRANKFORT Miles = 5.08 Roadway Information Miles AADT Truck Pct 5.08 3,616 10.6 ILL 149 ILL 149 STANDARD OVERLAY Est. Cost County MYP Years Past Current $1,625,000 FRANKLIN 5 2020 $1,400,000 FRANKLIN 2 2021-2025 $200,000 FRANKLIN 4 2021-2025 $1,000,000 FRANKLIN 1 2021-2025 $3,000,000 FRANKLIN 4 2021-2025 REHABILITATION - PAVEMENTS NHS Y 0.2 MI W OF ORIENT RD W OF WEST FRANKFORT TO I-57 Miles = 1.43 Roadway Information Miles AADT Truck Pct 1.43 7,143 11.7 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS Y 2 MI W OF I-57 W OF WEST FRANKFORT CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS ILL 149 FACTORY OUTLET DR TO I-57 OVERHEAD BRIDGE Miles = 0.21 Roadway Information Miles AADT Truck Pct 0.21 11,067 13.8 ILL 149 MAIN ST RECONSTRUCTION - PAVEMENTS NHS Y I-57 TO ILL 37 IN WEST FRANKFORT Miles = 0.74 Roadway Information Miles AADT Truck Pct 0.74 12,773 7.8 RECONSTRUCTION DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 46 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 149 Location I-57 TO ILL 37 IN WEST FRANKFORT Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $1,200,000 FRANKLIN 2 2020 $800,000 FRANKLIN 2 2021-2025 $500,000 FRANKLIN 4 2021-2025 $1,400,000 FRANKLIN 1 2020 $1,000,000 PERRY 1 2021-2025 MAIN ST REHABILITATION - PAVEMENTS ILL 149 I-57 TO ILL 37 IN WEST FRANKFORT LAND ACQUISITION MAIN ST REHABILITATION - PAVEMENTS ILL 149 I-57 TO ILL 37 IN WEST FRANKFORT UTILITY ADJUSTMENT MAIN ST REHABILITATION - PAVEMENTS ILL 149 MAIN ST ILL 37 TO ECL OF WEST FRANKFORT Miles = 1.87 Roadway Information Miles AADT Truck Pct 1.87 7,710 7.7 ILL 150 REHABILITATION - PAVEMENTS NHS N N OF CUTLER TO ILL 154 Miles = 2.85 Roadway Information Miles AADT Truck Pct 2.85 950 22.1 STANDARD OVERLAY STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 47 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 152 Location ILL 127 TO US 51 Miles = 6.76 Roadway Information Miles AADT Truck Pct 6.76 3,119 7.4 ILL 152 County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $12,000,000 PERRY 1 2021-2025 $1,500,000 PERRY 1 2021-2025 $400,000 PERRY 1 2020 $2,000,000 PERRY 1 2021-2025 $250,000 PERRY 1 2021-2025 Past Current REHABILITATION - PAVEMENTS NHS N ILL 127 TO US 51 LAND ACQUISITION REHABILITATION - PAVEMENTS ILL 152 BEAUCOUP CREEK 1 MI E OF ILL 127 BRIDGE DECK OVERLAY PRESERVATION - BRIDGES ILL 154 ILL 13 GRANT ST TO S WALNUT ST IN PINCKNEYVILLE Miles = 0.36 Roadway Information Miles AADT Truck Pct 0.36 7,750 12.6 ILL 154 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NHS N GRANT ST TO S WALNUT ST IN PINCKNEYVILLE LAND ACQUISITION ILL 13 RECONSTRUCTION - PAVEMENTS 9 - 48 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 154 Location HOG CREEK 2.1 MI W OF PERRY CO LINE Improvements TAMP Category BRIDGE DECK OVERLAY Est. Cost County MYP Years Past Current $120,000 PERRY 1 2020 $120,000 FRANKLIN 1 2020 $70,000 FRANKLIN 1 2020 $80,000 FRANKLIN 1 2020 $3,000,000 FRANKLIN 5 2021-2025 PRESERVATION - BRIDGES ILL 154 LITTLE MUDDY OVERFLOW AT PERRY CO LINE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES ILL 154 LITTLE MUDDY OVERFLOW 0.3 MI E OF PERRY CO LINE BRIDGE DECK OVERLAY PRESERVATION - BRIDGES ILL 154 LITTLE INDIAN CREEK 2 MI W OF ILL 148 BRIDGE DECK OVERLAY PRESERVATION - BRIDGES ILL 154 ILL 148 IN SESSER TO I-57 Miles = 7.78 Roadway Information Miles AADT Truck Pct 7.78 3,365 20.2 DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 49 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 154 Location REND LAKE CAUSEWAY 3 MI E OF SESSER Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost LARRY FOSTER PKWY TO FITZGERRELL PARK DR AT REND LAKE BRIDGE REPLACEMENT BIKEWAY $4,000,000 LARRY FOSTER PKWY TO FITZGERRELL PARK DR AT REND LAKE PRELIMINARY ENGINEERING FRANKLIN Structure Information Str Number AADT 3,300 0280052 $11,000,000 RECONSTRUCTION - BRIDGES ILL 154 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 154 County FRANKLIN Structure Information Str Number AADT 3,300 0280052 1 2021-2025 Truck Pct NHS 22 N 1 2021-2025 Truck Pct NHS 22 N $1,500,000 FRANKLIN 1 2020 $250,000 FRANKLIN 1 2021-2025 $200,000 WILLIAMSON 1 2020 RECONSTRUCTION - BRIDGES ILL 154 LARRY FOSTER PKWY TO FITZGERRELL PARK DR AT REND LAKE UTILITY ADJUSTMENT RECONSTRUCTION - BRIDGES ILL 166 3.3 MI S OF ILL 13 BRIDGE DECK OVERLAY PRESERVATION - BRIDGES 9 - 50 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street ILL 166 Location SUGAR CREEK AT ECL OF CREAL SPRINGS Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost ILL 37 TO US 45 Miles = 9.01 Roadway Information Miles AADT Truck Pct 3.75 1,569 11.8 5.26 1,797 ILL 169 13.4 STANDARD OVERLAY $1,000,000 9 2021-2025 Truck Pct NHS 8 N $2,800,000 PULASKI MASSAC 1 2021-2025 $850,000 PULASKI 1 2021-2025 PRESERVATION - PAVEMENTS NHS N N STREAM 0.4 MI W OF KARNAK BRIDGE REPLACEMENT STREAM 3.5 MI N OF MCLEANSBORO CULVERT REPLACEMENT Structure Information Str Number AADT 1,900 0770023 $250,000 RECONSTRUCTION - BRIDGES BLUEGRASS LN WILLIAMSON Structure Information Str Number AADT 1,300 1000031 RECONSTRUCTION - BRIDGES ILL 242 MYP Years Past Current RECONSTRUCTION - BRIDGES ILL 169 County SPRING CREEK 6.7 MI N OF ILL 3 (OFF ILL 151) BRIDGE REPLACEMENT HAMILTON Structure Information Str Number AADT 1,800 0332000 $500,000 JACKSON Truck Pct NHS 9 N 15 2021-2025 Truck Pct NHS 18 N 15 2020 JURISDICTIONAL TRANSFER HAS NOT BEEN AGREED TO BUT IMPROVEMENT IS SCHEDULED. RECONSTRUCTION - BRIDGES 9 - 51 Structure Information Str Number AADT 25 0390046 Truck Pct NHS 8 N FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street CRAB ORCHARD RD Location ILL 13 W CONNECTOR TO ILL 13 E CONNECTOR IN CRAB ORCHARD Miles = 1.79 Roadway Information Miles AADT Truck Pct 0.91 1,600 0.0 STANDARD OVERLAY Est. Cost County MYP Years Past Current $650,000 WILLIAMSON 1 2021-2025 $900,000 SALINE 17 2021-2025 REHABILITATION - PAVEMENTS NHS N 0.28 700 5.7 N 0.60 300 0.0 N FEAZEL RD Improvements TAMP Category STREAM S OF US 45 INT BRIDGE REPLACEMENT JURISDICTIONAL TRANSFER HAS NOT BEEN AGREED TO BUT IMPROVEMENT IS SCHEDULED. RECONSTRUCTION - BRIDGES HERRIN RD CH 9 CH 10 CH 11 ILL 149 IN HURST TO S OF COLP Miles = 5.08 Roadway Information Miles AADT Truck Pct 2.52 4,921 8.0 $1,800,000 WILLIAMSON 1 2021-2025 $500,000 WILLIAMSON 5 2021-2025 REHABILITATION - PAVEMENTS 5,600 5.8 N 1.02 3,300 6.8 N 0.5 MI W OF PUMPKIN PATCH RD TO 0.1 MI W OF PROSPERITY AVE IN JOHNSTON CITY Miles = 1.64 Roadway Information Miles AADT Truck Pct 1.64 6,390 7.2 Truck Pct NHS 2 N NHS N 1.54 HERRIN RD STANDARD OVERLAY Structure Information Str Number AADT 850 0830042 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 52 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street HERRIN RD Location CHRISTMAS TREE RD TO 0.1 MI W OF PROSPERITY AVE IN JOHNSTON CITY Miles = 1.64 Roadway Information Miles AADT Truck Pct 1.64 6,390 7.2 MAIN ST RIDGEWAY / Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $650,000 WILLIAMSON 1 2020 $600,000 GALLATIN 1 2021-2025 $550,000 JACKSON 5 2020 $800,000 JACKSON 5 2021-2025 $240,000 JACKSON 1 2021-2025 REHABILITATION - PAVEMENTS NHS N ILL 1 TO N MURPHY ST IN RIDGWAY Miles = 1.20 STANDARD OVERLAY NEW HAVEN RD Roadway Information Miles AADT Truck Pct 1.20 1,907 15.7 MAIN ST GORHAM RD LAKE ST TO ILL 3 IN GORHAM Miles = 1.55 Roadway Information Miles AADT Truck Pct 1.55 350 0.0 N 14TH ST REHABILITATION - PAVEMENTS DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N ILL 149 TO S OF DEWITTE ST IN MURPHYSBORO Miles = 0.75 Roadway Information Miles AADT Truck Pct 0.75 2,119 3.1 STANDARD OVERLAY NHS N AVA RD TO POPLAR ST IN MURPHYSBORO Miles = 2.77 Roadway Information Miles AADT Truck Pct 2.77 3,006 12.3 N 6TH ST REHABILITATION - PAVEMENTS NHS N STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 53 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street OLD ILL 13 Location N GIANT CITY RD TO S COUNTY LINE RD IN CARBONDALE Miles = 2.07 Roadway Information Miles AADT Truck Pct 2.07 3,911 2.7 OLD ILL 13 OLD ILL 13 STANDARD OVERLAY Est. Cost MYP Years Past Current $750,000 JACKSON 1 2021-2025 $1,600,000 JACKSON 1 2021-2025 $1,400,000 JACKSON 7 2021-2025 REHABILITATION - PAVEMENTS STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N CRAB ORCHARD CREEK 1.7 MI E OF CARBONDALE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES OLD ILL 13 County NHS N ILL 127 IN MURPHYSBORO TO W OF TOWER RD IN CARBONDALE Miles = 4.03 Roadway Information Miles AADT Truck Pct 4.03 4,920 4.2 Improvements TAMP Category CREEK 0.9 MI E OF GIANT CITY RD CULVERT REPLACEMENT Structure Information Str Number AADT 4,250 0390039 $250,000 Truck Pct NHS 2 N JACKSON 4 2021-2025 SALINE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS OLD ILL 13 HARCO RD TO WCL OF HARRISBURG Miles = 5.36 Roadway Information Miles AADT Truck Pct 5.36 336 13.4 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 54 $1,600,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street OLD ILL 3 Location 0.1 MI S OF LEVEE RD TO 0.1 MI S OF BEAN RIDGE RD IN THEBES Miles = 2.20 Roadway Information Miles AADT Truck Pct 2.05 187 0.0 0.15 175 OLD ILL 3 0.0 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $700,000 ALEXANDER 1 2021-2025 $250,000 ALEXANDER 1 2021-2025 $1,200,000 ALEXANDER 4 2021-2025 REHABILITATION - PAVEMENTS NHS N N SEXTON CREEK 0.1 MI E OF ILL 3 BRIDGE JOINT REPLACE/REPAIR BRIDGE REPAIR PRESERVATION - BRIDGES OLD ILL 3 MILLER CREEK 1 MI N OF THEBES BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES OLD US 51 US 51 N CONNECTOR TO US 51 S CONNECTOR IN CARBONDALE Miles = 2.37 Roadway Information Miles AADT Truck Pct 1.54 1,300 1.9 $1,100,000 JACKSON 4 2020 $1,500,000 JACKSON 1 2021-2025 REHABILITATION - PAVEMENTS 3,114 1.0 N 0.13 1,200 0.0 N US 51 AT ILLINOIS AVE TO US 51 CONNECTOR IN MAKANDA Miles = 4.28 Roadway Information Miles AADT Truck Pct 4.28 1,131 2.5 Truck Pct NHS 7 N NHS N 0.70 OLD US 51 STANDARD OVERLAY Structure Information Str Number AADT 175 0020010 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 55 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street OLD US 51 Location US 51 CONNECTOR IN MAKANDA TO CN RR BRIDGE IN COBDEN Miles = 5.75 Roadway Information Miles AADT Truck Pct 0.25 1,000 7.9 5.50 1,365 OLD US 51 7.6 OLD US 51 1.80 3,705 OLD US 51 6.9 County MYP Years Past Current $2,000,000 JACKSON UNION 1 2021-2025 $6,800,000 PULASKI 1 2021-2025 $2,200,000 UNION 1 2021-2025 $100,000 PULASKI 3 2021-2025 $800,000 SALINE 1 2021-2025 REHABILITATION - PAVEMENTS N DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N CN RR BRIDGE IN COBDEN TO ILL 146 IN ANNA Miles = 5.61 Roadway Information Miles AADT Truck Pct 3.81 2,514 5.5 STANDARD OVERLAY Est. Cost NHS N UNION CO LINE TO ILL 37 N OF CAIRO Miles = 18.52 Roadway Information Miles AADT Truck Pct 18.52 1,165 8.6 Improvements TAMP Category DESIGNED OVERLAY REHABILITATION - PAVEMENTS NHS N N NORTH ST IN PULASKI CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS POPLAR ST E OF ILL 13 TO US 45 IN HARRISBURG Miles = 1.41 Roadway Information Miles AADT Truck Pct 1.41 5,117 7.3 STANDARD OVERLAY REHABILITATION - PAVEMENTS NHS N 9 - 56 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street PRIVATE ENTRANCE Location AUSTIN CREEK 0.6 MI N OF ILL 3 (OFF ILL 151) Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost BIG CREEK 6.8 MI S OF WAYNE CO LINE JURISDICTIONAL TRANSFER MYP Years Past Current $350,000 RECONSTRUCTION - BRIDGES TR 107 County JACKSON Structure Information Str Number AADT N/A 0390047 $150,000 1 2021-2025 Truck Pct NHS N/A N HAMILTON 1 2020 VARIOUS 1 2020 $250,000 DISTRICT-WIDE FRANKLIN JEFFERSON HAMILTON WHITE GALLATIN 3 2020 $3,000,000 DISTRICT-WIDE 2 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS SMALL STRUCTURE REPLACEMENTS CULVERT REPLACEMENT $2,000,000 MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE DECK SEALING BRIDGE DECK SEALING PRESERVATION - BRIDGES VARIOUS STRUCTURE PRESERVATION BRIDGE JOINT REPLACE/REPAIR PRESERVATION - BRIDGES 9 - 57 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location STRUCTURE PRESERVATION Improvements TAMP Category BRIDGE JOINT REPLACE/REPAIR Est. Cost County MYP Years Past Current $15,000,000 DISTRICT-WIDE 1 2021-2025 $600,000 DISTRICT-WIDE 1 2021-2025 $1,500,000 DISTRICT-WIDE 1 2020 $1,500,000 DISTRICT-WIDE 1 2021-2025 $1,200,000 DISTRICT-WIDE 2 2020 $100,000 DISTRICT-WIDE 5 2020 PRESERVATION - BRIDGES VARIOUS BRIDGE ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY MISCELLANEOUS IMPROVEMENTS 9 - 58 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location POST-LAND ACQUISITION ACTIVITY Improvements TAMP Category POST-ACQUISITION ACTIVITY Est. Cost County MYP Years Past Current $500,000 DISTRICT-WIDE 5 2021-2025 $200,000 DISTRICT-WIDE 5 2020 $1,000,000 DISTRICT-WIDE 5 2021-2025 $250,000 DISTRICT-WIDE 1 2020 $750,000 DISTRICT-WIDE 1 2021-2025 $750,000 DISTRICT-WIDE 1 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS 9 - 59 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location MISCELLANEOUS LAND ACQUISITION Improvements TAMP Category LAND ACQUISITION Est. Cost County MYP Years Past Current $750,000 DISTRICT-WIDE 1 2021-2025 $750,000 DISTRICT-WIDE 1 2021-2025 $400,000 DISTRICT-WIDE 5 2021-2025 $250,000 DISTRICT-WIDE 1 2020 $250,000 DISTRICT-WIDE 1 2021-2025 $2,000,000 DISTRICT-WIDE 1 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION MISCELLANEOUS IMPROVEMENTS VARIOUS RIGHT-OF-WAY SURVEYS P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS RIGHT-OF-WAY SURVEYS P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS RIGHT-OF-WAY SURVEYS P.E. SURVEYS (ROW) MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS 9 - 60 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location ON-CALL ENGINEERING Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $2,000,000 DISTRICT-WIDE 1 2021-2025 $3,000,000 DISTRICT-WIDE 1 2021-2025 $1,500,000 DISTRICT-WIDE 1 2020 $4,500,000 DISTRICT-WIDE 1 2021-2025 $150,000 DISTRICT-WIDE 5 2020 $1,000,000 DISTRICT-WIDE 5 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICTWIDE GUARDRAIL HIT & RUN GUARDRAIL MISCELLANEOUS IMPROVEMENTS VARIOUS DISTRICTWIDE GUARDRAIL HIT & RUN GUARDRAIL MISCELLANEOUS IMPROVEMENTS 9 - 61 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location MISCELLANEOUS UTILITY ADJUSTMENTS Improvements TAMP Category UTILITY ADJUSTMENT Est. Cost County MYP Years Past Current $100,000 DISTRICT-WIDE 5 2020 $500,000 DISTRICT-WIDE 5 2021-2025 $150,000 DISTRICT-WIDE 4 2020 $750,000 DISTRICT-WIDE 4 2021-2025 $4,107,000 DISTRICT-WIDE 6 2020 $20,535,000 DISTRICT-WIDE 5 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT MISCELLANEOUS IMPROVEMENTS VARIOUS ADA IMPROVEMENTS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ADA IMPROVEMENTS ADA IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS 9 - 62 FY 2020-2025 Rebuild Illinois Highway Improvement Program District 9 State Highways Route / Street VARIOUS Location PAVEMENT PRESERVATION County MYP Years Improvements TAMP Category Est. Cost STANDARD OVERLAY $15,000,000 DISTRICT-WIDE 1 2021-2025 $3,000,000 DISTRICT-WIDE 2 2021-2025 $1,500,000 WILLIAMSON 1 2020 $1,000,000 WILLIAMSON 1 2021-2025 Past Current PRESERVATION - PAVEMENTS VARIOUS PAVEMENT PRESERVATION STANDARD OVERLAY PRESERVATION - PAVEMENTS WALKERS BLUFF HERRIN RD TO MERIDIAN RD AT WALKERS BLUFF PRELIMINARY ENGINEERING ACCESS (PROPOSED) INITIAL CONSTRUCTION - PAVEMENTS WALKERS BLUFF HERRIN RD TO MERIDIAN RD AT WALKERS BLUFF LAND ACQUISITION ACCESS (PROPOSED) INITIAL CONSTRUCTION - PAVEMENTS 9 - 63 DISTRICT 9 FY 2020-2023 PROPOSED LOCAL PROJECTS FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street ILL 13 Location STATE ST TO FAIR ST Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $12,000 WILLIAMSON 1 2020 $145,000 WILLIAMSON 1 2021-2025 $10,000 WILLIAMSON 1 2021-2025 $200,000 JEFFERSON 5 2021-2025 $250,000 WHITE 4 2020 $8,000 WHITE 4 2020 E DEYOUNG ST MISCELLANEOUS IMPROVEMENTS ILL 13 STATE ST TO FAIR ST SIDEWALKS E DEYOUNG ST MISCELLANEOUS IMPROVEMENTS ILL 13 STATE ST TO FAIR ST CONSTRUCTION ENGINEERING E DEYOUNG ST MISCELLANEOUS IMPROVEMENTS 5TH ST OVER ICG RR IN BELLE RIVE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 1500 N RD AT UNNAMED CREEK 2.5 MI SW OF NORRIS CITY CULVERT (NEW) INITIAL CONSTRUCTION - BRIDGES 1500 N RD AT UNNAMED CREEK 2.5 MI SW OF NORRIS CITY CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - BRIDGES 9 - 64 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street 200 E RD Location AT BIG CREEK 1.5 MI SE OF DAHLGREN Improvements TAMP Category BRIDGE (NEW) Est. Cost County MYP Years Past Current $480,000 HAMILTON 1 2021-2025 $8,000 HAMILTON 1 2021-2025 $300,000 JEFFERSON 1 2021-2025 $4,000 JEFFERSON 1 2021-2025 $140,000 WILLIAMSON 1 2020 $1,900,000 WILLIAMSON 1 2021-2025 INITIAL CONSTRUCTION - BRIDGES 200 E RD AT BIG CREEK 1.5 MI SE OF DAHLGREN CONSTRUCTION ENGINEERING INITIAL CONSTRUCTION - BRIDGES BLUFORD RD ILL 51 TO 1ST ST Miles = 1.13 STANDARD OVERLAY REHABILITATION - PAVEMENTS BLUFORD RD ILL 51 TO 1ST ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS CARTERVILLE GRAND AVE TO SHAWNEE TRAIL N OF ILL 13 P.E. (PHASE II) WEST BYP INITIAL CONSTRUCTION - PAVEMENTS CARTERVILLE WEST BYP GRAND AVE TO SHAWNEE TRAIL N OF ILL 13 Miles = 0.87 NEW CONSTRUCTION INITIAL CONSTRUCTION - PAVEMENTS 9 - 65 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street CARTERVILLE Location GRAND AVE TO SHAWNEE TRAIL N OF ILL 13 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $200,000 WILLIAMSON 1 2021-2025 $375,000 MASSAC 2 2021-2025 $625,000 MASSAC 1 2021-2025 $150,000 HARDIN 1 2020 $750,000 FRANKLIN 1 2021-2025 $500,000 PULASKI 2 2021-2025 WEST BYP INITIAL CONSTRUCTION - PAVEMENTS CH 1 NEW COLUMBIA RD JOHNSON CO LINE TO TEAGUE HILL RD Miles = 2.05 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 1 NEW COLUMBIA RD TEAGUE HILL RD TO BENTON RD Miles = 3.68 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 3 KARBERS RIDGE RD TO SHAWNEE HOLLOW RD P.E. (PHASE I) BASSET RD REHABILITATION - PAVEMENTS CH 3 AKIN BLKTP PIGG LN TO HAMILTON CO LINE Miles = 2.99 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 5 PERKS RD US 51 TO 2.4 MI E Miles = 2.40 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 66 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street CH 5 Location US 51 TO 2.4 MI E Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $4,000 PULASKI 2 2021-2025 $675,000 HAMILTON 8 2020 $12,000 HAMILTON 4 2020 $1,000,000 WHITE 2 2021-2025 $12,000 WHITE 2 2021-2025 JACKSON 1 2021-2025 PERKS RD REHABILITATION - PAVEMENTS CH 6 750 E RD 800 N RD TO DALE RD Miles = 2.50 BIT SURFACE TREATMENT-A2 PRESERVATION - PAVEMENTS CH 6 800 N RD TO DALE RD CONSTRUCTION ENGINEERING 750 E RD PRESERVATION - PAVEMENTS CH 7 CH 25 CARMI ECL TO 1300 N RD Miles = 2.59 STANDARD OVERLAY EPWORTH RD REHABILITATION - PAVEMENTS CH 7 CH 25 CARMI ECL TO 1300 N RD CONSTRUCTION ENGINEERING EPWORTH RD REHABILITATION - PAVEMENTS CH 7 BRICK PLANT RD ILL 4 TO RANDOLPH CO LINE Miles = 2.85 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 67 $725,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street CH 7 Location ILL 4 TO RANDOLPH CO LINE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $12,000 JACKSON 1 2021-2025 $800,000 JACKSON 4 2020 $12,000 JACKSON 4 2020 $400,000 SALINE 5 2021-2025 $8,000 SALINE 5 2021-2025 BRICK PLANT RD REHABILITATION - PAVEMENTS CH 12 GIANT CITY RD S CHURCH RD GIANT CITY RD: GRASSY RD TO S CHURCH RD; S CHURCH RD: GIANT CITY RD TO 0.4 MI W Miles = 3.90 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 12 GIANT CITY RD GIANT CITY RD: GRASSY RD TO S CHURCH RD; S CHURCH RD: GIANT CITY RD TO 0.4 MI W CONSTRUCTION ENGINEERING S CHURCH RD REHABILITATION - PAVEMENTS CH 15 CH 17 SALINE CO LINE N OF HORSESHOE RD TO 0.9 MI S Miles = 0.93 STANDARD OVERLAY FOREST RD REHABILITATION - PAVEMENTS CH 15 CH 17 SALINE CO LINE N OF HORSESHOE RD TO 0.9 MI S CONSTRUCTION ENGINEERING FOREST RD REHABILITATION - PAVEMENTS 9 - 68 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street CH 16 TR 97B Location KIMZEY RD TO 1 MI S & ILL 154 TO 0.7 MI N Miles = 1.70 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $450,000 PERRY 10 2021-2025 $4,000 PERRY 10 2021-2025 $500,000 WHITE 5 2021-2025 $8,000 WHITE 5 2021-2025 $900,000 WILLIAMSON 1 2021-2025 $16,000 WILLIAMSON 1 2021-2025 GLADSON RD REHABILITATION - PAVEMENTS CH 16 TR 97B KIMZEY RD TO 1 MI S & ILL 154 TO 0.7 MI N CONSTRUCTION ENGINEERING GLADSON RD REHABILITATION - PAVEMENTS CH 23 1175 E RD SCL OF CARMI TO 1.4 MI S Miles = 1.40 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 23 SCL OF CARMI TO 1.4 MI S CONSTRUCTION ENGINEERING 1175 E RD REHABILITATION - PAVEMENTS CH 27 LAKE OF EGYPT RD S MARKET RD TO ILL 166 Miles = 4.85 STANDARD OVERLAY REHABILITATION - PAVEMENTS CH 27 S MARKET RD TO ILL 166 CONSTRUCTION ENGINEERING LAKE OF EGYPT RD REHABILITATION - PAVEMENTS 9 - 69 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street DIX IRVINGTON RD Location US 51 RAMPS (NB) TO RICHVIEW RD Miles = 2.74 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $550,000 JEFFERSON 2 2021-2025 $4,000 JEFFERSON 2 2021-2025 $219,000 JEFFERSON 6 2021-2025 $925,000 JEFFERSON 1 2021-2025 $8,000 JEFFERSON 1 2021-2025 WILLIAMSON 1 2021-2025 REHABILITATION - PAVEMENTS DIX IRVINGTON RD US 51 RAMPS (NB) TO RICHVIEW RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS E 13TH ST OVER ICG RR IN BELLE RIVE BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES E DIVIDE RD HARMONY LN TO N PAPERTOWN LN Miles = 4.36 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS E DIVIDE RD HARMONY LN TO N PAPERTOWN LN CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS E GRAND AVE HURRICANE RD TO ILL 148 Miles = 1.52 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 70 $400,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street E GRAND AVE Location HURRICANE RD TO ILL 148 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 WILLIAMSON 1 2021-2025 $60,000 WILLIAMSON 1 2020 $925,000 WILLIAMSON 1 2021-2025 $40,000 WILLIAMSON 1 2021-2025 $300,000 POPE 1 2021-2025 $15,000 POPE 1 2021-2025 REHABILITATION - PAVEMENTS E HERRIN ST N 3RD ST HERRIN ST: ILL 148 TO N 3RD ST; N 3RD ST: N OF E BOND ST TO E HERRIN ST P.E. (PHASE II) REHABILITATION - PAVEMENTS E HERRIN ST N 3RD ST HERRIN ST: ILL 148 TO N 3RD ST; N 3RD ST: N OF E BOND ST TO E HERRIN ST Miles = 1.13 STANDARD OVERLAY REHABILITATION - PAVEMENTS E HERRIN ST N 3RD ST HERRIN ST: ILL 148 TO N 3RD ST; N 3RD ST: N OF E BOND ST TO E HERRIN ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS EDDYVILLE BLKTP RAGEN BRIDGE RD TO 1 MI S Miles = 1.03 STANDARD OVERLAY REHABILITATION - PAVEMENTS EDDYVILLE BLKTP RAGEN BRIDGE RD TO 1 MI S CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 9 - 71 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street ELDORADO BLKTP RD Location AT N FORK SALINE RIVER 1.8 MI W OF ILL 1 Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $2,523,000 GALLATIN 4 2021-2025 GALLATIN 4 2021-2025 $600,000 JACKSON 2 2021-2025 $8,000 JACKSON 2 2021-2025 $1,400,000 WHITE 1 2021-2025 $12,000 WHITE 1 2021-2025 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES ELDORADO BLKTP RD AT N FORK SALINE RIVER 1.8 MI W OF ILL 1 CONSTRUCTION ENGINEERING $139,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES ELKVILLE RD ILL 127 TO ELKVILLE WCL Miles = 5.04 STANDARD OVERLAY REHABILITATION - PAVEMENTS ELKVILLE RD ILL 127 TO ELKVILLE WCL CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS EPWORTH RD 1450 E RD E 1100 N RD TO E 650 N RD Miles = 4.51 STANDARD OVERLAY REHABILITATION - PAVEMENTS EPWORTH RD E 1100 N RD TO E 650 N RD CONSTRUCTION ENGINEERING 1450 E RD REHABILITATION - PAVEMENTS 9 - 72 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street FOREST RD Location AT LITTLE EAGLE CREEK 8 MI W OF ILL 1 Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $24,000 SALINE GALLATIN 2 2020 $360,000 SALINE GALLATIN 2 2021-2025 $1,200,000 JOHNSON 2 2020 $400,000 WILLIAMSON 3 2020 $24,000 WILLIAMSON 3 2020 $500,000 WILLIAMSON 1 2021-2025 REHABILITATION - BRIDGES FOREST RD AT LITTLE EAGLE CREEK 8 MI W OF ILL 1 BRIDGE REHABILITATION REHABILITATION - BRIDGES GOREVILLE RD US 57 RAMP (SB) TO ILL 37 Miles = 3.45 STANDARD OVERLAY REHABILITATION - PAVEMENTS GRASSY RD AT LITTLE WOLF CREEK 0.2 MI W OF ILL 148 BRIDGE SUPERSTRUCTURE REHABILITATION - BRIDGES GRASSY RD AT LITTLE WOLF CREEK 0.2 MI W OF ILL 148 CONSTRUCTION ENGINEERING REHABILITATION - BRIDGES GRASSY RD AT LITTLE WOLF CREEK 0.8 MI W OF ILL 148 BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES 9 - 73 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street GRASSY RD Location AT LITTLE WOLF CREEK 0.8 MI W OF ILL 148 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $24,000 WILLIAMSON 1 2021-2025 $800,000 SALINE 2 2021-2025 $1,000,000 SALINE 1 2021-2025 $1,500,000 JACKSON 3 2021-2025 $80,000 JACKSON 3 2021-2025 JEFFERSON 2 2021-2025 RECONSTRUCTION - BRIDGES HARCO RD OVER AMAX HAUL RD 0.7 MI N OF ILL 13 BRIDGE REMOVAL/DEMOLITION MISCELLANEOUS IMPROVEMENTS JOHNSTON CITY RD WILLIAMSON CO LINE TO HARCO RD Miles = 3.36 STANDARD OVERLAY REHABILITATION - PAVEMENTS N 7TH ST 0.4 MI S OF INDUSTRIAL PARK RD TO ILLINOIS AVE Miles = 0.68 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS N 7TH ST 0.4 MI S OF INDUSTRIAL PARK RD TO ILLINOIS AVE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS N BREHM LN I-64 RAMPS (EB) TO ILL 142 Miles = 2.77 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 74 $425,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street N BREHM LN Location I-64 RAMPS (EB) TO ILL 142 Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $4,000 JEFFERSON 2 2021-2025 $200,000 FRANKLIN 1 2021-2025 $20,000 FRANKLIN 1 2021-2025 $1,500,000 FRANKLIN 2 2021-2025 $485,000 JACKSON 1 2021-2025 $32,000 JACKSON 1 2021-2025 REHABILITATION - PAVEMENTS N DU QUOIN ST AT SUGAR CREEK 0.2 MI S OF PETROFF RD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES N DU QUOIN ST AT SUGAR CREEK 0.2 MI S OF PETROFF RD CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES N HORRELL AVE ST LOUIS ST N HORRELL AVE: N OF 9TH ST TO FRANKFORT RD; ST LOUIS ST: N HORRELL AVE TO ILL 149 Miles = 0.81 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS NEW ERA RD RELOCATED AIRPORT RD TO S OF GLENN RD Miles = 0.39 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS NEW ERA RD RELOCATED AIRPORT RD TO S OF GLENN RD CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS 9 - 75 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street NW MULTI-USE PATH Location NEW ERA RD TO OAKLAND AVE IN CARBONDALE Improvements TAMP Category BIKEWAY Est. Cost County MYP Years Past Current $129,000 JACKSON 2 2020 $275,000 WILLIAMSON 1 2020 $8,000 WILLIAMSON 1 2020 $400,000 PERRY 2 2021-2025 $8,000 PERRY 2 2021-2025 $750,000 PERRY 6 2020 MISCELLANEOUS IMPROVEMENTS PAULTON RD 0.3 MI N OF GRANT BRICK RD TO TOLEDO RD Miles = 1.98 STANDARD OVERLAY REHABILITATION - PAVEMENTS PAULTON RD 0.3 MI N OF GRANT BRICK RD TO TOLEDO RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS PYATT-CUTLER RD ILL 4 TO ILL 127 SHOULDER REPAIR MISCELLANEOUS IMPROVEMENTS PYATT-CUTLER RD ILL 4 TO ILL 127 CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS PYATT-CUTLER RD ILL 4 TO UNION SCHOOL RD Miles = 6.25 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 76 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street PYATT-CUTLER RD Location ILL 4 TO UNION SCHOOL RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 PERRY 6 2020 $500,000 PERRY 6 2021-2025 $8,000 PERRY 6 2021-2025 $850,000 FRANKLIN 10 2020 $8,000 FRANKLIN 6 2020 $500,000 GALLATIN 2 2020 REHABILITATION - PAVEMENTS PYATT-CUTLER RD UNION SCHOOL RD TO ILL 13/127 Miles = 6.75 STANDARD OVERLAY REHABILITATION - PAVEMENTS PYATT-CUTLER RD UNION SCHOOL RD TO ILL 13/127 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS REND CITY RD REND LAKE DAM RD TO ILL 14 Miles = 2.95 STANDARD OVERLAY REHABILITATION - PAVEMENTS REND CITY RD REND LAKE DAM RD TO ILL 14 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS RIDGWAY / NEW HAVEN RD JACKSON / NEW HOPE RD TO SHAWNEETOWN / NEW HAVEN RD Miles = 3.01 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 77 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street RIDGWAY / NEW HAVEN RD Location JACKSON / NEW HOPE RD TO SHAWNEETOWN / NEW HAVEN RD Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $16,000 GALLATIN 2 2020 $1,700,000 JACKSON 5 2020 $48,000 JACKSON 4 2020 $900,000 FRANKLIN 2 2021-2025 $8,000 FRANKLIN 2 2021-2025 PERRY 1 2021-2025 REHABILITATION - PAVEMENTS S OAKLAND AVE ILL 13 (WALNUT ST) TO CHAUTAUQUA ST IN CARBONDALE Miles = 0.61 RECONSTRUCTION RECONSTRUCTION - PAVEMENTS S OAKLAND AVE ILL 13 (WALNUT ST) TO CHAUTAUQUA ST IN CARBONDALE CONSTRUCTION ENGINEERING RECONSTRUCTION - PAVEMENTS S THOMPSONVILLE RD MAIN ST ILL 34 TO WILLIAMSON CO LINE Miles = 3.74 STANDARD OVERLAY REHABILITATION - PAVEMENTS S THOMPSONVILLE RD ILL 34 TO WILLIAMSON CO LINE CONSTRUCTION ENGINEERING MAIN ST REHABILITATION - PAVEMENTS S WALNUT ST RANDOLPH ST TO KASKASKIA ST Miles = 0.13 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 78 $180,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street S WALNUT ST Location RANDOLPH ST TO KASKASKIA ST Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $20,000 PERRY 1 2021-2025 $24,000 PULASKI 1 2020 $300,000 PULASKI 1 2021-2025 $16,000 PULASKI 1 2021-2025 $260,000 JEFFERSON 4 2021-2025 $5,000 JEFFERSON 4 2021-2025 REHABILITATION - PAVEMENTS SHAWNEE COLLEGE RD AT UNNAMED CREEK 2 MI SE OF ULLIN P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS SHAWNEE COLLEGE RD AT UNNAMED CREEK 2 MI SE OF ULLIN CULVERT REPLACEMENT MISCELLANEOUS IMPROVEMENTS SHAWNEE COLLEGE RD AT UNNAMED CREEK 2 MI SE OF ULLIN CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS SPARROW RD OVER ICG RR 2 MI N OF BLUFORD BRIDGE REPLACEMENT RECONSTRUCTION - BRIDGES SPARROW RD OVER ICG RR 2 MI N OF BLUFORD CONSTRUCTION ENGINEERING RECONSTRUCTION - BRIDGES 9 - 79 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street SPILLWAY RD GRASSY RD Location SPILLWAY RD: HAYTON SCHOOL RD TO GRASSY RD; GRASSY RD: SPILLWAY RD TO W OF CANEY BRANCH LN Miles = 3.46 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $680,000 WILLIAMSON 1 2020 $12,000 WILLIAMSON 1 2020 PULASKI 3 2021-2025 PULASKI 3 2021-2025 PULASKI 2 2021-2025 REHABILITATION - PAVEMENTS SPILLWAY RD GRASSY RD SPILLWAY RD: HAYTON SCHOOL RD TO GRASSY RD; GRASSY RD: SPILLWAY RD TO W OF CANEY BRANCH LN CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS TICK RIDGE RD AT POST CREEK CUT-OFF 4 MI E OF GRAND CHAIN BRIDGE REPLACEMENT $2,831,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES TICK RIDGE RD AT POST CREEK CUT-OFF 4 MI E OF GRAND CHAIN CONSTRUCTION ENGINEERING $283,000 ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. RECONSTRUCTION - BRIDGES TICK RIDGE RD POST CREEK CUT-OFF TO MASSAC CO LINE Miles = 1.91 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 80 $600,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street TICK RIDGE RD Location POST CREEK CUT-OFF TO MASSAC CO LINE Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 PULASKI 2 2021-2025 $800,000 JEFFERSON 10 2020 $4,000 JEFFERSON 4 2020 $400,000 JACKSON 3 2021-2025 $8,000 JACKSON 3 2021-2025 HARDIN 2 2021-2025 REHABILITATION - PAVEMENTS TOLLE LN MILLER LAKE LN TO FAIRFIELD RD Miles = 3.33 STANDARD OVERLAY REHABILITATION - PAVEMENTS TOLLE LN MILLER LAKE LN TO FAIRFIELD RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS TOWN CREEK RD ILL 3 TO 0.1 MI SW OF GRIMSBY RD Miles = 1.50 STANDARD OVERLAY REHABILITATION - PAVEMENTS TOWN CREEK RD ILL 3 TO 0.1 MI SW OF GRIMSBY RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS TR 25 AT HARRIS CREEK 1.5 MI SE OF CADIZ BRIDGE REPLACEMENT HARRIS CREEK RD RECONSTRUCTION - BRIDGES 9 - 81 $150,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street TR 25 Location AT HARRIS CREEK 1.5 MI SE OF CADIZ Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 HARDIN 2 2021-2025 $150,000 ALEXANDER 1 2021-2025 $8,000 ALEXANDER 1 2021-2025 $480,000 HAMILTON 1 2021-2025 $8,000 HAMILTON 1 2021-2025 UNION 5 2021-2025 HARRIS CREEK RD RECONSTRUCTION - BRIDGES TR 89A AT MILLER CREEK 2 MI NW OF THEBES BRIDGE REPLACEMENT MCKEE RD RECONSTRUCTION - BRIDGES TR 89A AT MILLER CREEK 2 MI NW OF THEBES CONSTRUCTION ENGINEERING MCKEE RD RECONSTRUCTION - BRIDGES TR 97B AT BIG CREEK 2 MI SE OF DAHLGREN BRIDGE (NEW) 1800 N RD INITIAL CONSTRUCTION - BRIDGES TR 97B AT BIG CREEK 2 MI SE OF DAHLGREN CONSTRUCTION ENGINEERING 1800 N RD INITIAL CONSTRUCTION - BRIDGES TR 112 AT MILL CREEK TRIB 2.5 MI NE OF MILL CREEK BRIDGE REPLACEMENT MILLER RD RECONSTRUCTION - BRIDGES 9 - 82 $200,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street TR 112 Location AT MILL CREEK TRIB 2.5 MI NE OF MILL CREEK Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 UNION 5 2021-2025 $200,000 UNION 1 2021-2025 $8,000 UNION 1 2021-2025 $350,000 WHITE 4 2021-2025 $8,000 WHITE 4 2021-2025 $200,000 UNION 2 2021-2025 MILLER RD RECONSTRUCTION - BRIDGES TR 112 AT MILL CREEK TRIB 1.2 MI N OF MILL CREEK BRIDGE REPLACEMENT MILLER RD RECONSTRUCTION - BRIDGES TR 112 AT MILL CREEK TRIB 1.2 MI N OF MILL CREEK CONSTRUCTION ENGINEERING MILLER RD RECONSTRUCTION - BRIDGES TR 159 AT LIMEKILN CREEK 3 MI NW OF CARMI BRIDGE REPLACEMENT E 1700 N RD RECONSTRUCTION - BRIDGES TR 159 AT LIMEKILN CREEK 3 MI NW OF CARMI CONSTRUCTION ENGINEERING E 1700 N RD RECONSTRUCTION - BRIDGES TR 164 AT BIG CREEK TRIB 4 MI SE OF ANNA BRIDGE REPLACEMENT NASH RD RECONSTRUCTION - BRIDGES 9 - 83 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street TR 164 Location AT BIG CREEK TRIB 4 MI SE OF ANNA Improvements TAMP Category CONSTRUCTION ENGINEERING Est. Cost County MYP Years Past Current $8,000 UNION 2 2021-2025 $225,000 WHITE 3 2020 $8,000 WHITE 3 2020 $180,000 WHITE 4 2021-2025 $8,000 WHITE 4 2021-2025 SALINE 4 2020 NASH RD RECONSTRUCTION - BRIDGES TR 181 AT GOWDY CREEK 1 MI NW OF ENFIELD BRIDGE REPLACEMENT 1600 N RD RECONSTRUCTION - BRIDGES TR 181 AT GOWDY CREEK 1 MI NW OF ENFIELD CONSTRUCTION ENGINEERING 1600 N RD RECONSTRUCTION - BRIDGES TR 206 AT DRAINAGE DITCH 2.5 MI E OF BURNT PRAIRIE BRIDGE REPLACEMENT 900 E RD RECONSTRUCTION - BRIDGES TR 206 AT DRAINAGE DITCH 2.5 MI E OF BURNT PRAIRIE CONSTRUCTION ENGINEERING 900 E RD RECONSTRUCTION - BRIDGES TR 276 AT INDIAN CREEK TRIB 2 MI NW OF ELDORADO BRIDGE REPLACEMENT HAGAN RD RECONSTRUCTION - BRIDGES 9 - 84 $180,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street TR 311 Location AT AUXIER CREEK 2.5 MI SW OF BLUFORD Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $300,000 JEFFERSON 3 2021-2025 $240,000 WHITE 6 2020 $8,000 WHITE 6 2020 $400,000 WHITE 7 2020 $8,000 WHITE 7 2020 JOHNSON 4 2021-2025 E LIBERTY RD RECONSTRUCTION - BRIDGES TR 380 AT CROOKED CREEK 0.5 MI N OF GARNERVILLE BRIDGE REPLACEMENT 1750 E RD RECONSTRUCTION - BRIDGES TR 380 AT CROOKED CREEK 0.5 MI N OF GARNERVILLE CONSTRUCTION ENGINEERING 1750 E RD RECONSTRUCTION - BRIDGES TR 412A AT FRENCH CREEK 1 MI N OF CALVIN BRIDGE REPLACEMENT 2000 E RD RECONSTRUCTION - BRIDGES TR 412A AT FRENCH CREEK 1 MI N OF CALVIN CONSTRUCTION ENGINEERING 2000 E RD RECONSTRUCTION - BRIDGES TUNNEL HILL RD ILL 37 TO PARRISH RIDGE RD Miles = 2.86 STANDARD OVERLAY REHABILITATION - PAVEMENTS 9 - 85 $1,000,000 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street UNIONVILLE RD Location MASSAC CO LINE TO 0.1 MI NE OF NEW LIBERTY RD Miles = 2.46 Improvements TAMP Category STANDARD OVERLAY Est. Cost County MYP Years Past Current $450,000 POPE 1 2021-2025 $16,000 POPE 1 2021-2025 $1,000,000 SALINE 7 2021-2025 $32,000 SALINE 7 2021-2025 $750,000 FRANKLIN 2 2021-2025 $32,000 FRANKLIN 2 2021-2025 REHABILITATION - PAVEMENTS UNIONVILLE RD MASSAC CO LINE TO 0.1 MI NE OF NEW LIBERTY RD CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS WALNUT GROVE RD US 45 TO ILL 145 Miles = 5.21 STANDARD OVERLAY REHABILITATION - PAVEMENTS WALNUT GROVE RD US 45 TO ILL 145 CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS WASTENA ST ILL 37 TO S MCLEANSBORO ST Miles = 0.55 DESIGNED OVERLAY WIDENING EXISTING PAVEMENT REHABILITATION - PAVEMENTS WASTENA ST ILL 37 TO S MCLEANSBORO ST CONSTRUCTION ENGINEERING REHABILITATION - PAVEMENTS 9 - 86 FY 2020-2023 Rebuild Illinois Highway Improvement Program District 9 Local Highways Route / Street WILDERNESS RETREAT Location AT UNNAMED CREEK 2.5 MI W OF MILL CREEK Improvements TAMP Category BRIDGE REPLACEMENT Est. Cost County MYP Years Past Current $200,000 UNION 15 2020 $8,000 UNION 15 2020 $200,000 UNION 8 2021-2025 $8,000 UNION 5 2021-2025 RD RECONSTRUCTION - BRIDGES WILDERNESS RETREAT AT UNNAMED CREEK 2.5 MI W OF MILL CREEK CONSTRUCTION ENGINEERING RD RECONSTRUCTION - BRIDGES WRIGHTS CROSSING AT UNNAMED STREAM 0.5 MI N OF COBDEN BRIDGE REPLACEMENT RD RECONSTRUCTION - BRIDGES WRIGHTS CROSSING AT UNNAMED STREAM 0.5 MI N OF COBDEN CONSTRUCTION ENGINEERING RD RECONSTRUCTION - BRIDGES 9 - 87 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Statewide SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION STATEWIDE LINE ITEMS FOR HIGHWAY PROJECTS The FY 2020-2025 Proposed Highway Improvement Program includes $1.7 billion for Statewide Line Item projects. These budget line items are used to reserve funds for types of work for which the need is anticipated but exact locations or other details are not known in program development. In some cases, actual projects are identified for these line items during the course of the current fiscal year. In other cases, the funds are reserved in the later years of the program for projects to be identified in subsequent programs. A complete list is included, but as examples, the statewide projects provide funding for: • • • • • • • • • • • • • Work zone and highway safety Traffic control improvements Bridge maintenance activities Roadway-related improvements that are performed by non-state forces Emergency road and bridge repairs Federally mandated training programs and support services Economic Development Program Environmental studies Engineering for miscellaneous work statewide Railroad crossing safety projects Local Truck Access Route Program (TARP) Illinois Transportation Enhancement Program Safe Routes to School Program 0-i FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location STIC (STATE TRANSPORTATION INNOVATION COUNCIL) INCENTIVE PROGRAM Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $120,000 VARIOUS 1 2020 STATE-WIDE 1 2020 1 2021-2025 VARIOUS 1 2021-2025 $7,888,000 STATE-WIDE 1 2021-2025 $15,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ILLINOIS COMPETITIVE FREIGHT PROGRAM INTELLIGENT TRUCK PARKING AVAILABILITY INFORMATION SYSTEM MISCELLANEOUS PROJECTS $3,412,000 MISCELLANEOUS IMPROVEMENTS VARIOUS LOCAL ONLY PARTICIPATION MISCELLANEOUS PROJECTS $60,000,000 MISCELLANEOUS IMPROVEMENTS VARIOUS STIC (STATE TRANSPORTATION INNOVATION COUNCIL) INCENTIVE PROGRAM PRELIMINARY ENGINEERING $240,000 MISCELLANEOUS IMPROVEMENTS VARIOUS ILLINOIS COMPETITIVE FREIGHT PROGRAM INTELLIGENT TRUCK PARKING AVAILABILITY INFORMATION SYSTEM MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE PAINTING BRIDGE PAINTING PRESERVATION - BRIDGES 0-1 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location BRIDGE PAINTING Improvements TAMP Category BRIDGE PAINTING Est. Cost County MYP Years Past Current $30,000,000 STATE-WIDE 2 2021-2025 $10,000,000 STATE-WIDE 3 2020 $20,000,000 STATE-WIDE 1 2021-2025 $350,000 STATE-WIDE 3 2020 $700,000 STATE-WIDE 1 2021-2025 $1,212,000 STATE-WIDE 3 2020 PRESERVATION - BRIDGES VARIOUS MAJOR BRIDGE PREVENTIVE MAINTENANCE PROGRAM BRIDGE REPAIR PRESERVATION - BRIDGES VARIOUS MAJOR BRIDGE PREVENTIVE MAINTENANCE PROGRAM BRIDGE REPAIR PRESERVATION - BRIDGES VARIOUS LAND ACQUISITION VARIOUS CONSULTING TASKS P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS LAND ACQUISITION VARIOUS CONSULTING TASKS P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS VARIOUS WEIGH STATIONS WEIGH STATION REPAIRS MISCELLANEOUS IMPROVEMENTS 0-2 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location WEIGH STATIONS Improvements TAMP Category WEIGH STATION REPAIRS Est. Cost County MYP Years Past Current $2,424,000 STATE-WIDE 2 2021-2025 $4,500,000 STATE-WIDE 3 2020 $9,000,000 STATE-WIDE 2 2021-2025 $20,000,000 STATE-WIDE 3 2020 $40,000,000 STATE-WIDE 2 2021-2025 $2,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS REST AREA IMPROVEMENTS & RENOVATIONS REST AREA IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS REST AREA IMPROVEMENTS & RENOVATIONS REST AREA IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY ENGINEERING P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS 0-3 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location HIGHWAY SAFETY ENGINEERING Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $4,000,000 STATE-WIDE 2 2021-2025 $4,392,000 STATE-WIDE 3 2020 $8,784,000 STATE-WIDE 2 2021-2025 $1,125,000 STATE-WIDE 3 2020 $2,250,000 STATE-WIDE 2 2021-2025 $450,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY-RAILROAD CROSSINGS (STATE) RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY-RAILROAD CROSSINGS (STATE) RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY-RAILROAD CROSSING SURFACE IMPROVEMENTS (STATE) RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY-RAILROAD CROSSING SURFACE IMPROVEMENTS (STATE) RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS VARIOUS UNDERWATER DIVING P.E. (PHASE I) MISCELLANEOUS IMPROVEMENTS 0-4 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location UNDERWATER DIVING Improvements TAMP Category P.E. (PHASE I) Est. Cost County MYP Years Past Current $450,000 STATE-WIDE 1 2021-2025 $700,000 STATE-WIDE 3 2020 $1,400,000 STATE-WIDE 2 2021-2025 $3,400,000 STATE-WIDE 3 2020 $6,800,000 STATE-WIDE 2 2021-2025 $12,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ILLINOIS BROADBAND CONNECTIONS PROGRAM MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS ILLINOIS BROADBAND CONNECTIONS PROGRAM MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS FREEWAY SIGN MAINTENANCE SIGN MAINTENANCE MISCELLANEOUS IMPROVEMENTS VARIOUS FREEWAY SIGN MAINTENANCE SIGN MAINTENANCE MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT MARKING PAVEMENT MARKING MISCELLANEOUS IMPROVEMENTS 0-5 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location PAVEMENT MARKING County MYP Years Improvements TAMP Category Est. Cost PAVEMENT MARKING $24,000,000 STATE-WIDE 2 2021-2025 $4,000,000 STATE-WIDE 3 2020 $8,000,000 STATE-WIDE 2 2021-2025 $450,000 STATE-WIDE 3 2020 $900,000 STATE-WIDE 2 2021-2025 $150,000 STATE-WIDE 3 2020 Past Current MISCELLANEOUS IMPROVEMENTS VARIOUS RAISED PAVEMENT MARKERS RAISED PAVEMENT MARKERS MISCELLANEOUS IMPROVEMENTS VARIOUS RAISED PAVEMENT MARKERS RAISED PAVEMENT MARKERS MISCELLANEOUS IMPROVEMENTS VARIOUS DOWNSTATE SIGNAL COORDINATION & TIMING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS DOWNSTATE SIGNAL COORDINATION & TIMING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS GUARDRAIL DELINEATION MAINTENANCE GUARDRAIL MISCELLANEOUS IMPROVEMENTS 0-6 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location GUARDRAIL DELINEATION MAINTENANCE Improvements TAMP Category GUARDRAIL Est. Cost County MYP Years Past Current $300,000 STATE-WIDE 2 2021-2025 $350,000 STATE-WIDE 3 2020 $700,000 STATE-WIDE 2 2021-2025 $6,000,000 STATE-WIDE 3 2020 $12,000,000 STATE-WIDE 2 2021-2025 $500,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS TRAFFIC CONTROL MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS MISCELLANEOUS TRAFFIC CONTROL MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS WORK ZONE SAFETY (STATE POLICE HIREBACK) MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS WORK ZONE SAFETY (STATE POLICE HIREBACK) MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS VARIOUS SIGN TRUSS INSPECTION PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS 0-7 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location SIGN TRUSS INSPECTION Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $1,000,000 STATE-WIDE 2 2021-2025 $2,900,000 STATE-WIDE 3 2020 $5,800,000 STATE-WIDE 2 2021-2025 $1,700,000 STATE-WIDE 3 2020 $3,400,000 STATE-WIDE 2 2021-2025 $500,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS SIGN TRUSS REPLACEMENT & REPAIR MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS SIGN TRUSS REPLACEMENT & REPAIR MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS VEGETATION CONTROL/EMERALD ASH BORER CONTROL MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS VEGETATION CONTROL/EMERALD ASH BORER CONTROL MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS PHOTO ENFORCEMENT ACTIVITIES MISC TRAFFIC CONTROL MISCELLANEOUS IMPROVEMENTS 0-8 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location PHOTO ENFORCEMENT ACTIVITIES Improvements TAMP Category MISC TRAFFIC CONTROL Est. Cost County MYP Years Past Current $1,000,000 STATE-WIDE 2 2021-2025 $450,000 STATE-WIDE 2 2021-2025 $900,000 STATE-WIDE 3 2021-2025 $750,000 STATE-WIDE 3 2020 $1,500,000 STATE-WIDE 2 2021-2025 $1,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS DYNAMIC MESSAGE / ITS MAINTENANCE MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS DYNAMIC MESSAGE / ITS MAINTENANCE MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS MAINTENANCE OF HIGH TENSION MEDIAN CABLE BARRIER MEDIAN CABLE MISCELLANEOUS IMPROVEMENTS VARIOUS MAINTENANCE OF HIGH TENSION MEDIAN CABLE BARRIER MEDIAN CABLE MISCELLANEOUS IMPROVEMENTS VARIOUS TRAFFIC SIGNAL MAST ARM REPLACEMENT TRAF SIGNAL MODERNIZATION MISCELLANEOUS IMPROVEMENTS 0-9 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location TRAFFIC SIGNAL MAST ARM REPLACEMENT Improvements TAMP Category TRAF SIGNAL MODERNIZATION Est. Cost County MYP Years Past Current $2,000,000 STATE-WIDE 2 2021-2025 $1,000,000 STATE-WIDE 3 2020 $2,000,000 STATE-WIDE 2 2021-2025 $1,700,000 STATE-WIDE 3 2020 $3,400,000 STATE-WIDE 2 2021-2025 $625,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS HIGH MAST LIGHT TOWER REPLACEMENT LIGHTING MISCELLANEOUS IMPROVEMENTS VARIOUS HIGH MAST LIGHT TOWER REPLACEMENT LIGHTING MISCELLANEOUS IMPROVEMENTS VARIOUS BIOLOGICAL & AGRICULTURAL SURVEYS BIOLOGICAL SURVEYS AGRICULTURAL SURVEY MISCELLANEOUS IMPROVEMENTS VARIOUS BIOLOGICAL & AGRICULTURAL SURVEYS BIOLOGICAL SURVEYS AGRICULTURAL SURVEY MISCELLANEOUS IMPROVEMENTS VARIOUS HOMELAND SECURITY & TRANSPORTATION INFRASTRUCTURE PROTECTION MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 0 - 10 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location HOMELAND SECURITY & TRANSPORTATION INFRASTRUCTURE PROTECTION Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $1,250,000 STATE-WIDE 2 2021-2025 $225,000 STATE-WIDE 3 2020 $450,000 STATE-WIDE 2 2021-2025 $450,000 STATE-WIDE 3 2020 $900,000 STATE-WIDE 2 2021-2025 $3,400,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ROAD WEATHER INFORMATION SYSTEM (RWIS) MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS ROAD WEATHER INFORMATION SYSTEM (RWIS) MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS WEIGH IN MOTION DATA COLLECTION MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS WEIGH IN MOTION DATA COLLECTION MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS ARCHAEOLOGICAL & HISTORICAL SURVEYS ARCHAEOLOGICAL SURVEY HISTORICAL SURVEY MISCELLANEOUS IMPROVEMENTS 0 - 11 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location ARCHAEOLOGICAL & HISTORICAL SURVEYS Improvements TAMP Category ARCHAEOLOGICAL SURVEY HISTORICAL SURVEY Est. Cost County MYP Years Past Current $6,800,000 STATE-WIDE 2 2021-2025 $2,740,000 STATE-WIDE 3 2020 $5,480,000 STATE-WIDE 2 2021-2025 $5,600,000 STATE-WIDE 3 2020 $11,200,000 STATE-WIDE 2 2021-2025 $500,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS HAZARDOUS MATERIAL STUDIES (PHASE I) HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS HAZARDOUS MATERIAL STUDIES (PHASE I) HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS HAZARDOUS MATERIAL SURVEYS (PHASE II) HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS HAZARDOUS MATERIAL SURVEYS (PHASE II) HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS POLLINATOR HABITAT RESTORATION & PRESERVATION MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 0 - 12 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location POLLINATOR HABITAT RESTORATION & PRESERVATION Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $1,000,000 STATE-WIDE 2 2021-2025 $325,000 STATE-WIDE 3 2020 $650,000 STATE-WIDE 2 2021-2025 $1,700,000 STATE-WIDE 3 2020 $3,400,000 STATE-WIDE 2 2021-2025 $250,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS AERIAL SURVEYS PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS AERIAL SURVEYS PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS WETLAND SURVEYS P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS WETLAND SURVEYS P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS WETLAND MONITORING PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS 0 - 13 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location WETLAND MONITORING Improvements TAMP Category PRELIMINARY ENGINEERING Est. Cost County MYP Years Past Current $500,000 STATE-WIDE 2 2021-2025 $75,000 STATE-WIDE 3 2020 $150,000 STATE-WIDE 2 2021-2025 $1,125,000 STATE-WIDE 3 2020 $2,250,000 STATE-WIDE 2 2021-2025 $7,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS NOISE ANALYSIS CONSULTANT PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS NOISE ANALYSIS CONSULTANT PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS ENGINEERING TASKS IN CENTRAL OFFICE PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS VARIOUS ENGINEERING TASKS IN CENTRAL OFFICE PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS EQUAL EMPLOYMENT OPPORTUNITY TRAINING MISCELLANEOUS IMPROVEMENTS 0 - 14 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location EQUAL EMPLOYMENT OPPORTUNITY Improvements TAMP Category TRAINING Est. Cost County MYP Years Past Current $14,000,000 STATE-WIDE 2 2021-2025 $150,000 STATE-WIDE 3 2020 $300,000 VARIOUS 2 2020 $400,000 STATE-WIDE 2 2021-2025 $600,000 VARIOUS 2 2021-2025 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS ASBESTOS INSPECTION HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS OPERATIONS VARIOUS CONSULTING TASKS P.E. (CONSULTANT TSL) MISCELLANEOUS IMPROVEMENTS VARIOUS ASBESTOS INSPECTION HAZARDOUS MATERIAL PE MISCELLANEOUS IMPROVEMENTS VARIOUS OPERATIONS VARIOUS CONSULTING TASKS P.E. (CONSULTANT TSL) MISCELLANEOUS IMPROVEMENTS VARIOUS OUTDOOR ADVERTISING CONTROL CONSULTANT P.E. PROJECT MANAGERS MISCELLANEOUS IMPROVEMENTS 0 - 15 $2,400,000 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location OUTDOOR ADVERTISING CONTROL CONSULTANT Improvements TAMP Category P.E. PROJECT MANAGERS Est. Cost County MYP Years Past Current $4,800,000 STATE-WIDE 1 2021-2025 $1,800,000 STATE-WIDE 3 2020 $1,800,000 STATE-WIDE 1 2021-2025 $500,000 STATE-WIDE 3 2020 $1,000,000 STATE-WIDE 2 2021-2025 $5,000,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE PAINTING ENGINEERING PRELIMINARY ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE PAINTING ENGINEERING PRELIMINARY ENGINEERING CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE FABRICATION INSPECTION CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE FABRICATION INSPECTION CONSTRUCTION ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BRIDGE PROJECTS MISCELLANEOUS (P.E. II) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS 0 - 16 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location BRIDGE PROJECTS MISCELLANEOUS (P.E. II) Improvements TAMP Category P.E. (PHASE II) Est. Cost County MYP Years Past Current $10,000,000 STATE-WIDE 2 2021-2025 $375,000 STATE-WIDE 3 2020 $750,000 STATE-WIDE 2 2021-2025 $750,000 STATE-WIDE 3 2020 $1,500,000 STATE-WIDE 2 2021-2025 $900,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS QUALITY REVIEW OF ILL ROADWAY INFORMATION SYSTEM DATA (FORMERLY DEV OF TAMP) CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS VARIOUS QUALITY REVIEW OF ILL ROADWAY INFORMATION SYSTEM DATA CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS VARIOUS ENGINEERING SERVICES FOR BUREAU OF RESEARCH PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ENGINEERING SERVICES FOR BUREAU OF RESEARCH PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS PAVEMENT TESTING, ENGINEERING EVALUATIONS & PERFORMANCE MONITORING CE QA/MATERIALS TESTING MISCELLANEOUS IMPROVEMENTS 0 - 17 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location PAVEMENT TESTING, ENGINEERING EVALUATIONS & PERFORMANCE MONITORING Improvements TAMP Category CE QA/MATERIALS TESTING Est. Cost County MYP Years Past Current $1,800,000 STATE-WIDE 2 2021-2025 $42,000,000 STATE-WIDE 3 2020 $67,950,000 STATE-WIDE 1 2020 $210,000,000 STATE-WIDE 2 2021-2025 $832,050,000 STATE-WIDE 1 2021-2025 $44,500,000 STATE-WIDE 3 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS RESERVE FOR EMERGENCIES & OTHER HIGHWAY NEEDS EMERGENCY RESERVE MISCELLANEOUS IMPROVEMENTS VARIOUS CHANGE ORDER RESERVE MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS RESERVE FOR EMERGENCIES & OTHER HIGHWAY NEEDS EMERGENCY RESERVE MISCELLANEOUS IMPROVEMENTS VARIOUS CHANGE ORDER RESERVE MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS VARIOUS CONTRACT MAINTENANCE CONTRACT MAINTENANCE STANDARD OVERLAY MAINTENANCE - PAVEMENTS 0 - 18 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location CONTRACT MAINTENANCE Improvements TAMP Category CONTRACT MAINTENANCE STANDARD OVERLAY Est. Cost County MYP Years Past Current $89,000,000 STATE-WIDE 2 2021-2025 $18,000,000 STATE-WIDE 4 2020 $54,000,000 STATE-WIDE 3 2021-2025 $57,345,000 STATE-WIDE 4 2020 $146,298,000 STATE-WIDE 3 2021-2025 $3,000,000 STATE-WIDE 4 2020 MAINTENANCE - PAVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS (LOCAL) SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS (LOCAL) SAFETY IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS VARIOUS ENHANCEMENT PROJECTS (LOCAL) MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS ENHANCEMENT PROJECTS (LOCAL) MISCELLANEOUS PROJECTS MISCELLANEOUS IMPROVEMENTS VARIOUS SAFE ROUTES TO SCHOOLS PROGRAM MISCELLANEOUS MISCELLANEOUS IMPROVEMENTS 0 - 19 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location SAFE ROUTES TO SCHOOLS PROGRAM Improvements TAMP Category MISCELLANEOUS Est. Cost County MYP Years Past Current $9,000,000 STATE-WIDE 3 2021-2025 $5,400,000 STATE-WIDE 4 2020 $16,200,000 STATE-WIDE 3 2021-2025 $600,000 STATE-WIDE 4 2020 $1,800,000 STATE-WIDE 3 2021-2025 $8,900,000 STATE-WIDE 4 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS STATE PARK PROJECTS PAVING MISCELLANEOUS IMPROVEMENTS VARIOUS STATE PARK PROJECTS PAVING MISCELLANEOUS IMPROVEMENTS VARIOUS STATE PARK PROJECTS P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS STATE PARK PROJECTS P.E. (PHASE I) P.E. (PHASE II) MISCELLANEOUS IMPROVEMENTS VARIOUS HIGHWAY-RAILROAD CROSSINGS (LOCAL) RR CROSSING IMPROVEMENT MISCELLANEOUS IMPROVEMENTS 0 - 20 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location HIGHWAY-RAILROAD CROSSINGS (LOCAL) Improvements TAMP Category RR CROSSING IMPROVEMENT Est. Cost County MYP Years Past Current $22,078,000 STATE-WIDE 3 2021-2025 $7,000,000 STATE-WIDE 4 2020 $16,500,000 STATE-WIDE 3 2021-2025 $500,000 STATE-WIDE 4 2020 $154,000 STATE-WIDE 3 2021-2025 $700,000 STATE-WIDE 4 2020 MISCELLANEOUS IMPROVEMENTS VARIOUS LOCAL TRUCK ACCESS ROUTE PROGRAM (TARP) MISCELLANEOUS REHABILITATION - PAVEMENTS VARIOUS LOCAL TRUCK ACCESS ROUTE PROGRAM (TARP) MISCELLANEOUS REHABILITATION - PAVEMENTS VARIOUS BLR&S MANUAL UPDATE & VARIOUS ENGINEERING TASKS PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS BLR&S MANUAL UPDATE & VARIOUS ENGINEERING TASKS PRELIMINARY ENGINEERING MISCELLANEOUS IMPROVEMENTS VARIOUS ENVIRONMENTAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS 0 - 21 FY 2020-2025 Rebuild Illinois Highway Improvement Program Statewide Route / Street VARIOUS Location ENVIRONMENTAL SURVEYS FOR LOCAL AGENCIES Improvements TAMP Category P.E. SURVEYS (PHASE I) Est. Cost County MYP Years Past Current $2,100,000 STATE-WIDE 1 2021-2025 $1,700,000 STATE-WIDE 4 2020 $5,100,000 STATE-WIDE 3 2021-2025 $15,000,000 STATE-WIDE 4 2020 $34,000,000 STATE-WIDE 3 2021-2025 MISCELLANEOUS IMPROVEMENTS VARIOUS ARCHAEOLOGICAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS ARCHAEOLOGICAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) MISCELLANEOUS IMPROVEMENTS VARIOUS ECONOMIC DEVELOPMENT PROJECTS (LOCAL) NEW CONSTRUCTION RECONSTRUCTION MISCELLANEOUS IMPROVEMENTS VARIOUS ECONOMIC DEVELOPMENT PROJECTS (LOCAL) NEW CONSTRUCTION RECONSTRUCTION MISCELLANEOUS IMPROVEMENTS 0 - 22