September 11, 2020 Benefits of Retiring Logan and Chambers Coal-fired Power Plants Prepared for: Starwood Energy Group Global, LLC PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 2 Table of Contents Executive Summary .................................................................................................................................................................... 3 Introduction ................................................................................................................................................................................ 5 Logan and Chambers Coal-fired Power Plants .......................................................................................................................... 5 Overview of CO2 Reduction Measures and Costs in PJM............................................................................................................ 7 CO2 Emission Rates and Reduction Measures in PJM ........................................................................................................... 7 Nuclear ................................................................................................................................................................................... 8 Offshore Wind ......................................................................................................................................................................... 8 Solar ........................................................................................................................................................................................ 9 Comparative Analysis of CO2 Emissions Reduction Costs .................................................................................................... 9 Logan and Chambers Retirements ........................................................................................................................................... 10 Value Proposition: Environmental and Ratepayer Impacts................................................................................................ 10 Other Benefits ...................................................................................................................................................................... 12 RGGI Benefits ................................................................................................................................................................... 12 Sites Redevelopment Opportunities .............................................................................................................................. 12 Avoidance of Externalities ............................................................................................................................................... 13 Summary Findings .................................................................................................................................................................... 13 Appendix A: Logan and Chambers Operations and Emissions ................................................................................................ 15 Appendix B: Summary of Comparative Analysis ...................................................................................................................... 16 Glossary ..................................................................................................................................................................................... 17 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 3 Executive Summary FTI Consulting, Inc. (“FTI”) was retained by Starwood Energy Group Global, LLC (“Starwood”) to assess the CO2 reduction cost savings that would occur if two Starwood-owned coal-fired plants in New Jersey, Logan and Chambers — located in Logan Township and Carneys Point Township, respectively — were to be retired (“L&C Retirements”) prior to the expiration of their Power Purchase Agreements (“PPAs”) with Atlantic City Electric Company (“ACE” or “PPA Counterparty”) in 2024. In addition to CO2 emissions avoidance and other benefits of the proposed retirements, Starwood would pay the PPA Counterparty $7.5 million to retire both plants by the end of 2020, with the PPA obligations to be fulfilled with replacement power and capacity from the PJM wholesale market for the remaining term at the same economic cost to ACE as under the existing PPAs. FTI’s analysis concludes that the proposed L&C Retirements would result in avoided net CO2 emissions of 3.9 million tons, which is calculated by subtracting replacement power emissions from the estimated L&C gross emissions during 2021-2024. To put this in perspective, a reduction of 3.9 million tons of CO2 is equivalent to taking 762,419 passenger vehicles off the road for one year in New Jersey. 1 This represents a meaningful step in progressing towards New Jersey’s goal of cutting CO2 emission by 80 percent compared to 2006 levels. 2 Further, by achieving the net CO2 reductions through the L&C Retirements rather than through alternative programs, New Jersey ratepayers would have cost savings ranging from $98 million to $932 million during 2021-2024, as shown in Figure ES-1. In addition, the L&C Retirements would provide the optionality to explore potential site redevelopment opportunities for solar, battery, or offshore wind interconnections, which are aligned with goals set in New Jersey’s 2019 Energy Master Plan. 3 The Starwood offer eliminates other externalities that would otherwise occur along the coal value chain, but are not explicitly captured in the price of electricity. Based on United States Environmental Protection Agency’s estimates, a typical passenger vehicle emits about 4.6 metric tons of CO2 per year, https://www.epa.gov/greenvehicles/greenhouse-gas-emissions-typical-passenger-vehicle. 2 The New Jersey Global Warming Response Act of 2007 (GWRA), N.J.S.A. 26:2C-37. 3 State of New Jersey, 2019 Energy Master Plan, https://nj.gov/emp/docs/pdf/2020_NJBPU_EMP.pdf. 1 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 4 Figure ES-1: Summary of Starwood Offer Impacts Through 2024 The ratepayer impacts are assessed by comparing the potential CO2 reduction cost savings associated with L&C Retirements to other state-level CO2 reduction programs that incentivize the continued development and operation of carbon-free generation resources. The alternative programs evaluated include the Zero Emission Certificate (“ZEC”) program for nuclear generation resources, the Offshore Wind Renewable Energy Certificate (“OREC”) program, and the Transition Renewable Energy Certificates (“TRECs”) program for solar in New Jersey. 4, 5, 6 The alternative CO2 reduction programs have shown a wide range of costs to ratepayers: $24 per ton as implied by New Jersey ZECs, $75 per ton as implied by the New Jersey ORECs, and $240 per ton as implied by the New Jersey TRECs, as shown in Figure ES-2. In comparison, the L&C Retirements have an estimated $2 per ton benefit (i.e., the opposite of a cost) to ratepayers enabled by the $7.5 million payment from Starwood.7 Figure ES-1: Comparative CO2 Emission Reduction Costs Note: The L&C Retirements direct savings are calculated by dividing the negative of Starwood’s payment of $7.5 million by the avoided net CO2 emissions of 3.9 million tons. The NJ ZEC cost is based on NJBPU awards and is converted from $/MWh to $/ton at the 2019 average PJM CO2 emission rates. The NJ offshore wind credit is calculated based on NJBPU’s net cost of OREC at $46.46/MWh (in 2019 dollars) with 2 percent escalation. The NJ TREC is based on NJBPU order in 2020. Both NJ OREC and TREC are converted at the PJM 2019 marginal onpeak emission rate. https://nj.gov/bpu/newsroom/2018/approved/20181119.html https://www.njcleanenergy.com/renewable-energy/programs/solar-renewable-energy-certificates-srec/new-jersey-solar-renewable-energy 6 https://www.nj.gov/dep/aqes/offshorewind.html#:~:text=On%20November%2019%2C%202019%20Governor,than%20double%20the%20initial%20goal 7 The L&C Retirements direct savings are calculated by dividing the negative of Starwood’s payment of $7.5 million by the avoided net CO2 emissions of 3.9 million tons. 4 5 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 5 Introduction FTI Consulting, Inc. was retained by Starwood Energy Group Global, LLC (“Starwood”) to assess the CO2 reduction cost savings that would occur if two Starwood-owned coal plants — Logan and Chambers — located in New Jersey were to retire by the end of 2020 (“L&C Retirements”) as originally proposed. Logan and Chambers each operates under a longterm PPA with ACE. Starwood would pay the PPA Counterparty $7.5 million to retire both plants by the end of 2020, with the PPA obligations to be fulfilled with replacement power and capacity from the PJM wholesale market for the remaining term and for the same economic cost to ACE as under the existing PPAs. FTI’s analysis compares the cost of CO2 reduction associated with the proposed retirement of Logan and Chambers to the cost of achieving the same amount of CO2 reduction under other state programs designed to reduce CO2 emissions by incentivizing the continued development and operation of carbon-free generation resources.8 The alternative CO2 reduction programs evaluated include: ■ Zero Emission Certificate (“ZEC”) for nuclear generation resources in New Jersey ■ Offshore Wind Renewable Energy Certificate (“OREC”) program in New Jersey ■ Transition Renewable Energy Certificates (“TRECs”) program for solar in New Jersey The following sections of the white paper examine and compare the costs borne by ratepayers to achieve the same amount of net CO2 reductions under each alternative, as well as the environmental, social, and economic benefits of the L&C Retirements. Logan and Chambers Coal-fired Power Plants The Logan and Chambers coal-fired power plants were placed in service in 1994, interconnecting to the PJM market. Both plants were built as “qualifying facilities” under the Public Utility Regulatory Policies Act (“PURPA”) given their cogeneration characteristics — they sell steam and electricity to two industrial counterparties.9 Logan is located in Logan Township, Gloucester County, and has an operating capacity of 219 megawatts (“MW”). It is 100 percent owned by Starwood and has a 30-year PPA with ACE that expires in December 2024. ACE is a wholly owned subsidiary of Exelon Corporation. Chambers is located in Carneys Point Township, Salem County, and has an operating capacity of 262 MW. It is jointly owned by Starwood and Atlantic Power Corp. and has a 30-year PPA with ACE that expires in March 2024. Table 1 summarizes the ownership structure and PPA terms of both plants. This study focuses on the CO2 emissions, though L&C Retirements will also have a disproportionately high concentration of other environmental benefits such as sulfur dioxide (SO2) and nitrogen oxide (NOx) emission reductions. 9 https://www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/other-regulatory-efforts/public 8 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 6 Table 1: Logan and Chambers Ownership and PPA Summary Ownership Starwood Energy Starwood Energy Atlantic Power Corporation Percentage 100% 60% 40% PPA Counterparty Atlantic City Electric Company Atlantic City Electric Company Start Dec 1994 Mar 1994 Logan Chambers Logan Chambers End Dec 2024 Mar 2024 Term (Years) 30 30 PPA Capacity (MW) 200 184 Source: Starwood As shown in Figure 1, in 2019, Logan and Chambers ran 25 percent and 27 percent of the time, respectively, slightly above the minimum take obligations of 50 MW for Logan and 46 MW for Chambers, per the PPAs’ terms. Those contractual minimum take obligations set a practical floor on the projected generation levels of both plants through to the expiration of the PPAs and serve as the basis for a conservative assumption of future production for both plants. Figure 1: Logan and Chambers Annual Capacity Factor During 2010-2019 100.00 90.00 Capacity Factor (%) 80.00 Logan, 55.67 70.00 60.00 50.00 Chambers, 26.56 40.00 30.00 20.00 Chambers, 51.58 Logan, 25.17 10.00 0.00 2010 2012 2014 2016 2018 Source: Starwood Table 2 summarizes the key operating parameters for Logan and Chambers in 2019. Logan and Chambers collectively emitted 1.67 million tons of CO2 in 2019, representing approximately 8 percent of total greenhouse gas emissions from the power sector in New Jersey.10 Retiring both plants by the end of 2020 will cease their operations and their carbon emissions. This is significant, especially considering that New Jersey’s average CO2 emissions in 2019 have increased from 2018 levels, according to a PJM report.11 10 11 State of New Jersey, Department of Environmental Protection, 2018 Statewide Greenhouse Gas Emissions Inventory. PJM, 2019 New Jersey State Infrastructure Report, page 4, https://www.pjm.com/-/media/library/reports-notices/state-specific-reports/2019/2019-new-jersey-stateinfrastructure-report.ashx?la=en. PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 7 Table 2: Logan and Chambers Operation and Emission Profiles in 2019 Logan Chambers Total Capacity MW 219 262 481 Net Generation MWh 482,817 554,931 1,037,748 Capacity Factor % 25% 27% Generation Costs $/MWh 79 108 Heat Rate Btu/KWh 12,290 13,700 CO2 Emission tons 680,064 985,119 1,665,183 Source: Starwood Overview of CO2 Reduction Measures and Costs in PJM CO2 Emission Rates and Reduction Measures in PJM Federal and state policies, regulations, legislation and subsidies have made significant impacts across the PJM footprint of 13 states and the District of Columbia. CO2 emission rates in PJM have steadily declined, reaching a system average rate of 851 pounds per megawatt hour (“lbs/MWh”) in 2019, as shown in Figure 2, compared to 1,014 lbs/MWh in 2015. The decline in the emissions rate is a result of several factors, including the retirements of aging coal plants and the significant growth in the contribution from renewable resources. Figure 2: PJM Marginal and Average CO2 Emission Rates 2,000 lbs/MWh 1,500 1,647 1,657 1,374 1,539 1,540 1,000 1,374 1,337 1,268 1,254 1,171 1,014 992 948 888 851 2015 2016 2017 2018 2019 500 Marginal On-Peak Marginal Off-Peak System Average Source: PJM 2015–2019 CO2, SO2 and NOX Emission Rates Federal production tax credits and investment tax credits for renewables have acted as significant drivers of renewable additions in PJM. State-level legislative programs in PJM states, such as Renewable Portfolio Standards (“RPS”), have also driven renewable additions through the issuance of Renewable Energy Credits (“RECs”). States have pursued further emissions reductions through mandated clean energy goals. To meet these goals in the power sector, some PJM states have created incentive programs that have: (1) allowed certain nuclear plants to remain in operation by receiving an additional revenue stream; (2) developed offshore wind targets and funding programs; and (3) set solar carve-outs within the RPS goals. PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 8 Nuclear In PJM, nuclear power generation facilities are not RPS-qualifying resources and therefore are ineligible to receive RECs. Some PJM states, such as Ohio, New Jersey and Illinois, have established ZEC procurement mechanisms to recognize the environmental attributes of nuclear as a major source of power with no CO2 emissions, thereby preserving economically at-risk nuclear generation facilities. New Jersey established its ZEC program to maintain the state’s nuclear fleet. The New Jersey ZEC represents the “fuel diversity, air quality, and other environmental attributes of one MWh of electricity generated by an eligible nuclear power plant selected by the New Jersey Board of Public Utilities (“NJBPU”) to participate in the program.”12 In April 2019, NJBPU awarded three-year ZECs valued at up to $300 million annually to the 1,291-MW Hope Creek and 2,340-MW Salem (unit 1 and 2) nuclear generating stations.13 The initial eligibility period ran from April 18, 2019 through May 31, 2019, plus an additional three energy years, from June 1, 2019 through May 31, 2022.14 The state’s electric distribution companies — Atlantic City Electric Company, Jersey Central Power & Light Company, Public Service Electric and Gas Company, Rockland Electric Company, and Butler Electric Utility — are authorized to collect a statutorily mandated rate of $0.004 per kilowatt hour from the retail customers to fund ZEC payments. Eligible nuclear units are selected until the combined nuclear procurement reaches 40 percent of the total retail sales. As such, the New Jersey ZEC is valued at $10 per MWh.15 Offshore Wind New Jersey plans to procure 7.5 GW of offshore wind (“OSW”) by 2035, a goal that, if realized, would contribute to approximately 50 percent of the state’s electricity needs.16 The NJBPU manages the Offshore Wind Renewable Energy Certificate (“OREC”) program, which grants OSW projects the right to sell, and electric power suppliers the obligation to buy, the ORECs generated by the OSW project. The all-in OREC prices include energy, capacity, and environmental attributes of electricity. In 2019, as result of the state’s first solicitation, NJBPU awarded Ørsted for the 1.1 GW Ocean Wind project, which offers a first-year OREC price at $98.10 per MWh in 2024, when the first project is expected to be operational, and a levelized OREC price of $116.82 per MWh. The levelized OREC cost, net of expected energy and capacity revenues, is estimated at $46.46 per MWh.17 NJBPU, https://www.bpu.state.nj.us/bpu/pdf/boardorders/2019/20190710/7-10-19-9C.pdf, pages 1-2. Hope Creek is 100 percent owned by PSEG Nuclear LLC. Salem Unit 1 and 2 are jointly owned by PSEG Nuclear LLC (57.41 percent ownership interest) and Exelon Generation Company LLC (42.59 percent ownership). 14 NJBPU, https://www.bpu.state.nj.us/bpu/pdf/boardorders/2019/20190710/7-10-19-9C.pdf, page 4. 15 NJBPU, https://www.nj.gov/rpa/docs/EO18080899_ZEC_Chang_Fagan_Certification_REDACTED.pdf. 16 State of New Jersey, “Governor Murphy Signs Executive Order to Increase Offshore Wind Goal to 7,500 Megawatts by 2035” https://www.nj.gov/governor/news/news/562019/20191119b.shtml. 17 NJBPU, Docket No. Q018121289, https://www.state.nj.us/bpu/pdf/boardorders/2019/20190621/6-21-19-8D.pdf. 12 13 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 9 Solar New Jersey’s Energy Master Plan recommends that New Jersey install 12.2 GW of solar by 2030 and 17.2 GW by 2035, and that in-state solar provide 34 percent of the state’s energy mix by 2050.18 New Jersey has administered the Solar Renewable Energy Certificate (“SREC”) program since 2004, which has transitioned to the Transition Renewable Energy Certificates (“TRECs”) program in 2020. New Jersey’s RPS requires load-serving entities to procure 50 percent of the electricity from renewable sources by 2030, with a solar carve-out of 5.1 percent by 2021. The SREC program allows solar projects to generate an SREC for each MWh of solar power produced. Load-serving entities must purchase enough SRECs to meet their solar carve-out requirement either through direct purchases or trading of SRECs. In 2019, the SREC program incentivized record-setting solar installations of 447 DC MW.19 In 2020, upon attaining the 5.1 percent milestone goal, NJBPU directed the closing out of the SREC program and the creation of a transition incentive program, which is composed of fixed-price, factorized TRECs. New Jersey offers a fixed compensation of $152 per TREC (one MWh of production of utility-scale solar) for each year of an eligible project’s 15year Transition Incentive Qualification Life, which is 15 years following the commencement of commercial operations.20 After the 15 years, projects may be eligible for a New Jersey Class I REC, incurring potential additional ratepayer costs.21 Comparative Analysis of CO2 Emissions Reduction Costs In summary, states have used a range of programs to reduce CO2 emissions. The CO2 emissions reduction costs have shown a wide range of costs of reducing the same amount of CO2 as would result from the retirements: $24 per ton for New Jersey ZEC, $75 per ton for the New Jersey ORECs, and $240 per ton for the New Jersey TRECs, as shown in Figure 3. Table 3 summarizes the alternative CO2 reduction program costs. In comparison, to achieve the same reductions, the Logan and Chambers retirements have an estimated $2 per ton benefit (i.e., the opposite of a cost) to ratepayers enabled by the $7.5 million payment from Starwood, in addition to avoided CO2 emission reduction costs ranging from $24 per ton to $240 per ton, based on the costs of alternative programs that are currently in place in New Jersey. State of New Jersey, 2019 New Jersey Energy Master Plan, page 124 and Figure 16, https://www.nj.gov/emp/docs/pdf/2020_NJBPU_EMP.pdf. NJBPU, “NJBPU Announces Record-Setting Year for Solar Installations in New Jersey,” https://www.state.nj.us/bpu/pdf/2019%20Solar%20Record%20Press%20Release_FINAL_032020.pdf. 20 NJBPU, Docket No. QO19010068, https://www.bpu.state.nj.us/bpu/pdf/boardorders/2020/20200309/3-9-20-8H.pdf. 21 PJM-EIS describes the New Jersey Class I REC category as follows: “Renewable sources include solar technologies, photovoltaic technologies, wind energy, fuel cells powered by renewable fuels, geothermal technologies, wave or tidal action, methane gas from landfills, or a biomass facility, provided that the biomass is cultivated and harvested in a sustainable manner. As a result of S.B. 1925, Class I renewable energy also includes hydroelectric facilities of 3 MW or less that are located in NJ and placed in service after July 23, 2012 (the effective date of S.B. 1925).” https://www.pjm-eis.com/program-information/new-jersey.aspx. 18 19 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 10 Figure 3: Comparative CO2 Emission Reduction Costs Note: The L&C Retirements savings are calculated by dividing the negative of Starwood’s $7.5 million payment by the avoided CO2 emissions of 3.9 million tons. The NJ ZEC cost is based on NJBPU ZEC awards and is converted from $/MWh to $/ton based on 2019 average PJM CO2 emission rates. NJ offshore wind credit is calculated based on NJBPU’s net cost of OREC at $46.46 (in 2019 dollars) with 2 percent escalation. The NJ TREC is based on NJBPU order in 2020. The NJ SREC is based on the New Jersey SREC Trading Statistics Energy Year 2020 (July 2019 – June 2020). The NJ OREC, TREC, and SREC are converted from $/MWh to $/ton at the PJM 2019 marginal on-peak emission rate. Table 3: New Jersey CO2 Reduction Programs Costs CO2 Reduction Programs Term Estimated Costs ($ million) Estimated Production (GWh) NJ ZEC 2019-2021 $900 90,000 NJ OREC 2024-2045 $6,199 97,096 NJ SREC EY 2020 $725 3,429 NJ TREC EY 2021 $521 3,429 Note: The NJ ZEC costs are based on $300 million per year for three years, which could potentially be re-applied for another three years. The NJ OREC costs account for the awarded contract, not including the ongoing and future solicitations. The NJ SREC costs are based on traded SRECS in Energy Year 2020 (July 2019 – June 2020). The NJ TREC program costs for EY 2021 are estimated assuming the same volume as NJ SERC for EY 2020. Logan and Chambers Retirements Value Proposition: Environmental and Ratepayer Impacts In addition to the avoidance of CO2 emissions and other intangible benefits of retirement, Starwood would pay $7.5 million in total to the PPA Counterparty to retire both plants by the end of 2020, while the PPA obligations would continue to be fulfilled with replacement power and capacity from the PJM wholesale market for the remaining term and for the same economic cost to ACE as under the existing PPAs. The value proposition of Starwood’s offer can be summarized through the following environmental and economic metrics: ■ Elimination of 5.3 million tons of gross CO2 emissions from 2021 to 2024 (line 2 in Table 4). The gross CO2 emissions for Logan and Chambers through the expiration of their respective PPAs are calculated assuming that both plants operate at the contractual minimum take levels of their respective PPAs and using 2019 monthly emission rates as a proxy for their go-forward emission rates.22 ■ Avoided net CO2 emissions of 3.9 million tons (line 4 in Table 4), which are the gross CO2 emissions of 5.3 million tons, net of the emissions of PJM replacement power, assumed at PJM 2019 average monthly CO2 emission rates. To put this in perspective, reduction of 3.9 million tons of CO2 is equivalent to taking 762,419 passenger vehicles PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 11 off the road for one year in New Jersey.23 This represents a meaningful step in progressing towards New Jersey’s goal of cutting CO2 emissions by 80 percent compared to 2006 levels.24 ■ Avoided CO2 emissions costs range from $91 million to $925 million (line 6 in Table 4). This is calculated by multiplying the avoided net CO2 emissions of 3.9 million tons by the respective CO2 reduction costs in $/ton for New Jersey ZEC, OREC and TREC (line 5 in Table 4) to derive the total costs for each alternative to achieve the same amount of CO2 reduction. ■ $7.5 million incremental ratepayer benefit created by Starwood’s proposed payment to the PPA Counterparty to be passed on to ratepayers (line 7 in Table 4). For the same amount of CO2 reduction, Starwood’s offer of L&C Retirements and payment of $7.5 million would translate into an estimated benefit of approximately $2 per ton of avoided CO2 emissions.25 ■ Estimated ratepayer cost savings of $25 to $242 per ton for L&C Retirements. Retiring Logan and Chambers by the end of 2020 would lead to 3.9 million net tons of avoided CO2 emissions through 2024 (line 5 in Table 4). Offsetting the same level of CO2 emissions using other programs would cost New Jersey ratepayers $91 million to $925 million (line 6 in Table 4). When considering the benefit payment of $7.5 million that would go back to ratepayers (line 7 in Table 4), the full opportunity cost of achieving the reductions through the retirements versus the alternative programs would be $98 million to $932 million (line 8 in Table 4), or $25 to $242 per ton (line 9 in Table 4). The projected ratepayer cost savings as summarized in Table 4 are conservative, due to the following key assumptions applied in the analysis. ■ Generation at minimum take levels of the PPAs for both plants. If either power plant is dispatched during peak periods in excess of these minimum levels — as has been observed historically — and ends up running at higher capacity factors, the CO2 emissions will be higher than estimated. ■ Flat emission rate for PJM replacement power. In reality, the PJM system-average CO2 emission rates have shown a steady decline year-over-year from 2015 to 2019, as shown in Figure 2 — a trend that is likely to persist due to continued addition of renewables and retirement of coal resources. If we assume a declining emission rate for PJM replacement power in the analysis, the avoided CO2 emission will be higher, because the offset associated with emissions from replacement power will be lower. ■ No operations after the PPAs’ expiration. Our analysis assumed that both plants will not operate beyond the PPAs’ expiration dates, although both plants are permitted to operate until the end of their useful lives — which could be at least an additional 10 years after 2024. The recent operating performance of the plants suggests the plants could continue to operate reliably. Assuming a longer period of operations would increase avoided CO2 emissions and ratepayer savings. Appendix A provides annual generation, capacity factor, and emissions of Logan and Chambers, as well as the replacement power from PJM. Based on United States Environmental Protection Agency’s estimates, a typical passenger vehicle emits about 4.6 metric tons of CO2 per year. 24 The New Jersey Global Warming Response Act of 2007 (GWRA), N.J.S.A. 26:2C-37. 25 The L&C Retirements direct savings are calculated by dividing the negative of Starwood’s payment of $7.5 million by the avoided net CO2 emissions of 3.9 million tons. 22 23 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 12 Table 4: Ratepayer Savings of the Starwood Offer Logan and Chambers Retirements CO2 Reduction Costs Savings (2021-2024) [1] Logan and Chambers Generation MWh 3,442,426 [2] Logan and Chambers Gross CO2 Emissions ton 5,321,857 [3] Replacement Power CO2 Emissions ton 1,464,017 [4] Avoided Net CO2 Emissions ton 3,857,839 Alternative Reduction Programs NJ ZEC NJ OREC NJ TREC [5] CO2 Emissions Reduction Alternative Program Costs $/ton 23.5 74.7 239.7 [6] CO2 Emissions Reduction Alternative Program Costs $ million 90.7 288.4 924.9 [7] L&C Retirements Proposed Starwood Payment $ million 7.5 7.5 7.5 [8] L&C Retirements Total Ratepayer Savings $ million 98.2 295.9 932.4 [9] L&C Retirements Total Ratepayer Savings $/ton 25.4 76.7 241.7 Note: The total generation, CO2 emissions, and savings are for the period of January 2021 to December 2024 for Logan and to March 2024 for Chambers. The generation levels are based on estimates provided by Starwood and reflect minimum take levels of the PPAs. The CO2 emissions are based on 2019 monthly emission rates. The avoided CO2 emissions are the total CO2 emissions net of replacement power emissions, which are assumed at PJM 2019 average monthly CO2 emission rates. The CO2 emissions costs are based on $/ton costs presented in Figure 3. The total CO2 emissions savings and total ratepayer savings are undiscounted nominal amounts during 2021-2024. Total ratepayer savings in $/ton is calculated by dividing total ratepayer savings (line 8) by avoided CO2 emissions (line 4). Other Benefits Starwood’s offer to retire Logan and Chambers directly supports New Jersey’s plan to transition to 100 percent clean energy by 2050 and to reduce state greenhouse gas emissions 80 percent below 2006 levels by 2050.26 Retiring both coal plants early is economically and environmentally aligned with the interests of New Jersey ratepayers and its economy. These benefits could be further explained in the context of New Jersey’s rejoining of the Regional Greenhouse Gas Initiative (“RGGI”), the intangible benefits of repurposing the sites for potential renewable energy infrastructure development, and the avoidance of externalities associated with the coal value chain.27 RGGI Benefits On June 17, 2019, New Jersey rejoined RGGI, a market-based program of the New England and Mid-Atlantic states to reduce greenhouse gas emissions from the power sector. Based on the “Investment of RGGI Proceeds in 2018” report, the benefits from RGGI investments included energy efficiency, clean and renewable energy, direct bill assistance and greenhouse gas abatement. RGGI investments in 2018 are estimated to return $2 billion in lifetime energy bill savings and avoid 4.6 million tons of CO2 emissions. Logan and Chambers are among the 36 power plants in New Jersey that are currently regulated under RGGI.28 The June 3, 2020 RGGI auction for the 2018-2020 compliance period cleared at $5.75 per ton.29 However, as legacy PURPA assets, Logan and Chambers are subject to CO2 costs that are capped at $2 per ton for MWhs generated under the PPAs.30 Sites Redevelopment Opportunities L&C Retirements will open doors for potential redevelopment opportunities for renewables and/or battery storage projects, especially in light of New Jersey’s mandates of 2.5 GW battery storage by 2035.31 Logan’s waterfront site provides the potential for use as an offshore wind interconnection hub, staging area and/or manufacturing support PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 13 facility. If PJM interconnection capacity at the project nodes is released as a result of the proposed retirements, it may allow offshore wind projects new interconnection points into New Jersey. The potential for use as an offshore wind interconnection hub directly aligns with New Jersey’s goal of having 7.5 GW of OSW in operations by 2035.32 Avoidance of Externalities According to the “Full Cost Accounting for the Life Cycle of Coal” study published by Epstein et al. in 2011, “each stage in the life cycle of coal—extraction, transport, processing, and combustion—generates a waste stream and carries multiple hazards for health and the environment.”33 The study estimated that the externalities, when normalized to a $/MWh of electricity basis, are equivalent to $178.4 per MWh, ranging from $94.2 per MWh to $268.9 per MWh.34 Assuming a conversion rate of 1.105 ton of CO2 per MWh of electricity, the externalities’ costs average $161 per ton.35 These are potential costs to society that are not explicitly captured in the price of electricity. The New Jersey Global Warming Response Act of 2007 (GWRA), N.J.S.A. 26:2C-37. https://www.rggi.org/ 28 The Regional Greenhouse Gas Initiative, “The Investment of RGGI Proceeds in 2018,” https://www.rggi.org/sites/default/files/Uploads/Proceeds/RGGI_Proceeds_Report_2018.pdf. 29 See Regional Greenhouse Gas Initiative, “Auction Results,” https://www.rggi.org/auctions/auction-results (Accessed August 12, 2020). 30 Based on information provided by Starwood. 31 State of New Jersey, 2019 New Jersey Energy Master Plan, page 13. 32 State of New Jersey, 2019 New Jersey Energy Master Plan, https://nj.gov/emp/docs/pdf/2020_NJBPU_EMP.pdf. 33 Paul R. Epstein, Jonathan J. Buonocore, Kevin Eckerle, Michael Hendryx, Benjamin M. Stout III, Richard Heinberg, Richard W. Clapp, Beverly May, Nancy L. Reinhart, Melissa M. Ahern, Samir K. Doshi, and Leslie Glustrom. 2011. Full cost accounting for the life cycle of coal in “Ecological Economics Reviews.” Robert Costanza, Karin Limburg & Ida Kubiszewski, Eds. Ann. N.Y. Acad. Sci. 1219: 73–98. 34 The externalities include land disturbance, methane emissions from mines, carcinogens, public health burden of communities in Appalachia, fatalities in the public due to coal transport, emissions of air pollutants from combustion, lost productivity from mercury emissions, excess mental retardation cases from mercury emissions, excess cardiovascular disease from mercury emissions, climate damage from combustion emissions of CO2, N2O and black carbon. 35 Conversion is derived from EPA resources. https://www.eia.gov/tools/faqs/faq.php?id=74&t=11. 26 27 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 14 Summary Findings Our comparative analysis of Starwood’s proposal to retire Logan and Chambers by the end of 2020 shows compelling attributes in terms of environmental benefits, ratepayer impacts, economic opportunities, and avoidances of externalities, as shown in Figure 4. ■ L&C Retirements would eliminate 5.3 million tons of CO2 emissions at the sources of the power plants during 20212024. This directly supports the state’s goal of cutting CO2 emissions by 80 percent compared to 2006 levels. ■ After factoring in the estimated emissions due to the replacement power from the PJM wholesale market, L&C Retirements would avoid net CO2 emissions of 3.9 million tons by 2024, assuming a flat emission rate at the 2019 PJM system level for the replacement power. This is equivalent to taking 762,419 passenger vehicles off the road for one year in New Jersey. ■ New Jersey ratepayers would benefit from cost savings ranging from $98 million to $932 million by achieving the net CO2 reduction of 3.9 million tons under Starwood’s proposal rather than under alternative programs such as ZEC, OREC, and TRECs. ■ Retiring the coal plants opens the opportunity to explore potential site redevelopment opportunities for solar, battery, or offshore wind interconnections, which are aligned with goals set in New Jersey’s 2019 Energy Master Plan.36 ■ The Starwood offer eliminates other potential externalities that could occur along the coal value chain, but are not explicitly captured in the cost of electricity. Figure 4: Summary of Starwood Offer Impacts Source: FTI analysis 36 State of New Jersey, 2019 Energy Master Plan, https://nj.gov/emp/docs/pdf/2020_NJBPU_EMP.pdf. PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants Appendix A: Logan and Chambers Operations and Emissions Starwood Global - Economic Analysis Logan and Chambers Retirement 2021 2022 2023 2024 Total Notes Logan Production Capacity Factor Emissions Rate Annual Emissions MWh % lb/MWh tons 497,054 25.9% 2,820 700,919 497,054 25.9% 2,820 700,919 497,054 497,054 1,988,216 25.9% 25.9% 25.9% 2,820 2,820 2,820 700,919 700,919 2,803,675 Annual generation during 1/1/2021 - 12/31/2024, provided by Starwood Calculated based on 219 MW capacity Monthly emissions are based on 2019 actual monthly emission / net generation Production * emission rates / 2,000 (lbs/ton), calculated at monthly level Chambers Production Capacity Factor Emissions Rate Annual Emissions MWh % lb/MWh tons 442,529 19.3% 3,488 771,756 442,529 19.3% 3,488 771,756 442,529 126,623 1,454,210 19.3% 22.4% 19.5% 3,488 3,205 3,463 771,756 202,915 2,518,182 Annual generation during 1/1/2021 - 3/31/2024 provided by Starwood Calculated based on 262 MW capacity Monthly emissions are based on 2019 actual monthly emission / net generation Production * emission rates / 2,000 (lbs/ton), calculated at monthly level Total Production Capacity Factor Emissions Rate Annual Emissions MWh % lb/MWh tons Less: Replacement Capacity Production Emissions Rate Annual Emissions MWh lb/MWh tons Net Emissions Impact tons 939,583 939,583 939,583 623,677 3,442,426 22.30% 22.30% 22.30% 25.10% 22.8% 3,135 3,135 3,135 2,898 3,092 1,472,675 1,472,675 1,472,675 903,833 5,321,857 Logan and Chambers total production Calculated at 219 MW for Logan and 262 MW for Chambers Logan and Chambers total emission divided by total production Logan and Chambers total emission 939,583 850 399,090 939,583 850 399,090 939,583 850 399,090 623,677 855 266,748 3,442,426 851 1,464,017 Logan and Chambers total production to be replaced Based on 2019 PJM system average monthly CO2 emission rates Production * Emission Rates / 2,000 (lbs/ton), calculated at monthly level 1,073,585 1,073,585 1,073,585 637,085 3,857,839 Logan and Chambers total emission net of replacement total emissions 15 PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants 16 Appendix B: Summary of Comparative Analysis Starwood Global - Economic Analysis Comparative Analysis Implied Costs NJ ZEC NJ OREC NJ TREC NJ SREC NJ ZEC NJ OREC NJ TREC NJ SREC Notes $/MWh $/MWh $/MWh $/MWh $/ton $/ton $/ton $/ton 10.0 47.4 152.0 211.5 23.5 74.7 296.5 333.6 NJBPU NJBPU’s net cost of OREC at $46.46 (in 2019 dollar), escalated by 2 percent NJBPU NJ SREC weighted average price for Energy Year 2020 (July 2019 - June 2020) NJ ZEC costs are converted from $/MWh to $/ton based on 2019 average PJM CO2 emission rates. NJ OREC cost is converted at the PJM 2019 marginal off-peak emission rate. NJ TREC is converted at the PJM 2019 marginal on-peak emission rate. NJ SREC is converted at the PJM 2019 marginal on-peak emission rate. NJ ZEC Period ZEC Price Nuclear Production Cost to Ratepayers $/MWh MWh $ million 2019-2021 10.0 90,000,000 $900 NJBPU Estimated 3-year total costs, divided by ZEC price Estimated at $300 million per year based on NJBPU award $/MWh MWh $ million 2024-2045 47.4 97,096,239 $6,199 NJBPU’s net cost of OREC at $46.46 (in 2019 dollar), escalated by 2 percent MWh to be delivered under the awarded contract, not including ongoing & future solicitations Net OREC escalated at 2 percent per year $/MWh MWh $ million Energy Year 2021 152 3,428,564 $521 NJBPU NJBPU Assumed same level as NJ SRECs in Energy Year 2020. Total estimated costs for Energy Year 2021. $/MWh MWh $ million Energy Year 2020 211.5 3,428,564 $725 NJ SREC weighted average price for Energy Year 2020 (July 2019 - June 2020) Total traded SRECs in Energy Year 2020 Total SREC costs for Energy Year 2020 NJ OREC Period OREC Price OSW Production Cost to Ratepayers NJ TREC Period TREC Price TREC Volumne Cost to Ratepayers NJ SREC Period SREC Price SREC Volume Cost to Ratepayers PUBLISHED 09/11/2020 – Benefits of Retiring Logan and Chambers Coal-fired Power Plants Glossary Lbs/MWh: pounds per megawatt hour MWh: megawatt hour NJBPU: New Jersey Board of Public Utilities OREC: Offshore Wind Renewable Energy Certificate PPA: Purchase Power Agreement PURPA: Public Utility Regulatory Policies Act REC: Renewable Energy Credit RGGI: Regional Greenhouse Gas Initiative RPS: Renewable Portfolio Standard SREC: Solar Renewable Energy Certificate TREC: Transition Renewable Energy Certificate ZEC: Zero Emission Certificate 17