Report 04/0 1/2.0 1 9 • Gulf Power· April1, 2019 Mr. Adam Teitzman, Commission Clerk Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee FL 32399-0870 Re: 2019 Ten Year Site Plan Dear Ms. Stauffer: Attached for electronic filing is Gulf Power Company's 2019 Ten Year Site Plan filed pursuant to FPSC Rule No. 25-22.071. Sincerely, C. Shane Boyett Regulatory Issues Manager md Attachments cc: Florida Public Service Commission Adam Teitzman, Office of the Commission Clerk (1 0 copies) Gulf Power Company Russell Badders, Esq., VP & Associate General Counsel Gulf Power Company One Energy Place. Pensacola. Florida 32520 7(1 <($5 6,7( 3/$1 )25 (/(&75,& *(1(5$7,1* )$&,/,7,(6 $1' $662&,$7(' 75$160,66,21 /,1(6 $35,/ *8/) 32:(5 &203$1< 7(1 <($5 6,7( 3/$1 )25 (/(&75,& *(1(5$7,1* )$&,/,7,(6 $1' $662&,$7(' 75$160,66,21 /,1(6 6XEPLWWHG 7R 7KH 6WDWH RI )ORULGD 3XEOLF 6HUYLFH &RPPLVVLRQ $35,/ TABLE OF CONTENTS Page 1 EXECUTIVE SUMMARY CHAPTER I Schedule 1 CHAPTER II DESCRIPTION OF EXISTING FACILITIES Description of Existing Facilities 5 Existing Generating Facilities 7 Gulf System Map 9 FORECAST OF ELECTRIC POWER DEMAND AND ENERGY CONSUMPTION Forecasting Methodology Overview 10 I. Assumptions 11 II. Customer Forecast 14 III. Energy Sales Forecast 15 IV. Peak Demand Forecast 18 V. Data Sources 19 VI. Conservation Programs 20 VII. Small Power Production/ Renewable Energy 27 Schedule 2.1 History and Forecast of Energy Consumption and Number of Customers by Customer Class 28 Schedule 2.2 History and Forecast of Energy Consumption and Number of Customers by Customer Class 29 i Page Schedule 2.3 History and Forecast of Energy Consumption and Number of Customers by Customer Class 30 Schedule 3.1 History and Forecast of Summer Peak Demand 31 Schedule 3.2 History and Forecast of Winter Peak Demand 32 Schedule 3.3 History and Forecast of Annual Net Energy for Load 33 Schedule 4 Previous Year Actual and Two-Year Forecast of Peak Demand and Net Energy for Load by Month 34 Schedule 5 Fuel Requirements 35 Schedule 6.1 Energy Sources - GWH 36 Schedule 6.2 Energy Sources - % of NEL 37 CHAPTER III PLANNING ASSUMPTIONS AND PROCESSES Integrated Resource Planning Process Transmission Planning Process Fuel Price Forecast Process 38 41 42 Fuel Price Forecasts 42 Generic Fuel Forecast 43 Natural Gas Prices 43 Natural Gas Price Outlook 44 Coal Price Outlook 45 ii Page CHAPTER IV Environmental Compliance 48 Availability of System Interchange 62 Off-System Sales 62 FORECAST OF FACILITIES REQUIREMENTS Capacity Resource Alternatives 64 Renewable Resources 65 Renewable Energy Sources 68 Preferred and Potential Sites for Capacity Additions 69 Schedule 7.1 Forecast of Capacity, Demand, and Scheduled Maintenance at Time Of Summer Peak 72 Schedule 7.2 Forecast of Capacity, Demand, and Scheduled Maintenance at Time Of Winter Peak 73 Schedule 8 Planned and Prospective Generating Facility Additions and Changes 74 Schedule 9 Status Report and Specifications of Proposed Generating Facilities 75 Schedule 10 Status Report and Specifications of Proposed Directly Associated Transmission Lines 76 Schedule 6.3 iii This page is intentionally blank. *8/) 32:(5 &203$1< 7(1 <($5 6,7( 3/$1 ([HFXWLYH 6XPPDU\ 7KH *XOI 3RZHU &RPSDQ\ *XOI 3RZHU *XOI RU &RPSDQ\ 7HQ